1 Gratiot Avenue Transit Study Tech Memo #4: Ridership 5/31/2016

2 Table of Contents 1 INTRODUCTION... 3 PROJECT DESCRIPTION TECH MEMO #4 OVERVIEW... 5 METHODOLOGY THE ALTERNATIVES AND POTENTIAL STATION LOCATIONS... 6 NO BUILD / TSM ALTERNATIVE... 6 BUS RAPID TRANSIT ALTERNATIVES CODING OF ALTERNATIVES... 8 TRANSIT SPEEDS / DWELL TIMES... 8 ACCESS AND EGRESS CODING... 8 FARE... 9 UPDATES TO NO BUILD / TSM ALTERNATIVE ROUTES... 9 UPDATES TO BRT ALTERNATIVES EVALUATION RESULTS STATION LOCATION SUMMARIES OVERALL RIDERSHIP SUMMARIES IMPACT TO THE TRANSPORTATION SYSTEM List of Tables Table 4-1: No Build Route Updates... 9 Table 4-2: BRT Route Updates Table 5-1: Station Ridership Table 5-2: System, Corridor and Route Ridership (2010) Table 5-3: Gratiot Ridership by Provider (2010) Table 5-4: Regional Vehicle Miles Travelled and Vehicle Hours Travelled List of Figures Figure 1-1: Study Area... 4 Figure 2-1: SEMCOG Region... 5 Figure 3-1: No Build Alternative... 6 Figure 3-2: Station Locations and Segments... 7 Figure 3-3: Mount Routes... 7

3 1 Introduction Project Description The Gratiot Avenue Corridor Study represents a crucial early step in the development of enhanced transit along Gratiot Avenue. This study is being led by the Regional Transit Authority of Southeast Michigan (RTA); it includes the development and evaluation of multiple rapid transit alternatives between Downtown Detroit and M-59 (Hall Road). The study area spans the 23-mile Gratiot Avenue corridor that serves portions of Wayne and Macomb counties. The corridor communities along Gratiot Avenue include five cities and townships in Wayne and Macomb Counties: Clinton Township Detroit Eastpointe Mount Roseville The study area includes a two-mile wide buffer centered on Gratiot Avenue, as represented in Figure 1-1. This report is the fourth in a series of technical memoranda (tech memos) that report the results of the Tier 2 Detailed Evaluation of Alternatives. The five other tech memos are available under separate cover and can be found at the RTA website ( under the Documents section: 1. Tech Memo #1: Transportation 2. Tech Memo #2: Operations and Maintenance Costs 3. Tech Memo #3: Capital Costs 4. Tech Memo #4: Ridership 5. Tech Memo #5: Environmental Analysis 6. Tech Memo #6: Station Area Evaluation Results contained in the six tech memos are summarized in the Tier 2 Summary Report, also available under separate cover and available on the website.

4 FIGURE 1-1: STUDY AREA

5 2 Tech Memo #4 Overview This tech memo includes the results of ridership forecasting that were used to evaluate the station location and the various routes and runningway alternatives along the Gratiot Avenue corridor. The Tier 2 alternatives, station locations, and segments under evaluation are described in Section 3. How each of the alternatives were coded into the model is summarized in Section 4, and results of the ridership evaluation are presented in Section 5. The results are broken into ridership by station, ridership for the bus-rapid transit, ridership for the Gratiot Avenue corridor, and then ridership for the entire transit system. Methodology The Southeast Michigan Council of Governments (SEMCOG) has developed a travel demand forecasting model for the seven-county southeast Michigan. This model is a traditional 4-step, trip based model which includes a robust mode choice model. Error! Reference source not found. illustrates the seven counties (plus the City of Detroit) included in the model and the locations of the three corridors within the model area. FIGURE 2-1: SEMCOG REGION The overall model was last updated in February 2013 and utilizes the TransCAD platform. The current version of the model is E6. The E6 model was calibrated for the base year of 2005 and a validation year of A subsequent update was conducted by SEMCOG in early 2015 and included the trip distribution and mode choice components of the model. The version was then modified to E6C+. SEMCOG staff led the update efforts. The following summarizes the key characteristics of the E6C+ model: The trip distribution and model choice model were calibrated to a base year of 2010, The highway assignment utilizes five different time periods (AM, mid-day, PM, evening, overnight), The transit assignment uses two time periods (peak and off-peak), Transit assignment is implemented by using trip tables in P-A format, The revised time of day model was calibrated using 2010 traffic patterns, E6 model managed lane features were incorporated in highway assignment, The model summary program was revised to reflect the changes made in E6C+, and Alternative Specific Constants for non-included attributes were added for the premium modes. A Forecasting Methodology document was developed for all RTA projects, including the Gratiot Avenue Transit Study. That document provides a more detailed description of the regional model, the input data, the model validation, and the forecasting strategy. This document is available upon request through the Southeast Michigan Regional Transit Authority.

6 3 The Alternatives and Potential Station Locations No Build / TSM Alternative FIGURE 3-1: NO BUILD ALTERNATIVE The No Build / Transportation Systems Management (TSM) Alternative is comprised of transit service and facilities that currently exist within the corridor. For purposes of the detailed Definition of Alternatives, the No Build Alternative is assumed to be continued operations of existing service for all corridor routes and a relatively modest improvement of service on select existing routes. The No Build Alternative is shown in Figure 3-1. Bus Rapid Transit Alternatives Bus Rapid Transit is being considered between Detroit and Macomb County along Gratiot Avenue, from downtown Detroit to M-59, with potential a potential deviation in downtown Detroit to serve the central business district, and a potential deviation along Main Street in downtown Mt.. The potential BRT route and station locations are shown in Figure 3-2. Four (4) BRT runningway alternatives have been evaluated as part of this technical memo, including: 1. Bus Rapid Transit Mixed Traffic Curb Running 2. Bus Rapid Transit Dedicated Lane Curb Running 3. Bus Rapid Transit Dedicated Lane Median Running 4. Bus Rapid Transit Dedicated Lane Center Running All of the BRT alternatives share several common elements, including having the same Service Plan, Stop Locations, Fare Collection, Technology / Customer Information, Identify / Branding, and maintenance Facility. The runningway is the primary difference between each of the alternatives. The runningway also impacts the type of vehicle, primarily based on the positioning of doors. Because runningway alternatives 2, 3 and 4 produce the same analysis results, they have been grouped together within this memo.

7 The BRT alternative s potential station locations shown in Figure 3-2 are: 1. Bricktown 2. Eastern Market 3. Mack Avenue 4. Warren Avenue 5. Van Dyke Avenue 6. McClellan Avenue 7. Harper Avenue 8. Outer Drive 9. McNichols Road Mile Road Mile Road Mile Road Mile Road Mile Road / I Utica Junction Mile Road 17. Common Road Mile Road 19. Macomb Mall Mile Road 21. Metro Parkway 22. South River 23. Downtown Mt. 24. Sandpiper 25. M Mile Road (not shown) FIGURE 3-2: STATION LOCATIONS AND SEGMENTS There are two downtown Mount route options that are also included in the alternatives. One route would be along Main Street in downtown Mount and the other route options is along Gratiot Avenue going around downtown Mount. Figure 3-3 illustrates these two routing options. FIGURE 3-3: MOUNT CLEMENS ROUTES

8 4 Coding of Alternatives In terms of ridership forecasting, two different running options were evaluated, a dedicated guideway and a mixed in traffic guideway. Two (2) BRT runningway alternatives were compared to a Base Year and No Build scenarios as briefly described below: Base: no change from existing conditions, used as a baseline for comparison to actual ridership No Build/Transportation Systems Management (TSM): some updates to service along Gratiot Avenue from existing conditions, includes increases in headways for traditional bus service along Gratiot Avenue and park and ride locations Mixed Traffic BRT: utilizes Transit Signal Priority (TSP) on all BRT vehicles and signals to enhance travel time efficiency, without the use of dedicated bus lanes Dedicated Lane BRT: utilizes Transit Signal Priority (TSP) on all BRT vehicles and signals to enhance travel time efficiency, with the use of either curbside, median, or center dedicated bus lanes in operation during peak and off-peak models Transit Speeds / Dwell Times The SEMCOG model allows for roadway segments to either have the BRT coded as mixed in traffic or to allow the use of dedicated BRT transit lanes. When roadways segments are coded as dedicated transit lanes, the transit speeds along the roadway are equivalent to the speed limit of the roadway. When the roadway segment is coded as mixed traffic (as all current bus routes are), the transit speed is the speed of prevailing traffic, which is typically less than the speed limit. This allows an advantage for dedicated lanes. Dwell times for the BRT, whether mixed in traffic or dedicated in a separate lane, was kept consistent between all alternatives. The dwell time was also consistent between all RTA projects and complementary to the dwell time for SMART routes. The dwell time was set for 0.28 minutes per station location. Access and Egress Coding All BRT station locations allowed for all types of transfers from SMART, DDOT, DPM, and AAATA. There were no restrictions placed on access or egress. A first model run was coded such that all station locations allowed for park and ride to determine which stations had the highest park and ride boardings. After that first run, only specific locations were allowed for park and ride based on ridership and also land availability. The following station locations were determined to be the best locations for park and ride access: Mile Road 2. M-59 (Hall Road) 3. Metropolitan Parkway 4. Macomb Mall 5. I-696 / 10 Mile Road 6. Harper Avenue 7. McClellan Avenue 8. Rosa Parks Transit Center / Michigan Avenue

9 Fare The model allows for various fares by route. The fare utilized for all the BRT service was kept consistent between all alternatives as well as consistent between all RTA projects. The AAATA fare was utilized for all BRT services within the region and was set for $0.60. The fares for all other routes were kept the same. The fares within the SEMCOG model are not the actual fare that is charged to those boarding a vehicle but an average fare including those that are discounted or subsidized by other means. For example, University of Michigan students do not pay a fare and other riders pay a monthly fee that equates to less than the published daily fare. Updates to No Build / TSM Alternative Routes Table 4-1 illustrates the updates to routes and headways for the No Build / TSM alternative as compared to the Base Year. Currently, inbound SMART routes does not allow for boarding to occur in the City of Detroit and the same for outbound SMART routes to egress in the City of Detroit. This was changed for the No Build / TSM to allow for SMART Route 560/565 to allow for open access and egress within the City of Detroit. SMART Route 580 was extended to start and end in downtown Mount. TABLE 4-1: NO BUILD ROUTE UPDATES Route Base Year No Build / TSM PEAK OFF-PEAK PEAK OFF-PEAK QLINE (Woodward Streetcar) n/a n/a 7 min 7.5 min SMART Route min 19 min 10 min 15 min SMART Route min n/a 15 min n/a SMART Route min 40 min 30 min 30 min SMART Route min n/a 20 min 30 min SMART Route min 40 min 15 min 20 min SMART Route min 40 min 15 min 20 min DDOT Route min 30 min 15 min 15 min Updates to BRT Alternatives Table 4-2 summarizes updates made to adjacent routes for all of the BRT alternatives. There were no changes made to the Gratiot DDOT Route 34 along the corridor. SMART Route 560 was changed to start and end at 8 Mile Road. SMART Route 565 was eliminated due to duplicate service being provided by the BRT. A route was added along M-59 / Hall Road between Schoenherr Road (Lakeside Mall) and Gratiot Avenue. A route was also added between Lakeside Mall and downtown Mount along Cass Avenue. The Blue Water Area Transit (BWAT) Route 94 was extended from 23 Mile Road to M-59, except for the option that evaluated the 23 Mile Road station. SMART Route 580 was extended to start and end in downtown Mount. For the dedicated lane alternatives, roadway laneage along Gratiot Avenue and/or Main Street was reduced by one lane in each direction in the following locations: Gratiot Avenue between Randolph Street and 8 Mile Road (Detroit) Gratiot Avenue between Remick Drive and Patterson Street (Clinton Township and Mount ) Main Street between Robertson Street and Cass Avenue (Mount )

10 TABLE 4-2: BRT ROUTE UPDATES Route Base Year BRT Alternatives PEAK OFF-PEAK PEAK OFF-PEAK QLINE (Woodward Streetcar) n/a n/a 7 min 7 min SMART Route min 19 min 30 min 30 min SMART Route min n/a n/a n/a SMART Route min 40 min 30 min 30 min SMART Route min n/a 20 min 30 min SMART Route min 40 min 15 min 20 min SMART Route min 40 min 15 min 20 min DDOT Route min 30 min 15 min 15 min M-59 Route n/a n/a 30 min 30 min Lakeside Route n/a n/a 30 min 30 min

11 5 Evaluation Results This section provides the results of the ridership evaluation. A stepwise process was utilized in order to compare different station locations. This was done in order to minimize the number of runs that would be needed to gather the information. The number of station locations were kept consistent for each model run, but the actual station locations would vary between model runs. For example, one model run would have a station at Harper Avenue and not McClellan Avenue and another run would have McClellan Avenue and not Harper Avenue. This was done to determine variations in ridership between different station locations. In addition, the addition of a station location at 23 Mile Road was conducted between two different model runs to determine the ridership at 23 Mile Road compared to a model run that did not have a station at 23 Mile Road. Station Location Summaries Table 5-1 illustrates the potential ridership at each station location, a range is given based on results from various model runs. TABLE 5-1: STATION RIDERSHIP Station Location Ridership Range Downtown Detroit 2,870 3,360 Bricktown Brush Eastern Market Mack Avenue Warren Avenue Van Dyke Avenue McClellan Avenue 1,025 1,080 Harper Avenue 1,100 1,150 Outer Drive McNichols Road Mile Road Mile Road 1,050 1,170 9 Mile Road Mile Road Mile Road / I Utica Junction Mile Road Common Road Mile Road Macomb Mall Mile Road Metro Parkway South River Downtown Mt Sandpiper M Mile Road There were some station locations that ranged a lot, such as the Macomb Mall station. This number depended on whether there was a station at 12 Mile Road and also at 13 Mile Road. When there was a

12 station at 12 Mile Road, the ridership at Macomb Mall decreased, which was due to transfers occurring from SMART routes. The stations at both McClellan Avenue and Harper Avenue show a large amount to the park and ride location. Approximately 90-percent of the ridership at these locations are either park and ride or kiss and ride. Most of the ridership (70-percent) is coming from the north and going south and utilizing the southbound route. It is expected that this amount will decrease and there will be additional park and ride usage north of McClellan, either at 8 Mile Road or further north. Overall Ridership Summaries Table 5-2 illustrates the overall ridership for the system, the corridor, and the BRT route for the base year, the No Build/TSM and by each BRT alternative. The overall system ridership includes all the transit providers in southeast Michigan, including the Detroit Department of Transportation (DDOT), the Detroit People Mover (DPM), the Suburban Mobility Authority for Regional Transportation (SMART), the Ann Arbor Area Transportation Authority (AAATA), the University of Michigan, Blue Water Area Transit, and Lake Erie Transit. The Gratiot Avenue corridor ridership was determined by adding the ridership for the BRT route, DDOT Route 34, and SMART Route 560/565. One option was evaluated where the BRT service was extended to 23 Mile Road north of M-59. This service was evaluated with a mixed traffic option between M-59 and 23 Mile Road. A park and ride was added at 23 Mile Road. TABLE 5-2: SYSTEM, CORRIDOR AND ROUTE RIDERSHIP (2010) Alternative System Ridership Gratiot Ridership BRT Ridership Base Year 231,260 10,555 n/a No Build / TSM 235,685 13,400 n/a Mixed Traffic along Gratiot Avenue around Downtown Mount 241,160 16,615 12,270 Mixed Traffic to Downtown Mount 240,600 16,520 12,195 Dedicated Lane along Gratiot Avenue around Downtown Mount 243,305 17,930 13,475 Dedicated Lane to Downtown Mount 242,255 17,710 13,425 Dedicated Lane to Downtown Mount with extension to 23 Mile Road* 242,110 17,825 13,590 * BRT in mixed traffic between M-59/Hall Road and 23 Mile Road As shown in Table 5-2, the ridership increased for the entire system by about two-percent when regular bus service was increased slightly. The ridership along Gratiot Avenue increased by 27-percent, indicating that there is some unmet demand along the corridor. Adding a BRT route onto Gratiot Avenue further increased the ridership by another 24- to 34-percent. Having a dedicated BRT lane along Gratiot Avenue instead of having the BRT mixed in traffic increased ridership by an additional 1,200 riders. The difference between the route going into Downtown Mount and around Mount did not vary by much, indicating that the zones are too large in the model to take into account a small difference in routing. The extension to 23 Mile Road would add approximately 165 riders to the BRT service.

13 Table 5-3 summarizes the ridership along Gratiot Avenue for each alternative by provider. TABLE 5-3: GRATIOT RIDERSHIP BY PROVIDER (2010) Alternative DDOT SMART RTA/BRT Total Base Year 5,605 4,950 n/a 10,555 No Build / TSM 1,840 11,560 n/a 13,400 Mixed Traffic along Gratiot Avenue around Downtown 3,300 1,045 12,270 16,615 Mount Mixed Traffic to Downtown Mount 3,310 1,030 12,870 16,520 Dedicated Lane along Gratiot Avenue around Downtown 3,175 1,280 13,475 17,930 Mount Dedicated Lane to Downtown Mount 3,255 1,030 13,425 17,710 Dedicated Lane to Downtown Mount with extension to 23 Mile Road* 3,235 1,000 13,590 17,825 As shown in Table 5-3, ridership for the DDOT and SMART providers decreased with the addition of the BRT. However, ridership on the DDOT route is still significant even with the BRT. Ridership for SMART decreased with the BRT service and provides local service along Gratiot Avenue within Macomb County. The increase in SMART service and decrease in DDOT service for the No Build had to do largely with changes in access within the City of Detroit for SMART service. The dwell time for SMART within the model is shorter than the DDOT headway and there are less stops in the City of Detroit for SMART than it is for DDOT routes. It is expected that there would be some increase in SMART ridership, but DDOT ridership would remain the same.

14 Impact to the Transportation System One of the evaluation criteria that is required by the Federal Transit Administration and used to determine the impact that a BRT system would have on the region is the overall impact to the Transportation System. This is determined by the amount of vehicle miles of travel (VMT) and vehicle hours of travel (VHT) within the region. A decrease in VMT and/or VHT is beneficial for the region because it indicates that an additional of a BRT system reduces overall vehicle travel in a region. Table 5-4 illustrates the VMT and VHT for the region for the Base Year, the No Build, and each of the BRT Alternatives. TABLE 5-4: REGIONAL VEHICLE MILES TRAVELLED AND VEHICLE HOURS TRAVELLED Alternative Vehicle Miles Travelled (VMT) Vehicle Hours Travelled (VHT) Base Year 124,398,185 3,727,310 No Build / TSM 124,371,015 3,726,315 BRT Mixed in Traffic going into downtown 124,342,735 3,725,815 Mount BRT Mixed in Traffic going around downtown Mount 124,346,160 3,725,810 BRT in a Dedicated Lane going into downtown Mount 124,322,245 3,726,400 BRT in a Dedicated Lane doing around downtown Mount 124,337,485 3,726,975 BRT in a Dedicated Lane going into downtown Mount extended to 23 Mile Road 124,324,630 3,725,940 According to the results, there was very little difference in the amount of vehicle hours travelled. However, the options with the dedicated lane had fewer vehicle miles travelled with the greatest reduction for the BRT in a dedicated lane going into downtown Mount. The VHT is higher with the dedicated lane options due to the reduction in laneage along Gratiot Avenue causing speeds to be decreased. However, this is still less than what would occur from the base year, indicating that fewer vehicles are driving and switching to transit.

Interim Transit Ridership Forecast Results Technical Memorandum

Interim Transit Ridership Forecast Results Technical Memorandum Interim Transit Ridership 401 South Jackson Street Seattle, WA 98104-2826 September 2012 Table of Contents 1 INTRODUCTION... 1-1 1.1 Project Background... 1-1 2 RIDERSHIP FORECASTS... 2-1 2.1 System Ridership

More information

Community Engagement Process

Community Engagement Process Community Engagement Process PHASE ONE PURPOSE + NEED STATEMENT IDEAS DESTINATIONS TRAVEL PATTERNS PHASE TWO MODE SELECTION INPUT PHASE THREE LOCALLY PREFERRED ALTERNATIVE SELECTION OF PREFERRED ALTERNATIVE

More information

ALTERNATIVES ANALYSIS EXECUTIVE SUMMARY

ALTERNATIVES ANALYSIS EXECUTIVE SUMMARY West Valley Connector Corridor ALTERNATIVES ANALYSIS EXECUTIVE SUMMARY FINAL September 2014 Ontario International Airport Ontario Mills Rancho Cucamonga Metrolink Station Kaiser Permanente PARSONS EXECUTIVE

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. 3 Date: 01-19-12 Worksession: Countywide Transit Corridors Functional Master Plan Larry Cole,

More information

Appendix A-2: Screen 1 Alternatives Report

Appendix A-2: Screen 1 Alternatives Report Appendix A-2: Screen 1 Alternatives Report SCREEN 1 ALTERNATIVES REPORT Western & Ashland Corridors Bus Rapid Transit (BRT) Project Prepared for Chicago Transit Authority 567 West Lake Street Chicago,

More information

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation APRIL 2016 A collaborative study between: For Additional Information or to Comment If you would like additional

More information

Evan Johnson, Tindale Oliver & Associates. Alan Danaher, P.E., PTOE, AICP, PTP

Evan Johnson, Tindale Oliver & Associates. Alan Danaher, P.E., PTOE, AICP, PTP To: Copies: From: Evan Johnson, Tindale Oliver & Associates Matt Muller, RTS Jesus Gomez, RTS Alan Danaher, P.E., PTOE, AICP, PTP Date: January 14, 2014 Subject: Ridership Projections Gainesville Streetcar

More information

Chapter 3 BUS IMPROVEMENT CONCEPTS

Chapter 3 BUS IMPROVEMENT CONCEPTS Chapter 3 BUS IMPROVEMENT CONCEPTS The purpose of this chapter is to describe potential bus improvement strategies and potential impacts or implications associated with BRT implementation within the existing

More information

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE April, 2012 1 INTRODUCTION The need for transit service improvements in the Routes 42/55/676 corridor was identified during the Southern

More information

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue Bus Rapid and Conventional Transit Planning and Design Services City of Saskatoon February 2018 Project Team HDR Corporation

More information

Midtown Corridor Alternatives Analysis

Midtown Corridor Alternatives Analysis Midtown Corridor Alternatives Analysis Ridership Forecast Methodology and Results December 2013 Prepared by the SRF Consulting Group Team for Table of Contents Introduction... 1 Methodology... 1 Assumptions...

More information

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007 Technical Memorandum May 2007 Syracuse Metropolitan Transportation Council Edwards and Kelcey with Wallace Roberts and Todd Alta Planning and Design CONTENTS SECTION ONE- INTRODUCTION...1 SECTION TWO-

More information

Arterial Transitway Corridors Study

Arterial Transitway Corridors Study Arterial Transitway Corridors Study February 2012 Arterial Transitway Corridors Study Overview Corridor Features and Demographics 11 study corridors, 95 route miles Routes: 86,000 daily rides and half

More information

PURPOSE AND NEED SUMMARY 54% Corridor Need 1. Corridor Need 2. Corridor Need 3. Corridor Need 4. Corridor Need 5

PURPOSE AND NEED SUMMARY 54% Corridor Need 1. Corridor Need 2. Corridor Need 3. Corridor Need 4. Corridor Need 5 SUMMARY PURPOSE AND NEED Chapel Hill Transit ridership has increased Buses operate every 4 minutes and have standing room only Exceeding seated capacity by 12% Corridor Need 1 by more than 20 percent between

More information

Arterial Transitway Corridors Study. Sept. 26, 2011

Arterial Transitway Corridors Study. Sept. 26, 2011 Arterial Transitway Corridors Study Sept. 26, 2011 Purpose of Study Study 11 urban corridors in Minneapolis, St. Paul and surrounding communities Develop service and facilities plan to improve Transit

More information

Title. Metropolitan Council Transportation Committee December 12, Brad Larson Metro District MnDOT

Title. Metropolitan Council Transportation Committee December 12, Brad Larson Metro District MnDOT Title Metropolitan Council Transportation Committee December 12, 2016 Evaluating the potential for Bus Rapid Transit and MnPASS Express Lanes in the southwest Metro Brad Larson Metro District MnDOT Background

More information

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations. The Last Mile Planning for Pedestrians Planning around stations will put pedestrians first. Making walking to stations safe and easy is important; walking will be a part of every rapid transit Accessible

More information

Aurora Corridor to E Line

Aurora Corridor to E Line Aurora Corridor to E Line Jack Whisner Transit Planner, Service Development King County Metro Transit Seattle, Washington jack.whisner@kingcounty.gov 206-477-5847 King County Metro Transit Part of general

More information

South King County High-Capacity Transit Corridor Study

South King County High-Capacity Transit Corridor Study HIGH-CAPACITY TRANSIT CORRIDOR STUDY South King County Corridor South King County High-Capacity Transit Corridor Study Corridor Report August 2014 South King County High Capacity Transit Corridor Report

More information

Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN

Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN Public Outreach Fall 2011: Two community meetings/open houses Fall 2012: Three community meetings/open houses

More information

Detroiters need to be able to conveniently and reliably get to work, school, church, stores, and parks.

Detroiters need to be able to conveniently and reliably get to work, school, church, stores, and parks. Environment & MOBILITY Detroiters need to be able to conveniently and reliably get to work, school, church, stores, and parks. Several surveyed challenges related to lack of mobility ranked in the top

More information

Preliminary Transportation Analysis

Preliminary Transportation Analysis Preliminary Transportation Analysis Goals of a Robust, Multimodal Transportation Network Safe Accessible/Connected Efficient Comfortable Context-Sensitive Motor Vehicle: Continue to analyze the data to

More information

Model Applications for Oakland Park Boulevard Transit Corridor Study

Model Applications for Oakland Park Boulevard Transit Corridor Study Model Applications for Oakland Park Boulevard Transit Corridor Study Southeast Florida FSUTMS Users Group June 13, 2014 Vikas Jain, AICP, GISP FDOT District Four Auditorium 3400 West Commercial Boulevard,

More information

Arterial Transitway Corridors Study

Arterial Transitway Corridors Study Arterial Transitway Corridors Study April 2012 Prepared by with SRF Consulting Group, Inc. Kimley-Horn and Associates, Inc. Connetics Transportation Group Luken Architecture CR Planning April 2012 Final

More information

Operational Comparison of Transit Signal Priority Strategies

Operational Comparison of Transit Signal Priority Strategies Operational Comparison of Transit Signal Priority Strategies Revision Submitted on: November, 0 Author: Adriana Rodriguez, E.I Assistant Engineer Parsons Brinckerhoff 0 South Orange Avenue, Suite 00 Orlando,

More information

Highway Transitway Corridor Study

Highway Transitway Corridor Study Highway Transitway Corridor Study CTS Research Conference May 21, 2014 1 2030 Transportation Policy Plan Transitway modes on highways: Highway bus rapid transit (BRT), plan identified 6 total Highway BRT

More information

Topics To Be Covered. Summarize Tier 2 Council Direction Discuss Mill and Ash Alternatives Next Steps

Topics To Be Covered. Summarize Tier 2 Council Direction Discuss Mill and Ash Alternatives Next Steps Topics To Be Covered Summarize Tier 2 Council Direction Discuss Mill and Ash Alternatives Next Steps Tier 2 Council Direction Dismiss Bus Rapid Transit along the Union Pacific Railroad Dismiss Bus Rapid

More information

ALTERNATIVES SCREENING REPORT

ALTERNATIVES SCREENING REPORT VAN NESS AVENUE BUS RAPID TRANSIT (BRT) ALTERNATIVES SCREENING REPORT Revised Draft, 3/28/08 San Francisco County Transportation Authority 1 Introduction The San Francisco County Transportation Authority

More information

Road Commission of Macomb County Long Range Master Plan Final Report

Road Commission of Macomb County Long Range Master Plan Final Report Road Commission of Macomb County Long Range Master Plan 2004 2030 Final Report Submitted to: Road Commission of Macomb County Submitted by: In association with: Langworthy Strader LeBlanc & Associates,

More information

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011 Corridor Advisory Group and Task Force Meeting #10 July 27, 2011 1 Agenda Recap CAG/TF #9 Public Meeting #2 Summary Single Mode Alternatives Evaluation Results Next Steps 2 3 CAG/TF #9 Recap CAG /TF #9

More information

Scottsdale Road/Rural Road Alternatives Analysis (AA) Study. Arizona ITE/IMSA Spring Conference March 7, 2012

Scottsdale Road/Rural Road Alternatives Analysis (AA) Study. Arizona ITE/IMSA Spring Conference March 7, 2012 Scottsdale Road/Rural Road Alternatives Analysis (AA) Study Arizona ITE/IMSA Spring Conference March 7, 2012 Study Location and Duration Primary Study Corridor (major focus of effort) Rural Road and Scottsdale

More information

Spring Lake Park Mounds View North Oaks. Arden Hills. Shoreview. Roseville. Little Canada. Falcon Heights SNELLING. Lilydale. West Saint Paul 35E

Spring Lake Park Mounds View North Oaks. Arden Hills. Shoreview. Roseville. Little Canada. Falcon Heights SNELLING. Lilydale. West Saint Paul 35E Coon Rapids Blaine Spring Lake Park Mounds View rth Oaks In 2011, Metro Transit embarked on the Arterial 494 Minnetonka Maple Grove Plymouth Hopkins Brooklyn Park New Hope Golden Valley Louis Park Edina

More information

Appendix 3.2 D. Ridership Errata Sheet

Appendix 3.2 D. Ridership Errata Sheet Appendix 3.2 D Ridership Errata Sheet January 14, 2010 Since the release of the Alternatives Description for the South Coast Rail project, the Massachusetts Department of Transportation has identified

More information

Ujari Mohite. Vijay Mahal and Vincent Sanders. Revised Ridership Forecasts for the Uptown DBL project. Date: August 17, 2015 INTRODUCTION/SUMMARY:

Ujari Mohite. Vijay Mahal and Vincent Sanders. Revised Ridership Forecasts for the Uptown DBL project. Date: August 17, 2015 INTRODUCTION/SUMMARY: To: From: Subject: Ujari Mohite Vijay Mahal and Vincent Sanders Revised Ridership Forecasts for the Uptown DBL project Date: August 17, 2015 INTRODUCTION/SUMMARY: This memorandum presents updated ridership

More information

Community Task Force July 25, 2017

Community Task Force July 25, 2017 Community Task Force July 25, 2017 Welcome and Introductions Project Partners Regional Transportation District (RTD) Colorado Department of Transportation (CDOT) Denver Regional Council of Governments

More information

Arterial Transitway Corridors Study. Ave

Arterial Transitway Corridors Study. Ave Arterial Transitway Corridors Study Ave January 2012 Arterial Transitway Corridors Study Overview Corridor Features and Demographics 11 study corridors, 95 route miles 86,000 daily rides and half of existing

More information

David Jickling, Public Transportation Director Regional Transportation Commission, Washoe County

David Jickling, Public Transportation Director Regional Transportation Commission, Washoe County David Jickling, Public Transportation Director Regional Transportation Commission, Washoe County Virginia Street Resort corridor connecting University of Nevada, Reno Downtown Truckee River Strip Casinos

More information

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need Chapter 2 Purpose and Need 2.1 Introduction The El Camino Real Bus Rapid Transit (BRT) Project (Project) would make transit and other transportation improvements along a 17.6-mile segment of the El Camino

More information

Locally Preferred Alternative Report May 27, North-South Corridor Study

Locally Preferred Alternative Report May 27, North-South Corridor Study Locally Preferred Alternative Report May 27, 2016 North-South Corridor Study i Table of Contents 1. Executive Summary... 4 2. Introduction... 6 2.1 Project Overview... 6 2.2 Project Process... 8 2.3 Project

More information

LIVERPOOL TRANSPORTATION MODELING TECHNICAL MEMO MAY 2009

LIVERPOOL TRANSPORTATION MODELING TECHNICAL MEMO MAY 2009 LIVERPOOL TRANSPORTATION MODELING TECHNICAL MEMO MAY 2009 Syracuse Metropolitan Transportation Council 100 Clinton Square 126 N. Salina Street, Suite 100 Syracuse, NY 13202 Telephone (315) 422-5716; Fax

More information

Item B1 November 19, 2009

Item B1 November 19, 2009 November 19, 2009 Planning and Development Department Land Use Planning Division DATE: November 19, 2009 STAFF REPORT TO: FROM: SUBJECT: Members of the Transportation Commission Elizabeth Greene Senior

More information

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts Appendix B Environmental Resource Technical Memorandum Assessment on Travel Pattern and Access Impacts TECHNICAL MEMORANDUM ENVIRONMENTAL RE-EVALUATION FOR UNION STATION TO OAK CLIFF DALLAS STREETCAR To:

More information

the Story of the 30s & 70s Bus Lines James Hamre - WMATA

the Story of the 30s & 70s Bus Lines James Hamre - WMATA Evaluation of a Service Restructuring: the Story of the 30s & 70s Bus Lines James Hamre - WMATA Metrorail is the second largest rail transit system in the nation 230 million annual riders 780,000 weekday

More information

Bus Rapid Transit Plans

Bus Rapid Transit Plans Twin Cities Region Bus Rapid Transit Plans ULI Minnesota Workshop Connecting Bus Rapid Transit to the Community December 15, 2009 John Levin Director of Service Development Metro Transit Metropolitan Area

More information

Bus Rapid Transit on Silicon Valley s El Camino Real: Working Together to Create a Grand Boulevard Steven Fisher

Bus Rapid Transit on Silicon Valley s El Camino Real: Working Together to Create a Grand Boulevard Steven Fisher Bus Rapid Transit on Silicon Valley s El Camino Real: Working Together to Create a Grand Boulevard Steven Fisher Senior Transportation Planner Santa Clara Valley Transportation Authority San Jose, CA How

More information

6 Screen 3 Analysis and Results

6 Screen 3 Analysis and Results 6 Screen 3 Analysis and Results Introduction This chapter documents the results of the Screen 3 (final) evaluation and screening process. This chapter contains the following elements: Description of the

More information

BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT FOR EXISTING AND PLANNED SECTIONS OF US 19

BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT FOR EXISTING AND PLANNED SECTIONS OF US 19 BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT FOR EXISTING AND PLANNED SECTIONS OF US 19 Project Advisory Committee Meeting January 27, 2016 A JOINT EFFORT OF THE PINELLAS METROPOLITAN PLANNING

More information

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

MEMORANDUM. Charlotte Fleetwood, Transportation Planner MEMORANDUM Date: Updated August 22, 2017 To: Organization: Charlotte Fleetwood, Transportation Planner Boston Transportation Department From: Jason DeGray, P.E., PTOE, Regional Director of Engineering

More information

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

MoPac South: Impact on Cesar Chavez Street and the Downtown Network MoPac South: Impact on Cesar Chavez Street and the Downtown Network Prepared by: The University of Texas at Austin Center for Transportation Research Prepared for: Central Texas Regional Mobility Authority

More information

Detailed Evaluation of Alternatives Report FINAL April 20, North-South Corridor Study

Detailed Evaluation of Alternatives Report FINAL April 20, North-South Corridor Study Detailed Evaluation of Alternatives Report FINAL April 20, 2016 North-South Corridor Study i Table of Contents 1. Introduction... 4 1.1 Overview of Evaluation Process... 4 1.1 Results of the Tier 1 Analysis...

More information

I-35W Solutions Alliance Project Update July 13, 2017

I-35W Solutions Alliance Project Update July 13, 2017 Title I-35W Solutions Alliance Project Update July 13, 2017 Evaluating the potential for Bus Rapid Transit and MnPASS Express Lanes in the southwest Metro, Investigating options for improved bus service

More information

Transit Signal Priority (TSP) Application to Miami-Dade Transit

Transit Signal Priority (TSP) Application to Miami-Dade Transit Transit Signal Priority (TSP) Application to Miami-Dade Transit Amar Sarvepalli Parsons Brinckerhoff Southeast Florida FSUTMS Users Group August 15, 2008 Overview PART A WHAT IS TSP INTRODUCTION PURPOSE

More information

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016

Providence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016 Providence Downtown Transit Connector STAKEHOLDER MEETING #2 Stakeholder Meeting #1 October 24, 2016 February 2017 1 AGENDA 1 DTC Goals and Expectations 2 Street Design Concepts 3 Potential Benefits and

More information

Seattle Transit Master Plan

Seattle Transit Master Plan Seattle Transit Master Plan Seattle City Council Transportation Committee Briefing July 26, 2011 Seattle Department of Transportation In Association with: URS Corporation SVR DKS Associates The Underhill

More information

Executive Summary BEYOND THE B-LINE: RAPID TRANSIT LINE PHASE II - COMMERCIAL DRIVE WEST. Final Draft December 13, Appendix B BROADWAY/LOUGHEED

Executive Summary BEYOND THE B-LINE: RAPID TRANSIT LINE PHASE II - COMMERCIAL DRIVE WEST. Final Draft December 13, Appendix B BROADWAY/LOUGHEED BEYOND THE B-LINE: BROADWAY/LOUGHEED RAPID TRANSIT LINE PHASE II - COMMERCIAL DRIVE WEST Appendix B Executive Summary Final Draft December 13, 1999 UMA Lloyd Lindley Davidson Yuen Simpson Architects BROADWAY/LOUGHEED

More information

Cedar Avenue Transitway/ METRO Red Line Implementation Plan Update. Metropolitan Transportation Committee July 27, 2015

Cedar Avenue Transitway/ METRO Red Line Implementation Plan Update. Metropolitan Transportation Committee July 27, 2015 Cedar Avenue Transitway/ METRO Red Line Implementation Plan Update Metropolitan Transportation Committee July 27, 2015 Purpose of Cedar Avenue Transitway Previous IPU August 2011 Review current transit

More information

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN Indian Nations Council of Governments August 2005 CONTACTING INCOG In developing the Destination 2030 Long Range Transportation Plan, INCOG s Transportation

More information

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway State Road 54/56 Tampa Bay s Northern Loop The Managed Lane Solution Linking I-75 to the Suncoast Parkway SUNCOAST PARKWAY Both I 75 and the Suncoast Parkway are planning, or in the process of constructing,

More information

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY DRAFT PLAN City Council Meeting August 14, 2017 STUDY AREA Sedgwick Corridor State Route 160, principal arterial with Class 3 access management designation, commuter and freight route, connection to SR

More information

DRAFT. Memo. Range of the Alternatives Considered in the EIS

DRAFT. Memo. Range of the Alternatives Considered in the EIS Memo Date: Friday, December 09, 2016 Project: To: From: Subject: State Route 30 EIS UDOT Vince Izzo This memorandum summarizes the draft State Route (S.R.) 30 Level 1 screening results. A more detailed

More information

US 19 Pedestrian and Bicycle Safe Access to Transit Corridor Study

US 19 Pedestrian and Bicycle Safe Access to Transit Corridor Study US 19 Pedestrian and Bicycle Safe Access to Transit Corridor Study DRAFT Technical Memorandum #6 Cost and Benefit Evaluation Methodology August 2016 Prepared for: FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

Item Description: Presentation and Discussion: Berkeley Rapid Transit Locally Preferred Alternative

Item Description: Presentation and Discussion: Berkeley Rapid Transit Locally Preferred Alternative Office of the City Manager Meeting Date: April 29, 2010 Item Number: 1 Item Description: Presentation and Discussion: Berkeley Rapid Transit Locally Preferred Alternative Staff report, resolution, and

More information

Calgary Transit Route 302 Southeast BRT Year One Review June

Calgary Transit Route 302 Southeast BRT Year One Review June Calgary Transit Route 302 Southeast BRT Year One Review 2011 June Calgary Transit Route 302 Southeast BRT: Year One Review 2011 April Table of Contents 1.0 Executive Summary... 1 2.0 Introduction... 3

More information

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2. Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW

More information

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division TO: Chair and Members Public Works Committee COMMITTEE DATE: June 18, 2018 SUBJECT/REPORT NO:

More information

. ' motion. APPLtlDK.L - L"iLC_t1GLR 201b APPENDIX 7 TECHNICAL MEMOS

. ' motion. APPLtlDK.L - LiLC_t1GLR 201b APPENDIX 7 TECHNICAL MEMOS . ' motion APPLtlDK.L - L"iLC_t1GLR 201b APPENDIX 7 TECHNICAL MEMOS The nmotion program will provide a large number of benefits for Middle Tennessee. This document presents selected benefits and other

More information

Travel and Rider Characteristics for Metrobus

Travel and Rider Characteristics for Metrobus Travel and Rider Characteristics for Metrobus 040829040.15 Travel and Rider Characteristics for Metrobus: 2012-2015 Overview The Miami Dade County Metropolitan Planning Organization (MPO) conducted a series

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: May 30, 2012 SUBJECT: ADDITIONAL OPERATING RESOURCE REQUIREMENTS TO MEET INCREASING TTC RIDERSHIP ACTION ITEM RECOMMENDATIONS

More information

EUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK

EUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK EUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK CITY OF SYRACUSE DEPARTMENT OF PUBLIC WORKS 1200 CANAL STREET EXTENSION SYRACUSE, NEW YORK 13210 DRAFT REPORT DATE: November 13,

More information

TABLE OF CONTENTS FIGURES TABLES. Executive Summary Report: BLUE LINE

TABLE OF CONTENTS FIGURES TABLES. Executive Summary Report: BLUE LINE TABLE OF CONTENTS 1.0 INTRODUCTION... 1 1.1 Blue Line Project Goals... 1 1.2 Corridor Travel Demand... 2 1.2.1 Market Analysis... 2 1.2.2 Existing Transit Operations... 2 2.0 RECOMMENDED ALTERNATIVE...

More information

Station Plan: Penn & 43rd Avenue

Station Plan: Penn & 43rd Avenue Station Plan: Penn & 43rd Avenue This station will serve the northern portion of the Penn Avenue corridor, including the commercial node at 44th Avenue. Ridership and roadway geometry support station siting

More information

PEDESTRIAN ACTION PLAN

PEDESTRIAN ACTION PLAN ATTACHMENT 2 CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN This page intentionally left blank EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY Setting the Stage

More information

Capital Metro Monthly Ridership Report September 2017 (Fiscal Year-end 2017)

Capital Metro Monthly Ridership Report September 2017 (Fiscal Year-end 2017) Capital Metro Monthly Ridership Report September 2017 (Fiscal Year-end 2017) Page 1 of 6 Ridership Summary This is a summary of Capital Metro system-wide ridership statistics for fiscal year-end and the

More information

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary WELCOME! Thank you for attending our open house. There will be no formal presentation today so please take the time to read the boards. If you have any questions, please do not hesitate to approach one

More information

Frequently Asked Questions (FAQ)

Frequently Asked Questions (FAQ) Frequently Asked s (FAQ) Study Process... 2 Rapid Transit Service and Operations... 5 Public Consultation... 8 Business Impacts... 8 Design and Property Impacts... 9 Construction Impacts...12 Traffic,

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

WHITE PAPER: TRANSIT SERVICE FOR SOUTH SHAGANAPPI

WHITE PAPER: TRANSIT SERVICE FOR SOUTH SHAGANAPPI 9/27/2012 TRANSIT PLANNING WHITE PAPER: TRANSIT SERVICE FOR SOUTH SHAGANAPPI 2012 Calgary Transit 1 Table of Contents Purpose... 3 Area of Change... 3 Background... 3 Access to destinations... 5 Connecting

More information

CITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION

CITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION CITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION June 2015 CITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION Introduction The Alpharetta Downtown Master Plan was developed in the fall

More information

Cotton Belt Corridor Regional Rail Project

Cotton Belt Corridor Regional Rail Project Cotton Belt Corridor Regional Rail Project Ridership July 2013 Prepared by URS Corporation Prepared for Dallas Area Rapid Transit General Planning Consultant Managed by URS Corporation Document Revision

More information

Contents. Champaign-Urbana Mass Transit District Stop Placement Guidelines

Contents. Champaign-Urbana Mass Transit District Stop Placement Guidelines Contents Champaign-Urbana Mass Transit District Introduction... 1 Stop Spacing... 2 Rural... 2 Low Density Suburban... 2 General Urban... 2 Urban Core... 2 Operational Safety... 3 Stop Placement... 4 Nearside

More information

Enhancing Return on Investment for MnPASS Express Lanes

Enhancing Return on Investment for MnPASS Express Lanes Enhancing Return on Investment for MnPASS Express Lanes Minnesota s Transportation Conference February 28, 2018 mnpass.org Agenda MnPASS Express Lane Background MnPASS System Update Enhancing Return on

More information

Guidelines for Providing Access to Public Transportation Stations APPENDIX C TRANSIT STATION ACCESS PLANNING TOOL INSTRUCTIONS

Guidelines for Providing Access to Public Transportation Stations APPENDIX C TRANSIT STATION ACCESS PLANNING TOOL INSTRUCTIONS APPENDIX C TRANSIT STATION ACCESS PLANNING TOOL INSTRUCTIONS Transit Station Access Planning Tool Instructions Page C-1 Revised Final Report September 2011 TRANSIT STATION ACCESS PLANNING TOOL INSTRUCTIONS

More information

Countywide Transit Corridors Functional Master Plan

Countywide Transit Corridors Functional Master Plan Countywide Transit Corridors Functional Master Plan Makeover Montgomery II May 10, 2014 Master Plan Status Begun: August 2011 Planning Board Approved Draft Plan: July 2013 Council Approved Final Plan:

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

ECTS Purpose & Needs. Exhibit Home-Based Work Trips Attracted to the Penn/Jeannette Area

ECTS Purpose & Needs. Exhibit Home-Based Work Trips Attracted to the Penn/Jeannette Area Exhibit 4.23 - Home-Based Work Trips Attracted to the Penn/Jeannette Area Exhibit 4.24 - Transit Use for Work Trips Attracted to the Penn/Jeannette Area Eastern Corridor Transit Study 61 Greensburg - and

More information

ITS-NY ANNUAL MEETING Bus Rapid Transit in New York City: Bus Lane Operations on One-Way Arterial Streets

ITS-NY ANNUAL MEETING Bus Rapid Transit in New York City: Bus Lane Operations on One-Way Arterial Streets ITS-NY ANNUAL MEETING Bus Rapid Transit in New York City: Bus Lane Operations on One-Way Arterial Streets June 9, 2011 Ted Orosz AICP, Director Long Range Bus Planning MTA New York City Transit 1 Overview

More information

City of Homewood Transportation Plan

City of Homewood Transportation Plan City of Homewood Transportation Plan Prepared for: City of Homewood, Alabama Prepared by: Skipper Consulting, Inc. May 2007 TABLE OF CONTENTS INTRODUCTION... 1 BACKGROUND INFORMATION... 1 EXISTING TRANSPORTATION

More information

ATTACHMENT 4 - TDM Checklist. TDM Checklist Overview

ATTACHMENT 4 - TDM Checklist. TDM Checklist Overview ATTACHMENT 4 - TDM Checklist TDM Checklist Overview The proposed checklist rates developments on the degree to which they are TDM and transit supportive. Points are assigned based on the level of transit

More information

Wilshire Boulevard Bus Rapid Transit Project

Wilshire Boulevard Bus Rapid Transit Project Los Angeles County Metropolitan Transportation Authority Wilshire Boulevard Bus Rapid Transit Project COMMUNITY MEETINGS November 2008 Agenda Introduction Proposed Project Overview Participating Agencies

More information

Van Ness Avenue BRT Overview and Scoping Process. Geary BRT CAC January 8, 2009

Van Ness Avenue BRT Overview and Scoping Process. Geary BRT CAC January 8, 2009 Van Ness Avenue BRT Overview and Scoping Process Geary BRT CAC January 8, 2009 VAN NESS AVENUE S ROLE Identified in Prop K for BRT treatment Muni 47 and 49; 19 operates on Polk 20,000 daily riders on Van

More information

SMART 1 Public Meeting #1. February 24, 2016

SMART 1 Public Meeting #1. February 24, 2016 SMART 1 Public Meeting #1 February 24, 2016 Agenda Who is the SMTC? SMART 1 project overview Syracuse Metropolitan Transportation Council An Introduction: Who we are & what we do What is an MPO? A Metropolitan

More information

ROUTE 52 ALLENTOWN. Port Authority of Allegheny County

ROUTE 52 ALLENTOWN. Port Authority of Allegheny County ROUTE 52 ALLENTOWN Route 52 Allentown is a limited service LRT line that operates on weekdays between South Hills Junction and downtown Pittsburgh. The route serves the Allentown neighborhood and skirts

More information

Capital Metro Monthly Ridership Report January 2018 (Fiscal Year 2018)

Capital Metro Monthly Ridership Report January 2018 (Fiscal Year 2018) Capital Metro Monthly Ridership Report January 2018 (Fiscal Year 2018) Page 1 of 5 Ridership Summary This is a summary of Capital Metro system-wide ridership statistics for the month of January 2018 by

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

A Comprehensive HCM 2010 Urban Streets Analysis Using HCS 2010 US 31W in Elizabethtown, KY

A Comprehensive HCM 2010 Urban Streets Analysis Using HCS 2010 US 31W in Elizabethtown, KY A Comprehensive HCM 2010 Urban Streets Analysis Using HCS 2010 US 31W in Elizabethtown, KY Ashley McLain, PE, PTOE Abstract The HCS 2010 Streets module was used to analyze a segment of the US 31W corridor

More information

4 Transportation Analysis and Effects

4 Transportation Analysis and Effects 4 Transportation Analysis and Effects 4.0 Introduction This chapter discusses the transportation-related analysis and effects associated with the No Build Alternative and the Southwest Light Rail Transit

More information

Metropolitan Council Transportation Committee

Metropolitan Council Transportation Committee Nicollet-Central Transit Alternatives Metropolitan Council Transportation Committee August 2013 Project Purpose (approved by Policy Advisory Committee 10/25/2012) The purpose is to improve transit connectivity,

More information

Scope of the Transit Priority Project

Scope of the Transit Priority Project Transit Planning Committee #1 March 19, 2015 Scope of the Transit Priority Project Review of the 2010 plan Analysis of Transit Priority Measures Preliminary plans for rapid transit Recommendations for

More information

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX

ADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX ADOT Statewide Bicycle and Pedestrian Program Summary of Activities APPENDIX B PEDESTRIAN DEMAND INDEX May 24, 2009 Pedestrian Demand Index for State Highway Facilities Revised: May 29, 2007 Introduction

More information