1 AWARDED: CALL ORDER: 020 PROJECT NO.:STPY-101A(072) J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 325 COUNTY: ADAIR HIGHWAY NO.: US-59 LENGTH: MILES DESCRIPTION : GRADING, DRAIN, AND SURFACE LOCATION : US-59: BEGIN AT THE DELAWARE COUNTY LINE, EXTEND SOUTH. CONTRACT AMOUNT : $ 9,155, CONTRACTOR : FORSGREN INC. FORT SMITH AR AWARDED: CALL ORDER: 040 PROJECT NO.:BRO-STIM(431)CO J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 120 COUNTY: ALFALFA HIGHWAY NO.: COUNTY ROAD(NS-262) LENGTH: MILES LOCATION : COUNTY ROAD (NS-262): OVER WEST CLAY CR 1.0 MI EAST OF SH-8 AND 2.7 MILES NORTH OF US-64. CONTRACT AMOUNT : $ 524, CONTRACTOR : K & R BUILDERS, INC. WHEATLAND OK AWARDED: CALL ORDER: 060 PROJECT NO.:BPMY-NBIP(412)3B J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 120 COUNTY: TEXAS HIGHWAY NO.: US-281/SH-8/SH-50/SH LENGTH: MILES DESCRIPTION : BRIDGE PAINTING LOCATION : US-281/SH-8/SH-50/SH-95: MULTIPLE LOCATIONS IN DIVISION VI. CONTRACT AMOUNT : $ 330, CONTRACTOR : TARPON INDUSTRIAL, INC. TARPON SPRINGS FL

2 AWARDED: CALL ORDER: 080 PROJECT NO.:BPMY-102C(153)3B J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 30 COUNTY: ALFALFA HIGHWAY NO.: SH-8/SH-95 LENGTH: MILES DESCRIPTION : JOINT SEAL/REPAIR LOCATION : SH-8/SH-95: MULTIPLE LOCATIONS IN DIVISION VI. CONTRACT AMOUNT : $ 51, CONTRACTOR : B & B CONSTRUCTION SERVICE J.T., INC. CLAYTON OK AWARDED: CALL ORDER: 100 PROJECT NO.:BRO-106D(088)CO J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 90 COUNTY: BLAINE HIGHWAY NO.: NS-258 LENGTH: MILES LOCATION : COUNTY ROAD (NS-258): OVER SPRING CREEK 5.0 MILES WEST OF SH-8 AND 2.8 MI SOUTH OF SH-51. CONTRACT AMOUNT : $ 317, CONTRACTOR : D. M. DOZERS, INC. BRADLEY OK AWARDED: CALL ORDER: 110 PROJECT NO.:SAP-022N(089) J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 450 COUNTY: BRYAN HIGHWAY NO.: US-70 LENGTH: MILES DESCRIPTION : GRADE, DRAIN, AND BRIDGE LOCATION : US-70 BYPASS: FROM 3.04 MILES SOUTHEAST OF US-70, EXTEND EAST TO SH-78. CONTRACT AMOUNT : $ 13,232, CONTRACTOR : OBC, INC. EDMOND OK

3 AWARDED: CALL ORDER: 120 PROJECT NO.:SAP-010B(304) J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 270 SBR-110B(207)SB COUNTY: CARTER HIGHWAY NO.: US-70 LENGTH: MILES DESCRIPTION : GRADE, DRAIN, SURFACE, AND BRIDGE LOCATION : US-70: OVER COTTON WOOD CREEK 8.5 MILES WEST OF I-35. CONTRACT AMOUNT : $ 3,489, CONTRACTOR : OBC, INC. EDMOND OK AWARDED: CALL ORDER: 140 PROJECT NO.:IMY-35-1(150)034 J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 150 COUNTY: CARTER HIGHWAY NO.: I-35 LENGTH: MILES DESCRIPTION : DRAINAGE STRUCTURE IMPROVEMENT LOCATION : I-35: BEGIN 0.5 MI NORTH OF US-70W, EXTEND NORTH (UNDERDRAIN). CONTRACT AMOUNT : $ 1,347, CONTRACTOR : SCHIRALLI CONSTRUCTION CORP. WILSON OK AWARDED: CALL ORDER: 150 PROJECT NO.:IMY (145)029 J.P. NUMBER: BAMS NO: COMPLETION DATE: November 23, 2010 COUNTY: CARTER HIGHWAY NO.: I-35 LENGTH: MILES DESCRIPTION : GRADE, DRAIN, SURFACE AND BRIDGE LOCATION : I-35: FROM 4.1 MILES NORTH OF THE LOVE C/L, EXTEND NORTH. CONTRACT AMOUNT : $ 21,601, CONTRACTOR : DOBSON BROTHERS. CONST. CO. LINCOLN NE

4 AWARDED: CALL ORDER: 162 PROJECT NO.:STP-114B(143)AG J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 250 COUNTY: CLEVELAND HIGHWAY NO.: CITY STREET (ROCK CR LENGTH: MILES DESCRIPTION : GRADE, DRAIN, SURFACE AND BRIDGE LOCATION : CITY STREET (ROCK CREEK RD): FROM PORTER AVE. IN THE CITY OF NORMAN, EXTEND EAST. CONTRACT AMOUNT : $ 4,487, CONTRACTOR : HASKELL LEMON CONST. CO. OKLAHOMA CITY OK AWARDED: CALL ORDER: 170 PROJECT NO.:BRO-115D(046)CO J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 120 COUNTY: COAL HIGHWAY NO.: COUNTY ROAD (NS-380) LENGTH: MILES LOCATION : COUNTY ROAD (NS-380): OVER ROCK CREEK, 7.3 MILES NORTH OF SH-3 AND 1.0 MILES EAST OF US-75. CONTRACT AMOUNT : $ 370, CONTRACTOR : BRIDGECO CONTRACTORS, INC. WELLSTON OK AWARDED: CALL ORDER: 180 PROJECT NO.:SAP-021N(029) J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 200 COUNTY: COMANCHE HIGHWAY NO.: SH-7 LENGTH: MILES DESCRIPTION : GRADE, DRAIN AND SURFACE LOCATION : SH-7: BEGIN 3.3 MILE EAST OF I-44, EXTEND EAST. CONTRACT AMOUNT : $ 6,516, CONTRACTOR : DUIT CONST. CO, INC./TTK CONST. CO., INC EDMOND OK

5 AWARDED: CALL ORDER: 200 PROJECT NO.:BPMY-NBIP(415)3B J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 120 COUNTY: GARFIELD HIGHWAY NO.: US-60/US-64 LENGTH: MILES DESCRIPTION : BRIDGE PAINTING LOCATION : US-60/US-64: MULTIPLE LOCATIONS IN DIVISION IV. CONTRACT AMOUNT : $ 530, CONTRACTOR : TEXAS BRIDGE, INC. HUMBLE TX AWARDED: CALL ORDER: 220 PROJECT NO.:BPMY-124C(125)3B J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 50 COUNTY: GRANT HIGHWAY NO.: US-64 LENGTH: MILES DESCRIPTION : JOINT SEAL/REPAIR LOCATION : US-64: VARIOUS LOCATIONS IN DIVISION IV. CONTRACT AMOUNT : $ 50, CONTRACTOR : PARADIGM CONSTRUCTION & ENGINEERING, INC AWARDED: CALL ORDER: 240 PROJECT NO.:STPY-126B(113) J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 65 COUNTY: GRADY HIGHWAY NO.: SH-39 LENGTH: MILES DESCRIPTION : GRADE, DRAIN, SURFACE, AND BRIDGE LOCATION : SH-39: BEGIN 0.3 MILES EAST OF US-62, EXTEND EAST. CONTRACT AMOUNT : $ 998, CONTRACTOR : MARKWELL PAVING COMPANY, INC. OKLAHOMA CITY OK

6 AWARDED: CALL ORDER: 260 PROJECT NO.:BRO-129D(015)CO J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 90 COUNTY: HARMON HIGHWAY NO.: COUNTY ROAD (EW-149. LENGTH: MILES LOCATION : COUNTY ROAD (EW-149.2): OVER HORSE CREEK 0.4 MI EAST OF SH-3. CONTRACT AMOUNT : $ 257, CONTRACTOR : SEWELL BROS., INC. OKLAHOMA CITY OK AWARDED: CALL ORDER: 280 PROJECT NO.:BRF-129C(034)CO J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 90 COUNTY: HARMON HIGHWAY NO.: EW-155 LENGTH: MILES LOCATION : COUNTY ROAD (EW-155): OVER AN UNNAMED CREEK 7.0 MILES NORTH OF US-62 AND 2.0 MILES EAST OF SH-5. CONTRACT AMOUNT : $ 239, CONTRACTOR : OBC, INC. EDMOND OK AWARDED: CALL ORDER: 290 PROJECT NO.:BRO-132D(049)CO J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 120 COUNTY: HUGHES HIGHWAY NO.: COUNTY ROAD (EW-123) LENGTH: MILES LOCATION : COUNTY ROAD (EW-123): OVER A TRIBUTARY TO MILL CREEK 2.0 MILES SOUTH OF SH-9 AND 0.7 MILES WEST OF THE MCINTOSH C/L. CONTRACT AMOUNT : $ 236, CONTRACTOR : PARADIGM CONSTRUCTION & ENGINEERING, INC

7 AWARDED: CALL ORDER: 300 PROJECT NO.:BRFY-136C(125) J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 120 COUNTY: KAY HIGHWAY NO.: US-177 LENGTH: MILES DESCRIPTION : GRADE, DRAIN, SURFACE AND BRIDGE LOCATION : US-177: BEGIN AT THE I-35 INTERSECTION, EXTEND SOUTHEAST OVER EAST BRANCH OF DRY CREEK. CONTRACT AMOUNT : $ 1,370, CONTRACTOR : OBC, INC. EDMOND OK AWARDED: CALL ORDER: 320 PROJECT NO.:BRF-140C(047)CO J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 120 COUNTY: LEFLORE HIGHWAY NO.: COUNTY ROAD LENGTH: MILES LOCATION : COUNTY ROAD (NS-474): OVER MORRIS CREEK 3.7 MI N OF SH-128. CONTRACT AMOUNT : $ 451, CONTRACTOR : PARADIGM CONSTRUCTION & ENGINEERING, INC AWARDED: CALL ORDER: 370 PROJECT NO.:OKCY-XTWN(065)SG J.P. NUMBER: BAMS NO: COMPLETION DATE: September 24, 201 COUNTY: OKLAHOMA HIGHWAY NO.: I-40 LENGTH: MILES DESCRIPTION : GRADE,DRAIN, SURFACE AND BRIDGE LOCATION : I-40: FROM 0.25 MILES EAST OF AGNEW AVE, EXTEND EAST IN OKLAHOMA CITY. CONTRACT AMOUNT : $ 22,514, CONTRACTOR : SHERWOOD CONST/ALLEN CONTR/MANHATTAN RD CATOOSA OK

8 AWARDED: CALL ORDER: 380 PROJECT NO.:STPG-155F(423)AG J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 30 COUNTY: OKLAHOMA HIGHWAY NO.: CITY STREET LENGTH: MILES DESCRIPTION : STRIPING AND PAVEMENT MARKINGS LOCATION : CITY STREETS: MULTIPLE LOCATIONS IN THE OKLAHOMA CITY METRO AREA. CONTRACT AMOUNT : $ 349, CONTRACTOR : ACTION SAFETY SUPPLY CO. OKLAHOMA CITY OK AWARDED: CALL ORDER: 400 PROJECT NO.:HSIPG-155N(715)TR J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 90 COUNTY: OKLAHOMA HIGHWAY NO.: I-35 LENGTH: MILES DESCRIPTION : SIGNING LOCATION : I-235: BEGIN 0.5 MI NORTH OF NE 23RD STREET IN OKLAHOMA CITY EXTEND SOUTH. CONTRACT AMOUNT : $ 192, CONTRACTOR : ACTION SAFETY SUPPLY CO. OKLAHOMA CITY OK AWARDED: CALL ORDER: 420 PROJECT NO.:BPMY-NBIP(416)3B J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 45 COUNTY: OKLAHOMA HIGHWAY NO.: SH-152 LENGTH: MILES DESCRIPTION : BRIDGE PAINTING LOCATION : SH-152: AT THE MERIDIAN AVENUE JUNCTION. CONTRACT AMOUNT : $ 328, CONTRACTOR : POSEIDON CONSTRUCTION, INC. CLEARWATER FL

9 AWARDED: CALL ORDER: 440 PROJECT NO.:BPMY-155C(741)3B J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 30 COUNTY: OKLAHOMA HIGHWAY NO.: I-44 LENGTH: MILES DESCRIPTION : JOINT SEAL/REPAIR LOCATION : I-44/SH-152: MULTIPLE LOCATIONS IN OKLAHOMA CITY. CONTRACT AMOUNT : $ 83, CONTRACTOR : LOGOS CONSTRUCTION CO. SAPULPA OK AWARDED: CALL ORDER: 480 PROJECT NO.:BRO-NBIL(097)CO J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 90 COUNTY: ROGER MILLS HIGHWAY NO.: COUNTY ROAD (EW-82) LENGTH: MILES LOCATION : COUNTY ROAD (EW-82): OVER BOGGY CREEK, 6.4 MILES EAST OF US-283 AND 3.0 MILES NORTH OF SH-47. CONTRACT AMOUNT : $ 316, CONTRACTOR : WITTWER CONST. CO., INC. STILLWATER OK AWARDED: CALL ORDER: 485 PROJECT NO.:NHY-030N(011) J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 345 COUNTY: ROGERS HIGHWAY NO.: US-169 LENGTH: MILES DESCRIPTION : GRADE, DRAIN, SURFACE AND BRIDGE LOCATION : US-169: FROM TALALA, EXTEND NORTH TO THE NOWATA C/L. CONTRACT AMOUNT : $ 12,216, CONTRACTOR : DONDLINGER & SONS CONST. CO., INC. WICHITA KS

10 AWARDED: CALL ORDER: 487 PROJECT NO.:STPY-166C(072) J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 325 COUNTY: ROGERS HIGHWAY NO.: SH-88 LENGTH: MILES DESCRIPTION : GRADE, DRAIN, SURFACE AND BRIDGE LOCATION : SH-88: FROM 3.5 MILES NORTHWEST OF US-412, EXTEND NORTH. CONTRACT AMOUNT : $ 8,993, CONTRACTOR : BECCO CONTRACTORS, INC. AWARDED: CALL ORDER: 490 PROJECT NO.:NHY-008N(057)HP J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 180 COUNTY: TEXAS HIGHWAY NO.: US-54 LENGTH: MILES DESCRIPTION : GRADE, DRAIN, SURFACE, AND BRIDGE LOCATION : US-54: FROM 0.1 MILE NORTH OF US-64, EXTEND NORTH. CONTRACT AMOUNT : $ 6,298, CONTRACTOR : J & R SAND COMPANY, INC. LIBERAL KS AWARDED: CALL ORDER: 495 PROJECT NO.:IMY (402)227 J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 700 COUNTY: TULSA HIGHWAY NO.: I-44 LENGTH: MILES DESCRIPTION : GRADE, DRAIN, SURFACE, AND BRIDGE LOCATION : I-44: BEGIN AT EAST 51ST STREET AND EXTEND EAST. CONTRACT AMOUNT : $ 47,963, CONTRACTOR : SHERWOOD CONSTRUCTION CO., INC. CATOOSA OK

11 AWARDED: CALL ORDER: 497 PROJECT NO.:SAP-030N(043) J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 390 SSP-030N(061)SS COUNTY: TULSA HIGHWAY NO.: US-169 LENGTH: MILES DESCRIPTION : WIDEN, RESURFACE (ASPHALT), AND BRIDGE LOCATION : US-169: BEGIN AT I-244 AND EXTEND NORTH. CONTRACT AMOUNT : $ 16,358, CONTRACTOR : BECCO CONTRACTORS, INC. AWARDED: CALL ORDER: 498 PROJECT NO.:SAP-172N(293) J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 240 COUNTY: TULSA HIGHWAY NO.: US-169 LENGTH: MILES DESCRIPTION : SAFETY IMPROVEMENT (SOUNDWALL) LOCATION : US-169: BETWEEN MEMORIAL DRIVE AND MINGO ROAD THE CITY OF TULSA. CONTRACT AMOUNT : $ 3,535, CONTRACTOR : CROSSLAND HEAVY CONTRACTORS. INC. COLUMBUS KS AWARDED: CALL ORDER: 500 PROJECT NO.:STP-172B(284)IG J.P. NUMBER: BAMS NO: COMPLETION DATE: October 31, 2010 STPG-172B(397)IG COUNTY: TULSA HIGHWAY NO.: CITY STREET LENGTH: MILES DESCRIPTION : GRADE, DRAIN, SURFACE, BRIDGE, AND TRAFFIC SIGNALS LOCATION : CITY STREET (WEKIWA RD): BEGIN WEST OF RIVER CITY PARK ROAD EXTEND EAST TO SH-97 IN SAND SPRINGS. CONTRACT AMOUNT : $ 3,230, CONTRACTOR : APAC-OKLAHOMA, INC.

12 AWARDED: CALL ORDER: 547 PROJECT NO.:BPMY-172C(471)3B J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 75 COUNTY: TULSA HIGHWAY NO.: US-64 / SH-11 LENGTH: MILES DESCRIPTION : JOINT SEAL/REPAIR LOCATION : US-64, SH-11: MULTIPLE LOCATIONS IN DIVISION VIII. CONTRACT AMOUNT : $ 324, CONTRACTOR : PARADIGM CONSTRUCTION & ENGINEERING, INC AWARDED: CALL ORDER: 550 PROJECT NO.:STPY-173B(019) J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 330 COUNTY: WAGONER HIGHWAY NO.: SH-51 LENGTH: MILES LOCATION : SH-51: OVER THE VERDIGRIS RIVER, 7.5 MILES EAST OF COWETA. CONTRACT AMOUNT : $ 8,762, CONTRACTOR : JENSEN CONST. CO. SAND SPRINGS OK AWARDED: CALL ORDER: 580 PROJECT NO.:SBR-114A(264)SB J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 75 COUNTY: CLEVELAND HIGHWAY NO.: SH-37 LENGTH: MILES DESCRIPTION : BRIDGE REDECKING AND REHABILITATION LOCATION : SH-37: OVER I-35, IN THE CITY OF MOORE. CONTRACT AMOUNT : $ 491, CONTRACTOR : PBX CORPORATION SAPULPA OK

13 LETTING DATE = 10/15/09 THE TOTAL AMOUNT OF AWARDED CONTRACTS: $197,520, ================ THE TOTAL AMOUNT OF REJECTED CONTRACTS: $ 0.00 ================ THE TOTAL AMOUNT OF DEFERRED CONTRACTS: $ 0.00 ================

AWARDED: CALL ORDER: 020 PROJECT NO.:BRFY-017N(018) J.P. NUMBER:1020904 BAMS NO: 080410 CALENDAR DAYS ALLOTTED: 300 COUNTY: ATOKA HIGHWAY NO.: SH-3 LENGTH: 1.1740 MILES LOCATION : SH-3: OVER MUDDY BOGGY

More information

*REVISED-AWARDED CALL ORDER /09/13

*REVISED-AWARDED CALL ORDER /09/13 *REVISED-AWARDED CALL ORDER 180 12/09/13 AWARDED: CALL ORDER: 020 PROJECT NO.:NHPPY-101N(023)SS J.P. NUMBER:1692809 BAMS NO: 130355 CALENDAR DAYS ALLOTTED: 365 COUNTY: ADAIR HIGHWAY NO.: US-59 LENGTH:

More information

AWARDED: CALL ORDER: 015 PROJECT NO.:STP-205C(038)3P J.P. NUMBER:3110804 BAMS NO: 150045 CALENDAR DAYS ALLOTTED: 30 COUNTY: BECKHAM HIGHWAY NO.: I-40B LENGTH: 1.6200 MILES LOCATION : I-40B: FROM THE NORTH

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 06/18/15 AWARD DATE = 07/06/15

OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 06/18/15 AWARD DATE = 07/06/15 AWARDED: CALL ORDER: 010 PROJECT NO.:NHPP-201N(014)RW J.P. NUMBER:1692823 BAMS NO: 150186 CALENDAR DAYS ALLOTTED: 180 COUNTY: ADAIR HIGHWAY NO.: US-59 LENGTH: 3.3140 MILES DESCRIPTION : RIGHT-OF-WAY CLEARANCE

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 04/16/15 AWARD DATE = 05/04/15

OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 04/16/15 AWARD DATE = 05/04/15 05/04/15 AWARDED: CALL ORDER: 010 PROJECT NO.:CIRB -202C(028)RB J.P. NUMBER:2483308 BAMS NO: 150120 CALENDAR DAYS ALLOTTED: 120 COUNTY: ALFALFA HIGHWAY NO.: COUNTY ROAD (EW-08) LENGTH: 3.9690 MILES DESCRIPTION

More information

AWARDED: CALL ORDER: 030 PROJECT NO.:NHY-13N(116)TR J.P. NUMBER:2409804 BAMS NO: 070225 CALENDAR DAYS ALLOTTED: 30 COUNTY: ATOKA HIGHWAY NO.: US-69/US-75 LENGTH: 0.0000 MILES DESCRIPTION : TRAFFIC SIGNALS

More information

06/01/15 AWARDED: CALL ORDER: 005 PROJECT NO.:CIRB-102C(130)RB J.P. NUMBER:2483209 BAMS NO: 150183 CALENDAR DAYS ALLOTTED: 150 COUNTY: ALFALFA HIGHWAY NO.: COUNTY ROAD (NS-255) LENGTH: 5.0300 MILES DESCRIPTION

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 03/16/17 AWARD DATE = 04/10/17

OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 03/16/17 AWARD DATE = 04/10/17 AWARDED: CALL ORDER: 010 PROJECT NO.:STP-202C(033) J.P. NUMBER:2794304 BAMS NO: 170112 CALENDAR DAYS ALLOTTED: 300 COUNTY: ALFALFA HIGHWAY NO.: SH-8 LENGTH: 0.2510 MILES LOCATION : SH-8: OVER DRIFTWOOD

More information

AWARDED: CALL ORDER: 020 PROJECT NO.:CIRB-102C(126)RB J.P. NUMBER:2483204 BAMS NO: 130174 CALENDAR DAYS ALLOTTED: 200 COUNTY: ALFALFA HIGHWAY NO.: EW-25 LENGTH: 4.9740 MILES DESCRIPTION : GRADE, DRAIN,

More information

AWARDED: CALL ORDER: 020 PROJECT NO.:BRO-103D(059)CO J.P. NUMBER:2110304 BAMS NO: 070001 CALENDAR DAYS ALLOTTED: 120 COUNTY: ATOKA HIGHWAY NO.: COUNTY ROAD LENGTH: 0.1530 MILES DESCRIPTION : BRIDGE & APPROACHES

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 11/16/17 AWARD DATE = 12/04/17

OKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 11/16/17 AWARD DATE = 12/04/17 AWARDED: CALL ORDER: 400 PROJECT NO.:NHPPI-216N(021)SS J.P. NUMBER:2705004 BAMS NO: 170342 CALENDAR DAYS ALLOTTED: 300 COUNTY: COMANCHE HIGHWAY NO.: I-44 LENGTH: 0.9610 MILES DESCRIPTION : INTERCHANGE

More information

AWARDED: CALL ORDER: 080 PROJECT NO.: SAP-111D(41) J.P. NUMBER: 1879104 BAMS NO: 010065 CALENDAR DAYS ALLOTTED: 30 COUNTY: CHEROKEE HIGHWAY NO.: PARK ROAD LENGTH: 0.000000 MILES LOCATION : SEQUOYAH STATE

More information

AWARDED: CALL ORDER: 043 PROJECT NO.:NHPPY-203N(012)3P J.P. NUMBER:2972604C BAMS NO: 130128 CALENDAR DAYS ALLOTTED: 60 NHPPY-261N(012)3P 2967604C NHPPY-264N(008)3P 2972704C COUNTY: ATOKA HIGHWAY NO.: SH-7/SH-3

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION

OKLAHOMA DEPARTMENT OF TRANSPORTATION BID OPENING OF November, 0 November, 0 PROJECT NO.: STP-NBIL(8)CI CALL ORDER: 00 COUNTY: CARTER DESCRIPTION: BRIDGE AND APPROACHES J.P. NUMBER 70 PROPOSAL NUMBER: 08 HIGHWAY NO: COUNTY ROAD COUNTY ROAD

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION DATE : October 20, 2000 BID OPENING OF October 19, 2000

OKLAHOMA DEPARTMENT OF TRANSPORTATION DATE : October 20, 2000 BID OPENING OF October 19, 2000 PROJECT NO.: E-SAP-144B(36) J.P. NUMBER: 18705(04) CALL ORDER: 010 PROPOSAL NUMBER: 000504 COUNTY: MCCLAIN HIGHWAY NO.: SH-9 DESCRIPTION: BRIDGE REPAIR LOCATION : ON SH-9 OVER I-35 APPROXIMATELY 0.5 MILE

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION DATE : October 18, 2000 BID OPENING OF October 19, 2000

OKLAHOMA DEPARTMENT OF TRANSPORTATION DATE : October 18, 2000 BID OPENING OF October 19, 2000 PROJECT NO.: E-SAP-144B(36) J.P. NUMBER: 18705(04) CALL ORDER: 010 PROPOSAL NUMBER: 000504 COUNTY: MCCLAIN HIGHWAY NO.: SH-9 DESCRIPTION: BRIDGE REPAIR LOCATION : ON SH-9 OVER I-35 APPROXIMATELY 0.5 MILE

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION. FFY-2018 through FFY-2021 Asset Preservation Plan

OKLAHOMA DEPARTMENT OF TRANSPORTATION. FFY-2018 through FFY-2021 Asset Preservation Plan OKLAHOMA DEPARTMENT OF TRANSPORTATION FFY-2018 through FFY-2021 Asset Preservation Plan Table of Contents SECTION I FOREWORD - Letter from the Director SECTION II BUDGETARY PROJECTIONS SECTION III BALANCING

More information

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FFY 2018

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FFY 2018 FFY 2018 STIP: STATEWIDE RAIL CROSSING ITEM PROJECTS 99 9 1704924 R R 0 SAFETY IMPROVEMENT PROJECTS=PROTECTION DEVICES, CROSSING SURFACES, 2018 ADVANCE WARNING SIGNS, STRIPING, CLOSURES, ETC $8,000,000

More information

Bowhunter Observation Survey

Bowhunter Observation Survey Oklahoma Department of Wildlife Conservation Bowhunter Observation Survey 2017-Season The Oklahoma Department of Wildlife Conservation (ODWC) sought participation from bowhunters for the second annual

More information

Bowhunter Observation Survey

Bowhunter Observation Survey Oklahoma Department of Wildlife Conservation Bowhunter Observation Survey 2016-Season The Oklahoma Department of Wildlife Conservation (ODWC) sought participation from bowhunters for the inaugural Bowhunter

More information

2017 DIVISIONS 1ST GRADE

2017 DIVISIONS 1ST GRADE 1ST GRADE Division 1 Division 2 Division 3 Division 4 Berryhill Blue BA Black BA Gold BA White Bixby White Bixby Blue Catoosa Claremore Red Collinsville Red Glenpool Blue Coweta Black Coweta White Glenpool

More information

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FFY 2019

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FFY 2019 FFY 2019 STIP: STATEWIDE RAIL CROSSING PROJECTS- ITEM PROJECTS 99 9 1704925 R R 0 SAFETY IMPROVEMENT PROTECTION DEVICES, CROSSING SURFACES, ADVANCE 2019 WARNING SIGNS, STRIPING, CLOSURES, ETC SPR $8,000,000

More information

Apparent Bids for Letting of January 20, 2017

Apparent Bids for Letting of January 20, 2017 Apparent Bids for Letting of January 20, 2017 Letting ID: 170120 Cut-Off Time: 11:00:59 AM A01-170120-A01 NODAWAY ****(1): Job J1P3056B Route 71 NODAWAY County. Bridge painting over White Cloud Creek north

More information

Estimated 2014 ARC-CO Wheat Payments Kansas and Oklahoma 1

Estimated 2014 ARC-CO Wheat Payments Kansas and Oklahoma 1 Disclaimer: This web page is designed to aid farmers with their marketing and risk management decisions. The risk of loss in trading futures, options, forward contracts, and hedge-to-arrive can be substantial

More information

Asphalt Concrete Plants With Expired or Nearly Expired Scale Certifications (Scales must be recertified every six months)

Asphalt Concrete Plants With Expired or Nearly Expired Scale Certifications (Scales must be recertified every six months) Asphalt Concrete lants With Expired or Nearly Expired Scale Certifications : Expired : Will expire in the next month or less : ortable lant IA Evaluator Name: Bobby Winkle Count of Scale Certs.: 1 Div

More information

RADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION FISCAL YEAR 2016 OBLIGATIONS REPORT JULY 1, JUNE 30, 2016

RADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION FISCAL YEAR 2016 OBLIGATIONS REPORT JULY 1, JUNE 30, 2016 RADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION OBLIGATIONS REPORT JULY 1, 2015 - JUNE 30, 2016 DECEMBER 2016 LINCOLN TRAIL AREA DEVELOPMENT DISTRICT P. O. BOX 604 613 COLLEGE STREET ELIZABETHTOWN,

More information

Club County Steer Heifer Total Stall Space Barn Column Stall # Stilwell FFA Adair 9 7 Total Adair F-150 E Alfalfa County 4-H Alfalfa

Club County Steer Heifer Total Stall Space Barn Column Stall # Stilwell FFA Adair 9 7 Total Adair F-150 E Alfalfa County 4-H Alfalfa Stilwell FFA Adair 9 7 Total Adair 9 7 9 F-150 E3 1456-1466 Alfalfa County 4-H Alfalfa 0 8 Cherokee FFA Alfalfa 2 0 Timberlake FFA Alfalfa 1 6 Total Alfalfa 3 14 14 Expedition A12 East 1281-1297 Atoka

More information

On The Road Again CLAREMORE INDUSTRIAL PARK COMMUTING STUDY

On The Road Again CLAREMORE INDUSTRIAL PARK COMMUTING STUDY On The Road Again CLAREMORE INDUSTRIAL PARK COMMUTING STUDY 2 On The Road Again Overview of Study Every day, almost 2,000 people go to work at the Claremore Industrial Park. The park is located in Rogers

More information

Plan Holders Listing October 19, 2018 Letting (1) CN McKinley County

Plan Holders Listing October 19, 2018 Letting (1) CN McKinley County (1) CN 6100902 McKinley County Albuquerque Asphalt Inc. P.O. Box 66450 Albuquerque, NM 87193 (505) 831-7311 BSN Santa Fe 28 Bisbee Ct. Santa Fe, NM 87508 (505) 473-7973 Construction Reporter LLC 4901 Mcleod

More information

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:

More information

OKLAHOMA DEPARTMENT OF WILDLIFE CONSERVATION FISHERIES DIVISION

OKLAHOMA DEPARTMENT OF WILDLIFE CONSERVATION FISHERIES DIVISION OKLAHOMA DEPARTMENT OF WILDLIFE CONSERVATION FISHERIES DIVISION PUBLIC STOCKING REPORT 2016 Table Of Contents SUMMARY OF SPECIES STOCKED... 3 PUBLIC STOCKINGS BY REGION... 4 CENTRAL REGION... 4 EAST CENTRAL

More information

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission FOR IMMEDIATE RELEASE Date: October 31, 2014 Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission Kalamazoo, MI- In a collaborative effort

More information

DAVID JAMESON 2014 BIG-GAME REPORT. By Erik Bartholomew, Big-Game Biologist and Emily Clark, Big-Game Technician OUTDOOR OKLAHOMA

DAVID JAMESON 2014 BIG-GAME REPORT. By Erik Bartholomew, Big-Game Biologist and Emily Clark, Big-Game Technician OUTDOOR OKLAHOMA DAVID JAMESON 214 BIG-GAME REPORT By Erik Bartholomew, Big-Game Biologist and Emily Clark, Big-Game Technician 14 OUTDOOR OKLAHOMA FIGURE 1 Total Deer Harvest 12 1 8 6 4 2 1972 1973 1974 197 1976 1977

More information

Flood Insurance Study

Flood Insurance Study Flood Insurance Study Tulsa County, Oklahoma and Incorporated Areas VOLUME 5 of 7 COMMUNITY NAME COMMUNITY NO. Bixby, City of 400207 Broken Arrow, City of 400236 Collinsville, City of 400360 Glenpool,

More information

Flood Insurance Study

Flood Insurance Study Flood Insurance Study Tulsa County, Oklahoma and Incorporated Areas VOLUME 6 of 7 COMMUNITY NAME COMMUNITY NO. Bixby, City of 400207 Broken Arrow, City of 400236 Collinsville, City of 400360 Glenpool,

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement. 1. I 271 WIDENING & RESURFACING - PID 89458 Project consists of major reconstruction, widening and bridge deck replacement. Project will accomplish widening from 4 to 6 lanes, including redecking and widening

More information

BID SUMMARY SHEET. S. Brothers Inc. CONTRACTOR'S NAME CONTRACT QUANTITY & UNIT UNIT PRICE AMOUNT

BID SUMMARY SHEET. S. Brothers Inc. CONTRACTOR'S NAME CONTRACT QUANTITY & UNIT UNIT PRICE AMOUNT CONTRACT. 13-31-01 : TALMADGE ROAD RESURFACING Fischer Contracting Inc. Z Brothers Concrete Contractors Inc. S. Brothers Inc. 10 Short Hills Ln 304 Jernee Mill Rd P.O. Box 317 Scotch Plains, NJ 07076 Sayreville,

More information

Single Lane Closures, expect delays. Anticipated Schedule: Start Completion Current Stage: August

Single Lane Closures, expect delays. Anticipated Schedule: Start Completion Current Stage: August Bennett Road From Hartwell Rd to Jordan Lake Rd & from Harwood Rd to M-66 Skip paving, wedging, crack seal, & chip seal $97,000 May Bonanza Road Over Tupper Creek Resurface bridge deck and approaches $19,600

More information

COUNTY OF HUNTERDON DEPARTMENT OF PUBLIC WORKS ROADS, BRIDGES & ENGINEERING PROJECT SUMMARY

COUNTY OF HUNTERDON DEPARTMENT OF PUBLIC WORKS ROADS, BRIDGES & ENGINEERING PROJECT SUMMARY COUNTY OF 2 HUNTERDON 0 1 DEPARTMENT OF PUBLIC WORKS ROADS, BRIDGES & ENGINEERING PROJECT SUMMARY 7 BOARD OF CHOSEN FREEHOLDERS COUNTY ADMINISTRATION BUILDING 71 MAIN STREET PO BOX 2900, FLEMINGTON, NJ

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

TABULATIONS SHOWING PROPOSALS ISSUED BY THE ALABAMA DEPARTMENT OF TRANSPORTATION TUESDAY, SEPTEMBER 16, 2014 FOR LETTING OF SEPTEMBER 26, 2014

TABULATIONS SHOWING PROPOSALS ISSUED BY THE ALABAMA DEPARTMENT OF TRANSPORTATION TUESDAY, SEPTEMBER 16, 2014 FOR LETTING OF SEPTEMBER 26, 2014 TABULATIONS SHOWING PROPOSALS ISSUED BY THE ALABAMA DEPARTMENT OF TRANSPORTATION TUESDAY, SEPTEMBER 16, 2014 FOR LETTING OF SEPTEMBER 26, 2014 The Asphalt Indexes for the Month of September 2014 are: ACI

More information

OKLAHOMA SECONDARY SCHOOL ACTIVITIES ASSOCIATION P.O. Box 14590, Oklahoma City, Oklahoma

OKLAHOMA SECONDARY SCHOOL ACTIVITIES ASSOCIATION P.O. Box 14590, Oklahoma City, Oklahoma OKLAHOMA SECONDARY SCHOOL ACTIVITIES ASSOCIATION P.O. Box 14590, Oklahoma City, Oklahoma 73113-0590 TO: Principals/Cheerleading Coaches FROM: Amy Cassell, Assistant RE: State Cheerleading Championship

More information

ODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR

ODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR ODOT DISTRICT 9 2019 CONSTRUCTION PROGRAM SERVING ADAMS, BROWN, HIGHLAND, JACKSON, LAWRENCE, PIKE, ROSS AND SCIOTO COUNTIES MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT

More information

Highway Construction

Highway Construction Ohio Department of Transportation Traffic Advisory DISTRICT 1 KIRK SLUSHER, P.E., DISTRICT DEPUTY DIRECTOR 1885 North McCullough St. Lima, Ohio 45801 www.transportation.ohio.gov/dist1 www.facebook.com/odotdistrict1;

More information

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO MILEGROUD - AIRPORT ROAD US 119 Monongalia County The Mileground - Airport Road project on US 119 involves upgrading the three-lane facility to a five-lane facility to help eliminate congestion and improve

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE Update April 1, 2016 Corkscrew Road West of I-75: Lee County DOT will

More information

Water Street Promenade Engineering and Design Services

Water Street Promenade Engineering and Design Services Preliminary Design Presentation Parking & Traffic Safety Committee Water Street Promenade Engineering and Design Services July 16,2014 November 3, 2016 Education / Infrastructure / Innovation 1 Project

More information

OKLAHOMA DEPARTMENT OF WILDLIFE CONSERVATION FISHERIES DIVISION

OKLAHOMA DEPARTMENT OF WILDLIFE CONSERVATION FISHERIES DIVISION OKLAHOMA DEPARTMENT OF WILDLIFE CONSERVATION FISHERIES DIVISION PUBLIC STOCKING REPORT 2017 Table of Contents SUMMARY OF SPECIES STOCKED... 3 PUBLIC STOCKINGS BY REGION... 4 Central Region... 4 East Central

More information

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

U.S. HIGHWAY 50 IMPROVEMENT PROJECT U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY

More information

Kentucky Highway District 7

Kentucky Highway District 7 Kentucky Highway District 7 ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

CTH M HIGHWAY PROJECT CTH Q to STH 113

CTH M HIGHWAY PROJECT CTH Q to STH 113 CTH M HIGHWAY PROJECT CTH Q to STH 113 PUBLIC INFORMATIONAL MEETING #3 Wednesday, May 25, 2005 Town of Westport Administration Building 5387 Mary Lake Road 6:00 p.m. to 8:00 p.m. PUBLIC INFORMATIONAL MEETING

More information

Affordable Housing Needs.

Affordable Housing Needs. Affordable Housing Needs www.oklahomahousingneeds.org P r o j e c t T e a m Owen S. Chip Ard, MAI Executive Vice President chip.ard@am.jll.com David A. Puckett, MAI Senior Vice President david.puckett@am.jll.com

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 1 VARIOUS Districts Pursuant to Transportation Code, Chapter 223, Subchapter A, and Title 43, Texas Administrative Code, Chapter

More information

Mileage One-Way (Remember, river left is the left side of the river headed downstream.)

Mileage One-Way (Remember, river left is the left side of the river headed downstream.) Santa Fe River Fact Sheet www.5-staryakpak.org Mileage One-Way (Remember, river left is the left side of the river headed downstream.) Mileage Chart 0.0 Santa Fe Rise (N29.87388 W82.59158) 2.4 Darby Spring,

More information

FY Regional Transportation Improvement Program

FY Regional Transportation Improvement Program FY2014-2018 Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell

More information

ACTIVE PROJECTS DIRECTORY

ACTIVE PROJECTS DIRECTORY District KC Off System CCN Dist Const and Matls Engineer Brian R. Burger B2B 600 NE Colbern Road Lee's Summit MO 64086 Phone (816)622-6500 Fax SiteManager Creator SiteManager Creator District Phone District

More information

Culpeper District. Albemarle County Monthly Report October, 2011

Culpeper District. Albemarle County Monthly Report October, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

Deck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge

Deck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge Deck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge US 1 NB & Ramps Chelsea September 11, 2017 Maurice J. Tobin Memorial Bridge Big Mystic Truss Current Project Little Mystic Truss Toll

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report February 10, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report February 10 through February 17, 2017 TREASURE COAST Construction and maintenance

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update January 10-16, 2019 Summerlin Road & Colonial Blvd: Lee County DOT will

More information

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT PROJECT NO. 093 MA 199 H 5807 01C FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENI HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT (INTERSECTION IMPROVEMENT) US 93/US 60 FINAL PROJECT ASSESSMENT April

More information

APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13,

APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13, APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER 2013 14:19 Thursday, June 13, 2013 1 ABILENE DISTRICT FUNC AUTHORIZED TOTAL EST OVER- TAYLOR 0034-01-124 US 83 C 34-1-124 5 3.2 P14BM $2,112,500 $3,721,952

More information

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Clermont County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL

More information

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE. February 2nd, 2015 Volume 2, Issue 107.

DOUG s CORNER CONTRACTOR S WEEKLY UPDATE COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE. February 2nd, 2015 Volume 2, Issue 107. CONTRACTOR S WEEKLY UPDATE February 2nd, 2015 Volume 2, Issue 107 DOUG s CORNER COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE Doug s Corner.1 3 Traffic/Active Work 4-5 Construction Notices.6-10 Project

More information

RECEIVED. Be it Enacted by the People of the State of Colorado: SECTION 1. In Colorado Revised Statutes, add part 11 to article 4 of title 43 as

RECEIVED. Be it Enacted by the People of the State of Colorado: SECTION 1. In Colorado Revised Statutes, add part 11 to article 4 of title 43 as Initiative 2017-2018 #167 FINAL TEXT INITIATED STATUTE TO AUTHORIZE BONDING FOR TRANSPORTATION FuNDs WITHOUT RAISING TAXESTOFIXOURDAIVINROADS RECEIVED PROPOSED INITIATIVE 2017-20 18 #167 MAR 162018 Be

More information

Cotton Belt Corridor PE/EIS

Cotton Belt Corridor PE/EIS Cotton Belt Corridor PE/EIS February, 28, 2011 Cotton Belt Corridor PE/EIS February 28, 2011 Prepared by Stantec Consulting, Inc Cotton Belt Corridor PE/EIS Table of Contents 1.0 INTRODUCTION... 2 2.0

More information

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

Weymouth - Abington Route 18 Widening and Reconstruction Project File No Weymouth - Abington Route 18 Widening and Reconstruction Project File No. 601630 PROJECT LOCATION Project Limit Previously Completed Signalized Intersections (Typical) Route 18 Widening Bridge No. W-32-013

More information

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS TOTAL LETTING DATE AWARD DATE NOTES Interstate Maintenance s 2.00 IM 0020(155) 04X N McCook Minnehaha 0.0 Mitchell Region on I90 Scour Protection $873,000 $960,000 Cancelled $0 $0 Minor Arterial 1.00 Minor

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report September 29, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report September 29 through October 6, 2017 TREASURE COAST Construction and maintenance

More information

DeSoto County. Fiscal Years FDOT Draft Tentative Five Year Work Program Project Highlights

DeSoto County. Fiscal Years FDOT Draft Tentative Five Year Work Program Project Highlights DeSoto County Fiscal Years 2019-2023 FDOT Draft Tentative Five Year Work Program Project Highlights DeSoto Map ID 1 Project Description SR 70 over Joshua Creek - Bridge #040027 Bridge - Repair / Rehabilitation

More information

August Gold Wing Road Riders Association

August Gold Wing Road Riders Association August 2017 Gold Wing Road Riders Association Friends for Fun, Safety and Knowledge Chapter Gathering: The fourth Monday of each month at: East China Buffet 13202 S. Memorial Dr. Bixby, OK. 74008 Eat at

More information

Update January 4, 2016

Update January 4, 2016 Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE Update January 4, 2016 Cape Coral - Del Prado Boulevard Lee County DOT

More information

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR VAUGH WILSON, P.E., DISTRICT DEPUTY DIRECTOR

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR VAUGH WILSON, P.E., DISTRICT DEPUTY DIRECTOR ODOT DISTRICT 9 2018 CONSTRUCTION PROGRAM SERVING ADAMS, BROWN, HIGHLAND, JACKSON, LAWRENCE, PIKE, ROSS AND SCIOTO COUNTIES JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR VAUGH WILSON, P.E., DISTRICT

More information

Proposed FUL-SR 66 Relocation on to CR 24. Presentation to Archbold Village Council April 17, 2017

Proposed FUL-SR 66 Relocation on to CR 24. Presentation to Archbold Village Council April 17, 2017 Proposed FUL-SR 66 Relocation on to CR 24 Presentation to Archbold Village Council April 17, 2017 Robert J. Seaman, P.E., P.S. Village Engineer Andrew J. Langenderfer, P.E. Sr. Project Manager Agenda Stakeholders

More information

District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID

District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID 77825 SA US 6/20 14.61/14.59 R Resurface US-6/US-20; perform necessary (Originally PID 76709); UPDATE (9/25/14) added culvert at SA-20-22.50 PID 95861. SSAUS00006**C 14.610 18.450 8,950,000.00 SA US 6/20

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update December 20, 2018 January 2, 2019 Alva Bridge & Big Carlos Pass Bridge:

More information

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update December 13 December 19, 2018 Alico Road Widening from Ben Hill Griffin

More information

July 2007 NO UPDATE FOR TEX-207-F, EFFECTIVE MAY 2007

July 2007 NO UPDATE FOR TEX-207-F, EFFECTIVE MAY 2007 July 2007 NO. 0707 UPDATE FOR TEX-207-F, EFFECTIVE MAY 2007 Tex-207-F, Determining Density of Compacted Bituminous Mixtures. is now on-line at the TxDOT website. This test procedure was implemented effective

More information

2012 Payne County Economic Outlook

2012 Payne County Economic Outlook 2012 Payne County Economic Outlook by Dan Rickman Regents Professor of Economics and Oklahoma Gas and Electric Services Chair in Regional Economic Analysis http://economy.okstate.edu/ 20,000 U.S. Real

More information

2019 Federal Transportation Improvement Program

2019 Federal Transportation Improvement Program VEN051211 Ventura SCCAB VEN051211 CAX63 L NON-EXEMPT 0 Description: PTC 4,417 Agency CAMARILLO LAS POSAS ROAD FROM VENTURA BLVD TO PLEASANT VALLEY ROAD WIDEN FROM 2 TO 6 LANES CITY FUNDS 4,417 4,417 4,417

More information

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

COWETA HIGH SCHOOL AND EAST HIGHWAY 51 COWETA HIGH SCHOOL AND EAST HIGHWAY 51 Lack of sidewalks along Ben Lumpkin Rd. Lack of crosswalks and ramps at intersection. Hwy 51 is wide to cross as a pedestrian. No ADA compliance or connection to

More information

ENERGY SECTOR ROADWAY REPAIR PROJECT. August 15, 2013 Industry Workshop

ENERGY SECTOR ROADWAY REPAIR PROJECT. August 15, 2013 Industry Workshop ENERGY SECTOR ROADWAY REPAIR PROJECT August 15, 2013 Industry Workshop Safety Moment Sign-in Sheet Exit Locations Gathering Point Directions from Emergency Responders Signal to re-enter the Building or

More information

Culpeper District. Albemarle County Monthly Report September, 2011

Culpeper District. Albemarle County Monthly Report September, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

SR 53 Corridor Study. Final Report Presentation. Friday, October 3, :00 AM to noon

SR 53 Corridor Study. Final Report Presentation. Friday, October 3, :00 AM to noon SR 53 Corridor Study Final Report Presentation Friday, October 3, 2014 10:00 AM to noon SR 53 Corridor Study Final Report Presentation Study Purpose: Investigate safety improvements along the SR 53 corridor

More information

NJTPA Transportation Improvement Program Fiscal Years

NJTPA Transportation Improvement Program Fiscal Years Revision 1 As of 7/2/2015 Mileposts: 0.46 DBNUM: NS9811 County Route 6 Bridge (MA-14) The Amboy Avenue bridge (MA-14) over Matawan Creek in the Boroughs of Keyport and Aberdeen is structurally deficient

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present

More information

HIGHWAY CAPITAL IMPROVEMENT PLAN

HIGHWAY CAPITAL IMPROVEMENT PLAN 2018 2023 HIGHWAY CAPITAL IMPROVEMENT PLAN 0.5% Sales Tax CIP July 25, 2017 6-Year CIP Summary 2018-2023 CALENDAR YEAR 2018 Highway & Bridge Improvement Projects COUNTY PROJECT LANE IMPROVEMENT TOTAL FEDERAL

More information

Asphalt PAIKY Winter Training School. January 27 - January 29, 2016 Downtown Louisville Marriott Louisville, Kentucky KENTUCKY RIDES ON US

Asphalt PAIKY Winter Training School. January 27 - January 29, 2016 Downtown Louisville Marriott Louisville, Kentucky KENTUCKY RIDES ON US KENTUCKY RIDES ON US Asphalt. 2016 PAIKY Winter Training School January 27 - January 29, 2016 Downtown Louisville Marriott Louisville, Kentucky SCHEDULE OF EVENTS WEDNESDAY, JANUARY 27 11:00 AM - 5:00

More information

Florida Department of Transportation Daniels Parkway Fort Myers, FL 33913

Florida Department of Transportation Daniels Parkway Fort Myers, FL 33913 Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update January 3-9, 2019 RICK SCOTT GOVERNOR Florida Department of Transportation

More information

information, please contact the District 9 Offices at or

information, please contact the District 9 Offices at or O hio s highways are essential to keeping and creating new jobs. With a mission to provide easy movement of people and goods from place to place, the Ohio Department of Transportation (ODOT) is responsible

More information

ROAD CLOSURES!! JACK JONES ROAD, from Boyd Cowart Road to N. Hollandtown Road. Closed due to bridge down. Road is open to local traffic only.

ROAD CLOSURES!! JACK JONES ROAD, from Boyd Cowart Road to N. Hollandtown Road. Closed due to bridge down. Road is open to local traffic only. ROAD CLOSURES!! JACK JONES ROAD, from Boyd Cowart Road to N. Hollandtown Road Closed due to bridge down. Road is open to local traffic only. ALTON CARLTON ROAD, from W. Main Street to the bridge Closed

More information

Secondary Road Program

Secondary Road Program Secondary Road Program Joint Legislative Transportation Oversight Committee October 5, 2012 1 Secondary Roads Program The Big Picture The Secondary Road System Needs and Project Types Paved and Unpaved

More information

LINE ITEM REPORT 9/18/2009

LINE ITEM REPORT 9/18/2009 Fiscal Year STIM Ind ARRA Cert County JP Number Project No. CLEVELAND 22670(07) STPY 114C (259) LINE ITEM REPORT 9/18/2009 KINGFISHER 25884(04) STP -137D (083) RR 10/21/2008 Awarded GRANT 25986(04) STP

More information

July 31, HIGHWAY CAPITAL IMPROVEMENT PLAN

July 31, HIGHWAY CAPITAL IMPROVEMENT PLAN July 31, 2018 2019 2024 HIGHWAY CAPITAL IMPROVEMENT PLAN 6-Year CIP Summary 2019-2024 CALENDAR YEAR 2019 CTH IV IV-2 CTH P to B/K Line Road Surface Maintenance, 2-Lane Town of Humbolt 2.04 Rural, Asphalt

More information

TRANSPORTATION COMMISSION. -Meeting Minutes. August 9, :00PM

TRANSPORTATION COMMISSION. -Meeting Minutes. August 9, :00PM Ben Calabretta Commission Chair TRANSPORTATION COMMISSION trans@ci.moscow. id. us -Meeting Minutes August 9, 2018 http://www.ci.moscow.id.us/556ffransportation-commission Les MacDonald Staff Liaison 208.883.7028