DSG CSS Consequential Change. 22 nd January 2019

Size: px
Start display at page:

Download "DSG CSS Consequential Change. 22 nd January 2019"

Transcription

1 DSG CSS Consequential Change 22 nd January 2019

2 Agenda Actions from previous meeting Gemini Topics for finalisation: Meter Readings at Transfer Management of Market Participant Data Management of MAP Id against Supply Meter Point High level design options New Topics for discussion: SPA Updates RGMA Meter Sector Code Meter Point Creation Meter Point Status Data Cleansing Update Customer road map

3 CSS Consequential Gemini High Level System Solution Impact Assessment

4 Customers Xoserve Switch can be requested anytime between D-5 and D - Switch is 30 secured with status on D-2 Existing Process Switch Goes Live with status D-2 D-1 D D+1 UKLINK Batch runs at 10 / 11 AM MDS & AAQ File is generated and sent to Gemini File Upload program is run & entries stored in DB MDS / AAQ values 06:00 -> ACT_Number Job 10 mins To generate unique id for new meter id combination received in MDS 11:00 -> Demand Estimation & UIG suite of job run Generate the nominations for D day Cyclic Job runs every 2/3 hours to reflect actual positions based on shipper nomination for DM sites Confirmed Nomination position Allocation Run NDM/UIG CON File Processing (run till close out) Maintenance Window 3 AM to 5 AM Gas Nomination ID received from UK Link Commence Gas Nomination submission for D View initial gas allocation position & UIG portion Finalise Gas nomination position Finalise gas purchases Revised gas allocation & UIG portion

5 Customers Xoserve POST CSS Switch can be requested anytime between D-1 and D - Switch is secured on D-1 Switch Goes D-1 D D+1 Owing to CSS, if the file generation is moved to D-1, consideration is information will be received by 17:30 SAP ISU could take c1.5 hours to update custom tables and generate MDS/AAQ files Gemini will then need to schedule ACT_NUMBER job on receipt of MDS/AAQ file Run the Demand Estimation and UIG suite of jobs Considering concurrency with other jobs (which has potential to overrun as well), infrastructure capacity needs to be assessed 10% increase in To-Be volumes has been considered for MDS/AAQ process Impacts to external stakeholder unknown at this stage 17:30* -> CSS sends the confirmed position at 17:00 Entries made in trigger table Batch run to generate consolidated MDS/AQQ file 20:00* -> ACT_Number Job 10 mins To generate unique id for new meter id combination received in MDS 20:15* -> Demand & UIG suit of job run 45 to 50 min Generate the nominations for D day Will Reflect actual positions based on shipper nomination for DM Confirmed Nomination position Allocation Run NDM/UIG CON File Processing (run till close out) Maintenance Window 3 AM to 5 AM All timings are indicative and need further analysis Gas Nomination ID received from UK Link from ~20:00 hours Commence Gas Nomination submission for D View initial gas allocation position & UIG portion after 20:15 hours Finalise Gas nomination position Finalise gas purchases Revised gas allocation & UIG portion

6 CSS Consequential Gemini Change Overview Currently Gemini receives all the Portfolio updates on D-2 from SAP ISU on a daily basis via MDS/AAQ files. As part of this change, Gemini will receive the changes for switching data effective on D day on D-1 evening post CSS gate closure. Solution Options 1 Gemini to receive Portfolio updates on D-2 and D-1 for effective D day 2 Gemini to receive Portfolio updates on D-1 for effective D day

7 Current Functionality : Gemini Gemini : As-Is Design Gemini receives all the Portfolio updates based on the below triggers on D-2 with effective date as D day from SAP ISU on a daily basis via MDS/AAQ files - o Class Change o AQ-Correction o SOQ Change Through Contract Change o Withdrawal Process o Isolation o Registration Process o Address Change (CMS) o Post Code Change Through Internal Screens o Site Takeover Process o EUC Change o SMP AQ Monthly Calculations o RATCHET o SOLR o Reconnection o SMP Exit Zone change for IGT site The NTS / LDZ Unique sites are been manually created by Business (received as Worki tem from SAP ISU) via online screen on D-2 (Business days). Activity Number for active DM meter types are created by Shipper via online screen or system generated. Shipper do place DM nominations within a window i.e. D-35 05:00 to D-1 12:00 for gas flow D day via online screen / API / interfaces. Activity Number for NDM / UG meter types are created by the system on D-1 06:00 DM Nomination are being estimated on D-1 at 08:00 for active DM meter ids in case they are not present in the system. Shipper can re-nominate for DM meter types within a window D-1 14:00 to D 04:59. NDM / UG Nominations for D and D+1 are been calculated in the system using the AQ values, DM Nominations and Weather values Gemini sends the data to internal & NG systems on scheduled times on a daily basis.

8 Option 1 Gemini to receive Portfolio updates on D-2 and D-1 for effective D day 1 Triggers for Changes on D-2 Class Change AQ- Correction SOQ Change through Contract Change Process on D-2 Triggers for Process on D-1 Changes on D-1 System Generates Activity numbers [DM/ NDM /UG Meters] Registration process Withdrawal process System Generates Activity numbers [DM/ NDM /UG Meters] Isolation Address Change Post Code Change through Internal screen Site Takeover Process EUC Change SMP AQ Monthly calculation Ratchet SOLR Reconnection SMP Exit Zone change for IGT site Shippers can nominate / re-nominate for DM meters on D-2 for any new / existing meter id for the ones triggered as part of D-2 updates. In case of no DM Nomination for any active meter id, the estimation will run on D-1 at 800 hour bar for the NDM / UG nomination process The NDM / UG Nomination run for D day will be triggered on D-1 as in with the data present in the system Estimation will run for the missing DM Re-Nomination for the active meter id The NDM / UG Nomination run for D day will be triggered on D-1 as in with the data present in the system

9 Option 1 - High Level Impact Assessment 1 Impacted Systems Impact Gemini Marketflow SAP PO SAP ISU API SAP BW CMS DES Assumptions MDS/AAQ files needs to be received and loaded before D-1 midnight, however a tool will be built to correct the data. No scheduling changes will be made for NDM & UG Nomination / Allocation / Invoicing suite No changes required in pre / post closeout processes in Gemini For Gas Year change, MDS/AAQ files will be loaded on D-2 and any changes can be updated on D-1 Last Sync message will be received from CSS by 6:00 pm Pros DM Nominations will be applicable for 13 triggers received on D-2 updates within its timelines Cons Technically complex for Gemini to handle 2 files loading D+1 and D updates sequentially on D-1 Overall Impact Incorrect mapping will be present for Future dates i.e. D+1 while D will contain the corrected record which will leads to incorrect NDM/UG Nominations Medium

10 Option 1 - System Impact Assessment 1 System Component: Development Type: Impacted User(s): Build Type: Gemini Process Code Code Change / Scheduling Shippers Existing SAP ISU Process Code Code Change Gemini Existing Change Description: System will be amended to load the D-2 and D-1 updates in Gemini followed by creation of activity number and estimation process. Code Changes will be done to send the 13 triggered on D-2 and rest 2 in D-1. Requirement Clarity: Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: A A G G A A A A A G G A A A

11 Option 1 - Process Impact Assessment 1 Process Area Complexity File Formats Exception External Screens Batch Jobs Performance Test? Meter Details M N n/a N Y Y Nomination / Renomination M N n/a N N Y Gas Trades n/a n/a n/a n/a n/a n/a Measurements n/a n/a n/a n/a n/a N Allocation n/a n/a n/a n/a n/a Y Invoicing n/a n/a n/a n/a n/a Y Interfaces M N n/a n/a Y Y External System M N n/a n/a N Y API n/a n/a n/a n/a n/a N

12 Option 2 Gemini to receive Portfolio updates on D-1 for effective D day 2 Triggers for Changes on D-1 Class Change AQ- Correction SOQ Change through Contract Change Process on D-1 System Generates Activity numbers [DM/ NDM /UG Meters] Isolation Address Change Post Code Change through Internal screen Site Takeover Process EUC Change Estimation will run for the missing DM Re-Nomination for the active meter id SMP AQ Monthly calculation Ratchet SOLR Reconnection SMP Exit Zone change for IGT site NDM / UG Nomination run for D day will be triggered on D-1 as in with the data present in the system Registration process Withdrawal process

13 Option 2 - High Level Impact Assessment 2 Impacted Systems Impact Gemini Marketflow SAP PO SAP ISU API SAP BW CMS DES Assumptions MDS/AAQ files needs to be received and loaded before D-1 midnight, however a tool will be built to correct the data. No scheduling changes will be made for NDM & UG Nomination / Allocation / Invoicing suite No changes required in pre / post closeout processes in Gemini For Gas Year change, MDS/AAQ files will be loaded on D-2 and any changes can be updated on D-1 Last Sync message will be received from CSS by 6:00 pm Pros Technically less complex for Gemini to handle 1 file loading D updates on D-1 Correct records will be stored in the system across for all the processes Overall Impact Medium Cons Nominations cannot be submitted by the shippers for all DM meter ids received in the file UG Nominations will be calculated based on the DM Nomination estimates and AQ present in the system NDM Nominations will be calculated based on the AQ values present at that time in the system

14 Option 2 - System Impact Assessment 2 System Component: Development Type: Gemini Process Code Code Change / Scheduling SAP ISU Process Code Code Change Impacted User(s): Build Type: Shippers Existing Gemini Existing Change Description: System will be amended to load the D-1 updates in Gemini followed by creation of activity number and estimation process. Code Changes will be done to send the updates to D-1. Requirement Clarity: Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: A G G G A A A A G G G A A A

15 Option 2 - Process Impact Assessment 2 Process Area Complexity File Formats Exception External Screens Batch Jobs Performance Test? Meter Details L N n/a N Y Y Nomination / Renomination M N n/a N N Y Gas Trades n/a n/a n/a n/a n/a n/a Measurements n/a n/a n/a n/a n/a n/a Allocation n/a n/a n/a n/a n/a Y Invoicing n/a n/a n/a n/a n/a Y Interfaces L N N N Y Y External System M N n/a n/a N Y API n/a n/a n/a n/a n/a n/a

16 Additional Design Considerations MDS/AAQ files received post midnight on D-1 will fail to load in Gemini. A tool may have to be built to load the data for any rejections or failures to avoid mismatches. DM Re-nomination timelines will be reduced for the D-1 updates for effective date D. The timelines will be applicable post loading of the files till D However, re-nominations can be placed by the shippers considering the lead time (2 hours from the request) and flow rate validation If the Shipper doesn t make a Re-nomination for the Day irrespective of the Estimated DM Nominations perceived to be an accurate reflection of the usage for the D day, for the purpose only of determining the Scheduling Charges the nominated quantity shall deemed to be zero (as is) Data and process impacts to other systems MIS, GCS, MIPI, IAP, SAP BW to be assessed Changes to NTS / LDZ Unique sites work items that are manually created on D-2 needs to be discussed

17 Topics for finalisation Meter Readings at Transfer Management of Market Participant Data Management of MAP Id against Supply Meter Point

18 CSS Impact Assessment Switching Processes High Level System Solution Impact Assessment

19 CSS Consequential UK Link High Level System Solution Impact Assessment

20 Contents Overall Assumptions Solution options for CSSC Category 1 requirements (Excluding Gemini, DES and BW impact) Nomination Enquiry Nomination Process Shipper Transportation Rates Settlement Details (aka Shell Record) Change of Supplier Change of Shipper Only Forced / Auto Confirmation Shipper Withdrawal

21 Overall Assumptions For high level design all interactions between CSS Provider and UKLink will be via Marketflow through IX and EFT All NTS sites are out of scope for CSS and hence, will continue to operate as is (BAU) Batch schedules need to be revisited as part of detail design to accommodate the faster switching timelines Shipper File formats impacted by CSS consequential need to be revisited and might require system changes The proposed solution options may change due to refinement and further changes to CSSC requirements and considerations during Detail design phase APIs are being considered as part of the solution options

22 Nomination Enquiry

23 Change Overview Nomination Enquiry UK Link will still allow for a proposing shipper to submit a Nomination Enquiry Request (NOM - S47) independent to a CSS switch to enable them to obtain the current values of Supply Meter Point. Solution Options 1 Nomination Enquiry will continue As Is 2 Nomination Enquiry via new API service and the existing file 3 Nomination Enquiry via a new API only

24 Option 1 - High Level Impact Assessment 1 1. Nomination Enquiry will continue As Is Nomination Enquiry will continue As Is via the file received from the Shippers. UK Link will allow the proposing Shipper to submit current S47 segment to obtain the Supply Meter Point details. All the current validations will be applied on S47 segment. Potential changes to file format with respect to withdrawal flag sent in the response (S59 segment) are anticipated. Impacted Systems Impact Gemini Assumptions All current Nomination Enquiry validations will continue to be applied Batch processing schedule might change Marketflow SAP PO SAP ISU CMS API SAP BW DES Overall Impact No Impacts

25 Option 1 - System Impact Assessment 1 SAP ISU SAP PO Marketflow System Component: Development Type: Impacted User(s): Build Type: SPA File Formats File Formats Code change Configuration Change Configuration Change Shippers Shippers Shippers Existing Existing Existing Change Description: Code changes will be done related to withdrawal flag File format change with respect to withdrawal flag File format change with respect to withdrawal flag Requirement Clarity: Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: G G G G G G G G G G G G G G G G G G G G G Performance Impact:

26 Option 1 - Process Impact Assessment 1 Process Area Complexity File Formats Exceptions External Screens Batch Jobs Performance Test? SPA L Y N N Y N Metering (Reads) n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Reconciliation n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Capacity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Commodity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Amendment n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Other n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Rolling AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Formula Year AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N

27 Option 2 - High Level Impact Assessment 2 2. Nomination Enquiry Process via new API service or existing File Nomination Enquiry process will be received via new API service or existing File. Shippers can send the enquiry file via API or can send the same way as they are doing today. UK Link will allow the proposing Shipper to submit S47 segment to obtain the Supply Meter Point details. All the current validations will be applied on S47 segment. Potential changes to file format with respect to withdrawal flag sent in the response (S64 segment) are anticipated. Impacted Systems Impact Gemini Marketflow SAP PO SAP ISU CMS Assumptions Existing business rules will be applied around enquiry via new API service. Data elements for the new API service will mirror the existing file All current Nomination Enquiry validations will continue existing file interface. API SAP BW DES Overall Impact Medium

28 Option 2 - System Impact Assessment 2 SAP ISU SAP PO Marketflow API System Component: Development Type: Impacted User(s): Build Type: Process Code Configuration & File Formats File Formats Configuration Code Change Configuration Change Configuration Change Configuration Change Shippers Shippers Shippers Shippers New New Existing New Change Description: Requirement Clarity: New Interface to be built for Nomination Enquiry via API New interface to be built in order to receive the Nomination Enquiry file via API. File format change with respect to withdrawal flag File format change with respect to withdrawal flag New interface to be built in order to receive the Nomination Enquiry. Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: Performance Impact: A A G A G G G G A A G A A A G A A A G A G G G G A A G A

29 Option 2 - Process Impact Assessment 2 Process Area Complexity File Formats Exceptions External Screens Batch Jobs Performance Test? SPA M Y N N N N Metering (Reads) n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Reconciliation n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Capacity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Commodity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Amendment n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Other n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Rolling AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Formula Year AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N

30 Option 3 - High Level Impact Assessment 3 2. Nomination Enquiry Process via new API service or existing File Nomination Enquiry process will be received via new API service which will mirror the current enquiry file. Impacted Systems Impact Gemini Assumptions Existing business rules will be applied around enquiry via new API service. Data elements for the new API service will mirror the existing file Marketflow SAP PO SAP ISU CMS API SAP BW DES Overall Impact Medium

31 Option 3 - System Impact Assessment 3 SAP ISU SAP PO API System Component: Development Type: Impacted User(s): Build Type: Process Code Configuration & File Formats Configuration Code Change Configuration Change Configuration Change Shippers Shippers Shippers New New New Change Description: Requirement Clarity: New Interface to be built for Nomination Enquiry via API New interface to be built in order to receive the Nomination Enquiry file via API. File format change with respect to withdrawal flag New interface to be built in order to receive the Nomination Enquiry. Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: Performance Impact: G G G G G G

32 Option 3 - Process Impact Assessment 3 Process Area Complexity File Formats Exceptions External Screens Batch Jobs Performance Test? SPA M N N N N N Metering (Reads) n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Reconciliation n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Capacity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Commodity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Amendment n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Other n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Rolling AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Formula Year AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N

33 Nomination Process

34 Nomination Process Change Overview Currently UK Link requires the proposing (or current registered) shipper to submit a Nomination Request (NOM) to obtain details of the Transportation charges, to support Network referrals and for changes to Class, batch frequency or MRF on the MPRN for the large competitive supply meter points where AQ is greater than 73,200. Post CSS, a version of the Nomination request from a proposing or registered shipper for any large supply meter points will used to support the Network appraisal (referrals). Switching can still take place through CSS without a nomination being submitted. Solution Options 1 Nomination Process

35 Option 1 - High Level Impact Assessment 1 1. Nomination Process UK Link will still need to allow for a proposing (or current registered) shipper to submit a Nomination Request (NOM) independent of a switch request to enable the transporter to assess the impact on the changes where necessary. Potential changes to File format with respect to withdrawal flag sent in the Nomination offer (S64 segment) are anticipated. Impacted Systems Impact Gemini Marketflow SAP PO SAP ISU API SAP BW CMS DES Assumptions No Impacts to Nomination cancellation process UK Link will send the relevant notifications to the DMSPs(GCC file) that is currently issued at Nomination. A Shipper can still send multiple Nomination request. All Nomination validations will continue to be As Is. Batch processing schedule might change Overall Impact Low

36 Option 1 - System Impact Assessment 1 SAP ISU SAP PO Marketflow System Component: Development Type: Impacted User(s): Build Type: SPA File Formats File Formats Code change Configuration Change Configuration Change Shippers Shippers Shippers Existing Existing Existing Change Description: Code changes will be done related to withdrawal flag File format change with respect to withdrawal flag File format change with respect to withdrawal flag Requirement Clarity: Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: G G G G G G G G G G G G G G G G G G G G G Performance Impact:

37 Option 1 - Process Impact Assessment 1 Process Area Complexity File Formats Exceptions External Screens Batch Jobs Performance Test? SPA L Y N N Y N Metering (Reads) n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Reconciliation n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Capacity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Commodity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Amendment n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Other n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Rolling AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Formula Year AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N

38 Shipper Transportation Rates

39 Shipper Transportation Charges Change Overview Shipper users will be able to access transportation charges, this will be an extract of existing transportation rates. If shipper needs any specific rate with respect to change of Class, MRF, batch frequency and any referrals, the Shipper must correct process in order to obtain an offer. Shippers will query transportation rate via a new API Service. Validation rules will be build within UK Link to restrict the invalid requests. This services will only provide data for transportation rates for Large supply meter points Solution Options 1 Transportation rate extract to shippers via new API Service (Supporting multiple MPRNs)

40 Option 1 - High Level Impact Assessment 1 1- Transportation rate extract to shippers via new API Service (Supporting multiple MPRNs) Shipper API service will be designed to provide facility to extract current transportation rate values. This service will enable Shippers to query data from UK Link for multiple MPRNs. Impacted Systems Impact Gemini Marketflow SAP PO SAP ISU API SAP BW CMS DES Assumptions Any shipper can request for transportation rate data for LSP sites even if the site is outside of their portfolio Existing business rules will be applied around querying transportation rate data through API service route(nomination Request Equivalent ) Any changes to existing MRF, Batch, Class, Capacity will still be received via Nomination request Real time transportation rates will be provided without validity period and are subjected to change based on existing business rules Overall Impact Medium

41 Option 1 - System Impact Assessment 1 SAP ISU SAP PO API System Component: Process Code Configuration Configuration Development Type: Impacted User(s): Build Type: Code Change Configuration code Configuration Code Shippers Shippers Shippers New Service for Shippers New Service for Shippers New Service for Shippers Change Description: Code development to fetch real time transportation rate data System to make the configuration to pass Data to Shipper API System to make the configuration for API to send data to Shippers Requirement Clarity: Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: G G G G G G G G G Performance Impact:

42 Option 1 - Process Impact Assessment 1 Process Area Complexity File Formats Exceptions External Screens Batch Jobs Performance Test? SPA M N N N N Y Metering (Reads) n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Reconciliation n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Capacity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Commodity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Amendment n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Other n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Rolling AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Formula Year AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N

43 Settlement Details (AKA Shell Record)

44 Settlement details (AKA shell record) Change Overview Shippers will continue to provide and maintain the settlement details that are required in UK Link for the Supplier/Shipper's registration period. Details provided by a shipper as part of the current confirmation process that are not provided to UK Link via the CSS Registration Synchronization message, can be provided by the shipper to ensure the relevant settlement details are applied from the shipper's confirmation effective date. This will include items such Class, Meter Read Frequency, SOQ/SHQ, Contact details etc. Where a shipper have provided any settlement details, they will be linked to the CSS switch and applied on the effective date of the switch. Incase of no details provided, default values will be applied based on the rules defined. Solution Options 1 New Batch interface and response for Settlement details (AKA Shell record)

45 Option 1 - High Level Impact Assessment 1 1- New Batch interface for Settlement details (AKA Shell record) As part of the solution, two new file based interfaces will be built Interface 1: to receive the settlement details from shippers via Marketflow and Interface 2: to send the responses back to shippers via Marketflow. In case of multiple settlement details being sent the latest valid data will be applied when the secured sync message is received from CSS. In case of no settlement details received from shipper when the secured sync is received, default settlement details will be applied based on the rules defined. Settlement details will be validated on receipt and re-validated when switch is secured; response will be sent to shipper only if validation fails (Rejection). Matching / linking will be based on MPRN, Shipper and Supplier, and if provided the CSS Registration Identifier. Impacted Systems Impact Gemini Marketflow SAP PO SAP ISU API SAP BW Overall Impact Medium CMS DES Assumptions If settlement details has transporter Nomination reference, offer data will take precedence in calculation of transportation rates. If no settlement details are received by UK Link from shipper, offer details will not be applied. Proposal for 3:00 PM cut off to receive settlement details. Rules for the application of settlement details will be defined for all the possible switching scenarios and site types. Settlement details may be received after switch Validation (VL), hence the notification will have rates calculated based on default values which are subjected to change till the status is changed to Secured (SC). Latest Valid settlement details received will be applied when switch is secured. File Formats and Validity Period of Settlement details will be received before DD Phase.

46 Option 1 - System Impact Assessment 1 System Component: Development Type: Impacted User(s): Build Type: SAP ISU SAP PO Marketflow SPA Configuration Configuration Code Change Configuration code Configuration Code Shippers Shippers Shippers 2 New Interfaces for Shippers 2 New Interfaces for Shippers 2 New Interfaces for Shippers Change Description: 2 new interfaces will be built Interface 1 - To receive the settlement details(aka shell record) Interface 2 - To send the response to shippers System will be configured to cater the 2 new interfaces between ISU and marketflow System will be configured to cater the 2 new interfaces between ISU and marketflow Requirement Clarity: Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: Performance Impact: A G A G G G G G G

47 Option 1 - Process Impact Assessment 1 Process Area Complexity File Formats Exceptions External Screens Batch Jobs Performance Test? SPA M Y N N Y Y Metering (Reads) n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Reconciliation n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Capacity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Commodity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Amendment n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Other n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Rolling AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Formula Year AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N

48 Change of Supplier (with or without change of Shipper)

49 Supplier Switching Solution Options Change Overview Currently any changes to the supplier are received via GEA or Reconfirmation process by shippers to UKLink. Post CSS implementation, the supplier switching process will be mastered by CSS. This will include below requests from CSS: Change of Supplier with same shipper Change of Supplier with different shipper UK Link will receive notifications from the CSS as part of Registration Sync message to advise of the current status of Supplier switches once they have been successfully Validated, Confirmed and Secured. However, on receipt of Registration sync from the CSS, UKLink is expected to perform high level validations (e.g. MPRN, Org ID etc.) and notify response to CSS in case of failures/warnings as new interface. UK Link will record the incoming Shipper and Supplier details and is expected to notify. Gaining shipper following the receipt of validated (VL) sync message (Current world equivalent of CFR) Gaining and Losing shippers(ceased Responsibility) following receipt of Secured (SC) sync (Current world equivalent TRF, MRI & PAC) i Registration Sync for VL Status 1a 2a Minimum changes to existing CFR File New interface for Gaining shipper notification Registration Sync for SC Status 1b 2b Minimum changes to existing TRF, MRI & PAC Files New Interface to combine existing files and remove redundant information

50 Option 1 - High Level Impact Assessment 1a 1. Registration Sync for VL Status - Minimum changes to existing CFR File New Registration Sync interface will be build to notify any switching triggers from CSS system to ISU via Marketflow. Marketflow is expected to generate a delivery receipt acknowledgment to CSS on receipt of these sync messages. Once received at ISU, validations will be performed to verify the Registration sync messages and in case of failures, rejection response will be sent via new interface to notify CSS If Validation is successful, switch will be created with VL status in ISU and gaining shipper will be notified in CFR file Minimum changes to existing CFR file format to include the settlement data details if received or default values that will be applied. Impacted Systems Impact Gemini Marketflow SAP PO SAP ISU API SAP BW CMS DES Assumptions CNF will no longer be used to receive a switch request except for NTS sites. If received it will be rejected Supplier sync without shipper change will be treated as reconfirmation process If no settlement details received, CFR will be sent with data based on agreed default values Registration sync will be validated at ISU, if failed, rejection will be notified to CSS (VL) and gaining shipper will not be notified Losing shipper will not be notified on validated sync Overall Impact High

51 Option 1 - System Impact Assessment 1a SAP ISU SAP PO Marketflow System Component: Development Type: Impacted User(s): SPA Configuration Configuration Code Change Configuration Change Configuration Change Shippers & CSS Provider Shippers & CSS Provider Shippers & CSS Provider Build Type: 1- Existing for Shippers 2- New for CSS provider 1- Existing for Shippers 2- New for CSS provider 1- Existing for Shippers 2- New for CSS provider Change Description: 1. New Interface to receive Supplier Switch 2. New Interface to reject the invalid Sync 3. CFR to gaining shipper with minimum File format changes 1. System to be configured to cater to 2 new interface 2.Change to existing interface between ISU and marketflow 1. System to be configured to cater to 2 new interface 2.change to existing interface between ISU and marketflow Requirement Clarity: Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: Performance Impact:

52 Option 1 - Process Impact Assessment 1a Process Area Complexity File Formats Exceptions External Screens Batch Jobs Performance Test? SPA H Y Y N Y Y Metering (Reads) n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Reconciliation n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Capacity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Commodity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Amendment n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Other n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Rolling AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Formula Year AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N

53 Option 2 - High Level Impact Assessment 2a 2. Registration Sync for VL Status - New interface for Gaining shipper notification New Registration Sync interface will be build to notify any switching triggers from CSS system to ISU via Marketflow Marketflow is expected to generate a delivery receipt acknowledgment to CSS on receipt of these sync messages Once received at ISU, validations will be performed to verify the Registration sync messages and in case of failures, rejection response will be sent via new interface to notify CSS If Validation is successful, switch will be created with VL status in ISU and gaining shipper will be notified in new file format which will include settlement details if received or default values that will be applied. Impacted Systems Impact Gemini Marketflow SAP PO SAP ISU API SAP BW Overall Impact High CMS DES Assumptions CNF will no longer be used to receive a switch request except for NTS sites. If received will be rejected Supplier sync without shipper change will be treated as reconfirmation process If no settlement details received, new interface will be sent based on agreed default values Registration sync will be validated at ISU, if failed, rejection will be notified to CSS (VL) Losing shipper will not be notified on validated sync Objection/Annulment window will be managed by CSS

54 Option 2 - System Impact Assessment 2a SAP ISU SAP PO Marketflow System Component: SPA Configuration Configuration Development Type: Code Change Configuration Change Configuration Change Impacted User(s): Shippers & CSS Provider Shippers & CSS Provider Shippers & CSS Provider Build Type: 3 New Interfaces (2- CSS Provider, 1-Shipper) 3 New Interfaces (2- CSS Provider, 1-Shipper) 3 New Interfaces (2- CSS Provider, 1-Shipper) Change Description: 1. New Interface to receive Supplier Switch sync 2. New Interface to reject the invalid Sync 3. New interface to gaining shipper on Validated sync 1. System to be configured to cater to 3 new interface between ISU and Marketflow 1. System to be configured to cater to 3 new interface between ISU and Marketflow Requirement Clarity: Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: Performance Impact:

55 Option 2 - Process Impact Assessment 2a Process Area Complexity File Formats Exceptions External Screens Batch Jobs Performance Test? SPA H Y Y N Y Y Metering (Reads) n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Reconciliation n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Capacity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Commodity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Amendment n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Other n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Rolling AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Formula Year AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N

56 Option 1 - High Level Impact Assessment 1b 1. Registration Sync for SC Status - Minimum changes to existing TRF, MRI & PAC Files Registration Sync interface will be built to notify any switching triggers from CSS system to ISU via Marketflow Marketflow is expected to generate a delivery receipt acknowledgment to CSS on receipt of these sync messages Once received at ISU, validations will be performed to verify the Registration sync messages and in case of failures, rejection response will be sent via new interface to notify CSS Irrespective of warning notification, switch will be updated to Secured status in ISU and gaining shipper will be notified with minimum changes in existing files (TRF/MRI/PAC) to accommodate settlement details and losing shipper will be notified in TRF file with ceased responsibility Impacted Systems Impact Gemini Marketflow SAP PO SAP ISU API SAP BW CMS DES Assumptions Last sync message from CSS will be received by 18:00 hrs Registration sync will be validated in ISU, if failed, warning will be issued to CSS (SC) with rejection but switch will go live UK Link will receive the sync messages in sequence and will process in batches Batch schedule need to be reviewed Transportation rates derived based on defaults will be sent if settlement data is not received by shipper or rejected on re-validation at the time of secured Overall Impact High

57 Option 1 - System Impact Assessment SAP ISU SAP PO Marketflow 1b System Component: SPA Configuration Configuration Development Type: Impacted User(s): Code Change Configuration Change Configuration Change Shippers & CSS Provider Shippers & CSS Provider Shippers & CSS Provider Build Type: 2 - Existing to Shippers 2 - New for CSS Provider 2 - Existing to Shippers 2 - New for CSS Provider 2 - Existing to Shippers 2 - New for CSS Provider Change Description: Requirement Clarity: 1. New Interface to receive Supplier Switch sync 2. New Interface to send warning for the invalid Sync 3. TRF/MRI to gaining shipper with minimum File format changes 4. TRF to Losing Shipper (AS IS) 1. System to be configured to cater to 2 new interface 2. Change to existing interface between ISU and marketflow 3. TRF to losing shipper (AS IS) 1. System to be configured to cater to 1 new interface 2.Change to existing interface between ISU and marketflow 3. TRF to losing shipper (AS IS) Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: Performance Impact:

58 Option 1 - Process Impact Assessment 1b Process Area Complexity File Formats Exceptions External Screens Batch Jobs Performance Test? SPA H Y Y N Y Y Metering (Reads) n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Reconciliation n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Capacity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Commodity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Amendment n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Other n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Rolling AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Formula Year AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N

59 Option 2 - High Level Impact Assessment 2b 2. Registration Sync for SC Status - New Interface to combine existing files and remove redundant information Registration Sync interface will be built to notify any switching triggers from CSS system to ISU via Marketflow. Marketflow is expected to generate a delivery receipt acknowledgment to CSS on receipt of these sync messages. Once received at ISU, validations will be performed to verify the Registration sync messages and in case of failures, rejection response will be sent via new interface to notify CSS Irrespective of warning notification, switch document will be updated to Secured status in ISU and New File format will be developed to combine the notifications sent to gaining shipper for TRF/MRI/PAC files along with details for settlement details and losing shipper will be notified in TRF file with ceased responsibility Impacted Systems Impact Marketflow SAP PO SAP ISU API Gemini SAP BW CMS DES Assumptions Last sync message from CSS will be received no later than 18:00 hrs Registration sync will be validated at ISU, if failed, warning will be issued to CSS (SC) with rejection but switch will go live UKLink will receive the sync messages in sequence and processes these in batches Batch schedule need to be reviewed Transportation rates will be derived based on default values if settlement details are not received by shipper or rejected on re-validation at the time of secured Overall Impact High

60 Option 2 - System Impact Assessment 2b SAP ISU SAP PO Marketflow System Component: Development Type: SPA Configuration Configuration Code Change Configuration Change Configuration Change Shippers & CSS Provider Shippers & CSS Provider Shippers & CSS Provider Impacted User(s): Build Type: 1 Existing to Shippers 1 New FF for shippers 2 New for CSS Provider 1 Existing to Shippers 1 New FF for shippers 2 New for CSS Provider 1 Existing to Shippers 1 New FF for shippers 2 New for CSS Provider Change Description: 1. New Interface to receive Supplier Switch secured sync 2. New Interface to send warning for the invalid Sync 3. New File format to club the proposing shipper notification. 4. TRF to Losing Shipper (AS IS) 1. System to be configured to cater to 2 new interfaces between CSS and ISU 2. New File format to club the proposing shipper notification 3. TRF to losing shipper (AS IS) System to be configured to cater to 2 new interfaces between CSS and ISU 2. New File format to club the proposing shipper notification 3. TRF to losing shipper (AS IS) Requirement Clarity: Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: Performance Impact:

61 Option 2 - Process Impact Assessment 2b Process Area Complexity File Formats Exceptions External Screens Batch Jobs Performance Test? SPA H Y Y N Y Y Metering (Reads) n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Reconciliation n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Capacity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Commodity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Amendment n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Other n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Rolling AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Formula Year AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N

62 Change of Shipper Only

63 Change of Shipper Only Change Overview Currently, shipper submits the shipper transfer request via Confirmation process to UKLink whereas post CSS implementation, CSS will initiate Change of Shipper Event Sync to UKLink with no change in supplier details and below changes will be considered: Where the energy supplier makes a change to the Shipper associated to their registration via the CSS process, then a synchronization message will be received via Registration Sync by UK Link to update this data This is an update/event for CSS and hence, validated, confirmed and secured sync messages will not be received from CSS On receipt of Registration sync from the CSS, UKLink is expected to perform high level validations (e.g.. MPRN, Org ID etc.) and notify response to CSS in case of failures/warnings as new interface UKLink will treat this as a existing shipper transfer process and expected to notify gaining shipper on receipt and after the gate closure whereas losing shipper will be notified of ceased responsibility. Solution CSS can Options: cancel a futuristic change of shipper request with a synchronization message to UK Link to notifying it of the cancellation. ilenotifications on Receipt of Change of Shipper Event Sync 1a 2a Minimum changes to existing CFR File New interface for Gaining shipper notification Notifications post Gate Closure on D-1 1b 2b Minimum changes to existing TRF, MRI & PAC Files New Interface to combine existing files and remove redundant information

64 Option 1 - High Level Impact Assessment 1a 1. Notifications on Receipt of Change of Shipper Event Sync - Minimum changes to existing CFR File New Registration Sync interface will be build to notify any switching triggers from CSS system to ISU via Marketflow Marketflow is expected to generate a delivery receipt acknowledgment to CSS on receipt of these sync messages Once received at ISU, validations will be performed to verify the Registration sync messages and in case of failures, rejection response will be sent via new interface to notify CSS If Validation is successful, switch will be created for effective date and gaining shipper will be notified in CFR file with minimum changes to existing file format to include the settlement details if received or defaults that will be applied. Impacted Systems Impact Gemini Marketflow SAP PO SAP ISU API SAP BW Overall Impact High CMS DES Assumptions CNF will no longer be used to receive a switch request except for NTS sites. If received will be rejected Offer will not be mandatory for LSP sites GEA file will not be used for Supplier changes If no settlement data received, CFR will be sent with transportation rates derived based on default values Registration sync will be validated at ISU, if failed, rejection will be notified to CSS Losing shipper will not be notified on receipt of change of shipper only sync Change of Shipper cancellation sync will be received before gate closure

65 Option 1 - System Impact Assessment 1a SAP ISU SAP PO Marketflow System Component: Development Type: Impacted User(s): Build Type: SPA Configuration Configuration Code Change Configuration Change Configuration Change Shippers & CSS Provider Shippers & CSS Provider Shippers & CSS Provider 1-Existing for Shippers 2- New for CSS provider 1-Existing for Shippers 2- New for CSS provider 1-Existing for Shippers 2- New for CSS provider Change Description: 1. New Interface to receive change of shipper sync 2. New Interface to reject the invalid Sync 3. CFR to gaining shipper with minimum File format changes 1. System to be configured to cater to 2 new interface 2.Change to existing interface between ISU and marketflow 1. System to be configured to cater to 2 new interface 2.change to existing interface between ISU and marketflow Requirement Clarity: Change Complexity: Integration Complexity: Test Data Prep Complexity: Test Execution: Regression Testing Impact: Performance Impact:

66 Option 1 - Process Impact Assessment 1a Process Area Complexity File Formats Exceptions External Screens Batch Jobs Performance Test? SPA H Y Y N Y Y Metering (Reads) n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Reconciliation n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Capacity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Commodity n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Amendment n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Invoicing Other n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Rolling AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N Formula Year AQ n/a / H / M / L n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N n/a / Y / N

Network Transmission System Gas Supply Emergency / Gas SCR Overview

Network Transmission System Gas Supply Emergency / Gas SCR Overview Network Transmission System Gas Supply Emergency / Gas SCR Overview Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size

More information

Meter Data Distribution Market Trials

Meter Data Distribution Market Trials Meter Data Distribution Market Trials IESO Response to Participant Feedback Issue Date: June 5, 2015 Public Copyright 2015 Independent Electricity System Operator. All rights reserved. Public Page 2 of

More information

Meter Data Distribution User Manual

Meter Data Distribution User Manual 0.1 Meter Data Distribution User Manual February 2016 Public Copyright 2015 Independent Electricity System Operator. All rights reserved. Public Page 2 of 24 Table of Contents Contents 1. Overview... 4

More information

Winter Annual Ratio (WAR) bands

Winter Annual Ratio (WAR) bands Winter Annual Ratio (WAR) bands p It is mandatory for supply points with an annual consumption >293 MWh to be monthly-read. p For NDM monthly-read sites where the relevant meter reading history is available,

More information

[XACT INTEGRATION] The Race Director. Xact Integration

[XACT INTEGRATION] The Race Director. Xact Integration 2018 The Race Director Xact Integration [XACT INTEGRATION] This document describes the steps in using the direct integration that has been built between Race Director and Xact. There are three primary

More information

A Shipper s Guide to TOG Contacts and the Use of Conquest, Xoserve s Query Management System.

A Shipper s Guide to TOG Contacts and the Use of Conquest, Xoserve s Query Management System. A Shipper s Guide to TOG Contacts and the Use of Conquest, Xoserve s Query Management System. Including Brief Guidelines on Shipper Responsibilities With Regards to Theft of Gas Detection and Prevention.

More information

The Wincanton Supplier Trading Process. Detailed Guidance Notes PO Transactions

The Wincanton Supplier Trading Process. Detailed Guidance Notes PO Transactions The Wincanton Supplier Trading Process Detailed Guidance Notes PO Transactions Detailed Guidance Notes PO Transactions 1. Introduction Wincanton operates standardised back office procedures to deliver

More information

Network Transmission System Gas Supply Emergency / Gas SCR Overview. Jenny Phillips

Network Transmission System Gas Supply Emergency / Gas SCR Overview. Jenny Phillips Network Transmission System Gas Supply Emergency / Gas SCR Overview Jenny Phillips Agenda 1.What is a Network Gas Supply Emergency 2.Classifications of Network Gas Supply Emergencies 3.Gas Emergency Legislation

More information

CLUB REGISTRATION & SUPPORT / TICKETING

CLUB REGISTRATION & SUPPORT / TICKETING CLUB REGISTRATION & SUPPORT / TICKETING Version number: 1.0 Account Manager: Kevin Fowler Nemisys Authors: Andy Felton & Paul Keeling Nemisys English Golf Union Customer Name: Club Systems International

More information

I HAVE A QUERY. Putting you in touch with the RIGHT people

I HAVE A QUERY. Putting you in touch with the RIGHT people I HAVE A QUERY Putting you in touch with the RIGHT people TABLE OF CONTENTS NATIONAL GRID PUBLICATIONS... 3 GAS CONNECTIONS... 3 GAS DIVERSIONS... 3 PROJECT CLOCC (CUSTOMER LOW COST CONNECTIONS)... 4 GAS

More information

IMPACT & IMPLEMENTATION REPORT SUMMARY SECTION (For AEMO to complete and administer)

IMPACT & IMPLEMENTATION REPORT SUMMARY SECTION (For AEMO to complete and administer) IMPACT & IMPLEMENTATION REPORT SUMMARY SECTION (For AEMO to complete and administer) Issue Number STTM IIR 15-003 Proponent AEMO Date of submission Affected gas markets STTM (wholesale) Consultation process

More information

SIDRA INTERSECTION 6.1 UPDATE HISTORY

SIDRA INTERSECTION 6.1 UPDATE HISTORY Akcelik & Associates Pty Ltd PO Box 1075G, Greythorn, Vic 3104 AUSTRALIA ABN 79 088 889 687 For all technical support, sales support and general enquiries: support.sidrasolutions.com SIDRA INTERSECTION

More information

I HAVE A QUERY FOR GAS TRANSMISSION QUERIES ONLY FOR DOMESTIC GAS QUERIES, PLEASE CONTACT YOUR NETWORK OPERATOR

I HAVE A QUERY FOR GAS TRANSMISSION QUERIES ONLY FOR DOMESTIC GAS QUERIES, PLEASE CONTACT YOUR NETWORK OPERATOR I HAVE A QUERY Putting you in touch with the RIGHT people FOR GAS TRANSMISSION QUERIES ONLY FOR DOMESTIC GAS QUERIES, PLEASE CONTACT YOUR NETWORK OPERATOR Energy Networks / Who is my Network Operator?

More information

Purpose. Scope. Process flow OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT

Purpose. Scope. Process flow OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT SYDNEY TRAINS SAFETY MANAGEMENT SYSTEM OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT Purpose Scope Process flow This operating procedure supports SMS-07-SP-3067 Manage Safety Change and establishes the

More information

Gas Interruptions. customer guide

Gas Interruptions. customer guide Gas Interruptions customer guide December 2006 Dear Customer Gas Interruptions Customer Guide We have produced this guide for customers who take interruptible gas supplies from us. The new gas year commences

More information

Maestro 3 rd Party Golf User Guide

Maestro 3 rd Party Golf User Guide Maestro 3 rd Party Golf User Guide Published Date: November 15 Golf Setup Before Golfing reservations can be made using a 3 rd party Golf Interface, an amount of setup is required. This setup is performed

More information

AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS

AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS 1. AB Amber Grid Rules for Natural Gas Transmission System Balancing (hereinafter - the Rules) are designed to identify

More information

Organisation Management Services (OMS) operating model

Organisation Management Services (OMS) operating model 3 July 2017 EMA/459105/2016 version 3 Information Management Division Organisation Management Services (OMS) operating model Table of contents 1. Executive summary... 2 2. OMS operating model... 2 2.1.

More information

Commercial Licensing Division

Commercial Licensing Division 1. PURPOSE The purpose of this procedure is to provide information regarding the necessary documents a Trakhees Client will require obtaining Commercial Permits, the costs incurred therewith and the required

More information

Venue Operating Procedures

Venue Operating Procedures Version: 2.1 Date: 29 May 2008 Change History Version Date Description Author 1.0 1 February 2008 Document Creation Simon Provost 1.1 7 March 2007 Amended NSW Office of Liquor, Gaming and Racing, Signage

More information

Team BUSY : Excise register RG-23 A-11, provision made to input starting S.No.

Team BUSY : Excise register RG-23 A-11, provision made to input starting S.No. The BUSY development team is proud to announce the immediate release of BUSY 16 ( Rel 4.0 ) with following feedbacks implemented and bugs rectified : Statutory Changes Team BUSY : Delhi VAT ereturn as

More information

Integrating Best of Breed Outage Management Systems with Mobile Data Systems. Abstract

Integrating Best of Breed Outage Management Systems with Mobile Data Systems. Abstract Integrating Best of Breed Outage Management Systems with Mobile Data Systems Donald Shaw Partner ExtenSys Inc. 31 Plymbridge Crescent North York, ON M2P 1P4 Canada Telephone: (416) 481-1546 Fax: (416)

More information

Hazard Training Guide

Hazard Training Guide Hazard Training Guide Using the Main Application v1.5 WHS Version Control Document Title: Hazard Training Guide using the Main Application Document Issue: Version 1.5 Date Issued: 12 Aug 2014 Issue Date

More information

Significant Change to Dairy Heat Treatment Equipment and Systems

Significant Change to Dairy Heat Treatment Equipment and Systems Significant to Dairy Heat Treatment September 2008 Page 1 Significant to Dairy Heat Treatment Equipment and Systems September 2008 1 Background Requirements for the assessment of dairy heat treatment equipment

More information

Integration of the. BBL pipeline into. the TTF market. area. Operational aspects

Integration of the. BBL pipeline into. the TTF market. area. Operational aspects Integration of the BBL pipeline into the TTF market area Operational aspects 18-10-2017 2 Contents Introduction 5 Introduction 5 Operational processes 6 Overview of relevant networkpoints and relating

More information

OMS Alerts with Milsoft IVR Written by: Darcy O Neal Presented by: Clayton Tucker

OMS Alerts with Milsoft IVR Written by: Darcy O Neal Presented by: Clayton Tucker OMS Alerts with Milsoft IVR Written by: Darcy O Neal Presented by: Clayton Tucker The Foundation Milsoft IVR s Notification One-stop shop for Email, Text, and Voice Call Notifications Robust and Configurable

More information

2017 IIHF BID REGULATIONS

2017 IIHF BID REGULATIONS 2017 IIHF BID REGULATIONS May 2014 Preface The foregoing IIHF Bid Regulations has been developed by the IIHF strictly for the purpose of improving the selection process for the venues of IIHF top-level

More information

AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS

AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS AB AMBER GRID RULES FOR NATURAL GAS TRANSMISSION SYSTEM BALANCING I. GENERAL PROVISIONS 1. AB Amber Grid Rules for Natural Gas Transmission System Balancing (hereinafter - the Rules) are designed to identify

More information

All TSOs of the Nordic Capacity Calculation Region Proposal for fallback procedures in accordance with Article 44 of Commission Regulation (EU)

All TSOs of the Nordic Capacity Calculation Region Proposal for fallback procedures in accordance with Article 44 of Commission Regulation (EU) All TSOs of the Nordic Capacity Calculation Region Proposal for fallback procedures in accordance with Article 44 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity

More information

Payment Acceleration for OMAR Data Submission

Payment Acceleration for OMAR Data Submission Payment Acceleration for OMAR Data Submission Operations Data & Compliance (916) 351-4431 mdas@caiso.com Payment Acceleration for OMAR Data Submission July 1, 2009 Agenda Payment Acceleration Project Overview

More information

MP15 Jockey Pump Controller

MP15 Jockey Pump Controller Setup and Operating Instructions MP15 Jockey Pump Controller This manual provides general information, installation, operation, maintenance, and system setup information for Metron Model MP15 Jockey Pump

More information

Using Referential and Organisation master data in eaf

Using Referential and Organisation master data in eaf 29 June 2018 EMA/819524/2017 version 2 Information Management Division Using Referential and Organisation master data in eaf Table of Contents 1. Purpose of the document... 2 2. Introduction... 2 3. Referential

More information

Standard Operating Policy and Procedures (SOPP) 3:

Standard Operating Policy and Procedures (SOPP) 3: Standard Operating Policy and Procedures (SOPP) 3: INITIAL AND CONTINUING REVIEW BY THE IRB: REQUIREMENTS FOR SUBMISSION OF APPLICATIONS, APPROVAL CRITERIA, EXPEDITED AND CONVENED COMMITTEE REVIEW AND

More information

Common Test Scenarios Document. Version 1.9

Common Test Scenarios Document. Version 1.9 Common Test Scenarios Document Version 1.9 Page 1 of 120 References Abbreviation Title & Originator s Reference Source SEC Smart Energy Code DECC DUIS DCC User Interface Specification DCC ETAD Enduring

More information

STTM EVENT: CONTINGENCY GAS TRIGGER GAS DAY 1 OCTOBER 2016 AT SYDNEY HUB

STTM EVENT: CONTINGENCY GAS TRIGGER GAS DAY 1 OCTOBER 2016 AT SYDNEY HUB STTM EVENT: CONTINGENCY GAS TRIGGER GAS DAY 1 OCTOBER 2016 AT SYDNEY HUB PREPARED BY: Market Monitoring and Change DOCUMENT REF: STTM ER 16/004 VERSION: 1.0 DATE: 11 November 2016 FINAL Australian Energy

More information

Hazard Reporting Training Guide

Hazard Reporting Training Guide Hazard Reporting Training Guide Using the Public Portal v1.4 WHS Version Control Document Title: Hazard Training Guide using the Public Portal Document Issue: Version 1.4 Date Issued: 22 July 2014 Issue

More information

Safety Monitor Requirements Revised. February 2018

Safety Monitor Requirements Revised. February 2018 This report is an update of the Safety Monitor Report published in September 2017. We are updating the report due to changes with Rough Storage, and Non Storage Supply (NSS) flows observed so far this

More information

Safety Manual VEGAVIB series 60

Safety Manual VEGAVIB series 60 Safety Manual VEGAVIB series 60 NAMUR Document ID: 32005 Contents Contents 1 Functional safety... 3 1.1 General information... 3 1.2 Planning... 4 1.3 Adjustment instructions... 6 1.4 Setup... 6 1.5 Reaction

More information

Distribution Connection Forms

Distribution Connection Forms Distribution Connection Forms Form No. DR01 DR02 DR03 DR04 DR05 DR06 DR07 DR08 DR09 DR10 DR11 GDP101 GDP102 GDP105 GDP106 GDP107 GDP108 GDP111 KG-D01 KG-D02 KG-D03 KG-D04 Description Application For Gas

More information

FRDS GEN II SIMULATOR WORKBOOK

FRDS GEN II SIMULATOR WORKBOOK FRDS GEN II SIMULATOR WORKBOOK Trotter Control Inc 2015 Document# Revision Revised 9001-0038 FRDS GEN II Simulator Workbook E 02/15/2015 by DC FRDS GEN II Simulator Workbook This workbook is a follow-on

More information

PRICE GUIDE. NB-PB-NT-LA-TSO-CHK-Price Guide Combined

PRICE GUIDE. NB-PB-NT-LA-TSO-CHK-Price Guide Combined PRICE GUIDE Effective 1 July 2018 Noor Bank rates and fees are revised and are exclusive of VAT (where applicable) and are subject to change as per Central Bank s guideline. Account s Packages Basic Link

More information

[CROSS COUNTRY SCORING]

[CROSS COUNTRY SCORING] 2015 The Race Director Guide [CROSS COUNTRY SCORING] This document describes the setup and scoring processes employed when scoring a cross country race with Race Director. Contents Intro... 3 Division

More information

HIGH PERFORMANCE SELECTION PANEL RESPONSE ISA INTERNATIONAL BENCHMARK SCORES

HIGH PERFORMANCE SELECTION PANEL RESPONSE ISA INTERNATIONAL BENCHMARK SCORES HIGH PERFORMANCE SELECTION PANEL RESPONSE ISA INTERNATIONAL BENCHMARK SCORES Released 24 January 2015 High Performance Selection Panel Melina Simjanovic (Chair) Sharon Gaylard Lisa Jelinek Cathy Taylor

More information

Safety Manual. Process pressure transmitter IPT-1* 4 20 ma/hart. Process pressure transmitter IPT-1*

Safety Manual. Process pressure transmitter IPT-1* 4 20 ma/hart. Process pressure transmitter IPT-1* Safety Manual Process pressure transmitter IPT-1* 4 20 ma/hart Process pressure transmitter IPT-1* Contents Contents 1 Functional safety 1.1 General information... 3 1.2 Planning... 4 1.3 Instrument parameter

More information

Interconnected Party (IP) Rights and Obligations. In relation to Interconnection Agreements (ICAs), the Final Assessment Paper (FAP) determined that:

Interconnected Party (IP) Rights and Obligations. In relation to Interconnection Agreements (ICAs), the Final Assessment Paper (FAP) determined that: MEMO From To Gas Industry Co GTAC Stakeholders Date 3 July 2018 Interconnected Party (IP) Rights and Obligations In relation to Interconnection Agreements (ICAs), the Final Assessment Paper (FAP) determined

More information

SCHEDULE OF FEES ACCOUNTS SERVICES

SCHEDULE OF FEES ACCOUNTS SERVICES SCHEDULE OF FEES ACCOUNTS SERVICES Account Type Average Balance Minimum Balance Average Balance Average Balance No Minimum / Average Balance Requirement Average Balance Account Opening Amount AED 2,500

More information

Online League Management lta.tournamentsoftware.com. User Manual. Further support is available online at

Online League Management lta.tournamentsoftware.com. User Manual. Further support is available online at Online League Management lta.tournamentsoftware.com User Manual Further support is available online at www.lta.org.uk/leagueplanner Contents Welcome... 3 Using this guide... 3 Further support?... 3 Publishing

More information

MEMORANDUM. To: PRL Performance Standards Subgroup From: Donna Pratt Subject: Performance Method Recommendation Date: January 18, 2001

MEMORANDUM. To: PRL Performance Standards Subgroup From: Donna Pratt Subject: Performance Method Recommendation Date: January 18, 2001 MEMORANDUM To: PRL Performance Standards Subgroup From: Donna Pratt Subject: Performance Method Recommendation Date: January 18, 2001 The Emergency Demand Response Program Manual is in its final phase

More information

Metering Code Gas TSO, measurement by connected party Effective from to the present

Metering Code Gas TSO, measurement by connected party Effective from to the present Please note that although Gasunie Transport Services B.V. translated the Dutch network codes with utmost care, Gasunie Transport Services B.V. would like to point out that only the decisions of the Dutch

More information

Registering Club players in Whole Game Club Official Training Guide

Registering Club players in Whole Game Club Official Training Guide Registering Club players in Whole Game Club Official Training Guide Version 1.1 Page 1 INTRODUCTION As part a commitment by The FA and County FAs to improve the administration experience for grassroots

More information

Release notes Chesar 3.3

Release notes Chesar 3.3 15/11/2017 Release notes Chesar 3.3 Contents 1. WHAT IS NEW IN CHESAR 3.3... 2 1.1. ALIGNMENT WITH IUCLID... 2 1.2. USE MAP RELATED FEATURES... 2 1.3. SCOPE OF ASSESSMENT... 3 1.4. EXPOSURE ASSESSMENT...

More information

Market Simulation Fall 2014 Release

Market Simulation Fall 2014 Release Market Simulation Fall 2014 Release Christopher McIntosh Lead Market Simulation Coordinator Fall 2014 Release December 8 th, 2014 Agenda Fall 2014 Market Simulation Initiatives and Timelines Upcoming Market

More information

Reliability of Safety-Critical Systems Chapter 4. Testing and Maintenance

Reliability of Safety-Critical Systems Chapter 4. Testing and Maintenance Reliability of Safety-Critical Systems Chapter 4. Testing and Maintenance Mary Ann Lundteigen and Marvin Rausand mary.a.lundteigen@ntnu.no RAMS Group Department of Production and Quality Engineering NTNU

More information

Ameren Oracle ebusiness CCTM Supplier

Ameren Oracle ebusiness CCTM Supplier CCTM PROCESS... 1 S1.1 CREATE A RATE CARD: INTRODUCTION... 2 S1.1.1 Create a Rate Card Online... 3 S1.1.2 Download a Rate Card Template... 29 S1.1.3 Rate Card Template Field Descriptions... 40 S1.1.4 Upload

More information

STCP 08-2 Issue 004: Circuit Live Trip & DAR Tests

STCP 08-2 Issue 004: Circuit Live Trip & DAR Tests STCP 08-2 Issue 004: Circuit Live Trip & DAR Tests STC Procedure Document Authorisation Party Name of Party Representative Signature Date National Grid Electricity Transmission SP Transmission Ltd Scottish

More information

1. INTRODUCTION. (collectively the transactions ). The circular contains:

1. INTRODUCTION. (collectively the transactions ). The circular contains: ASCENSION PROPERTIES LIMITED (Incorporated in the Republic of South Africa) (Registration number 2006/026141/06) JSE share code: AIA ISIN: ZAE000161881 JSE share code: AIB ISIN: ZAE000161899 (Approved

More information

Order No. 55/18 CENTRA GAS MANITOBA INC.: PRIMARY GAS RATE APPLICATION, EFFECTIVE MAY 1, April 26, 2018

Order No. 55/18 CENTRA GAS MANITOBA INC.: PRIMARY GAS RATE APPLICATION, EFFECTIVE MAY 1, April 26, 2018 CENTRA GAS MANITOBA INC.: PRIMARY GAS RATE APPLICATION, EFFECTIVE MAY 1, 2018 BEFORE: Larry Ring, Q.C., Panel Chair Marilyn Kapitany, B.Sc.(Hon), M.Sc., Vice Chair Carol Hainsworth, C.B.A., Member Susan

More information

Oracle ebusiness CCTM Supplier: Rate Card

Oracle ebusiness CCTM Supplier: Rate Card S1.2 CREATE A RATE CARD: INTRODUCTION... 1 S1.2.1 Create a Rate Card Online... 2 S1.2.2 Download a Rate Card Template... 16 S1.2.3 Rate Card Template Field Descriptions... 20 S1.2.4 Upload a Rate Card

More information

[CROSS COUNTRY SCORING]

[CROSS COUNTRY SCORING] 2018 The Race Director Guide [CROSS COUNTRY SCORING] This document describes the setup and scoring processes employed when scoring a cross country race with Race Director. Contents Intro... 3 Division

More information

Micro Environmental Control Systems Woda Sci Sump Sprinkler and Home Water Control System Manual Contents

Micro Environmental Control Systems Woda Sci Sump Sprinkler and Home Water Control System Manual Contents User Manual 1 Micro Environmental Control Systems Woda Sci Sump Sprinkler and Home Water Control System Manual Contents Powering Up... 3 Navigating thru the menus.... 3 Main Menu Option... 4 Main Menu

More information

DMC LEISURE SAFFRON WALDEN & DISTRICT SNOOKER LEAGUE LEAGUE CONSTITUTION, GENERAL RULES AND HANDICAPS 1 AUGUST 2017

DMC LEISURE SAFFRON WALDEN & DISTRICT SNOOKER LEAGUE LEAGUE CONSTITUTION, GENERAL RULES AND HANDICAPS 1 AUGUST 2017 DMC LEISURE SAFFRON WALDEN & DISTRICT SNOOKER LEAGUE LEAGUE CONSTITUTION, GENERAL RULES AND HANDICAPS 1 1 AUGUST 2017 DMC Leisure Saffron Walden & District Snooker League League Constitution 1. The League

More information

Withdrawal from an Aegon General Investment Account (GIA) into an Aegon Junior ISA (JISA)

Withdrawal from an Aegon General Investment Account (GIA) into an Aegon Junior ISA (JISA) For customers Aegon Platform Withdrawal from an Aegon General Investment Account (GIA) into an Aegon Junior ISA (JISA) Before completing this form You must have been provided with an illustration, Aegon

More information

ASX Genium Clearing Industry Wide Testing Briefing Pack

ASX Genium Clearing Industry Wide Testing Briefing Pack ASX Genium Clearing Industry Wide Testing Briefing Pack Table of Contents 1. INTRODUCTION... 3 1.1. 1.2. BACKGROUND... 3 GENIUM CLEARING UPGRADE TIMELINE FEBRUARY 2014... 3 2. IWT OVERVIEW... 4 2.1. 2.2.

More information

Click on the menu icon in the left corner to open the menu. From the menu you can:

Click on the menu icon in the left corner to open the menu. From the menu you can: The Golf Short Game Tracker App supports two types of measurements: meters and yards/feet. By default the measurements are shown in meters. If you like to use yards/feet go to Settings to change the Distance

More information

CONTENTS. Welcome to Season Setup in Play Football Setting Up Our Details Setting up Age Groups... 9

CONTENTS. Welcome to Season Setup in Play Football Setting Up Our Details Setting up Age Groups... 9 SEASON SETUP 2018 CONTENTS Welcome to Season Setup in Play Football... 2 Setting Up Our Details... 5 Setting up Age Groups... 9 Setting up Fees and Registration Packages... 11 Create a Registration Package...

More information

Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved Discipline Engineering Standard NSW Category Signalling Title Rerailing Precautions to be Taken Reference Number SMP 26 (RIC Standard: SC 00 52 00 26 SI) Document Control Status Date Prepared Reviewed

More information

ERCBH2S Frequently Asked Questions.

ERCBH2S Frequently Asked Questions. ERCBHS Frequently Asked Questions. Issue: Sweet pipeline tie-in to a sour gathering system A company is tying a sweet pipeline into one containing HS. Since the model assumes flow from either end of the

More information

Safety Monitor Requirements. September 2012

Safety Monitor Requirements. September 2012 Introduction This document sets out Safety Monitors for the 2012/13 winter, pursuant to National Grid s obligations under the Uniform Network Code (UNC), Section Q. Safety Monitors were introduced in 2004

More information

Tel: October 2013

Tel: October 2013 www.golfclub.com.au Tel: 07 3366 6696 sales@golfclub.com.au October 2013 The following are responses by Golf Computer Systems to items on the interactive checklist for Clubs in relation to the new GA Handicapping

More information

Chapter D4 Annex 1 Retention of Documents Schedule

Chapter D4 Annex 1 Retention of Documents Schedule Chapter D4 Annex 1 Retention of Documents Schedule Documents listed below are to be retained for the period of time indicated Copy Purchase Orders Paid Invoices Payroll Records / Personal Record Cards

More information

Safety Manual VEGAVIB series 60

Safety Manual VEGAVIB series 60 Safety Manual VEGAVIB series 60 Contactless electronic switch Document ID: 32002 Contents Contents 1 Functional safety... 3 1.1 General information... 3 1.2 Planning... 4 1.3 Adjustment instructions...

More information

Guidelines for Providing Access to Public Transportation Stations APPENDIX C TRANSIT STATION ACCESS PLANNING TOOL INSTRUCTIONS

Guidelines for Providing Access to Public Transportation Stations APPENDIX C TRANSIT STATION ACCESS PLANNING TOOL INSTRUCTIONS APPENDIX C TRANSIT STATION ACCESS PLANNING TOOL INSTRUCTIONS Transit Station Access Planning Tool Instructions Page C-1 Revised Final Report September 2011 TRANSIT STATION ACCESS PLANNING TOOL INSTRUCTIONS

More information

Gas System Operator Incentives Initial Proposals Consultation 2011/12

Gas System Operator Incentives Initial Proposals Consultation 2011/12 NOVEMBER 2010 ef Gas System Operator Incentives Initial Proposals Consultation 2011/12 UK Gas Transmission 1 Executive Summary Executive Summary The current arrangements for recovery of costs associated

More information

Aliso Canyon Gas-Electric Coordination Phase 3 Draft Final Proposal

Aliso Canyon Gas-Electric Coordination Phase 3 Draft Final Proposal Aliso Canyon Gas-Electric Coordination Phase 3 Draft Final Proposal Cathleen Colbert Senior Market Design and Regulatory Policy Developer Market & Infrastructure Policy June 23, 2017 Agenda Time Topic

More information

PSSI 1 High Voltage Switching

PSSI 1 High Voltage Switching 1. SCOPE This Safety Instruction sets down the procedures to be adopted when carrying out High Voltage (HV) Switching operations on The Company s System and other System(s) operated by the Company other

More information

TENDER FOR THE SUPPLY OF MEDICAL OXYGEN AND NITROUS OXIDE GASES CYLINDERS FOR ONE YEAR.

TENDER FOR THE SUPPLY OF MEDICAL OXYGEN AND NITROUS OXIDE GASES CYLINDERS FOR ONE YEAR. L E S 1 Government of Karnataka BELGAUM INSTITUTE OF MEDICAL SCIENCES, BELGAUM AUTONOMOUS INSTITUTE (Registered Under Societies Registration Act) Dr. B. R. Ambedkar Road, Belgaum 590 001. Phone No: 0831-2420320,

More information

HSBC UAE Corporate Tariff and Charges

HSBC UAE Corporate Tariff and Charges HSBC UAE Corporate Tariff and Charges Issued by HSBC Bank Middle East Limited, P.O. Box 66, Dubai, UAE. Regulated by the Jersey Financial Services Commission and the Central Bank of the United Arab Emirates.

More information

1.1 The Program is administered by the RSL Victoria. Certain services relating to the Program may be provided by Tabcorp.

1.1 The Program is administered by the RSL Victoria. Certain services relating to the Program may be provided by Tabcorp. RSL Rewards Rules These Rules set out the agreement between the person named in the attached membership application form and the RSL Victoria in relation to their membership of the RSL Rewards Loyalty

More information

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL CITY OF WEST KELOWNA COUNCIL POLICY MANUAL Page 1 of 7 DEPARTMENT: Engineering Services SUBJECT: Traffic Calming Policy (Revised June 6, 2017) Policy Statement: The provision of traffic calming measures

More information

Software Solution. for large geographically spread design. For internal use only / Siemens AG All Rights Reserved.

Software Solution. for large geographically spread design. For internal use only / Siemens AG All Rights Reserved. Software Solution for large geographically spread design More than SCADA! PVSS OMS 产品介绍 PVSS Oil Management Suite introduction Overview Refinery Schwechat OMS Overview Disposition of Movements Order Generation

More information

Who takes the driver seat for ISO and DO 254 verification?

Who takes the driver seat for ISO and DO 254 verification? Who takes the driver seat for ISO 26262 and DO 254 verification? Reconciling requirement based verification with coverage-driven verification Avidan Efody, Mentor Graphics Corp. Motivation ISO and DO users

More information

The Race Director. IPICO Integration Direct Connect [IPICO INTEGRATION]

The Race Director. IPICO Integration Direct Connect [IPICO INTEGRATION] 2017 The Race Director IPICO Integration Direct Connect [IPICO INTEGRATION] This document explains how to manage the results data between your IPCIO readers and Race Director using a direct connection

More information

TECHNICAL NOTE HOW TO USE LOOPERS. Kalipso_TechDocs_Loopers. Revision: 1.0. Kalipso version: Date: 16/02/2017.

TECHNICAL NOTE HOW TO USE LOOPERS. Kalipso_TechDocs_Loopers. Revision: 1.0. Kalipso version: Date: 16/02/2017. TECHNICAL NOTE HOW TO USE LOOPERS Document: Kalipso_TechDocs_Loopers Revision: 1.0 Kalipso version: 4.0 20161231 Date: 16/02/2017 Author: RS Contents 1. About... 3 2. Application Examples... 4 2.1. List

More information

TOURNAMENT TEAM REGISTRATION INSTRUCTIONS:

TOURNAMENT TEAM REGISTRATION INSTRUCTIONS: TOURNAMENT TEAM REGISTRATION INSTRUCTIONS: A Tournament Team is registered and rostered by Maryland State Youth Soccer Association (MSYSA) for the sole purpose of participation in a tournament. The tournament

More information

FIMVO OBP WORKSHOP. Paul Mills - EMVO

FIMVO OBP WORKSHOP. Paul Mills - EMVO FIMVO OBP WORKSHOP Paul Mills - EMVO AGENDA I EMVS System Overview Onboarding Master Data Multi-Market Data Inter-Market Transactions 2 AGENDA II Connection Types NCA Reporting Retrospective Uploading

More information

Two phases have been established for the classification of incidents to help in determining the appropriate course of action;

Two phases have been established for the classification of incidents to help in determining the appropriate course of action; 1.0 CLASSIFICATION OF AN EMERGENCY SITUATION Two phases have been established for the classification of incidents to help in determining the appropriate course of action; Alert phase, and Emergency phase.

More information

How to Set Up Your League

How to Set Up Your League From www.pcdrafter.com How to Set Up Your League The following tutorial will help you quickly see how easy PC Drafter is to use as you configure your fantasy league with your own rules, teams, draft order

More information

342 Export Interval Meter Daily Readings

342 Export Interval Meter Daily Readings 342 Export Interval Meter Daily Readings Header 342 Specific Information 342 MPRN Level Information M Meter ID M Trailer Channel Info M Interval Info M 342 Export Interval Meter Daily Readings 342 Valid

More information

Race Screen: Figure 2: Race Screen. Figure 3: Race Screen with Top Bulb Lock

Race Screen: Figure 2: Race Screen. Figure 3: Race Screen with Top Bulb Lock Eliminator Competition Stand Alone Mode - Instruction Manual Main Menu: After startup, the Eliminator Competition will enter the Main Menu. Press the right/left arrow buttons to move through the menu.

More information

2014 GW Holiday STaC Dec 8-14, 2014 Sanction #ST

2014 GW Holiday STaC Dec 8-14, 2014 Sanction #ST 2014 Great Western Holiday STaC Dec 8-14, 2014 Sanction # ST1412002 DIC: Bill Michael E-Mail: stacman592@yahoo.com This is the only e-mail address to use any other submission may not get to me in a timely

More information

Please read this document of Terms and conditions carefully so that you fully understand our responsibilities and your commitments.

Please read this document of Terms and conditions carefully so that you fully understand our responsibilities and your commitments. Terms and Conditions This document includes our standard Terms and Conditions that apply to you as our customer using our gas services at your residential or business premises. In conjunction with your

More information

Generic Safe Method for placing TTM on MM-ALR

Generic Safe Method for placing TTM on MM-ALR Summary 1. This paper describes a generic safe method for setting up and taking down Temporary Traffic Management (TTM) on Managed Motorway All Lane Running (MM-ALR) schemes. 2. An understanding of how

More information

IIHF UNIFORM PROGRAM GUIDELINES 2014/ /16

IIHF UNIFORM PROGRAM GUIDELINES 2014/ /16 IIHF UNIFORM PROGRAM GUIDELINES 2014/15 2015/16 1 IIHF Ice Hockey Uniform Program 2014/15 2015/16 Introduction The IIHF uniform programme procedure will continue to build on the success of the process

More information

Youth Progression Tracking System Manual

Youth Progression Tracking System Manual 1 Youth Progression Tracking System Manual 2 Youth Progression Section Manual Table of Contents The Four Factors 3 Levels... 3 Age Requirements... 3 Participation... 4 Results... 4 System Detail 5 How

More information

I. Summary. II. Responsibilities

I. Summary. II. Responsibilities IRB Procedure 11a: Continuing Review Revision Date: May 15, 2007, revised November 11, 2009, revision July 17, 2010, revised March 1, 2011, revised February 9, 2015 I. Summary The IRB policy is to make

More information

SCHOOLGIRLS ROWING 2015 GUIDELINES

SCHOOLGIRLS ROWING 2015 GUIDELINES SCHOOLGIRLS ROWING 2015 GUIDELINES 1. HOST SCHOOL ARRANGEMENTS (School coming off a rest year will host Regatta 2) Regatta 1 (9 th May) PLC Canning Bridge Regatta 2 (23 rd May) PEN Canning Bridge Regatta

More information

User Help. Fabasoft Scrum

User Help. Fabasoft Scrum User Help Fabasoft Scrum Copyright Fabasoft R&D GmbH, Linz, Austria, 2018. All rights reserved. All hardware and software names used are registered trade names and/or registered trademarks of the respective

More information

Technical Bulletin, Communicating with Gas Chromatographs

Technical Bulletin, Communicating with Gas Chromatographs Last Updated: 13- July-2010 TB-080000C Technical Bulletin, Communicating with Gas Chromatographs OMNI FLOW COMPUTERS, INC. 12620 West Airport Boulevard, Suite 100 Sugar Land, Texas 77478 United States

More information

IRB Staff Administration Guide

IRB Staff Administration Guide March 2013 Table of Contents IRB Process Overview 3 IRB Submission Types 3 Study Process Overview 4 Ancillary Review Overview 5 Initiating Ancillary Reviews 5 Notifications and Ancillary Review Feedback

More information

This test shall be carried out on all vehicles equipped with open type traction batteries.

This test shall be carried out on all vehicles equipped with open type traction batteries. 5.4. Determination of hydrogen emissions page 1 RESS-6-15 5.4.1. This test shall be carried out on all vehicles equipped with open type traction batteries. 5.4.2. The test shall be conducted following

More information