1 The 2nd Conference on Traffic and Transportation Engineering, 2016, *, ** Published Online **** 2016 in SciRes. Evaluation and Improvement of the Roundabouts in Changchun Mo Zhou Department of Civil Engineering, National University of Singapore, Singapore , Singapore Received **** 2016 Abstract Among the grade crossing of city road in Changchun, roundabouts consist of a major part. They are often designed to connect the main roads due to their ability to eliminate or alter conflict points, making them safer than the traditional intersections. Also, they can beautify the city in a way no other crossings can. However, as a result of increasing traffic volume, the malfunction, or even paralysis of roundabouts is happening more and more frequent. It means that we need to evaluate the roundabouts on time, and make improvements to those whose performance are considered poor. By categorizing the roundabouts in Changchun, an example is selected from each kind. Through measuring the geometry condition, the V/C ratio in weaving sections, and delay, the poorly-performed roundabouts can be determined, and the enhancement proposals can be made according to the criteria. Subsequently, with the help of a micro-simulation software AIMSUN, a basic model is established using the OD data collected by field measurement, and error checking was then carried out. Afterwards, by putting forward a model parameter sensitivity analysis, the key parameters can be chosen. Then average queue length is applied to calibrate key parameters which influence the models, in order to ensure the minimum RMSE value between model output and field data. Finally the proposed improvements, therefore, can be tested based and assessed. Keywords Roundabouts; Evaluation; Micro-simulation; AIMSUN; Improvements 1. Introduction (Heading 1) Nowadays, several problems like the prolonged delay and increased queue length have gradually occurred in some roundabouts. Without timely evaluation and improvement on them, these small problems can get way worse. However, as for Changchun, who has at least three roundabouts in almost every arterial roads (as is marked with black five-pointed stars in Figure 1.1), malfunction of any single roundabout can be insufferable and disastrous. Therefore, it is highly necessary to assess the current running state of the roundabouts and evaluate proposed amendments by using micro-simulation. How to cite this paper: Mo Zhou (2016) Evaluation and Improvement of the Roundabouts in Changchun. *********, *, **-**.

2 Figure 1.1.Distribution Map of Roundabouts in Urban Areas of Changchun Research content and process can be briefly demonstrated in the technology map in Figure 1.2. Figure 1.2.Technology Map 2. Running Features of the Roundabouts in Changchun 2.1. Classification of Roundabouts According to the existence of traffic light and the number of connected lanes, the common roundabouts in Changchun can be classified into four types: 2

3 (1) Unsignalized four-leg roundabouts (eg. Weixing Square and Jingyang Square) (2) Signalized four-leg roundabouts (eg. Xi an Square) (3) Unsignalized five-leg roundabouts (eg. Zhengyang Square and Zhanqian Square) (4) Signalized five-leg roundabouts (eg. Nanhu Square and Xinmin Square) This thesis will choose an example from each types, and evaluate it, see if there s any hidden problem in it Basic Data Collection Detailed plan is shown as Table 2.1. Table 2.1. Data Collection Plan Location Time Content Weixing Square May 5 th Road Inventory and Peak Hour Flow 16:30-18:30 in Each Weaving Sections Weixing Square May 10 th Peak Hour Flow in Each Entrance 16:30-18:30 Sections and Turning Proportion Zhengyang Square th May 17 Road Inventory and Peak Hour Flow 16:30-18:30 in Each Weaving Sections Xinmin Square th May 18 Data needed for Individual Sample of 16:30-18:30 Stop Delay survey method Xi an Square th May 19 Data needed for Individual Sample of 16:30-18:30 Stop Delay survey method 3. Evaluation of the Roundabouts in Changchun 3.1. Unsignalized Four-leg Roundabouts (Weixing Square) As one of the most important roundabouts in Changchun, Weixing Square is selected as an example of this kind. First, the four weaving sections was marked as is shown in Figure 3.1. Figure 3.1.Weaving sections in Weixing Square The evaluation index of unsignalized multi-lane roundabout is the V/C ratio of weaving section. [1] After measuring the geometry data from digital map and collecting the peak hour flow, V/C ratio can be calculated with the help of the Index Calculator. Taking Weaving Section No.3 as an example, Figure 3.2 shows the user interface of the calculator. 3

4 Figure 3.2.User Interface of the Index Calculator V/C ratio is corresponding to level of service. [2] Therefore, the level of service of each weaving sections in Weixing Square can be determined. Table 3.1. The V/C Ratio and Level of Service of Each Weaving Sections in Weixing Square No V/C Ratio Level of Service C F C F When the level of service of a weaving section reaches level F, severe congestion will occur, resulting in prolonged delay and increased queue length, which would definitely have a detrimental effect on the traffic flow, bringing hidden danger. As is shown in Table 3.1, service level of weaving section 2 and 4 have already reached F level. Consequently, the general running state of Weixing Square is unsatisfying, which means amendments should be made to this roundabout Unsignalized Five-leg Roundabout As for unsignalized roundabout, Zhengyang Square is chosen to be an example. Similarly, each weaving sections is marked in Figure 3.3. Figure 3.3.Weaving Sections in Zhengyang Square Also, by using the Index Calculator, V/C ratio and service level can be listed in Table 3.2. Table 3.2. The V/C Ratio and Level of Service of Each Weaving Sections in Zhengyang Square No V/C Ratio Level of Service B E C B E 4

5 None of the service level reaches F, indicating that Zhengyang Square haven t shown any severe malfunction yet. The delay is relatively acceptable, and the conflicts are not so prominent Signalized Four-leg Roundabout Xi an Square, as one of the most important intersection in Changchun, is chosen as an example. Since the evaluation indexes of signalized roundabouts is the same as those of signalized cross intersection, [1] average delay is used to assess Xi an Square. When it comes to evaluation, delay is better virtually measured than estimated. So Individual Sample of Stop Delay survey method was used to collect data and calculate average [3] delay. Also according to HCM, service level can be corresponded. Table 3.3. The Average Delay and Level of Service of Each Entrance Sections in Xi an Square No Average Delay Level of Service D C D D Based on Table 3.3, the traffic flow runs relatively smooth in Xi an Square Signalized Five-leg Roundabout Take one of the most famous roundabout in Changchun---Xinmin Square---as an example. In order to describe clearly, five legs are firstly marked with numbers in Figure 3.4. Figure 3.4. Five legs in Xinmin Square Similarly, average delay and service level of each sections can be calculated and listed as Table 3.4. Table 3.4. The Average Delay and Level of Service of Each Entrance Sections in Xinmin Square No Average Delay Level of Service D D C D D As is shown above, traffic flow in each sections can be deemed steady. The average delay now is sufferable. Therefore, it is not urgent to make adjustments to this roundabout. In summary, Weixing Square, among the four mentioned roundabouts, particularly needs to be improved. 4. Micro-Simulation of the Roundabout 4.1. Basic Model Development Firstly, the base map is introduced into the new project of AIMSUN. 5

6 Figure 4.1. Base Model Based on the data that was collected before, traffic state settings can be filled in through calculation. In order to define OD matrix and allocate the generation and attraction, centroid configuration is also necessary. Figure 4.2 demonstrates the four centroid of this roundabout. Blue lines mean generation, while green lines represent attraction. In this picture, every single line corresponds with a specific percentage. Figure 4.2. Centroid Configuration After finishing the last step, OD matrix can be defined as Figure 4.3 and Figure 4.4 shows. Figure 4.3. OD Matrix of Car 6

7 Figure 4.4. OD Matrix of Bus Then related traffic demand and dynamic scenario can be created. By running the new experiment replica, AIMSUN is able to run the initial simulation. A screenshot (Figure 4.5) was taken during the simulation process. Figure 4.5. Screenshot of the Simulation Effect The last step was to carry out error checking, which includes three stages: software error checking, input data error checking and animation error checking. [4] After checking the software and input data, animation is supposed to be reviewed. Compared with the actual condition, the queue length in the simulation is slightly longer, which probably results from the give way to those who are entering the roundabout protocol. In addition, the running state in weaving section is slightly smoother than that in real-life scenario. This is because under the influence of temporal construction inside the roundabout, the central island is actually malformed, causing the number of lanes in some weaving sections less than 5. Hence, in general, the animation is very close to reality Model Parameter The Gipps model inside AIMSUN can be seen in an equation below. (1) Where: a n = max acceleration of vehicle n bn = max deceleration of vehicle n bn-1 = max deceleration of vehicle n-1 T.. = reaction time θ.. = reaction time to ensure safety = max expected speed of vehicle n in time t v n 7

8 v n (t). = speed of vehicle n in time t xn(t).= driven distance of vehicle n in time t Sn-1...= effective length of vehicle n-1 From the equation, the involved parameters are reaction time. speed limit, max acceleration, max deceleration, general deceleration, and so on. Take average queue length as the criterion to assess the sensitivity of the model, according to the pre-experiment, reaction time does not have a significant influence on average queue length, thus should not be considered as a parameter to be calibrated. Moreover, since the model involves roundabout, which contains give way protocol, max give-way time should be taken into consideration. After proposing appropriate value range of the parameters, the calibrating process can be carried out. In this case, the Root Mean Square Error method is used to get a minimum error value between the model measurements and the field measurements of V/C ratio. Through calculating under different range value, the minimum RMSE value can be found. The corresponding parameter value can therefore be determined. The calibrated parameters and the default ones are compared in Table 4.1. Table 4.1. Comparison of the Calibrated and the Default Parameters Parameter Default Calibrated average minimum maximum average minimum maximum Max Acceleration (m/s 2 ) Max Decceleration (m/s 2 ) Max Expected Speed(km/h) Max Give-way Time (s) Since there s no modification to the original model in the software, it is deemed unnecessary to carry out the validation process. 5. Simulation and Analysis of the Alternative Scenarios 5.1. Alternative Scenario 1: Addition of lane in weaving sections Add lanes to the north and south weaving section like Figure 5.1 shows. Figure 5.1. Addition of lane Then run the new experiment replica, record the V/C ratio of each weaving sections again. Compared to the field measurement, Table 5.1 can be obtained. 8

9 Table 5.1. Comparison of Alternative Scenario 1 and Real-life Scenario Weaving Section East North East South V/C Ratio of Realife Scenario V/C Ratio of Alternative Scenario Variation Range -5.08% % -2.22% % From table 5.1, it is obvious that V/C ratio in north and south weaving sections have dropped significantly, leading in the improvement of corresponding service level from F to C. Additionally, other indexes have also improved more or less as is shown in Table 5.2. Table 5.2. Variation Range of Other Indexes in Alternative Scenario 1 Index Queue Length Travel Time Delay Variation Range -1.39% -6.02% % 5.2. Alternative Scenario 2: Apply Signal Control Add lanes to the north and south weaving section like Figure 5.1 shows. As is shown in Figure 5.2, add fixed-time control to the base model. Figure 5.2. Apply Signal Control Create a new control plan and run this new experiment replica, and the comparison can be listed as Table 5.3. Table 5.3. Comparison of Alternative Scenario 2 and Real-life Scenario Weaving Section East North East South V/C Ratio of Realife Scenario V/C Ratio of Alternative Scenario Variation Range % % % % According to Table 5.3, the V/C ratio has dropped tremendously, while other indexes have deteriorated like Table 5.4 shows. Table 5.4. Variation Range of Other Indexes in Alternative Scenario 2 Index Queue Length Travel Time Delay Variation Range % % % All in all, signal control, who are generally considered as an effective method, is actually not suitable for this intersection, whereas addition of lane is much more appropriate. 9

10 Acknowledgements The guidance of two amazing supervisors is indispensable to the accomplishment of the thesis. One is my future supervisor Associate Professor Chin Hoong Chor from National University of Singapore, who broadened my comprehension to this topic, and introduced this great micro-simulation software to me. The other is my undergraduate thesis supervisor Yang Lili from Jilin University, who patiently answers my every questions and help me modify and refine this article over and over again. I couldn t finish this article without either of them. Therefore, I would like to express my sincere gratitude to them. References [1] The compilation group of Technical Guidelines for Traffic Impact Analysis of Construction Project (2010). Technical Guidelines for Traffic Impact Analysis of Construction Project. 1st Edition. [2] An Zizhen. (2008) Research on Capacity and Levels of Service for Roundabout. Master Thesis, Southeast University, China. [3] Li Qingyin, Sun Feng. (2011) Evaluation Indexes Selection and Level-of-service Classification for Roundabouts. Journal of Highway and Transportation Research and Development, 28, [4] Septarina. (2012) Micro-Simulation of The Roundabout at Idrottsparken Using AIMSUN. Master Thesis, Linköping University, Sweden. 1 0

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

USA Parkway Traffic Operations Analysis, Roundabout Option. Pedro Rodriguez, NDOT; Bryan Gant, Jacobs; Randy Travis, NDOT

USA Parkway Traffic Operations Analysis, Roundabout Option. Pedro Rodriguez, NDOT; Bryan Gant, Jacobs; Randy Travis, NDOT Technical Memorandum TO: Hoang Hong, NDOT DATE: September 21, 2012 FROM: SUBJECT: COPIES: John Karachepone, Jacobs USA Parkway Traffic Operations Analysis, Pedro Rodriguez, NDOT; Bryan Gant, Jacobs; Randy

More information

Lane changing and merging under congested conditions in traffic simulation models

Lane changing and merging under congested conditions in traffic simulation models Urban Transport 779 Lane changing and merging under congested conditions in traffic simulation models P. Hidas School of Civil and Environmental Engineering, University of New South Wales, Australia Abstract

More information

MICROSIMULATION USING FOR CAPACITY ANALYSIS OF ROUNDABOUTS IN REAL CONDITIONS

MICROSIMULATION USING FOR CAPACITY ANALYSIS OF ROUNDABOUTS IN REAL CONDITIONS Session 5. Transport and Logistics System Modelling Proceedings of the 11 th International Conference Reliability and Statistics in Transportation and Communication (RelStat 11), 19 22 October 2011, Riga,

More information

Comparative Study of VISSIM and SIDRA on Signalized Intersection

Comparative Study of VISSIM and SIDRA on Signalized Intersection Available online at www.sciencedirect.com ScienceDirect Procedia - Social and Behavioral Scien ce s 96 ( 2013 ) 2004 2010 13th COTA International Conference of Transportation Professionals (CICTP 2013)

More information

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015 Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative

More information

Queue analysis for the toll station of the Öresund fixed link. Pontus Matstoms *

Queue analysis for the toll station of the Öresund fixed link. Pontus Matstoms * Queue analysis for the toll station of the Öresund fixed link Pontus Matstoms * Abstract A new simulation model for queue and capacity analysis of a toll station is presented. The model and its software

More information

An Analysis of Reducing Pedestrian-Walking-Speed Impacts on Intersection Traffic MOEs

An Analysis of Reducing Pedestrian-Walking-Speed Impacts on Intersection Traffic MOEs An Analysis of Reducing Pedestrian-Walking-Speed Impacts on Intersection Traffic MOEs A Thesis Proposal By XIAOHAN LI Submitted to the Office of Graduate Studies of Texas A&M University In partial fulfillment

More information

BLOSSOM AT PICKENS SIGNALIZED INTERSECTION IMPROVEMENT STUDY

BLOSSOM AT PICKENS SIGNALIZED INTERSECTION IMPROVEMENT STUDY BLOSSOM AT PICKENS SIGNALIZED INTERSECTION IMPROVEMENT STUDY Class Project Report for ECIV 542 Traffic Engineering Submitted by Omor Sharif Muchun Song Narges Kaveshgar Quyen Pham Chih-Yao Lin Submission

More information

Introduction Roundabouts are an increasingly popular alternative to traffic signals for intersection control in the United States. Roundabouts have a

Introduction Roundabouts are an increasingly popular alternative to traffic signals for intersection control in the United States. Roundabouts have a HIGH-CAPACITY ROUNDABOUT INTERSECTION ANALYSIS: GOING AROUND IN CIRCLES David Stanek, PE and Ronald T. Milam, AICP Abstract. Roundabouts have become increasingly popular in recent years as an innovative

More information

Roundabout Design 101: Roundabout Capacity Issues

Roundabout Design 101: Roundabout Capacity Issues Design 101: Capacity Issues Part 2 March 7, 2012 Presentation Outline Part 2 Geometry and Capacity Choosing a Capacity Analysis Method Modeling differences Capacity Delay Limitations Variation / Uncertainty

More information

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis MEMORANDUM Transportation Bill Troe, AICP Jason Carbee, AICP 12120 Shamrock Plaza Suite 300 Omaha, NE 68154 (402) 334-8181 (402) 334-1984 (Fax) To: Project File Date: Subject: Solberg Avenue / I-229 Grade

More information

At each type of conflict location, the risk is affected by certain parameters:

At each type of conflict location, the risk is affected by certain parameters: TN001 April 2016 The separated cycleway options tool (SCOT) was developed to partially address some of the gaps identified in Stage 1 of the Cycling Network Guidance project relating to separated cycleways.

More information

ANALYSIS OF SIGNALISED INTERSECTIONS ACCORDING TO THE HIGHWAY CAPACITY MANUAL FROM THE POINT OF VIEW OF THE PROCESSES APPLIED IN HUNGARY

ANALYSIS OF SIGNALISED INTERSECTIONS ACCORDING TO THE HIGHWAY CAPACITY MANUAL FROM THE POINT OF VIEW OF THE PROCESSES APPLIED IN HUNGARY 2nd Int. Symposium in Civil Engineering 1998 Budapest ANALYSIS OF SIGNALISED INTERSECTIONS ACCORDING TO THE HIGHWAY CAPACITY MANUAL FROM THE POINT OF VIEW OF THE PROCESSES APPLIED IN HUNGARY István Styevola

More information

Evaluation and further development of car following models in microscopic traffic simulation

Evaluation and further development of car following models in microscopic traffic simulation Urban Transport XII: Urban Transport and the Environment in the 21st Century 287 Evaluation and further development of car following models in microscopic traffic simulation P. Hidas School of Civil and

More information

Updated Roundabout Analysis Methodology

Updated Roundabout Analysis Methodology Updated Roundabout Analysis Methodology In 1998, the Transportation Planning Analysis Unit (TPAU) working as part of the Roundabout Task Group selected the interim roundabout methodologies of the SIDRA

More information

William Castro Associated Professor, Faculty of Engineering, Universidad Nacional de Colombia Bogotá, Colombia,

William Castro Associated Professor, Faculty of Engineering, Universidad Nacional de Colombia Bogotá, Colombia, ANALYSIS AND COMPARISON BETWEEN TWO-LANE ROUNDABOUTS AND TURBO ROUNDABOUTS BASED ON A ROAD SAFETY AUDIT METHODOLOGY AND MICROSIMULATION: A CASE STUDY IN URBAN AREA Lenin A. Bulla Associated Professor,

More information

1. Introduction. 2. Survey Method. Volume 6 Issue 5, May Licensed Under Creative Commons Attribution CC BY

1. Introduction. 2. Survey Method. Volume 6 Issue 5, May Licensed Under Creative Commons Attribution CC BY A Study on Performance of an Urban Arterial Corridor Guggilla Raju 1, Rontala Ashwini 2 1 Assistant Professor, Department of Civil Engineering, GCET 2 Assistant Professor, Department of Civil Engineering,

More information

HIGHWAY CAPACITY MANUAL

HIGHWAY CAPACITY MANUAL HISTORY OF THE HIGHWAY CAPACITY MANUAL TexITE - Houston Chapter November 10, 2010 Michael Y. Ereti City of Houston Department of Public Works & Engineering THE NEW GUY (Michael Ereti) Consultant (10 years)

More information

The Application of Pedestrian Microscopic Simulation Technology in Researching the Influenced Realm around Urban Rail Transit Station

The Application of Pedestrian Microscopic Simulation Technology in Researching the Influenced Realm around Urban Rail Transit Station Journal of Traffic and Transportation Engineering 4 (2016) 242-246 doi: 10.17265/2328-2142/2016.05.002 D DAVID PUBLISHING The Application of Pedestrian Microscopic Simulation Technology in Researching

More information

Appendix E-2: Microsimulation Report

Appendix E-2: Microsimulation Report Appendix E-2: Microsimulation Report London Bus Rapid Transit Transit Project Assessment Process Environmental Project Report DRAFT April 2018 P R E PA R E D BY LONDON BUS RAPID TRANSIT PROJECT TRAFFIC

More information

aasidra for Roundabouts INTRODUCTION

aasidra for Roundabouts INTRODUCTION aasidra for Roundabouts INTRODUCTION Rahmi Akçelik Director, Akcelik & Associates Pty Ltd Adjunct Professor, Monash University Mark Besley Director, Akcelik & Associates Pty Ltd TRB Roundabout Conference

More information

A Traffic Operations Method for Assessing Automobile and Bicycle Shared Roadways

A Traffic Operations Method for Assessing Automobile and Bicycle Shared Roadways A Traffic Operations Method for Assessing Automobile and Bicycle Shared Roadways A Thesis Proposal By James A. Robertson Submitted to the Office of Graduate Studies Texas A&M University in partial fulfillment

More information

A Comprehensive HCM 2010 Urban Streets Analysis Using HCS 2010 US 31W in Elizabethtown, KY

A Comprehensive HCM 2010 Urban Streets Analysis Using HCS 2010 US 31W in Elizabethtown, KY A Comprehensive HCM 2010 Urban Streets Analysis Using HCS 2010 US 31W in Elizabethtown, KY Ashley McLain, PE, PTOE Abstract The HCS 2010 Streets module was used to analyze a segment of the US 31W corridor

More information

EXAMINING THE EFFECT OF HEAVY VEHICLES DURING CONGESTION USING PASSENGER CAR EQUIVALENTS

EXAMINING THE EFFECT OF HEAVY VEHICLES DURING CONGESTION USING PASSENGER CAR EQUIVALENTS EXAMINING THE EFFECT OF HEAVY VEHICLES DURING CONGESTION USING PASSENGER CAR EQUIVALENTS Ahmed Al-Kaisy 1 and Younghan Jung 2 1 Department of Civil Engineering, Montana State University PO Box 173900,

More information

Analysis of Unsignalized Intersection

Analysis of Unsignalized Intersection International Journal of Constructive Research in Civil Engineering (IJCRCE) Volume 2, Issue 1, 2016, PP 30-36 ISSN 2454-8693 (Online) www.arcjournals.org Analysis of Unsignalized Intersection B.Ramkumar

More information

Demonstration of Possibilities to Introduce Semi-actuated Traffic Control System at Dhanmondi Satmasjid Road by Using CORSIM Simulation Software

Demonstration of Possibilities to Introduce Semi-actuated Traffic Control System at Dhanmondi Satmasjid Road by Using CORSIM Simulation Software Paper ID: TE-043 746 International Conference on Recent Innovation in Civil Engineering for Sustainable Development () Department of Civil Engineering DUET - Gazipur, Bangladesh Demonstration of Possibilities

More information

Sensitivity of Equilibrium Flows to Changes in Key Transportation Network Parameters

Sensitivity of Equilibrium Flows to Changes in Key Transportation Network Parameters Sensitivity of Equilibrium Flows to Changes in Key Transportation Network Parameters Sara Moridpour Department of Civil Engineering Monash University, Melbourne, Victoria, Australia 1 Introduction In transportation

More information

Intersection of Massachusetts Avenue and Maple Street in Lexington Signalized Intersection and Roundabout Comparison

Intersection of Massachusetts Avenue and Maple Street in Lexington Signalized Intersection and Roundabout Comparison Intersection of Massachusetts Avenue and Maple Street in Lexington Signalized Intersection and Roundabout Comparison Michael Wallwork, Roundabout Expert, Orange Park, Florida Tom Bertulis (MS, PE, PTOE),

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

The Effect of Additional Lane Length on Roundabout Delay

The Effect of Additional Lane Length on Roundabout Delay The Effect of Additional Lane Length on Roundabout Delay Samuel Hammond Graduate Research Assistant Transportation Engineering University of Rhode Island, Kingston, RI 02881 (401) 874-2692; Fax: (401)

More information

ScienceDirect. Microscopic Simulation on the Design and Operational Performance of Diverging Diamond Interchange

ScienceDirect. Microscopic Simulation on the Design and Operational Performance of Diverging Diamond Interchange Available online at www.sciencedirect.com ScienceDirect Transportation Research Procedia 6 (2015 ) 198 212 4th International Symposium of Transport Simulation-ISTS 14, 1-4 June 2014, Corsica, France Microscopic

More information

Conversation of at Grade Signalized Intersection in to Grade Separated Intersection

Conversation of at Grade Signalized Intersection in to Grade Separated Intersection IJIRST International Journal for Innovative Research in Science & Technology Volume 2 Issue 05 October 2015 ISSN (online): 2349-6010 Conversation of at Grade Signalized Intersection in to Grade Separated

More information

City of Homewood Transportation Plan

City of Homewood Transportation Plan City of Homewood Transportation Plan Prepared for: City of Homewood, Alabama Prepared by: Skipper Consulting, Inc. May 2007 TABLE OF CONTENTS INTRODUCTION... 1 BACKGROUND INFORMATION... 1 EXISTING TRANSPORTATION

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

TRAFFIC STUDY GUIDELINES Clarksville Street Department

TRAFFIC STUDY GUIDELINES Clarksville Street Department TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two

More information

Simulating Street-Running LRT Terminus Station Options in Dense Urban Environments Shaumik Pal, Rajat Parashar and Michael Meyer

Simulating Street-Running LRT Terminus Station Options in Dense Urban Environments Shaumik Pal, Rajat Parashar and Michael Meyer Simulating Street-Running LRT Terminus Station Options in Dense Urban Environments Shaumik Pal, Rajat Parashar and Michael Meyer Abstract The Exposition Corridor transit project is a light rail project

More information

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report Preparedby: ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS Final Report Prepared for Maricopa County Department of Transportation Prepared by TABLE OF CONTENTS Page EXECUTIVE SUMMARY ES-1

More information

Traffic Impact Analysis

Traffic Impact Analysis Traffic Impact Analysis Isle of Capri Casinos, Inc. Waterloo, Iowa SEH No. A-CLAAS0501.00 November 16, 2004 Table of Contents (Continued) Table of Contents Certification Page Table of Contents Page 1.0

More information

Traffic Academy: IJS & IMS FAQ/RULES OF THUMB

Traffic Academy: IJS & IMS FAQ/RULES OF THUMB FAQ/RULES OF THUMB HCS intersection analysis criteria See LDM Figure 401-14aE Cycle lengths between 60 to 120 seconds No impractical phases, i.e., 1 second green time Yellow + All Red must be no less than

More information

Introduction to Roundabout Analysis Using ARCADY

Introduction to Roundabout Analysis Using ARCADY Introduction to Roundabout Analysis Using ARCADY Toronto SimCap User Group Technical Event and ITE Toronto Section Social Event July 22, 2014 Phil Weber, P.Eng. GHD Inc. (The Home of Ourston Roundabout

More information

Tight Diamond Interchange versus Single Point Urban Interchange: Pedestrians Prospective

Tight Diamond Interchange versus Single Point Urban Interchange: Pedestrians Prospective Tight Diamond Interchange versus Single Point Urban Interchange: Pedestrians Prospective Ahmed Amer, M.S. Ph.D. Candidate Graduate Research/Teaching Assistant Department of Civil & Environmental Engineering

More information

Evaluating Roundabout Capacity, Level of Service and Performance

Evaluating Roundabout Capacity, Level of Service and Performance Roundabouts with Metering Signals ITE 2009 Annual Meeting, San Antonio, Texas, USA, August 9-12, 2009 Evaluating Roundabout Capacity, Level of Service and Performance Presenter: Rahmi Akçelik rahmi.akcelik@sidrasolutions.com

More information

Roundabouts along Rural Arterials in South Africa

Roundabouts along Rural Arterials in South Africa Krogscheepers & Watters 0 0 Word count: 00 text + figures = 0 equivalent words including Title and Abstract. Roundabouts along Rural Arterials in South Africa Prepared for: rd Annual Meeting of Transportation

More information

Global Journal of Engineering Science and Research Management

Global Journal of Engineering Science and Research Management SIMULATION AND OPTIMZING TRAFFIC FLOW AT SIGNALIZED INTERSECTION USING MATLAB Dr Mohammed B. Abduljabbar*, Dr Amal Ali, Ruaa Hameed * Assist Prof., Civil Engineering Department, Al-Mustansiriayah University,

More information

Title of the proposed project Development of a Toolbox for Evaluation and Identification of Urban Road Safety Improvement Measures

Title of the proposed project Development of a Toolbox for Evaluation and Identification of Urban Road Safety Improvement Measures Centre of Excellence (CoE) in Urban Transport Department of Civil Engineering, IIT Madras Title of the proposed project Development of a Toolbox for Evaluation and Identification of Urban Road Safety Improvement

More information

Issues in Performance Assessment of Sign-Controlled Intersections

Issues in Performance Assessment of Sign-Controlled Intersections Akcelik & Associates Pty Ltd PO Box 1075G, Greythorn, Vic 3104 AUSTRALIA info@sidrasolutions.com Management Systems Registered to ISO 9001 ABN 79 088 889 687 REPRINT Issues in Performance Assessment of

More information

Appendix B: Forecasting and Traffic Operations Analysis Framework Document

Appendix B: Forecasting and Traffic Operations Analysis Framework Document Existing Conditions Report - Appendix Appendix B: Forecasting and Traffic Operations Analysis Framework Document This document defines the methodology and assumptions that will be used in the traffic forecasting

More information

Collision Estimation and Cost Calculation

Collision Estimation and Cost Calculation Collision Estimation and Cost Calculation Table of Contents Introduction... 3 Rates Based Method... 4 20-Year Collision Cost Procedure... 4 Safety Performance Function Method... 7 Important notes when

More information

Analysing the Effects of Stop-&-Go Conditions in Traffic Assignment Models

Analysing the Effects of Stop-&-Go Conditions in Traffic Assignment Models Analysing the Effects of Stop-&-Go Conditions in Traffic Assignment Models Neeraj Saxena * ; Vinayak Dixit 1 ; Travis S. Waller 2 * Corresponding author: E-mail address: n.saxena@unsw.edu.au ; Tel: (+61

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

Relative safety of alternative intersection designs

Relative safety of alternative intersection designs Urban Transport XII: Urban Transport and the Environment in the 21st Century 379 Relative safety of alternative intersection designs L. C. Wadhwa 1 & M. Thomson 2 1 James Cook University Townsville Queensland

More information

Volume-to-Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning

Volume-to-Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning Volume-to-Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning Hao Xu (Corresponding Author) Research Associate Department of Civil & Environmental Engineering Texas

More information

1 Introduction. COPY John Denney FROM Chris Morahan DATE 2 November 2015 FILE 6-XT177.62/305DC SUBJECT Stanley Street Network Traffic Modelling

1 Introduction. COPY John Denney FROM Chris Morahan DATE 2 November 2015 FILE 6-XT177.62/305DC SUBJECT Stanley Street Network Traffic Modelling Opus International Consultants Ltd Christchurch Office 20 Moorhouse Avenue PO Box 1482, Christchurch Mail Centre, Christchurch 8140 New Zealand TO Reece Gibson COPY John Denney FROM Chris Morahan DATE

More information

EFFICIENCY OF TRIPLE LEFT-TURN LANES AT SIGNALIZED INTERSECTIONS

EFFICIENCY OF TRIPLE LEFT-TURN LANES AT SIGNALIZED INTERSECTIONS EFFICIENCY OF TRIPLE LEFT-TURN LANES AT SIGNALIZED INTERSECTIONS Khaled Shaaban, Ph.D., P.E., PTOE (a) (a) Assistant Professor, Department of Civil Engineering, Qatar University (a) kshaaban@qu.edu.qa

More information

ASSESSMENT OF THE CAPACITY OF ROADS WEAVING SEGMENTS

ASSESSMENT OF THE CAPACITY OF ROADS WEAVING SEGMENTS Transport and Telecommunication, 2017, volume 18, no. 2, 101 106 Transport and Telecommunication Institute, Lomonosova 1, Riga, LV-1019, Latvia DOI 10.1515/ttj-2017-0009 ASSESSMENT OF THE CAPACITY OF ROADS

More information

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007 Technical Memorandum May 2007 Syracuse Metropolitan Transportation Council Edwards and Kelcey with Wallace Roberts and Todd Alta Planning and Design CONTENTS SECTION ONE- INTRODUCTION...1 SECTION TWO-

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

Impact of Signalized Intersection on Vehicle Queue Length At Uthm Main Entrance Mohd Zulhilmi Abdul Halim 1,b, Joewono Prasetijo 2,b

Impact of Signalized Intersection on Vehicle Queue Length At Uthm Main Entrance Mohd Zulhilmi Abdul Halim 1,b, Joewono Prasetijo 2,b Impact of Signalized Intersection on Vehicle Queue Length At Uthm Main Entrance Mohd Zulhilmi Abdul Halim 1,b, Joewono Prasetijo 2,b 1,2 Smart Driving Research Center, Faculty of Civil and Environmental

More information

Capacity and Performance Analysis of Roundabout Metering Signals

Capacity and Performance Analysis of Roundabout Metering Signals Capacity and Performance Analysis of Roundabout Metering Signals TRB National Roundabout Conference Vail, Colorado, USA, 22-25 May 2005 Pictures modified to show driving on the right-hand side of the road

More information

QUEUE DISCHARGE BEHAVIOR AT SIGNALIZED INTERSECTION: A COMPARISON BETWEEN FIELD MEASUREMENTS WITH ANALYTICAL AND MICRO-

QUEUE DISCHARGE BEHAVIOR AT SIGNALIZED INTERSECTION: A COMPARISON BETWEEN FIELD MEASUREMENTS WITH ANALYTICAL AND MICRO- QUEUE DISCHARGE BEHAVIOR AT SIGNALIZED INTERSECTION: A COMPARISON BETWEEN FIELD MEASUREMENTS WITH ANALYTICAL AND MICRO- SIMULATION MODELS Mohsin Shahzad CHAUDHRY PhD Student Civil and Environmental Engineering

More information

Delay Analysis of Stop Sign Intersection and Yield Sign Intersection Based on VISSIM

Delay Analysis of Stop Sign Intersection and Yield Sign Intersection Based on VISSIM Available online at www.sciencedirect.com ScienceDirect Procedia - Social and Behavioral Scien ce s 96 ( 2013 ) 2024 2031 13th COTA International Conference of Transportation Professionals (CICTP 2013)

More information

Traffic simulation of Beijing West railway station North area

Traffic simulation of Beijing West railway station North area Journal of Industrial Engineering and Management JIEM, 2013 6(1):336-345 Online ISSN: 2013-0953 Print ISSN: 2013-8423 http://dx.doi.org/10.3926/jiem.678 Traffic simulation of Beijing West railway station

More information

SIDRA INTERSECTION 6.1 UPDATE HISTORY

SIDRA INTERSECTION 6.1 UPDATE HISTORY Akcelik & Associates Pty Ltd PO Box 1075G, Greythorn, Vic 3104 AUSTRALIA ABN 79 088 889 687 For all technical support, sales support and general enquiries: support.sidrasolutions.com SIDRA INTERSECTION

More information

Rural Highway Overtaking Lanes

Rural Highway Overtaking Lanes Rural Highway Overtaking Lanes Kah Wai Ng School of Civil and Resource Engineering, University of Western Australia Song Wang School of Mathematics and Statistics, University of Western Australia Doina

More information

RESPONSIVE ROUNDABOUTS MYTH OR REALITY

RESPONSIVE ROUNDABOUTS MYTH OR REALITY RESPONSIVE ROUNDABOUTS MYTH OR REALITY Andy Poole WSP UK Three White Rose Office Park Millshaw Park Lane Leeds LS11 0DL andy.poole@wspgroup.com Keywords: Traffic signals, optimisation, micro-simulation,

More information

Management of Multi-Lane Highways in Jordan (Case Study)

Management of Multi-Lane Highways in Jordan (Case Study) Management of Multi-Lane Highways in Jordan (Case Study) Basim Jrew 1), Nidal Hussein 2) and Rami Al-Kouz 3) 1) Isra University, Jordan. E-Mail: basim.jrew@iu.edu.jo 2) Isra University, Jordan. E-Mail:

More information

ANALYSIS OF SATURATION FLOW RATE FLUCTUATION FOR SHARED LEFT-TURN LANE AT SIGNALIZD INTERSECTIONS *

ANALYSIS OF SATURATION FLOW RATE FLUCTUATION FOR SHARED LEFT-TURN LANE AT SIGNALIZD INTERSECTIONS * ANALYSIS OF SATURATION FLOW RATE FLUCTUATION FOR SHARED LEFT-TURN LANE AT SIGNALIZD INTERSECTIONS * By Peng CHEN**, Hideki NAKAMURA*** and Miho ASANO**** 1. Introduction In urban corridor performance evaluation,

More information

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Date: April 16 th, 2015 To: From: Re: Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Darian Nagle-Gamm, Traffic Engineering Planner Highway 6 (2 nd Street) /

More information

Operational Ranking of Intersections: A Novel Prioritization Methodology

Operational Ranking of Intersections: A Novel Prioritization Methodology Operational Ranking of Intersections: A Novel Prioritization Methodology Reza Omrani, Ph.D. Transportation Engineer CIMA+ 3027 Harvester Road, Suite 400 Burlington, ON L7N 3G7 Reza.Omrani@cima.ca Pedram

More information

Roundabouts in Australia: the state of the art on models and applications

Roundabouts in Australia: the state of the art on models and applications Roundabouts in Australia: the state of the art on models and applications Seminar Presentation One-day International Meeting on Roundabouts Università di Pisa - Corso di TECNICA del TRAFFICO, Livorno,

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

US-6 Spanish Fork Fact Finding Study. December 2017

US-6 Spanish Fork Fact Finding Study. December 2017 US-6 Spanish Fork Fact Finding Study December 2017 US-6 Spanish Fork Fact Finding Study Avenue Consultants December 2017 US-6 Spanish Fork Fact Finding Study December 2017 Table of Contents 1 Introduction...

More information

LEFT-TURN LANE DESIGN AND OPERATION

LEFT-TURN LANE DESIGN AND OPERATION Report No. TxDOT 0-5290-1 LEFT-TURN LANE DESIGN AND OPERATION August 2007 By Lei Yu, Ph.D., P.E., Yi Qi, Ph.D. Mehdi Azimi Chenyan Guo Lei Guo 1. Report No. 2. Government Accession No. Recipient's Catalog

More information

EFFECTS OF TRANSIT SIGNAL PRIORITY ON BUS RAPID TRANSIT SYSTEM. Sahil Chawla, Shalini Sinha and Khelan Modi

EFFECTS OF TRANSIT SIGNAL PRIORITY ON BUS RAPID TRANSIT SYSTEM. Sahil Chawla, Shalini Sinha and Khelan Modi EFFECTS OF TRANSIT SIGNAL PRIORITY ON BUS RAPID TRANSIT SYSTEM Sahil Chawla, Shalini Sinha and Khelan Modi PRESENTATION STRUCTURE INTRODUCTION AIM / OBJECTIVES STUDY APPROACH LITERATURE REVIEW MODEL DEVELOPMENT

More information

Queue Jump Lane, Transit Signal Priority, and Stop Location: Evaluation of Transit Preferential Treatments using Microsimulation

Queue Jump Lane, Transit Signal Priority, and Stop Location: Evaluation of Transit Preferential Treatments using Microsimulation Queue Jump Lane, Transit Signal Priority, and Stop Location: Evaluation of Transit Preferential Treatments using Microsimulation Burak Cesme (corresponding author) AECOM 1 Wilson

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

An Evaluation of Rotary Intersection: A Case Study of Prabhat Square Raisen Road Bhopal

An Evaluation of Rotary Intersection: A Case Study of Prabhat Square Raisen Road Bhopal An Evaluation of Rotary Intersection: A Case Study of Prabhat Square Raisen Road Bhopal 1 Rakesh Kumar Chhalotre 2 Dr. Y. P. Joshi 1 M.E. Student, 2 Professor 1,2 Department of Civil Engineering 1,2 Samrat

More information

Capital Region Council of Governments

Capital Region Council of Governments March 23, 2018 Capital Region Council of Governments PROJECT CONCEPT REPORT Realignment of Swamp and Northfield Road s approaches to Route 44 (Boston Turnpike) Town of Coventry SUMMARY: The Town of Coventry

More information

AN APPROACH FOR ASSESSMENT OF WEAVING LENGTH FOR MID-BLOCK TRAFFIC OPERATIONS

AN APPROACH FOR ASSESSMENT OF WEAVING LENGTH FOR MID-BLOCK TRAFFIC OPERATIONS International Journal for Traffic and Transport Engineering, 215, 5(4): 442-45 UDC: 625.739 DOI: http://dx.doi.org/1.778/ijtte.215.5(4).8 AN APPROACH FOR ASSESSMENT OF WEAVING LENGTH FOR MID-BLOCK TRAFFIC

More information

Pedestrian traffic flow operations on a platform: observations and comparison with simulation tool SimPed

Pedestrian traffic flow operations on a platform: observations and comparison with simulation tool SimPed Pedestrian traffic flow operations on a platform: observations and comparison with simulation tool SimPed W. Daamen & S. P. Hoogendoorn Department Transport & Planning, Delft University of Technology,

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

Evaluation of Work Zone Strategies at Signalized Intersections

Evaluation of Work Zone Strategies at Signalized Intersections Evaluation of Work Zone Strategies at Signalized Intersections Khaled Shaaban Qatar University/Department of Civil and Architectural Engineering, Doha, Qatar Email: kshaaban@qu.edu.qa Dina Elnashar Qatar

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

Solutions to Traffic Jam on East Road of Beijing Jiaotong University in Rush Hours Based on Analogue Simulation

Solutions to Traffic Jam on East Road of Beijing Jiaotong University in Rush Hours Based on Analogue Simulation MATEC Web of Conferences 25, 04 00 4 ( 2015) DOI: 10.1051/ matecconf/ 20152 504 004 C Owned by the authors, published by EDP Sciences, 2015 Solutions to Traffic Jam on East Road of Beijing Jiaotong University

More information

3 ROADWAYS 3.1 CMS ROADWAY NETWORK 3.2 TRAVEL-TIME-BASED PERFORMANCE MEASURES Roadway Travel Time Measures

3 ROADWAYS 3.1 CMS ROADWAY NETWORK 3.2 TRAVEL-TIME-BASED PERFORMANCE MEASURES Roadway Travel Time Measures ROADWAYS Approximately 6 million trips are made in the Boston metropolitan region every day. The vast majority of these trips (80 to percent, depending on trip type) involve the use of the roadway network

More information

FORM A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION

FORM A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION FORM 901.3.A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION The following information is required from all applicants directly or indirectly accessing any collector or arterial road or as otherwise

More information

Data Driven Decisions for Centralised Bus Priority in Dublin City. Dublin City Council ITS Bus Priority James Calvey, Maggie O Donnell, Niall Bolger

Data Driven Decisions for Centralised Bus Priority in Dublin City. Dublin City Council ITS Bus Priority James Calvey, Maggie O Donnell, Niall Bolger Data Driven Decisions for Centralised Bus Priority in Dublin City Traffic Signal Management in Dublin City Sydney Coordinated Adaptive Traffic System (SCATS) Adaptive system which reacts to traffic Over

More information

ROUNDABOUT MODEL COMPARISON TABLE

ROUNDABOUT MODEL COMPARISON TABLE Akcelik & Associates Pty Ltd PO Box 1075G, Greythorn, Vic 3104 AUSTRALIA www.sidrasolutions.com Management Systems Registered to ISO 9001 ABN 79 088 889 687 ROUNDABOUT MODEL COMPARISON TABLE Prepared by

More information

This document is downloaded from DR-NTU, Nanyang Technological University Library, Singapore.

This document is downloaded from DR-NTU, Nanyang Technological University Library, Singapore. This document is downloaded from DR-NTU, Nanyang Technological University Library, Singapore. Title Modelling and simulation of vehicle movements at signalised road junctions Author(s) Liu, Jialin Citation

More information

Chapter 16: Traffic and Parking A. INTRODUCTION

Chapter 16: Traffic and Parking A. INTRODUCTION Chapter 6: Traffic and Parking A. ITRODUCTIO This chapter examines the potential traffic and parking impacts of the proposed Fresh Kills Park roads. The analysis of transit and pedestrians is presented

More information

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas 133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS Overland Park, Kansas September 1, 2017 TABLE OF CONTENTS 1. INTRODUCTION... 1 2. LITERATURE REVIEW... 1 3. CONCEPT

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

EVALUATION OF PERFORMANCE OF MODERN ROUNDABOUTS USING PARAMICS MICRO-SIMULATION MODEL

EVALUATION OF PERFORMANCE OF MODERN ROUNDABOUTS USING PARAMICS MICRO-SIMULATION MODEL Oketch, Delsey and Robertson 1 Paper Title: EVALUATION OF PERFORMANCE OF MODERN ROUNDABOUTS USING PARAMICS MICRO-SIMULATION MODEL Authors: Timothy Oketch, Ph.D., P. Eng., Project Manager*; Mike Delsey,

More information

Title: Modeling Crossing Behavior of Drivers and Pedestrians at Uncontrolled Intersections and Mid-block Crossings

Title: Modeling Crossing Behavior of Drivers and Pedestrians at Uncontrolled Intersections and Mid-block Crossings Title: Modeling Crossing Behavior of Drivers and Pedestrians at Uncontrolled Intersections and Mid-block Crossings Objectives The goal of this study is to advance the state of the art in understanding

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

unsignalized signalized isolated coordinated Intersections roundabouts Highway Capacity Manual level of service control delay

unsignalized signalized isolated coordinated Intersections roundabouts Highway Capacity Manual level of service control delay Whether unsignalized or signalized, isolated or coordinated, you can use TransModeler to simulate intersections with greater detail and accuracy than any other microsimulation software. TransModeler allows

More information