PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3

Size: px
Start display at page:

Download "PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3"

Transcription

1 PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 1 WORK DESCRIPTION 2 WORK DESCRIPTION 3 Install Remove Repair

2 613 IMPACT ATTENUATOR ACTIVITY DESCRIPTION Repair, install, remove and maintain impact attenuator systems adjacent to the roadway. WORK DESCRIPTION 1 Install WORK DESCRIPTION 2 Remove WORK DESCRIPTION 3 Repair TRAFFIC CONTROL Flagging operations are required for work activities that require equipment, personnel, materials, or any vehicles to encroach upon a travel lane or within 1 foot of a travel lane. When the work may be performed without the necessity for equipment, personnel, materials, or vehicles to encroach within 1 foot of an adjacent travel, utilize right shoulder closures. FLAGGING OPERATIONS DRAWING A - FLAGGING OPERATIONS DRAWING B(1) - FLAGGING OPERATIONS STOP SIGN CONTROLLED SIDE ROADS DRAWING B(2) - FLAGGING OPERATIONS 4-WAY STOP CONTROLLED INTERSECTION DRAWING C(1) - FLAGGING OPERATIONS TRAFFIC SIGNAL CONTROLLED INTERSECTION LAW ENFORCEMENT OFFICER(S) DRAWING C(2) - FLAGGING OPERATIONS TRAFFIC SIGNAL CONTROLLED INTERSECTION FLAGGERS DRAWING D(1) - FLAGGING OPERATIONS BEGINNING at an INTERSECTION with a TWO-LANE TWO-WAY ROADWAY DEPARTURE LANE 613-1

3 DRAWING D(2) - FLAGGING OPERATIONS TERMINATING at an INTERSECTION with a TWO-LANE TWO-WAY ROADWAY APPROACH LANE DRAWING E(1) DRAWING E(2) - FLAGGING OPERATIONS INTERSECTIONS with ROADWAYS DRAWING F(1) DRAWING F(2) - FLAGGING OPERATIONS INTERSECTIONS with INTERMEDIATE SPEED to HIGH SPEED 40 MPH - 60 MPH ROADWAYS DRAWING FLAGGING OPERATIONS SINGLE FLAGGER OPERATION LOW VOLUME TO INTERMEDIATE SPEED DRAWING A - RIGHT SHOULDER CLOSURE 613-2

4 SECONDARY AND PRIMARY ROADWAYS Lane closures are required for work activities that require equipment, personnel, materials, or any vehicles to encroach upon a travel lane or within 1 foot of a travel lane. When the work may be performed without the necessity for equipment, personnel, materials, or vehicles to encroach within 1 foot of an adjacent travel, utilize shoulder closures. LANE CLOSURES DRAWING LANE CLOSURE DRAWING A - LANE CLOSURE INTERMEDIATE SPEED TO HIGH SPEED 40 MPH - 60 MPH DRAWING B - RIGHT SHOULDER CLOSURE DRAWING C - RIGHT SHOULDER CLOSURE (MINOR ENCROACHMENT) DRAWING D - LEFT SHOULDER CLOSURE DIVIDED HIGHWAY w/ GRASSED EARTH MEDIAN (MINOR ENCROACHMENT) DRAWING LEFT SHOULDER CLOSURE DRAWING LEFT SHOULDER CLOSURE 613-3

5 INTERSTATE ROADWAYS Lane closures are required for work activities that require equipment, personnel, materials, or any vehicles to encroach upon a travel lane or within 10 feet of a travel lane. When the work may be performed without the necessity for equipment, personnel, materials, or vehicles to encroach within 10 feet of an adjacent travel, utilize shoulder closures. LANE CLOSURES DRAWING A - LANE CLOSURE DRAWING B - LANE CLOSURE EXIT / ENTRANCE RAMPS DRAWING RIGHT SHOULDER CLOSURE DRAWING LEFT SHOULDER CLOSURE NARROW MEDIAN DRAWING LEFT SHOULDER CLOSURE DRAWING LEFT SHOULDER CLOSURE DRAWING LEFT SHOULDER CLOSURE CASE II / CASE II 613-4

PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4

PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4 PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 1 WORK DESCRIPTION 2 WORK DESCRIPTION 3 WORK DESCRIPTION 4 Repair Install Remove Clean 306 DRAINAGE PIPE ACTIVITY DESCRIPTION Install, repair, clean,

More information

PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT

PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT PERFORMANCE ACTIVITY 405 LIMB MANAGEMENT 405 LIMB MANAGEMENT ACTIVITY DESCRIPTION Cut and/or remove and/or grind tree limbs from the right-of-way. TRAFFIC CONTROL Utilize intermittent mobile operations

More information

PERFORMANCE ACTIVITY 401 MOWING WORK DESCRIPTION 5

PERFORMANCE ACTIVITY 401 MOWING WORK DESCRIPTION 5 PERFORMANCE ACTIVITY 401 MOWING WORK DESCRIPTION 1 WORK DESCRIPTION 2 WORK DESCRIPTION 3 WORK DESCRIPTION 4 WORK DESCRIPTION 5 Brush Management Hand Trimming Outdoor Advertising Window Routine Safety 401

More information

WORK ZONE TRAFFIC CONTROL PROCEDURES

WORK ZONE TRAFFIC CONTROL PROCEDURES WORK ZONE SETUP / REMOVAL WORK ZONE TRAFFIC CONTROL PROCEDURES When installing a work zone, install the advance warning signs on all approaches prior to installing the traffic control devices. Perform

More information

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES April 1, 2017 WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES Table of Contents

More information

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA Addendum Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA 22406-1022 800-272-8772 This material is based upon work supported by

More information

REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL. Ginger Quinn & Paul Kelley April 11, 2018

REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL. Ginger Quinn & Paul Kelley April 11, 2018 REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL Ginger Quinn & Paul Kelley April 11, 2018 ADA & District Traffic Engineer Added in various sections Work Zone Pedestrian and Bicycle Guidance document VDOT

More information

Appendix Work Zone Traffic Control

Appendix Work Zone Traffic Control ppendix Work Zone Traffic Control The purpose of this appendix is to present basic guidelines for work zone traffic control and to supplement the Highway Work Zone Safety Checklist. This appendix presents

More information

GUIDELINES FOR EMERGENCY TRAFFIC CONTROL

GUIDELINES FOR EMERGENCY TRAFFIC CONTROL GUIDELINES FOR EMERGENCY TRAFFIC CONTROL TABLE OF Contents Page Introduction...1 Chapter 6I of the 2009 MUTCD...2 Reason for Control...6 Components of Incident Management Area...7 Traffic Control Devices

More information

CHAPTER 6H. TYPICAL APPLICATIONS

CHAPTER 6H. TYPICAL APPLICATIONS Section 6H.01 Typical Applications Support: CHAPTER 6H. TYPICAL APPLICATIONS Chapter 6G contains discussions of typical temporary traffic control activities. Chapter 6H presents typical applications for

More information

CHAPTER 6H. TYPICAL APPLICATIONS

CHAPTER 6H. TYPICAL APPLICATIONS 2006 Edition Page 6H-1 CHAPTER 6H. TYPICAL APPLICATIONS Section 6H.01 Typical Applications Support: Whenever the acronym TTC is used in this Chapter, it refers to temporary traffic control. Standard: The

More information

DEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space

DEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space DEFINITIONS Activity Area - that part of a TTC zone activity area where the work actually takes place. It consists of the work space, traffic space and one or more buffer spaces. Advance Warning Area -

More information

2004 Traffic and Safety Notes. Cross Reference between the Old Note Number and the New Note Number

2004 Traffic and Safety Notes. Cross Reference between the Old Note Number and the New Note Number Michigan Department of Transportation 2004 Traffic and Safety Notes Cross Reference between the Old Note Number and the New Note Number OLD NEW Number Number Title (Prior to 2004) 1.1.1 101-Series General

More information

Characteristics of. Entering & Exiting High Speed Considerations

Characteristics of. Entering & Exiting High Speed Considerations Mod 6 Characteristics of Expressways Entering & Exiting High Speed Considerations Characteristics of an Expressway Controlled access (limited entry and exit) High speed (up to 65 mph) Divided by a barrier

More information

2017 Changes to the 2011 MMUTCD January 2017

2017 Changes to the 2011 MMUTCD January 2017 2017 Changes to the 2011 MMUTCD January 2017 The design for the Weight Limit symbol sign (R12-5) has been modified to show a threeunit vehicle as the third line of the regulatory weight limit sign. This

More information

Speed Control & Limits

Speed Control & Limits Speed Control & Limits Exceeding the speed limit is a common contributing factor of fatal and other types of accidents. *25 mph* School zones, business or residential districts *55 mph* Certain state highways

More information

Stationary And Slowly Moving Work Zones On Rural And Urban Roads. Kenneth A. Swain

Stationary And Slowly Moving Work Zones On Rural And Urban Roads. Kenneth A. Swain Stationary And Slowly Moving Work Zones On Rural And Urban Roads Kenneth A. Swain Session Objectives Identify procedures for the placement of Short Term Stationary and Slowly Moving Work Zones on rural

More information

General References Definitions. (1) Design Guidance. (2) Supporting Information

General References Definitions. (1) Design Guidance. (2) Supporting Information Chapter 1240 Turning Roadways 1240.01 General 1240.02 References 1240.03 Definitions 1240.04 Turning Roadway Widths 1240.05 Documentation 1240.01 General The roadway on a curve may need to be widened to

More information

Identify the letter of the choice that best completes the statement or answers the question.

Identify the letter of the choice that best completes the statement or answers the question. Chapter 02 - Practice Questions Multiple Choice Identify the letter of the choice that best completes the statement or answers the question. 1) No-parking zones often are near a. fire hydrants, curves,

More information

Traffic Control Inspection Checklist Segment:

Traffic Control Inspection Checklist Segment: Traffic Control Inspection Checklist Segment: Simon Contractors Simon Contractors Originator: Description Reviewed by: Initials Date Distribution: Traffic Quality Manager, Site Assistant Traffic Manager

More information

Module 5: Navigating Roadways

Module 5: Navigating Roadways Module 5: Navigating Roadways Topic 1: Intersections 1. One out of FATAL crashes occur at intersections. 2. Label the intersection warning signs: 3. When possible, begin searching seconds ahead of the

More information

Including Revision 1 dated May 2012 and Revision 2 dated May 2012

Including Revision 1 dated May 2012 and Revision 2 dated May 2012 Including Revision 1 dated May 2012 and Revision 2 dated May 2012 Page 634 2009 Edition Notes for Figure 6H-1 Typical pplication 1 Work eyond the Shoulder 1. If the work space is in the median of a divided

More information

Traffic Signs and Signals

Traffic Signs and Signals CHAPTER FOUR Traffic Signs and Signals Traffic signs control traffic flow, making streets and highways safer for drivers, bicyclists and pedestrians. These signs, which are posted by the Indiana Department

More information

Major Grady Carrick Florida Highway Patrol PROCEDURES FOR

Major Grady Carrick Florida Highway Patrol PROCEDURES FOR Major Grady Carrick Florida Highway Patrol PROCEDURES FOR ROLLING ROADBLOCKS ROLLING ROADBLOCKS Objectives Review the need for safety Identify applications Establish planning and resource requirements

More information

CHAPTER 6I. CONTROL OF TRAFFIC THROUGH TRAFFIC INCIDENT MANAGEMENT AREAS Section 6I.01 General

CHAPTER 6I. CONTROL OF TRAFFIC THROUGH TRAFFIC INCIDENT MANAGEMENT AREAS Section 6I.01 General May 20, 2011 DRAFT 6I-1 CHAPTER 6I. CONTROL OF TRAFFIC THROUGH TRAFFIC INCIDENT MANAGEMENT AREAS Section 6I.01 General 01 The National Incident Management System (NIMS) has been adopted nationally and

More information

Temporary Traffic Control for Highway Work Zones

Temporary Traffic Control for Highway Work Zones Temporary Traffic Control for Highway Work Zones MONTHLY DELMARVA MISS UTILITY MEMBER MEETING MARCH 20, 2014 PRESENTED BY: Adam Weiser, P.E. PTOE Safety Programs Manager Delaware Department of Transportation

More information

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities 6G.01 Typical Applications Each temporary traffic control (TTC) zone is different. Many variables, such as location of work, highway type,

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

Florida Class E Knowledge Exam Road Rules Practice Questions

Florida Class E Knowledge Exam Road Rules Practice Questions 1. If you are being followed too closely while driving, you should: A. Drive closer to the car in front of you. B. Speed up to increase the distance between you and the following vehicle. C. Slow down

More information

TRAFFIC ALERT FOR FEBRUARY 26 to MARCH 2, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR FEBRUARY 26 to MARCH 2, 2018 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE February 23, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18-039 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

TEMPORARY TRAFFIC CONTROL GUIDELINES FOR HIGHWAY-RAIL GRADE CROSSINGS

TEMPORARY TRAFFIC CONTROL GUIDELINES FOR HIGHWAY-RAIL GRADE CROSSINGS TEMPORARY TRAFFIC CONTROL GUIDELINES FOR HIGHWAY-RAIL GRADE CROSSINGS 1.0 INTRODUCTION 1.1 Purpose The Southern California Regional Rail Authority (SCRRA) is the designated track owner of the Metrolink

More information

New Trends In Temporary Traffic Control (TTC) Spring Occupational Safety & Health Committee Conference Philadelphia, PA

New Trends In Temporary Traffic Control (TTC) Spring Occupational Safety & Health Committee Conference Philadelphia, PA New Trends In Temporary Traffic Control (TTC) Spring Occupational Safety & Health Committee Conference Philadelphia, PA Michael Kelly Work history - Fire service member of 30 years (retired at the rank

More information

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications A - Typical two-lane, two-way marking with passing permitted in both directions B - Typical two-lane, two-way marking with no-passing zones

More information

CITY OF SASKATOON COUNCIL POLICY

CITY OF SASKATOON COUNCIL POLICY ORIGIN/AUTHORITY Clause 1, Report No. 1-1980 and Clause 4, Report No. 22-1990 of the Works and Utilities Committee; Clause 6, Report No. 17-2004 of the Planning and Operations Committee; and Clause D5,

More information

FOR LOOP RAMPS-TAPERED DECELERATION LANE

FOR LOOP RAMPS-TAPERED DECELERATION LANE 6" WHITE DOTTED LINE: 5 MARK, 20 SKIP 6" WHITE CRYSTAL MONO-DIRECTIONAL MAIN LINE END (EVERY 50 FEET) 50 FEET BEYOND LAST CRYSTAL PAVEMENT MARKER 5 AMBER MONO-DIRECTIONAL 50 FEET BEFORE LAST CRYSTAL PAVEMENT

More information

GIS Based Non-Signalized Intersection Data Inventory Tool To Improve Traffic Safety

GIS Based Non-Signalized Intersection Data Inventory Tool To Improve Traffic Safety GIS Based Non-Signalized Intersection Data Inventory Tool To Improve Traffic Safety UNIVERSITY OF ALABAMA JENNA SIMANDL JENNY BLEIHOLDER ANDREW GRAETTINGER TIM BARNETT LUKE TAYLOR RANDY SMITH Introduction

More information

J-Turn An Intersection Safety Improvement Purdue Road School 2016 Tuesday, March 8, 2016 Brian Malone, INDOT & Josh Cook, HNTB

J-Turn An Intersection Safety Improvement Purdue Road School 2016 Tuesday, March 8, 2016 Brian Malone, INDOT & Josh Cook, HNTB J-Turn An Intersection Safety Improvement Purdue Road School 2016 Tuesday, March 8, 2016 Brian Malone, INDOT & Josh Cook, HNTB US 231 and SR 62 and SR 68 US 231 and SR 62 Intersection Traffic Data Traffic

More information

City of Prince Albert Statement of POLICY and PROCEDURE. Department: Public Works Policy No. 66. Section: Transportation Issued: July 14, 2014

City of Prince Albert Statement of POLICY and PROCEDURE. Department: Public Works Policy No. 66. Section: Transportation Issued: July 14, 2014 Page: 1 of 8 1 POLICY 1.01 The City shall follow all of the specifications in the Manual of Uniform Traffic Control Devices for Canada, prepared by the National Committee of Uniform Traffic Control, and

More information

CHAPTER 3 SIGNS, SIGNALS AND PAVEMENT MARKINGS. Responsible Driving (Red book) NOTES & STUDY GUIDE

CHAPTER 3 SIGNS, SIGNALS AND PAVEMENT MARKINGS. Responsible Driving (Red book) NOTES & STUDY GUIDE CHAPTER 3 SIGNS, SIGNALS AND PAVEMENT MARKINGS Responsible Driving (Red book) NOTES & STUDY GUIDE Regulatory Signs Warning Signs International Signs Guide Signs Types of Road Signs Sub category (construction

More information

SUPPLEMENT HANDBOOK ON RIDERS SAFETY

SUPPLEMENT HANDBOOK ON RIDERS SAFETY SUPPLEMENT HANDBOOK ON RIDERS SAFETY June 2005 REVISED January 2016 This riders handbook is a supplement informational source only and a quick reference on safety and chapter group riding. Chapter riders

More information

Ch Driving on Expressways. Characteristics of Expressway Driving. Expressway. Types of Expressways. Why do they have fewer collisions?

Ch Driving on Expressways. Characteristics of Expressway Driving. Expressway. Types of Expressways. Why do they have fewer collisions? Ch 11 Driving on Expressways 11.1 Characteristics of Expressway Driving Expressway Is a limited-access or controlled-access highway. Types of Expressways Interstate highways Freeways Parkways * Most of

More information

TRAFFIC CONTROL DEVICES

TRAFFIC CONTROL DEVICES TRAFFIC CONTROL DEVICES SIGNS Temporary traffic control work zone signs include regulatory, warning and guide signs utilized to provide regulations, warnings and guidance information to road users impacted

More information

Water Street Promenade Engineering and Design Services

Water Street Promenade Engineering and Design Services Preliminary Design Presentation Parking & Traffic Safety Committee Water Street Promenade Engineering and Design Services July 16,2014 November 3, 2016 Education / Infrastructure / Innovation 1 Project

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: RAMP TERMINAL DESIGN SPECIFIC SUBJECT: RAMP TERMINAL AND SPEED CHANGE LANE

More information

CW20-1D 48" X 48" (Flags- See note 1) G " X 24" (See note 2)

CW20-1D 48 X 48 (Flags- See note 1) G  X 24 (See note 2) CK: DW: CK: x for mph or less mph devices may be omitted if the work area is a minimum of from the nearest traveled way. (See notes 4 & 5) x for mph or less Work Space mph x for mph or less mph (See notes

More information

Characteristics of Fatal Pedestrian Crashes on Freeways. Kay Fitzpatrick Texas A&M Transportation Institute

Characteristics of Fatal Pedestrian Crashes on Freeways. Kay Fitzpatrick Texas A&M Transportation Institute Characteristics of Fatal Pedestrian Crashes on Freeways Kay Fitzpatrick Texas A&M Transportation Institute Transportation Short Course Design Session October 15, 2013 Project Background (0-6702) Motivation:

More information

SUMMARY OF TRAFFIC CONTROL GUIDELINES FOR MAJOR INCIDENT RESPONSE SUMMARY REPORT 410-S(S) FROM

SUMMARY OF TRAFFIC CONTROL GUIDELINES FOR MAJOR INCIDENT RESPONSE SUMMARY REPORT 410-S(S) FROM SUMMARY OF TRAFFIC CONTROL GUIDELINES FOR MAJOR INCIDENT RESPONSE SUMMARY REPORT 410-S(S) FROM Guidelines for Utilization of Police Officers In Traffic Control and Enforcement on Urban Freeways Research

More information

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related

More information

FREEWAY AND SERVICE ROAD CONNECTIONS

FREEWAY AND SERVICE ROAD CONNECTIONS EDGE LINE WHITE STOP BAR SERVICE ROAD EDGE LINE DOTTED LINE (5 MARK, 20 GAP) EDGE LINE 4" WHITE BROKEN LINE 12" WHITE DOTTED LINE (5 MARK, 20 GAP) LINE LINE EDGE LINE 300 SERVICE ROAD 1/2 X (500 MAX) CHANNELIZING

More information

Edge Wedge 150 lb/ft 3

Edge Wedge 150 lb/ft 3 Page 1 of 14 Page 2 of 14 6443 OL 4774 Mill 22,098 Edge Wedge (Rock) @ 150 lb/ft 3 Page 3 of 14 Edge Wedge (Rock) @ 150 lb/ft 3 Page 4 of 14 Edge Wedge (Rock) @ 150 lb/ft 3 Page 5 of 14 Page 6 of 14 Page

More information

Guide for Law Enforcement Personnel in Work Zones

Guide for Law Enforcement Personnel in Work Zones Guide for Law Enforcement Personnel in Work Zones Table of Contents Introduction........................... 3 Roles and Responsibilities................ 5 Most Common Law Enforcement Services in Work

More information

Snohomish County Fire Chiefs Association Document #

Snohomish County Fire Chiefs Association Document # Snohomish County Fire Chiefs Association Document # 70-03-12 Traffic Safety/Apparatus Placement Approved at General membership meeting 09/03/12 1.0 Purpose The purpose of this SOG is to establish safe

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

Vermont Permit Test Flash Cards

Vermont Permit Test Flash Cards Vermont Permit Test Flash Cards Study online at quizlet.com/_aormb are the most likely places for car and motorcycle collisions to occur. intersections are areas around trucks where cars disappear 2. :

More information

CHAPTER 6G. TYPE OF TEMPORARY TRAFFIC CONTROL ZONE ACTIVITIES Section 6G.01 Typical Applications

CHAPTER 6G. TYPE OF TEMPORARY TRAFFIC CONTROL ZONE ACTIVITIES Section 6G.01 Typical Applications May 20, 2011 DRAFT 6G-1 CHAPTER 6G. TYPE OF TEMPORARY TRAFFIC CONTROL ZONE ACTIVITIES Section 6G.01 Typical Applications 01 Each TTC zone is different. Many variables, such as location of work, highway

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report February 10, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report February 10 through February 17, 2017 TREASURE COAST Construction and maintenance

More information

California Manual on Uniform Traffic Control Devices

California Manual on Uniform Traffic Control Devices California Manual on Uniform Traffic Control Devices FHWA s MUTCD 2009 Edition as amended for use in California 2012 Edition State of California Business, Transportation and Housing Agency Department of

More information

Idaho Driver Education and Training

Idaho Driver Education and Training Idaho Driver Education and Training Strategies for Controlled Access Highways Part I M13-1 Introduction to Controlled Access Highways Plans for the Interstate System," began in the late 1930s The system

More information

The procedures to be followed in undertaking Non-Emergency work depend on the degree of traffic disruption caused by the work.

The procedures to be followed in undertaking Non-Emergency work depend on the degree of traffic disruption caused by the work. APPENDIX G TRAFFIC CONTROL GUIDELINES FOR UTILITY WORK WITHIN ROADWAY RIGHTS- OF-WAY JUNE 2001 Scope of Guidelines These traffic control guidelines cover work performed by utility companies and/or their

More information

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS

CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS 2011 Edition - Revision 2 Page 275 Section 2G.01 Scope CHAPTER 2G. PREFERENTIAL AND MANAGED LANE SIGNS 01 Preferential lanes are lanes designated for special traffic uses such as high-occupancy vehicles

More information

Sign Design Manual (TEM 295-2)

Sign Design Manual (TEM 295-2) TEMPORARY TRAFFIC CONTROL SIGNS INDEX Regulatory Signs R1-1 R-1 STOP R1-2 R-2 YIELD R1-2a R-2A TO ONCOMING TRAFFIC R4-1 R-33 DO NOT PASS R4-2 R-34 PASS WITH CARE R4-3 R-35 SLOWER TRAFFIC KEEP RIGHT R4-9

More information

DRIVING ON EXPRESSWAYS/ INTERSTATE CHAPTER 11

DRIVING ON EXPRESSWAYS/ INTERSTATE CHAPTER 11 DRIVING ON EXPRESSWAYS/ INTERSTATE CHAPTER 11 SECTION 1- CHARACTERISTICS OF EXPRESSWAY DRIVING AN EXPRESSWAY IS A LIMITED-ACCESS OR CONTROLLED ACCESS HIGHWAY. VEHICLES CAN ONLY ENTER AND LEAVE AT INTERCHANGES.

More information

Everyone is a Pedestrian

Everyone is a Pedestrian Everyone is a Pedestrian Improving Pedestrian Safety in Texas Transportation and Trinity River Project Committee 26 May 2015 Everyone is a Pedestrian Federal Highway Administration [ FHWA ] Programs to

More information

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT HIGHWAY ALERT VirginiaDOT.org CONTACT: Public Affairs Oct.3, Richmondinfo@VirginiaDOT.org WEEKLY HIGHWAY ALERT RICHMOND DISTRICT COLONIAL HEIGHTS Road construction that is expected to cause delays from

More information

CHAPTER 3A. GENERAL PAGE CHAPTER 3B. PAVEMENT AND CURB MARKINGS PAGE

CHAPTER 3A. GENERAL PAGE CHAPTER 3B. PAVEMENT AND CURB MARKINGS PAGE Virginia Supplement to the 2009 MUTCD Revision 1 Page TC-3-1 PART 3. MARKINGS CHAPTER 3A. GENERAL PAGE Section 3A.01 Functions and Limitations Section 3A.02 Standardization of Application Section 3A.03

More information

Low Volume Roads: Rural and Urban

Low Volume Roads: Rural and Urban Rural Highway with less than 400 DT, and an Urban Residential Street with less than 400 DT and speeds of 0 mph or less. *Drawings Not To Scale *Drawings Not To Scale mndot.gov/fieldmanual Low Volume Low

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2)

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2) October 2004 REVISIONS (2) Chapter 11 HORIZONTAL ALIGNMENT SUPERELEVATION DEVELOPMENT 11.3(2) Chapter 12 VERTICAL ALIGNMENT VERTICAL CURVES PASSING SIGHT DISTANCE 12.5(2) VERTICAL CURVES STOPPING SIGHT

More information

Mammoet USA South, Inc. TRAFFIC CONTROL AND TRAVEL PLAN December 31, 2013 Calumet Refinery CH2M Hill Great Falls, MT.

Mammoet USA South, Inc. TRAFFIC CONTROL AND TRAVEL PLAN December 31, 2013 Calumet Refinery CH2M Hill Great Falls, MT. TRAFFIC CONTROL AND TRAVEL PLAN December 31, 2013 Calumet Refinery CH2M Hill Great Falls, MT. TRANSPORTATION PLAN Truck will enter Idaho 95 and SH128 Lewiston Idaho. Load dimensions are outlined in permit.

More information

Driver Education Ch. 4: Safe Driving Rules & Regulations. Ms. Marx

Driver Education Ch. 4: Safe Driving Rules & Regulations. Ms. Marx Driver Education Ch. 4: Safe Driving Rules & Regulations Ms. Marx Speed Control Speed is one of the most common contributing factors of fatal & other types of accidents School zones, business or residential

More information

Guidelines from the Manual on Uniform Traffic Control Devices for Streets and Highways Pertaining to Violation

Guidelines from the Manual on Uniform Traffic Control Devices for Streets and Highways Pertaining to Violation Specific Legal Statutes Relating to this Case Alleged Violation UTAH CODE 72-6-114. Restricting use of or closing highway -- Penalty for failure to observe barricade, warning light, etc. (1) A highway

More information

Work Zone Safety. Developed by HMTRI through cooperative agreement # 2 U45 ES with NIEHS

Work Zone Safety. Developed by HMTRI through cooperative agreement # 2 U45 ES with NIEHS Work Zone Safety Developed by HMTRI through cooperative agreement # 2 U45 ES006177-14 with NIEHS Goal Provide you with information to keep you: Safe in the work zone. Prevent e injury and death. 2 Introduction

More information

Hidden Oaks Elementary School

Hidden Oaks Elementary School Hidden Oaks Elementary School SCHOOL ROUTE PLAN For HIDDEN OAKS ELEMENTARY SCHOOL LOCATION 13 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

STREET and UTILITY REPAIRS WORK AREA PROTECTION GUIDE

STREET and UTILITY REPAIRS WORK AREA PROTECTION GUIDE STREET and UTILITY REPAIRS WORK AREA PROTECTION GUIDE May 2006 Street and Utility Repairs Work Area Protection Guide TABLE OF CONTENTS 1. Introduction... 1 2. Typical Applications... 11 2.1 Use of Hand-Signaling

More information

CURRENT ORIGINAL REFERENCE SECTIONS. (Typical Section) (Typical Section) The Parade Island Bay : Concept Option Summary Sheets.

CURRENT ORIGINAL REFERENCE SECTIONS. (Typical Section) (Typical Section) The Parade Island Bay : Concept Option Summary Sheets. ORIGINAL (Typical Section) CURRENT (Typical Section) 3,900 3,000 2,000 1,500 3,100 1,600 3,100 1,500 2,000 2,500 3,900 3,000 1,800 600 2,000 3,000 3,000 2,000 600 1,800 2,500 Existing Planting Traffic

More information

GWINNETT COUNTY DEPARTMENT OF TRANSPORTATION

GWINNETT COUNTY DEPARTMENT OF TRANSPORTATION GWINNETT COUNTY DEPARTMENT OF TRANSPORTATION 1 of 7 June 20, 2007 GENERAL: The following guidelines shall be used in the determination of the requirement for left turn lanes for development projects and

More information

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET NUMBER

MISSOURI HIGHWAYS AND TRANSPORTATION PLANS FOR PROPOSED STATE HIGHWAY DESIGN DESIGNATION INDEX OF SHEETS LENGTH OF PROJECT SHEET NUMBER DESIGN DESIGNATION A.A.D.T - = V = M.P.H MISSOURI AND TRANSPORTATION PLANS FOR PROPOSED HIGHWAY INDE OF SHEETS SHEET DESCRIPTION NUMBER TITLE SHEET --------------------------- 1 TYPICAL SECTIONS (TS) (1

More information

CHAPTER 2: SIGNALS, SIGNS AND PAVEMENT MARKINGS

CHAPTER 2: SIGNALS, SIGNS AND PAVEMENT MARKINGS CHAPTER 2: SIGNALS, SIGNS AND PAVEMENT MARKINGS This chapter provides the information you need to know about Pennsylvania roadways. It covers: Signals Signs Pavement Markings SIGNALS Traffic signals are

More information

Roadway Safety S.O.G. and Training Outline. Captain Rodney J. Palmer. Oak Creek Fire Department

Roadway Safety S.O.G. and Training Outline. Captain Rodney J. Palmer. Oak Creek Fire Department Roadway Safety S.O.G. 1 Roadway Safety S.O.G. and Training Outline Captain Rodney J. Palmer Oak Creek Fire Department 7000 S. 6 th Street Oak Creek Wisconsin, 53154 414-570-5630 rpalmer@oakcreekwi.org

More information

Subject: Use of Pull-off Areas in Work Zones Page: 1 of 13. Brief Description: Guidance for the use and placement of pull-off area in work zones.

Subject: Use of Pull-off Areas in Work Zones Page: 1 of 13. Brief Description: Guidance for the use and placement of pull-off area in work zones. 6 - G2 Subject: Use of Pull-off Areas in Work Zones Page: 1 of 13 MdMUTCD REF. NO. None Date Issued: 09/09 Effective Date: 09/09 Brief Description: Guidance for the use and placement of pull-off area in

More information

How would you like it if people drove their cars thru your office?

How would you like it if people drove their cars thru your office? How would you like it if people drove their cars thru your office? Work Zone Safety More than 40,000 people are injured each year as a result of motor vehicle crashes in work zones How serious is the WZ

More information

September 2008 REVISIONS (1) SYMMETRICAL VERTICAL CURVE EQUATIONS 12.5(12) VERTICAL CURVE COMPUTATIONS 12.5(14) TURNING LANE LENGTHS 15.

September 2008 REVISIONS (1) SYMMETRICAL VERTICAL CURVE EQUATIONS 12.5(12) VERTICAL CURVE COMPUTATIONS 12.5(14) TURNING LANE LENGTHS 15. September 2008 REVISIONS (1) CHAPTER 12 VERTICAL ALIGNMENTS SYMMETRICAL VERTICAL CURVE EQUATIONS 12.5(12) VERTICAL CURVE COMPUTATIONS 12.5(14) CHAPTER 15 INTERSECTIONS TURNING LANE LENGTHS 15.5(10) CHAPTER

More information

MINNESOTA FLAGGING HANDBOOK

MINNESOTA FLAGGING HANDBOOK MINNESOTA FLAGGING HANDBOOK January, 2018 Flagging Handbook This Flagging Handbook has been developed following the guidelines of the 2011 edition of the Minnesota Manual on Uniform Traffic Control Devices,

More information

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table

More information

c. continue onto the expressway and use the next exit ramp.

c. continue onto the expressway and use the next exit ramp. Chapter 11 - Practice Questions Multiple Choice Identify the letter of the choice that best completes the statement or answers the question. 1) The exit ramp you want to use is entirely blocked by traffic.

More information

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc.

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc. SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN 6926 By Josh Larson McLaury Engineering Inc. Project Limits SD 50 from Broadway to Burleigh and from Marne Creek to Archery

More information

South Carolina Department of Transportation. Engineering Directive

South Carolina Department of Transportation. Engineering Directive South Carolina Department of Transportation Engineering Directive Directive Number: ED-22 Effective: December 16, 2009 Subject: References: Purpose: This Directive Applies to: Considerations for Bicycle

More information

Module 1: Work Zone Traffic Control

Module 1: Work Zone Traffic Control Module 1: Work Zone Traffic Control Overview of Module 1 Underlying principles of work zone traffic control Manual of Uniform Traffic Control Device (MUTCD) Features of work zone traffic control Hazards

More information

FOR HISTORICAL REFERENCE ONLY

FOR HISTORICAL REFERENCE ONLY To: From: Subject: Electronic Distribution Recipients MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No. 12-14-B-03 December 18, 2012 Jon M. Chiglo, P.E. Division

More information

MUTCD Part 6: Temporary Traffic Control

MUTCD Part 6: Temporary Traffic Control MUTCD Part 6: Temporary Traffic Control OMUTCD English units are preferred. OHIO MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES TABLE OF CONTENTS PREFACE INTRODUCTION TABLE OF CONTENTS PART 1. GENERAL Chapter

More information

Sign Designs and Markings Manual (TEM 295-2) Page 8-3

Sign Designs and Markings Manual (TEM 295-2) Page 8-3 Sign Designs and Markings Manual (TEM 295-2) Page 8-3 TEMPORARY TRAFFIC CONTROL SIGNS INDEX Regulatory Signs R1-1 STOP R1-2 YIELD R1-2a TO ONCOMING TRAFFIC R2-1 SPEED LIMIT R2-H2a VEHICLES OVER 4 TONS

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department) To: From: Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering Date: March 20, 2001 Subject: Roadway Geometric Design Criteria Project: TH 14/218 Design-Build Project, SP 7408-29,

More information

New Jersey Department of Transportation. Safety Impact Teams. May 22, 2007 Patricia Ott, P. E. Director, Traffic Engineering & Safety

New Jersey Department of Transportation. Safety Impact Teams. May 22, 2007 Patricia Ott, P. E. Director, Traffic Engineering & Safety New Jersey Department of Transportation Safety Impact Teams May 22, 2007 Patricia Ott, P. E. Director, Traffic Engineering & Safety Safe Corridor Legislation Approved July 2003 Double Fines for Motor Vehicle

More information

Table of Contents. Guidelines on Rolling Roadblocks for Work Zone Applications

Table of Contents. Guidelines on Rolling Roadblocks for Work Zone Applications 431919.ATSSA_431919.ATSSA 8/16/13 6:16 AM Page 1 431919.ATSSA_431919.ATSSA 8/16/13 6:16 AM Page 1 Table of Contents What Is a Rolling Roadblock?...3 Where Rolling Roadblocks are Used...4 Planning and Coordinating

More information

Texas Driver Education Classroom and In-car Instruction Model Curriculum

Texas Driver Education Classroom and In-car Instruction Model Curriculum Texas Driver Education Classroom and In-car Instruction Model Curriculum BasicManeuvering Tasks: Moderate Risk Environment Module Four SPACE MANAGEMENT CONCEPTS CHANGING LANES TURNABOUTS PARKING WORKSHEETS

More information

7 DESIGN CRITER RIA 7.1 Design Space Requirements

7 DESIGN CRITER RIA 7.1 Design Space Requirements 7 DESIGN CRITERIA 7.1 Design Space Requirements The Nebraskaa Department of Roads (NDOR) provided examples of intersections where an approved guardrail end terminal and Approach Guardrail Transition (AGT)

More information

SPECIAL SPECIFICATION 7581 Performance Based Vegetation Management

SPECIAL SPECIFICATION 7581 Performance Based Vegetation Management 2004 Specifications CSJ 6216-60-001 SPECIAL SPECIFICATION 7581 Performance Based Vegetation Management 1. Description. This item will govern for complete vegetation management of highway rightof-way, including

More information

Access Location, Spacing, Turn Lanes, and Medians

Access Location, Spacing, Turn Lanes, and Medians Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-3 Access Location, Spacing, Turn Lanes, and Medians This section addresses access location, spacing, turn lane and median needs, including

More information