1 DRAFT NOT FINAL (Note: document was not finalized due to an eastbound stopping site distance design issue that requires more detailed bridge and roadway design considerations. This discussion starts on page 4.) DESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP TRUNK HIGHWAY 36 AT-GRADE INTERSECTIONS & TRUNK HIGHWAY 36/TRUNK HIGHWAY 95 INTERCHANGE CITY OF OAK PARK HEIGHTS, CITY OF STILLWATER, CITY OF BAYPORT WASHINGTON COUNTY JULY 2006

2 ST. CROIX RIVER CROSSING PROJECT DESIGN MEMORANDUM TABLE OF CONTENTS Page No. BACKGROUND...2 TH 36 (TH 5 TO OSGOOD AVENUE)...2 TH 36 (EAST OF OSGOOD AVENUE)...2 DESIGN STANDARDS AND DISCUSSION...3 STATE AID STANDARDS...3 INTERSTATE/STRAHNET SYSTEM...4 DESIGN EXCEPTIONS AND JUSTIFICATION...4 TH 36 EAST OF OSGOOD AVENUE DESIGN EXCEPTION REQUEST...4 Trunk Highway 36 Partnership Study...5 Supplemental Draft EIS Alternatives Development and Preliminary Roadway Design...5 Preliminary Bridge Design...6 Final Roadway Design...7 Alternative Layout Development...7 TH 36 NORTH FRONTAGE ROAD DESIGN EXCEPTION REQUEST...7 TH 36 SOUTH FRONTAGE ROAD (OAKGREEN AVENUE INTERSECTION) DESIGN EXCEPTION REQUEST...8 SOUTH FRONTAGE ROAD (EASTERN TERMINUS WITH STAGECOACH TRAIL) DESIGN EXCEPTION REQUEST...9 BEACH ROAD DESIGN EXCEPTION REQUEST...10 Design Memorandum - i - July 2006

3 St. Croix River Crossing Project Design Memorandum LIST OF TABLES AND FIGURES Page No. Attachment A: Geometric Design Tables (Trunk Highway 36 and Trunk Highway 95) Highway Geometric Design Standards for TH 36 (Washington Avenue/Norell Avenue to Osgood Avenue)... A-1 Highway Geometric Design Standards for TH 36 (east of Osgood Avenue)... A-5 Highway Geometric Design Standards for TH A-11 Attachment B: Geometric Design Tables (TH 36/95 Interchange) TH 36/95 Interchange Ramp Geometric Design Standards...B-1 Attachment C: Geometric Design Tables (Trunk Highway 36 Frontage Roads and Local Roadways) North Frontage Road Geometric Design Standards...C-1 South Frontage Road Geometric Design Standards...C-5 Oakgreen Avenue/Greeley Street Geometric Design Standards...C-11 Osgood Avenue Geometric Design Standards...C-14 Beach Road Geometric Design Standards...C-18 Attachment D: Figures Figure 3-2 Minnesota TH 36 (TH 5 to Osgood Avenue) Preferred Alternative... D-1 Figure 3-3 TH 36 & TH 95 Interchange Area Preferred Alternative... D-2 Figure 3-5 Minnesota TH 36 Preferred Alternative Typical Sections... D-3 Figure 3-6 TH 36 & TH 95 Interchange Preferred Alternative Typical Sections... D-4 Figure 3-7 Minnesota TH 95 Preferred Alternative Typical Sections... D-5 Figure 3-8 River Bridge Preferred Alternative Typical Sections... D-6 H:\Projects\4686\EP\Reports\DesignMemo\final\Preferred Alt\StCroixDesignMemo-TH36AtGrade-July06.doc Design Memorandum - ii - July 2006

4 STATE OF MINNESOTA Office Memorandum Department: MnDOT Metro District Date : July 7, 2006 To : Project File From : Todd Clarkowski, P.E., Area Engineer, Mn/DOT Monty Hamri, Design Project Manager, Mn/DOT Phone : 651/ / Subject : Design Memorandum with Design Exceptions TRUNK HIGHWAY 36 AT-GRADE INTERSECTIONS State Project Number(s): Federal Highway Administration: FHWA-MN-EIS DS TH Number(s): Trunk Highway (TH) 36 and TH 95 Cities: Oak Park Heights, Stillwater, Bayport County: Washington Type of Work: Trunk highway reconstruction; Frontage road reconstruction; New frontage road construction; Interchange reconstruction Project Termini:TH 36 from approximately 1,050 feet west of Washington Avenue/Norell Avenue to the TH 36/Osgood Avenue intersection (TH 36 at-grade intersections) North frontage road from approximately 1,050 feet west of Washington Avenue/Norell Avenue to the TH 36/Osgood Avenue intersection South frontage road from approximately 1,050 feet west of Washington Avenue/Norell Avenue to Stagecoach Trail TH 95 from approximately 700 feet north of Lookout Trail to approximately 400 feet south of 10th Avenue North This project is scheduled for an anticipated letting, depending upon project funding. The Design Exceptions described in the attached documentation are recommended for approval by: Todd Clarkowski, P.E. Date Design Exceptions approved by: Design Exceptions approved by: State Design Engineer Date FHWA Area Engineer Date

5 BACKGROUND TH 36 (TH 5 to Osgood Avenue) As part of the St. Croix River Crossing Project, associated improvements will be completed on the Trunk Highway (TH) 36 mainline, the TH 36 at-grade intersections, the TH 36 frontage road system and intersecting cross streets to improve traffic operations on TH 36 west of the new river crossing. The proposed improvements were originally developed as part of the St. Croix River Crossing Project and documented with a Preferred Alternative in the 1995 Final EIS. Municipal consent was received from the Cities of Stillwater and Oak Park Heights for the proposed alignment in Right of way was purchased along the frontage road system prior to project suspension in The proposed improvements were incorporated into a new Preferred Alternative and documented in the 2006 Supplemental Final EIS (SFEIS). Resurfacing of TH 36 will begin approximately 1,050 feet east of the Washington/Norell intersection and continue east to Osgood Avenue. Additional turn lanes will be constructed on TH 36 at the at-grade intersections with Oakgreen Avenue/Greeley Avenue and Osgood Avenue. Reconstruction of TH 36 as a four-lane urban roadway section to accommodate a new TH 36/95 standard diamond interchange and river crossing bridge will begin east of Osgood Avenue. The north and south TH 36 frontage roads will be reconstructed as a three-lane urban section from approximately 1,050 feet east of Washington/Norell to Osgood Avenue. The north and south frontage roads will be pulled back approximately 450 feet and 750 feet, respectively, from the TH 36 mainline at Oakgreen Avenue/Greeley Street. Oakgreen Avenue will be relocated to the east of the existing alignment to accommodate the pulled back south frontage road. The north and south frontage road intersections with Oakgreen/Greeley and Osgood will be expanded to include dedicated right and left turn lanes. A new south frontage road will be constructed east of Osgood Avenue to Stagecoach Trail. TH 36 (east of Osgood Avenue) A new bridge over the St. Croix River and associated roadway improvements will be constructed to provide a safe, reliable, and efficient transportation corridor by reducing congestion and improving roadway safety on Trunk Highway 36 (TH 36) and TH 95 in Stillwater and Oak Park Heights, Minnesota. The following summarizes the major design elements of the proposed improvements. Design Memorandum July 2006

6 As part of the St. Croix River Crossing Project, improvements will be completed on TH 36 east of Osgood Avenue, Beach Road, and TH 95. TH 36 will be reconstructed as a four-lane urban roadway section to accommodate a new TH 36/95 standard diamond interchange and river crossing bridge As noted above, these improvements will begin east of Osgood Avenue. A new south frontage road will be constructed from Osgood Avenue east to Stagecoach Trail. The existing Beach Road overpass and ramps to existing TH 36 will be removed. A new two-lane Beach Road overpass over TH 36 will be constructed to the west of the existing Beach Road overpass location. The new Beach Road overpass will intersect with the new south frontage road approximately 700 feet west of the existing Beach Road alignment. TH 95 will be reconstructed as a two-lane urban roadway section expanding to a four-lane urban roadway section at the intersections with the TH 36/95 interchange ramps. Total length of the TH 95 construction is approximately 7,550 feet. TH 95 will pass under the TH 36 mainline. Dedicated turn lanes will be constructed on TH 95 at the TH 36/95 interchange ramp intersections. DESIGN STANDARDS AND DISCUSSION Based on the Design Standards Documentation Requirements and the Type of Work, this project will be designed to Mn/DOT's New Construction/ Reconstruction Standards. Geometric design standards are summarized in the attached Geometric Design Tables included as Attachment A. Highway Geometric Design Table (TH 36 at-grade intersection design Washington/Norell Avenue to Osgood Avenue) Highway Geometric Design Table (TH 36 east of Osgood Avenue) Highway Geometric Design Table (TH 95) Geometric design standards are summarized in the attached Geometric Design Tables included as Attachment B. Ramp Geometric Design Table (TH 36/95 interchange) State Aid Standards State aid standards are used as the basis for the design of the critical elements of the TH 36 north and south frontage roads as well as with the TH 36 cross streets (i.e., Washington Avenue/Norell Avenue; Oakgreen Avenue/Greeley Street; Osgood Avenue; Beach Road). Design Memorandum July 2006

7 Geometric design standards for these elements are summarized in the attached Geometric Design Tables, pursuant to Minnesota Rules (geometric design standards; urban; new or reconstruction projects), and are included in Attachment C. Roadway Geometric Design Table (TH 36 North Frontage Road) Roadway Geometric Design Table (TH 36 South Frontage Road) Roadway Geometric Design Table (Oakgreen Avenue/Greeley Avenue) Roadway Geometric Design Table (Osgood Avenue (Co. Rd. 24)) Roadway Geometric Design Table (Beach Road) INTERSTATE/STRAHNET SYSTEM (X) This project does not involve work on the Interstate/STRAHNET system. ( ) This project involves work on the Interstate/STRAHNET system. ( ) At the completion of this project, all bridges will meet the 4.9 m (16 ft) standard for vertical clearance over Interstate highways. ( ) At the completion of this project the vertical clearance of the bridge will remain unchanged. The scope of work involves limited repair of the bridge or roadway pavement. The project scope does not provide the opportunity to alter the vertical clearance situation. FHWA will be requested to coordinate with the Department of Defense - MTMCTEA at least three months before letting. DESIGN EXCEPTIONS AND JUSTIFICATION TH 36 East of Osgood Avenue Design Exception Request A design exception is requested for Stopping Sight Distance for TH 36 east of Osgood Avenue to the St. Croix River crossing. TH 36 has a design speed of 60 miles per hour (mph). The eastbound TH 36 alignment from Sta to Sta provides a stopping sight distance of 495 feet. This stopping sight distance does not meet the required 570-foot horizontal sight distance for a 60 mph design speed. The eastbound TH 36 horizontal stopping sight distance obstruction is the bridge median barrier. From Sta to Sta , the 6-foot left shoulder provides a stopping sight distance of 495 feet. A 495-foot stopping sight distance is adequate for a 55 mph design speed. To obtain a 570-foot horizontal stopping sight distance, the left shoulder would need to be increased an additional 3.8 feet to 9.8 feet. Design Memorandum July 2006

8 Trunk Highway 36 Partnership Study In 2002, the TH 36 Partnership Study was established in to recommendations in the TH 36 Interregional Corridor (IRC) Management Plan (May 2001) to explore design concepts for the segment of TH 36 in Oak Park Heights and Stillwater from TH 5 to TH 95. A committee of representatives from Oak Park Heights, Stillwater, and Washington County, along with business owners and citizens formed a Policy Advisory Committee (PAC) to ensure that the Partnership Study reflected local concerns, to help identify alternatives, evaluate study findings, and make consensus recommendations regarding potential TH 36 designs. The outcome of this process was the TH 36 Partnership Study Final Report (December 2002). This report documented the Partnership Study process, purpose, and PAC findings and recommendations. One of the recommendations documented in the Final Report was that a grade-separated facility with two interchanges and a maximum design speed of 45 mph should be the ultimate solution for this segment of TH 36 to provide adequate capacity and acceptable levels of operations. 1 Supplemental Draft EIS Alternatives Development and Preliminary Roadway Design Following re-initiation of the St. Croix River Crossing Project in 2002, a stakeholder panel was identified to help inform the decision-making process of the project proposers. The stakeholder panel, collectively referred to as the Stakeholders Group, was comprised of representatives of federal, state, and local governments, as well as other non-governmental groups. Through the Stakeholder process, four Build Alternatives were developed and documented in a Supplemental Draft EIS (SDEIS). In order to reduce impacts to the environmental, historic, and social resources in the project area, several members of the Stakeholder Group proposed alternatives with structure heights and design speeds that were lower and slower. As a result of these concerns, and through negotiations with the Stakeholder Group, the SDEIS Build Alternatives were designed with this concept in mind. Part of the SDEIS Build Alternatives design also included addressing the transition from the higher design speeds at the Wisconsin approach (i.e., 70 mph) to the lower design speeds at the Minnesota approach and TH 36/95 interchange. Design standards were minimized to the extent possible, where feasible, to reduce impacts, while still fulfilling the project purpose and need. Trunk Highway 36 design speeds for the SDEIS Build Alternatives east of Osgood Avenue (i.e., Minnesota approach) ranged from 30 mph for SDEIS Build Alternative E, 1 See Recommendation #4 on page 15 of the TH 36 Partnership Study Final Report (December 2002). Design Memorandum July 2006

9 45 mph for SDEIS Build Alternatives C and D, and up to 55 mph for SDEIS Build Alternative B-1. Design speeds for the Wisconsin approach ranged from 30 mph on the westbound Wisconsin approach for SDEIS Build Alternative E, 55 mph for Alternative D, and 70 mph for SDEIS Build Alternatives B-1 and C. SDEIS Alternative B-1 a was identified as the Preferred Alternative river crossing in Fall The identification of Alternative B-1 a as the Preferred Alternative included only identification of the Preferred Alternative bridge type; preliminary bridge design had not been completed at this point. In Spring 2005, the Preferred Alternative preliminary design layout was submitted for design review. The layout submitted at that time noted a 55 mph design for sight stopping distance on eastbound TH 36 east of the new river crossing bridge. In Summer 2005, Mn/DOT Geometrics Unit noted in their comments on the Level 1 Preliminary Geometric Layout that the design speed for the project should be increased from 55 mph to 60 mph. Mn/DOT staff approved the layout with a 55 mph design speed in July Preliminary Bridge Design The proposed project may result in a stopping sight distance design exception until this design element can be reviewed further during preliminary bridge design and final roadway design (see discussion on page 7). During preliminary bridge design, the following analyses will be considered: 1. Adjusting the center median to shift 2 feet from the eastbound TH 36 inside shoulder to the westbound TH 36 inside shoulder, resulting in an 8-foot inside shoulder for eastbound TH 36. Although this would still result in a substandard stopping sight distance for a 60 mph design, an 8-foot inside shoulder meets a stopping sight distance for a 58 mph design. This design modification would not result in any changes to the bridge width, and would therefore not increase project costs. Any increases in bridge width to address the stopping sight distance design exception would result in increased project costs; 2. Widening the bridge until the full 10-foot inside shoulder is achieved on eastbound TH 36 would provide a 60 mph design speed, thereby eliminating the stopping sight distance design exception. This will require an economic analysis to document the costs associated with widening the bridge. In addition, in order to complete this analysis, the locations to taper into, and out of, the 10-foot inside shoulder on eastbound TH 36 would also have to be defined. Providing the 10-foot inside shoulder across the entire bridge from Minnesota to Wisconsin would substantially increase project costs; and Design Memorandum July 2006

10 3. Construction feasibility for the new river crossing bridge will also be considered and documented with any alterations to the TH 36 alignment, profile, and cross section. Final Roadway Design The stopping sight distance design exception will also be evaluated during final roadway design. In order to further approach or meet the horizontal stopping sight distance design standard for 60 mph, final roadway designers would have to develop additional alignments, profiles, and cross sections to provide the additional 2 feet to the inside shoulder to meet a 58 mph design speed (see Item #1 on page 6 above), up to the full 10-foot inside shoulder for a 60 mph design speed for eastbound TH 36. Any alignment or profile adjustments to achieve this full 10-foot inside shoulder width must match the TH 36/95 interchange alignment and profile, as well as matching the alignment and profile in Wisconsin. Any subsequent environmental and social impacts as a result of alignment and profile adjustments would also have to be considered and appropriately documented. Alternative Layout Development The Geometrics Office could also develop an alternative roadway design layout that maintains the 6-foot inside shoulder on westbound TH 36 and includes a full 10-foot inside shoulder on eastbound TH 36 to eliminate the stopping sight distance design exception (see Item #2 above). If developed, this alternative layout could be considered during the preliminary bridge design and final roadway design phases described above. During both the preliminary bridge design and final roadway design phases, bridge designers, roadway designers, and geometrics staff should work together to address alternatives to the eastbound TH 36 stopping sight distance design exception. TH 36 North Frontage Road Design Exception Request A design exception is requested for the Horizontal Alignment Radius of the TH 36 north frontage road to the east and west of the north frontage road/greeley Avenue (CSAH 66) intersection. The north frontage road has a design speed of 30 mph. Urban design criteria are used for the north frontage road in conformance with Minnesota State Aid Rule The north frontage road alignment from Sta to Sta provides a four horizontal curve alignment that does not meet the required 300-foot radius Design Memorandum July 2006

11 for a roadway section with a normal crown (e=n.c.) and a 30 mph design speed. At full super-elevation (e=0.06) and 30 mph design speed, a 215-foot minimum radius would be required. The tangent length required between curves to match the full super-elevation runoff length at a 30 mph design speed is 230 feet. Under the proposed project, the tangent length between horizontal curves is insufficient to provide this super-elevation runoff length. The geometrics for these four horizontal curves along the north frontage road at Greeley Avenue, from west to east, are described below. North frontage road curve A (Sta to Sta ) provides a 25 mph curve (R=212 ft; e=n.c.), a 103-foot tangent, followed by north frontage road curve B (Sta to Sta ) (25 mph curve; R=212 ft; e=n.c.). The north frontage road then intersects with Greeley Avenue. North frontage road curve C (Sta to Sta ) provides a 20 mph curve (R=163 ft; e=n.c.), an 80-foot tangent, followed by north frontage road curve D (Sta to Sta ) (20 mph curve; R=163 ft; e=n.c.). The north frontage road then continues east parallel to TH 36. These curves were used to minimize right of way impacts to commercial property along the north frontage road and to minimize fill impacts to an existing drainage pond along the east side of Greeley Avenue. The horizontal alignment of the north frontage road east of Greeley Avenue and west of Greeley Avenue are interdependent on one another to provide the new signalized intersection with Greeley Avenue. This design previously received staff approval in May of The right of way for the north frontage road was secured for construction of the St. Croix River Crossing Project prior to its suspension in Shifting the horizontal alignment of the north frontage road outside the 1994 planned original alignment would result in right of way and fill impacts as noted above. TH 36 South Frontage Road (Oakgreen Avenue Intersection) Design Exception Request A design exception is requested for the Horizontal Alignment Radius of the TH 36 south frontage road to the east and west of the south frontage road/oakgreen Avenue intersection. The south frontage road has a design speed of 30 mph. Urban design criteria are used for the south frontage road in conformance with Minnesota State Aid Rule The south frontage road alignment from Sta to Sta and from Sta to Sta provides a four horizontal curve alignment that does Design Memorandum July 2006

12 not meet the required 300-foot radius for a roadway section with a normal crown (e=n.c.) and a 30 mph design speed. At full super-elevation (e=0.06) and 30 mph design speed, a 215-foot minimum radius would be required. The tangent length required between curves to provide super-elevation runoff lengths at a 30 mph design speed is 230 feet. Under the proposed project, the tangent length between horizontal curves is insufficient to provide super-elevation runoff lengths. The geometrics for these four horizontal curves along the south frontage road at Oakgreen Avenue, from west to east, are described below. South frontage road curve A (Sta to Sta ) provides a 25 mph curve (R=197 ft; e=n.c.), a 48-foot tangent, followed by south frontage road curve B (Sta to Sta ) (25 mph curve; R=280 ft; e=n.c.). The south frontage road then intersects with Oakgreen Avenue. South frontage road curve C (Sta to Sta ) provides a 25 mph curve (R=216 ft; e=n.c.), a 407-foot tangent, followed by south frontage road curve D (Sta to Sta ) (25 mph curve; R=280 ft; e=n.c.). The south frontage road continues east parallel to TH 36. This design was used to minimize right of way impacts to commercial and residential properties along the south side of the south frontage road, to minimize impacts to wetlands along Oakgreen Avenue, and to avoid electrical transmission line towers. A utility line corridor crosses Oakgreen Avenue approximately 500 feet south of the existing Oakgreen Avenue/south frontage road intersection. Under the proposed project, the new Oakgreen Avenue/south frontage road intersection will be located within the utility corridor. Existing electric transmission towers will be located at the northeast quadrant of the Oakgreen Avenue/south frontage road intersection. This design previously received staff approval in May of The right of way for the south frontage road was secured for construction of the St. Croix River Crossing Project prior to its suspension in South Frontage Road (Eastern Terminus with Stagecoach Trail) Design Exception Request A design exception is requested for Horizontal Alignment Radius of the TH 36 south frontage road at its eastern terminus with Stagecoach Trail. This design is included with both the 2006 SFEIS Preferred Alternative and the Concept F Alternative. The south frontage road has a design speed of 30 mph. Urban design criteria are used for the south frontage road in conformance with Minnesota State Aid Rule The south frontage road alignment from Sta to Sta provides a Design Memorandum July 2006

13 horizontal curve that does not meet the required 300-foot radius for a roadway section with a normal crown (e=n.c.) designed to a 30 mph design speed. At full super-elevation (e=0.06) and 30 mph design speed, a 215-foot radius would be required. The south frontage road alignment from Sta to Sta provides a horizontal curve radius of 120 feet with a normal crown (e=n.c.), which corresponds to a 20 mph design speed. This is 180 feet below the 30 mph design standard with a normal crown, or 95 feet below the 30 mph design standard with a super-elevation of e=0.06. The radius of the existing roadway is approximately 50 feet. Land use south and west of the existing roadway is residential The proposed design for the south frontage road was used to minimize right of way impacts to residential properties to the south of the south frontage road and west of Stagecoach Trail and to stay within existing right of way to the extent feasible. The proposed design also accommodates a trail connection from the new bridge and also maximizes the amount of land available between the south frontage road and the TH 36/95 ramp for potential stormwater treatment. Beach Road Design Exception Request A design exception is requested for Vertical Alignment, Sag K Value of Beach Road near its intersection with the south frontage road. Beach Road has a design speed of 30 mph. Urban design criteria are used for Beach Road in conformance with Minnesota State Aid Rule The Beach Road alignment from Sta to Sta provides a vertical curve that does not meet the required 37 ft/% minimum vertical alignment, sag K value for a roadway section designed to a 30 mph design speed. The Beach Road alignment from Sta to Sta provides a vertical curve sag K value of 31 ft/%, which corresponds to a 25 mph design speed. This is 6 ft/% below the 30 mph design standard. The vertical curve is located adjacent to the Beach Road/south frontage road intersection, with a stop condition for Beach Road at the south frontage road. The vertical curve is currently designed to provide a low-point on Beach Road prior to the intersection This curve could be lengthened to match the 30 mph design standard, but this may force stormwater runoff into the Beach Road/south frontage road intersection. The Beach Road vertical alignment will be coordinated with the stormwater drainage design during final design to address design standards and ensure that runoff is not collected within the Beach Road/south frontage road intersection. Design Memorandum July 2006

14 Attachments: Attachment A Geometric Design Tables (Trunk Highway 36 and Trunk Highway 95) Highway (TH 36 at-grade intersection design Washington Avenue/ Norell Avenue to Osgood Avenue) Highway (TH 36 east of Osgood Avenue) Highway (TH 95) Attachment B Geometric Design Tables (TH 36/95 Interchange) Ramps (TH 36/TH 95 Interchange) Attachment C Geometric Design Tables (Trunk Highway 36 Frontage Roads and Local Roadways) Roadway (North Frontage Road) Roadway (South Frontage Road) Roadway (Oakgreen Avenue/Greeley Street) Roadway (Osgood Avenue) Roadway (Beach Road) Attachment D Figures Final (reduced) Layout Proposed Typical Sections Design Memorandum July 2006

15 ATTACHMENT A GEOMETRIC DESIGN STANDARDS/TABLES TRUNK HIGHWAY 36 AT-GRADE INTERSECTIONS TRUNK HIGHWAY 95

16 HIGHWAY GEOMETRIC DESIGN STANDARDS FOR TRUNK HIGHWAY 36 (WASHINGTON AVENUE/ NORELL AVENUE TO OSGOOD AVENUE)

17 Highway Geometric Design Standards for TH 36 (Washington Avenue/Norell Avenue to Osgood Avenue) Highway Type Two Lane Highway, Rural Multi-lane Divided Highway, Rural (High Speed) Two Lane Highway, Urban X Multi-lane Divided Highway, Urban (High Speed) (1) Freeway, Rural Multi-lane Divided Highway, Urban (Low Speed) Freeway, Urban Multi-lane Undivided Highway, Urban (Low Speed) (1) The outside shoulder on proposed TH 36 is an urban section. The inside shoulder is a rural section. Design Standard: Design of this project will follow Mn/DOT s ( ) Preservation (X) New Construction/Reconstruction standards for the above referenced highway type. Design Parameters: Functional Class: (X) Principal Arterial ( ) Minor Arterial ( ) Collector Terrain: ( ) Level (X) Rolling ( ) Rough Traffic Volume: Current ADT 27,000 veh./day (based on ( ) actual counts, (X) traffic flow map, dated 2002) Forecast ADT (2030) - 54,000 veh./day - based on Traffic Forecast # SP Posted Speed: Design Unit: The anticipated posted speed will be 50 mph. This project will be designed in ( ) metric units (X) English units. Critical Design Elements Table Critical Design Element (X) Proposed Typical Sections are in Attachment D. (X) Reduced layout is included in Attachment D. Existing Proposed MnDOT Standard for New Construction/ Reconstruction Reference MnDOT Road Design Manual Design Speed Design Speed selected for this project is 60 mph. Table A Lane Width 12 ft 12 ft 12 ft Chapter 2, Section Shoulder Width Right 10 ft 12 ft 10 ft Table A Or Table 4-401C Left 4 ft 4 ft 4 ft Table B Bridge Shoulder Width Right Table A Left Table A Horizontal Clearance to Obstructions Bridge Structural Capacity >1.5 ft (1) >1.5 ft 1.5 ft Section All new bridges to have HS-25 design load Chapter 9, Section Design Memorandum A-1 July 2006

18 Critical Design Element Existing Proposed MnDOT Standard for New Construction/ Reconstruction Reference MnDOT Road Design Manual 425 ft (1) 620 ft 570 ft min. Table A Stopping Sight Distance Horizontal Alignment, Radius 11,459 ft 11,459 ft 1340 ft min. Table A or Table B Grades, Percent 2.0 % max % max. 6 % max. Table A Vertical Alignment, K value Crest 84 ft/% min. (1) 172 ft/% min. 151 ft/% min. Figure A Sag 96 ft/% min. (1) 152 ft/% min. 136 ft/% min. Figure D Normal Cross Slope 0.02 (1) Table A Superelevation 0.06 (1) Normal Crown 0.06 max. Chapter 3, Section Vertical Clearance Highway under bridge Railroad under bridge Highway under sign or pedestrian bridge 16 ft-4 in 23 ft-0 in 17 ft-5 in Table B Table Notes: * An asterisk preceding proposed condition indicates a Geometric Design Exception. See Geometric Design Exception Justification below for additional information. (1) Existing condition critical design elements based on design standards for 50 mph posted speed. Interstate/STRAHNET system (X) This project does not involve work on the Interstate/STRAHNET system. ( ) This project involves work on the Interstate/STRAHNET system. ( ) At the completion of this project, all bridges will meet the 16 foot standard for vertical clearance over Interstate highways. ( ) At the completion of this project the vertical clearance of the bridge will remain unchanged. The scope of work involves limited repair of the bridge or roadway pavement. The project scope does not provide the opportunity to alter the vertical clearance situation. FHWA will be requested to coordinate with the Department of Defense MTMCTEA at least three months before letting. Geometric Design Exception Justification Currently there is not any design exception for this section of the project. Design Memorandum A-2 July 2006

19 Traffic Handling During Construction To be determined in final design. See Chapter 12 of the 2006 SFEIS for the preliminary staging concept. Bicycle and Pedestrian Considerations 1. Select one of the following (a or b) if bicycles and pedestrians will not be allowed on this roadway: (X) a. crossing of this roadway by bicycles and pedestrians ( ) will be (X) has been evaluated in the development of this project ( ) b. accommodation for crossing of bicycles and pedestrians has been evaluated and found to be not required for this project (see HPDP Bikeways and Pedestrians Guidance Threshold Criteria). 2. (X) Bicycles and pedestrians are not prohibited from this roadway, and accommodation of bicycles and pedestrians ( ) will be (X) has been evaluated. A separate trail system will be provided along the TH 36 frontage road system and along TH 95. A 4.8-mile loop trail system will be also provided, connecting Stillwater and Oak Park Heights with the Town of St. Joseph, Wisconsin using the Lift Bridge and a trail along the north side of the new river crossing. 3. ( ) Existing access for bicycles or pedestrians will be eliminated by this project (an alternative route for bicycles and pedestrians must be provided). 4. If 1(a), 2 or 3 is checked, list the local units of government that ( ) will be (X) have been contacted for information to coordinate this project with existing and proposed bikeways: Mn/DOT Transit Office Bicycle and Pedestrian Section Minnesota Department of Natural Resources (MnDNR) Trails and Waterways Division Washington County City of Stillwater City of Oak Park Heights City of Bayport 5. (X) Preliminary layouts and/or draft layouts ( ) will be (X) have been provided to the Bicycle and Pedestrian Section of the Transit Office for advisory comment in accordance with the HPDP project review guidelines (see HPDP Bikeways and Pedestrians Guidance Threshold Criteria). Layout Status: ( ) A geometric layout is not required for this project. (X) A level 1 Geometric Layout (and profile) ( ) will be (X) has been prepared for this project. (X) Municipal approval is required. Municipal approval anticipated for Summer/Fall Design Memorandum A-3 July 2006

20 HIGHWAY GEOMETRIC DESIGN STANDARDS FOR TRUNK HIGHWAY 36 EAST OF OSGOOD AVENUE

21 Highway Geometric Design Standards for TH 36 (east of Osgood Avenue) Highway Type Two Lane Highway, Rural X Multi-lane Divided Highway, Rural (High Speed) (1) Two Lane Highway, Urban Multi-lane Divided Highway, Urban (High Speed) Freeway, Rural Multi-lane Divided Highway, Urban (Low Speed) Freeway, Urban Multi-lane Undivided Highway, Urban (Low Speed) (1) Rural section up to Sta ; urban section up to the state line. Design Standard: Design of this project will follow Mn/DOT s ( ) Preservation (X) New Construction/Reconstruction standards for the above referenced highway type. Design Parameters: Functional Class: (X) Principal Arterial ( ) Minor Arterial ( ) Collector Terrain: ( ) Level (X) Rolling ( ) Rough Traffic Volume: Current ADT 20,500 veh./day (based on ( ) actual counts, (X) traffic flow map, dated 2002) Forecast ADT (2030) - 57,000 - based on Traffic Forecast # (Not required for Preservation projects) Posted Speed: Design Unit: The anticipated posted speed will be 60 mph. This project will be designed in ( ) metric units (X) English units. Critical Design Elements Table Critical Design Element (X) Proposed Typical Sections are in Attachment D. (X) Reduced layout is included in Attachment D. Existing Proposed MnDOT Standard for New Construction/ Reconstruction Reference MnDOT Road Design Manual Design Speed Design Speed selected for this project is 60 mph. Table A Lane Width 12 ft 12 ft 12 ft Chapter 2, Section Shoulder Width Right 10 ft 10 ft 10 ft Table A Or Table 4-401C Left 4 ft 6 ft 4 ft Table B Bridge Shoulder Width Right 8 ft 10 ft 10 ft (1) Table A Left 4 ft 6 ft 6 ft Table A Horizontal Clearance to Obstructions Bridge Structural Capacity Stopping Sight Distance Not Applicable HS 20 HS-25 All new bridges to have Design load (2) HS-25 design load Section Chapter 9, Section ft (3) * 495 ft 570 ft Table A Design Memorandum A-5 July 2006

22 Critical Design Element Horizontal Alignment, Radius Existing Proposed MnDOT Standard for New Construction/ Reconstruction Reference MnDOT Road Design Manual 1,480 ft 2,584 ft 1,340 ft Table A or Table B Grades, Percent 4.8 % max. 4.2 % 6 % max. Table A Vertical Alignment, K value Crest 84 ft/% min. (3) 172 ft/% min. 151 ft/% min. Figure A Sag 94 ft/% min. (3) 152 ft/% min. 136 ft/% min. Figure D Normal Cross Slope 0.02 (3) Table A Superelevation 0.06 (3) (4) 0.06 max. Chapter 3, Section Vertical Clearance Highway under bridge Railroad under bridge Highway under sign or pedestrian bridge 16 ft-4 in 17 ft-5 in 16.5 ft 58.0 ft 17 ft-5 in 16 ft-4 in 23 ft-0 in 17 ft-5 in Table B Table Notes: * An asterisk preceding proposed condition indicates a Geometric Design Exception. See Geometric Design Exception Justification below for additional information. (1) Based on urban approach cross section. (2) Structural capacity studied for deck replacement options for the Lift Bridge as part of the 2005 Lift Bridge Repair Project (Deck Replacement Study Report of Findings. Stillwater Lift Bridge. March 21, 2005). (3) Existing condition critical design elements based on design standards for 50 mph posted speed. (4) Based on 60 mph design speed. Interstate/STRAHNET system (X) This project does not involve work on the Interstate/STRAHNET system. ( ) This project involves work on the Interstate/STRAHNET system. ( ) At the completion of this project, all bridges will meet the 16 foot standard for vertical clearance over Interstate highways. ( ) At the completion of this project the vertical clearance of the bridge will remain unchanged. The scope of work involves limited repair of the bridge or roadway pavement. The project scope does not provide the opportunity to alter the vertical clearance situation. FHWA will be requested to coordinate with the Department of Defense MTMCTEA at least three months before letting. Preservation projects where proposed Critical Elements are less than the New Construction Reconstruction standard:. Design Memorandum A-6 July 2006

23 Geometric Design Exception Justification A design exception is requested for Stopping Sight Distance for TH 36 east of Osgood Avenue to the St. Croix River crossing. TH 36 has a design speed of 60 miles per hour (mph). The eastbound TH 36 alignment from Sta to Sta provides a stopping sight distance of 495 feet. This provided stopping sight distance of 495 feet does not meet the required 570-foot horizontal sight distance for a 60 mph design speed. The eastbound TH 36 horizontal stopping sight distance obstruction is the bridge median barrier. As noted above, from Sta to Sta , the 6-foot left shoulder provides a stopping sight distance of 495 feet. A 495-foot stopping sight distance is adequate for a 55 mph design speed. To obtain a 570-foot horizontal stopping sight distance, the left shoulder would need to be increased an additional 3.8 feet to 9.8 feet. Trunk Highway 36 Partnership Study In 2002, the TH 36 Partnership Study was established in to recommendations in the TH 36 Interregional Corridor (IRC) Management Plan (May 2001) to explore design concepts for the segment of TH 36 in Oak Park Heights and Stillwater from TH 5 to TH 95. A committee of representatives from Oak Park Heights, Stillwater, and Washington County, along with business owners and citizens formed a Policy Advisory Committee (PAC) to ensure that the Partnership Study reflected local concerns, to help identify alternatives, evaluate study findings, and make consensus recommendations regarding potential TH 36 designs. The outcome of this process was the TH 36 Partnership Study Final Report (December 2002). This report documented the Partnership Study process, purpose, and PAC findings and recommendations. One of the recommendations documented in the Final Report was that a grade-separated facility with two interchanges and a maximum design speed of 45 mph should be the ultimate solution for this segment of TH 36 to provide adequate capacity and acceptable levels of operations. 2 Supplemental Draft EIS Alternatives Development and Preliminary Roadway Design Following re-initiation of the St. Croix River Crossing Project in 2002, a stakeholder panel was identified to help inform the decision-making process of the project proposers. The stakeholder panel, collectively referred to as the Stakeholders Group, was comprised of representatives of federal, state, and local governments, as well as other non-governmental groups. Through the Stakeholder process, four Build Alternatives were developed and documented in a Supplemental Draft EIS (SDEIS). In order to reduce impacts to the environmental, historic, and social resources in the project area, several members of the Stakeholder Group proposed alternatives with structure heights and design speeds that were lower and slower. As a result of these concerns, and through negotiations with the Stakeholder Group, the SDEIS Build Alternatives were designed with this concept in mind. Part of the SDEIS Build Alternatives design also included addressing the transition from the higher design speeds at the Wisconsin approach (i.e., 70 mph) to the lower design speeds at the Minnesota approach and TH 36/95 interchange. Design standards were minimized to the extent possible, where feasible, to reduce impacts, while still fulfilling the project purpose and need. Trunk Highway 36 design speeds for the SDEIS Build Alternatives east of Osgood Avenue (i.e., Minnesota approach) ranged from 30 mph for SDEIS Build Alternative E, 45 mph for SDEIS Build Alternatives C and D, and up to 55 mph for SDEIS Build Alternative B-1. Design speeds for the Wisconsin approach ranged from 30 mph on the westbound Wisconsin approach for SDEIS Build Alternative E, 55 mph for Alternative D, and 70 mph for SDEIS Build Alternatives B-1 and C. SDEIS Alternative B-1 a was identified as the Preferred Alternative river crossing in Fall The identification of 2 See Recommendation #4 on page 15 of the TH 36 Partnership Study Final Report (December 2002). Design Memorandum A-7 July 2006

24 Alternative B-1 a as the Preferred Alternative included only identification of the Preferred Alternative bridge type; preliminary bridge design had not been completed at this point. In Spring 2005, the Preferred Alternative preliminary design layout was submitted for design review. The layout submitted at that time noted a 55 mph design for sight stopping distance on eastbound TH 36 east of the new river crossing bridge. In Summer 2005, Mn/DOT Geometrics Unit noted in their comments on the Level 1 Preliminary Geometric Layout that the design speed for the project should be increased from 55 mph to 60 mph. Mn/DOT staff approved the layout with a 55 mph design speed in July Preliminary Bridge Design The proposed project may require a stopping sight distance design exception. This design element will be reviewed further during preliminary bridge design and final roadway design (see discussion on page 7 of this Design Memorandum). During preliminary bridge design, the following analyses will be considered: 1. Adjusting the center median to shift 2 feet from the TH 36 eastbound inside shoulder into the TH 36 westbound inside shoulder, resulting in an 8-foot inside shoulder for eastbound TH 36. Although this would still result in a substandard stopping sight distance for a 60 mph design, an 8-foot inside shoulder meets a stopping sight distance for a 58 mph design. This design modification would not result in any changes to the bridge width, and would therefore not increase project costs. Any increases in bridge width to address the stopping sight distance design exception would result in increased project costs; 2. Widening the bridge until the full 10-foot inside shoulder is achieved on eastbound TH 36 would provide a design speed of 60 mph, thereby eliminating the stopping sight distance design exception. This will require an economic analysis to document the costs associated with widening the bridge. In addition, in order to complete this analysis, the locations to taper into, and out of, the 10-foot inside shoulder on eastbound TH 36 would also have to be defined. Providing the 10-foot inside shoulder across the entire bridge from Minnesota to Wisconsin would substantially increase project costs; and 3. Construction feasibility for the new river crossing bridge will also be considered and documented with any alterations to the TH 36 alignment, profile, and cross section. Final Roadway Design The stopping sight distance design exception will also be evaluated during final roadway design. In order to further approach or meet the horizontal stopping sight distance design standard for 60 mph, final roadway designers would have to develop additional alignments, profiles, and cross sections to provide the additional 2 feet to the inside shoulder to meet a 58 mph design speed (see Item #1 on page 6), up to the full 10-foot inside shoulder for a 60 mph design speed for eastbound TH 36. Any alignment or profile adjustments to achieve this full 10-foot inside shoulder width must match the TH 36/95 interchange alignment and profile, as well as matching the alignment and profile in Wisconsin. Any subsequent environmental and social impacts as a result of alignment and profile adjustments would also have to be considered and appropriately documented. Alternative Layout Development The Geometrics Office could also develop an alternative roadway design layout that maintains the 6-foot inside shoulder on westbound TH 36 and includes a full 10-foot inside shoulder on eastbound TH 36 to eliminate the stopping sight distance design exception (see Item #2 above). If developed, this alternative layout could be considered during the preliminary bridge design and final roadway design phases described above. Design Memorandum A-8 July 2006

25 During both the preliminary bridge design and final roadway design phases, bridge designers, roadway designers, and geometrics staff should work together to address alternatives to the eastbound TH 36 stopping sight distance design exception. Traffic Handling During Construction (explain how traffic will be handled during construction; attach detour map if applicable) To be determined in final design. See Chapter 12 of the 2006 SFEIS for the preliminary staging concept. Bicycle and Pedestrian Considerations 1. Select one of the following (a or b) if bicycles and pedestrians will not be allowed on this roadway: ( ) a. crossing of this roadway by bicycles and pedestrians ( ) will be ( ) has been evaluated in the development of this project ( ) b. accommodation for crossing of bicycles and pedestrians has been evaluated and found to be not required for this project (see HPDP Bikeways and Pedestrians Guidance Threshold Criteria). 2. (X) Bicycles and pedestrians are not prohibited from this roadway, and accommodation of bicycles and pedestrians ( ) will be (X) has been evaluated. A separate trail system will be provided along the TH 36 frontage road system and along TH 95. A 4.8-mile loop trail system will be also provided, connecting Stillwater and Oak Park Heights with the Town of St. Joseph, Wisconsin using the Lift Bridge and a trail along the north side of the new river crossing. 3. ( ) Existing access for bicycles or pedestrians will be eliminated by this project (an alternative route for bicycles and pedestrians must be provided). 4. If 1(a), 2 or 3 is checked, list the local units of government that ( ) will be (X) have been contacted for information to coordinate this project with existing and proposed bikeways: Mn/DOT Transit Office Bicycle and Pedestrian Section MnDNR Trails and Waterways Division Washington County City of Stillwater City of Oak Park Heights City of Bayport 5. (X) Preliminary layouts and/or draft layouts ( ) will be (X) have been provided to the Bicycle and Pedestrian Section of the Transit Office for advisory comment in accordance with the HPDP project review guidelines (see HPDP Bikeways and Pedestrians Guidance Threshold Criteria). Layout Status: ( ) A geometric layout is not required for this project. (X) A level 1 Geometric Layout (and profile) ( ) will be (X) has been prepared for this project. (X) Municipal approval is required. Municipal approval anticipated for Summer/Fall Design Memorandum A-9 July 2006

26 HIGHWAY GEOMETRIC DESIGN STANDARDS FOR TRUNK HIGHWAY 95

27 Highway Geometric Design Standards for TH 95 Highway Type Two Lane Highway, Rural Two Lane Highway, Urban Freeway, Rural Freeway, Urban Multi-lane Divided Highway, Rural (High Speed) Multi-lane Divided Highway, Urban (High Speed) X Multi-lane Divided Highway, Urban (Low Speed) Multi-lane Undivided Highway, Urban (Low Speed) Design Standard: Design of this project will follow Mn/DOT s ( ) Preservation (X) New Construction/Reconstruction standards for the above referenced highway type. Design Parameters: Functional Class: ( ) Principal Arterial (X) Minor Arterial ( ) Collector Terrain: ( ) Level (X) Rolling ( ) Rough Traffic Volume: Current ADT 13,400 veh./day (based on ( ) actual counts, (X) traffic flow map, dated 2002) Forecast ADT (2030) - 23,000 - based on Traffic Forecast # SP# Posted Speed: Design Unit: The anticipated posted speed will be 30 mph. This project will be designed in ( ) metric units (X) English units. Critical Design Elements Table Critical Design Element (X) Proposed Typical Sections are in Attachment D. (X) Reduced layout is included in Attachment D. Existing Proposed MnDOT Standard for New Construction/ Reconstruction Reference MnDOT Road Design Manual Design Speed Design Speed selected for this project is 40 mph. Table A Lane Width 12 ft 12 ft 12 ft Chapter 2, Section Shoulder Width Right 2 ft 6 ft 6 ft Table A Left 2 ft 2 ft 2 ft Section Bridge Shoulder Width Right Table A Left Table A Horizontal Clearance 1.5 ft 2 ft 1.5 ft Section to Obstructions Bridge Structural Capacity All new bridges to have HS-25 Chapter 9, Section Stopping Sight Distance design load 425 ft 464 ft 305 ft min. Table A Design Memorandum A-11 July 2006

28 Critical Design Element Existing Proposed MnDOT Standard for New Construction/ Reconstruction Reference MnDOT Road Design Manual Horizontal Alignment, Radius 1,600 ft 1,637 ft 450 ft min. Table A or Table B Grades, Percent 2.5 % max. 4.5 % max. 9 % max. Table A Vertical Alignment, K value Crest 84 ft/% min. 133 ft/% min. 44 ft/% min. Figure A Sag 96 ft/% min. 100 ft/% min. 64 ft/% min. Figure D Normal Cross Slope Table A Superelevation 0.06 Normal Crown 0.06 max. Chapter 3, Section Vertical Clearance Highway under bridge Railroad under bridge Highway under sign or pedestrian bridge Table Notes: 16 ft-4 in 16.7 ft 16 ft-4 in 23 ft-0 in 17 ft-5 in Table B * An asterisk preceding proposed condition indicates a Geometric Design Exception. See Geometric Design Exception Justification below for additional information. Interstate/STRAHNET system (X) This project does not involve work on the Interstate/STRAHNET system. ( ) This project involves work on the Interstate/STRAHNET system. ( ) At the completion of this project, all bridges will meet the 16 foot standard for vertical clearance over Interstate highways. ( ) At the completion of this project the vertical clearance of the bridge will remain unchanged. The scope of work involves limited repair of the bridge or roadway pavement. The project scope does not provide the opportunity to alter the vertical clearance situation. FHWA will be requested to coordinate with the Department of Defense MTMCTEA at least three months before letting. Geometric Design Exception Justification Currently there is not any design exception for the section of the project. Traffic Handling During Construction To be determined in final design. See Chapter 12 of the 2006 SFEIS for the preliminary staging concept. Design Memorandum A-12 July 2006

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department) To: From: Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering Date: March 20, 2001 Subject: Roadway Geometric Design Criteria Project: TH 14/218 Design-Build Project, SP 7408-29,

More information

Roadway Design Manual

Roadway Design Manual Roadway Design Manual Manual Notice Archive by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2009-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective

More information

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2)

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2) October 2004 REVISIONS (2) Chapter 11 HORIZONTAL ALIGNMENT SUPERELEVATION DEVELOPMENT 11.3(2) Chapter 12 VERTICAL ALIGNMENT VERTICAL CURVES PASSING SIGHT DISTANCE 12.5(2) VERTICAL CURVES STOPPING SIGHT

More information

Roadway Design Manual

Roadway Design Manual Roadway Design Manual Revised December 2013 2013 by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2013-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective

More information

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II)

Progress Report on the Design and Planning of an Infrastructure Improvement Project for the Sunnyside TIF District (Phase II) Presentation to the CNRC Board of Directors Regular Meeting March 11, 2015 1 Agenda Preferred Alternate Refinement for University Avenue, 3rd Street, and Beverly Avenue Intersection Improvements validate

More information

Geometric Design Tables

Geometric Design Tables Design Manual Chapter 5 - Roadway Design 5C - Geometric Design Criteria 5C-1 Geometric Design Tables A. General The following sections present two sets of design criteria tables - Preferred Roadway Elements

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

Intersection Traffic Control Feasibility Study

Intersection Traffic Control Feasibility Study Intersection Traffic Control Feasibility Study CSAH 9 at CSAH 60 (185th Avenue) Prepared For: Dakota County Transportation Department Western Service Center 14955 Galaxie Avenue, 3rd Floor Apple Valley,

More information

APPENDIX D. May 22, 2002 Open House Summary and Materials

APPENDIX D. May 22, 2002 Open House Summary and Materials APPENDIX D May 22, 2002 Open House Summary and Materials TH 36 Partnership Study Open House May 22, 2002 Summary of Survey Responses 1. If no new crossing of the St. Croix River is built (e.g. the existing

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table

More information

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

FOR HISTORICAL REFERENCE ONLY

FOR HISTORICAL REFERENCE ONLY To: From: Subject: Electronic Distribution Recipients MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No. 12-14-B-03 December 18, 2012 Jon M. Chiglo, P.E. Division

More information

10.0 CURB EXTENSIONS GUIDELINE

10.0 CURB EXTENSIONS GUIDELINE 10.0 CURB EXTENSIONS GUIDELINE Road Engineering Design Guidelines Version 1.0 March 2017 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services

More information

General Design Factors

General Design Factors Chapter 3: 3-1.0 Introduction General Design Factors Mn/DOT s goals include encouraging and accommodating safe bicycling. From a design perspective, these goals are achieved by first having an understanding

More information

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design

I-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design I-20 ODESSA-MIDLAND CORRIDOR STUDY Public Meeting for Schematic Design The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being,

More information

This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans.

This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans. 4.1 GENERAL This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans. These Roadway Standards are for new construction and modification

More information

CHAPTER 1 GENERAL DESIGN

CHAPTER 1 GENERAL DESIGN CHAPTER 1 GENERAL DESIGN 1.0 INTRODUCTION The purpose of this Manual is to provide its users with the current, uniform procedures and guidelines for the application and design of safe, convenient, efficient

More information

Introduction to Roadway Design

Introduction to Roadway Design Chapter Introduction to Roadway Design 1 This chapter lays the foundation for the Roadway Design course. You examine the roadway design workflow and the completed drawing files and review the project scope,

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

GEOMETRIC DESIGN STANDARDS FOR NEW RESIDENTIAL SUBDIVISION STREETS TABLE 1A CG-6 CURB AND GUTTER SECTION

GEOMETRIC DESIGN STANDARDS FOR NEW RESIDENTIAL SUBDIVISION STREETS TABLE 1A CG-6 CURB AND GUTTER SECTION TABLE 1A CG-6 CURB AND GUTTER SECTION HORIZONTAL AND VERTICAL CONTROLS CURB AND GUTTER ROADWAYS MAXIMUM 3:1 CUT OR FILL SLOPE CURVE DATA MIN. SIGHT DISTANCE PROJECTED TRAFFIC VOLUME (ADT) MIN. DESIGN SPEED

More information

Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS

Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS Overview Highway Functions and Classifications Highway Design Components Design Control

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...

More information

Freeway System Considerations

Freeway System Considerations Session 11 Jack Broz, PE, HR Green May 5-7, 2010 Freeway System Considerations Mainline Transit: Shoulder Operations, BRT, Stations HOV, HOT, UPA Interchanges Exit Ramps Entrance Ramps Bridges Local Crossings

More information

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

Recommended Roadway Plan Section 2 - Land Development and Roadway Access Recommended Roadway Plan Section 2 - Land Development and Roadway Access SECTION 2 Land Development and Roadway Access 2.1 Land Use and Access Management The Federal Highway Administration (FHWA) defines

More information

General References Definitions. (1) Design Guidance. (2) Supporting Information

General References Definitions. (1) Design Guidance. (2) Supporting Information Chapter 1240 Turning Roadways 1240.01 General 1240.02 References 1240.03 Definitions 1240.04 Turning Roadway Widths 1240.05 Documentation 1240.01 General The roadway on a curve may need to be widened to

More information

1.3.4 CHARACTERISTICS OF CLASSIFICATIONS

1.3.4 CHARACTERISTICS OF CLASSIFICATIONS Geometric Design Guide for Canadian Roads 1.3.4 CHARACTERISTICS OF CLASSIFICATIONS The principal characteristics of each of the six groups of road classifications are described by the following figure

More information

SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN

SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN SECTION 1A NEW JERSEY TURNPIKE GEOMETRIC DESIGN Table of Contents Page No 1A.1 GENERAL...1 1A.1.1 DESIGN CONTROLS...1 1A.2 MAINLINE ROADWAYS...4 1A.2.1 ROADWAY DESIGNATION...4 1A.2.2 DESIGN SPEED...4 1A.2.3

More information

Technical Memorandum. Shoulder Width Standards for State Highways. Expiration. Implementation. Introduction. Purpose

Technical Memorandum. Shoulder Width Standards for State Highways. Expiration. Implementation. Introduction. Purpose Minnesota Department of Transportation Engineering Services Division Technical Memorandum No. 17-12-TS-05 Technical Memorandum To: Electronic Distribution Recipients From: Nancy T. Daubenberger, P.E. Divison

More information

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities Approved: Policy: 20-004(P) Responsible Office: Planning Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities I. POLICY STATEMENT: This policy

More information

# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan

# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan #70421 Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan Public Information Meetings and Hearings May June 2002 1 Reason for Freeway System Study 270-mile

More information

Figure 1: Graphical definitions of superelevation in terms for a two lane roadway.

Figure 1: Graphical definitions of superelevation in terms for a two lane roadway. Iowa Department of Transportation Office of Design Superelevation 2A-2 Design Manual Chapter 2 Alignments Originally Issued: 12-31-97 Revised: 12-10-10 Superelevation is the banking of the roadway along

More information

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

More information

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL THE FUTURE OF THE TXDOT ROADWAY DESIGN MANUAL Kenneth Mora, P.E. (Design Division) 10/10/2017 Table of contents 1 2 Reduction in FHWA design controlling criteria Innovative Intersection Guidance 3-7 8-42

More information

3-13 UFC - GENERAL PROVISIONS AND GEOMETRIC DESIGN FOR ROADS, STREETS, WALKS, AND OPEN

3-13 UFC - GENERAL PROVISIONS AND GEOMETRIC DESIGN FOR ROADS, STREETS, WALKS, AND OPEN maintenance, and erosion. Stability is required to maintain the integrity of the pavement structure, and a slope stability analysis should be conducted for cuts and fills greater than 15 feet. For lower

More information

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners DRAFT Corridor study Honeysuckle Road October 2017 Prepared for the City of Dothan, AL Prepared by TABLE OF CONTENTS SECTION I... 1 STUDY SUMMARY... 1 INTRODUCTION... 1 CONCLUSIONS... 5 SECTION II... 7

More information

2.0 LANE WIDTHS GUIDELINE

2.0 LANE WIDTHS GUIDELINE 2.0 LANE WIDTHS GUIDELINE Road Engineering Design Guidelines Version 2.0.1 May 2018 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services initiated

More information

APPENDIX A SECTION A-1-GEOMETRIC DESIGN STANDARDS

APPENDIX A SECTION A-1-GEOMETRIC DESIGN STANDARDS APPENDIX A SECTION A-1-GEOMETRIC DESIGN STANDARDS Introduction... A-1 Flexibility In Design... A-1 Secondary Project Improvements... A-2 Roadway Width... A-3 Design Speed (V)... A-3 Operating Speed...

More information

Chapter 6: Transportation

Chapter 6: Transportation Chapter 6: Transportation I. INTRODUCTION The purpose of the Transportation Plan element of the Comprehensive Plan is to provide guidance to the City of North Mankato, as well as existing and future landowners

More information

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study Welcome Thank you for your interest in the Lewis & Clark Viaduct Concept Study Please use the arrows in the upper left hand corner to navigate through the presentation. Use the envelope icon to ask a question

More information

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities 6G.01 Typical Applications Each temporary traffic control (TTC) zone is different. Many variables, such as location of work, highway type,

More information

Route 47 (North Main Street) Reconstruction

Route 47 (North Main Street) Reconstruction TOWN OF SUNDERLAND Route 47 (North Main Street) Reconstruction Presented by Lou Rabito, P.E. Presented to Town of Sunderland June 11, 2018 Project Overview MassDOT Project No. 607245 Resurfacing and Related

More information

IH 20 RANGER HILL PUBLIC MEETING

IH 20 RANGER HILL PUBLIC MEETING IH 20 RANGER HILL PUBLIC MEETING AUGUST 25, 2015 IH 20, Eastland County, TX CSJ 0007-06-084 IH 20 from 3.5 mi. East of LP 254 to SH 16 (Ranger Hill) August 25, 2015 Agenda Introductions Purpose of the

More information

Defining Purpose and Need

Defining Purpose and Need Advanced Design Flexibility Pilot Workshop Session 4 Jack Broz, PE, HR Green May 5-6, 2010 Defining Purpose and Need In your agency s project development process, when do design engineers typically get

More information

NOVEMBER, 2012 MnDOT ROAD DESIGN MANUAL 2-0(1)

NOVEMBER, 2012 MnDOT ROAD DESIGN MANUAL 2-0(1) NOVEMBER, 2012 MnDOT ROAD DESIGN MANUAL 2-0(1) 2-1.0 GENERAL 2-1.01 Design Flexibility 2-2.0 HIGHWAY SYSTEMS 2-2.01 Jurisdictional Systems 2-2.02 State Aid Systems 2-3.0 DESIGN CONTROLS 2-3.01 Drivers

More information

SECTION A-1-GEOMETRIC DESIGN STANDARDS

SECTION A-1-GEOMETRIC DESIGN STANDARDS APPENDIX A SECTION A-1-GEOMETRIC DESIGN STANDARDS Introduction... A-1 Flexibility In Design... A-1 Secondary Project Improvements... A-2 Roadway Width... A-3 Design Speed (V)... A-3 Operating Speed...

More information

SECTION A-1-GEOMETRIC DESIGN STANDARDS

SECTION A-1-GEOMETRIC DESIGN STANDARDS APPENDIX A SECTION A-1-GEOMETRIC DESIGN STANDARDS Introduction... A-1 Flexibility In Design... A-1 Secondary Project Improvements... A-2 Roadway Width... A-3 Design Speed (V)... A-3 Operating Speed...

More information

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION 5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION Having held a public hearing, that Council approve the preliminary designs

More information

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS SECTION 13 BIKEWAYS 13-1 GENERAL The City of Roseville bikeway standards are designed to insure that transportation and recreational bikeways are constructed in a manner that would provide a safe and comfortable

More information

Preliminary Engineering Study

Preliminary Engineering Study Preliminary Engineering Study Open House # 2 June 6, 2018 PREPARED FOR: PREPARED BY: Agenda Background and status of preliminary engineering study County Road 26 design summary County Road 63 design summary

More information

Section 4 Basic Geometric Design Elements

Section 4 Basic Geometric Design Elements 4.1 General Section 4 Basic Geometric Design Elements BDC07MR-01 Geometric highway design pertains to the visible features of the highway. It may be considered as the tailoring of the highway to the terrain,

More information

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA Addendum Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA 22406-1022 800-272-8772 This material is based upon work supported by

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

Who is Toole Design Group?

Who is Toole Design Group? 2018 AASHTO Bike Guide Status Update NCHRP 15 60 Amalia Leighton Cody, PE, AICP & Kenneth Loen, PE Washington APWA October 4, 2018 Who is Toole Design Group? TDG is a full service engineering, planning

More information

Regional Transportation Needs Within Southeastern Wisconsin

Regional Transportation Needs Within Southeastern Wisconsin Regional Transportation Needs Within Southeastern Wisconsin #118274 May 24, 2006 1 Introduction The Southeastern Wisconsin Regional Planning Commission (SEWRPC) is the official areawide planning agency

More information

4.0 IDENTIFICATION OF DEFICIENCIES

4.0 IDENTIFICATION OF DEFICIENCIES 4.0 IDENTIFICATION OF DEFICIENCIES 4.1 PERFORMANCE MEASURES AND RESULTS OF ANALYSIS 4.1.1 Roadway Safety As documented in Chapter 3, there were four key factors that were used to analyze the occurrence

More information

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer I-264 CORRIDOR EVALUATION STUDY September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer Study Overview Interchange Locations Study Context Follow-up

More information

RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E.

RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E. RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project 0-6840) June 7, 2016 Presented by: Karen Dixon, Ph.D., P.E., TTI Team: Kay Fitzpatrick, Raul Avelar, & Subasish Das Project

More information

List of Display Boards

List of Display Boards List of Display Boards Welcome Introduction Municipal Class Environmental Assessment (EA) Process Need and Justification for an Interchange Alternatives for Evaluation Vertical and Horizontal Alignments

More information

SECTION 1 - TRAFFIC PLANNING

SECTION 1 - TRAFFIC PLANNING SECTION 1 - TRAFFIC PLANNING 1.1 TRAFFIC OPERATIONS 1.1.1 Roadway Functional Classification The Multnomah County Comprehensive Framework Plan s Policy 34: Trafficways and the Functional Classification

More information

Donahue Drive Corridor Traffic Operational Evaluation

Donahue Drive Corridor Traffic Operational Evaluation Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

CHAPTER 1 STANDARD PRACTICES

CHAPTER 1 STANDARD PRACTICES CHAPTER 1 STANDARD PRACTICES OBJECTIVES 1) Functions and Limitations 2) Standardization of Application 3) Materials 4) Colors 5) Widths and Patterns of Longitudinal Pavement Marking Lines 6) General Principles

More information

ENGINEERING STANDARD FOR GEOMETRIC DESIGN OF ROADS AND STREETS ORIGINAL EDITION MAR. 1996

ENGINEERING STANDARD FOR GEOMETRIC DESIGN OF ROADS AND STREETS ORIGINAL EDITION MAR. 1996 ENGINEERING STANDARD FOR GEOMETRIC DESIGN OF ROADS AND STREETS ORIGINAL EDITION MAR. 1996 This standard specification is reviewed and updated by the relevant technical committee on Dec. 2000(1) and July.

More information

DESIGN EXCEPTION MANUAL

DESIGN EXCEPTION MANUAL DESIGN EXCEPTION MANUAL 2004 U.S. Customary English Units DESIGN EXCEPTION PROCEDURE A. General When conditions warrant, a design exception may be granted for a project design that proposes one or more

More information

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications A - Typical two-lane, two-way marking with passing permitted in both directions B - Typical two-lane, two-way marking with no-passing zones

More information

Joshua Jester, E.I., Florida Department of Transportation, District One

Joshua Jester, E.I., Florida Department of Transportation, District One MEMORANDUM To: From: Joshua Jester, E.I., Florida Department of Transportation, District One Michael Garau, P.E., Kimley-Horn and Associates, Inc. Date: October 5, 2018 Subject: at Gulfstream Avenue Intersection

More information

Driveway Design Criteria

Driveway Design Criteria Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved

More information

Active Traffic Management and Part-Time Shoulder Use in Montgomery County, PA

Active Traffic Management and Part-Time Shoulder Use in Montgomery County, PA Active Traffic Management and Part-Time Shoulder Use in Montgomery County, PA PENN STATE TESC SESSION 8B MOVING PENNDOT AND PTC FORWARD DECEMBER 8, 2017 Agenda Define Active Traffic Management and describe

More information

This Technical Memorandum extends the expiration date of Technical Memorandum TS-07 to August 1, 2021 unless superseded prior to that date.

This Technical Memorandum extends the expiration date of Technical Memorandum TS-07 to August 1, 2021 unless superseded prior to that date. Minnesota Department of Transportation Engineering Services Division Technical Memorandum No. 18-08-TS-06 August 1, 2018 Technical Memorandum To: Electronic Distribution Recipients From: Nancy T. Daubenberger,

More information

By: CHE ROS ISMAIL PROF DR MOHD ROSLI HAININ DR HARYATI YAACOB DR SITTI ASMAH HASSAN JGP-FKA, UTM

By: CHE ROS ISMAIL PROF DR MOHD ROSLI HAININ DR HARYATI YAACOB DR SITTI ASMAH HASSAN JGP-FKA, UTM By: CHE ROS ISMAIL PROF DR MOHD ROSLI HAININ DR HARYATI YAACOB DR SITTI ASMAH HASSAN JGP-FKA, UTM CONTENT 1. INTRODUCTION 2. STAGES OF HIGHWAY DEVELOPMENT 3. ROAD CATEGORY/CLASSIFICATION 4. DESIGN STANDARDS

More information

GDOT Cross Section Elements. Course ID: GDOT PDH Credits

GDOT Cross Section Elements. Course ID: GDOT PDH Credits GDOT Cross Section Elements Course ID: GDOT-01 2 PDH Credits Civil Engineer Educators LLC 1026 Timberwolf Lane Juneau, AK 99801 Email: support@civilpdh.com Chapter 6 Contents 6. CROSS SECTION ELEMENTS

More information

Off-Road Facilities Part 1: Shared Use Path Design

Off-Road Facilities Part 1: Shared Use Path Design Off-Road Facilities Part 1: Shared Use Path Design Presentation by: Eric Mongelli, P.E. Tom Huber October 9, 2012 FOLLOW THE CONVERSATION ON TWITTER Toole Design Group is live tweeting this webinar @tooledesign

More information

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them? Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy

More information

US Route 24 Eastbound (Quincy Memorial Bridge) Over the Mississippi River

US Route 24 Eastbound (Quincy Memorial Bridge) Over the Mississippi River Purpose and Need March 2015 US Route 24 Eastbound (Quincy Memorial Bridge) Over the Mississippi River Adams County - Quincy, IL Marion County, MO Region 4 District 6 Table of Contents I. Purpose of the

More information

APPENDIX L. Design Criteria

APPENDIX L. Design Criteria APPENDIX L Design Criteria DRAFT PRELIMINARY DESIGN CRITERIA Page 1 of 18 APPROVALS MANAGER, ENGINEERING CITY OF HAMILTON MANAGER, ENGINEERING REGION OF HALTON DATE This Design Criteria for the New East-West

More information

TABLE OF CONTENTS. General... A. New Construction/Reconstruction (4R)...B. Resurfacing, Restoration and Rehabilitation (3R)...C

TABLE OF CONTENTS. General... A. New Construction/Reconstruction (4R)...B. Resurfacing, Restoration and Rehabilitation (3R)...C - LOCAL AGENCY PROJECTS TABLE OF CONTENTS Section General... A New Construction/Reconstruction (4R)...B Resurfacing, Restoration and Rehabilitation (3R)...C Preventive Maintenance (PM)... D Design Exception...E

More information

Off-road Trails. Guidance

Off-road Trails. Guidance Off-road Trails Off-road trails are shared use paths located on an independent alignment that provide two-way travel for people walking, bicycling, and other non-motorized users. Trails specifically along

More information

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway State Road 54/56 Tampa Bay s Northern Loop The Managed Lane Solution Linking I-75 to the Suncoast Parkway SUNCOAST PARKWAY Both I 75 and the Suncoast Parkway are planning, or in the process of constructing,

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported

More information

Clackamas County Comprehensive Plan

Clackamas County Comprehensive Plan ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They

More information

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) US 20 Feasibility Study Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) Village Board Meeting Bartlett Village Hall February 16, 2016 1 Background 1991 IDOT Study Recommendations

More information

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway TRANSPORTATION PLAN INTENT Transportation is the key to the economic and social development of Prince William County and especially to the I 66/Route 29 Sector Plan area. This includes transportation for

More information

GDOT Elements of Design. Course ID: GDOT PDH Credits

GDOT Elements of Design. Course ID: GDOT PDH Credits GDOT Elements of Design Course ID: GDOT-06 3 PDH Credits Civil Engineer Educators LLC 1026 Timberwolf Lane Juneau, AK 99801 Email: support@civilpdh.com Chapter 4 Contents 4. ELEMENTS OF DESIGN 1 4.1. Sight

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

Practical Application of Turn Lane Design Criteria in Developing Suburban & Urban Corridors

Practical Application of Turn Lane Design Criteria in Developing Suburban & Urban Corridors Practical Application of Turn Lane Design Criteria in Developing Suburban & Urban Corridors Presented by Gilmer D. Gaston, P.E., PTOE October 14, 2014 San Antonio Austin Houston Fort Worth Dallas When

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

Executive Summary. September 3, 2014

Executive Summary. September 3, 2014 D Executive Summary September 3, 2014 Study Background and Purpose Citizens for Picture Rocks is a community advocacy group representing the Picture Rocks Fire Department, Pima County Sheriff s Department,

More information

TRASBURG RANSPORTATION

TRASBURG RANSPORTATION TRASBURG RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION

More information

Designing with the Railroad

Designing with the Railroad Designing with the Railroad 23 CFR 646.214 (b)(2) requires that crossings be evaluated when they are within limits or near terminus of Federally Funded project. Some rough numbers for planning: Active

More information

Technical Memorandum. Subject: Interchange Ramp Terminal Configuration. Expiration. Implementation. Introduction

Technical Memorandum. Subject: Interchange Ramp Terminal Configuration. Expiration. Implementation. Introduction Minnesota Department of Transportation Engineering Services Division Technical Memorandum To: Electronic Distribution Recipients From: Nancy T. Daubenberger, P.E. Assistant Commisioner, Engineering Services

More information

Access Management Regulations and Standards for Minor Arterials, Collectors, Local Streets

Access Management Regulations and Standards for Minor Arterials, Collectors, Local Streets Access Management Regulations and Standards for Minor Arterials, Collectors, Local Streets September 2009 Paul Grasewicz Access Management Administrator Concept of Access Management The way to manage access

More information

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks Circulation, as it is used in this General Plan, refers to the many ways people and goods move from place to place in Elk Grove and the region. Circulation in Elk Grove includes: Motor vehicles, including

More information

122 Avenue: 107 Street to Fort Road

122 Avenue: 107 Street to Fort Road : 107 Street to Fort Road November 24, 2015 4:30 8:00 p.m. Meeting Purpose Summarize project work completed to date Share results of public input from Phase 1 Share the draft concept plan and proposed

More information

City of Homewood Transportation Plan

City of Homewood Transportation Plan City of Homewood Transportation Plan Prepared for: City of Homewood, Alabama Prepared by: Skipper Consulting, Inc. May 2007 TABLE OF CONTENTS INTRODUCTION... 1 BACKGROUND INFORMATION... 1 EXISTING TRANSPORTATION

More information

TRANSMITTAL LETTER. Guidelines for the Design of Local Roads and Streets December 2009 Edition

TRANSMITTAL LETTER. Guidelines for the Design of Local Roads and Streets December 2009 Edition OS-299 (7-08) TRANSMITTAL LETTER PUBLICATION: December 2009 Edition DATE: December 21, 2009 SUBJECT: Guidelines for the Design of Local Roads and Streets December 2009 Edition INFORMATION AND SPECIAL INSTRUCTIONS:,

More information

APPENDIX L: COST ESTIMATING TOOLS

APPENDIX L: COST ESTIMATING TOOLS APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders

More information

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (17-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual

DISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (17-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual DISTRIBUTION: Electronic Recipients List MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards Unit ISSUED BY: Office of Project Management and Technical Support TRANSMITTAL LETTER NO.

More information