TRANSPORTATION MASTER PLAN Review Citywide Recommendations, Updated List and Scoring Methodology December 6, 2018
|
|
- Neil Powers
- 5 years ago
- Views:
Transcription
1 NOTE: Due to lengthy Committee discussion and allotted meeting time, slides were not presented at the meeting, but are provided here for reference. TRANSPORTATION MASTER PLAN Review Citywide Recommendations, Updated List and Scoring Methodology December 6, 2018
2 AGENDA Review of Project Goals and Purpose (15 min) Citywide Projects (30 min) Review of feedback and changes to the projects (~1 hr) Scoring Methodology (45 min) Next Steps (10 min) 2
3 REVIEW PROJECT GOALS AND PURPOSE 3
4 BACKGROUND ConnectMenlo Circulation Element Transportation Master Plan 4
5 PURPOSE Transportation Master Plan General Plan Circulation 2.C Community engagement on key issues Identify projects Cost estimates Prioritize improvements Adopt Impact Fee program General Plan Circulation 6.C Establish connection between new development and new infrastructure Update fee program Set fee rates by land use Development pays new fees Fees due at building permit stage Improvements constructed as funds accumulate 5
6 FM1 CURRENT FEE PROGRAM EXAMPLE Cost of improvements Identify Improvements Determine total cost of needed infrastructure $40M Allocate to new development Determine future growth Divide into portion that benefits New 25% development Existing users Determine fee by use E.g., by housing unit or square foot of office space Can lower or waive fees to incentivize certain uses 75% $3250 per home $4.80 / sf office 6
7 ILLUSTRATIVE EXAMPLE El Camino Real/Middle Ave 2009 TIF Recommendation as shown Consistent with? Middle Plaza (500 ECR) El Camino Real Corridor Study ECR/Downtown Specific Plan ConnectMenlo Circulation Element Middle Pedestrian/Bike Crossing Narrow lanes Repurpose median Narrow sidewalks 7
8 TRANSPORTATION MASTER PLAN GOALS Safety Vision Zero Eliminate traffic fatalities and reduce the number of non-fatal collisions by 50% by (Policy CIRC-1.1) Sustainability Enable the City to meet the goals of the current and future Climate Action Plan, including a 27 percent greenhouse gas emission reduction Mobility Choice Design transportation projects to accommodate all modes and people of all abilities. Encourage the use of lower emission modes such as walking, biking and transit. (Policy CIRC-2.1 and 4.1) 8
9 PRIORITIZATION CRITERIA Cost $: Less than $100,000 $$: $100,000 - $1,000,000 $$$: $1,000,000 - $3,000,000 PP: Partner Projects F: Funded Ease of implementation May be accomplished during routine pavement maintenance or City-guided program May be eligible for grant funding Significant community support Sensitive populations El Camino Real Proximity to daycares, senior centers, and communities of concern Transportation sustainability Meets City s goals and policies for mobility choices and health & wellness Safety Could improve safety conditions School nearby K-12 school located with ½ mile radius Congestion relief Short-Term Long-Term Circulation Patterns GHG reduction / person throughput Moves people out of SOV and into transit, carpools, shuttles, etc. Meets City s GHG goal Green infrastructure Reduces impervious surface or increases pervious surface; stormwater 9 treatment
10 HOW DID WE GET HERE? Date Task November December 2016 January-June 2017 August 2017 July October 2017 July December 2017 January March 2018 City Council adopts ConnectMenlo Identifies TMP as highest priority Circulation Element program City selects W-Trans, Project Initiated City Council establishes Outreach and Oversight Committee 1stround community engagement. 1,000 participants. Prep existing transportation information summary W-Trans develops draft recommendations and strategies March 14, 2018 CityCouncil info item to prepare for OOC #2 March 20, 2018 Outreach and Oversight Committee #2: Draft strategies and recommendations for high priority corridors 10
11 HOW DID WE GET HERE? Date March 27, 2018 April 17 & 24, 2018 May 9, 2018 May 22, 2018 May 30, 2018 August-September 2018 Task City Council info item: Identify need for more meetings Review recommendations from OOC City Council policy discussion and direction Complete Streets Commission Council approval of revised scope of work OOC #3: Review Council-adopted scope, goals, prioritization criteria and role of OOC OOC #4, #5, #6: Review recommendations for north, central, and south areas of City Complete Streets Commission #2: Review bicycle and pedestrian network recommendations 11
12 Data Analysis Needs Assessments Public Engagement Prioritization Criteria Walk Audits Community Input OOC Plans Prioritization Criteria Memo Connect Menlo Goals Strategies and Recommendations Working Paper Transportation Background Memo Initiatives EIRs Project List and OOC Meetings 12
13 PROJECT LIST REFINEMENT North South Central OOC Additional Analysis Public Input Staff Updated Project List OOC Meetings Feedback Loop 13
14 CITYWIDE PROJECTS 1 4
15 MENLO PARK ATTRACTS WORKERS FROM OUTSIDE OF MENLO PARK 15 Source: onthemap.ces.census.gov
16 WHERE DO THOSE 35,000 WORKERS LIVE? 16 Source: onthemap.ces.census.gov
17 CITYWIDE PROJECTS Most projects are related to establishing new programs Eight projects are related to Intelligent Transportation Systems Added Evaluation of Relinquishment of Willow Road from Caltrans to the City (Project #176) Added program to evaluate street lights (Project #177) 17
18 REVIEW FEEDBACK AND PROJECT CHANGES 1 8
19 FEEDBACK SUMMARY Staff received approximately 250 comments from Committee members, Complete Street Commissioners, and members of the public Approximately 95 of the comments refer to projects to be Added/Modified/Clarified Remaining comments were either duplicates, agreement with project recommendations or includes policies/projects beyond the scope of the TMP 19
20 PROJECT ADDITIONS Pedestrian and Bicycle crossing over 101 north of Marsh Road (Project #178) Pedestrian and Bicycle Rail crossing over Dumbarton rail to Onetta Harris Community Center (Project #185) Marsh Road sidewalks Requires removal of parking, landscaping and coordination with Redwood City residents (Project #184) EncinalAvenue sidewalks Requires removal of parking and landscaping (Project #179) Bicycle Lanes on Chrysler requires parking removal (Project #186) Bicycle Lanes on University between Oak Grove and Santa Cruz Ave requires parking removal (Project #189) Bicycle Lanes on Oak Grove between Crane and University requires parking removal (Project #107) 20
21 PROJECT MODIFICATIONS Coleman between Ringwood Avenue and Willow Road (#61) Request: Class II bike lanes within City limits Tradeoff: removal of on-street parking, Coordination with San Mateo County Laurel Street from Burgess to Willow Road (#75) Request: Class II instead of Class III Tradeoff: removal of on-street parking EncinalAvenue from Garwood Way to El Camino Real (#82) Request: Class II instead of Class III Tradeoff: removal of on street parking on both sides of the street 21
22 PROJECTS BEING REMOVED Willow Road Exclusive Bus Lanes between Bayfront Expressway and US 101 (Project #35) Menalto Bike/Ped overcrossing and Menalto Bicycle Route from US 101 to O Brien (Projects #33 and #34) Menalto Bicycle Route from Durham to Woodland (Project #60) Compact roundabouts at College & University and Cambridge and University (Projects #121 and #122) 22
23 INTERSECTION IMPROVEMENTS Operational improvements proposed at 21 intersections include striping updates, added capacity, signal timing updates, and new signal installations Average delay and level of service (LOS) expected to improve during AM at 16 intersections and PM at 13 intersections LOS remains acceptable at other intersections except Bayfront/Chilco where the benefit for local residents outweighs the average increase in delay 23
24 INTERSECTION ANALYSIS Intersection Delay & Level of Service No Improvement With Improvement AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour Project Location Delay LOS Delay LOS Delay LOS Delay LOS 2 Bayfront Expy & Marsh Rd 50.4 D 29.0 C 29.0 C 22.9 C 3 Bayfront Expy & Chrysler Dr 8.9 A 18.0 B 15.5 B 22.6 C 4 Bayfront Expy & Chilco St 29.8 C 47.5 D 36.7 D 99.8 F 6 Bayfront Expy & Facebook Bldg D F 40.5 D F 8 Bayfront Expy & Willow Rd F F F 62.3 E 17 Chrysler Dr & Jefferson Dr 13.8 B 14.9 B 8.3 A 21.0 C 18 Chrysler Dr & Independence Dr 10.9 B 13.3 B 23.1 C 17.3 B 21 Chilco St & Constitution Dr F F 87.3 F 47.9 D 31 University Ave & Adams Dr F F 18.1 B 31.4 C 38 Willow Rd & Hamilton Ave 10.9 B F 19.2 B 78.1 E 39 Willow Rd & Ivy Dr 13.7 B 24.9 C 8.7 A 13.3 B 41 Willow Rd & Newbridge St 59.5 E 58.8 D 52.3 D 43.0 D 43 Willow Rd & Bay Rd 11.9 B 13.8 B 11.7 B 13.8 B 45 Willow Rd & Coleman Ave 20.4 C 8.5 A 14.2 B 8.5 B 47 Willow Rd & Middlefield Rd 59.0 E 68.9 E 37.7 D 29.6 C 53 Bay Rd & Ringwood Ave-Sonoma Ave F C 63 Middlefield Rd & Ravenswood Ave 40.4 D 52.1 D 11.1 B 52.1 D 64 Middlefield Rd & Ringwood Ave-D St 22.5 C 42.2 D 16.5 B 42.2 D 72 Laurel St & Glenwood Ave 70.1 F 17.2 c 17.3 B 15.5 B 112 Santa Cruz Ave & University Dr (North) F F 28.1 C 41.3 D 133 Santa Cruz Ave & Orange Ave-Avy Ave F F 35.6 D 35.4 D 24
25 WILLOW AND MIDDLEFIELD 25
26 NOTE: The Committee voted unanimously at the meeting to remove this project from the list. WILLOW ROAD REVERSIBLE BUS LANE 26
27 MIDDLEFIELD AND RAVENSWOOD 27
28 SCORING METHODOLOGY 2 8
29 PROJECTS SCORED BASED ON PRIORITIZATION CRITERIA AND GOALS Prioritization Criteria Updated Project List Mode Choice Multiplier Rank Review Ranked Project List Connect Menlo Goals Revise 29
30 PROJECTS PRIORITIZED BASED ON TOTAL SCORE AND TIMEFRAME Low Priority Medium Priority High Priority Short- Term Medium- Term Short- Term Medium- Term Short- Term Medium- Term Long- Term Long- Term Long- Term 30
31 DISCUSSION Public Comment Committee Feedback Questions and Clarification 31
32 NEXT STEPS 3 2
33 SCHEDULE Task Schedule Community workshop and online open house Winter 2019 Release draft Master Plan Spring 2019 OOC #8 & Complete Streets Commission review draft Transportation Master Plan Spring 2019 City Council review and adoption Summer 2019 Develop Fee Program update Fall
34 DISCUSSION Public Comment Committee Feedback Schedule Upcoming Meetings 34
35 THANK YOU
TMP Oversight and Outreach Committee Meeting Date: 4/23/2019 Staff Report Number: TMP
AGENDA ITEM C-2 Public Works STAFF REPORT TMP Oversight and Outreach Committee Meeting Date: 4/23/2019 Staff Report Number: 18-008-TMP Regular Business: Provide feedback and recommend to City Council approval
More informationDETAILED PROJECT LIST
1 Haven Ave from Marsh Rd to Haven Court Bayfront Expy Multimodal Construct Class I Multi-Use Path from Marsh Rd to Atherton Channel Establish Class II Bicycle Lanes from Haven Court to Atherton Channel
More informationPublic Works AGENDA ITEM D-2 STAFF REPORT
AGENDA ITEM D-2 Public Works STAFF REPORT Transportation Master Plan Oversight and Outreach Committee Meeting Date: 10/30/2017 Staff Report Number: 17-001-TMP Regular Business: Provide feedback on Performance
More informationCITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA
CITY OF SIGNAL HILL 2175 Cherry Avenue Signal Hill, CA 90755-3799 AGENDA ITEM TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: STEVE MYRTER, P. E. DIRECTOR OF PUBLIC WORKS SUBJECT: SPRING STREET
More informationAGENDA ITEM G-2 Public Works
AGENDA ITEM G-2 Public Works STAFF REPORT City Council Meeting Date: 12/6/2016 Staff Report Number: 16-214-CC Regular Business: Approve the Oak Grove University Crane Bike Improvement Concept Plan, authorize
More informationGeneral Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701
General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701 Meeting Agenda 1. Purpose of Scoping Meeting 2. Project Overview 3.
More informationSan Mateo County Bicycle and Pedestrian Advisory Committee
San Mateo County Bicycle and Pedestrian Advisory Committee January 19, 2017 Emma Shlaes, Policy Manager About SVBC Mission Our purpose is to create a healthy community, environment, and economy through
More informationGet Us Moving Update. June 2018
Get Us Moving Update June 2018 Community Engagement 2 Outreach by the Numbers $12 Billion in need identified through a call for projects process 7 Million Get Us Moving impressions on digital and social
More informationItem No. 14 Town of Atherton
Item No. 14 Town of Atherton CITY COUNCIL STAFF REPORT CONSENT AGENDA TO: THROUGH: FROM: HONORABLE MAYOR AND CITY COUNCIL GEORGE RODERICKS, CITY MANAGER MICHAEL KASHIWAGI, COMMUNITY SERVICES DIRECTOR MARTY
More informationREVIEW OF LOCAL TRAFFIC FLOW / LONG RANGE PLANNING SOLUTIONS STUDY
ITEM Town of Atherton TRANSPORTATION COMMITTEE STAFF REPORT TO: FROM: MEMBERS OF THE COMMITTEE ROBERT OVADIA, PUBLIC WORKS DIRECTOR DATE: FEBRUARY 12, 2019 SUBJECT: REVIEW OF LOCAL TRAFFIC FLOW / LONG
More information4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC
4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study
More informationPEDESTRIAN ACTION PLAN
ATTACHMENT 2 CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN This page intentionally left blank EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY Setting the Stage
More informationMemorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:
Memorandum Date: November 20, 2017 To: Transportation Authority Board From: Eric Cordoba Deputy Director Capital Projects Subject: 12/5/17 Board Meeting: San Francisco Freeway Corridor Management Study
More informationBETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY
DRAFT PLAN City Council Meeting August 14, 2017 STUDY AREA Sedgwick Corridor State Route 160, principal arterial with Class 3 access management designation, commuter and freight route, connection to SR
More informationBD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1
BD00 RESOLUTION NO. - RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE [NTIP PLANNING] FINAL REPORT WHEREAS, The Vision Zero Ramp Intersection Study Phase was recommended by Commissioner
More informationTABLE OF CONTENTS. Executive Summary
Executive Summary Background... ES-1 Pedestrian Network... ES-2 Bikeway Network... ES-2 Collision History... ES-2 Public Input... ES-4 Conclusions and Recommendations... ES-4 1. Introduction and Setting
More information3.3 Transportation/Traffic
3.3 This section provides an evaluation of traffic and transportation related to the proposed Commonwealth Corporate Center Project. The Project site is accessible from Commonwealth rive and Jefferson
More informationINNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES
INNER LOOP EAST TRANSFORMATION PROJECT AIA Rochester Annual Meeting November 13, 2013 Bret Garwood, NBD Erik Frisch, DES Why? We are building a city that encourages walking, biking and enjoying the outdoor
More informationCOMMUNITY MEETING AGENDA
COMMUNITY MEETING AGENDA Welcome and Introductions SAFE Presentation Project Presentation Priorities Feedback Next Steps Q&A Santa Cruz Avenue Corridor Study 1 Santa Cruz Avenue Corridor Study Community
More informationMoving Ahead. (Community Engagement) Chapter Three
3 Community Chapter Three Moving Ahead (Community Engagement) engagement provided an exciting opportunity to engage Redwood City residents, workers, and business owners people who walk, bike, take transit,
More informationPEDESTRIAN ACTION PLAN
CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN DRAFT OCTOBER 2015 City Council, February 23, 2016 Beth Rolandson, AICP Principal Transportation Planner Mobility Division, Planning and Community Development
More informationPEDESTRIAN ACTION PLAN
CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN DRAFT OCTOBER 2015 Safe Streets Santa Monica, December 3, 2015 Beth Rolandson, AICP Principal Transportation Planner Strategic + Transportation Planning, Planning
More informationSan Mateo County Comprehensive Bicycle and Pedestrian Plan
San Mateo County Comprehensive Bicycle and Pedestrian Plan August 26, 2010 Presented to the San Mateo County BPAC by Lauren Ledbetter, Alta Planning + Design in association with: Fehr & Peers Eisen Letunic
More informationBicycle Master Plan Goals, Strategies, and Policies
Bicycle Master Plan Goals, Strategies, and Policies Mobilizing 5 This chapter outlines the overarching goals, action statements, and action items Long Beach will take in order to achieve its vision of
More informationEl Camino Real Bus Rapid Transit Conceptual Engineering. Los Altos Council Workshop January 24, 2012
El Camino Real Bus Rapid Transit Conceptual Engineering Los Altos Council Workshop January 24, 2012 Agenda Introduction Growth in the El Camino Real Corridor Benefits of BRT El Camino Real BRT Decision
More informationFoothill Expressway Improvements Between El Monte and San Antonio
Foothill Expressway Improvements Between El Monte and San Antonio June 29, 2017 - Los Altos Community Meeting Introduction Project Background Agenda Visit Stations: Provide Input and Ask Questions Reconvene:
More informationCaltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns
Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Revised: May 10, 2016 The California Department of Transportation (Caltrans) is planning various
More informationRecommendations For Oak Grove Bike Project Field Trial
Purpose: It is not easy to make decisions that require trade-offs between competing interests, what the Menlo Park City Council now faces, as it considers a field trial to evaluate the Oak Grove- Crane-University
More informationDraft MOBILITY ELEMENET. Community Meeting May 22, 2013
Draft MOBILITY ELEMENET Community Meeting May 22, 2013 Agenda Presentation Ira Brown New Mobility Paradigm Movement of People Implementation Q&A Ira Brown and Dave Roseman Small Group Discussion at Each
More informationLos Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation
Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto
More informationCITY OF CAMBRIDGE 2015 BICYCLE PLAN TOWARDS A BIKABLE FUTURE
CITY OF CAMBRIDGE 2015 BICYCLE PLAN TOWARDS A BIKABLE FUTURE WHICH FUTURE? CAMBRIDGE MUNICIPAL POLICIES 1992: Vehicle Trip Reduction Ordinance 1998: Parking & Transportation Demand Ordinance 2002: Climate
More informationSUBJECT Memorandum of Understanding to Complete a Caltrain Grade Separation Study for the Whipple Avenue Crossing
REPORT To the Honorable Mayor and City Council From the City Manager October 1, 2018 SUBJECT Memorandum of Understanding to Complete a Caltrain Grade Separation Study for the Whipple Avenue Crossing RECOMMENDATION
More informationUpper Market Street Bike Lane Project
Upper Market Street Bike Lane Project 17th Street to Octavia Boulevard 6 30 2010 SAN FRANCISCO, CALIFORNIA Agenda San Francisco & Sustainable Transportation Project Goals Outreach & Coordination Project
More informationI will attend tonight's meeting to summarize this proposal during my public comment. Thank you.
Grossman, Rachel M From: Andrew Boone Sent: Wednesday, January 11, 2012 2:29 PM To: thprop@earthlink.net; nate.menlopark@gmail.com; Bianca.walser@gmail.com; Mshiu147@gmail.com; menlo.commish.mueller@gmail.com;
More informationBeach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan
Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan AGENDA 1 Introductions & Project Scope 2 Public Outreach Recap 3 Living Streets Design Manual 4 Aviation Boulevard
More informationDumbarton Transportation Corridor Study. San Francisco Bay ITE November 2016
Dumbarton Transportation Corridor Study San Francisco Bay ITE November 2016 Dumbarton Corridor Source: Wikipedia 2 Dumbarton Corridor 3 Growth Imbalance Jobs-housing imbalance Major employers driving growth
More informationCITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies
CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN Section VIII Mobility Element Goals, Objectives, and Policies Adopted August 6, 2015 by Ordinance No. 1591 VIII MOBILITY ELEMENT Table of Contents Page Number
More informationProposed. City of Grand Junction Complete Streets Policy. Exhibit 10
Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel
More informationCRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN
CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN Preferred Plan Community Presentation September 27, 2017 City of El Paso de Robles in partnership with: Local Government Commission, W-Trans,
More informationTransportation Master Plan Advisory Task Force
Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved
More informationI-105 Corridor Sustainability Study (CSS)
I-105 Corridor Sustainability Study (CSS) Metro Streets and Freeways Subcommittee March 21, 2019 Gary Hamrick Cambridge Systematics, Inc. I-105 CSS Project History & Background Funded by Caltrans Sustainable
More informationOakland Pedestrian Master Plan Oakland Pedestrian Plan Draft Recommendations Chapter Outline
EISEN LETUNIC T R A N S P O R T A T I O N, ENVIRO N M E N TA L A N D URBAN PLANNIN G MEMORANDUM To Oakland Pedestrian Plan Technical Advisory Committee & Pedestrian Advisory Group From Victoria Eisen Date
More informationREDWOOD CITY STREETCAR - ALTERNATIVES ANALYSIS
REDWOOD CITY STREETCAR - ALTERNATIVES ANALYSIS The purpose of this document is to ennumerate the analysis of alternatives for a streetcar along the Broadway Corriodor of Redwood City. The six alternatives
More informationNOTES FROM JUNIOR COUNCIL ORIENTATION SESSION HELD ON MONDAY, JANUARY 22, 2018, AT 3:30 PM IN COUNCIL CHAMBERS, CITY HALL
CITY OF KAMLOOPS Junior Council Meeting Agenda March 12, 2018, at 3:30 pm in Council Chambers, 7 Victoria Street West, Kamloops, BC Page 1. APPROVAL OF THE AGENDA 2. MINUTES Attachment Recommendation:
More informationAgenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN
PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations
More informationFOR INFORMATION ONLY
9 Date: August 6, 2012 Current Meeting: August 16, 2012 Board Meeting: September 6, 2012 BOARD MEMORANDUM TO: THROUGH: FROM: SUBJECT: Santa Clara Valley Transportation Authority Congestion Management Program
More informationColchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016
Colchester/Riverside/Barrett/ Mill Intersection Study PAC Meeting #3 September 22, 2016 Tonight s Agenda Review Project Purpose and Need Describe short term and long improvements and changes since public
More informationPublic Information Centre
WELCOME Public Information Centre Father Tobin Road Lougheed Middle School - Library Wednesday November 7, 2012 7:00 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background The City
More informationMagnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.
Magnolia Place Traffic Impact Analysis Prepared for: City of San Mateo Prepared by: Hexagon Transportation Consultants, Inc. Updated January 4, 2010 Table of Contents 1. Introduction...1 2. Existing Conditions...6
More informationData Analysis February to March Identified safety needs from reported collisions and existing travel patterns.
Welcome! Thank you for participating in today s Valencia Bikeway Improvements workshop. Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns. Initial
More informationUniversity of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description
University of Victoria Campus Cycling Plan Terms of Reference 1.0 Project Description The Campus Cycling Plan, a first for the University, will provide a comprehensive and coordinated approach to support
More informationMCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx
MCTC 8 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV.xlsx Madera County Transportation Commission Regional Transportation Plan / Sustainable Communities Strategy Multi-Modal Project
More informationSan Mateo County Comprehensive Bicycle and Pedestrian Plan Open House
San Mateo County Comprehensive Bicycle and Pedestrian Plan Open House October 28, 2010 Presented to San Mateo County residents and interested parties by Lauren Ledbetter, Alta Planning + Design Matt Haynes,
More informationVan Ness Avenue BRT Overview and Scoping Process. Geary BRT CAC January 8, 2009
Van Ness Avenue BRT Overview and Scoping Process Geary BRT CAC January 8, 2009 VAN NESS AVENUE S ROLE Identified in Prop K for BRT treatment Muni 47 and 49; 19 operates on Polk 20,000 daily riders on Van
More informationTRANSPORTATION TRAINING TOPICS. April 6, 2010
TRANSPORTATION TRAINING TOPICS April 6, 2010 Roles of Transportation Providers Context and Policy Makers Division of Transportation and Traffic Other City Operations Other Transportation Operators CMA
More informationBellevue Downtown Association Downtown Bike Series
Bellevue Downtown Association Downtown Bike Series Meeting 2 Franz Loewenherz Andreas Piller Kyle Potuzak Chris Long October 26, 2017 Today s Agenda: 1) Meeting Purpose 2) 9/28 Meeting Recap 3) Candidate
More informationB. TRANSPORTATION, CIRCULATION AND PARKING
FEBRUARY 0 89 EL CAMINO REAL PROJECT EIR This section describes the existing traffic, circulation, parking, and transit conditions in the vicinity of the project site and provides an analysis of the project
More informationWELCOME Public Information Centre
WELCOME Public Information Centre Fernforest Drive Brampton Soccer Centre Community Room #2 Tuesday January 19, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background
More informationSan Tomas Expressway
Implementation Plan San Tomas Expressway Roads and Airports Department August 19, 2003 Implementation Plan San Tomas Expressway County of Santa Clara Roads and Airports Department 101 Skyport Drive San
More informationCommunity Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007
Community Meeting Tonight s Agenda 6:00 Introductions South Boston/Dot Ave Improvement Study Background 6:15 Consultant Introductions Review of Scope and Schedule Review of Proposed Corridor Wide Guidelines
More informationFROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04
TO: HONORABLE CITY COUNCIL FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04 SUBJECT: FINANCE COMMITTEE RECOMMENDATION TO ADOPT TRANSPORTATION STRATEGIC
More informationEl Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018
El Camino Real Specific Plan TAC/CAC Meeting #2 Aug 1, 2018 Land Use Alternatives Goals and Tradeoffs Parks & open space Housing Retail & services Civic spaces Parking Community gathering spaces 3 Alternatives
More informationCity of Charlottesville Bicycle and Pedestrian Master Plan Update
City of Charlottesville Bicycle and Pedestrian Master Plan Update September 17, 2014 I. Welcome and meeting overview II. Project status update III. Network overview IV. Break-out groups Pedestrian Network
More informationEL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT
Agenda Item #4.2 EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT VTA BOARD WORKSHOP MAY 1, 2015 ABOUT THIS PRESENTATION CONTEXT Existing conditions and planning for growth WHAT IS THE PROJECT? Project alternatives
More informationTRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO
TRAFFIC ACTION PLAN North Central Neighborhood CITY OF SAN MATEO Draft February 2017 Table of Contents Introduction... 1 The Traffic Forum Process... 4 Neighborhood Traffic Issues... 6 Neighborhood Recommendations
More informationT1-A - Service Reduction (Re-sizing)
Key T1-A Choice A Key T1-B Choice B Key T1-C Choice C Key T1-D Choice D Key T1-E Choice E Key T1-F Choice F Key Choice G T2 T1-A - Service Reduction (Re-sizing) Description This key choice would represent
More informationTonight is for you. Learn everything you can. Share all your ideas.
Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.
More informationPRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN
PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations
More informationCommunity Transportation Plan Acknowledgements
Community Transportation Plan Acknowledgements The Decatur CTP was developed with participation and guidance from City of Decatur staff, its Resident Boards and Commissions, and numerous residents, business
More information101 Corridor Managed Lanes
101 Corridor Managed Lanes TA BOD Meeting May 5, 2016 Agenda Item 11a Presentation Outline 101 Corridor Profile System Deficiencies Background Managed Lanes Proposed Purpose and Need Alternatives Under
More informationMay 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return
Summary: Local return is an important revenue source for cities to maintain their local transportation infrastructure. Most cities use their local return to operate small bus systems and repave streets,
More informationBicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017
Bicycle and Pedestrian Chapter TPP Update Overview TAB September 20, 2017 Bicycling & Walking in the Twin Cities Where are we now? The Bike-Pedestrian system Current trends New developments Where are we
More informationOutreach Approach RENEW SF served as the primary liaison with the North Beach community; the Chinatown. Executive Summary
Executive Summary Executive Summary The Columbus Avenue Neighborhood Transportation Study s objective is to identify changes to transportation infrastructure and policies that could enhance the livability
More informationAnn Arbor Downtown Street Plan
1 Ann Arbor Downtown Street Plan Public Workshop #1 We know that. 2 Public right-of-way (streets, sidewalks, and alleys) make up 30% of the total District area of downtown. Streets need to provide mobility
More informationCITY OF ANN ARBOR TRAFFIC CALMING PROGRAM PROCESS OVERVIEW. Petitioner defines the project area limits and gathers petition signatures.
CITY OF ANN ARBOR TRAFFIC CALMING PROGRAM PROCESS OVERVIEW Step 1: Petition Petitioner defines the project area limits and gathers petition signatures. 50% of addresses within the project area must sign
More information2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE
About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation
More informationMOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014
MOBILITY WORKSHOP Joint City Council and Transportation Commission May 5, 2014 Review of General Plan M-1 Develop world-class transit system M-3 Maintain/enhance pedestrian-oriented City M-4 Create comprehensive
More informationCity of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE
Welcome Welcome to the third community meeting for the Issaquah-Fall City Road Improvements Project. AGENDA 6:00 p.m. Welcome and sign-in 6:10 p.m. Presentation 6:50 p.m. Open house Learn about the roadway
More informationWelcome! San Jose Avenue Open House August 25, 2015
Welcome! San Jose Avenue Open House August 25, 2015 Vision Zero The City and County of San Francisco adopted Vision Zero San Francisco Vision Zero High Injury Network as a policy in 2014, committing an
More informationReplace century-old sewer & water pipes Pedestrian-scale sidewalk lighting
PROJECT OVERVIEW The Masonic Avenue Streetscape Project is an effort to improve safety for everyone travelling on Masonic Avenue between Geary Boulevard and Fell Street. This project will bring a variety
More informationData Analysis February to March Identified safety needs from reported collisions and existing travel patterns.
Welcome! Thank you for participating in today s Valencia Bikeway Improvements workshop. Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns. Initial
More informationChapter 5. Complete Streets and Walkable Communities.
Chapter 5. Complete Streets and Walkable Communities. 5.1 Description of Complete Streets. Cities throughout the world, and specifically the United States, are coming to embrace a new transportation and
More informationNorth Shore Transportation Improvement Strategy
North Shore Transportation Improvement Strategy Preliminary, Near-term Recommendation 2016 April Transportation Improvement Strategy (TIS) Comprehensive and Analytical A multi-modal transportation strategy
More informationTransportation Assessment
Transportation Assessment Midtown Open House February 10, 2018 Overview Midtown in Focus Overview & Purpose of Today Transportation Assessment overview Summary of Transportation work to date Review & Analysis
More informationIn station areas, new pedestrian links can increase network connectivity and provide direct access to stations.
The Last Mile Planning for Pedestrians Planning around stations will put pedestrians first. Making walking to stations safe and easy is important; walking will be a part of every rapid transit Accessible
More informationCity of Jacksonville Mobility Fee Update
City of Jacksonville Mobility Fee Update 2017 Preliminary Analysis May 3, 2017 Carnival Cruise lines photo credit Presentation Overview Public Outreach Process Pedestrian and Bicycle Master Plan Study
More informationCommunity Task Force July 25, 2017
Community Task Force July 25, 2017 Welcome and Introductions Project Partners Regional Transportation District (RTD) Colorado Department of Transportation (CDOT) Denver Regional Council of Governments
More informationRapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion
RapidRide Roosevelt Seattle Bicycle Advisory Board 1 Our mission, vision, and core values Mission: deliver a high-quality transportation system for Seattle Vision: connected people, places, and products
More informationCity Council Agenda Item #6-A CITY OF ALAMEDA Memorandum. To: Honorable Mayor and Members of the City Council. John A. Russo City Manager
CITY OF ALAMEDA Memorandum To: From: Honorable Mayor and Members of the City Council John A. Russo City Manager Date: January 14, 2013 Re: Adopt a Resolution Approving a Complete Streets Policy, in Accordance
More informationWELCOME. Traffic & Parking Commission Special Meeting May 30, Iteris, Inc. All rights reserved.
WELCOME Traffic & Parking Commission Special Meeting May 30, 2018 WORKSHOP #2 CONCEPTS FOR IMPROVEMENT MAY 30, 2018 Agenda 1. Welcome 10 min 2. Project Presentation 25 min 3. Roundtable Dialogue 50 min
More informationMEMORANDUM - CITY OF PASADENA Department Of Transportation DATE: OCTOBER 21, 2008 TO: ENVIRONMENTAL ADVISORY COMMISSION FROM: ~ FRED C. DOCK, DIRECTOR OF TRANSPORTATION SUBJECT: UPDATE ON DEPT. OF TRANSPORTATION
More informationTULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY
CITY OF TULSA BICYCLE & PEDESTRIAN INFRASTRUCTURE TULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY 31, 2013 CITY OF TULSA ENGINEERING SERVICES DEPARTMENT CITY OF TULSA ADA TRANSITION
More informationWELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.
City of Carlsbad Pedestrian Master Plan: WELCOME WELCOME Please Sign In Provide Input at Flip Charts Review Boards Presentation of Draft Plan Thank you for joining us at the Second Public Workshop for
More informationSan Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation
San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco Capital Needs In 2006, the Mayor and Board of Supervisors approved San
More informationRESOLUTION NO A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENLO PARK ADOPTING A COMPLETE STREETS POLICY
RESOLUTION NO. 6123 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENLO PARK ADOPTING A COMPLETE STREETS POLICY WHEREAS, the term Complete Streets describes a comprehensive, integrated transportation
More informationREGULAR MEETING of the San Mateo County Bicycle and Pedestrian Advisory Committee (SMCBPAC) Thursday, October 20, 2016
REGULAR MEETING of the San Mateo County Bicycle and Pedestrian Advisory Committee (SMCBPAC) Thursday, October 20, 2016 San Mateo City Hall 330 West 20 th Street, Conference Room A City of San Mateo, California
More informationGeary Bus Rapid Transit Project
Geary Bus Rapid Transit Project Outreach Update SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY April 28, 2016 Project Activities Since January Meeting Continued
More informationMEETING OF THE CITY OF CONCORD BICYCLE, PEDESTRIAN AND SAFE ROUTES TO TRANSIT PLAN ADVISORY COMMITTEE AGENDA
MEETING OF THE CITY OF CONCORD BICYCLE, PEDESTRIAN AND SAFE ROUTES TO TRANSIT PLAN ADVISORY COMMITTEE Monday, April 25, 2016 5:30 p.m., Regular Meeting PERMIT CENTER CONFERENCE ROOM 1950 Parkside Drive,
More informationFreeway ramp intersection study
Freeway ramp intersection study Supporting Vision Zero: Zero traffic deaths in San Francisco by 2024 Study Goals: Primary Improve Safety Improve Accessibility Secondary Provide Efficient Circulation Accommodate
More informationCity of San Diego Vision Zero Draft Strategic Plan FY 2017
City of San Diego Vision Zero Draft Strategic Plan FY 2017 Engineering Objective: To develop and implement a strategy that employs best planning, design and engineering practices. Background: Over the
More information