1 CITY OF OAKLAND 27th Street Bikeway Feasibility and Design Final Report (v3) March 23, 2007 PREPARED BY: Kimley-Horn and Associates, Inc.
2 Table of Contents 1. Introduction th Street/Bay Place Corridor Description and Existing Conditions 4 3. Analysis Methodology 7 4. Data Collection and Analysis 8 5. Proposed Cross Sections 9 6. Results of Analysis Mitigation Measures Recommendations and Summary 16 Tables Table 1: Average Daily Traffic Counts Table 2: Collision Summary from 7/1/01 6/30/06 Table 3: Bike/Ped Counts (EB/WB per hour) Table 4: Intersection Level of Service (LOS) Definitions Table 5: Existing Intersection LOS Table 6: Future-Year Intersection LOS Table 7: Future-Year LOS with Geometric and Signal Mitigations Figures Figure 1: Project Study Area Figure 2: Project Area Photos Figure 3: Whole Foods Area Geometrics Figure 4: Existing and Proposed Cross Sections Figure 5: Plan View of 27 th Street and Telegraph Avenue Appendices APPENDIX A: ADTs, Synchro, TMCs (Stored electronically: \\Pwafile1\pwa\Divisions_and_Teams\Transportation\Bike- Ped_Program\27th_Street\Study_AppendixA) APPENDIX B: Parking Removal Analysis (analysis by City staff after completion of consultant report) City of Oakland 2
3 27th Street Bikeway Feasibility and Design Final Report 1. Introduction This report documents Kimley-Horn s feasibility analysis and recommendations for a continuous bikeway on 27 th Street/Bay Place between San Pablo Avenue and Grand Avenue. This bikeway will serve as a critical link in the bicycle network in the City of Oakland, providing bicyclists connections to major bikeways near Lake Merritt, Broadway, and Market Street (scheduled for construction in the summer of 2007). Figure 1 illustrates the project study area. Design Alternatives Several alternatives were discussed with City staff, and the following two were selected for study: Alternative 1 No change to lane configurations: This alternative would include installing shared roadway bicycle markings ( sharrows ) and signage to increase awareness of the potential presence of bicyclists. Alternative 2 Reduce lane configuration to accommodate a continuous bikeway: This alternative would remove one of three lanes in each direction between San Pablo Avenue and City of Oakland 3
4 Harrison Street and sign and stripe Class II bike lanes. Along the entire corridor, two through lanes will be maintained, therefore no lane reduction is proposed or studied at San Pablo Avenue, Telegraph Avenue, Broadway (westbound only), Harrison Street, Vernon Street and Bay Place th Street/Bay Place Corridor Description and Existing Conditions The 27th Street/Bay Place corridor consists of three (3) lanes in each direction on 27 th Street between San Pablo Street and Harrison Street, and two (2) lanes in each direction on Bay Place between Harrison Street and Grand Avenue. Approaching Northgate in either direction, the road widens to accommodate I-980 / SR 24 freeway ramps. There is on-street parking in both directions and a raised median along the entire corridor. The speed limit varies between 25 mph and 35 mph. Figure 2: Project area (clockwise from top left: View towards Telegraph along 27 th ; view toward Grand along Bay Place; View towards Broadway along 27 th ) City of Oakland 4
5 Whole Foods Development For the purposes of this study, geometric and signal changes approved as part of a new Whole Foods Development to be located at the intersection of Harrison Street and 27 th Street/Bay Place were assumed to be existing conditions and incorporated into all analysis scenarios. These conditions include: A new signal and lane configurations at the Bay Place/Vernon Street intersection. Upgraded traffic signal, new signal timing, and new lane configurations at the intersection of Bay Place/Harrison Street Figure 3. Whole Foods Area Geometrics AC Transit Bus Service There are currently no AC Transit routes that run along 27th Street or Bay Place; however, several routes use streets that intersect this corridor at San Pablo Avenue, Martin Luther King, Jr. Way, Telegraph Avenue, Broadway, Harrison Street, and Grand Avenue. City of Oakland 5
6 Average Daily Traffic Counts (ADTs) ADT counts were obtained on Monday 8/7/06 and Tuesday 8/8/06 to validate the TMCs taken at the 11 study intersections. This information is presented in Table 1. Table th Street Average Daily Traffic Counts Segment Eastbound Westbound Total Broadway Harrison 7,837 8,311 16,148 Telegraph Broadway 6,779 8,330 15,109 West MLK Jr. Way 5,238 7,035 12,272 Collision Analysis Collision data were reviewed for a period of time between 7/1/2001 and 6/30/2006. This information is presented in Table 2. Table 2. Collision Summary from 7/1/01 6/30/06 Segment San Pablo to Northgate Northgate to Broadway Broadway to Harrison Number of Collisions Collisions Resulting in Injury Collisions Involving Bikes or Pedestrians Bike/Ped Counts Although 27 th Street/Bay Place is not currently designated as a bicycle route, there is a fair amount of bicycle traffic that utilizes the study area corridor as a route between Lake Merritt and San Pablo Avenue. Bicycle and pedestrian counts were included in the vehicular turning movement counts in August The results are shown in Table 3. City of Oakland 6
7 Intersection Table 3: Bike/Ped Counts (EB/WB per hour) AM PM Bikes Pedestrians Bikes Pedestrians San Pablo/27th 20/6 20/12 11/18 36/9 Telegraph/27th 2/12 4/16 6/2 32/32 Bay Place/Grand - Southbound* AM counts were taken from 7:00am to 9:00am. PM counts were taken from 4:00pm to 6:00pm. * Note: The intersection of Bay Place/Grand Avenue only has one crosswalk so only one value is shown in the table. Existing Signal Actuation In the project area, the following four (4) signalized intersections are semi-actuated with vehicle detection on 27 th Street: San Pablo Avenue, Telegraph Avenue, Broadway, and Vernon Street. With detection, the traffic signals will be able to operate under actuated conditions. This means that major street traffic flow will only be interrupted when a vehicle is present on the minor street. This will reduce overall delay at the intersection. 3. Analysis Methodology Operation of the study intersections was evaluated using standardized Level of Service (LOS) calculations for current- and future-year (2025) conditions. LOS is a qualitative description of the performance of an intersection based on the average delay per vehicle. Intersection LOS ranges from LOS A, which indicates free flow or excellent conditions with short delays, to LOS F, which indicates congested or overloaded conditions with extremely long delays. In the City of Oakland, LOS A through D are considered satisfactory except in the downtown area where LOS E is also acceptable. Intersection LOS was determined based upon the Highway Capacity Manual (HCM) 2000 guidelines. The HCM 2000 guidelines use control delay value (in seconds) to calculate intersection LOS. Table 4 presents the intersection LOS grades based on average delay per vehicle. Future-year conditions were forecast using growth rates from the Alameda County Congestion Management Agency s travel demand model, modified to reflect the City of Oakland s land use forecasts. Projected net growth between existing and 2025 model data was added to existing turning movement counts to derive the future values. City of Oakland 7
8 Table 4: Intersection Level of Service (LOS) Definitions Control Delay Per Vehicle (seconds) LOS 0 to 10 seconds A 11 to 20 seconds B 21 to 35 seconds C 36 to 55 seconds D 56 to 80 seconds E 80+ seconds F Source: Highway Capacity Manual The following eleven (11) intersections were analyzed for Level of Service under currentand future-year conditions as well as mitigated and optimized scenarios for both Alternative 1 and 2: th Street/San Pablo Avenue th Street/West Street th Street/Martin Luther King Way th Street/Northgate West th Street/Northgate East th Street/Telegraph Avenue th Street/Broadway th Street/Valdez Street 9. Bay Place/Harrison Street 10. Bay Place/Vernon Street (planned signal) 11. Bay Place/Grand Avenue As previously noted, at the intersections of San Pablo Avenue, Telegraph Avenue, Broadway (westbound only), Harrison Street, Vernon Street, and Grand Avenue, the lane configuration did not change between Alternative 1 and 2. Therefore, the LOS of service and delay did not change and are not presented. 4. Data Collection and Analysis Signal timing sheets for the study intersections were provided by the City for input into the Synchro traffic models. Collision data were provided by the City for analysis. Turning movement counts (TMCs), pedestrian, and bicycle counts were collected on Tuesday, Wednesday, and Thursday during the second week of August 2006 for a two-hour time period, at 15-minute intervals, during the following times: City of Oakland 8
9 o AM peak period: o PM peak period: 7:00 AM to 9:00 AM 4:00 PM to 6:00 PM ADT counts obtained on Monday 8/7/06 and Tuesday 8/8/06 were used to validate the TMCs taken at the 11 study intersections. The traffic predicted to be generated by the planned Whole Foods Development was added to the study intersections AM and PM turning movement counts for the current-year conditions. For future-year conditions, no traffic was added because the Whole Foods is already part of the City model. The signal timing information and the TMCs for each of the study intersections were input into the Synchro traffic model. The TMCs and ADTs are provided in Appendix A. Parking occupancy information was collected by the City in March This information will be used to assess the impacts of potential parking removal along the corridor to accommodate the addition of the bike lane. (See the discussion of Parking Removal in the Recommendations section.) The intersection Level of Service (LOS) and other Measures of Effectiveness (MOE) such as volume to capacity ratio, approach delay, effective green, etc. were reported for each study intersection along 27 th Street and Bay Place corridors during both peak hours. 5. Proposed Cross Sections The traffic analysis was based on the Alternative 2 configuration (travel lane removal plus bike lanes) with the following exceptions: (1) At intersections where exclusive turn lanes are existing or part of required mitigation; (2) Where there are currently only two through lanes (San Pablo Avenue, Telegraph Avenue, Broadway (westbound only), Harrison Street, Vernon Street, and Grand Avenue) no additional lane reduction is proposed; (3) At Telegraph Avenue, the available roadway width at all but the westbound approach is sufficient to maintain the current travel lanes and add bike lanes; and (4) At Harrison Street, the intersection geometry is based on the Whole Foods plans. Sharrows To improve the connection to adjacent bike lanes on Grand Avenue (existing) and Market Street (scheduled for construction this summer), the study also considered installing shared City of Oakland 9
10 use lane markings ( sharrows ) on Bay Place from Harrison Street to Grand Avenue and on San Pablo Ave from 27 th St to Market St. Sharrows are installed in the outer travel lane next to parallel parking stalls. Sharrows serve two purposes: 1. To encourage cyclists to ride outside of the door zone the area where a suddenly opened car door can cause a bicyclist collision; and 2. To alert motorists to expect bicyclists in the travel lane. On busy streets, sharrows are proposed only where bike lanes are not feasible due to limited right-of-way. While less beneficial than bike lanes, sharrows are a good way to close bikeway network gaps. Note that installing sharrows on these streets requires no modification to the lane configuration, so no LOS analysis is required. Typical existing and proposed typical cross sections are shown in Figures 4a and 4b. Note that the lane widths shown are typical but vary slightly throughout the corridor. City of Oakland 10
11 Figure 4a: Existing and Proposed Cross Sections, 27 th Street City of Oakland 11
12 Figure 4b: Existing and Proposed Cross Sections, Bay Place City of Oakland 12
13 6. Results of Analysis Current-Year Conditions Table 5 presents the AM and PM peak hour LOS for each study intersection along 27 th Street and Bay Place with a comparison between the two alternatives. Under both alternatives, all study intersections with the exception of Harrison Street intersection (PM peak) operate at LOS D or better during both peak hours. Synchro worksheets indicating detailed results of the analysis are provided in the Appendix. Table 5: Existing Intersection LOS 27 th Street AM Peak Hour PM Peak Hour Alternative 1 Alternative 2 Alternative 1 Alternative 2 Cross Street Control Delay LOS Control Delay LOS Control Delay LOS Control Delay LOS 1 San Pablo Ave* 26.5 C 40.5 D 2 West St 13.6 B 12 B 13.9 B 16.9 B 3 Martin Luther King, Jr. Way 10.3 B 16.1 B 13.5 B 17 B 4 Northgate Ave (West) 13 B 13.5 B 14.1 B 14.9 B 5 Northgate Ave (East) 13.4 B 13.9 B 14.5 B 14.5 B 6 Telegraph Ave* 23.1 C 26.6 C 7 Broadway 13.4 B 14.5 B 22 C 51 D 8 Valdez St 10.8 B 11.6 B 10.8 B 11.4 B 9 Harrison St* 24.9 C 65.2 E 10 Vernon St (/Bay Place)* 8.3 A 11 B 11 Grand Ave (/Bay Place)* 20.1 C 26 C No lane reduction was proposed or analyzed for these intersections. Source: Kimley-Horn and Associates, Inc. March 2007 Future-Year Conditions and Forecast Methodology The future peak hour TMCs were forecast by adding growth volumes from the model to current counts plus traffic volumes projected from the Whole Foods development. Table 6 presents the future-year AM and PM peak hour LOS for each study area intersection under both project alternatives. Synchro worksheets indicating detailed results of the analysis are provided in Appendix A. City of Oakland 13
14 Table 6: Future-Year Intersection LOS 27th Street AM Peak Hour PM Peak Hour Alternative 1 Alternative 2 Alternative 1 Alternative 2 Cross Street Control Delay LOS Control Delay LOS Control Delay LOS Control Delay LOS 1 San Pablo Ave * 21.4 C 61.7 E 2 West St 14.7 B 16.3 B 18.7 B 19.4 B Martin Luther King, Jr. 3 Way 14.8 B 57.5 E 45.7 D F 4 Northgate Ave (West) 15.8 B 19.7 B 38.4 D F 5 Northgate Ave (East) 11.7 B 12.4 B 34.4 C 48 D 6 Telegraph Ave* 23.4 C 54 D 7 Broadway 15.5 B 16.6 B 67.6 E F 8 Valdez St 13.9 B 14.9 B 43.8 D 55.0 D 9 Harrison St* 76 E F 10 Vernon St (/Bay Place)* 12.3 B 9.1 A 11 Grand Ave (/Bay Place)* 14.7 B 12.1 B No lane reduction was proposed or analyzed for these intersections. Source: Kimley-Horn and Associates, Inc. March 2007 The above results indicate that, under Alternative 2, three analyzed intersections are expected to operate at worse than LOS D during the PM peak period Martin Luther King, Jr. Way, Northgate West, and Broadway. Mitigation was evaluated for these three intersections and is presented in the next section. 7. Mitigation Measures To improve the future-year LOS at Martin Luther King, Jr. Way (AM and PM), Northgate (West) (PM), and Broadway (PM), the following geometric and signal optimization mitigation measures were analyzed: 1. Convert the inside through/left lane into an exclusive left-turn lane for the eastbound movement at 27 th Street/Broadway intersection. 2. Convert the inside through/left lanes into exclusive left-turn lanes for the eastbound and westbound movements at 27 th Street/Martin Luther King, Jr. Way intersection, and, maintain the existing two through lanes in the westbound direction. 3. Optimize the signal timing at Martin Luther King, Jr. Way and Northgate (West) to provide more green time on 27 th St while maintaining the current signal cycle length. In the first two cases, the conversion to exclusive left turn lanes would require that the two through lanes remain, as described for the Alternative 2 scenario. However, the available City of Oakland 14
15 roadway width is insufficient to allow for the installation of bike lanes. To create a continuous bikeway while maintaining adequate LOS in future year conditions, sharrows could be installed, or, if feasible, parking could be removed to make space for bike lanes. See the discussion of Parking Removal in the Recommendations section. The first mitigation measure improved the LOS at Broadway to D. The second mitigation measure did not improve the LOS F at Martin Luther King, Jr. Way, although it did reduce the total intersection delay by 50%. Therefore, minor signal re-timing changes were also evaluated at Martin Luther King, Jr. Way and Northgate (West). These changes maintain the 80 second cycle length for the intersection, but give a larger number of seconds to the green time for 27 th Street. By itself, the signal re-timing (without the exclusive left-turn lanes) did not provide an adequate mitigation. Although signal optimization is not a typical mitigation solution, a combination of exclusive left-turn lanes, maintaining two through lanes in the westbound direction, and signal retiming improved the LOS at the Martin Luther King, Jr. Way intersection to B. Since Martin Luther King, Jr. Way is less than 200 feet from Northgate West, the same minor signal retiming changes were made at Northgate West. This improved the LOS at Northgate (West) from F to C. The proposed signal optimization would not require the purchase of new controllers or other equipment. Table 7 presents the results of the mitigated future-year conditions. For the mitigation options, the results reflect the geometric mitigation first, then geometric plus operations mitigation second. The only other intersections that are expected to operate below LOS D are San Pablo Avenue and Harrison Street. However, the delay and LOS are the same as the future-year Alternative 1 condition so mitigation is not proposed. City of Oakland 15
16 Table 7: Future-Year LOS with Geometric and Signal Mitigations 27th Street AM Peak Hour PM Peak Hour Alternative 1 Alternative 2 Mitigated (Geometric) Exclusive Left Turn Lane Mitigated (Operational) Left Turn Lane + Signal Optimization Alternative 1 Alternative 2 Mitigated (Geometric) Exclusive Left Turn Lane Mitigated (Operational) Left Turn Lane + Signal Optimization Control Control Control Control Control Control Control Control LOS LOS LOS LOS LOS LOS LOS Cross Street Delay Delay Delay Delay Delay Delay Delay Delay LOS San Pablo Ave* 21.4 C 61.7 E West St 14.7 B 16.3 B 18.7 B 19.4 B MLK Jr. Way 14.8 B 57.5 E 19.1 B 10.3 B 45.7 D F 82.6 F 14.7 B Northgate (W) 15.8 B 19.7 B 19.7 B 17 B 38.4 D F 98.4 F 15.3 B Northgate (E) 11.7 B 12.4 B 34.4 C 48 D Telegraph Ave* 23.4 C 54 D Broadway 15.5 B 16.6 B 15.6 B 67.6 E F 54.4 D Valdez St 13.9 B 14.9 B 43.8 D 55.0 D Harrison St* 76 E F Vernon St* 12.3 B 9.1 A Grand Ave* 14.7 B 12.1 B No lane reduction was proposed or analyzed for these intersections. March 2007 Source: Kimley-Horn and Associates, Inc. City of Oakland 16
17 8. Recommendations and Summary It is recommended that the City remove one through lane and add Class II bike lanes in each direction along 27 th Street as described for Alternative 2. To improve connectivity to the bike lanes on Grand Avenue and Market Street, the City should install sharrows along Bay Place and San Pablo Avenue to encourage bicyclists to ride clear of the door zone. Further, the City should consider the proposed lane configuration mitigation and minor traffic signal timing modifications at the three impacted intersections described in Section 7 to improve the LOS in future-year conditions. Current-Year Conditions In comparing the current-year analysis results for Alternatives 1 and 2, the following summarizes the impacts: During the AM peak period, there is very minimal increase in delay at a few study intersections between Alternatives 1 and 2. All intersections remain at LOS B. During the PM peak period, the delay increases at the intersection of 27 th Street/Broadway (from LOS C to LOS D). The change comes from eastbound left turn volumes waiting to clear the intersection which increases the delay to eastbound through traffic. All other intersections with proposed changes remain at LOS B. This means that under existing conditions, motor vehicle LOS will stay within the City s accepted thresholds if a travel lane is removed and bike lanes are added. In the short term, removing one lane in each direction will not significantly impact motor vehicle delay at any intersections. Future-Year Conditions In comparing the future-year analysis results for Alternatives 1 and 2, the following summarizes the impacts: During the AM peak period at 27 th Street/ Martin Luther King, Jr. Way, the LOS decreases from B to E. All other intersections with proposed modifications remain at LOS B. During the PM peak period, the LOS decreases at the following intersections: 27 th Street/Martin Luther King, Jr. Way: from LOS D to F 27 th Street/Northgate (West): from LOS D to F 27 th Street/Broadway: from LOS E to F Mitigation measures were analyzed in Synchro for the future-year (2025) Alternative 2 in the AM and PM peak periods. Analysis indicates that converting existing through/left lanes to exclusive left-turn lanes and/or minor signal timing changes would mitigate impacts to traffic City of Oakland 17
18 flow along the 27 th Street/Bay Place corridor. These mitigation measures are summarized below: Exclusive left-turn lanes for the eastbound and westbound movements at 27 th Street/Martin Luther King, Jr. Way, Minor signal timing changes (while keeping the same cycle length of 80 seconds) at 27 th Street/Martin Luther King, Jr. Way, Minor signal timing changes (while keeping the same cycle length of 80 seconds) at 27 th Street/Northgate Ave (West) (consistent with the timing proposed for Martin Luther King, Jr. Way), and Exclusive left-turn lane for the eastbound movement at 27 th Street/Broadway intersection. At these intersections, the proposed mitigations would reduce the overall signal delay and improve the LOS to future-year Alternative 1 conditions or better. All intersections would operate within the City s accepted thresholds. Bike Lane Gaps and Parking Removal As described in Alternative 2, the recommended project would include two travel lanes throughout the project area. Exclusive left-turn lanes that are part of the existing conditions would remain. Additionally, the above mitigations include new exclusive left-turn lanes at specific intersections. In the following locations, the existing curb-to-curb right-of-way width does not allow for two travel lanes, an exclusive left-turn, a bike lane, and on-street parallel parking: 1. Martin Luther King, Jr. Way, westbound, near-side 2. Martin Luther King, Jr. Way, eastbound, near-side 3. Telegraph Avenue, westbound, near-side 4. Broadway, eastbound, near-side At these locations, the City may consider the limited removal of on-street parking in order to provide continuous bike lanes. Such a recommendation would be based on a parking occupancy study for each location to determine the effects of parking removal. If parking removal is not feasible, it is recommended that sharrows be included at these locations to connect the gaps in the bike lanes. For a summary of the City s parking occupancy study, please see Appendix B. Other Issues At the westbound approach to Broadway, an existing hardscape median prevents the installation of continuous bike lanes. The City should consider shaving this median by 2-3 feet and installing a 4 curbside bike lane to maximize facility continuity, pending investigation of utility issues. City of Oakland 18
19 APPENDIX A: ADTs, Synchro, TMCs (Stored electronically: \\Pwafile1\pwa\Divisions_and_Teams\Transportation\Bike- Ped_Program\27th_Street\Study_AppendixA) City of Oakland 19
20 27 th Street Bikeway Feasibility Study Appendix B Parking Removal, 27 th Street, San Pablo Avenue to Harrison Street According to the results of the 27 th Street Bikeway Feasibility Study conducted by Kimley-Horn and Assoc., striping continuous bike lanes on 27 th Street from San Pablo Avenue to Harrison Street would require parking removal at certain intersections. At these locations, left turn pockets would be added to maintain adequate intersection level of service in the future year scenario. At these intersections, the curb-to-curb right-of-way is insufficient to accommodate the left turn pocket, two travel lanes, the bicycle lane, and curbside parallel parking. Parking removal would allow for continuous bike lanes at the following locations on 27 th Street: Location # spaces/type #1. Eastbound, approaching Martin Luther King Jr. Way 14 / un-metered #2. Eastbound, approaching Broadway 11 / 9 metered, 2 handicap #3. Westbound, approaching Telegraph 6 / 5 metered; 1 un-metered #4. Westbound, approaching Martin Luther King Jr. Way 3 / un-metered In total, the four locations include 34 parallel parking stalls (14 metered and 20 un-metered including two handicap stalls). These spaces constitute 12% of the 281 available parking spaces along the 27 th Street/Bay Place corridor. To determine the feasibility of removing these stalls, staff performed occupancy surveys from February 26-April 1, 2007 during key observation times: Weekday, mid-morning or mid-day Weekday, 6-9pm Sunday, 10am-noon Results of these surveys are in Table 1. With the exception of Location #1, at least three observations were completed for each time period at each location (at least nine per location for a total of 51 observations.) Additional surveys were conducted during other time periods and of adjacent segments. These locations are referenced in the following discussion and summarized in a Table 2. 1 STAFF RECOMMENDATION Based on the survey results, staff recommends pursuing removal of a total of 20 parking stalls at Locations 2-4. Staff does not recommend parking removal at Location 1. A total of 14 metered and six un-metered spaces would be removed, pending input from adjacent property owners. These spaces include two handicap spaces (un-metered) that may be appropriate to relocate. The 1 Staff conducted twenty-eight (28) observations outside of key times at Locations #2-4. The results of these observations are shown in Table 2 but not reflected in the overall analysis. Staff found fewer vehicles parked during off-peak times at Locations #2-4, ranging from 12% to 23% less occupied than during key times.
21 twenty spaces recommended for removal constitute 7% of the 281 available parking spaces along the 27 th Street/Bay Place corridor. DISCUSSION Location #1. Eastbound, approaching Martin Luther King Jr. Way Spaces proposed for removal: 14 stalls, un-metered Number of Observations: 5 Average Occupancy: 8.6 / 61.4% Land use: Residential Discussion: Staff surveyed this location five times before concluding that parking removal is not feasible due to the dense residential adjacent land use. At this location, staff recommends that sharrows be installed to create a continuous bikeway. Location #2. Eastbound, approaching Broadway Spaces proposed for removal: 11 stalls, 9 metered and 2 un-metered-handicap Number of Observations: 17 Average Occupancy: 3.53 / 32% Land use: First Presbyterian Church / related outbuildings (2619 Broadway, long frontage on 27 th Street); further west, State DGS Garage ( th Street) Discussion: On Sundays, 10am-noon, during church services, occupancy was very high (84% of 11 spaces occupied). The average occupancy during other times was 16%. Next steps: Identify options for relocating or removing the handicap stalls. Contact property management at church to get input on proposal. If proposal is opposed, consider a parking prohibition for all times but Sundays between 9am and noon. Location #3. Westbound, approaching Telegraph Avenue Spaces proposed for removal: 6 stalls, 5 metered, 1 un-metered Number of Observations: 14 Average Occupancy: 2.21 / 37% Land use: medical office buildings Discussion: At this location, occupancy is moderate. The adjacent medical office buildings have off-street parking lots. Staff documented available, nearby spaces during the key weekday times in the following locations: Eastbound 27 th Street, past Telegraph Avenue (directly across 27th Street): 33% of 4 unmetered spaces were occupied (6 observations). Eastbound, 27 th Street, approaching Telegraph Avenue (diagonally across 27th Street, adjacent to the Sears Lofts): 5% of 8 metered spaces were occupied (5 observations). Metered parking is also available on Telegraph Avenue although counts were not taken in this location. PWA-TSD, 27 th Street Bikeway, Parking Occupancy Study Results and Recommendations April 2007 page 2 of 3
22 Next steps: Contact property management at two medical buildings to get input on proposal. Location #4. Westbound, approaching Martin Luther King Jr. Way Spaces proposed for removal: 3 stalls, un-metered Number of Observations: 15 Average Occupancy: 2 / 67% Land use: freeway frontage Discussion: Staff observed trailers illegally parked at this location, as well as cars being towed. Removal of parking here could help address neighborhood blight issues. The three spaces proposed for removal are adjacent to underutilized, un-metered parking under the freeway. PWA-TSD, 27 th Street Bikeway, Parking Occupancy Study Results and Recommendations April 2007 page 3 of 3
23 TABLE 1: 27th Street Parking Occupancy, Key Observation Times (51 total observations) Location 1. EB approaching MLK Jr. Way 2. EB approaching Broadway 3. WB approaching Telegraph 4. WB approaching MLK # of spaces Observer Date/Time 310 ft; unmetered 350 ft; un/metered (two handicap stalls) 200 ft; un/metered 100 ft; unmetered Sunday, 10 to noon Patton Sunday, 3/11/07, 11:30am 6 2 Stanley Sunday, 3/18/07, 11:00am Patton Sunday, 3/25/07, 10:00am Patton Sunday, 4/1/07, 10:00am WEEKDAYS Mid-morning or mid-day (9am-4pm) Stanley Tuesday, 3/13/07, 1:45pm Stanley Weds, 3/14/07, 2pm Lorne Leon Weds, 3/7/07, 2pm 8 1 Stanley Weds, 3/14/07, 11am Stanley Mon, 2/26/07, 9:15 am Stanley Thurs, 3/1/07, 9:15 am Lorne Leon Weds, 3/7/07, 10am 3 1 Stanley Tues, 3/20/07, 9am 2 Weekday, Evening (6-9pm) Stanley Thurs, 3/1/07, 7:30 pm Stanley Thurs, 3/15/07, 9:45pm Stanley Tues, 3/13/07, 7:20p Stanley Weds, 2/28/07; 6:15-30pm Stanley Weds, 3/14/07, 7pm 3 Stanley Thurs, 3/22/07, 6:30pm Average # Vehicles Percent Occupied 61% 32% 37% 67% TABLE 2: 27th Street Parking Occupancy, Other Observation Times (28 total observations) Location 1. EB approaching MLK Jr. Way 2. EB approaching Broadway 4. WB approaching Telegraph 5. WB approaching MLK # of spaces Observer Date/Time 310 ft; unmetered 350 ft; un/metered (two handicap stalls) 200 ft; un/metered 100 ft; unmetered Saturday afternoon/evening Patton Sat. 3/10/07, 5:30pm 0 2 Patton Sat., 3/3/07, 4:30pm 0 1 Saturday morning Patton Sat. 3/10/07, 9:30am 0 2 Patton Sat., 3/3/07, 10:30am 2 1 Sunday morning Patton Sun., 3/4/07, 9:30am 9 2 Sunday afternoon/evening Patton Sun, 3/4/07, 4:00pm 6 2 Patton Sunday, 3/18/07, 1:30pm 4 1 Patton Sunday, 3/25/07, 5:30pm Weekday morning Stanley Fri, 3/16/06, 8:45am Stanley Thurs, 3/15/07, 8:45am Stanley Weds, 3/14/07, 8:45am Stanley Mon, 3/19/07, 8:45am 0 Stanley Weds, 3/20/07, 8:45am 1 Average # Vehicles Percent Occupied 20% 14% 45% PWA-TSD, 27th Street Bikeway, Parking Occupancy Study Results and Recommendations April 2007 page 4 of 4
East 12 th Street Bikeway Feasibility Study
Final Report East 12 th Street Bikeway Feasibility Study Prepared for: City of Oakland Public Works Agency Submitted by: 180 Grand Avenue, Suite 250 Oakland, CA 94612 Phone: (510) 839-1742; Fax: (510)
More informationRoad Conversion Study Plumas Street
Plumas Street Phase I Submitted to The Regional Transportation Commission of Washoe County Submitted by Zong Tian, Ph.D., P.E. Saeedeh Farivar Haiyuan Li, Ph.D. Center for Advanced Transportation Education
More informationEvaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation
Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad
More informationComplete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA
Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Aaron Elias, Bill Cisco Abstract As part of evaluating the feasibility of a road diet on Orange Grove Boulevard in Pasadena,
More informationEUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK
EUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK CITY OF SYRACUSE DEPARTMENT OF PUBLIC WORKS 1200 CANAL STREET EXTENSION SYRACUSE, NEW YORK 13210 DRAFT REPORT DATE: November 13,
More informationTRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio
TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client
More informationJ Street and Folsom Boulevard Lane Conversion Project (T ) Before and After Traffic Evaluation
J Street and Folsom Boulevard Lane Conversion Project (T15125400) Before and After Traffic Evaluation Prepared by Transportation Division June 2014 Executive Summary On February 12, 2013, the City of Sacramento
More informationHARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN
HARRISON STREET/OAKLAND AVENUE Community Workshop #4: Draft Plan Review December 3, 2009 D E S I G N, C O M M U N I T Y & E N V I R O N M E N T INTRODUCTIONS Key Project Staff: Alisa Shen, Project Manager,
More informationProject Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015
Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative
More informationCITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM
CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: April 1, 219 To: Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee From:
More informationALLEY 24 TRAFFIC STUDY
ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland
More informationDOWNTOWN TUPELO MAIN STREET: ROAD DIET STUDY
DOWNTOWN TUPELO MAIN STREET: ROAD DIET STUDY Since mid-2009, RPM Transportation Consultants (RPM) has worked with the Downtown Tupelo Main Street Association to evaluate traffic conditions and potential
More informationDEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:
DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,
More informationDavid DiPierro, John Amberson. Steering Committee Meeting #4 Overview
IBI GROUP 18401 Von Karman Avenue Suite 110 Irvine CA 92612 USA tel 949 833 5588 fax 949 833 5511 ibigroup.com Memorandum To/Attention Steering Committee Members Date February 17, 2016 From IBI Group Project
More informationChapter 4 Traffic Analysis
Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection
More informationDear Mr. Tweed: Sincerely, Min Zhou, P.E. Vice President
December 17, 2012 Mr. Steve Tweed City of Long Beach, Department of Public Works Traffic & Transportation Bureau, 10 th Floor City Hall 333 West Ocean Boulevard Long Beach, CA 90802 Subject: Broadway and
More information4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC
4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study
More informationList of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...
List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing
More information4.0 TRANSPORTATION SYSTEMS
Transportation Systems 4.0 TRANSPORTATION SYSTEMS This chapter examines the impacts of the Central Corridor Extension on existing roadways and traffic operations and discusses the transit service, operations,
More informationBridge Street Corridor Study Report
Bridge Street Corridor Study Report Prepared for: Prepared by: BRIDGE STREET CORRIDOR STUDY REPORT PREPARED FOR: CITY OF ARROYO GRANDE COMMUNITY DEVELOPMENT DEPARTMENT 300 EAST BRANCH STREET ARROYO GRANDE,
More informationEAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA
T R A F F I C I M P A C T A N A LY S I S EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA April 217 T R A F F I C I M P A C T A N A LY S I S EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA Submitted
More informationShockoe Bottom Preliminary Traffic and Parking Analysis
Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA
More informationHenderson Avenue Mixed-Use Development
Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic
More informationFigure 1: Vicinity Map of the Study Area
ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove
More information9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.
9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major
More informationMagnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.
Magnolia Place Traffic Impact Analysis Prepared for: City of San Mateo Prepared by: Hexagon Transportation Consultants, Inc. Updated January 4, 2010 Table of Contents 1. Introduction...1 2. Existing Conditions...6
More informationTraffic Impact Analysis Chatham County Grocery Chatham County, NC
Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...
More informationTraffic Impact Study WestBranch Residential Development Davidson, NC March 2016
Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC
More informationDUNBOW ROAD FUNCTIONAL PLANNING
DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report
More informationWalmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota
Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn
More informationTraffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas
ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest
More informationDr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018
Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 What s Happening The City plans to mill and resurface Dr. M.L.
More informationTRAFFIC IMPACT ANALYSIS
TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014
More informationOperational Comparison of Transit Signal Priority Strategies
Operational Comparison of Transit Signal Priority Strategies Revision Submitted on: November, 0 Author: Adriana Rodriguez, E.I Assistant Engineer Parsons Brinckerhoff 0 South Orange Avenue, Suite 00 Orlando,
More informationCycle Track Design Best Practices Cycle Track Sections
Design Best Practices Sections It is along street segments where the separation and protection methods of cycle tracks offer more comfort than conventional bicycle lanes, and are more attractive to a wide
More informationHarrah s Station Square Casino
Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December
More informationTransportation Impact Study for Abington Terrace
Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,
More informationTRAFFIC OPERATIONS ANALYSIS REPORT. Pacheco Boulevard Alignment Study and Alternatives Analysis
TRAFFIC OPERATIONS ANALYSIS REPORT Pacheco Boulevard Alignment Study and Alternatives Analysis PREPARED FOR: CITY OF MARTINEZ AND CONTRA COSTA COUNTY OCTOBER 2016 FINAL REPORT Prepared By: under contract
More informationDRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners
DRAFT Corridor study Honeysuckle Road October 2017 Prepared for the City of Dothan, AL Prepared by TABLE OF CONTENTS SECTION I... 1 STUDY SUMMARY... 1 INTRODUCTION... 1 CONCLUSIONS... 5 SECTION II... 7
More informationTRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for:
TRAFFIC IMPACT STUDY For Creekside Thornton, Colorado August 215 November 215 Revised: August 216 Prepared for: Jansen Strawn Consulting Engineers 45 West 2 nd Avenue Denver, Colorado 8223 Prepared by:
More information5858 N COLLEGE, LLC N College Avenue Traffic Impact Study
5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...
More informationTRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION
TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212
More informationDate: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment
To: Peter Cavanaugh General Electric From: David Bohn, PE Ryan White, PE Date: April 4, 217 Project #: 13421. Re: / Traffic/Intersection Assessment Consistent with the Cooperation Agreement between the
More informationFigure 1: East West Connector Alignment Alternatives Concept Drawing
Page 2 of 9 Figure 1: East West Connector Alignment Alternatives Concept Drawing The Montebello Drive extension will run north south and connect Wilsonville Road to the Boones Ferry Road to Brown Road
More informationTraffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC
Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.
More informationTABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS...
TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... IX 1 INTRODUCTION... 1 1.1 Project Overview... 1 1.2 Analysis Scenarios...
More informationGrant Avenue Streetscape
REPORT TYPE GOES HERE Grant Avenue Streetscape PREPARED FOR City of Manassas 9027 Center Street Manassas, VA 20110 PREPARED BY 8300 Boone Boulevard Suite 700 Vienna, Virginia 22182 571.389.8121 July 31,
More informationTHIS PAGE LEFT BLANK INTENTIONALLY
GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,
More informationMultimodal Analysis in the 2010 Highway Capacity Manual
Multimodal Analysis in the 2010 Highway Capacity Manual It s not just cars anymore! Jamie Parks, AICP HCAT Conference May 9-10, 2011 Multimodal LOS in the 2010 HCM History and background Overview of methods
More informationClay Street Realignment Project Traffic Study
Final Clay Street Realignment Project Traffic Study November 24, 2009 Prepared for: City of Placerville RS07-2466 2990 Lava Ridge Court, Suite 200 Roseville, CA 95661 (916) 773-1900 Fax (916) 773-2015
More informationStation 1: Street & Sidewalk Upgrades
Station 1: Street & Sidewalk Upgrades Existing no left turn; Potential left turn arrow, see Circulation Study boards for more information Thru-lane guidance Improved lead-in green bike lane 17TH ST CASTRO
More informationAbrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677
Transportation Impact Analysis Sierra College Boulevard Commercial Project City of Rocklin Prepared for: David Mohlenbrok City of Rocklin 081 Alvis Court Rocklin, CA 95677 Prepared by: 1875 Olympic Boulevard,
More information6060 North Central Expressway Mixed-Use Site Dallas, Texas
Volume 1 Traffic Impact Analysis 6060 North Central Expressway Mixed-Use Site Dallas, Texas April 30, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #063238300 Registered Firm F-928 Traffic
More informationUniversity Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007
Technical Memorandum May 2007 Syracuse Metropolitan Transportation Council Edwards and Kelcey with Wallace Roberts and Todd Alta Planning and Design CONTENTS SECTION ONE- INTRODUCTION...1 SECTION TWO-
More informationTRAFFIC ASSESSMENT River Edge Colorado
TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF
More informationLos Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation
Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto
More informationTable of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents
Traffic Impact Study Hudson Street Parking Garage MC Project No.: 151714A Table of Contents Table of Contents I. INTRODUCTION... 2 II. EXISTING CONDITIONS... 5 III. 215 EXISTING TRAFFIC CONDITIONS... 6
More informationHarbord Street and Hoskin Avenue Bicycle Lane Upgrades
STAFF REPORT ACTION REQUIRED and Bicycle Lane Upgrades Date: April 22, 2014 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Transportation Services 19 and
More informationEvaluation and Changes to Pedestrian Priority Phase Signal (Scramble Crossing) at Bay Street and Bloor Street
PW2.2 STAFF REPORT ACTION REQUIRED Evaluation and Changes to Pedestrian Priority Phase Signal (Scramble Crossing) at Bay Street and Bloor Street Date: February 12, 2015 To: From: Public Works and Infrastructure
More informationTAKOMA METRO STATION
TKOM METRO STTION Traffic nalysis Technical Memorandum Station Planning in Support of Joint evelopment Job No. 13-FQ165-LN-2 November 213 WSHINGTON METROPOLITN RE TRNSIT UTHORITY (WMT) Takoma Metro Station
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO.: 10.3 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various traffic and parking modifications on Bay Street
More informationFINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM
FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM July 2014 FINAL (SR 43) Project Development and Environment Study From State Road 60 (Adamo Drive) to I-4 (SR 400) Hillsborough County, Florida Work Program Item
More informationPlace Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012
Update for the May 31 st, 2012 Traffic Impact Study Prepared for Broccolini Construction 111-23596-00 September 20 th, 2012 2611 Queensview Drive, Suite 300, Ottawa, Ontario CANADA K2B 8K2 Telephone: 613-829-2800
More informationBICYCLE LEVEL OF SERVICE for URBAN STREETS. Prepared by Ben Matters and Mike Cechvala. 4/16/14 Page 1
BICYCLE LEVEL OF SERVICE for URBAN STREETS Prepared by Ben Matters and Mike Cechvala 4/16/14 Page 1 Introduction The methodology used for the Bicycle (BLOS) analysis is from the Highway Capacity Manual
More informationReference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis
To James Hinkamp and Tony Coe, City of Lafayette Date January 19, 2017 Copies Reference number 243381/VP From Michael Iswalt and Vanessa Peers File reference 4-05 Subject Lafayette Downtown Congestion
More informationArlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014
Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks Thomas Jefferson Working Group Meeting #6 November 10, 2014 2 3 INTRODUCTION 4 Goal of our work: Identify and assess multi-modal
More informationOttawa Beach Road Study
Ottawa Beach Road Study Prepared For: Park Township September 30, 2014 Project No. G140303 OTTAWA BEACH ROAD STUDY PREPARED FOR: PARK TOWNSHIP SEPTEMBER 30, 2014 PROJECT NO. G140303 TABLE OF CONTENTS 1.0
More informationMilitary Road Safety Improvements
Military Road Safety Improvements 26 th Road North to 31 st Street North SUMMARY OF DATA REVIEW AND PRELIMINARY RECOMMENDATIONS Prepared for: Department of Environmental Services Traffic Engineering and
More informationClybourn Ave. Protected Bike Lane Study Halsted St. to Division St.
Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St. Nathan Roseberry, Senior Engineer Pam Broviak, Project Manager July 24, 2014 Agenda Project Goals Existing Roadway Conditions Traffic
More information7 th Street Bike Lane Traffic Impact Study
7 th Street Bike Lane Traffic Impact Study Submitted by: San Francisco Department of Parking and Traffic Michael Sallaberry June 11, 2001 EXECUTIVE SUMMARY This report presents the Department of Parking
More informationTruck Climbing Lane Traffic Justification Report
ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:
More information3.9 - Transportation and Traffic
Transportation and Traffic 3.9 - Transportation and Traffic This section describes the potential transportation and traffic effects of project implementation on the project site and its surrounding area.
More informationTraffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017
Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI
More information5.3 TRAFFIC, CIRCULATION AND PARKING
5.3 TRAFFIC, CIRCULATION AND PARKING This section is based upon the Downtown Lancaster Specific Plan Traffic Impact Analysis (April 2, 2008) and the Downtown Lancaster Specific Plan Parking Analysis (May
More informationDowntown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services
Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue Bus Rapid and Conventional Transit Planning and Design Services City of Saskatoon February 2018 Project Team HDR Corporation
More informationDell Range Boulevard Corridor Study Powderhouse Road to College Drive. Prepared for: Cheyenne Metropolitan Planning Organization
Dell Range Boulevard Corridor Study Powderhouse Road to College Drive Prepared for: Cheyenne Metropolitan Planning Organization Draft August 2014 Dell Range Boulevard Corridor Study (Powderhouse Road to
More informationAppendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD
Appendix T CCMP 3.3.4 TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD 3.3.4 Trail Traffic and Transportation Design Multi-use trails have certain design standards, which vary depending on the agency that
More informationSTILLWATER AVENUE CORRIDOR STUDY Old Town, Maine
Draft Study STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine SUBMITTED TO: BANGOR AREA COMPREHENSIVE TRANSPORTATION SYSTEM SUBMITTED BY: I MAY 23, 2017 DRAFT STILLWATER AVENUE STUDY FINAL REPORT Table
More informationToronto and East York Community Council. Director, Transportation Services, Toronto and East York District
No Turn on Red Regulations STAFF REPORT ACTION REQUIRED Date: June 1, 2010 To: From: Toronto and East York Community Council Director, Transportation Services, Toronto and East York District Wards: Trinity
More informationEXECUTIVE SUMMARY. Page 1 of 6
EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the
More informationAngie Silva Kitsap County Commissioners Office Stef Herzstein, PE, PTOE Transpo Group Jessica Lambert Transpo Group
DRAFT MEMORANDUM Date: September 30, 2016 TG: 16125.00 To: From: cc: Subject: Angie Silva Kitsap County Commissioners Office Stef Herzstein, PE, PTOE Transpo Group Jessica Lambert Transpo Group Erik Rundell
More informationList of Exhibits...ii
One Brickell Traffic Study TABLE OF CONTENTS List of Exhibits...ii EXECUTIVE SUMMARY...1 1. INTRODUCTION...2 1.1 Study Area...2 1.2 Study Objective...5 2. EXISTING TRAFFIC CONDITIONS...6 2.1 Data Collection...6
More information4.12 TRANSPORTATION Executive Summary. Setting
4.12 TRANSPORTATION 4.12.1 Executive Summary This section is based on the Multimodal Transportation Impact Study (TIS; 2016) prepared by Omni-Means, Ltd. to evaluate projected transportation impact conditions
More informationAverage Delay/Vehicle (sec/veh) Signalized. Unsignalized Intersection
Attachment: Traffic Analysis Results Traffic simulation modeling analysis was completed for Santa Cruz Ave from Alameda De Las Pulgas to Junipero Serra Blvd. Analysis was performed for existing conditions
More informationAppendix B: Forecasting and Traffic Operations Analysis Framework Document
Existing Conditions Report - Appendix Appendix B: Forecasting and Traffic Operations Analysis Framework Document This document defines the methodology and assumptions that will be used in the traffic forecasting
More informationINDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.
INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting
More informationTraffic Signal Optimization Project (Hosman Road) (Future Coordinated Corridor)
Onondaga County Department of Transportation Traffic Signal Optimization Project (Hosman Road) (Future Coordinated Corridor) Prepared for: Syracuse Metropolitan Transportation Council 126 North Salina
More informationActive Transportation Facility Glossary
Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike
More informationNorth Park Mid-City Bikeways Project: Traffic and Safety Impact Assessment
FINAL REPORT North Park Mid-City Bikeways Project: University Bikeway Traffic and Safety Impact Assessment April 23, 2018 Lead Agency: San Diego Association of Governments (SANDAG) 401 B Street, Suite
More informationTraffic Impact Memorandum. May 22, 2018
BISHOP PROFESSIONAL DEVELOPMENT BUILDING Proposed Land-use Change & Parking Modification 3601 SW 31st Street Topeka, Kansas 66614 CFS Project No. 185077 Traffic Impact Memorandum May 22, 2018 Prepared
More informationTABLE TRAFFIC ANALYSIS SCENARIOS
4.11 TRANSPORTATION The potential traffic impacts of the proposed project are evaluated in the Buena Park Beach/Orangethorpe Mixed Use Project Traffic Analysis (Traffic Analysis) by Austin-Foust Associates
More informationTRAFFIC STUDY GUIDELINES Clarksville Street Department
TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two
More informationMission Street Medical Office Development
reet Medical Office Development Traffic Impact Analysis Prepared for: Palo Alto Medical Foundation February 23, 2012 Hexagon Office: 7888 Wren Avenue, Suite B121 Gilroy, CA 95020 Hexagon Job Number: 11RD11
More informationMEMORANDUM. Sutter Street Bicycle Lanes, Stockton, CA SF
MEMORANDUM Date: To: From: Subject: PURPOSE Anthony J. Lopes, Siegfried Engineering Christine Carey & Matthew Ridgway, Fehr & Peers Sutter Street Bicycle Lanes, Stockton, CA SF09-0468 The City of Stockton
More information7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION
7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION 7.1 INTRODUCTION & METHODOLOGY FEASIBILITY REPORT Congestion hot spot problem locations have been assessed using the
More information133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas
133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS Overland Park, Kansas September 1, 2017 TABLE OF CONTENTS 1. INTRODUCTION... 1 2. LITERATURE REVIEW... 1 3. CONCEPT
More informationCITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY
RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study
More informationGateway Transportation Study
Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213 Back of
More informationD.13 Transportation and Traffic
This section addresses transportation and traffic issues and impacts related to the Proposed Project. Section D.13.1 provides a description of the affected environment for the Proposed Project. Applicable
More informationProject Goals and Objectives
Project Goals and Objectives Goal 1: Goal 2: Goal 3: Transform Coast Highway into a Complete Street that accommodates all roadway users (pedestrians, bicyclists, and autos) Objectives: Improve the pedestrian
More information