1 AWARDED: CALL ORDER: 020 PROJECT NO.:CIRB-102C(126)RB J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 200 COUNTY: ALFALFA HIGHWAY NO.: EW-25 LENGTH: MILES DESCRIPTION : GRADE, DRAIN, SURFACE, AND BRIDGE LOCATION : COUNTY ROAD (EW-25) : FROM 1.0 MILE WEST OF THE WOODS COUNTY LINE, EXTEND EAST. CONTRACT AMOUNT : $ 3,696, CONTRACTOR : THE CUMMINS CONSTRUCTION CO., INC. ENID OK AWARDED: CALL ORDER: 060 PROJECT NO.:HSIP-205C(019)TR J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 30 COUNTY: BECKHAM HIGHWAY NO.: SH-30 LENGTH: MILES DESCRIPTION : SAFETY IMPROVEMENT (SCHOOL ZONE) LOCATION : SH-30: AT EW-111 IN THE TOWN OF SWEETWATER. CONTRACT AMOUNT : $ 14, CONTRACTOR : TRAFFIC SIGNALS, INC. AWARDED: CALL ORDER: 100 PROJECT NO.:SSP-107C(154)SS J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 240 COUNTY: BRYAN HIGHWAY NO.: SH-48 LENGTH: MILES LOCATION : SH-48: OVER THE BLUE RIVER AND BLUE RIVER OVERFLOW, 1.6 MI NORTH OF SH-78. CONTRACT AMOUNT : $ 3,298, CONTRACTOR : PARADIGM CONSTRUCTION & ENGINEERING, INC TULSA OK
2 AWARDED: CALL ORDER: 120 PROJECT NO.:NHPPIY (437) J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 90 COUNTY: CADDO HIGHWAY NO.: I-40 LENGTH: MILES DESCRIPTION : BRIDGE REHABILITATION LOCATION : I-40: AT MILEPOST CONTRACT AMOUNT : $ 344, CONTRACTOR : REDLANDS CONTRACTING, LLC AWARDED: CALL ORDER: 140 PROJECT NO.:STPG-214E(018)AG J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 60 COUNTY: CLEVELAND HIGHWAY NO.: CITY STREETS LENGTH: MILES DESCRIPTION : TRAFFIC SIGNALS (VIDEO DETECTION UPGRADE) LOCATION : CITY STREETS: AT MULTIPLE LOCATIONS IN THE CITY OF NORMAN. CONTRACT AMOUNT : $ 482, CONTRACTOR : TRAFFIC SIGNALS, INC. AWARDED: CALL ORDER: 160 PROJECT NO.:STP-119D(184)CI J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 110 COUNTY: CREEK HIGHWAY NO.: COUNTY ROAD (EW-91) LENGTH: MILES LOCATION : COUNTY ROAD (EW-91): OVER SANDY CREEK, 2.0 MILES EAST OF SH-48. CONTRACT AMOUNT : $ 677, CONTRACTOR : BELK BRIDGE, INC. BROKEN ARROW OK
3 AWARDED: CALL ORDER: 190 PROJECT NO.:SSP-219B(021)SS J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 90 COUNTY: CREEK HIGHWAY NO.: SH-51 LENGTH: MILES DESCRIPTION : TRAFFIC SIGNALS LOCATION : SH-51: FROM 3.7 MILES WEST OF THE TULSA C/L IN MANNFORD. CONTRACT AMOUNT : $ 100, CONTRACTOR : MIDSTATE TRAFFIC CONTROL, INC. AWARDED: CALL ORDER: 195 PROJECT NO.:CIRB-137C(075)RB J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 90 COUNTY: KINGFISHER HIGHWAY NO.: COUNTY ROAD(NS-274) LENGTH: MILES DESCRIPTION : GRADE, DRAIN, AND SURFACE LOCATION : COUNTY ROAD (NS-274): FROM 4.0 MILES SOUTH OF SH-33, EXTEND NORTH. CONTRACT AMOUNT : $ 1,733, CONTRACTOR : DUIT CONST. CO, INC./TTK CONST. CO., INC AWARDED: CALL ORDER: 200 PROJECT NO.:HSIPG-237F(007)TR J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 30 COUNTY: GRANT HIGHWAY NO.: MULTIPLE LOCATIONS LENGTH: MILES DESCRIPTION : SAFETY IMPROVEMENT (RUMBLE STRIP) LOCATION : SH-3/SH-11/SH-33: AT MULTIPLE LOCATIONS IN DIVISION IV. CONTRACT AMOUNT : $ 67, CONTRACTOR : ACTION SAFETY SUPPLY CO.
4 AWARDED: CALL ORDER: 240 PROJECT NO.:STPY-241C(008)RW J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 180 COUNTY: LINCOLN HIGHWAY NO.: US-62 LENGTH: MILES DESCRIPTION : RIGHT-OF-WAY CLEARANCE LOCATION : US-62: FROM 0.65 MILES WEST OF THE LINCOLN/OKLAHOMA COUNTY LINE, EXTEND EAST. CONTRACT AMOUNT : $ 45, CONTRACTOR : M & M WRECKING, INC. BLANCHARD OK AWARDED: CALL ORDER: 260 PROJECT NO.:STPG-242C(010)AG J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 15 COUNTY: LOGAN HIGHWAY NO.: CITY STREETS LENGTH: MILES DESCRIPTION : STRIPING AND PAVEMENT MARKING LOCATION : CITY STREETS: AT MULTIPLE LOCATIONS IN LOGAN COUNTY. CONTRACT AMOUNT : $ 27, CONTRACTOR : ACTION SAFETY SUPPLY CO. AWARDED: CALL ORDER: 280 PROJECT NO.:SSP-243N(002)SS J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 210 COUNTY: LOVE HIGHWAY NO.: I-35 LENGTH: MILES DESCRIPTION : GRADE, DRAIN, SURFACE, AND BRIDGE LOCATION : I-35: NORTH HALF OF INTERCHANGE AT WINSTAR BLVD (PHASE 2). CONTRACT AMOUNT : $ 7,484, CONTRACTOR : SILVER STAR CONSTRUCTION CO., INC. MOORE OK
5 AWARDED: CALL ORDER: 300 PROJECT NO.:SSP-247C(003)SS J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 30 COUNTY: MAJOR HIGHWAY NO.: SH-8 LENGTH: MILES DESCRIPTION : BRIDGE PAINTING LOCATION : SH-8: OVER DEEP CREEK, 2.0 MILES NORTH OF THE BLAINE COUNTY LINE. CONTRACT AMOUNT : $ 97, CONTRACTOR : P & H STUCCO & CONSTRUCTION, INC. TARPON SPRINGS FL AWARDED: CALL ORDER: 320 PROJECT NO.:STPY-252C(010) J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 30 COUNTY: CANADIAN HIGHWAY NO.: MULTIPLE LOCATIONS LENGTH: MILES DESCRIPTION : BRIDGE WATER PROOF SEAL LOCATION : I-35/I-40/US-77/US-81/US-177: AT MULTIPLE LOCATIONS IN DIVISION IV. CONTRACT AMOUNT : $ 156, CONTRACTOR : JLT CONTRACTING, LLC CUSHING OK AWARDED: CALL ORDER: 340 PROJECT NO.:STPG-155F(363)AG J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 45 COUNTY: OKLAHOMA HIGHWAY NO.: CITY STREETS LENGTH: MILES DESCRIPTION : STRIPING AND PAVEMENT MARKING LOCATION : CITY STREETS: AT MULTIPLE LOCATIONS IN DEL CITY. CONTRACT AMOUNT : $ 71, CONTRACTOR : ACTION SAFETY SUPPLY CO.
6 AWARDED: CALL ORDER: 360 PROJECT NO.:STP-155C(604)AG J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 250 COUNTY: OKLAHOMA HIGHWAY NO.: CITY STREET LENGTH: MILES DESCRIPTION : GRADE, DRAIN, SURFACE, AND BRIDGE LOCATION : CITY STREET (KELLY AVE): FROM COVELL RD, EXTEND NORTH TO COFFEE CREEK RD IN EDMOND. CONTRACT AMOUNT : $ 5,934, CONTRACTOR : DUIT CONST. CO, INC./TTK CONST. CO., INC AWARDED: CALL ORDER: 380 PROJECT NO.:STP-157D(090)CI J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 120 COUNTY: OSAGE HIGHWAY NO.: COUNTY ROAD LENGTH: MILES LOCATION : COUNTY ROAD (EW-45) : OVER QUAPAW CREEK, 0.5 MILE SOUTH OF SH-20. CONTRACT AMOUNT : $ 1,142, CONTRACTOR : PARADIGM CONSTRUCTION & ENGINEERING, INC TULSA OK AWARDED: CALL ORDER: 390 PROJECT NO.:STP-165D(123)CI J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 90 COUNTY: ROGER MILLS HIGHWAY NO.: COUNTY ROAD (EW-92) LENGTH: MILES LOCATION : COUNTY ROAD (EW-92): OVER CAMP HOLLOW CREEK 3.5 MILES EAST AND 2.0 MILES NORTH OF THE NORTH SH-30/SH-47 JCT. CONTRACT AMOUNT : $ 421, CONTRACTOR : SEWELL BROS., INC.
7 AWARDED: CALL ORDER: 400 PROJECT NO.:CIRB-175D(099)RB J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 210 COUNTY: WASHITA HIGHWAY NO.: COUNTY ROAD LENGTH: MILES DESCRIPTION : GRADE, DRAIN, AND SURFACE LOCATION : COUNTY ROAD (NS-225): FROM SH-152, EXTEND NORTH IN CORDELL. CONTRACT AMOUNT : $ 2,793, CONTRACTOR : CORNELL CONST. CO., INC. CLINTON OK AWARDED: CALL ORDER: 420 PROJECT NO.:STPY-176B(096)SS J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 340 COUNTY: WOODS HIGHWAY NO.: US-281 LENGTH: MILES LOCATION : US-281: OVER THE CIMMARON RIVER, 0.8 MILES NORTH OF THE MAJOR COUNTY LINE. CONTRACT AMOUNT : $ 7,411, CONTRACTOR : SEWELL BROS., INC.
8 LETTING DATE = 05/16/13 REJECTED: CALL ORDER: 180 PROJECT NO.:STP-219B(016)SG J.P. NUMBER: BAMS NO: CALENDAR DAYS ALLOTTED: 60 COUNTY: CREEK HIGHWAY NO.: SH-51 LENGTH: MILES DESCRIPTION : LIGHTING LOCATION : SH-51: FROM 2.0 MILES EAST OF SH-48 IN MANNFORD, EXT EAST. CONTRACT AMOUNT : CONTRACTOR :
9 LETTING DATE = 05/16/13 THE TOTAL AMOUNT OF AWARDED CONTRACTS: $ 36,001, ================ THE TOTAL AMOUNT OF REJECTED CONTRACTS: $ 433, ================ THE TOTAL AMOUNT OF DEFERRED CONTRACTS: $ 0.00 ================
AWARDED: CALL ORDER: 015 PROJECT NO.:STP-205C(038)3P J.P. NUMBER:3110804 BAMS NO: 150045 CALENDAR DAYS ALLOTTED: 30 COUNTY: BECKHAM HIGHWAY NO.: I-40B LENGTH: 1.6200 MILES LOCATION : I-40B: FROM THE NORTH
More information06/01/15 AWARDED: CALL ORDER: 005 PROJECT NO.:CIRB-102C(130)RB J.P. NUMBER:2483209 BAMS NO: 150183 CALENDAR DAYS ALLOTTED: 150 COUNTY: ALFALFA HIGHWAY NO.: COUNTY ROAD (NS-255) LENGTH: 5.0300 MILES DESCRIPTION
More information*REVISED-AWARDED CALL ORDER /09/13
*REVISED-AWARDED CALL ORDER 180 12/09/13 AWARDED: CALL ORDER: 020 PROJECT NO.:NHPPY-101N(023)SS J.P. NUMBER:1692809 BAMS NO: 130355 CALENDAR DAYS ALLOTTED: 365 COUNTY: ADAIR HIGHWAY NO.: US-59 LENGTH:
More informationAWARDED: CALL ORDER: 043 PROJECT NO.:NHPPY-203N(012)3P J.P. NUMBER:2972604C BAMS NO: 130128 CALENDAR DAYS ALLOTTED: 60 NHPPY-261N(012)3P 2967604C NHPPY-264N(008)3P 2972704C COUNTY: ATOKA HIGHWAY NO.: SH-7/SH-3
More informationOKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 06/18/15 AWARD DATE = 07/06/15
AWARDED: CALL ORDER: 010 PROJECT NO.:NHPP-201N(014)RW J.P. NUMBER:1692823 BAMS NO: 150186 CALENDAR DAYS ALLOTTED: 180 COUNTY: ADAIR HIGHWAY NO.: US-59 LENGTH: 3.3140 MILES DESCRIPTION : RIGHT-OF-WAY CLEARANCE
More informationOKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 04/16/15 AWARD DATE = 05/04/15
05/04/15 AWARDED: CALL ORDER: 010 PROJECT NO.:CIRB -202C(028)RB J.P. NUMBER:2483308 BAMS NO: 150120 CALENDAR DAYS ALLOTTED: 120 COUNTY: ALFALFA HIGHWAY NO.: COUNTY ROAD (EW-08) LENGTH: 3.9690 MILES DESCRIPTION
More informationAWARDED: CALL ORDER: 020 PROJECT NO.:STPY-101A(072) J.P. NUMBER:2422904 BAMS NO: 090608 CALENDAR DAYS ALLOTTED: 325 COUNTY: ADAIR HIGHWAY NO.: US-59 LENGTH: 2.6800 MILES DESCRIPTION : GRADING, DRAIN, AND
More informationOKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 03/16/17 AWARD DATE = 04/10/17
AWARDED: CALL ORDER: 010 PROJECT NO.:STP-202C(033) J.P. NUMBER:2794304 BAMS NO: 170112 CALENDAR DAYS ALLOTTED: 300 COUNTY: ALFALFA HIGHWAY NO.: SH-8 LENGTH: 0.2510 MILES LOCATION : SH-8: OVER DRIFTWOOD
More informationOKLAHOMA DEPARTMENT OF TRANSPORTATION BAMS/LAS - NOTICE OF CONTRACT AWARDS LETTING DATE = 11/16/17 AWARD DATE = 12/04/17
AWARDED: CALL ORDER: 400 PROJECT NO.:NHPPI-216N(021)SS J.P. NUMBER:2705004 BAMS NO: 170342 CALENDAR DAYS ALLOTTED: 300 COUNTY: COMANCHE HIGHWAY NO.: I-44 LENGTH: 0.9610 MILES DESCRIPTION : INTERCHANGE
More informationOKLAHOMA DEPARTMENT OF TRANSPORTATION
BID OPENING OF November, 0 November, 0 PROJECT NO.: STP-NBIL(8)CI CALL ORDER: 00 COUNTY: CARTER DESCRIPTION: BRIDGE AND APPROACHES J.P. NUMBER 70 PROPOSAL NUMBER: 08 HIGHWAY NO: COUNTY ROAD COUNTY ROAD
More informationAWARDED: CALL ORDER: 030 PROJECT NO.:NHY-13N(116)TR J.P. NUMBER:2409804 BAMS NO: 070225 CALENDAR DAYS ALLOTTED: 30 COUNTY: ATOKA HIGHWAY NO.: US-69/US-75 LENGTH: 0.0000 MILES DESCRIPTION : TRAFFIC SIGNALS
More informationAWARDED: CALL ORDER: 020 PROJECT NO.:BRFY-017N(018) J.P. NUMBER:1020904 BAMS NO: 080410 CALENDAR DAYS ALLOTTED: 300 COUNTY: ATOKA HIGHWAY NO.: SH-3 LENGTH: 1.1740 MILES LOCATION : SH-3: OVER MUDDY BOGGY
More informationAWARDED: CALL ORDER: 020 PROJECT NO.:BRO-103D(059)CO J.P. NUMBER:2110304 BAMS NO: 070001 CALENDAR DAYS ALLOTTED: 120 COUNTY: ATOKA HIGHWAY NO.: COUNTY ROAD LENGTH: 0.1530 MILES DESCRIPTION : BRIDGE & APPROACHES
More informationAWARDED: CALL ORDER: 080 PROJECT NO.: SAP-111D(41) J.P. NUMBER: 1879104 BAMS NO: 010065 CALENDAR DAYS ALLOTTED: 30 COUNTY: CHEROKEE HIGHWAY NO.: PARK ROAD LENGTH: 0.000000 MILES LOCATION : SEQUOYAH STATE
More informationOKLAHOMA DEPARTMENT OF TRANSPORTATION DATE : October 20, 2000 BID OPENING OF October 19, 2000
PROJECT NO.: E-SAP-144B(36) J.P. NUMBER: 18705(04) CALL ORDER: 010 PROPOSAL NUMBER: 000504 COUNTY: MCCLAIN HIGHWAY NO.: SH-9 DESCRIPTION: BRIDGE REPAIR LOCATION : ON SH-9 OVER I-35 APPROXIMATELY 0.5 MILE
More informationOKLAHOMA DEPARTMENT OF TRANSPORTATION DATE : October 18, 2000 BID OPENING OF October 19, 2000
PROJECT NO.: E-SAP-144B(36) J.P. NUMBER: 18705(04) CALL ORDER: 010 PROPOSAL NUMBER: 000504 COUNTY: MCCLAIN HIGHWAY NO.: SH-9 DESCRIPTION: BRIDGE REPAIR LOCATION : ON SH-9 OVER I-35 APPROXIMATELY 0.5 MILE
More informationOKLAHOMA DEPARTMENT OF TRANSPORTATION. FFY-2018 through FFY-2021 Asset Preservation Plan
OKLAHOMA DEPARTMENT OF TRANSPORTATION FFY-2018 through FFY-2021 Asset Preservation Plan Table of Contents SECTION I FOREWORD - Letter from the Director SECTION II BUDGETARY PROJECTIONS SECTION III BALANCING
More informationSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FFY 2018
FFY 2018 STIP: STATEWIDE RAIL CROSSING ITEM PROJECTS 99 9 1704924 R R 0 SAFETY IMPROVEMENT PROJECTS=PROTECTION DEVICES, CROSSING SURFACES, 2018 ADVANCE WARNING SIGNS, STRIPING, CLOSURES, ETC $8,000,000
More informationSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FFY 2019
FFY 2019 STIP: STATEWIDE RAIL CROSSING PROJECTS- ITEM PROJECTS 99 9 1704925 R R 0 SAFETY IMPROVEMENT PROTECTION DEVICES, CROSSING SURFACES, ADVANCE 2019 WARNING SIGNS, STRIPING, CLOSURES, ETC SPR $8,000,000
More informationBowhunter Observation Survey
Oklahoma Department of Wildlife Conservation Bowhunter Observation Survey 2017-Season The Oklahoma Department of Wildlife Conservation (ODWC) sought participation from bowhunters for the second annual
More informationAsphalt Concrete Plants With Expired or Nearly Expired Scale Certifications (Scales must be recertified every six months)
Asphalt Concrete lants With Expired or Nearly Expired Scale Certifications : Expired : Will expire in the next month or less : ortable lant IA Evaluator Name: Bobby Winkle Count of Scale Certs.: 1 Div
More informationTO: CHEER COACHES FROM: Amy J. Cassell RE: STATE CHAMPIONSHIP CHEER COMPETITION FACILITY INFORMATION DATE: SEPTEMBER 22, 2018
TO: CHEER COACHES FROM: Amy J. Cassell RE: STATE CHAMPIONSHIP CHEER COMPETITION FACILITY INFORMATION DATE: SEPTEMBER 22, 2018 Below you will find important information regarding the Mabee Center at Oral
More informationBowhunter Observation Survey
Oklahoma Department of Wildlife Conservation Bowhunter Observation Survey 2016-Season The Oklahoma Department of Wildlife Conservation (ODWC) sought participation from bowhunters for the inaugural Bowhunter
More informationAffordable Housing Needs.
Affordable Housing Needs www.oklahomahousingneeds.org P r o j e c t T e a m Owen S. Chip Ard, MAI Executive Vice President chip.ard@am.jll.com David A. Puckett, MAI Senior Vice President david.puckett@am.jll.com
More informationOKLAHOMA SECONDARY SCHOOL ACTIVITIES ASSOCIATION P.O. Box 14590, Oklahoma City, Oklahoma
OKLAHOMA SECONDARY SCHOOL ACTIVITIES ASSOCIATION P.O. Box 14590, Oklahoma City, Oklahoma 73113-0590 TO: Principals/Cheerleading Coaches FROM: Amy Cassell, Assistant RE: State Cheerleading Championship
More informationLegislative Update Williamsburg Residency
Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:
More informationSouthmoore Instrument Arts Program 2019 Spring Calendar
Southmoore Instrument Arts Program 20 Spring Calendar It is time to get started! We have another fantastic spring semester planned. As you look over this calendar, please take note of the following: Ø
More informationOKLAHOMA DEPARTMENT OF WILDLIFE CONSERVATION FISHERIES DIVISION
OKLAHOMA DEPARTMENT OF WILDLIFE CONSERVATION FISHERIES DIVISION PUBLIC STOCKING REPORT 2016 Table Of Contents SUMMARY OF SPECIES STOCKED... 3 PUBLIC STOCKINGS BY REGION... 4 CENTRAL REGION... 4 EAST CENTRAL
More informationODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.
ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,
More informationFY Regional Transportation Improvement Program
FY2014-2018 Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell
More informationKentucky Highway District 7
Kentucky Highway District 7 ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit organization
More informationEstimated 2014 ARC-CO Wheat Payments Kansas and Oklahoma 1
Disclaimer: This web page is designed to aid farmers with their marketing and risk management decisions. The risk of loss in trading futures, options, forward contracts, and hedge-to-arrive can be substantial
More informationCheck Out the Discounts for OU Employees at These Participating Fitness Centers!
Check Out the Discounts for OU Employees at These Participating Fitness Centers! KODA CrossFit OKC KODA Norman CrossFit Norman Gold s Gym various locations Fitness One Deer Creek CrossFit Edmond/NOKC CrossFit
More informationOKLAHOMA DEPARTMENT OF WILDLIFE CONSERVATION FISHERIES DIVISION
OKLAHOMA DEPARTMENT OF WILDLIFE CONSERVATION FISHERIES DIVISION PUBLIC STOCKING REPORT 2017 Table of Contents SUMMARY OF SPECIES STOCKED... 3 PUBLIC STOCKINGS BY REGION... 4 Central Region... 4 East Central
More informationCulpeper District. Albemarle County Monthly Report September, 2011
Culpeper District Albemarle County Monthly Report Special Issues FY Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications
More informationWYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways
WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to
More informationClub County Steer Heifer Total Stall Space Barn Column Stall # Stilwell FFA Adair 9 7 Total Adair F-150 E Alfalfa County 4-H Alfalfa
Stilwell FFA Adair 9 7 Total Adair 9 7 9 F-150 E3 1456-1466 Alfalfa County 4-H Alfalfa 0 8 Cherokee FFA Alfalfa 2 0 Timberlake FFA Alfalfa 1 6 Total Alfalfa 3 14 14 Expedition A12 East 1281-1297 Atoka
More informationHIR on Oklahoma Turnpikes
HIR on Oklahoma Turnpikes Tammy Robinson, P.E., Division Engineer EST, Inc. Stephen A. Cross, PhD, PE Professor, Oklahoma State Executive Director Pavement Recycling & Reclaiming Center HIR on Oklahoma
More informationODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR
ODOT DISTRICT 9 2019 CONSTRUCTION PROGRAM SERVING ADAMS, BROWN, HIGHLAND, JACKSON, LAWRENCE, PIKE, ROSS AND SCIOTO COUNTIES MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT
More informationFY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects
-2022 Transportation Improvement Program - DRAFT Project Number Alamo Area Commute Solutions Pgm - FY 2017 5101.0 0915-12-547 AACOG Alamo Area Commute Solutions Pgm - FY 2018 5102.0 0915-12-543 AACOG Alamo
More informationSIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS
TOTAL LETTING DATE AWARD DATE NOTES Interstate Maintenance s 2.00 IM 0020(155) 04X N McCook Minnehaha 0.0 Mitchell Region on I90 Scour Protection $873,000 $960,000 Cancelled $0 $0 Minor Arterial 1.00 Minor
More informationREPAIRS AND RESURFACING, VERMILION VALLEY SERVICE PLAZA, MILEPOST , LORAIN COUNTY, OHIO MAY 23, 2016 AT 2:00 P.M.
General Info Number: Description: Deadline: (Estimated Cost: $1,000,000) PROJECT NO. 53-16-03 REPAIRS AND RESURFACING, VERMILION VALLEY SERVICE PLAZA, MILEPOST 139.50, LORAIN COUNTY, OHIO MAY 23, 2016
More informationPEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES
PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES UNDERSTANDING THE ISSUES Intersections of freeway ramp terminals at crossroads are the most critical components of an interchange Challenge: balance mobility
More informationTabulation of Bids. Counties: Project(s):
Page: 1 14 ROTE 94, ROTE 46 TO OLD COACH RD Quantity and nits nit Price nit Price nit Price 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 154003P MOBILIZATION 0007 157004M CONSTRCTION LAYOT 0012
More informationVertical Alignment. Concepts of design & guidelines Computing elevations along vertical curves Designing vertical curves
Vertical Alignment Concepts of design & guidelines Computing elevations along vertical curves Designing vertical curves Flat terrain You can select smooth horizontal alignment and smooth vertical alignment
More informationCulpeper District. Albemarle County Monthly Report October, 2011
Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications
More informationTRANSPORTATION COMMISSION OF WYOMING
TRANSPORTATION COMMISSION OF WYOMING The Transportation Commission of Wyoming met in the Commission Room of the Transportation Headquarters building in Cheyenne on June 24, 2010. The teleconference was
More informationU.S. HIGHWAY 50 IMPROVEMENT PROJECT
U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY
More informationLINE ITEM REPORT 9/18/2009
Fiscal Year STIM Ind ARRA Cert County JP Number Project No. CLEVELAND 22670(07) STPY 114C (259) LINE ITEM REPORT 9/18/2009 KINGFISHER 25884(04) STP -137D (083) RR 10/21/2008 Awarded GRANT 25986(04) STP
More information***PROJECT NO AWARDED TO E.S. WAGNER VIA RESOLUTION NO ON JANUARY 19, 2016***
General Info Number: PROJECT NO. 43-16-03 Description: Deadline: BRIDGE DECK REPLACEMENT AND REHABILITATION, CLIFTON-GUNN ROAD OVER OHIO TURNPIKE M.P. 21.4, RUEGER-SHETLER ROAD OVER OHIO TURNPIKE M.P.
More informationCOUNTY OF HUNTERDON DEPARTMENT OF PUBLIC WORKS ROADS, BRIDGES & ENGINEERING PROJECT SUMMARY
COUNTY OF 2 HUNTERDON 0 1 DEPARTMENT OF PUBLIC WORKS ROADS, BRIDGES & ENGINEERING PROJECT SUMMARY 7 BOARD OF CHOSEN FREEHOLDERS COUNTY ADMINISTRATION BUILDING 71 MAIN STREET PO BOX 2900, FLEMINGTON, NJ
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present
More informationApparent Bids for Letting of January 20, 2017
Apparent Bids for Letting of January 20, 2017 Letting ID: 170120 Cut-Off Time: 11:00:59 AM A01-170120-A01 NODAWAY ****(1): Job J1P3056B Route 71 NODAWAY County. Bridge painting over White Cloud Creek north
More informationThe Richland County Transportation Penny Program. September 21, 2015
The Richland County Transportation Penny Program September 21, 2015 Program Funding Categories Bike / Ped./ Greenway, $80,888,356 Administration, $32,100,000 Bus Service, $300,991,000 Roadway Projects,
More informationAPPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13,
APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER 2013 14:19 Thursday, June 13, 2013 1 ABILENE DISTRICT FUNC AUTHORIZED TOTAL EST OVER- TAYLOR 0034-01-124 US 83 C 34-1-124 5 3.2 P14BM $2,112,500 $3,721,952
More informationSummary of Local HSIP Solicitation State Fiscal Years (SFY) 2016, 2017, 2018 & 2019
Summary of Local HSIP Solicitation State Fiscal s 2016, 2017, 2018 & 2019 Project Selection: A selection team with representation from the State Aid Division (SALT), the Office of Traffic, Safety, and
More informationOrange County Rail-Highway Grade Crossing Safety Enhancement Program. City of San Juan Capistrano April 17, 2012
Orange County Rail-Highway Grade Crossing Safety Enhancement Program City of San Juan Capistrano April 17, 2012 Orange County Rail-Highway Grade Crossing Safety Enhancement Program (OCX) 52 crossings 8
More informationINCOG Board of Directors
INCOG Board of Directors Thursday, January 14, 2010 Progress Report of the Regional Trails Master Plan Adopted July 1999 History of Master Plan Development Plan Vision 283 miles of multi-use trails 207
More informationPavement Rehabilitation & Buffered Bike Lane
Pembina Highway from Grant Avenue to Osborne Street Pavement Rehabilitation & Buffered Bike Lane Welcome April 21, 2016 Please complete and submit a comment sheet prior to leaving or complete it online
More informationGeneral Notes. Project No /15/2018 Page 1 of 1
5025 Page 1 of 10 General Notes 5/15/2018 Page 1 of 1 Project No. 82 18-18- 82 KA D 5025-01 0307-19 1 2 Note The contractor is responsible for establishing and maintaining centerline of the traveled way
More informationAnnual Listing of Obligated MPO Projects
Thurston Regional Planning Council Annual Listing of Obligated MPO Projects CY 2015 March, 2016 2424 Heritage Court SW, Suite A, Olympia, WA 98502 360.956.7575 www.trpc.org About TRPC, established in 1967,
More informationWYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)
WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION
More informationCurrent Roadway Projects Wednesday, September 03, 2014
Current Roadway Projects Wednesday, September 03, 2014 Restore our Roads Projects 1 US 72 East at Moores Mill Road Additional lane WB from Moores Mill to Sparkman Drive and intersection improvements at
More informationSR 2108-A12 Forbes Avenue Betterment. March 1, 2018
SR 2108-A12 Forbes Avenue Betterment March 1, 2018 Introductions Project Team PENNDOT Cheryl Moon-Sirianni, PE; District Executive Jason Zang, P.E.; Acting Assistant District Executive-Construction John
More information"Emul Asph (SS-1HP) Tack".
Page 1 of 25 Application of Emulsified Asphalt, (fog seal 2-lane section). Using a distributor, uniformly apply fog seal to the rumble strip with two passes of the distributor, one in each direction of
More informationGeneral Notes. Project No /15/2018 Page 1 of 1
5081 Page 1 of 13 General Notes 5/15/2018 Page 1 of 1 Project No. 82 183-82 KA D 5081-01 0309-19 1 2 Note The contractor is responsible for establishing and maintaining centerline of the traveled way for
More informationBRIDGE REPLACEMENT AND REHABILITATION PROGRAM
BRIDGE REPLACEMENT AND REHABILITATION PROGRAM INTRODUCTION An integral element of the City's transportation infrastructure is a network of bridges designed to carry vehicular, railroad, light rail, pedestrian,
More informationLee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update January 10-16, 2019 Summerlin Road & Colonial Blvd: Lee County DOT will
More informationTabulation of Bids. Counties:
Page 1 of 16 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 153003P PROGRESS SCHEDLE 0005 153005M PROGRESS SCHEDLE PDATE 0006 153011M TRAINEES 0007 154003P MOBILIZATION 0010 157004M CONSTRCTION LAYOT
More informationMISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET 1 COUNTY
DESIGN DESIGNATION A.A.D.T - XXXX = XXXX V = XX M.P.H PLANS FOR PROPOSED HIGHWAY INDEX OF SHEETS DESCRIPTION TITLE SHEET ----------------------- 1 TYPICAL SECTIONS (TS) (1 SHEET)-- QUANTITIES (QU) (1 SHEET)--------
More informationTO: CHEER COACHES FROM: Amy J. Cassell RE: STATE CHAMPIONSHIP CHEER COMPETITION FACILITY INFORMATION DATE: SEPTEMBER 22, 2014
7300 N. Broadway Extension Oklahoma City 73116 PO Box 14590 Oklahoma City 73113 Phone: 405-840-1116 Fax: 405-840-9559 O K L A H O M A S E C O N D A R Y S C H O O L A C T I V I T I E S A S S O C I A T I
More informationAmericans with Disabilities Act Transition Plan for Public Right-of-Way Improvements
Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Prepared by: Public Works Department Engineering Division October 2015 Table of Contents Section I Introduction.. 3
More informationTRAFFIC OPERATIONS DEPARTMENT
TRAFFIC OPERATIONS DEPARTMENT TRAFFIC OPERATION S MISSION STATEMENT To provide the highest level of service to the citizens of Waterloo by providing reductions of accidents, congestion, and travel times
More informationFY 2006 TRANSPORTATION CAPITAL PROGRAM
Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported
More informationNapa Hot Air Balloon Adventure
Napa Hot Air Balloon Adventure * August 24 Lunch at The Grill at Silverado Golf Course * August 24-1 night stay at Napa River Inn * August 24 - Celadon's Restaurant - Napa River Mill Complex * August 25
More informationPRESENTATION OUTLINE
November 8, 2017 PRESENTATION OUTLINE Regional Express Lanes Network Purpose/Benefits of Express Lanes 95 Express Phase 3C Project Video and Overview 95 Express Phase 3C Schedule 2 SOUTH FLORIDA REGIONAL
More informationDistrict 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID
77825 SA US 6/20 14.61/14.59 R Resurface US-6/US-20; perform necessary (Originally PID 76709); UPDATE (9/25/14) added culvert at SA-20-22.50 PID 95861. SSAUS00006**C 14.610 18.450 8,950,000.00 SA US 6/20
More informationTabulation of Bids. Counties: ROUTE 202,ALEXAUKEN CREEK ROAD TO RT 179/CR514
Page 1 of 17 18 HNTERDON ROTE 202,ALEXAKEN CREEK ROAD TO RT 179/CR514 Quantity and nits nit Price nit Price nit Price SECTION: 0001 ROADWAY 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 153003P PROGRESS
More informationS/TIP LIST OF PROJECTS
LI OF PROJECTS : October 04, 2018 Page: 1 of 5 Responsible GPA Type Name Limits Length Primary 2017 120683 Berrien Berrien Line Dayton Rd Multiple 2.448 Segments $69,210 $0 $24,742 $93,952 $93,952.00 U
More informationNorth Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary
Division One Highway Infrastructure Program Summary 1 Hyde NC 12 Northern Ferry Dock Ocracoke Village R-5149 Resurface and Widening to Accommodate Bicycling 13.3 $3,310,000 $0 $3,310,000 Jul-09 1 Dare
More information2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage
2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000
More informationTaylor Road Resurfacing Project
Project General Information: Contractor: Perk Company, Inc. Awarded: July 28, 2011 Signed Contract: August 25, 2011 Project Bid Price: $3,600,000 Project Length: 1.5 miles 2 General Information: Project
More informationUpdate January 4, 2016
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE Update January 4, 2016 Cape Coral - Del Prado Boulevard Lee County DOT
More informationUPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase
Presentation for County Board, February 27, 2018 Regular Hearing N. Lynn Street Esplanade and Custis Trail Improvements Funding Request for VDOT Construction Bid Award UPC Design 70762 / CN 109813 Locally
More informationSFY Transportation Improvement Program Highway and Bikeway Element Amendments
PID Project Description SFY 2014-2017 Transportation Improvement Program Highway and Bikeway Element Amendments Type of Work Funding Data CUY FARNSLEIGH RD IMPROVEMENT Bike/Pedestrian/Streetscape C Shaker
More informationShort and Long Term Needs
Short and Long Term Needs The short- and long-term programs of proposed projects listed below have been designed to address the mobility issues in South Montgomery County. These improvements to the transportation
More informationMILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO
MILEGROUD - AIRPORT ROAD US 119 Monongalia County The Mileground - Airport Road project on US 119 involves upgrading the three-lane facility to a five-lane facility to help eliminate congestion and improve
More informationCity of Conway Mayor s Office 1201 Oak Street Conway, AR Invitation and Bid
City of Conway Mayor s Office 1201 Oak Street Conway, AR 72032 www.cityofconway.org Invitation and Bid 2010-25 INVITATION TO THE VENDOR ADDRESSED: Bidders are invited to furnish the items listed herein
More informationENERGY SECTOR ROADWAY REPAIR PROJECT. August 15, 2013 Industry Workshop
ENERGY SECTOR ROADWAY REPAIR PROJECT August 15, 2013 Industry Workshop Safety Moment Sign-in Sheet Exit Locations Gathering Point Directions from Emergency Responders Signal to re-enter the Building or
More informationPlan Holders Listing October 19, 2018 Letting (1) CN McKinley County
(1) CN 6100902 McKinley County Albuquerque Asphalt Inc. P.O. Box 66450 Albuquerque, NM 87193 (505) 831-7311 BSN Santa Fe 28 Bisbee Ct. Santa Fe, NM 87508 (505) 473-7973 Construction Reporter LLC 4901 Mcleod
More informationReplace Bridge 51 on Blackiston Mill Dr. over Silver Creek,
INDIANA PROJECTS 1558 Bridge 51 1601823 1601971 I 64 Blackiston Mill Road Phase II Charlestown Rd. Clark State Forest Road Maintenance E. Main Street Improvements to Blackiston Mill Road from just north
More informationMeadow Woods Elementary School
Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete
More informationDeSoto County. Fiscal Years FDOT Draft Tentative Five Year Work Program Project Highlights
DeSoto County Fiscal Years 2019-2023 FDOT Draft Tentative Five Year Work Program Project Highlights DeSoto Map ID 1 Project Description SR 70 over Joshua Creek - Bridge #040027 Bridge - Repair / Rehabilitation
More informationTabulation of Bids. Counties:
Page 1 of 27 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 153003P PROGRESS SCHEDLE 0005 153005M PROGRESS SCHEDLE PDATE 0006 154003P MOBILIZATION 0009 157004M CONSTRCTION LAYOT 0010 157006M MONMENT
More informationMISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET NUMBER
DESIGN DESIGNATION A.A.D.T - = V = M.P.H MISSOURI AND TRANSPORTATION PLANS FOR PROPOSED HIGHWAY INDE OF SHEETS SHEET DESCRIPTION NUMBER TITLE SHEET --------------------------- 1 TYPICAL SECTIONS (TS) (1
More informationWelcome! CHICAGO TO ST. LOUIS HIGH-SPEED RAIL Public Meeting.
Welcome! CHICAGO TO ST. LOUIS HIGH-SPEED RAIL Public Meeting www.idothsr.org Corridor Map Summit Chicago Station Rehabilitation Underway Joliet New Station Open New Station Under Construction Dwight Pontiac
More informationINTERSECTION WITH RIGHT TURN TAPER
(TYP.) TAPER 4" BROKEN INTERSECTION WITH RIGHT TURN TAPER 4" SOLID WHITE 4" BROKEN ARROW & LEGEND MARKINGS (SEE NOTE 2) INTERSECTION WITH RIGHT TURN LANE Notes: 1. Paint intersection tapers greater than
More informationUpdated There is no park access roadway to be constructed points beyond the limit of along full limits of the park's the phase I work. Phase 1. Revise
The signs will be installed as Temporary signs the color (Orange/White) have been added to the plans. Need to specify color to be used for stripes. Closures that may be in place for extended periods need
More informationPaul Vraney Bureau of Project Development 02/11/2016
Paul Vraney Bureau of Project Development 02/11/2016 ADA background & alterations definition Design considerations Provide sufficient layout data Curb ramp selection Maximum curb ramp and gutter slopes
More informationODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010)
Bikeways and Enhancements Report for Clermont County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL
More information