1 Run 1 Run 2 Run Company: Lamont Doherty Well: Field: Rig: Expedition 33 Site U1374A Louisville Seamounts JOIDES Resolution Ocean: Phasor Pacific JOIDES Resolution Louisville Seamounts Latitude: S 28* Expedition 33 Site U1374A Lamont Doherty LOCATION Induction Natural Gamma Ray Latitude: S 28* Longitude: W 173* Permanent Datum: Log Measured From: Sea Floor Sea Floor Elev.: Elev.: K.B. G.L. D.F.. m 157. m. m 157. m 157. mabove Perm. Datum Rig: MUD Field: Location: Well: Company: Logging Date Run Number Depth Driller Schlumberger Depth Bottom Log Interval Top Log Interval Casing Driller Size Depth Casing Schlumberger Bit Size Type Fluid In Hole Density Viscosity Drilling Measured From: Fluid Loss PH Source Of Sample RM Measured Temperature RMF Measured Temperature RMC Measured Temperature Source RMF RMC RM MRT RMF MRT Maximum Recorded Temperatures Circulation Stopped Time Logger On Bottom Time Unit Number Location Recorded By Witnessed By API Serial No. 19 Jan m 52 m 518 m m 4.5 in 13 m in Seawater 1.78 g/cm3 Sea Floor N/A N/A N/A degc 18 Jan Jan Houston K. Swain L. Anderson, S. Ehmann Max. Hole Devi. deg 128 m 15 : 14:35 Longitude W 123* Latitude S 27* MUD Logging Date Run Number Depth Driller Schlumberger Depth Bottom Log Interval Top Log Interval Casing Driller Size Depth Casing Schlumberger Bit Size Type Fluid In Hole Density Viscosity Fluid Loss PH Source Of Sample RM Measured Temperature RMF Measured Temperature RMC Measured Temperature Source RMF RMC RM MRT RMF MRT Maximum Recorded Temperatures Circulation Stopped Time Logger On Bottom Time Unit Number Location Recorded By Witnessed By

2 3 Run 4 DISCLAIMER THE USE OF AND RELIANCE UPON THIS RECORDED DATA BY THE HEREIN NAMED COMPANY (AND ANY OF ITS AFFILIATES, PARTNERS, REPRESENTATIVES, AGENTS, CONSULTANTS AND EMPLOYEES) IS SUBJECT TO THE TERMS AND CONDITIONS AGREED UPON BETWEEN SCHLUMBERGER AND THE COMPANY, INCLUDING: (a) RESTRICTIONS ON USE OF THE RECORDED DATA; (b) DISCLAIMERS AND WAIVERS OF WARRANTIES AND REPRESENTATIONS REGARDING COMPANY S USE OF AND RELIANCE UPON THE RECORDED DATA; AND (c) CUSTOMER S FULL AND SOLE RESPONSIBILITY FOR ANY INFERENCE DRAWN OR DECISION MADE IN CONNECTION WITH THE USE OF THIS RECORDED DATA. OTHER SERVICES1 OTHER SERVICES2 OS1: FMS OS1: OS2: UBI OS2: OS3: HNGS OS3: OS4: HLDS/APS OS4: OS5: GBM OS5: REMARKS: RUN NUMBER 1 REMARKS: RUN NUMBER 2 Depths originally recorded from drill floor as main depth reference. Log files were played back with offset of 157m to force sea floor as the new reference. This log references sea floor at m. TD of hole at 522m (driller), 52 m (log) Tools run inside drill pipe and drill collars thru bit release and BHA. 9 7/8" bit released prior to logging. ID of pipe at minimum is 4.1" diameter. ILE inline eccentralizer run for APS porosity tool to eccentralize it. GPIT run with tool for Active Heave Compensator testing (AHC). GR spike at 75m possiblly related to APS neutron activation by correcting wrap on cable drum requiring toolstring to descend in order to repair. Repeat section shows GR at slightly ligher level due to Neutron activation of the borehole. Multiple attempts at logging this hole were made, with last attempt being successful after full wiper trip and drilling through obstructions. RUN 1 RUN 2 SERVICE ORDER #: SERVICE ORDER #: PROGRAM VERSION: 17C 154 PROGRAM VERSION: FLUID LEVEL: FLUID LEVEL: LOGGED INTERVAL START STOP LOGGED INTERVAL START STOP SFT SFT GSR U 6168 WITM (DTS) A EQUIPMENT DESCRIPTION RUN 1 RUN 2 SURFACE EQUIPMENT DOWNHOLE EQUIPMENT LEH QT LEH QT 31 DTC H ECH KC 1777 CTEM TelStatus ToolStatu HNGS BA Upper_1 Lower_

3 HNGS BA 194 HNSH BA 25 HNGC B HNGH A 115 HNGC Stat AH 191 ILE F ILE F AH 19 APS C APH AC 22 APS C 22 MNTR F 5589 Status Minitron Near TD Near Arr Near Far Arr Far Far TD LDSC B LDSH A 319 LDSC Stat HLDS GSR Z 2397 HLDV D 51 HLDS D 45 HEH H 53 HLDP C 61 Caliper SS LS Status DTA A ECH KE GPIT A/B GPIC AC DIT E DIC EB 171 MIH ZA 342 DIS HB SP Deep Ind Aux Meas SFL Med Ind HV DF Status GPIT Tension TOOL ZERO. MAXIMUM STRING DIAMETER 3.75 IN MEASUREMENTS RELATIVE TO TOOL ZERO ALL LENGTHS IN METERS (in) (M) Production String Well Schematic Casing String MD OD ID OD ID (M) MD (in)

4 Kelly Bushing Elevation Derrick Floor Elevation Mean Sea Level Sea Floor Open Hole 522 Total Depth

5 Input DLIS Files PI_LDL_APS_NGS_28LUP FN:48 2 Jan : M M Output DLIS Files DEFAULT PI_LDL_APS_NGS_114PUP FN:4 PRODUCER 11 Feb 211 7: M 2.3 M OP System Version: 17C 154 DIT E 17C 154 GPIT A/B SRPC 3971 Q1_21_OP17 DTA A 17C 154 HLDS SPC 3961 OP17_NUCL LDSC B SPC 3961 OP17_NUCL APS C SPC 3961 OP17_NUCL HNGC B SPC 3961 OP17_NUCL HNGS BA SPC 3961 OP17_NUCL DTC H 17C 154 Time Mark Every 6 S PIP SUMMARY HNGS Spectroscopy Gamma Ray (HSGR) (GAPI) 1 SFL_ QUAL From D3T to SFQF UPlog 2 Area From HCGR to HSGR IM_QUAL From SFQF to IMQF SFL Unaveraged (SFLU).2 (OHMM) 2

6 HNGS Computed Gamma Ray (HCGR) (GAPI) 1 ID_QUAL From IMQF to IDQF Medium Induction Phasor processed Resistivity (IMPH).2 (OHMM) 2 HLDS Caliper (LCAL) (IN) 2 Tension (TENS) (LBF) 1 Deep Induction Phasor processed Resistivity (IDPH).2 (OHMM) 2 Sea Floor 25

7 5 TENS GR Spike 75 See Remarks HCGR SFQF IMQF IDQF IMPH IDPH SFLU

8 LCAL HSGR Drill Pipe Cali Closed

9 15 175

10 HLDS Caliper (LCAL) (IN) 2 Tension (TENS) (LBF) Deep Induction Phasor processed Resistivity (IDPH).2 (OHMM) 2 2 TENS HCGR LCAL HSGR SFQF IMQF IDQF 225 IMPH IDPH SFLU Cali Opened FR DITE

11 (LBF) 1 HNGS Computed Gamma Ray (HCGR) (GAPI) 1 ID_QUAL From IMQF to IDQF Medium Induction Phasor processed Resistivity (IMPH).2 (OHMM) 2 Area From HCGR to HSGR HNGS Spectroscopy Gamma Ray (HSGR) (GAPI) 1 Time Mark Every 6 S IM_QUAL From SFQF to IMQF SFL_ QUAL From D3T to SFQF SFL Unaveraged (SFLU).2 (OHMM) 2 UPlog 2 PIP SUMMARY Parameters DLIS Name Description DIT E: Dual Induction E BHS Borehole Status OPEN BHT Bottom Hole Temperature (used in calculations) 5 DEGF DGF2 Deep 2 khz Gain Factor DPH2 Deep 2 khz Shift DEG DRE2 Deep Real 2 khz Sonde Error Correction MM/M DSR2 Deep Sigma Reference (2 khz) 1843 MM/M DXE2 Deep Quad 2 khz Sonde Error Correction MM/M GCSE Generalized Caliper Selection BS GDEV Average Angular Deviation of Borehole from Normal DEG GGRD Geothermal Gradient.1 DF/F GTSE Generalized Temperature Selection LINEAR_ESTIMATE IFRS DIT E Induction Frequency Selector 2 IPHA DIT E Phasor Processing Mode ALL IPRO DIT E Induction Processing Selector PHASOR ITEN DIT E Temperature Enable ENABLE MGF2 Medium 2 khz Gain Factor MPH2 Medium 2 khz Shift DEG MRE2 Medium Real 2 khz Sonde Error Correction MM/M MSR2 Medium Sigma Reference (2 khz) 325 MM/M MXE2 Medium Quad 2 khz Sonde Error Correction MM/M SFCR SFL Channel Ratio 1 SHT Surface Hole Temperature 68 DEGF APS C: Accelerator Porosity Tool BHS Borehole Status OPEN BHT Bottom Hole Temperature (used in calculations) 5 DEGF GCSE Generalized Caliper Selection BS GDEV Average Angular Deviation of Borehole from Normal DEG GGRD Geothermal Gradient.1 DF/F GTSE Generalized Temperature Selection LINEAR_ESTIMATE SHT Surface Hole Temperature 68 DEGF HNGS BA: Hostile Natural Gamma Ray Sonde BAR1 HNGS Detector 1 Barite Constant 1 BAR2 HNGS Detector 2 Barite Constant 1 BHK HNGS Borehole Potassium Correction Concentration BHS Borehole Status OPEN BHT Bottom Hole Temperature (used in calculations) 5 DEGF CSD1 Inner Casing Outer Diameter IN CSD2 Outer Casing Outer Diameter IN CSW1 Inner Casing Weight LB/F CSW2 Outer Casing Weight LB/F DBCC HNGS Barite Constant Correction Flag NONE GCSE Generalized Caliper Selection BS GDEV Average Angular Deviation of Borehole from Normal DEG GGRD Geothermal Gradient.1 DF/F GTSE Generalized Temperature Selection LINEAR_ESTIMATE H1P HNGS Detector 1 Allow/Disallow In Processing ALLOW H2P HNGS Detector 2 Allow/Disallow In Processing ALLOW HABK HNGS Borehole Potassium Running Average HALF HNGS Alpha Filter Length 6 IN HCRB HNGS Apply Borehole Potassium Correction NONE HMWM Mud Weighting Material NATU HNPE HNGS Processing Enable YES S1BI HNGS Detector 1 Calibration Bismuth Count Rate 1.3 CPS S2BI HNGS Detector 2 Calibration Bismuth Count Rate 1.3 CPS

12 SGRC SHT HNGS Standard Gamma Ray Correction Flag Surface Hole Temperature YES 68 DEGF TPOS Tool Position ECCE VBA1 HNGS Detector 1 Variable Barite Factor Running Average VBA2 HNGS Detector 2 Variable Barite Factor Running Average System and Miscellaneous BS Bit Size IN DFD Drilling Fluid Density 1.8 G/C3 DO Depth Offset for Playback 157. M FLEV Fluid Level 5. M PP Playback Processing NORMAL TD Total Depth 1713 FT Format: DITE_LogPhasor Vertical Scale: 1:2 Graphics File Created: 11 Feb 211 7:8 OP System Version: 17C 154 DIT E 17C 154 GPIT A/B SRPC 3971 Q1_21_OP17 DTA A 17C 154 HLDS SPC 3961 OP17_NUCL LDSC B SPC 3961 OP17_NUCL APS C SPC 3961 OP17_NUCL HNGC B SPC 3961 OP17_NUCL HNGS BA SPC 3961 OP17_NUCL DTC H 17C 154 Input DLIS Files PI_LDL_APS_NGS_28LUP FN:48 2 Jan : M M Output DLIS Files DEFAULT PI_LDL_APS_NGS_114PUP FN:4 PRODUCER 11 Feb 211 7:8 Input DLIS Files PI_LDL_APS_NGS_27LUP FN:46 2 Jan : M M Output DLIS Files DEFAULT PI_LDL_APS_NGS_113PUP FN:3 PRODUCER 11 Feb 211 6: M 16.3 M OP System Version: 17C 154 DIT E 17C 154 GPIT A/B SRPC 3971 Q1_21_OP17 DTA A 17C 154 HLDS SPC 3961 OP17_NUCL LDSC B SPC 3961 OP17_NUCL APS C SPC 3961 OP17_NUCL HNGC B SPC 3961 OP17_NUCL HNGS BA SPC 3961 OP17_NUCL DTC H 17C 154 Time Mark Every 6 S PIP SUMMARY HNGS Spectroscopy Gamma Ray (HSGR) (GAPI) 1 SFL_ QUAL From D3T to SFQF Main Log Area From HCGR to HSGR IM_QUAL From SFQF to IMQF SFL Unaveraged (SFLU).2 (OHMM) 2 HNGS Computed Gamma Ray (HCGR) (GAPI) 1 ID_QUAL From IMQF to IDQF Medium Induction Phasor processed Resistivity (IMPH).2 (OHMM) 2 HLDS Caliper (LCAL) (IN) 2 Tension (TENS) (LBF) 1 Deep Induction Phasor processed Resistivity (IDPH).2 (OHMM) 2

13 SeaFloor 25

14 5 TENS 75 HCGR LCAL HSGR SFQF IMQF IDQF IDPH IMPH SFLU

15 1 125 Drill Pipe Caliper Closed 15

16 175 2

17 225 25

18 275 3

19

20 4 425

21 45 TENS HCGR LCAL HSGR SFQF IMQF IDQF IMPH IDPH SFLU 475

22 FR HNGS 5 Caliper Opened FR DITE HLDS Caliper (LCAL) (IN) 2 Total Depth Tension (TENS) (LBF) 1 Deep Induction Phasor processed Resistivity (IDPH).2 (OHMM) 2 HNGS Computed Gamma Ray (HCGR) (GAPI) 1 ID_QUAL From IMQF to IDQF Medium Induction Phasor processed Resistivity (IMPH).2 (OHMM) 2 Area From HCGR to HSGR IM_QUAL From SFQF to IMQF SFL Unaveraged (SFLU).2 (OHMM) 2 HNGS Spectroscopy Gamma Ray (HSGR) (GAPI) 1 Time Mark Every 6 S SFL_ QUAL From D3T to SFQF Main Log PIP SUMMARY Parameters DLIS Name Description DIT E: Dual Induction E BHS Borehole Status OPEN BHT Bottom Hole Temperature (used in calculations) 5 DEGF

23 DGF2 DPH2 Deep 2 khz Gain Factor Deep 2 khz Shift DEG DRE2 Deep Real 2 khz Sonde Error Correction MM/M DSR2 Deep Sigma Reference (2 khz) 1843 MM/M DXE2 Deep Quad 2 khz Sonde Error Correction MM/M GCSE Generalized Caliper Selection BS GDEV Average Angular Deviation of Borehole from Normal DEG GGRD Geothermal Gradient.1 DF/F GTSE Generalized Temperature Selection LINEAR_ESTIMATE IFRS DIT E Induction Frequency Selector 2 IPHA DIT E Phasor Processing Mode ALL IPRO DIT E Induction Processing Selector PHASOR ITEN DIT E Temperature Enable ENABLE MGF2 Medium 2 khz Gain Factor MPH2 Medium 2 khz Shift DEG MRE2 Medium Real 2 khz Sonde Error Correction MM/M MSR2 Medium Sigma Reference (2 khz) 325 MM/M MXE2 Medium Quad 2 khz Sonde Error Correction MM/M SFCR SFL Channel Ratio 1 SHT Surface Hole Temperature 68 DEGF APS C: Accelerator Porosity Tool BHS Borehole Status OPEN BHT Bottom Hole Temperature (used in calculations) 5 DEGF GCSE Generalized Caliper Selection BS GDEV Average Angular Deviation of Borehole from Normal DEG GGRD Geothermal Gradient.1 DF/F GTSE Generalized Temperature Selection LINEAR_ESTIMATE SHT Surface Hole Temperature 68 DEGF HNGS BA: Hostile Natural Gamma Ray Sonde BAR1 HNGS Detector 1 Barite Constant 1 BAR2 HNGS Detector 2 Barite Constant 1 BHK HNGS Borehole Potassium Correction Concentration BHS Borehole Status OPEN BHT Bottom Hole Temperature (used in calculations) 5 DEGF CSD1 Inner Casing Outer Diameter IN CSD2 Outer Casing Outer Diameter IN CSW1 Inner Casing Weight LB/F CSW2 Outer Casing Weight LB/F DBCC HNGS Barite Constant Correction Flag NONE GCSE Generalized Caliper Selection BS GDEV Average Angular Deviation of Borehole from Normal DEG GGRD Geothermal Gradient.1 DF/F GTSE Generalized Temperature Selection LINEAR_ESTIMATE H1P HNGS Detector 1 Allow/Disallow In Processing ALLOW H2P HNGS Detector 2 Allow/Disallow In Processing ALLOW HABK HNGS Borehole Potassium Running Average HALF HNGS Alpha Filter Length 6 IN HCRB HNGS Apply Borehole Potassium Correction NONE HMWM Mud Weighting Material NATU HNPE HNGS Processing Enable YES S1BI HNGS Detector 1 Calibration Bismuth Count Rate 1.3 CPS S2BI HNGS Detector 2 Calibration Bismuth Count Rate 1.3 CPS SGRC HNGS Standard Gamma Ray Correction Flag YES SHT Surface Hole Temperature 68 DEGF TPOS Tool Position ECCE VBA1 HNGS Detector 1 Variable Barite Factor Running Average VBA2 HNGS Detector 2 Variable Barite Factor Running Average System and Miscellaneous BS Bit Size IN DFD Drilling Fluid Density 1.8 G/C3 DO Depth Offset for Playback 157. M FLEV Fluid Level 5. M PP Playback Processing NORMAL TD Total Depth 1713 FT Format: DITE_LogPhasor Vertical Scale: 1:2 Graphics File Created: 11 Feb 211 6:49 OP System Version: 17C 154 DIT E 17C 154 GPIT A/B SRPC 3971 Q1_21_OP17 DTA A 17C 154 HLDS SPC 3961 OP17_NUCL LDSC B SPC 3961 OP17_NUCL APS C SPC 3961 OP17_NUCL HNGC B SPC 3961 OP17_NUCL HNGS BA SPC 3961 OP17_NUCL DTC H 17C 154 Input DLIS Files PI_LDL_APS_NGS_27LUP FN:46 2 Jan : M M Output DLIS Files

24 DEFAULT PI_LDL_APS_NGS_113PUP FN:3 PRODUCER 11 Feb 211 6:49 Calibration and Check Summary Measurement Nominal Before After Change Limit Units General Purpose Inclinometer Wellsite Calibration CROUZET ACCELEROMETER PROM HAS BEEN READ CORRECTLY Before: 2 Jan :32 TEMPERATURE REFERENCE : N/A N/A 2 N/A N/A N/A DEGC YEAR OF CALIBRATION : N/A N/A 92 N/A N/A N/A MONTH OF CALIBRATION : N/A N/A 1 N/A N/A N/A SERIAL NUMBER : N/A N/A 448 N/A N/A N/A General Purpose Inclinometer Wellsite Calibration CROUZET MAGNETOMETER PROM HAS BEEN READ CORRECTLY Before: 2 Jan :32 TEMPERATURE REFERENCE : N/A N/A 19 N/A N/A N/A DEGC YEAR OF CALIBRATION : N/A N/A 99 N/A N/A N/A MONTH OF CALIBRATION : N/A N/A 12 N/A N/A N/A SERIAL NUMBER : N/A N/A 428 N/A N/A N/A Hostile Litho Density Sonde Wellsite Calibration Background Measurement : 11 Dec 21 5:21 Before: 25 Dec 21 6:5 After: 2 Jan :53 SS Cs Resolution Bkg % LS Cs Resolution Bkg % LSW1 Background CPS LSW2 Background CPS LSW3 Background CPS LSW4 Background CPS LSW5 Background CPS SSW1 Background CPS SSW2 Background CPS SSW3 Background CPS SSW4 Background CPS SSW5 Background CPS Hostile Litho Density Sonde Wellsite Calibration Aluminum Measurement : 11 Dec 21 5:21 LSW1 Aluminum N/A N/A N/A N/A CPS LSW2 Aluminum N/A N/A N/A N/A CPS LSW3 Aluminum N/A N/A N/A N/A CPS LSW4 Aluminum N/A N/A N/A N/A CPS LSW5 Aluminum N/A N/A N/A N/A CPS SSW1 Aluminum N/A N/A N/A N/A CPS SSW2 Aluminum N/A N/A N/A N/A CPS SSW3 Aluminum N/A N/A N/A N/A CPS SSW4 Aluminum N/A N/A N/A N/A CPS SSW5 Aluminum N/A N/A N/A N/A CPS Hostile Litho Density Sonde Wellsite Calibration Lithology Measurement : 11 Dec 21 5:21 LSW1 Iron N/A N/A N/A N/A CPS LSW2 Iron N/A N/A N/A N/A CPS LSW3 Iron N/A N/A N/A N/A CPS LSW4 Iron N/A N/A N/A N/A CPS LSW5 Iron N/A N/A N/A N/A CPS SSW1 Iron N/A N/A N/A N/A CPS SSW2 Iron N/A N/A N/A N/A CPS SSW3 Iron N/A N/A N/A N/A CPS SSW4 Iron N/A N/A N/A N/A CPS SSW5 Iron N/A N/A N/A N/A CPS Hostile Litho Density Sonde Wellsite Calibration Caliper Calibration Before: 25 Dec 21 5:54 HLDS Caliper Small Ring N/A N/A N/A N/A IN HLDS Caliper Large Ring N/A 17.1 N/A N/A N/A IN Accelerator Porosity Tool Wellsite Calibration Detector Background : 11 Dec 21 9: Before: 2 Jan :41 After: 2 Jan :56 Near Det Bkg Cntrate N/A CPS Far Det Bkg Cntrate N/A CPS Array 1 Det Bkg Cntrate N/A CPS Array 2 Det Bkg Cntrate N/A CPS Array Therm Det Bkg Cntrate N/A CPS Accelerator Porosity Tool Wellsite Calibration Calibration Ratios : 11 Dec 21 9:

25 Near/Far Calibration Ratio N/A N/A N/A N/A Near/Array Calibration Ratio N/A N/A N/A N/A Near/Array Cal Ratio Up/Down N/A N/A N/A N/A Accelerator Porosity Tool Wellsite Calibration Tank Check : 11 Dec 21 9: Array 1 Standoff Porosity N/A N/A N/A N/A PU Array 2 Standoff Porosity N/A N/A N/A N/A PU Average Slowing Down Time N/A N/A N/A N/A US Array 1 SDT Ratio Up/Down N/A N/A N/A N/A Array 2 SDT Ratio Up/Down N/A N/A N/A N/A Sigma Formation N/A N/A N/A N/A CU Accelerator Porosity Tool Wellsite Calibration CCR7 signal boxes : 11 Dec 21 8:15 Near Detector Plateau Setting N/A N/A N/A N/A V Far Detector Plateau Setting 2 28 N/A N/A N/A N/A V Array Detector Plateau Setting N/A N/A N/A N/A V Hostile Natural Gamma Ray Sonde Wellsite Calibration Detector 1 Check : 1 Dec 21 8:35 Before: 25 Dec 21 5:54 After: 2 Jan :54 Na 511 Peak Loc Na 511 Peak Res % High Voltage N/A V Na 1785 Peak Loc Na 1785 Peak Res % Temperature N/A DEGC Na Count Rate CPS Hostile Natural Gamma Ray Sonde Wellsite Calibration Detector 2 Check : 1 Dec 21 8:35 Before: 25 Dec 21 5:54 After: 2 Jan :54 Na 511 Peak Loc Na 511 Peak Res % High Voltage N/A V Na 1785 Peak Loc Na 1785 Peak Res % Temperature N/A DEGC Na Count Rate CPS Hostile Natural Gamma Ray Sonde Wellsite Calibration Ratio Of Detector 1 To Detector 2 : 1 Dec 21 8:35 Before: 25 Dec 21 5:54 After: 2 Jan :54 Coincidence Count Rate Ratio Accelerator Porosity Tool Detector Plateau Settings : Near Detector Plateau Setting Far Detector Plateau Setting Array Detector Plateau Setting 1734 V 28 V 1968 V Dual Induction E / Equipment Identification Primary Equipment: Dual Induction Sonde DIS HB 129 Dual Induction Cartridge DIC EB 171 Auxiliary Equipment: Mass Isolated Housing MIH ZA 342 Dual Induction E Calibration Test Loop Calibration: Calibration of Internal Reference to Test Loop Standard Deep 1 khz Gain Factor Deep 2 khz Gain Factor Deep 4 khz Gain Factor Medium 1 khz Gain Factor Medium 2 khz Gain Factor Medium 4 khz Gain Factor Deep 1 khz Shift Deep 2 khz Shift Deep 4 khz Shift

26 Medium 1 khz Shift Medium 2 khz Shift Medium 4 khz Shift : Calibration out of date 8 Jun 21 1:23 Dual Induction E Calibration Sonde Error Corrections: Correction for sonde response in zero conductivity environment. (Normalized to 25C). Real Deep 1 khz S.E. Corr. Real Deep 2 khz S.E. Corr. Real Deep 4 khz S.E. Corr Quad Deep 1 khz S.E. Corr Quad Deep 2 khz S.E. Corr Quad Deep 4 khz S.E. Corr Real Medium 1 khz S.E. Corr Real Medium 2 khz S.E. Corr Real Medium 4 khz S.E. Corr Quad Medium 1 khz S.E. Corr Quad Medium 2 khz S.E. Corr Quad Medium 4 khz S.E. Corr : Calibration out of date 8 Jun 21 1:38 General Purpose Inclinometer / Equipment Identification Primary Equipment: GPIT Cartridge AC GPIC AC 719 Auxiliary Equipment: GPIT Housing GPIH A 2864 Hostile Litho Density Sonde / Equipment Identification Primary Equipment: Hostile Litho Density Sonde HLDS D 45 Hostile Litho Density High Voltage HLDV D 51 Gamma Source Radioactive GSR Z 2397 Auxiliary Equipment: Hostile Litho Density Pad HLDP C 61 Hostile Litho Density High Voltage Housi HEH H 53 Litho Density Spectroscopy Cartridge B / Equipment Identification Primary Equipment: LDSC Cartridge LDSC B 521 Auxiliary Equipment: LDSC Housing LDSH A 319 Accelerator Porosity Tool / Equipment Identification Primary Equipment: Accelerator Porosity Sonde APS C 22 APS Minitron MNTR F 5589 Auxiliary Equipment: Accelerator Porosity Housing APH AC 22 APS Calibration Water Tank SFT APS Aluminum Calibrator Sleeve SFT 281 1

27 Hostile Natural Gamma Ray Cartridge B / Equipment Identification Primary Equipment: HNGC Cartridge HNGC B 3 Auxiliary Equipment: HNGC Housing HNGH A 115 Hostile Natural Gamma Ray Sonde / Equipment Identification Primary Equipment: HNGS Sonde HNGS BA 194 Auxiliary Equipment: HNGS Sonde Housing HNSH BA 25 Gamma Source Radioactive GSR U 6168 DTS Telemetry Tool / Equipment Identification Primary Equipment: DTC H Auxiliary Cartridge DTCH A 8799 DTC H Telemetry Cartridge DTCH A 8798 Auxiliary Equipment: DTCH Telemetry Cartridge Housing ECH KC 1777 Company: Well: Field: Rig: Ocean: Lamont Doherty Expedition 33 Site U1374A Louisville Seamounts JOIDES Resolution Pacific Phasor Induction Natural Gamma Ray

Lamont Doherty. Expedition 330 Site U1376A. Louisville Seamounts. Company: Well: Field: Phasor Induction. Natural Gamma Ray.

Lamont Doherty. Expedition 330 Site U1376A. Louisville Seamounts. Company: Well: Field: Phasor Induction. Natural Gamma Ray. Run 1 Run 2 Run Company: Lamont Doherty Well: Field: Rig: Expedition 33 Site U1376A Louisville Seamounts JOIDES Resolution Ocean: Phasor Induction Pacific JOIDES Resolution Louisville Seamounts Latitude:

More information

County: Field: Location: Well: Company: Drilling Measured From: API Serial No. KELLY BUSHING KELLY BUSHING. District: Grant.

County: Field: Location: Well: Company: Drilling Measured From: API Serial No. KELLY BUSHING KELLY BUSHING. District: Grant. RMF @ Measured Temperature RMC @ Measured Temperature Source RMF RMC RM @ MRT RMF @ MRT Maximum Recorded Temperatures Circulation Stopped Time Logger On Bottom Time Unit Number Location Recorded By Witnessed

More information

Lamont Doherty. Expedition 335 Site U1256D. Superfast Spreading Crust IV. Pacific Ocean. Company: Well: Field: Hostile Litho Density

Lamont Doherty. Expedition 335 Site U1256D. Superfast Spreading Crust IV. Pacific Ocean. Company: Well: Field: Hostile Litho Density Run 1 Run 2 Run Company: Lamont Doherty Well: Field: Rig: Expedition 335 Site U1256D Superfast Spreading Crust IV Joides Resolution Ocean: Hostile Litho Density Pacific Ocean Joides Resolution Superfast

More information

Location: MUD Density. Province: Field: Location: Well: Company: Newfoundland Undefined UTM (NAD 27) Storm #1 Vulcan Minerals Inc.

Location: MUD Density. Province: Field: Location: Well: Company: Newfoundland Undefined UTM (NAD 27) Storm #1 Vulcan Minerals Inc. RMF Measured Temperature RMC Measured Temperature Source RMF RMC RM MRT RMF MRT Recorded Temperatures Circulation Stopped Time Logger On Bottom Time Unit Number Location Recorded By Witnessed By Karla

More information

Oil Well Potential Test, Completion or Recompletion Report, and Log

Oil Well Potential Test, Completion or Recompletion Report, and Log Tracking No.: 102948 Status: Submitted RAILROAD COMMISSION OF TEXAS Oil and Gas Division API No. 42- Oil Well Potential Test, Completion or Recompletion Report, and Log 1. FIELD NAME (as per RRC Records

More information

Depth - Driller COMPANY VAL ENERGY INC. BROWN-ROLFE 3-26 FIELD COUNTY GROUND LEVEL. , 11.0 ft above perm. Datum. Elev.: K.B ft

Depth - Driller COMPANY VAL ENERGY INC. BROWN-ROLFE 3-26 FIELD COUNTY GROUND LEVEL. , 11.0 ft above perm. Datum. Elev.: K.B ft Witnessed By Recorded By Equipment Location Max. Rec. Temperature Time on Bottom Time Since Circulation Rm BHT Source Rmf Rmc Rmc Meas. Temperature Rmf Meas. Temperature Rm Meas. Temperature Source of

More information

HRLA High-Resolution Laterolog Array Tool. Improving the accuracy of Rt

HRLA High-Resolution Laterolog Array Tool. Improving the accuracy of Rt HRLA High-Resolution Laterolog Array Tool Improving the accuracy of Rt Applications Resistivity determination in conductive mud systems Thin-bed evaluation Invasion characterization for permeability indication

More information

OCEAN DRILLING PROGRAM

OCEAN DRILLING PROGRAM BIH OCEAN DRILLING PROGRAM www.oceandrilling.org Scientifi c Application Packers A packer is an inflatable rubber element that inflates to seal the annular space between the drill string and the borehole

More information

PowerDrive X6. Rotary Steerable System for high-performance drilling and accurate wellbore placement

PowerDrive X6. Rotary Steerable System for high-performance drilling and accurate wellbore placement Rotary Steerable System for high-performance drilling and accurate wellbore placement The PowerDrive X6 RSS maintains control under the most difficult conditions, bringing the benefits of rotary steerable

More information

New power in production logging

New power in production logging New power in production logging Locating the zones where fluids enter the wellbore in a producing or injecting well is an important aspect of production logging. It is relatively straightforward to establish

More information

FIG: 27.1 Tool String

FIG: 27.1 Tool String Bring up Radioactive Tracer service. Click Acquisition Box - Edit - Tool String Edit the tool string as necessary to reflect the tool string being run. This is important to insure proper offsets, filters,

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Date: Tracking No.: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Submitted

More information

OIL/GAS WELL COMPLETION REPORT. Well Name and Number Surveyed elevation (feet): KB GL

OIL/GAS WELL COMPLETION REPORT. Well Name and Number Surveyed elevation (feet): KB GL 1800 Washingn Blvd. Baltimore Maryland 21230 OIL/GAS WELL COMPLETION REPORT Permit No. Name of Operar Address Well Name and Number Surveyed elevation (feet): KB GL Well Location Field (If wildcat, so state)

More information

Depth - Driller COMPANY MCCOY PETROLEUM CORP SCHMIDT C 4-29 FIELD COUNTY GROUND LEVEL. , 13.0 ft above perm. Datum. Elev.: K.B ft

Depth - Driller COMPANY MCCOY PETROLEUM CORP SCHMIDT C 4-29 FIELD COUNTY GROUND LEVEL. , 13.0 ft above perm. Datum. Elev.: K.B ft Witnessed By Recorded By Equipment Location Max. Rec. Temperature Time on Bottom Time Since Circulation Rm @ BHT Source Rmf Rmc Rmc @ Meas. Temperature Rmf @ Meas. Temperature Rm @ Meas. Temperature Source

More information

BLACK HILLS PLATEAU PRODUCTION COMPANY

BLACK HILLS PLATEAU PRODUCTION COMPANY BLACK HILLS PLATEAU PRODUCTION COMPANY DRILLING PROGRAM Homer Deep Unit 9 11CH SHL: 300 FNL, 200 FWL, NWNW Sect. 9 T8S R98W BHL: 1350 FSL, 2100 FEL NWSE Sect. 15 T8S R98W Garfield & Mesa Counties, Colorado

More information

FORMATION TESTER MOBILITY. Lachlan Finlayson, Chief Petrophysicist Petrofac Engineering & Production Services Engineering Services Consultancy

FORMATION TESTER MOBILITY. Lachlan Finlayson, Chief Petrophysicist Petrofac Engineering & Production Services Engineering Services Consultancy FORMATION TESTER MOBILITY Lachlan Finlayson, Chief Petrophysicist Petrofac Engineering & Production Services Engineering Services Consultancy 1 Introduction Petrofac Formation Testers Pretest Procedure

More information

Hydraulic Optimization Worksheet for MS Excel All Versions subsequent to 5.0

Hydraulic Optimization Worksheet for MS Excel All Versions subsequent to 5.0 Hydraulic Optimization Worksheet for MS Excel All Versions subsequent to 5.0 1. Introduction. 2. Data Input. Header. Bit Information. Mud Information. Casing Program. P.D.M./Turbine. Drill String Design.

More information

Overview. 2 Module 13: Advanced Data Processing

Overview. 2 Module 13: Advanced Data Processing 2 Module 13: Advanced Data Processing Overview This section of the course covers advanced data processing when profiling. We will discuss the removal of the fairly gross effects of ship heave and talk

More information

Well Integrity Log Interpretation (Magnetic Thickness Detector and 56-Arm Multi-Finger Caliper)

Well Integrity Log Interpretation (Magnetic Thickness Detector and 56-Arm Multi-Finger Caliper) Well Integrity Log Interpretation (Magnetic Thickness Detector and 56-Arm Multi-Finger Caliper) Company: Well: Field: Province: Alberta Country: Canada License: UWI: Logging Date: 21-Mar-2015 Report Date:

More information

Comparative temperature measurements in an experimental borehole heat exchanger. Vincent Badoux 1, Rita Kobler 2

Comparative temperature measurements in an experimental borehole heat exchanger. Vincent Badoux 1, Rita Kobler 2 European Geothermal Congress 2016 Strasbourg, France, 19-24 Sept 2016 Comparative temperature measurements in an experimental borehole heat exchanger Vincent Badoux 1, Rita Kobler 2 1 GEOTEST AG, Bernstrasse

More information

Flow Scanner. Production logging in multiphase horizontal wells

Flow Scanner. Production logging in multiphase horizontal wells Flow Scanner Production logging in multiphase horizontal wells Applications Multiphase flow profiling in nonvertical wells Identification of fluid and gas entries in multiphase well or liquid in gas wells

More information

Along-string pressure, temperature measurements hold revolutionary promise for downhole management

Along-string pressure, temperature measurements hold revolutionary promise for downhole management Along-string pressure, temperature measurements hold revolutionary promise for downhole management IT S WIDELY KNOWN that the majority of stuck pipe incidents occur while pulling out of hole. If we can

More information

River Bridge - Test Shaft-1 Clarke County, MS, 4/2/2012

River Bridge - Test Shaft-1 Clarke County, MS, 4/2/2012 Page 1 of 9 The enclosed report contains the data and analysis summary for the SoniCaliper shaft caliper, performed at River Bridge (Test Shaft-1), Clarke County, MS on Monday, April 02, 2012 by Dave Jakstis.

More information

For Multi-Parameter Meters see mvx

For Multi-Parameter Meters see mvx Design Features VORTEX IN-LINE FLOW METERS For Multi-Parameter Meters see m Principles of Operation n No moving parts to wear or fail. n Electronics can be remotely mounted up to 30.5 m (0 ft). n No fluid

More information

For Multi-Parameter Meters see mvx

For Multi-Parameter Meters see mvx VORTEX IN-LINE FLOW METERS Design Features For Multi-Parameter Meters see mvx Principles of Operation VX No moving parts to wear or fail. Electronics can be remotely mounted up to 30.5 m (0 ft). No fluid

More information

WL16 WATER LEVEL LOGGERS Submersible pressure transducer and USB datalogger combination

WL16 WATER LEVEL LOGGERS Submersible pressure transducer and USB datalogger combination WL16 WATER LEVEL LOGGERS Submersible pressure transducer and USB datalogger combination Warning: Non-vented water level loggers may have readings with errors of up to 250mm due to barometric pressure changes.

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Approved 06/29/2015

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Approved 03/16/2016

More information

Rig Math. Page 1.

Rig Math. Page 1. Page 1 The Calculator and Main Keyboard Display Numerical 10-key pad used for entering numerical values Trigonometric Functions These keys will be used where wellbore angle is an issue These are the keys

More information

Depth - Driller COMPANY VAL ENERGY INC. BLEVINS #1-35 FIELD COUNTY GROUND LEVEL. , 11.0 ft above perm. Datum. Elev.: K.B ft

Depth - Driller COMPANY VAL ENERGY INC. BLEVINS #1-35 FIELD COUNTY GROUND LEVEL. , 11.0 ft above perm. Datum. Elev.: K.B ft Witnessed By Recorded By Equipment Location Max. Rec. Temperature Time on Bottom Time Since Circulation Rm @ BHT Source Rmf Rmc Rmc @ Meas. Temperature Rmf @ Meas. Temperature Rm @ Meas. Temperature Source

More information

Instruction Manual. PLT Series. 1. General Specification. 2. Installation. 3. Wiring. 4. Function. 5. Setting & Calibration

Instruction Manual. PLT Series. 1. General Specification. 2. Installation. 3. Wiring. 4. Function. 5. Setting & Calibration 4 Digit Display, 4-20mA Output Instruction Manual (Digital Differential Pressure Transmitter) 1. General Specification 2. Installation 3. Wiring 4. Function 5. Setting & Calibration 1 4 20 1 Differential

More information

Depth - Driller COMPANY HILL TRUST 7-20 FIELD COUNTY. , 14.0 ft above perm. Datum. Elev.: K.B ft ft. Fold here

Depth - Driller COMPANY HILL TRUST 7-20 FIELD COUNTY. , 14.0 ft above perm. Datum. Elev.: K.B ft ft. Fold here Witnessed By Recorded By Equipment Location Max. Rec. Temperature Time on Bottom Time Since Circulation Rm @ BHT Source Rmf Rmc Rmc @ Meas. Temperature Rmf @ Meas. Temperature Rm @ Meas. Temperature Source

More information

APPENDIX A1 - Drilling and completion work programme

APPENDIX A1 - Drilling and completion work programme APPENDIX A1 - Drilling and completion work programme Information about the well and drilling To the extent possible, the international system of units (SI) should be adhered to, and the drilling programme

More information

Drilling Morning Report

Drilling Morning Report REPORT DATE 5/0/200 Report # AFE # Casing OD(in) WT(lbs/ft) Grade Btm MD(ft) Btm TVD(ft) DCRB04 TVD: 32 MD: 32 Progress: 32 Planned TD:,500 Current Hole Size: Days From Spud: Spud Date: 5//0 Days on Well:

More information

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also)

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also) RECEIVING PBL AT RIG SITE TITLE: Operating Instructions for -3/4 PBL -3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes -1/4 & -1/2 also) OPERATING INSTRUCTIONS 1. On receipt of PBL Bypass Tools at

More information

Chapter 5 HORIZONTAL DRILLING

Chapter 5 HORIZONTAL DRILLING Chapter 5 HORIZONTAL DRILLING Chapter 5 How much money am I about to put on the table for a horizontal well? Did I do sufficient planning? Keys to Successful Horizontal Wells Multi-disciplined teams working

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Approved 10/13/2015

More information

International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 02, Pages , 2015

International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 02, Pages , 2015 International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 02, Pages 116- ISSN: 2289-4713 Improving Reservoir Recovery Factor Using Enhanced Electrical Submersible Pump Design; a Case

More information

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM RECEIVING PBL AT RIG SITE TITLE: Operating Instructions for 2-7/8 Triple Port PBL 1-10-201 2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM OPERATING INSTRUCTIONS 1. On receipt of PBL Bypass Tools at Rig site, the

More information

WIND DATA REPORT. Paxton, MA

WIND DATA REPORT. Paxton, MA WIND DATA REPORT Paxton, MA July 1, 2011 September 30, 2011 Prepared for Massachusetts Clean Energy Center 55 Summer Street, 9th Floor Boston, MA 02110 by Eric Morgan James F. Manwell Anthony F. Ellis

More information

COPYRIGHT. Production Logging Flowmeter Survey Solution Guide

COPYRIGHT. Production Logging Flowmeter Survey Solution Guide Production Logging Flowmeter Survey Solution Guide Applying Slippage & Liquid Holdup equations, solve for Q oil and Q water at 6130 ft and 6216 ft @ 6130 ft, the % ratio of flow is about 100 %, or 9190

More information

Stadium Project - DP-70 Atlanta, GA, 9/30/2014

Stadium Project - DP-70 Atlanta, GA, 9/30/2014 Page 1 of 13 The enclosed report contains the data and analysis summary for the SoniCaliper shaft caliper, performed at Stadium Project (DP-70), Atlanta, GA on Tuesday, September 30, 2014 by Chris Kohlhof.

More information

SUBSEA KILL SHEET EXERCISE No. 5

SUBSEA KILL SHEET EXERCISE No. 5 Subsea Kill Sheet Exercise No. 5 SUBSEA KILL SHEET EXERCISE No. 5 Name: Date: Complete the Subsea vertical kill sheet provided on pages 2 and 3. Then answer questions 1 to 12. Please round calculations

More information

Cased-Hole Logging Environment

Cased-Hole Logging Environment Cased-Hole Logging Environment 2 Planning a Production Logging Job Planning is an important part of a production logging job. Frequently these jobs can only be done in safety during daylight. Thus, the

More information

MOCS. Multiple Opening Circulation Sub. Fluid Bypass Valve

MOCS. Multiple Opening Circulation Sub. Fluid Bypass Valve MOCS Multiple Opening Circulation Sub Fluid Bypass Valve 1 Applications BHA Protection o o Pumping LCM Spotting Acid Work-over and completions o o o Well bore cleanout Fluid displacements Bottoms-up circulation

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking.: Approved 03/11/2015

More information

Preferred Instruments Danbury, CT USA

Preferred Instruments Danbury, CT USA Tank Level Sensor Model TG-EL-WF-xx Installation & Operation Instructions SDI-TG-EL-WF March 6, 2006 Preferred Instruments Danbury, CT USA www.preferredinstruments.com CONTENTS Installation Pg. 2 Calibration

More information

1 Overview. Pressure Measurement Single-range transmitters for general applications. 1/22 Siemens FI

1 Overview. Pressure Measurement Single-range transmitters for general applications. 1/22 Siemens FI Siemens AG 06 SITRANS LH00 Transmitter for hydrostatic level Overview Function U const. p U I EM The pressure transmitter SITRANS LH00 is a submersible sensor for hydrostatic level measurement. The pressure

More information

STIPumpCard. User Manual

STIPumpCard. User Manual STIPumpCard User Manual Contents 1. Introduction...1 1.1. What is STIPumpCard?... 1 1.2. Main User Interface... 2 2. Input Parameters...4 2.1. Project... 4 2.2. Simulation Settings GroupBox... 4 2.3. Pump

More information

Instructions for SMV 3000 Multivariable Configuration (MC) Data Sheets

Instructions for SMV 3000 Multivariable Configuration (MC) Data Sheets Instructions for SMV 3000 Multivariable Configuration (MC) Data Sheets Similar to the TC option for ST 3000 transmitters, the MC option for the SMV 3000 provides a service to our customers which results

More information

WILD WELL CONTROL WARNING SIGNS OF KICKS

WILD WELL CONTROL WARNING SIGNS OF KICKS WARNING SIGNS OF KICKS Warning Signs of Kicks Learning Objectives You will learn the warning signs that indicate the well may be kicking: Warning signs of kicks False kick indicators You will also learn

More information

4 RESERVOIR ENGINEERING

4 RESERVOIR ENGINEERING 4 RESERVOIR ENGINEERING This chapter summarizes the reservoir engineering data and analysis used in the development of the Depletion Plan for the White Rose Field. The data were derived from seismic and

More information

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity :

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity : Daily Completion Report - University CN A #6 API # 42-105-42334 12/23/2016 Activity at Report Time: Perfs - 2512' - 2632' Depth at Report Time Put Well on Production 2655' - PBTD Activity : Arrive Location.

More information

U S F O S B u o y a n c y And Hydrodynamic M a s s

U S F O S B u o y a n c y And Hydrodynamic M a s s 1 U S F O S B u o y a n c y And Hydrodynamic M a s s 2 CONTENTS: 1 INTRODUCTION... 3 2 ACCURACY LEVELS... 3 2.1 LEVEL-0... 3 2.2 LEVEL-1... 3 2.3 PANEL MODEL... 3 3 EX 1. SINGLE PIPE. NON FLOODED... 4

More information

Situated 250km from Muscat in

Situated 250km from Muscat in CYAN MAGENTA YELLOW BLACK GRAVITY GAINS A novel method of determining gas saturation has proved successful in Oman s Natih Field where conventional methods were giving anomalous results in difficult conditions.

More information

C-Flow Coriolis Mass Flow Meters

C-Flow Coriolis Mass Flow Meters Coriolis Mass Flow Meters Ready for Take Off The New Compact C-Flow Küppers Elektromechanik GmbH The C-Flow The C-Flow Coriolis Mass Meters consist of two components: KCE Transmitter KCM Transducer 2 KEM

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS What are some applications in which you ve successfully used this product? New Completions - Stage by Stage Diversion Between Frac plugs for Intra-Stage Diversion Replace Frac Plugs with Perf PODs - Full

More information

PHYS 101 Previous Exam Problems

PHYS 101 Previous Exam Problems PHYS 101 Previous Exam Problems CHAPTER 14 Fluids Fluids at rest pressure vs. depth Pascal s principle Archimedes s principle Buoynat forces Fluids in motion: Continuity & Bernoulli equations 1. How deep

More information

BIT User Manual. 1. About this manual. 2. Know your BIT 1.1. WARNING System Components

BIT User Manual. 1. About this manual. 2. Know your BIT 1.1. WARNING System Components BIT User Manual About this manual WARNING Know your BIT System Components Operation Methods Maintenance, charging 3.3.1. Cleaning General handling Software Setup Calibrating the BIT Inclinometer calibration

More information

Casing Design. Casing Design. By Dr. Khaled El-shreef

Casing Design. Casing Design. By Dr. Khaled El-shreef Casing Design By Dr. Khaled El-shreef 1 Casing Design CONTENTS Function of Casing Casing Types & Tools Strength Properties Casing Specification Casing Design 2 1 RUNNING AND CEMENTING CASING Reasons for

More information

PROCESS MONITORING AND CONTROL

PROCESS MONITORING AND CONTROL Chemical Engineering Process Design PROCESS MONITORING AND CONTROL Keith Marchildon David Mody Monitoring means Measurement 1. There is no Control without Monitoring 2. Monitoring should not be done without

More information

Top Drive System. 1. AC VFD Top Drive System. Technical characters

Top Drive System. 1. AC VFD Top Drive System. Technical characters Top Drive System The top drive system is a high-tech content products, which integrates mechanical, electrical hydraulic, and communications integration, and was used to replace traditional rotary table-kelly

More information

Site Description: LOCATION DETAILS Report Prepared By: Tower Site Report Date

Site Description: LOCATION DETAILS Report Prepared By: Tower Site Report Date Wind Resource Summary for Holyoke Site Final Report Colorado Anemometer Loan Program Monitoring Period:: 6/21/26 /6/27 Report Date: December 2, 27 Site Description: The site is 17.4 miles south of the

More information

P9000 DESCRIPTION. For parts requiring RoHS compliance, please contact factory. P February /6

P9000 DESCRIPTION. For parts requiring RoHS compliance, please contact factory. P February /6 P9000 High accuracy through digital compensation High thermal stability Rugged stainless steel construction Ideal for test stands High burst pressure limit DESCRIPTION The P9000 Series is a range of advanced,

More information

Certified according to DIN EN ISO 9001 Technical Datasheet TRICOR Series Mass Flow Meters

Certified according to DIN EN ISO 9001 Technical Datasheet TRICOR Series Mass Flow Meters www.kem-kueppers.com info@kem-kueppers.com Certified according to DIN EN ISO 9001 Technical Datasheet TRICOR Series Mass Flow Meters Description The Tricor Mass Flow Meters measure simultaneously mass

More information

IDL01. Battery Powered Precision Digital Gauge for Leak Testing. Stainless Steel Sensor. class 0.05

IDL01. Battery Powered Precision Digital Gauge for Leak Testing. Stainless Steel Sensor. class 0.05 IDL0 Battery Powered Precision Digital Gauge for Leak Testing Stainless Steel Sensor class 0.05 Nominal pressure from 0 00 mbar up to 0... 00 bar Special characteristics modular sensor concept data logger

More information

Depth - Driller COMPANY END WRENCH #5 FIELD COUNTY. , 10.0 ft above perm. Datum. Elev.: K.B ft ft. Fold here

Depth - Driller COMPANY END WRENCH #5 FIELD COUNTY. , 10.0 ft above perm. Datum. Elev.: K.B ft ft. Fold here Witnessed By Recorded By Equipment Location Max. Rec. Temperature Time on Bottom Time Since Circulation Rm @ BHT Source Rmf Rmc Rmc @ Meas. Temperature Rmf @ Meas. Temperature Rm @ Meas. Temperature Source

More information

WIND DATA REPORT. Bourne Water District

WIND DATA REPORT. Bourne Water District WIND DATA REPORT Bourne Water District July to September 2010 Prepared for Massachusetts Clean Energy Center 55 Summer Street, 9th Floor Boston, MA 02110 by Dylan Chase James F. Manwell Utama Abdulwahid

More information

HydroPull. Extended-Reach Tool. Applications

HydroPull. Extended-Reach Tool. Applications Extended-Reach Tool HydroPull This tool incorporates a cycling valve that momentarily interrupts the flow to create water-hammer pressure pulses inside coiled or jointed tubing used in horizontal well

More information

Pressure Measurement Single-range transmitters for general applications

Pressure Measurement Single-range transmitters for general applications Siemens AG 07 Overview Function U const. p U I EM Sensor Connection for auxiliary power supply Vent pipe with humidity filter Protective conductor connection/ Equipotential bonding Diaphragm The pressure

More information

Analysis of 24-Hour Pump Test in Well NC-EWDP-3S, Near Yucca Mountain, Nevada

Analysis of 24-Hour Pump Test in Well NC-EWDP-3S, Near Yucca Mountain, Nevada Analysis of 24-Hour Pump Test in Well NC-EWDP-3S, Near Yucca Mountain, Nevada Prepared for: Nye County Department of Natural Resources and Federal Facilities, Nuclear Waste Repository Project Office, Grant

More information

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger Advanced Applications of Wireline Cased-Hole Formation Testers Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger Agenda Introduction to Cased Hole Formation tester Tool specifications Applications

More information

Qualification of Fastrak & First Gen Product to Railway applications Shock and Vibration Standard EN 61373

Qualification of Fastrak & First Gen Product to Railway applications Shock and Vibration Standard EN 61373 Qualification of Fastrak & First Gen Product to Railway applications Shock and Vibration Standard EN 61373 (Governing Standard BS EN 5155 Railway Applications Electronic equipment used on rolling stock)

More information

1 Overview. Pressure Measurement Single-range transmitters for general applications. 1/22 Siemens FI US Edition

1 Overview. Pressure Measurement Single-range transmitters for general applications. 1/22 Siemens FI US Edition Siemens AG 07 SITRANS LH00 Transmitter for hydrostatic level Overview Function U const. p U I EM The pressure transmitter SITRANS LH00 is a submersible sensor for hydrostatic level measurement. The pressure

More information

Installing a Probe. Typical Installation

Installing a Probe. Typical Installation for hazardous locations. Prior to any installation in a Classified Hazardous Location, verify installation methods by the Control Drawing referenced on the product s name tag 2. The Feed Through Assemblies

More information

Basic Well Log Interpretation

Basic Well Log Interpretation PDHonline Course K132 (3 PDH) Basic Well Log Interpretation Instructor: Joshua Cook, P.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org

More information

WIND DATA REPORT. Ragged Mt Maine

WIND DATA REPORT. Ragged Mt Maine WIND DATA REPORT Ragged Mt Maine December 1 st 2007 to February 29 th 2007 by James R. Browning James F. Manwell Utama Abdulwahid Anthony F. Ellis April 10, 2008 Report template version 3.1 Renewable Energy

More information

Section Freepoint Service 26.1 FREEPOINT CONTROL PANEL

Section Freepoint Service 26.1 FREEPOINT CONTROL PANEL Section 26 26 Freepoint Service The Warrior system supports Freepoint tools that do not require motorized deployment. This includes Applied Electronics Bowspring and Magnetic tools and Homco tools. Other

More information

SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE SURFACE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE Instructions Use the example well data from this document or the powerpoint notes handout to complete the following graphs.

More information

Site Description: Tower Site

Site Description: Tower Site Wind Resource Summary for Elizabeth Site Final Report Colorado Anemometer Loan Program Monitoring Period: 7/3/6 /15/7 Report Date: December 22, 7 Site Description: The site is.6 miles northeast of the

More information

Module 9. Advanced Data Processing

Module 9. Advanced Data Processing Module 9 Advanced Data Processing 2 Module 9: Advanced Data processing Overview Advanced Data Processing or Why Doesn t My Data Look Like the Examples in Class? Sensor alignment, matching measurements

More information

BUYER S GUIDE AQUAlogger 520

BUYER S GUIDE AQUAlogger 520 OCEAN & ENVIRONMENTAL BUYER S GUIDE AQUAlogger 520 Mini Temperature and Pressure Logger AQUAlogger 520 Aquatec s primary temperature and depth model, the AQUAlogger 520, combines years of product development

More information

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing ECD Reduction Tool R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing Drilling Engineering Association, Fourth Quarter Meeting November 20, 2008 1 Presentation outline Description

More information

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure? DAY ONE 1. Normal formation pressure gradient is generally assumed to be: A..496 psi/ft B..564 psi/ft C..376 psi/ft D..465 psi/ft 2. Referring to the last question, what mud weight would be required to

More information

Pneumatic high-pressure controller Model CPC7000

Pneumatic high-pressure controller Model CPC7000 Calibration technology Pneumatic high-pressure controller Model CPC7000 WIKA data sheet CT 27.63 Applications Healthcare and avionics industry Industry (laboratory, workshop and production) Transmitter

More information

RSKtools for Matlab processing RBR data

RSKtools for Matlab processing RBR data Table of Contents Introduction... 1 RSKtools help... 1 Getting set up... 1 Remove atmospheric pressure from measured total pressure... 2 Correct for A2D zero-order hold... 2 Low-pass filtering... 3 Alignment

More information

Expert Hydrostatic Level Transmitters

Expert Hydrostatic Level Transmitters Expert Hydrostatic s General Features MJK Expert hydrostatic level transmitters are designed for level measurement by submerging the transmitter in open channels, drains and tanks. Expert hydrostatic level

More information

LONG TERM SITE WIND DATA ANNUAL REPORT. Mass Turnpike Authority Blandford, MA

LONG TERM SITE WIND DATA ANNUAL REPORT. Mass Turnpike Authority Blandford, MA LONG TERM SITE WIND DATA ANNUAL REPORT Mass Turnpike Authority Blandford, MA July 1, 2012 June 30, 2013 Prepared for Massachusetts Clean Energy Center 55 Summer Street, 9th Floor Boston, MA 02110 by Dylan

More information

86BSD Backside Digital Output

86BSD Backside Digital Output Stainless steel with O-ring seal Pressure/temperature read-out Backside digital output ASIC calibrated Absolute, gage Cable/connector option Low power option DESCRIPTION The 86BSD is a small profile, media

More information

HTHP Viscometer. Features DRILLING FLUIDS EQUIPMENT

HTHP Viscometer. Features DRILLING FLUIDS EQUIPMENT DRILLING FLUIDS EQUIPMENT For over 30 years OFI Testing Equipment (OFITE) has provided instruments and reagents for testing drilling fluids, well cements, completion fluids, and wastewater. In addition

More information

OPERATING MANUAL DOUBLE ACTING DRILLING INTENSIFIER HYDRAULIC TYPE

OPERATING MANUAL DOUBLE ACTING DRILLING INTENSIFIER HYDRAULIC TYPE Page 1 of 8 OPERATING MANUAL DOUBLE ACTING DRILLING INTENSIFIER HYDRAULIC TYPE Size Series 6.50" 478 Reviewed And Approved By: Signature: Initials: Date: Page 2 of 8 Section OPERATING MANUAL DOUBLE ACTING

More information

RMAG, Snowbird, UT, October 6-9, Michael Holmes, Antony M. Holmes, and Dominic I. Holmes, Digital Formation, Inc.

RMAG, Snowbird, UT, October 6-9, Michael Holmes, Antony M. Holmes, and Dominic I. Holmes, Digital Formation, Inc. RMAG, Snowbird, UT, October 6-9, 2007 A METHOD TO QUANTIFY GAS SATURATION IN GAS/WATER SYSTEMS, USING DENSITY AND NEUTRON LOGS INTERPRETATION OF RESERVOIR PROPERTIES WHEN COMPARED WITH GAS SATURATIONS

More information

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug The North American Sealing Solutions composite bridge plug, caged ball and ball drop (flow thru) frac plug provide

More information

DM01. Please visit our website: Battery Powered Precision Digital Gauge. Stainless Steel Sensor. class 0.05

DM01. Please visit our website:  Battery Powered Precision Digital Gauge. Stainless Steel Sensor. class 0.05 DM0 Battery Powered Stainless Steel Sensor class 0.05 Nominal pressure from 0 00 mbar up to 0... 00 bar Special characteristics modular sensor concept data logger graphic display stainless steel housing

More information

IWCF Equipment Sample Questions (Surface Stack)

IWCF Equipment Sample Questions (Surface Stack) IWCF Equipment Sample Questions (Surface Stack) 1. During a well control operation 4000 psi was shut in below the middle pipe rams. Ram type BOP data: Model: Cameron U type Rated Working Pressure: 15000

More information

ATION TITLE. Survey QC, Decision Making, and a Modest Proposal for Error Models. Marc Willerth, MagVAR

ATION TITLE. Survey QC, Decision Making, and a Modest Proposal for Error Models. Marc Willerth, MagVAR 1 a Modest Proposal for Error Models ATION TITLE Marc Willerth, MagVAR Speaker Information Marc Willerth VP of Survey Technologies April 11, 2018 MagVAR 2 Speaker Bio Marc Willerth Magnetic Variation Services,

More information

Pneumatic high-pressure controller Model CPC7000

Pneumatic high-pressure controller Model CPC7000 Calibration technology Pneumatic high-pressure controller Model CPC7000 WIKA data sheet CT 27.63 Applications Automotive and avionics industry Industry (laboratory, workshop and production) Transmitter

More information

CS115 BAROMETRIC PRESSURE SENSOR INSTRUCTION MANUAL

CS115 BAROMETRIC PRESSURE SENSOR INSTRUCTION MANUAL CS115 BAROMETRIC PRESSURE SENSOR INSTRUCTION MANUAL 3/03 COPYRIGHT (c) 2002-2003 CAMPBELL SCIENTIFIC, INC. This is a blank page. WARRANTY AND ASSISTANCE This equipment is warranted by CAMPBELL SCIENTIFIC

More information

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack)

IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack) IWCF Equipment Sample Questions (Combination of Surface and Subsea Stack) 1. Given the volumes below, how much hydraulic fluid will be required to carry out the following operations (no safety margin)?

More information

D DAVID PUBLISHING. Gas Ratio Analysis in Hovsan Oil Field. 1. Introduction 1. Samir Hashimov