1 East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study Houston, TX Technical Memorandum April 15 th, 2009 Prepare by: 2950 North Loop West, Ste. 900 Houston, TX 77092

2 Table of Content I. Introduction II. Background III. Evaluations Pavement and Sidewalk Underground Utilities: Sanitary Sewer, Storm Sewer, Water Lines Traffic IV. Recommended Improvements V. Cost Estimates VI. List of Exhibits Exhibit 1: Study Area Limits Exhibit 2: Existing Pavement Condition Exhibit 3: Existing Sidewalk Condition Exhibit 4: Combined Existing Condition Exhibit 5: Existing Utilities Exhibit 6: Multimodal Exhibit 7: PM-Peak Traffic Counts Exhibit 8: Proposed Utilities Exhibit 9: Combined Proposed Improvements Exhibit 10: Existing AM and PM Peak-Hour Traffic Counts

3 I. Introduction The purpose of the East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study is the identification of needed improvements to the existing infrastructure and underground utilities as part of the East Downtown revitalization plan. In addition to the revitalization plan, a study for a proposed soccer stadium is underway bounded by Hutchins and Dowling from west to east and Walker and Texas from south to north. Another project that is also under study in the area is a proposed pedestrian walkway along Bastrop from Bell to Walker. HNTB s responsibilities include a field inventory and record verification of drainage, water and storm sewer facilities. The study area limits fall within the Key Map 493 and existing TIRZ No. 15 boundary, see Exhibit 1: Study Area Limits. II. Background TIRZ No. 15 is part of the East Downtown revitalization plan. East Downtown is located east of US Highway (US) 59 and north of Interstate Highway (IH) 45. TIRZ No. 15 is easily accessible from all parts of the Greater Houston Region, due to its proximity to US 59 and IH 45, and ramps connecting directly to Interstate 10. The study area is bounded by Prairie Street on the north, Leeland Street on the south, Chartres Street on the west and St. Charles Street on the east, omitting the proposed soccer stadium limits, see Exhibit 1. The East Downtown TIRZ Conceptual Redevelopment Plan prepared by HNTB in February 2003 evaluated land use, urban design framework, and infrastructure improvements for utilities, roadways, and sidewalks. This previous plan will be referenced throughout this study as part of the basis of recommendations and estimates. Existing land use in the study area is a mix of residential, including single family and multi family, industrial, and commercial warehouses. In addition, there are some undeveloped parcels and abandoned buildings within the study area that local artists are using as live-work studios. There are also restaurants, groceries and small shops, but there are no schools or churches located in the study area. III. Evaluations The existing condition of the study area was evaluated by field observation and review of the previous record drawings and report. The evaluations are divided into three sections: Pavement and Sidewalk, Underground Utilities (which includes sanitary sewer, storm sewer, and water line) and Traffic. Pavement and Sidewalk Existing pavement and sidewalk conditions were identified by field observation. Most of the north-south street pavements are in good, good to fair or fair condition, as shown in Exhibit 2. The east-west streets, such as Bell Street, Dallas Street, Lamar Avenue and

4 Walker Street, are mostly in fair to poor and poor condition. These streets have significant deficiencies with broken curbs, faded pavement markings, large pot holes and cracks in the pavement. Along Walker Street and St. Charles Street, sections of nonfunctioning railroad tracks cross the streets and create an uncomfortable driving experience. Streets and sidewalks were analyzed on all streets within the project except for the areas designated for the proposed soccer stadium footprint and along Bastrop Street for the proposed future pedestrian walkway from Bell Street to Walker Street Another street eliminated from the analysis was Texas Avenue due to the future Metro rail line that will be constructed along this street, see Exhibit 6. As shown in Exhibit 3, sidewalks surrounding new developments on Texas Ave are in good condition. On other streets, sidewalks either do not exist or they are in poor condition. Some sidewalks are deteriorating so badly that they are unusable. See exhibit 4 for the combined existing sidewalks and pavement condition. Underground Utilities: Sanitary Sewer, Storm Sewer, Water Lines Sanitary Sewer The East Downtown TIRZ area is served by the 69 th Street Treatment Plant. Existing sanitary sewer is provided by a series of lines ranging between 6-inch to 36-inch diameter pipes, which vary in age and type, as shown in Exhibit 5: Existing Utilities. For example, an existing 36-inch line on Bastrop, which runs from Bell Street to McKinney Street, was constructed in An 8-inch line on Chartres Street runs from Bell Street to Texas Avenue. The majority of the sanitary sewers are 8-inch in size throughout the study area, see Exhibit 5. HNTB received from the City of Houston (COH) Engineering Planning Branch proposed sanitary line upgrades of existing deficient sanitary lines. These COH recommendations account for possible future developments in order to service the sanitary needs of the area, see Exhibit 8. Sanitary work is scheduled to be completed under the Texas Commission on Environmental Quality (TCEQ) Agree Order for the fiscal year 2009 along Dowling, from McKinney to Bell and along St. Charles, from Lamar to Bell. Therefore, no sanitary sewer recommendations are made on these streets in this study. Storm Sewer Existing storm sewer is provided by a series of lines ranging between 18-inch to 48-inch diameter pipes, shown in Exhibit 5: Existing Utilities. HNTB requested previous drainage studies/reports for the study area from various agencies, including City of Houston, Texas Department of Transportation (TxDOT) and Harris County Flood Control District (HCFCD), but all stated that no studies/reports were available. Based on field observations, many locations along Lamar Avenue, Bell Street, Hutchins Street and

5 Clay Street have water ponding issues along the streets after rain events. This creates an unsafe driving condition, possible pavement infiltration and unappealing aesthetics. From record drawings of existing facilities and geographic information system (GIS) files obtained from the City of Houston, and the Comprehensive Drainage Plan (CDP), there are three lateral lines serving the interior areas of the study area: Texas Street, Lamar Street, Bell Street with 36-inch, 36-inch and 48-inch pipe size respectively, see Exhibit 5. Based on the evaluation of the existing drainage system, four criteria were used to determine potential drainage improvements for this Phase I analysis. 1. Bring existing TIRZ 15 storm sewers up to current City of Houston minimum pipe size standards. All existing storm sewers and leads with diameters less than 24-inches would be removed and replaced with minimum standard storm sewers. 2. Remove, plug, and where necessary, realign the existing storm sewer system within the proposed soccer stadium footprint. 3. Realign, where required, future proposed (CDP) storm sewers within the proposed soccer stadium footprint. 4. Combine the drainage recommendations from the HNTB 2003 study, which accounts for full build out of the area, with the requirements of the first three criteria above to propose an optimal drainage facility for the study area, see Exhibit 8: Proposed Utilities. Water Lines Existing water lines, range from 3/4-inch to 72-inch, of which some have been in service for more than 50 years, are scattered through the study area, shown in Exhibit 5: Existing Utilities. Existing water is supplied to the service area by a 24-inch water line along Hutchins Street constructed in As with the sanitary facilities, deficient water lines were also identified by the COH Engineering Planning Branch with proposed water line upgrades. Similar to the storm sewer analysis, a comparison was made with the HNTB 2003 report and an overall recommendation was developed, see Exhibit 8: Proposed Utilities. Traffic Traffic controls within the study area include 4-way stops and traffic signals. No traffic queue up or congestion is caused by the existing signal timing. Two sets of traffic tube counts were collected on weekdays in October and November of One set was collected on a day with an event and the other set was collected on a day without an event. Review of the collected traffic data does not indicate a need for additional traffic lanes on any streets in the study area at this time. The highest AM and PM peak hour volume for the event and non-event days were collected on northbound Chartres Street between Rusk Street and Walker Street, which is summarized in Table 1: Highest AM and PM Peak Hour Volume (2008).

6 Table 1: Highest AM and PM Peak Hour Volume (2008) Event Day (vehicle per hour) Non-Event Day (vehicle per hour) AM PM Exhibit 7 shows the PM-Peak hour volume and Exhibit 10 includes a complete list of AM and PM peak-hour volumes during event and non-event days.

7 IV. Recommended Improvements The following streets are recommended for improvement based on evaluation of the existing conditions of the streets from field observations and underground utility improvement needs, summarized in Table 2: East Downtown Tax Increment Reinvestment Zone No. 15 Recommended Improvements. A graphical presentation of the proposed recommendations below is presented in Exhibit 9: Combined Proposed Improvements. Table 2: East Downtown Tax Increment Reinvestment Zone No. 15 Recommended Improvements Street Name From To Recommendations Reasons for Recommendations The roadway is in relatively good condition, but some Replace sidewalks, ramps, curbs, Leeland Chartres St. Charles blocks have no sidewalks or poor condition sidewalks. drainage, sanitary and water Major TIRZ #15 thoroughfare. Bell Chartres St. Charles Reconstruct street, sidewalks, ramps, curbs, drainage, sanitary and water Clay Chartres Dowling Upgrade drainage, sanitary and water Polk Chartres St. Charles Dallas Chartres St. Charles Lamar Chartres St. Charles McKinney Chartres St. Charles Walker Chartres Dowling Replace sidewalks, ramps, curbs, drainage, sanitary and water Reconstruct street, sidewalks, ramps, curbs, drainage, sanitary and water Reconstruct street, sidewalks, ramps, curbs, drainage, sanitary and water Reconstruct street, sidewalks, ramps, curbs, drainage, sanitary and water Reconstruct street, sidewalks, ramps, curbs, drainage, sanitary and water Portion of roadway is in poor condition, with no sidewalks or poor condition sidewalks, some water ponding at Bastrop. Improve distribution for future developments within the surrounding area. The roadway is in relatively good condition, but poor condition sidewalks. Major eastbound access to TIRZ #15. Most of roadway in poor condition, with no sidewalks or poor condition sidewalks, large area of water ponding at Bastrop. Most of roadway in poor condition, with no sidewalks, large area of water ponding at Bastrop. Portion of roadway in poor condition, with poor condition sidewalks, some water ponding at SE corner at Hutchins. Most of roadway in poor condition, with poor condition sidewalks.

8 Table 2: East Downtown Tax Increment Reinvestment Zone No. 15 Recommended Improvements (Continued) Street Name From To Recommendations Reasons for Recommendations Chartres Hutchins The roadway is in relatively good condition, but some Replace sidewalks, ramps, curbs, Rusk blocks have no sidewalks or poor condition sidewalks. Dowling St. Charles drainage, sanitary and water Major eastbound access to TIRZ #15. Chartres Hutchins Reconstruct street, sidewalks, ramps, Capitol Roadway in poor condition with no sidewalks. Dowling St. Charles curbs, and water Prairie Bastrop St. Charles Chartres Leeland Texas St. Emanuel Leeland Prairie Hutchins Leeland Texas Bastrop Leeland Texas Walker Prairie Dowling Leeland Prairie St. Charles Leeland Prairie Replace sidewalks, ramps, curbs, and water Replace sidewalks, ramps, curbs, sanitary, and water Reconstruct street, sidewalks, ramps, and curbs Reconstruct street, sidewalks, ramps, curbs, and water Reconstruct street, sidewalks, ramps, curbs, and water Reconstruct street, sidewalks, ramps, curbs, drainage, sanitary and water Reconstruct street, sidewalks, ramps, curbs, and drainage Roadway in fair condition with poor condition sidewalks. The roadway is in relatively good condition, but some blocks have poor condition sidewalks. Major TIRZ #15 thoroughfare. Main sanitary line upgrade. Small portion of roadway in poor condition, with no sidewalk or poor condition sidewalks, some water ponding at NE corner at Leeland. Most of roadway in poor condition, with no sidewalk or poor condition sidewalks, some water ponding between Clay and McKinney. Roadway in poor condition with no sidewalks. Majority of roadway is in relatively good to fair condition, but some poor condition sidewalks. Major TIRZ #15 thoroughfare with heavy truck traffic. Most of roadway in poor condition, with no sidewalk or poor condition sidewalks.

9 V. Cost Estimates Based on the recommended improvements, the preliminary cost estimate is calculated and summarized in Table 3: Recommended Improvement Cost Estimate Summary. Table 3: Recommended Improvement Cost Estimate Summary Section Item No Street Name From To Total In Figures 1 Leeland Chartres St. Charles $810,000 2 Bell Chartres St. Charles $1,040,000 3 Clay Chartres Dowling $660,000 4 Polk Chartres St. Charles $790,000 5 Dallas Chartres St. Charles $860,000 6 Lamar Chartres St. Charles $900,000 7 McKinney Chartres St. Charles $910,000 8 Walker Chartres Dowling $1,240,000 9 Rusk Chartres Hutchins $480,000 Dowling St. Charles 10 Captiol Chartres Hutchins $380,000 Dowling St. Charles 11 Prairie Bastrop St. Charles $110, Chartres Leeland Texas $2,040, St. Emanuel Leeland Prairie $440, Hutchins Leeland Texas $3,160, Bastrop Leeland Walker $2,370,000 Texas Prairie 16 Dowling Leeland Prairie $2,800, St. Charles Leeland Prairie $890,000 TOTAL $19,900,000

10 TAX INCREMENT REINVESTMENT ZONE (TIRZ) 15 CONSTRUCTION COST ESTIMATE 4/15/2009 Street Name: Limit: Leeland St Chartres to St. Charles Item No. Control No. Item Description Measure Quantity Price Total in Figures GENERAL PROJECT ITEMS ALL Mobilization LS 5 $5, $25,000 ALL Traffic Control & Regulation LS 5 $5, $25,000 ALL Signalization LS N/A $250, N/A STREET AND BRIDGE ITEMS SB Remove and dispose of reinforced concrete pavement with or without asphalt overlay, all thicknesses SY N/A $4.00 N/A SB Remove and disposed of existing concrete curb or curb and gutter LF 2,100 $5.00 $10,500 SB " reinforced concrete Pavement (inc. 6" lime stab subgrade) SY N/A $40.00 N/A SB " Concrete Curb LF 3,500 $3.00 $10,500 SB Roadway excavation CY N/A $13.00 N/A SB /2-inch concrete sidewalk, including headers, dowels and including expansion joints SF 14,000 $4.00 $56,000 SB Remove and dispose of concrete sidewalks, driveways, medians and riprap (all thicknesses) SY 1,556 $3.00 $4,667 STORM WATER ITEMS SW Type "C" Manhole EA 2 $2, $4,000 SW Type B-B Inlets EA 14 $1, $26,600 SW Install 24" RCP LF 655 $90.00 $58,950 SW Install 30" RCP LF N/A $ N/A SW Install 36" RCP LF N/A $ N/A SW Install 42" RCP LF N/A $ N/A SW Install 60" RCP LF N/A $ N/A SW Remove and Dispose (18" RCP) LF 674 $8.00 $5,392 SW Remove and Dispose (21" RCP) LF N/A $9.00 N/A SW Remove and Dispose (24" RCP) LF N/A $10.00 N/A SW Remove and Dispose (30" RCP) LF N/A $12.00 N/A SW Remove and Dispose (32" RCP) LF N/A $14.00 N/A SW Remove and Dispose (36" RCP) LF N/A $15.00 N/A WATER MAIN ITEMS WA inch diameter ductile iron water line w/restrained joints by augering LF 1,648 $ $164,800 WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA Water Appurtanances LS 1 25% $41,200 WASTE WATER ITEMS WA Sanitary Manholes EA 5 $2, $10,500 WA inch diameter sanitary sewer by open cut LF 350 $50.00 $17,500 WA inch diameter sanitary sewer by open cut LF 658 $90.00 $59,220 WA inch diameter sanitary sewer by open cut LF N/A $ N/A WA Wastewater Appurtanances LS 1 25% $21,805 SUBTOTAL $541,634 CONTINGENCY TOTAL COST Contingency 50% $270,817 SUBTOTAL + CONTINGENCY $810,000

11 TAX INCREMENT REINVESTMENT ZONE (TIRZ) 15 CONSTRUCTION COST ESTIMATE 4/15/2009 Street Name: Limit: Bell St Chartres to St. Charles Item No. Control No. Item Description Measure Quantity Price Total in Figures GENERAL PROJECT ITEMS ALL Mobilization LS 5 $5, $25,000 ALL Traffic Control & Regulation LS 5 $5, $25,000 ALL Signalization LS N/A $250, N/A STREET AND BRIDGE ITEMS SB Remove and dispose of reinforced concrete pavement with or without asphalt overlay, all thicknesses SY 1,750 $4.00 $7,000 SB Remove and disposed of existing concrete curb or curb and gutter LF 1,400 $5.00 $7,000 SB " reinforced concrete Pavement (inc. 6" lime stab subgrade) SY 1,750 $40.00 $70,000 SB " Concrete Curb LF 2,100 $3.00 $6,300 SB Roadway excavation CY 389 $13.00 $5,056 SB /2-inch concrete sidewalk, including headers, dowels and including expansion joints SF 7,000 $4.00 $28,000 SB Remove and dispose of concrete sidewalks, driveways, medians and riprap (all thicknesses) SY 468 $3.00 $1,403 STORM WATER ITEMS SW Type "C" Manhole EA 3 $2, $6,000 SW Type B-B Inlets EA 4 $1, $7,600 SW Install 24" RCP LF 329 $90.00 $29,610 SW Install 30" RCP LF N/A $ N/A SW Install 36" RCP LF N/A $ N/A SW Install 42" RCP LF N/A $ N/A SW Install 60" RCP LF N/A $ N/A SW Remove and Dispose (18" RCP) LF N/A $8.00 N/A SW Remove and Dispose (21" RCP) LF 292 $9.00 $2,628 SW Remove and Dispose (24" RCP) LF N/A $10.00 N/A SW Remove and Dispose (30" RCP) LF N/A $12.00 N/A SW Remove and Dispose (32" RCP) LF N/A $14.00 N/A SW Remove and Dispose (36" RCP) LF N/A $15.00 N/A WATER MAIN ITEMS WA inch diameter ductile iron water line w/restrained joints by augering LF 336 $ $33,600 WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF 1,314 $ $262,800 WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA Water Appurtanances LS 1 25% $74,100 WASTE WATER ITEMS WA Sanitary Manholes EA 8 $2, $16,800 WA inch diameter sanitary sewer by open cut LF 1,320 $50.00 $66,000 WA inch diameter sanitary sewer by open cut LF N/A $90.00 N/A WA inch diameter sanitary sewer by open cut LF N/A $ N/A WA Wastewater Appurtanances LS 1 25% $20,700 SUBTOTAL $694,597 CONTINGENCY TOTAL COST Contingency 50% $347,298 SUBTOTAL + CONTINGENCY $1,040,000

12 TAX INCREMENT REINVESTMENT ZONE (TIRZ) 15 CONSTRUCTION COST ESTIMATE 4/15/2009 Street Name: Limit: Clay St Chartres to Dowling Item No. Control No. Item Description Measure Quantity Price Total in Figures GENERAL PROJECT ITEMS ALL Mobilization LS 4 $5, $20,000 ALL Traffic Control & Regulation LS 4 $5, $20,000 ALL Signalization LS N/A $250, N/A STREET AND BRIDGE ITEMS SB Remove and dispose of reinforced concrete pavement with or without asphalt overlay, all thicknesses SY N/A $4.00 N/A SB Remove and disposed of existing concrete curb or curb and gutter LF N/A $5.00 N/A SB " reinforced concrete Pavement (inc. 6" lime stab subgrade) SY N/A $40.00 N/A SB " Concrete Curb LF N/A $3.00 N/A SB Roadway excavation CY N/A $13.00 N/A SB /2-inch concrete sidewalk, including headers, dowels and including expansion joints SF N/A $4.00 N/A SB Remove and dispose of concrete sidewalks, driveways, medians and riprap (all thicknesses) SY N/A $3.00 N/A STORM WATER ITEMS SW Type "C" Manhole EA N/A $2, N/A SW Type B-B Inlets EA 14 $1, $26,600 SW Install 24" RCP LF 1,316 $90.00 $118,440 SW Install 30" RCP LF N/A $ N/A SW Install 36" RCP LF N/A $ N/A SW Install 42" RCP LF N/A $ N/A SW Install 60" RCP LF N/A $ N/A SW Remove and Dispose (18" RCP) LF N/A $8.00 N/A SW Remove and Dispose (21" RCP) LF N/A $9.00 N/A SW Remove and Dispose (24" RCP) LF N/A $10.00 N/A SW Remove and Dispose (30" RCP) LF N/A $12.00 N/A SW Remove and Dispose (32" RCP) LF N/A $14.00 N/A SW Remove and Dispose (36" RCP) LF N/A $15.00 N/A WATER MAIN ITEMS WA inch diameter ductile iron water line w/restrained joints by augering LF 1,320 $ $132,000 WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA Water Appurtanances LS 1 25% $33,000 WASTE WATER ITEMS WA Sanitary Manholes EA 3 $2, $6,300 WA inch diameter sanitary sewer by open cut LF 1,320 $50.00 $66,000 WA inch diameter sanitary sewer by open cut LF N/A $90.00 N/A WA inch diameter sanitary sewer by open cut LF N/A $ N/A WA Wastewater Appurtanances LS 1 25% $18,075 SUBTOTAL $440,415 CONTINGENCY TOTAL COST Contingency 50% $220,208 SUBTOTAL + CONTINGENCY $660,000

13 TAX INCREMENT REINVESTMENT ZONE (TIRZ) 15 CONSTRUCTION COST ESTIMATE 4/15/2009 Street Name: Limit: Polk St Chartres to St. Charles Item No. Control No. Item Description Measure Quantity Price Total in Figures GENERAL PROJECT ITEMS ALL Mobilization LS 5 $5, $25,000 ALL Traffic Control & Regulation LS 5 $5, $25,000 ALL Signalization LS N/A $250, N/A STREET AND BRIDGE ITEMS SB Remove and dispose of reinforced concrete pavement with or without asphalt overlay, all thicknesses SY N/A $4.00 N/A SB Remove and disposed of existing concrete curb or curb and gutter LF 2,100 $5.00 $10,500 SB " reinforced concrete Pavement (inc. 6" lime stab subgrade) SY N/A $40.00 N/A SB " Concrete Curb LF 2,100 $3.00 $6,300 SB Roadway excavation CY N/A $13.00 N/A SB /2-inch concrete sidewalk, including headers, dowels and including expansion joints SF 11,200 $4.00 $44,800 SB Remove and dispose of concrete sidewalks, driveways, medians and riprap (all thicknesses) SY 1,244 $3.00 $3,733 STORM WATER ITEMS SW Type "C" Manhole EA 2 $2, $4,000 SW Type B-B Inlets EA 14 $1, $26,600 SW Install 24" RCP LF 1,316 $90.00 $118,440 SW Install 30" RCP LF N/A $ N/A SW Install 36" RCP LF N/A $ N/A SW Install 42" RCP LF N/A $ N/A SW Install 60" RCP LF N/A $ N/A SW Remove and Dispose (18" RCP) LF 320 $8.00 $2,560 SW Remove and Dispose (21" RCP) LF N/A $9.00 N/A SW Remove and Dispose (24" RCP) LF 333 $10.00 $3,330 SW Remove and Dispose (30" RCP) LF N/A $12.00 N/A SW Remove and Dispose (32" RCP) LF N/A $14.00 N/A SW Remove and Dispose (36" RCP) LF N/A $15.00 N/A WATER MAIN ITEMS WA inch diameter ductile iron water line w/restrained joints by augering LF 1,316 $ $131,600 WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA Water Appurtanances LS 1 25% $32,900 WASTE WATER ITEMS WA Sanitary Manholes EA 4 $2, $8,400 WA inch diameter sanitary sewer by open cut LF 1,316 $50.00 $65,800 WA inch diameter sanitary sewer by open cut LF N/A $90.00 N/A WA inch diameter sanitary sewer by open cut LF N/A $ N/A WA Wastewater Appurtanances LS 1 25% $18,550 SUBTOTAL $527,513 CONTINGENCY TOTAL COST Contingency 50% $263,757 SUBTOTAL + CONTINGENCY $790,000

14 TAX INCREMENT REINVESTMENT ZONE (TIRZ) 15 CONSTRUCTION COST ESTIMATE 4/15/2009 Street Name: Limit: Dallas St Chartres to St. Charles Item No. Control No. Item Description Measure Quantity Price Total in Figures GENERAL PROJECT ITEMS ALL Mobilization LS 5 $5, $25,000 ALL Traffic Control & Regulation LS 5 $5, $25,000 ALL Signalization LS N/A $250, N/A STREET AND BRIDGE ITEMS SB Remove and dispose of reinforced concrete pavement with or without asphalt overlay, all thicknesses SY 3,500 $4.00 $14,000 SB Remove and disposed of existing concrete curb or curb and gutter LF 1,750 $5.00 $8,750 SB " reinforced concrete Pavement (inc. 6" lime stab subgrade) SY 3,500 $40.00 $140,000 SB " Concrete Curb LF 1,750 $3.00 $5,250 SB Roadway excavation CY 778 $13.00 $10,111 SB /2-inch concrete sidewalk, including headers, dowels and including expansion joints SF 7,000 $4.00 $28,000 SB Remove and dispose of concrete sidewalks, driveways, medians and riprap (all thicknesses) SY 778 $3.00 $2,333 STORM WATER ITEMS SW Type "C" Manhole EA N/A $2, N/A SW Type B-B Inlets EA 16 $1, $30,400 SW Install 24" RCP LF 330 $90.00 $29,700 SW Install 30" RCP LF N/A $ N/A SW Install 36" RCP LF N/A $ N/A SW Install 42" RCP LF N/A $ N/A SW Install 60" RCP LF N/A $ N/A SW Remove and Dispose (18" RCP) LF N/A $8.00 N/A SW Remove and Dispose (21" RCP) LF N/A $9.00 N/A SW Remove and Dispose (24" RCP) LF N/A $10.00 N/A SW Remove and Dispose (30" RCP) LF N/A $12.00 N/A SW Remove and Dispose (32" RCP) LF N/A $14.00 N/A SW Remove and Dispose (36" RCP) LF N/A $15.00 N/A WATER MAIN ITEMS WA inch diameter ductile iron water line w/restrained joints by augering LF 1,311 $ $131,100 WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA Water Appurtanances LS 1 25% $32,775 WASTE WATER ITEMS WA Sanitary Manholes EA 3 $2, $6,300 WA inch diameter sanitary sewer by open cut LF 1,311 $50.00 $65,550 WA inch diameter sanitary sewer by open cut LF N/A $90.00 N/A WA inch diameter sanitary sewer by open cut LF N/A $ N/A WA Wastewater Appurtanances LS 1 25% $17,963 SUBTOTAL $572,232 CONTINGENCY TOTAL COST Contingency 50% $286,116 SUBTOTAL + CONTINGENCY $860,000

15 TAX INCREMENT REINVESTMENT ZONE (TIRZ) 15 CONSTRUCTION COST ESTIMATE 4/15/2009 Street Name: Limit: Lamar Ave Chartres to St. Charles Item No. Control No. Item Description Measure Quantity Price Total in Figures GENERAL PROJECT ITEMS ALL Mobilization LS 5 $5, $25,000 ALL Traffic Control & Regulation LS 5 $5, $25,000 ALL Signalization LS N/A $250, N/A STREET AND BRIDGE ITEMS SB Remove and dispose of reinforced concrete pavement with or without asphalt overlay, all thicknesses SY 3,500 $4.00 $14,000 SB Remove and disposed of existing concrete curb or curb and gutter LF N/A $5.00 N/A SB " reinforced concrete Pavement (inc. 6" lime stab subgrade) SY 3,500 $40.00 $140,000 SB " Concrete Curb LF 2,100 $3.00 $6,300 SB Roadway excavation CY 778 $13.00 $10,111 SB /2-inch concrete sidewalk, including headers, dowels and including expansion joints SF 8,400 $4.00 $33,600 SB Remove and dispose of concrete sidewalks, driveways, medians and riprap (all thicknesses) SY 933 $3.00 $2,800 STORM WATER ITEMS SW Type "C" Manhole EA N/A $2, N/A SW Type B-B Inlets EA 16 $1, $30,400 SW Install 24" RCP LF 661 $90.00 $59,490 SW Install 30" RCP LF N/A $ N/A SW Install 36" RCP LF N/A $ N/A SW Install 42" RCP LF N/A $ N/A SW Install 60" RCP LF N/A $ N/A SW Remove and Dispose (18" RCP) LF N/A $8.00 N/A SW Remove and Dispose (21" RCP) LF N/A $9.00 N/A SW Remove and Dispose (24" RCP) LF N/A $10.00 N/A SW Remove and Dispose (30" RCP) LF N/A $12.00 N/A SW Remove and Dispose (32" RCP) LF N/A $14.00 N/A SW Remove and Dispose (36" RCP) LF N/A $15.00 N/A WATER MAIN ITEMS WA inch diameter ductile iron water line w/restrained joints by augering LF 1,321 $ $132,100 WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA Water Appurtanances LS 1 25% $33,025 WASTE WATER ITEMS WA Sanitary Manholes EA 3 $2, $6,300 WA inch diameter sanitary sewer by open cut LF 1,321 $50.00 $66,050 WA inch diameter sanitary sewer by open cut LF N/A $90.00 N/A WA inch diameter sanitary sewer by open cut LF N/A $ N/A WA Wastewater Appurtanances LS 1 25% $18,088 SUBTOTAL $602,264 CONTINGENCY TOTAL COST Contingency 50% $301,132 SUBTOTAL + CONTINGENCY $900,000

16 TAX INCREMENT REINVESTMENT ZONE (TIRZ) 15 CONSTRUCTION COST ESTIMATE 4/15/2009 Street Name: Limit: McKinney St Chartres to St. Charles Item No. Control No. Item Description Measure Quantity Price Total in Figures GENERAL PROJECT ITEMS ALL Mobilization LS 5 $5, $25,000 ALL Traffic Control & Regulation LS 5 $5, $25,000 ALL Signalization LS N/A $250, N/A STREET AND BRIDGE ITEMS SB Remove and dispose of reinforced concrete pavement with or without asphalt overlay, all thicknesses SY 1,750 $4.00 $7,000 SB Remove and disposed of existing concrete curb or curb and gutter LF 1,400 $5.00 $7,000 SB " reinforced concrete Pavement (inc. 6" lime stab subgrade) SY 1,750 $40.00 $70,000 SB " Concrete Curb LF 1,400 $3.00 $4,200 SB Roadway excavation CY 389 $13.00 $5,056 SB /2-inch concrete sidewalk, including headers, dowels and including expansion joints SF 5,600 $4.00 $22,400 SB Remove and dispose of concrete sidewalks, driveways, medians and riprap (all thicknesses) SY 622 $3.00 $1,867 STORM WATER ITEMS SW Type "C" Manhole EA N/A $2, N/A SW Type B-B Inlets EA 20 $1, $38,000 SW Install 24" RCP LF 982 $90.00 $88,380 SW Install 30" RCP LF N/A $ N/A SW Install 36" RCP LF N/A $ N/A SW Install 42" RCP LF N/A $ N/A SW Install 60" RCP LF N/A $ N/A SW Remove and Dispose (18" RCP) LF N/A $8.00 N/A SW Remove and Dispose (21" RCP) LF N/A $9.00 N/A SW Remove and Dispose (24" RCP) LF N/A $10.00 N/A SW Remove and Dispose (30" RCP) LF N/A $12.00 N/A SW Remove and Dispose (32" RCP) LF N/A $14.00 N/A SW Remove and Dispose (36" RCP) LF N/A $15.00 N/A WATER MAIN ITEMS WA inch diameter ductile iron water line w/restrained joints by augering LF 660 $ $66,000 WA inch diameter water line w/restrained joints by augering LF 982 $ $147,300 WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA Water Appurtanances LS 1 25% $53,325 WASTE WATER ITEMS WA Sanitary Manholes EA 3 $2, $6,300 WA inch diameter sanitary sewer by open cut LF 660 $50.00 $33,000 WA inch diameter sanitary sewer by open cut LF N/A $90.00 N/A WA inch diameter sanitary sewer by open cut LF N/A $ N/A WA Wastewater Appurtanances LS 1 25% $9,825 SUBTOTAL $609,652 CONTINGENCY TOTAL COST Contingency 50% $304,826 SUBTOTAL + CONTINGENCY $910,000

17 TAX INCREMENT REINVESTMENT ZONE (TIRZ) 15 CONSTRUCTION COST ESTIMATE 4/15/2009 Street Name: Limit: Walker St Chartres to Dowling Item No. Control No. Item Description Measure Quantity Price Total in Figures GENERAL PROJECT ITEMS ALL Mobilization LS 4 $5, $20,000 ALL Traffic Control & Regulation LS 4 $5, $20,000 ALL Signalization LS N/A $250, N/A STREET AND BRIDGE ITEMS SB Remove and dispose of reinforced concrete pavement with or without asphalt overlay, all thicknesses SY 5,250 $4.00 $21,000 SB Remove and disposed of existing concrete curb or curb and gutter LF 2,100 $5.00 $10,500 SB " reinforced concrete Pavement (inc. 6" lime stab subgrade) SY 5,250 $40.00 $210,000 SB " Concrete Curb LF 2,100 $3.00 $6,300 SB Roadway excavation CY 1,167 $13.00 $15,167 SB /2-inch concrete sidewalk, including headers, dowels and including expansion joints SF 8,400 $4.00 $33,600 SB Remove and dispose of concrete sidewalks, driveways, medians and riprap (all thicknesses) SY 933 $3.00 $2,800 STORM WATER ITEMS SW Type "C" Manhole EA 4 $2, $8,000 SW Type B-B Inlets EA 16 $1, $30,400 SW Install 24" RCP LF N/A $90.00 N/A SW Install 30" RCP LF 655 $ $78,600 SW Install 36" RCP LF N/A $ N/A SW Install 42" RCP LF N/A $ N/A SW Install 60" RCP LF N/A $ N/A SW Remove and Dispose (18" RCP) LF 301 $8.00 $2,408 SW Remove and Dispose (21" RCP) LF N/A $9.00 N/A SW Remove and Dispose (24" RCP) LF 247 $10.00 $2,470 SW Remove and Dispose (30" RCP) LF N/A $12.00 N/A SW Remove and Dispose (32" RCP) LF N/A $14.00 N/A SW Remove and Dispose (36" RCP) LF N/A $15.00 N/A WATER MAIN ITEMS WA inch diameter ductile iron water line w/restrained joints by augering LF 655 $ $65,500 WA inch diameter water line w/restrained joints by augering LF 656 $ $98,400 WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA Water Appurtanances LS 1 25% $40,975 WASTE WATER ITEMS WA Sanitary Manholes EA 5 $2, $10,500 WA inch diameter sanitary sewer by open cut LF N/A $50.00 N/A WA inch diameter sanitary sewer by open cut LF 1,311 $90.00 $117,990 WA inch diameter sanitary sewer by open cut LF N/A $ N/A WA Wastewater Appurtanances LS 1 25% $32,123 SUBTOTAL $826,732 CONTINGENCY TOTAL COST Contingency 50% $413,366 SUBTOTAL + CONTINGENCY $1,240,000

18 TAX INCREMENT REINVESTMENT ZONE (TIRZ) 15 CONSTRUCTION COST ESTIMATE 4/15/2009 Street Name: Limit: Rusk St Chartres to Hutchins and Dowling to St. Charles Item No. Control No. Item Description Measure Quantity Price Total in Figures GENERAL PROJECT ITEMS ALL Mobilization LS 3 $5, $15,000 ALL Traffic Control & Regulation LS 3 $5, $15,000 ALL Signalization LS N/A $250, N/A STREET AND BRIDGE ITEMS SB Remove and dispose of reinforced concrete pavement with or without asphalt overlay, all thicknesses SY N/A $4.00 N/A SB Remove and disposed of existing concrete curb or curb and gutter LF 1,400 $5.00 $7,000 SB " reinforced concrete Pavement (inc. 6" lime stab subgrade) SY N/A $40.00 N/A SB " Concrete Curb LF 1,400 $3.00 $4,200 SB Roadway excavation CY N/A $13.00 N/A SB /2-inch concrete sidewalk, including headers, dowels and including expansion joints SF 5,600 $4.00 $22,400 SB Remove and dispose of concrete sidewalks, driveways, medians and riprap (all thicknesses) SY 622 $3.00 $1,867 STORM WATER ITEMS SW Type "C" Manhole EA 1 $2, $2,000 SW Type B-B Inlets EA 10 $1, $19,000 SW Install 24" RCP LF 323 $90.00 $29,070 SW Install 30" RCP LF N/A $ N/A SW Install 36" RCP LF N/A $ N/A SW Install 42" RCP LF N/A $ N/A SW Install 60" RCP LF N/A $ N/A SW Remove and Dispose (18" RCP) LF 322 $8.00 $2,576 SW Remove and Dispose (21" RCP) LF N/A $9.00 N/A SW Remove and Dispose (24" RCP) LF N/A $10.00 N/A SW Remove and Dispose (30" RCP) LF N/A $12.00 N/A SW Remove and Dispose (32" RCP) LF N/A $14.00 N/A SW Remove and Dispose (36" RCP) LF N/A $15.00 N/A WATER MAIN ITEMS WA inch diameter ductile iron water line w/restrained joints by augering LF 983 $ $98,300 WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA Water Appurtanances LS 1 25% $24,575 WASTE WATER ITEMS WA Sanitary Manholes EA 3 $2, $6,300 WA inch diameter sanitary sewer by open cut LF N/A $50.00 N/A WA inch diameter sanitary sewer by open cut LF 656 $90.00 $59,040 WA inch diameter sanitary sewer by open cut LF N/A $ N/A WA Wastewater Appurtanances LS 1 25% $16,335 SUBTOTAL $322,663 CONTINGENCY TOTAL COST Contingency 50% $161,331 SUBTOTAL + CONTINGENCY $480,000

19 TAX INCREMENT REINVESTMENT ZONE (TIRZ) 15 CONSTRUCTION COST ESTIMATE 4/15/2009 Street Name: Limit: Capitol St Chartres to Hutchins and Dowling to St. Charles Item No. Control No. Item Description Measure Quantity Price Total in Figures GENERAL PROJECT ITEMS ALL Mobilization LS 3 $5, $15,000 ALL Traffic Control & Regulation LS 3 $5, $15,000 ALL Signalization LS N/A $250, N/A STREET AND BRIDGE ITEMS SB Remove and dispose of reinforced concrete pavement with or without asphalt overlay, all thicknesses SY N/A $4.00 N/A SB Remove and disposed of existing concrete curb or curb and gutter LF N/A $5.00 N/A SB " reinforced concrete Pavement (inc. 6" lime stab subgrade) SY N/A $40.00 N/A SB " Concrete Curb LF 700 $3.00 $2,100 SB Roadway excavation CY N/A $13.00 N/A SB /2-inch concrete sidewalk, including headers, dowels and including expansion joints SF 2,800 $4.00 $11,200 SB Remove and dispose of concrete sidewalks, driveways, medians and riprap (all thicknesses) SY 311 $3.00 $933 STORM WATER ITEMS SW Type "C" Manhole EA N/A $2, N/A SW Type B-B Inlets EA N/A $1, N/A SW Install 24" RCP LF N/A $90.00 N/A SW Install 30" RCP LF N/A $ N/A SW Install 36" RCP LF N/A $ N/A SW Install 42" RCP LF N/A $ N/A SW Install 60" RCP LF N/A $ N/A SW Remove and Dispose (18" RCP) LF N/A $8.00 N/A SW Remove and Dispose (21" RCP) LF N/A $9.00 N/A SW Remove and Dispose (24" RCP) LF N/A $10.00 N/A SW Remove and Dispose (30" RCP) LF N/A $12.00 N/A SW Remove and Dispose (32" RCP) LF N/A $14.00 N/A SW Remove and Dispose (36" RCP) LF N/A $15.00 N/A WATER MAIN ITEMS WA inch diameter ductile iron water line w/restrained joints by augering LF 330 $ $33,000 WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF 660 $ $132,000 WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA Water Appurtanances LS 1 25% $41,250 WASTE WATER ITEMS WA Sanitary Manholes EA N/A $2, N/A WA inch diameter sanitary sewer by open cut LF N/A $50.00 N/A WA inch diameter sanitary sewer by open cut LF N/A $90.00 N/A WA inch diameter sanitary sewer by open cut LF N/A $ N/A WA Wastewater Appurtanances LS N/A 25% $0 SUBTOTAL $250,483 CONTINGENCY TOTAL COST Contingency 50% $125,242 SUBTOTAL + CONTINGENCY $380,000

20 TAX INCREMENT REINVESTMENT ZONE (TIRZ) 15 CONSTRUCTION COST ESTIMATE 4/15/2009 Street Name: Limit: Prairie St Bastrop to St. Charles Item No. Control No. Item Description Measure Quantity Price Total in Figures GENERAL PROJECT ITEMS ALL Mobilization LS 2 $5, $10,000 ALL Traffic Control & Regulation LS 2 $5, $10,000 ALL Signalization LS N/A $250, N/A STREET AND BRIDGE ITEMS SB Remove and dispose of reinforced concrete pavement with or without asphalt overlay, all thicknesses SY N/A $4.00 N/A SB Remove and disposed of existing concrete curb or curb and gutter LF 700 $5.00 $3,500 SB " reinforced concrete Pavement (inc. 6" lime stab subgrade) SY N/A $40.00 N/A SB " Concrete Curb LF 700 $3.00 $2,100 SB Roadway excavation CY N/A $13.00 N/A SB /2-inch concrete sidewalk, including headers, dowels and including expansion joints SF 2,800 $4.00 $11,200 SB Remove and dispose of concrete sidewalks, driveways, medians and riprap (all thicknesses) SY 311 $3.00 $933 STORM WATER ITEMS SW Type "C" Manhole EA N/A $2, N/A SW Type B-B Inlets EA N/A $1, N/A SW Install 24" RCP LF N/A $90.00 N/A SW Install 30" RCP LF N/A $ N/A SW Install 36" RCP LF N/A $ N/A SW Install 42" RCP LF N/A $ N/A SW Install 60" RCP LF N/A $ N/A SW Remove and Dispose (18" RCP) LF N/A $8.00 N/A SW Remove and Dispose (21" RCP) LF N/A $9.00 N/A SW Remove and Dispose (24" RCP) LF N/A $10.00 N/A SW Remove and Dispose (30" RCP) LF N/A $12.00 N/A SW Remove and Dispose (32" RCP) LF N/A $14.00 N/A SW Remove and Dispose (36" RCP) LF N/A $15.00 N/A WATER MAIN ITEMS WA inch diameter ductile iron water line w/restrained joints by augering LF 285 $ $28,500 WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA Water Appurtanances LS 1 25% $7,125 WASTE WATER ITEMS WA Sanitary Manholes EA N/A $2, N/A WA inch diameter sanitary sewer by open cut LF N/A $50.00 N/A WA inch diameter sanitary sewer by open cut LF N/A $90.00 N/A WA inch diameter sanitary sewer by open cut LF N/A $ N/A WA Wastewater Appurtanances LS N/A 25% $0 SUBTOTAL $73,358 CONTINGENCY TOTAL COST Contingency 50% $36,679 SUBTOTAL + CONTINGENCY $110,000

21 TAX INCREMENT REINVESTMENT ZONE (TIRZ) 15 CONSTRUCTION COST ESTIMATE 4/15/2009 Street Name: Limit: Chartres St Leeland to Texas Item No. Control No. Item Description Measure Quantity Price Total in Figures GENERAL PROJECT ITEMS ALL Mobilization LS 10 $5, $50,000 ALL Traffic Control & Regulation LS 10 $5, $50,000 ALL Signalization LS N/A $250, N/A STREET AND BRIDGE ITEMS SB Remove and dispose of reinforced concrete pavement with or without asphalt overlay, all thicknesses SY N/A $4.00 N/A SB Remove and disposed of existing concrete curb or curb and gutter LF 1,750 $5.00 $8,750 SB " reinforced concrete Pavement (inc. 6" lime stab subgrade) SY N/A $40.00 N/A SB " Concrete Curb LF 1,750 $3.00 $5,250 SB Roadway excavation CY N/A $13.00 N/A SB /2-inch concrete sidewalk, including headers, dowels and including expansion joints SF 7,000 $4.00 $28,000 SB Remove and dispose of concrete sidewalks, driveways, medians and riprap (all thicknesses) SY 778 $3.00 $2,333 STORM WATER ITEMS SW Type "C" Manhole EA N/A $2, N/A SW Type B-B Inlets EA N/A $1, N/A SW Install 24" RCP LF N/A $90.00 N/A SW Install 30" RCP LF N/A $ N/A SW Install 36" RCP LF N/A $ N/A SW Install 42" RCP LF N/A $ N/A SW Install 60" RCP LF N/A $ N/A SW Remove and Dispose (18" RCP) LF N/A $8.00 N/A SW Remove and Dispose (21" RCP) LF N/A $9.00 N/A SW Remove and Dispose (24" RCP) LF N/A $10.00 N/A SW Remove and Dispose (30" RCP) LF N/A $12.00 N/A SW Remove and Dispose (32" RCP) LF N/A $14.00 N/A SW Remove and Dispose (36" RCP) LF N/A $15.00 N/A WATER MAIN ITEMS WA inch diameter ductile iron water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF 330 $ $49,500 WA inch diameter water line w/restrained joints by augering LF 2,649 $ $529,800 WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA Water Appurtanances LS 1 25% $144,825 WASTE WATER ITEMS WA Sanitary Manholes EA 15 $2, $31,500 WA inch diameter sanitary sewer by open cut LF N/A $50.00 N/A WA inch diameter sanitary sewer by open cut LF 354 $90.00 $31,860 WA inch diameter sanitary sewer by open cut LF 2,979 $ $327,690 WA Wastewater Appurtanances LS 1 25% $97,763 SUBTOTAL $1,357,271 CONTINGENCY TOTAL COST Contingency 50% $678,635 SUBTOTAL + CONTINGENCY $2,040,000

22 TAX INCREMENT REINVESTMENT ZONE (TIRZ) 15 CONSTRUCTION COST ESTIMATE 4/15/2009 Street Name: Limit: St. Emanuel St Leeland to Prairie Item No. Control No. Item Description Measure Quantity Price Total in Figures GENERAL PROJECT ITEMS ALL Mobilization LS 7 $5, $35,000 ALL Traffic Control & Regulation LS 7 $5, $35,000 ALL Signalization LS N/A $250, N/A STREET AND BRIDGE ITEMS SB Remove and dispose of reinforced concrete pavement with or without asphalt overlay, all thicknesses SY 3,500 $4.00 $14,000 SB Remove and disposed of existing concrete curb or curb and gutter LF 2,450 $5.00 $12,250 SB " reinforced concrete Pavement (inc. 6" lime stab subgrade) SY 3,500 $40.00 $140,000 SB " Concrete Curb LF 2,450 $3.00 $7,350 SB Roadway excavation CY 778 $13.00 $10,111 SB /2-inch concrete sidewalk, including headers, dowels and including expansion joints SF 9,800 $4.00 $39,200 SB Remove and dispose of concrete sidewalks, driveways, medians and riprap (all thicknesses) SY 1,089 $3.00 $3,267 STORM WATER ITEMS SW Type "C" Manhole EA N/A $2, N/A SW Type B-B Inlets EA N/A $1, N/A SW Install 24" RCP LF N/A $90.00 N/A SW Install 30" RCP LF N/A $ N/A SW Install 36" RCP LF N/A $ N/A SW Install 42" RCP LF N/A $ N/A SW Install 60" RCP LF N/A $ N/A SW Remove and Dispose (18" RCP) LF N/A $8.00 N/A SW Remove and Dispose (21" RCP) LF N/A $9.00 N/A SW Remove and Dispose (24" RCP) LF N/A $10.00 N/A SW Remove and Dispose (30" RCP) LF N/A $12.00 N/A SW Remove and Dispose (32" RCP) LF N/A $14.00 N/A SW Remove and Dispose (36" RCP) LF N/A $15.00 N/A WATER MAIN ITEMS WA inch diameter ductile iron water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA Water Appurtanances LS N/A 25% $0 WASTE WATER ITEMS WA Sanitary Manholes EA N/A $2, N/A WA inch diameter sanitary sewer by open cut LF N/A $50.00 N/A WA inch diameter sanitary sewer by open cut LF N/A $90.00 N/A WA inch diameter sanitary sewer by open cut LF N/A $ N/A WA Wastewater Appurtanances LS N/A 25% $0 SUBTOTAL $296,178 CONTINGENCY TOTAL COST Contingency 50% $148,089 SUBTOTAL + CONTINGENCY $440,000

23 TAX INCREMENT REINVESTMENT ZONE (TIRZ) 15 CONSTRUCTION COST ESTIMATE 4/15/2009 Street Name: Limit: Hutchins St Leeland to Texas Item No. Control No. Item Description Measure Quantity Price Total in Figures GENERAL PROJECT ITEMS ALL Mobilization LS 10 $5, $50,000 ALL Traffic Control & Regulation LS 10 $5, $50,000 ALL Signalization LS N/A $250, N/A STREET AND BRIDGE ITEMS SB Remove and dispose of reinforced concrete pavement with or without asphalt overlay, all thicknesses SY 8,750 $4.00 $35,000 SB Remove and disposed of existing concrete curb or curb and gutter LF 1,400 $5.00 $7,000 SB " reinforced concrete Pavement (inc. 6" lime stab subgrade) SY 8,750 $40.00 $350,000 SB " Concrete Curb LF 4,550 $3.00 $13,650 SB Roadway excavation CY 1,944 $13.00 $25,278 SB /2-inch concrete sidewalk, including headers, dowels and including expansion joints SF 18,200 $4.00 $72,800 SB Remove and dispose of concrete sidewalks, driveways, medians and riprap (all thicknesses) SY 2,022 $3.00 $6,067 STORM WATER ITEMS SW Type "C" Manhole EA N/A $2, N/A SW Type B-B Inlets EA N/A $1, N/A SW Install 24" RCP LF N/A $90.00 N/A SW Install 30" RCP LF N/A $ N/A SW Install 36" RCP LF N/A $ N/A SW Install 42" RCP LF N/A $ N/A SW Install 60" RCP LF N/A $ N/A SW Remove and Dispose (18" RCP) LF N/A $8.00 N/A SW Remove and Dispose (21" RCP) LF N/A $9.00 N/A SW Remove and Dispose (24" RCP) LF N/A $10.00 N/A SW Remove and Dispose (30" RCP) LF N/A $12.00 N/A SW Remove and Dispose (32" RCP) LF N/A $14.00 N/A SW Remove and Dispose (36" RCP) LF N/A $15.00 N/A WATER MAIN ITEMS WA inch diameter ductile iron water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF 3,364 $ $1,009,200 WA Water Appurtanances LS 1 25% $252,300 WASTE WATER ITEMS WA Sanitary Manholes EA N/A $2, N/A WA inch diameter sanitary sewer by open cut LF N/A $50.00 N/A WA inch diameter sanitary sewer by open cut LF 2,100 $90.00 $189,000 WA inch diameter sanitary sewer by open cut LF N/A $ N/A WA Wastewater Appurtanances LS 1 25% $47,250 SUBTOTAL $2,107,544 CONTINGENCY TOTAL COST Contingency 50% $1,053,772 SUBTOTAL + CONTINGENCY $3,160,000

24 TAX INCREMENT REINVESTMENT ZONE (TIRZ) 15 CONSTRUCTION COST ESTIMATE 4/15/2009 Street Name: Limit: Bastrop St Leeland to Walker and Texas to Prairie Item No. Control No. Item Description Measure Quantity Price Total in Figures GENERAL PROJECT ITEMS ALL Mobilization LS 6 $5, $30,000 ALL Traffic Control & Regulation LS 6 $5, $30,000 ALL Signalization LS 5 $250, $1,250,000 STREET AND BRIDGE ITEMS SB Remove and dispose of reinforced concrete pavement with or without asphalt overlay, all thicknesses SY 1,750 $4.00 $7,000 SB Remove and disposed of existing concrete curb or curb and gutter LF N/A $5.00 N/A SB " reinforced concrete Pavement (inc. 6" lime stab subgrade) SY 1,750 $40.00 $70,000 SB " Concrete Curb LF 700 $3.00 $2,100 SB Roadway excavation CY 389 $13.00 $5,056 SB /2-inch concrete sidewalk, including headers, dowels and including expansion joints SF 2,800 $4.00 $11,200 SB Remove and dispose of concrete sidewalks, driveways, medians and riprap (all thicknesses) SY 389 $3.00 $1,167 STORM WATER ITEMS SW Type "C" Manhole EA N/A $2, N/A SW Type B-B Inlets EA N/A $1, N/A SW Install 24" RCP LF 330 $90.00 $29,700 SW Install 30" RCP LF N/A $ N/A SW Install 36" RCP LF N/A $ N/A SW Install 42" RCP LF N/A $ N/A SW Install 60" RCP LF N/A $ N/A SW Remove and Dispose (18" RCP) LF N/A $8.00 N/A SW Remove and Dispose (21" RCP) LF 330 $9.00 $2,970 SW Remove and Dispose (24" RCP) LF N/A $10.00 N/A SW Remove and Dispose (30" RCP) LF N/A $12.00 N/A SW Remove and Dispose (32" RCP) LF N/A $14.00 N/A SW Remove and Dispose (36" RCP) LF N/A $15.00 N/A WATER MAIN ITEMS WA inch diameter ductile iron water line w/restrained joints by augering LF 330 $ $33,000 WA inch diameter water line w/restrained joints by augering LF 333 $ $49,950 WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA Water Appurtanances LS 1 25% $20,738 WASTE WATER ITEMS WA Sanitary Manholes EA N/A $2, N/A WA inch diameter sanitary sewer by open cut LF N/A $50.00 N/A WA inch diameter sanitary sewer by open cut LF 350 $90.00 $31,500 WA inch diameter sanitary sewer by open cut LF N/A $ N/A WA Wastewater Appurtanances LS 1 25% $7,875 SUBTOTAL $1,582,255 CONTINGENCY TOTAL COST Contingency 50% $791,127 SUBTOTAL + CONTINGENCY $2,370,000

25 TAX INCREMENT REINVESTMENT ZONE (TIRZ) 15 CONSTRUCTION COST ESTIMATE 4/15/2009 Street Name: Limit: Dowling St Leeland to Prairie Item No. Control No. Item Description Measure Quantity Price Total in Figures GENERAL PROJECT ITEMS ALL Mobilization LS 11 $5, $55,000 ALL Traffic Control & Regulation LS 11 $5, $55,000 ALL Signalization LS 2 $250, $500,000 STREET AND BRIDGE ITEMS SB Remove and dispose of reinforced concrete pavement with or without asphalt overlay, all thicknesses SY 1,750 $4.00 $7,000 SB Remove and disposed of existing concrete curb or curb and gutter LF 3,150 $5.00 $15,750 SB " reinforced concrete Pavement (inc. 6" lime stab subgrade) SY 1,750 $40.00 $70,000 SB " Concrete Curb LF 3,150 $3.00 $9,450 SB Roadway excavation CY 389 $13.00 $5,056 SB /2-inch concrete sidewalk, including headers, dowels and including expansion joints SF 12,600 $4.00 $50,400 SB Remove and dispose of concrete sidewalks, driveways, medians and riprap (all thicknesses) SY 1,400 $3.00 $4,200 STORM WATER ITEMS SW Type "C" Manhole EA 6 $2, $14,000 SW Type B-B Inlets EA 8 $1, $15,200 SW Install 24" RCP LF 327 $90.00 $29,430 SW Install 30" RCP LF 301 $ $36,120 SW Install 36" RCP LF 335 $ $56,950 SW Install 42" RCP LF 327 $ $62,130 SW Install 60" RCP LF 390 $ $117,000 SW Remove and Dispose (18" RCP) LF 689 $8.00 $5,512 SW Remove and Dispose (21" RCP) LF 331 $9.00 $2,979 SW Remove and Dispose (24" RCP) LF N/A $10.00 N/A SW Remove and Dispose (30" RCP) LF N/A $12.00 N/A SW Remove and Dispose (32" RCP) LF 669 $14.00 $9,366 SW Remove and Dispose (36" RCP) LF N/A $15.00 N/A WATER MAIN ITEMS WA inch diameter ductile iron water line w/restrained joints by augering LF 660 $ $66,000 WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF 2,645 $ $529,000 WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA Water Appurtanances LS 1 25% $148,750 WASTE WATER ITEMS WA Sanitary Manholes EA 1 $2, $2,100 WA inch diameter sanitary sewer by open cut LF N/A $50.00 N/A WA inch diameter sanitary sewer by open cut LF N/A $90.00 N/A WA inch diameter sanitary sewer by open cut LF N/A $ N/A WA Wastewater Appurtanances LS 1 25% $525 SUBTOTAL $1,866,918 CONTINGENCY TOTAL COST Contingency 50% $933,459 SUBTOTAL + CONTINGENCY $2,800,000

26 TAX INCREMENT REINVESTMENT ZONE (TIRZ) 15 CONSTRUCTION COST ESTIMATE 4/15/2009 Street Name: Limit: St. Charles St Leeland to Prairie Item No. Control No. Item Description Measure Quantity Price Total in Figures GENERAL PROJECT ITEMS ALL Mobilization LS 11 $5, $55,000 ALL Traffic Control & Regulation LS 11 $5, $55,000 ALL Signalization LS N/A $250, N/A STREET AND BRIDGE ITEMS SB Remove and dispose of reinforced concrete pavement with or without asphalt overlay, all thicknesses SY 5,250 $4.00 $21,000 SB Remove and disposed of existing concrete curb or curb and gutter LF 2,800 $5.00 $14,000 SB " reinforced concrete Pavement (inc. 6" lime stab subgrade) SY 5,250 $40.00 $210,000 SB " Concrete Curb LF 6,300 $3.00 $18,900 SB Roadway excavation CY 1,167 $13.00 $15,167 SB /2-inch concrete sidewalk, including headers, dowels and including expansion joints SF 26,600 $4.00 $106,400 SB Remove and dispose of concrete sidewalks, driveways, medians and riprap (all thicknesses) SY 2,956 $3.00 $8,867 STORM WATER ITEMS SW Type "C" Manhole EA 3 $2, $6,000 SW Type B-B Inlets EA N/A $1, N/A SW Install 24" RCP LF 324 $90.00 $29,160 SW Install 30" RCP LF N/A $ N/A SW Install 36" RCP LF 265 $ $45,050 SW Install 42" RCP LF N/A $ N/A SW Install 60" RCP LF N/A $ N/A SW Remove and Dispose (18" RCP) LF 693 $8.00 $5,544 SW Remove and Dispose (21" RCP) LF N/A $9.00 N/A SW Remove and Dispose (24" RCP) LF N/A $10.00 N/A SW Remove and Dispose (30" RCP) LF N/A $12.00 N/A SW Remove and Dispose (32" RCP) LF N/A $14.00 N/A SW Remove and Dispose (36" RCP) LF N/A $15.00 N/A WATER MAIN ITEMS WA inch diameter ductile iron water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA inch diameter water line w/restrained joints by augering LF N/A $ N/A WA Water Appurtanances LS N/A 25% $0 WASTE WATER ITEMS WA Sanitary Manholes EA N/A $2, N/A WA inch diameter sanitary sewer by open cut LF N/A $50.00 N/A WA inch diameter sanitary sewer by open cut LF N/A $90.00 N/A WA inch diameter sanitary sewer by open cut LF N/A $ N/A WA Wastewater Appurtanances LS N/A 25% $0 SUBTOTAL $590,087 CONTINGENCY TOTAL COST Contingency 50% $295,044 SUBTOTAL + CONTINGENCY $890,000

27 SCOTT CLAY LAMAR TRAVIS BRAZOS Legend: LOUISIANA SMITH City Of Houston TIRZ #15 MC KINNEY MILAM TRAVIS DALLAS LOUISIANA MC KINNEY City of Houston Planning & Development Department GIS Services Division Map Date: May 2008 Disclaimer: City Limits East Downtown ,200 LAMAR DALLAS MAIN MAIN ± TEXAS COHGIS data is prepared and made available for general reference purposes only and should not be used, or relied upon for specific applications, without independent verification. The City of Houston neither represents, nor warrants COHGIS data accuracy, or completeness, nor will the City of Houston accept liability of any kind in conjunction with its use. pj14136 Feet SAN JACINTO RUSK LA BRANCH CAROLINE PRAIRIE CAPITOL CRAWFORD AUSTIN PRESTON Exhibit 1: Study Area Limits LA BRANCH Minute Maid Park JACKSON CHARTRES CHENEVERT HAMILTON PRESTON N US 59 RUIZ ST EMANUEL FRANKLIN CONGRESS NAVIGATION HUTCHINS EAST SPERBER ADAM UNKNOWN UNKNOWN RILEY COLBY UNKNOWN FLYNN RUNNELS JENSEN ANN LIVE OAK NAGLE Mcalpine SALTUS CANAL ST CHARLES NIX DELANO SHERMAN LIVE OAK COMMERCE ENGELKE NAGLE NAVIGATION PAGIE FOX PALMER ENNIS MIDDLE MIDDLE BERING FOX K VELASCO BELL PEASE FANNIN CLAY FANNIN POLK Toyota Center Discovery Green Park George R. Brown Convention Center RUSK Proposed Soccer Stadium PRAIRIE PAIGE MIDDLETON HAWKINS HARRISBURG VELASCO SHERMAN ROBERTS GARROW SHERMAN COMME WEBSTER CRAWFORD ST JOSEPH S US 45 JACKSON JACKSON LEELAND JEFFERSON CHENEVERT US 59 IH 45 CHENEVERT BELL JEFFERSON CLAY HUTCHINS BELL CLAY Shenzhen Garden BASTROP LIVE OAK NAGLE ST CHARLES LAMAR DALLAS DELANO WALKER MC KINNEY PAIGE ENNIS CAPITOL RUSK CAPITOL RUSK PRESTON TEXAS SAMPSON YORK YORK PRESTON TEXAS HUTCHESON EVERTON HUTCHESON RUSK EVERTON HARRIS HADLEY GRAY DOWLING PEASE PEASE CLAY PALMER VELASCO CLAY ROBERTS MILBY WALKER WOODLEIGH ST JOSEPH ST JOSEPH LAMAR LAMAR ST AUGUSTINE CLAY WEBSTER ST CHARLES CALHOUN ADEN MIST ROBERTS DENVER EDMUNDSON MILBY DALLAS W

28 Exhibit 2: Existing Pavement Condition Pease St Leeland St Bell St Clay St Polk St Dallas St Lamar Ave McKinney St Walker St Rusk St Capitol Ave Texas Ave Prairie St Preston St Jackson St Discovery Green Park Avenida de Las Americas Chenevert St Holiday Exp Inn Hilton Hotel Garage George R. Brown Convention Center Minute Maid Ballpark Hamilton St Chartres St St. Emanuel St shopping center restaura nt empty Hutchins St Bastrop St B-C Tex parking lot with a building Harris Co Tax Off. Janco Food Dowling St Roadway Good Good to Fair Fair Fair to poor Poor No Street Proposed residential Development St. Charles St proposed restaurant Existing Residential

29 Exhibit 3: Existing Sidewalk Condition Pease St Leeland St Bell St Clay St Polk St Dallas St Lamar Ave McKinney St Walker St Rusk St Capitol Ave Texas Ave Prairie St Preston St Jackson St Discovery Green Park Avenida de Las Americas Hilton Hotel Chenevert St Garage George R. Brown Convention Center Minute Maid Ballpark Holiday Exp Inn Hamilton St Chartres St St. Emanuel St shopping center restaura nt empty Hutchins St Sidewalk Good Fair Bad No Sidewalk EXISTING Signed Route/Shared Lane Bike Route Bastrop St Dowling St St. Charles St proposed restaurant B-C Tex parking log with a building Janco Food Ser Harris Co Tax Off. PROPOSED Multi-use Trail Bike Trail Proposed residential Development Existing Residential

30 Exhibit 4: Combined Existing Condition Jackson St Avenida de Las Americas Pease St Leeland St Bell St Clay St Polk St Dallas St Lamar Ave McKinney St Discovery Green Park Walker St Rusk St Capitol Ave Texas Ave Prairie St Minute Maid Ballpark Preston St From I-10, US- 59 SB, I-45 SB Chenevert St George R. Brown Convention Center To I-45 NB From US-59 NB, SH 288 NB Hamilton St Chartres St St. Emanuel St To US-59 SB, SH 288 SB From US-59 NB, SH 288 NB To I-10, I-45 NB Hutchins St From I-45 NB Bastrop St Dowling St St. Charles St Roadway Good Good to Fair Fair Fair to poor Poor No Street Sidewalk Good Fair Bad/No Sidewalk No Sidewalk EXISTING Signed Route/Shared Lane Bike Route PROPOSED On Street Multi-use Trail Proposed residential Development Existing Residential

31 Exhibit 5: Existing Utilities Pease St Leeland St Bell St Clay St Polk St Dallas St Lamar Ave McKinney St Walker St Rusk St Capitol Ave Texas Ave Prairie St Preston St Jackson St Discovery Green Park Avenida de Las Americas Hilton Hotel Garage Chenevert St Holiday Exp Inn George R. Brown Convention Center Minute Maid Ballpark Hamilton St Chartres St shopping center restaurant empty Sanitary 6" 8" 10" 15" 18" 36" Water 3/4", 1", 2", 6" 8" 12" 24" >60" Drainage < 24" 24" 30-33" 36" >42" St. Emanuel St Hutchins St Bastrop St Dowling St St. Charles St proposed restaurant B-C Tex Janco Food Ser

32 Exhibit 6: Multimodal Pease St Leeland St Bell St Clay St Polk St Dallas St Lamar Ave McKinney St Walker St Rusk St Capitol Ave Texas Ave Prairie St Preston St Jackson St Discovery Green Park Avenida de Las Americas Chenevert St Holiday Exp Inn George R. Brown Convention Center Minute Maid Ballpark Hamilton St Chartres St St. Emanuel St Hutchins St Bastrop St Public Transportation Route Proposed Light Rail Transit (LRT) Bus Route 36 Bus Route 40 Bus Route 50 Bus Route 80 Dowling St St. Charles St EXISTING Signed Route/Shared Lane Bike Route PROPOSED On Street Multi-use Trail

33 Exhibit 7: PM-Peak Traffic Counts Pease St Leeland St Bell St Clay St Polk St Dallas St Lamar Ave McKinney St Walker St Rusk St Capitol Ave Texas Ave Prairie St Preston St Jackson St Discovery Green Park Avenida de Las Americas Chenevert St Hamilton St Chartres St St. Emanuel St Hutchins St 12 9 Holiday Exp Inn George R. Brown Convention Center Minute Maid Ballpark Bastrop St Dowling St St. Charles St Legend: XX Oct 2008 PM Peak Hour Volume without event XX Oct 2008 PM Peak Hour Volume with event Not a Thru Street Streets with Peak Volume > 100

Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364)

Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364) Mid Rivers Mall Drive Multi-Use Path (Rte. N to MO 364) Sponsor St Peters Project No. RB19-000022 Project Type Other TOTAL FUNDING Total County Sponsor Federal $1,177,251.00 $238,179.00 $59,546.00 $879,526.00

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

IH 20 RANGER HILL PUBLIC MEETING

IH 20 RANGER HILL PUBLIC MEETING IH 20 RANGER HILL PUBLIC MEETING AUGUST 25, 2015 IH 20, Eastland County, TX CSJ 0007-06-084 IH 20 from 3.5 mi. East of LP 254 to SH 16 (Ranger Hill) August 25, 2015 Agenda Introductions Purpose of the

More information

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK This is Meeting 2 Unfortunately, some residents in Bellevue and Virginia Park received the wrong information for this public open house (Meeting

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT PROJECT NO. 093 MA 199 H 5807 01C FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENI HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT (INTERSECTION IMPROVEMENT) US 93/US 60 FINAL PROJECT ASSESSMENT April

More information

Access requests to County streets and roadways are processed through one of the following methods:

Access requests to County streets and roadways are processed through one of the following methods: 13.1 GENERAL APPLICATION PROCESS Access requests to County streets and roadways are processed through one of the following methods: A. Planned Developments may set general locations for access points.

More information

2014 Street and Utility Improvement Project. Feasibility Report January 28, 2014

2014 Street and Utility Improvement Project. Feasibility Report January 28, 2014 2014 Street and Utility Improvement Project Feasibility Report January 28, 2014 Public Informational Meeting 22 residents from 17 properties signed in Questions about construction (FAQs) Eyebrow cul-de-sac

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

TRASBURG RANSPORTATION

TRASBURG RANSPORTATION TRASBURG RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION

More information

Chapter 4: Funding and Implementation

Chapter 4: Funding and Implementation Chapter 4: Funding and Implementation 83 84 Cost Estimating Cost estimating is an iterative process. When a project is in the conceptual stage, preliminary cost estimates are also provided conceptually,

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: City of Livermore Date: 12/4/2017 Primary Point of Contact Name: Debbie

More information

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design I-20 ODESSA-MIDLAND CORRIDOR STUDY Public Meeting for Schematic Design The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being,

More information

Span-Wire Intersections Study SPAN-WIRE INTERSECTIONS STUDY. City of Naples Streets & Stormwater Department 1

Span-Wire Intersections Study SPAN-WIRE INTERSECTIONS STUDY. City of Naples Streets & Stormwater Department 1 SPAN-WIRE INTERSECTIONS STUDY City of Naples Streets & Stormwater Department 1 Intersection Traffic Control and Design Feasibility Analysis a.k.a Span-Wire Intersections Study Streets & Stormwater Department

More information

Building Great Neighbourhoods LANSDOWNE

Building Great Neighbourhoods LANSDOWNE Building Great Neighbourhoods LANSDOWNE We are here today to Explain how the City is investing in improving your neighbourhood and how your neighbourhood will be improved to meet current City standards.

More information

Figure 1: Vicinity Map of the Study Area

Figure 1: Vicinity Map of the Study Area ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project City of RE 4APNOIPF Vh, X` W\ YII PTC ING, CITY COUNCIL AGENDA REPORT Council Meeting Date: September 26, 2016 To: From: Agenda Item: Honorable Mayor and City Council Members Ron Rosenthal, Engineering

More information

Water Street Promenade Engineering and Design Services

Water Street Promenade Engineering and Design Services Preliminary Design Presentation Parking & Traffic Safety Committee Water Street Promenade Engineering and Design Services July 16,2014 November 3, 2016 Education / Infrastructure / Innovation 1 Project

More information

MPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017

MPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017 MPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017 RECOMMENDED ACTION: Consider HSIP Candidate Projects for the FY2019-2022 TIP as Being Consistent

More information

Maywood Town Hall Meeting. May 4, 2016

Maywood Town Hall Meeting. May 4, 2016 Maywood Town Hall Meeting May 4, 2016 1 AGENDA Overall I-290 Study Background Maywood Advisory Working Group (AWG) findings to date Noise Wall Update Next Steps 2 Questions? Study team members also available

More information

Hospital Link Project Project Update September 2017

Hospital Link Project Project Update September 2017 Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

Final Sidewalk Feasibility Study

Final Sidewalk Feasibility Study Garfield Drive From Anastasia Drive to Elizabeth Place City of South Daytona July 23, 2009 Final Sidewalk Feasibility Study Prepared for: Prepared by: Final Sidewalk Feasibility Study Garfield Drive 2

More information

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Prepared by: Public Works Department Engineering Division October 2015 Table of Contents Section I Introduction.. 3

More information

I-290 Phase I Study Area OAK PARK AVE AUSTIN BLVD. Reconstruction Area (9 miles) Oak Park RIDGELAND AVE CENTRAL AVE HARLEM AVE. Cicero.

I-290 Phase I Study Area OAK PARK AVE AUSTIN BLVD. Reconstruction Area (9 miles) Oak Park RIDGELAND AVE CENTRAL AVE HARLEM AVE. Cicero. RIDGELAND AVE OAK PARK AVE AUSTIN BLVD UP-RR BRC-RR ASHLAND AVE Study Area Map I-290 Phase I Study Area 294 UP RR Metra UP-W Illinois Prairie Path 38 Berkeley WOLF RD Hillside MANNHEIM RD Bellwood 290

More information

TANGIBLE CAPITAL ASSET (TCA) Reporting Guidelines for Land Development Projects

TANGIBLE CAPITAL ASSET (TCA) Reporting Guidelines for Land Development Projects January 2012 TANGIBLE CAPITAL ASSET (TCA) Reporting Guidelines for Land Development Projects 1. PURPOSE OF REPORTING The purpose of Tangible Capital Asset (TCA) reporting is to comply with PSAB 3150 reporting

More information

INTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS

INTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS INTRODUCTION The thoroughfare plan will assist public officials in the development of a specialized system for efficient and safe movement of vehicular traffic while minimizing potential conflicts with

More information

Basalt Creek Transportation Refinement Plan Recommendations

Basalt Creek Transportation Refinement Plan Recommendations Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for

More information

Item No. 14 Town of Atherton

Item No. 14 Town of Atherton Item No. 14 Town of Atherton CITY COUNCIL STAFF REPORT CONSENT AGENDA TO: THROUGH: FROM: HONORABLE MAYOR AND CITY COUNCIL GEORGE RODERICKS, CITY MANAGER MICHAEL KASHIWAGI, COMMUNITY SERVICES DIRECTOR MARTY

More information

Lake Waterford Community Association Meeting. November 15, 2016

Lake Waterford Community Association Meeting. November 15, 2016 Lake Waterford Community Association Meeting November 15, 2016 Introduction Staff Introduction Project Overviews - Completed Projects - Pavement Management Program - Pasadena Road Sidewalk Improvements

More information

Blair/Williamson Intersection Expressed Needs

Blair/Williamson Intersection Expressed Needs Blair/Williamson Intersection Expressed Needs NORTH Blair Street is a barrier for pedestrians and bicycles Relocate Capitol City Trail crossing from Blair Street and John Nolen Drive intersection to Williamson

More information

PROPOSAL. PROPOSAL OF, a corporation a

PROPOSAL. PROPOSAL OF, a corporation a PROPOSAL PROPOSAL OF, a corporation a partnership consisting of and an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction and Invitations to Bidders, the undersigned

More information

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Atwood Avenue Fair Oaks Avenue Cottage Grove Road Atwood Avenue Fair Oaks Avenue Cottage Grove Road Agenda Purpose Review project scope & goals Present design alternatives Gather feedback Answer Questions Format Open House Presentation Q&A Open House

More information

CITY OF ROCK ISLAND. 46th Street Reconstruction North of 28th Avenue to 29th Avenue. 29th Avenue Reconstruction 46th Street to 47th Avenue Court

CITY OF ROCK ISLAND. 46th Street Reconstruction North of 28th Avenue to 29th Avenue. 29th Avenue Reconstruction 46th Street to 47th Avenue Court 46th Street Reconstruction North of 28th Avenue to 29th Avenue 29th Avenue Reconstruction 46th Street to 47th Avenue Court 47th Street Court Reconstruction 29th Avenue to Cul-de-sac CITY OF ROCK ISLAND

More information

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY Prepared for: City of Thornton And Colorado Department of Transportation Prepared by: 11 Blake Street, Suite 2 Denver, Colorado 822 Contact: Brian Bern, PE, PTOE

More information

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION AGENDA ITEM #8: FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by the state

More information

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES PROJECT LOCATION MAP (1) DEYOUNG PARK IMPROVEMENTS Project Description - DeYoung Park Improvements include treehouse deck, play area, new

More information

Hospital Link Project Project Update November 2017

Hospital Link Project Project Update November 2017 Hospital Link Project Project Update November 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

FEASIBILITY REPORT STORM DRAINAGE IMPROVEMENTS TERRACE AND METCALF CITY OF OVERLAND PARK JOHNSON COUNTY, KANSAS

FEASIBILITY REPORT STORM DRAINAGE IMPROVEMENTS TERRACE AND METCALF CITY OF OVERLAND PARK JOHNSON COUNTY, KANSAS March 2, 2011 FEASIBILITY REPORT STORM DRAINAGE IMPROVEMENTS STANLEY STORM DRAINAGE IMPROVEMENTS, 151sT TERRACE AND METCALF CITY OF OVERLAND PARK JOHNSON COUNTY, KANSAS DESCRIPTION: This report relates

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

SR 44 from US 441 / SR 500 to SR 44 / Orange Ave.

SR 44 from US 441 / SR 500 to SR 44 / Orange Ave. SR 44 from US 441 / SR 500 to SR 44 / Orange Ave. Financial Project ID: 409870-1-52-01 LAKE COUNTY DESIGN ALTERNATIVE STUDY FOR MULTI-USE PATH Prepared for: FLORIDA DEPARTMENT OF TRANSPORTATION District

More information

4 GENERIC COST ESTIMATING TOOL

4 GENERIC COST ESTIMATING TOOL 4 GENERIC COST ESTIMATING TOOL Table 4-1 presents a generic cost estimating tools that can serve as a conceptual planning tool for local jurisdictions to estimate the costs of pedestrian improvements.

More information

20 minute presentation on proposed project. Comments and Questions following presentation. City of Madison

20 minute presentation on proposed project. Comments and Questions following presentation. City of Madison 20 minute presentation on proposed project Comments and Questions following presentation 2016 2017 Replace concrete pavement & base Replace curb and sidewalk as needed Proposed contra-flow bike lane Replace

More information

Request for Authorization to Open Public Comment Period

Request for Authorization to Open Public Comment Period Request for Authorization to Open Public Comment Period May 12, 2015 LRP, TIPs, and Conformity Reasons for Requested Action: LRP and TIP Amendment to Connections 2040 LRP, and Draft FY 2016 TIP for New

More information

Fleur Drive Reconstruction

Fleur Drive Reconstruction Fleur Drive Reconstruction October 29, 2018 1 Agenda: Fleur Drive Reconstruction Project Scope & Cost Overview Fleur Drive Cross Section Elements - Travel Lane Widths - Sidewalk Widths - Parkway Widths

More information

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,

More information

Building Great Neighbourhoods QUEEN ALEXANDRA

Building Great Neighbourhoods QUEEN ALEXANDRA Building Great Neighbourhoods QUEEN ALEXANDRA We are here today to Explain how the City is investing in improving your neighbourhood and how your neighbourhood will be improved to meet current City standards.

More information

CITY MANUALS AND STANDARDS REVIEW

CITY MANUALS AND STANDARDS REVIEW GEORGETOWN SIDEWALK MASTER PLAN CITY MANUALS AND STANDARDS REVIEW RESOURCES AND STANDARDS As part of the Master Plan process, a review and evaluation of current City documents and policies relevant to

More information

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS ITEM #9: TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by

More information

IMPLEMENTATION WORKBOOK

IMPLEMENTATION WORKBOOK Lawrence Township Bicycle and Pedestrian Planning Assistance Study IMPLEMENTATION WORKBOOK Final Action Plan - Part 2 April 2009 Prepared For: The Township of Lawrence and the New Jersey Department of

More information

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility ADA Transition Plan FY19-FY28 Date: November 5, 2018 Prepared by: City Of Gainesville Department of Mobility 1.0 INTRODUCTION 1.1 BACKGROUND The federal statute known as the Americans with Disabilities

More information

Water Street Promenade. Engineering and Design Services. Public Information Meeting No. 2. Education / Infrastructure / Innovation. Maplewood Avenue &

Water Street Promenade. Engineering and Design Services. Public Information Meeting No. 2. Education / Infrastructure / Innovation. Maplewood Avenue & Public Information Meeting No. 2 Water Street Promenade Maplewood Avenue & Engineering and Design Services Adjacent Areas July 16,2014Portsmouth, NH May 10, 2016 Education / Infrastructure / Innovation

More information

City of Moorhead Committee of the Whole Meeting

City of Moorhead Committee of the Whole Meeting City of Moorhead Committee of the Whole Meeting Corridor Study Limits Center Avenue (Red River to 8th Street) TH 10 (Red River to TH 336) TH 75 (20th Ave S to Main Avenue) 2 Study Need: Project Overview

More information

CITY OF SOUTH DAYTONA

CITY OF SOUTH DAYTONA CITY OF SOUTH DAYTONA FIVE YEAR WORK PLAN for HALF-CENT SALES TAX FY 2020-2025 Table of Contents Executive Summary Purpose of the Work Program... 3 Project List Magnolia Avenue North Roadway, Drainage

More information

122 Avenue: 107 Street to Fort Road

122 Avenue: 107 Street to Fort Road : 107 Street to Fort Road November 24, 2015 4:30 8:00 p.m. Meeting Purpose Summarize project work completed to date Share results of public input from Phase 1 Share the draft concept plan and proposed

More information

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects:

More information

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table

More information

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach CONNECTIVITY PLAN Adopted December 5, 2017 City of Virginia Beach CONTENTS 1.0 Background & Purpose... 2 2.0 Existing Inventory & Analysis... 3 ViBe District Existing Walking Conditions... 4 3.0 ViBe District

More information

S T A T I O N A R E A P L A N

S T A T I O N A R E A P L A N The Circulation and Access Plan describes vehicle, pedestrian, and transit improvements recommended within the Concept Plan. In order to create and sustain a vibrant business district that provides pedestrian-friendly

More information

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY Appendix 2 City of Mississauga Lakeshore Road FINAL REPORT Transportation Review Study December 2010 EXECUTIVE SUMMARY Study Purpose

More information

Donahue Drive Corridor Traffic Operational Evaluation

Donahue Drive Corridor Traffic Operational Evaluation Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Open House Public Meeting S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Municipality of Bethel Park, Allegheny County Bethel Park Municipal Building 5001 West Library

More information

Building Great Neighbourhoods STRATHEARN

Building Great Neighbourhoods STRATHEARN Building Great Neighbourhoods STRATHEARN Public Involvement Community League Meeting #1: October 5, 2015 Public Meeting #2: March 15, 2016 Public Meeting #3: January 17, 2017 Building Great Neighbourhoods

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

TRAFFIC ACCIDENT ANALYSIS

TRAFFIC ACCIDENT ANALYSIS TRAFFIC ACCIDENT ANALYSIS Westheimer at Chimney Rock and Westheimer at Dunvale Prepared for Prepared by Klotz Associates, Inc. 1160 Dairy Ashford, Suite 500 Houston, Texas 77079 The preparation of this

More information

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017 DES MOINES AREA MPO Presentation to Iowa Commercial Real Estate Association April 6, 2017 Presentation Outline MPO Overview Trends We re Watching Plans, Projects, Initiatives, Regional Transportation Priorities

More information

State Street and Pierce Park Lane Intersection Concept Report

State Street and Pierce Park Lane Intersection Concept Report State Street and Pierce Park Lane Intersection Prepared for September 2017 Prepared by CITATION Parametrix. 2017. State Street & Pierce Park Lane Intersection. Prepared by Parametrix, Boise, ID. September

More information

Project Update May 2018

Project Update May 2018 Project Update May 2018 Dakota County, in cooperation with the City of Lakeville, is planning to reconstruct 202 nd Street West (County Road 50) from Holyoke Avenue to Cedar Avenue (County Road 23). 202

More information

Public Involvement Outreach Requirements for Public Information Open House Meeting: C.N , HSIP-5003(12) 132 nd and West Center Road, Omaha

Public Involvement Outreach Requirements for Public Information Open House Meeting: C.N , HSIP-5003(12) 132 nd and West Center Road, Omaha To: NDOR Environmental From: Randy McCart, HDR Date: 4 April 2017 RE: Public Involvement Summary Report, HSIP-5003(12) 132 nd and West Center Road, Omaha; C.N. 22629 Public Involvement Outreach Requirements

More information

APPENDIX L. Design Criteria

APPENDIX L. Design Criteria APPENDIX L Design Criteria DRAFT PRELIMINARY DESIGN CRITERIA Page 1 of 18 APPROVALS MANAGER, ENGINEERING CITY OF HAMILTON MANAGER, ENGINEERING REGION OF HALTON DATE This Design Criteria for the New East-West

More information

Table 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line

Table 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line Grade Crossing Enhancements CPUC 1 2 3 4 5 Citrus Avenue, Riverside County Palmyrita Ave., Columbia Avenue, Marlborough Ave., Spruce St., MP 0.57 002X-0.6 027301Y MP 1.00 002X-1.0 027302F MP 1.24 002X-1.3

More information

Building Great Neighbourhoods BONNIE DOON

Building Great Neighbourhoods BONNIE DOON Building Great Neighbourhoods BONNIE DOON We Are Here Today To Explain the Neighbourhood Renewal Process Show you the Westwood Preliminary Design Ask for local knowledge Highlight the Local Improvement

More information

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212

More information

TRANSPORTATION & INDUSTRIAL ACCESS STUDY PHASE II GENESEE TRANSPORTATION COUNCIL

TRANSPORTATION & INDUSTRIAL ACCESS STUDY PHASE II GENESEE TRANSPORTATION COUNCIL TRANSPORTATION & INDUSTRIAL ACCESS STUDY PHASE II GENESEE TRANSPORTATION COUNCIL MONROE COUNTY VILLAGE SQUARE FINAL CONCEPT-LEVEL STRATEGY REPORT I. Introduction The purpose of this report is to recommend

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems

CHAPTER 8 STAKING SIGNALS AND LIGHTING FIELD GUIDE. 8.1 Staking Traffic Control Signal Systems CHAPTER 8 STAKING STAKING Correct staking of traffic control signal or lighting systems is critical to the appropriate placement of system components. 8.1 Traffic Control Signal Systems Locating the components

More information

Exhibit B: Proposed amendments to the Transportation Element of the Oakland Comprehensive Plan

Exhibit B: Proposed amendments to the Transportation Element of the Oakland Comprehensive Plan Exhibit B: Proposed amendments to the Transportation Element of the Oakland Comprehensive Plan TRANSPORTATION Introduction An important aspect of any community is its transportation system, the means by

More information

Central Corridor. Light Rail Transit. Improving mobility Easing congestion Strengthening our communities. Committee of the Whole January 30, 2008

Central Corridor. Light Rail Transit. Improving mobility Easing congestion Strengthening our communities. Committee of the Whole January 30, 2008 - Committee of the Whole January 30, 2008 Improving mobility Easing congestion Strengthening our communities Today s Agenda Bridges 2 or 3-car trains/platforms Reconstruction of right-ofway Traffic signals

More information

GENERAL LEGEND 12"CMP

GENERAL LEGEND 12CMP PLANS FOR X-REFS: west branch_ci FILE PATH: Z:\WEST BRANCH 36863 SIDEWALK IMPROVEMENTS 212 - SRTS - OLIPHANT\DRAWINGS\_PRODUCTION DRAWINGS\A.1 COVER PLOTTED: Monday, July 23, 212 2:44:13 PM OLIPHANT STREET

More information

SECTION 1 - TRAFFIC PLANNING

SECTION 1 - TRAFFIC PLANNING SECTION 1 - TRAFFIC PLANNING 1.1 TRAFFIC OPERATIONS 1.1.1 Roadway Functional Classification The Multnomah County Comprehensive Framework Plan s Policy 34: Trafficways and the Functional Classification

More information

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

U.S. HIGHWAY 50 IMPROVEMENT PROJECT U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY

More information

Clackamas County Comprehensive Plan

Clackamas County Comprehensive Plan ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They

More information

Meadow Woods Elementary School

Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

Driveway Design Criteria

Driveway Design Criteria Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved

More information

FINAL SCOPING REPORT. Bennington Streetscape Improvement Project BENNINGTON STP SDWK (12) August Bennington County Regional Commission

FINAL SCOPING REPORT. Bennington Streetscape Improvement Project BENNINGTON STP SDWK (12) August Bennington County Regional Commission FINAL SCOPING REPORT Bennington Streetscape Improvement Project BENNINGTON STP SDWK (12) August 214 Bennington County Regional Commission Table of Contents Purpose & Need 3 Project Area Photos 5 Conceptual

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016 M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

DRAFT TRAFFIC STUDY BOULDER AVENUE BRIDGE REPLACEMENT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA

DRAFT TRAFFIC STUDY BOULDER AVENUE BRIDGE REPLACEMENT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA DRAFT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA August 8, 2006 DRAFT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA Prepared for: City of Highland 27215 Baseline Highland, California 92346

More information

RZC Appendix 8A Marymoor Subarea Street Requirements

RZC Appendix 8A Marymoor Subarea Street Requirements RZC Appendix 8A Marymoor Subarea Street Requirements For additional design details for Marymoor Subarea infrastructure, refer to the 2017 Marymoor Subarea Infrastructure Planning Report. STREET REQUIREMENTS

More information

City of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate

City of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate City of Hyattsville Transportation Study Project Recommendations Planning Level Cost Estimate Project ID Project Category Project Name Qty/Len(Mi) Cost Estimate BB 1 Bike boulevard Jefferson Street or

More information

Deer Street Parking Garage & Deer Street Associates Development

Deer Street Parking Garage & Deer Street Associates Development Traffic Impact and Access Study Deer Street Parking Garage & Deer Street Associates Development Portsmouth, New Hampshire Submitted to: City of Portsmouth, New Hampshire 1 Junkins Avenue Portsmouth, New

More information

S TREET (TO DADE ) BE IMPROVED. 96.3' - -, I I i---- , so. a - - r- - r - so. o, LOT 1 LOT 2 POND T.O.B (() I 100.0' I I LOT 3 !

S TREET (TO DADE ) BE IMPROVED. 96.3' - -, I I i---- , so. a - - r- - r - so. o, LOT 1 LOT 2 POND T.O.B (() I 100.0' I I LOT 3 ! - F - r-=-::--;;m11s.. THTHESE DRAWNGS CONSTRUCTON OTE: TD SOllE BE CONS DETAllS TYPCAL DH PlANS. AND NLY - NTT FOR PERMT OR El NOT BE R :tt eecce lll""' FAMLAR,_ EASBLJTY O.,."',_"'.,.. "' CTRONA DRVE

More information

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway State Road 54/56 Tampa Bay s Northern Loop The Managed Lane Solution Linking I-75 to the Suncoast Parkway SUNCOAST PARKWAY Both I 75 and the Suncoast Parkway are planning, or in the process of constructing,

More information

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting Study Area April 9 Public Meeting Comments Summary Pedestrian Safety - A Walking Neighborhood Pedestrian traffic is very difficult A need

More information

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS

2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS CITY OF REDMOND, OREGON 2010 STANDARD SPECIFICATIONS STANDARD DRAWINGS TABLE OF CONTENTS SECTION 1 TRENCHES TITLE 1-1 Utility Trench 1-2 Water Line & Sewer Line Separation 1-3 RR X-ING Single/Joint Use

More information