1 City of Sarnia Michigan Avenue Traffic Study Final Report November 29, 218 B17 SUBMITTED BY CIMA CANADA INC Harvester Road Burlington, ON L7N 3G7 T F cima.ca CONTACT Stephen Keen stephen.keen@cima.ca T , 6834

2

3 November 29, 218 Table of Contents 1. Introduction Background and Purpose Road Diets Study Area Study Approach Existing Conditions Roadway Cross-Section Traffic Volumes and Lane Configurations Existing Intersection Operations Pedestrian and Cyclist Facilities Parking Potential Road Diet Cross-Sections Traffic Operations with Road Diet Lane Configurations with Road Diet Traffic Forecasting Future Intersection Traffic Operations Discussion and Recommendations EA Process Recommended Cross Section Additional Recommendations List of Tables Table 1: LOS Criteria for Signalized and Unsignalized Intersections... 3 Table 2: Existing Intersection Operations... 6 Table 3: Evaluation of Proposed Cross-Sections Table 4: 231 Future Intersection Operations with Existing Lane Configurations 13 Table 5: Future Intersection Operations with Road Diet B17_Traffic Study_Michigan Avenue_e2.docx iii

4 November 29, 218 List of Figures Figure 1: Typical Road Diet... 1 Figure 2: Study Area... 2 Figure 3: Michigan Avenue Existing Cross-Section... 4 Figure 4: Existing Traffic Volumes... 5 Figure 5: Michigan Avenue Lane Configurations... 5 Figure 6: Proposed Cross-Section No. 1 (Two-way Left Turn Lane)... 8 Figure 7: Proposed Cross-Section No. 2 (Parking Lanes)... 8 Figure 8: Proposed Cross-Section No. 3 (Multi-use Path)... 9 Figure 9: Proposed Cross-Section No. 4 (Bicycle Lanes)... 9 Figure 1: Proposed Cross-Section No. 5 (Parking Lane on north side and MUP on south side)... 1 Figure 11: Proposed Cross-Section No. 6 (Parking Lane on north side and Bicycle Lane on south side)... 1 Figure 12: Michigan Avenue Lane Configurations with Road Diet Figure 13: Average Annual Daily Traffic Trend List of Appendices Appendix A: Traffic Volumes Appendix B: Synchro Reports Appendix C: iv B17_Traffic Study_Michigan Avenue_e2.docx

5 November 29, Introduction 1.1. Background and Purpose Michigan Avenue is within the County of Lambton s jurisdiction and the current capital plan includes reconstruction of the roadway in 219. During preliminary dialogue between the County and City staff, the capacity of the existing road was discussed. From this, an alternative solution of a possible lane reduction (road diet) from 4 to 3 lanes was proposed. CIMA+ was retained by the City of Sarnia (the City) to undertake a traffic study of a 62-metre section of Michigan Avenue, between Christine Street North and Colborne Road, regarding the viability of reducing the current 4-lane cross-section with the implementation of a road diet. This study evaluates various cross-sections that include a two-way left-turn lane, on-street parking and a multi-use trail to recommend the ideal cross-section. The purpose of this assignment is to review existing traffic conditions and opportunities for future improvement, as well as to provide qualitative and quantitative review of benefits and disbenefits of a proposed road diet within the study area Road Diets According to the Federal Highway Administration s (FHWA) Road Diet Informational Guide, a road diet is generally described as removing travel lanes from a roadway and utilizing the space for other users and travel modes. The most common road diet reconfiguration consists of converting an undivided four-lane roadway to a three-lane undivided roadway (one of which being a two-way left-turn lane) and reassigning the remaining width to be reallocated for bicycle lanes, parking lanes, pedestrians or transit users. Figure 1 illustrates a typical road diet. BEFORE AFTER Figure 1: Typical Road Diet 1 1 FHWA Road Diet Informational Guide (p. 3) 1

6 November 29, 218 Since their inception, road diets have consistently produced reductions in operating speeds, collisions, and aggressive driving behaviours. Conceived as a reaction to over-designed fourlane roadways where growth was anticipated beyond what transpired, as well as certain operating difficulties with four-lane roadways, road diets provide an adequate solution for neighbourhood thoroughfares where more effective, but correspondingly more intrusive, measures such as speed humps are considered inappropriate. Ontario cities have implemented road diets to great effect. In the Region of Waterloo, Frederick Street between Bruce and Edna Streets was reduced from two travel lanes in each direction to one travel lane per direction and a TWLTL, resulting in 44% fewer collisions.2 The City of Toronto reduced St. George Street between Bloor and College Streets West from four lanes to two lanes with left-turn lanes at major intersections. This resulted in a 4% reduction in collisions, as well as an increase in cycling by 1%. Further, it became part of a cycling network which saw cycling trips rise by 23% Study Area The study area is a 62-metre four-lane road section along Michigan Avenue between Christine Street North and Colborne Road. The study area includes two (2) signalized and two (2) unsignalized intersections, as illustrated in Figure 2. Michigan Avenue is a major east-west arterial road that runs from Alexandra Avenue in the west to Modeland Road in the east, where it then turns into Michigan Line. Colborne Rd March Rd Study area Newell St Christine St N Legend Michigan Ave Figure 2: Study Area The land use surrounding the study area is predominantly residential, with a golf course on the south side of Michigan Avenue (no direct access to Michigan Avenue). In addition, a fire station 2 3 Region of Waterloo, Road and Traffic Safety, Road Diets Transport Canada St. George Street Revitalization: Road Diets in Toronto 2 B17_Traffic Study_Michigan Avenue_e2.docx

7 November 29, 218 is located on the southwest corner of Michigan Avenue and Colborne Road. The current posted speed limit on Michigan Avenue within the study area is 5 km/h Study Approach This study focussed on a quantitative review of intersection operations in terms of capacity, delays and queues because of the reduced number of lanes. Intersection capacity analysis was undertaken using procedures described in the Highway Capacity Manual (HCM). The analysis primarily focuses on performance measures such as level-of-service (LOS), volume to capacity (v/c) ratio, and queueing. LOS is a qualitative measure of operational performance and is based on control delay. The LOS criteria for signalized and unsignalized intersections is shown in Table 1. LOS A represents a control delay of less than 1 seconds per vehicle. LOS F is represented by a control delay greater than 5 seconds per vehicle or if the volume-to-capacity ratio for the movement exceeds 1., regardless of the control delay. Table 1: LOS Criteria for Signalized and Unsignalized Intersections Level of Service Signalized Intersection Unsignalized Intersection A 1 1 B >1 2 >1 15 C >2 35 >15 25 D >35 55 >25 35 E >55 8 >35 5 F >8 >5 V/C ratio is the ratio between traffic volumes and the capacity of an intersection movement. A v/c ratio greater than 1. indicates that the movement is operating over capacity. 95 th Percentile Queue is the queue length that has only a 5 percent probability of being exceeded during the analysis period. It is industry practice and accepted methodology to use the 95 th percentile queue length for design and operational analysis purposes. The study also examined the benefits and disbenefits of the proposed road diet considering the following aspects: Pedestrian and cyclist safety and convenience Parking operations; and Overall traffic safety 3

8 November 29, Existing Conditions 2.1. Roadway Cross-Section Within the study limits, Michigan Avenue presents one consistent cross-section as illustrated in Figure 3. The available pavement width is 12.6 metres (curb to curb), consisting of two 3.2- metre and two 3.1-metre (2.8 metres + gutters) wide travel lanes in both the eastbound and westbound directions. Sidewalks are provided within the study area on the north side of Michigan Avenue with a width of 1.2 metres. Boulevards are also present on the north side with a width between 1.4 and 2. metres. No sidewalks or boulevards are present in the south side. Figure 3: Michigan Avenue Existing Cross-Section 2.2. Traffic Volumes and Lane Configurations Traffic counts were provided by the City for the intersections of Michigan Avenue at Christina Street North, Michigan Avenue and Colborne Road. These counts were taken on September 13 th, 218 during the AM and PM peak hours of 8:15 to 9:15 and 16: to 17:, respectively. The referenced volumes are provided in Appendix A. Trip generation, distribution and assignment were performed for the unsignalized intersections of Michigan Avenue and Newell Street and Michigan Avenue and Marcin Road since no traffic counts were available. Trip generation was performed using the ITE Trip Generation Manual, 1 th Edition methodology. The ITE trip generation land use type Single-Family Detached Housing (21) for AM and PM weekday was used to estimate the generated trips along Marcin Road and adjacent roads to Newell Street (Prentice Avenue and Hollywood Place). The trips generated at Marcin Road and Newell Street were assigned to Michigan Avenue with the assumptions that the traffic in and out of the intersections is evenly distributed eastbound and westbound. The trips generated at Hollywood Place were also evenly distributed westbound and eastbound, distributing the latter trips evenly for the northbound and southbound 4 B17_Traffic Study_Michigan Avenue_e2.docx

9 November 29, 218 directions. The trips estimated at Prentice Avenue were similarly distributed with the exception that all the eastbound trips were assigned to the southbound direction towards Michigan Avenue. Finally, the volumes were balanced for the AM and PM peak hour. The existing traffic volumes are summarized in Figure 4. The study area currently has two lanes in each direction with a shared through/left-turn and shared through/right-turn configuration at all intersections along Michigan Avenue. Figure 5 illustrates this configuration. Figure 4: Existing Traffic Volumes 2.3. Existing Intersection Operations Figure 5: Michigan Avenue Lane Configurations An intersection operational analysis was undertaken for the signalized and stop-controlled intersections along Michigan Avenue in the study area. The results of the analysis are 5

10 November 29, 218 summarized in Table 2. Detailed Synchro reports are provided in Appendix B for further reference. Direction / Movement Table 2: Existing Intersection Operations Storage Length (m) v/c ratio AM Peak LOS 95% ile Queue (m) Michigan Avenue and Christina Street North v/c ratio PM Peak LOS 95% ile Queue (m) EB L/T T/R B B 3 WB L/T T/R B B 18 NB L 38.5 B 5.15 B 12 T/R B 9.25 B 24 SB L 48.6 B 7.6 B 6 T/R B B 14 Overall -.22 B -.33 B - Michigan Avenue and Newell Street EB L/T T/R 39.4 A 1.1 A 1 WB L/T T/R 92.8 A.9 A 1 NB L/T/R 42.1 A 1.2 A 1 SB L/T/R 11.5 B 2.5 B 2 Overall - - A - - A - Michigan Avenue and Marcin Road EB L/T 92.6 A 1.13 A 1 WB T/R SB L/R 34.3 B 1.4 B 1 Overall - - A - - A - Michigan Avenue and Colborne Road EB WB NB SB L/T T/R B 1.27 B 2 L/T T/R B B 23 L/T B B 21 R 34.7 A.14 A L/T T/R B 18.8 B 15 6 B17_Traffic Study_Michigan Avenue_e2.docx

11 November 29, 218 Overall -.33 B -.33 B - The results indicate that all movements, approaches and intersections are operating at LOS B or better and with v/c ratios of.41 or lower under existing conditions. No queueing issues were observed. Therefore, no operational issues were identified in the study area under existing conditions Pedestrian and Cyclist Facilities Pedestrians are accommodated with the 1.2-metre-wide sidewalk on the north side of Michigan Avenue within the study limits, which is narrower than the minimum requirement of 1.5-metres for exterior travel paths 4. Depressed curbs are present at in all approaches with the exception of the south-west corner at the intersections of Christina Street North and Newell Street. The depressed curbs do not have tactile walking surface indicators except for those at Newell Street. According to the Accessibility for Ontarians with Disabilities Act (AODA), where the depressed curb is provided at a pedestrian crossing, it must have tactile walking surface indicators. Dedicated bicycle facilities are not currently present along Michigan Avenue, resulting in bicyclists having to share the road with vehicular traffic (however, no bicycle volumes were provided for review). It is important to note that there is a 2.7-metre multi-use path on the north side of Michigan Avenue, west of Christina Street North. The City s Transportation Master Plan shows Michigan Avenue as a long-term route, however no further details are available currently Parking Parking is currently allowed on both the north and south sides of Michigan Avenue except for the north side between Christina Street North and Newell Street, where a No Parking sign is present. 3. Potential Road Diet Cross-Sections Using minimum and desirable lane widths from various industry standards and guidelines, including the Geometric Design Standards for Ontario Highways (GDSOH), TAC Geometric Design Guide for Canadian Roads, and Ontario Traffic Manual (OTM) Book 18 Cycling Facilities, the potential cross-sections illustrated in Figure 6 to Figure 11Figure 8 were developed for Michigan Avenue within the study area. The first cross-section includes a 5.-metre wide two-way left-turn lane with two 3.8 metres travel lanes (3.5 metres + gutter). 4 Accessibility for Ontarians with Disabilities Act, O.Reg. 191/11 7

12 November 29, 218 Figure 6: Proposed Cross-Section No. 1 (Two-way Left Turn Lane) The second cross-section includes two 3.5-metre travel lanes and two 2.8-metre wide (2.5 metres + gutter) parking lanes on the north and south sides of Michigan Avenue. The parking lanes would appear to be redundant for the land uses adjacent to the roadway these lanes could also be used as through lanes unless bump outs were used to delineate the parking spaces. Figure 7: Proposed Cross-Section No. 2 (Parking Lanes) 8 B17_Traffic Study_Michigan Avenue_e2.docx

13 November 29, 218 The third potential cross-section includes a 4.-metre wide buffered multi-use path on the south side. Figure 8: Proposed Cross-Section No. 3 (Multi-use Path) The fourth cross-section includes a one-directional bicycle lane on each side of the road. Figure 9: Proposed Cross-Section No. 4 (Bicycle Lanes) 9

14 November 29, 218 The fifth cross-section includes a parking lane adjacent to the housing on the north side and a sub-standard multiuse path on the south side. Figure 1: Proposed Cross-Section No. 5 (Parking Lane on north side and MUP on south side) The sixth and final cross-section option replaces the multiuse path on the south side with a oneway bicycle lane (however, no provision is provided for bicycle travelling in the other direction. Figure 11: Proposed Cross-Section No. 6 (Parking Lane on north side and Bicycle Lane on south side) A summary assessment and evaluation table is shown overleaf for the different cross-section options. Green shaded squares indicate a positive; red - negative and no shading indicates a neutral assessment. 1 B17_Traffic Study_Michigan Avenue_e2.docx

15 November 29, 218 Table 3: Evaluation of Proposed Cross-Sections Criteria\Option TWLTL Parking MUP Bike Lanes Parking Lane + MUP Parking Lane + Bike Lane (Figure 1) (Figure 2) (Figure 3) (Figure 4) (Figure 5) (Figure 6) Transition to 3 lanes at intersection Can easily transition to exclusive left-turn lane Can transition to exclusive left-turn lane by interrupting parking and shifting lanes outward Cannot transition to exclusive leftturn lane Can potentially transition to exclusive left-turn lane but may require geometric modifications at I/S Can potentially transition to exclusive left-turn lane but may require MUP modifications at I/S Can potentially transition to exclusive left-turn lane but may require dropping bike lane at I/S Provision of cycling facilities None Cyclists share the road with motor vehicles None - Cyclists can use parking lanes if usage is low Cyclists are physically separated from motor vehicle Cyclists have a designated space Cyclists have a designated space (sub-standard) Cyclists have a designated space (sub-standard) Serving actual needs No major entrances along the study area (effectively a 1- way LT) No apparent demand for onstreet parking Study area is designated as a long-term cycling route in the TMP Study area is designated as a long-term cycling route in the TMP No apparent demand for onstreet parking No apparent demand for onstreet parking Providing clear direction to drivers TWLTL may be used as an EB through lane (no entrances on south side) Drivers could use parking lane if usage is low Lane uses are clearly designated Lane uses are clearly designated Drivers could use parking lane if usage is low Drivers could use parking lane if usage is low SUMMARY GOOD OPTION BUT SOME POTENTIAL MIS- USE OF TWLTL INAPPROPRIATE FOR THE CORRIDOR NEEDS VERY GOOD OPTION MEETS CORRIDOR NEEDS (EB lane can be made a little wider) VERY GOOD OPTION MEETS CORRIDOR NEEDS PARKING INAPPROPRIATE FOR CORRIDOR NEEDS MUP SUB-STANDARD PARKING INAPPROPRIATE FOR CORRIDOR NEEDS BIKE LANE 1 DIRECTION ONLY 11

16 November 29, Traffic Operations with Road Diet 4.1. Lane Configurations with Road Diet The lane configurations with the road diet were assumed to include eastbound and westbound shared through/right-turn lanes and exclusive left-turn lanes (extension of TWLTL) at the intersections, as illustrated in Figure Traffic Forecasting Figure 12: Michigan Avenue Lane Configurations with Road Diet Based on a review of historical Average Annual Daily Traffic (AADT) data provided by the City, it was found that the AADT on Michigan Avenue decreases by approximately 3% per year (Figure 13). However, after reviewing historical traffic counts for the intersections of Michigan Avenue and Christina Street North and Michigan Avenue and Colborne Road it was found that volumes increased at a rate of 3% per year and 1-2%, respectively. Following discussions with the City, a growth factor of 2% over the next 13 years (i.e. a growth rate of 1.4% per year to 231) was considered to be a reasonable assumption. 12 B17_Traffic Study_Michigan Avenue_e2.docx

17 November 29, 218-3% per year Figure 13: Average Annual Daily Traffic Trend Future Intersection Traffic Operations Table 4 and Table 5 summarize the traffic operations within the study area during the AM and PM peak hours with the existing and proposed lane configuration, respectively. Table 4: 231 Future Intersection Operations with Existing Lane Configurations AM Peak PM Peak Direction / Storage v/c 95% Movement Length (m) LOS ile v/c 95% LOS ile ratio Queue (m) ratio Queue (m) Michigan Avenue and Christina Street North EB WB NB SB EB L/T T/R L/T T/R B B B B 21 L 38.8 B 6.18 B 14 T/R B 1.31 B 28 L 48.8 B 8.8 B 7 T/R B 22.2 B 18 Overall -.27 B -.4 B - L/T T/R Michigan Avenue and Newell Street 39.5 A 1.12 A 1 WB L/T 92.1 A.11 A 1 13

18 November 29, 218 T/R NB L/T/R 42.1 B 1.2 B 1 SB L/T/R 11.6 B 2.7 B 2 Overall - - A - - A - Michigan Avenue and Marcin Road EB L/T 92.7 A 1.16 A 1 WB T/R SB L/R 34.5 B 1.6 B 2 EB WB NB Overall - - A - - A - L/T T/R L/T T/R Michigan Avenue and Colborne Road B B B B 28 L/T B B 26 R 34.8 A.17 A L/T SB B B 18 T/R Overall -.4 B -.41 B - The results presented in Table 4 indicate that all intersections within the study area are expected to operate at LOS B or better with acceptable v/c ratios. Additionally, no queuing issues were identified. Direction / Movement EB WB NB SB Table 5: Future Intersection Operations with Road Diet AM Peak PM Peak Storage v/c 95% Length (m) LOS ile v/c 95% LOS ile ratio Queue (m) ratio Queue (m) Michigan Avenue and Christina Street North L/ B B 34 T/R B B 45 L/ B B 11 T/R B B 38 L 38.8 B 6.18 B 14 T/R B 1.31 B 28 L 48.8 B 8.8 B 7 T/R B 22.2 B 17 Overall -.31 B -.38 B - Michigan Avenue and Newell Street EB L 15.1 A 1.1 A 1 14 B17_Traffic Study_Michigan Avenue_e2.docx

19 November 29, 218 T/R WB L 15 - A - A 1 T/R NB L/T/R 42.1 B 1.3 B 1 SB L/T/R 11.6 B 2.6 B 2 Overall - - A - - A - Michigan Avenue and Marcin Road EB L 15.1 A 1.1 A 1 T WB T/R SB L/R 34.4 B 1.5 B 1 Overall - - A - - A - Michigan Avenue and Colborne Road EB L 15.7 B 6.11 B 8 T/R B B 5 WB L B B 26 T/R B B 39 NB L/T B B 26 R 34.8 A.17 A SB L/T T/R B B 18 Overall -.37 B -.44 B - The results presented in Table 5 indicate that all movements, approaches and intersections are expected to operate at a LOS B or better and with acceptable v/c ratios. 95 th percentile queues range between and 6 metres. A fire station entrance is located approximately 3 metres west of the intersection of Michigan Avenue and Colborne Road, and the expected eastbound queue length during the PM peak hour is 5 metres, which could potentially block the access to the emergency vehicles along Michigan Avenue. However, the City indicated that this is not the main access for emergency vehicles (the entrance on Colborne Road is typically used). If this queue is found to be a concern, the City may consider providing hatched pavement markings in front of the fire station access to prevent vehicles from blocking it stopping in that area, as well as a FIRE TRUCK ENTRANCE sign (WC-25). A sensitivity analysis was completed assuming all east-west intersection approaches as single lane (shared left/through/right) to verify how the intersections may operate with the multi-use path option. The results show v/c ratios of up to.88 (Michigan Avenue & Christina Street EB) and LOS up to C. Although operations would still acceptable, this configuration could experience vehicles waiting to turn left blocking through traffic at intersections, which could contribute to rear end collisions. This would be a worsened condition compared to the existing configuration, since the 4-lane cross section allows through vehicles to use the right lane to bypass left-turning vehicles. 15

20 November 29, Discussion and Recommendations 5.1. EA Process The companion guide to the Municipal Class EA document provides a clarification on proposed Road Diets: Where it can be demonstrated through the completion of a traffic study that sufficient capacity in the roadway will remain following the removal of travel lanes, project proponents may determine, through the use of their engineering judgement, that the objective and application of the roadway remain unchanged and the volume, size and capability do not exceed the minimum municipal standard, or the existing rated capacity, and that on this basis, a road diet may be more appropriately subject to a Schedule A+ process. If the traffic study concludes that a reallocation of travel lanes to other purposes will not cause serious congestion, then a Schedule A+ process could be followed. The results of the analysis presented in this report has shown that traffic operations will remain very good should a lane be taken away and it is therefore possible for the City/County to proceed with a Schedule A+ process to pursue the road diet Recommended Cross Section Based on the results presented in the previous sections, there are three potential two-lane cross-sections that have merit in further consideration. These are: A bicycle lane on either side of the road; A multiuse path on the south side of the road; and Addition of a centre two-way left-turn lane. In order to make a final recommendation on a preferred cross-section, it is recommended that a functional design exercise for these short-listed options be carried out in order to determine how each option is modified as it approaches each intersection (an exclusive left turn lane is needed) and also how the road diet transitions back to the 4-lane cross-section outside of the study area. This exercise will allow a proper costing of options including any potential utility impacts. It is important to note that after the review was completed, the City informed CIMA + that a road diet had already been implemented on Colborne Road. Further analysis was carried out to evaluate the updated lane configuration with the recommended cross-section. The results indicate no significant change on the traffic operations of this intersection as all movements and approaches continue to operate at a LOS B or better and with acceptable v/c ratios. 95 th percentile queues increased due to the reduction of lanes on the north-south approaches. The queues range between 25 and 47 metres for the northbound approach and between 33 and 42 metres for the southbound approach. However, no queues exceed the provided storage length of 267 and 16 metres for the northbound and southbound approaches, respectively Additional Recommendations - Hatched area at fire station entrance if queues are considered an issue 16 B17_Traffic Study_Michigan Avenue_e2.docx

21 November 29, Consider widening sidewalk to a minimum of 1.5 m to comply with AODA - If multi-use path, need to monitor conflicts between left-turning and through vehicles - 17

22 A Appendix A

23 Michigan Christina St Morning Peak Diagram Specified Period From: 7:: To: 1:: One Hour Peak From: 8:15: To: 9:15: Municipality: Site #: Intersection: TFR File #: Count date: Lambton 2 Michigan Ave & Christina St 2 13-Sep-218 Weather conditions: Clear/Dry Person(s) who counted: Cam ** Signalized Intersection ** Major Road: Michigan Ave runs W/E North Leg Total: 527 Heavys 2 2 Heavys 6 East Leg Total: 375 North Entering: 365 Trucks Trucks 2 East Entering: 241 North Peds: 5 Cars Cars 154 East Peds: 3 Peds Cross: Totals Totals 162 Peds Cross: Heavys Trucks Cars Totals Michigan Ave Heavys Trucks Cars Totals Christina St N W E S Christina St Cars Trucks Heavys Totals Michigan Ave Cars Trucks Heavys Totals Peds Cross: Cars 275 Cars Peds Cross: West Peds: Trucks Trucks South Peds: West Entering: 172 Heavys Heavys South Entering: 117 West Leg Total: 496 Totals 275 Totals South Leg Total: 392 Comments

24 Michigan Christina St Mid-day Peak Diagram Specified Period From: 1:: To: 14:: One Hour Peak From: 12:: To: 13:: Municipality: Site #: Intersection: TFR File #: Count date: Lambton 2 Michigan Ave & Christina St 2 13-Sep-218 Weather conditions: Clear/Dry Person(s) who counted: Cam ** Signalized Intersection ** Major Road: Michigan Ave runs W/E North Leg Total: 553 Heavys Heavys 3 East Leg Total: 395 North Entering: 265 Trucks Trucks 2 East Entering: 27 North Peds: 4 Cars Cars 283 East Peds: 3 Peds Cross: Totals Totals 288 Peds Cross: Heavys Trucks Cars Totals Michigan Ave Heavys Trucks Cars Totals Christina St N W E S Christina St Cars Trucks Heavys Totals Michigan Ave Cars Trucks Heavys Totals Peds Cross: Cars 187 Cars Peds Cross: West Peds: 1 Trucks 3 Trucks South Peds: 3 West Entering: 272 Heavys 2 Heavys South Entering: 211 West Leg Total: 559 Totals 192 Totals South Leg Total: 43 Comments

25 Michigan Christina St Afternoon Peak Diagram Specified Period From: 14:: To: 17:: One Hour Peak From: 16:: To: 17:: Municipality: Site #: Intersection: TFR File #: Count date: Lambton 2 Michigan Ave & Christina St 2 13-Sep-218 Weather conditions: Clear/Dry Person(s) who counted: Cam ** Signalized Intersection ** Major Road: Michigan Ave runs W/E North Leg Total: 72 Heavys Heavys 1 East Leg Total: 54 North Entering: 267 Trucks Trucks 1 East Entering: 247 North Peds: 5 Cars Cars 451 East Peds: 4 Peds Cross: Totals Totals 453 Peds Cross: Heavys Trucks Cars Totals Michigan Ave Heavys Trucks Cars Totals Christina St N W E S Christina St Cars Trucks Heavys Totals Michigan Ave Cars Trucks Heavys Totals Peds Cross: Cars 211 Cars Peds Cross: West Peds: Trucks Trucks South Peds: 2 West Entering: 49 Heavys Heavys South Entering: 361 West Leg Total: 736 Totals 211 Totals South Leg Total: 572 Comments

26 Total Count Diagram Michigan Christina St Municipality: Site #: Intersection: TFR File #: Count date: Lambton 2 Michigan Ave & Christina St 2 13-Sep-218 Weather conditions: Clear/Dry Person(s) who counted: Cam ** Signalized Intersection ** Major Road: Michigan Ave runs W/E North Leg Total: 557 Heavys Heavys 3 East Leg Total: 3744 North Entering: 2658 Trucks Trucks 24 East Entering: 1995 North Peds: 51 Cars Cars 2345 East Peds: 25 Peds Cross: Totals Totals 2399 Peds Cross: Heavys Trucks Cars Totals Michigan Ave Heavys Trucks Cars Totals Christina St N W E S Christina St Cars Trucks Heavys Totals Michigan Ave Cars Trucks Heavys Totals Peds Cross: Cars 292 Cars Peds Cross: West Peds: 2 Trucks 11 Trucks South Peds: 9 West Entering: 245 Heavys 17 Heavys South Entering: 1864 West Leg Total: 5149 Totals 212 Totals South Leg Total: 3984 Comments

27 Michigan Colborne Rd Morning Peak Diagram Specified Period From: 7:: To: 1:: One Hour Peak From: 8:15: To: 9:15: Municipality: Site #: Intersection: TFR File #: Count date: Lambton 3 Michigan Ave & Colborne Rd 3 13-Sep-218 Weather conditions: Clear/Dry Person(s) who counted: Cam ** Signalized Intersection ** Major Road: Michigan Ave runs W/E North Leg Total: 467 Heavys Heavys 6 East Leg Total: 653 North Entering: 268 Trucks Trucks 3 East Entering: 415 North Peds: 7 Cars Cars 19 East Peds: 2 Peds Cross: Totals Totals 199 Peds Cross: Heavys Trucks Cars Totals Michigan Ave Heavys Trucks Cars Totals Colborne Rd N W E S Colborne Rd Cars Trucks Heavys Totals Michigan Ave Cars Trucks Heavys Totals Peds Cross: Cars 387 Cars Peds Cross: West Peds: 7 Trucks 2 Trucks South Peds: 1 West Entering: 159 Heavys 9 Heavys South Entering: 25 West Leg Total: 416 Totals 398 Totals South Leg Total: 648 Comments

28 Michigan Colborne Rd Mid-day Peak Diagram Specified Period From: 1:: To: 14:: One Hour Peak From: 12:3: To: 13:3: Municipality: Site #: Intersection: TFR File #: Count date: Lambton 3 Michigan Ave & Colborne Rd 3 13-Sep-218 Weather conditions: Clear/Dry Person(s) who counted: Cam ** Signalized Intersection ** Major Road: Michigan Ave runs W/E North Leg Total: 444 Heavys Heavys 1 East Leg Total: 627 North Entering: 221 Trucks Trucks 9 East Entering: 294 North Peds: Cars Cars 213 East Peds: 3 Peds Cross: Totals Totals 223 Peds Cross: Heavys Trucks Cars Totals Michigan Ave Heavys Trucks Cars Totals Colborne Rd N W E S Colborne Rd Cars Trucks Heavys Totals Michigan Ave Cars Trucks Heavys Totals Peds Cross: Cars 38 Cars Peds Cross: West Peds: 5 Trucks 6 Trucks South Peds: West Entering: 24 Heavys 2 Heavys 1 1 South Entering: 336 West Leg Total: 459 Totals 316 Totals South Leg Total: 652 Comments

29 Michigan Colborne Rd Afternoon Peak Diagram Specified Period From: 14:: To: 17:: One Hour Peak From: 16:: To: 17:: Municipality: Site #: Intersection: TFR File #: Count date: Lambton 3 Michigan Ave & Colborne Rd 3 13-Sep-218 Weather conditions: Clear/Dry Person(s) who counted: Cam ** Signalized Intersection ** Major Road: Michigan Ave runs W/E North Leg Total: 571 Heavys Heavys 2 East Leg Total: 849 North Entering: 232 Trucks 1 1 Trucks 4 East Entering: 355 North Peds: 3 Cars Cars 333 East Peds: 8 Peds Cross: Totals Totals 339 Peds Cross: Heavys Trucks Cars Totals Michigan Ave Heavys Trucks Cars Totals Colborne Rd N W E S Colborne Rd Cars Trucks Heavys Totals Michigan Ave Cars Trucks Heavys Totals Peds Cross: Cars 321 Cars Peds Cross: West Peds: 7 Trucks 3 Trucks South Peds: West Entering: 331 Heavys 2 Heavys 2 2 South Entering: 517 West Leg Total: 67 Totals 326 Totals South Leg Total: 843 Comments

30 Total Count Diagram Michigan Colborne Rd Municipality: Site #: Intersection: TFR File #: Count date: Lambton 3 Michigan Ave & Colborne Rd 3 13-Sep-218 Weather conditions: Clear/Dry Person(s) who counted: Cam ** Signalized Intersection ** Major Road: Michigan Ave runs W/E North Leg Total: 4323 Heavys Heavys 31 East Leg Total: 6213 North Entering: 2174 Trucks Trucks 49 East Entering: 3181 North Peds: 62 Cars Cars 269 East Peds: 45 Peds Cross: Totals Totals 2149 Peds Cross: Heavys Trucks Cars Totals Michigan Ave Heavys Trucks Cars Totals Colborne Rd N W E S Colborne Rd Cars Trucks Heavys Totals Michigan Ave Cars Trucks Heavys Totals Peds Cross: Cars 3147 Cars Peds Cross: West Peds: 66 Trucks 37 Trucks South Peds: 7 West Entering: 22 Heavys 41 Heavys South Entering: 3227 West Leg Total: 418 Totals 3225 Totals South Leg Total: 6452 Comments

31 Appendix A B Appendix B 1

32 Queues Existing Conditions 3: Christina St N & Michigan Ave Timing Plan: AM Peak Lane Group EBT WBT NBL NBT SBL SBT Lane Group Flow (vph) v/c Ratio Control Delay Queue Delay Total Delay Queue Length 5th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio B17_Sarnia Traffic Study CIMA Canada Inc. 1/17/218

33 HCM Signalized Intersection Capacity Analysis Existing Conditions 3: Christina St N & Michigan Ave Timing Plan: AM Peak Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) 6% 2% % % 2% % 12% 5% 15% % % 1% Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot.3 c.8 v/s Ratio Perm.7 c v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service B B B B B B Approach Delay (s) Approach LOS B B B B HCM 2 Control Delay 13.4 HCM 2 Level of Service B HCM 2 Volume to Capacity ratio.22 Actuated Cycle Length (s) 7. Sum of lost time (s) 12. Intersection Capacity Utilization 73.3% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group B17_Sarnia Traffic Study CIMA Canada Inc. 1/17/218

34 Queues Existing Conditions 6: Colborne Rd & Michigan Ave Timing Plan: AM Peak Lane Group EBT WBT NBT NBR SBT Lane Group Flow (vph) v/c Ratio Control Delay Queue Delay..... Total Delay Queue Length 5th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) 33. Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio B17_Sarnia Traffic Study CIMA Canada Inc. 1/17/218

35 HCM Signalized Intersection Capacity Analysis Existing Conditions 6: Colborne Rd & Michigan Ave Timing Plan: AM Peak Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) 1% 4% % 3% 2% 2% % 5% 3% 3% 3% 4% Turn Type Perm NA Perm NA Perm NA Free Perm NA Protected Phases Permitted Phases Free 4 Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm.5 c c.9 v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service B B B A B Approach Delay (s) Approach LOS B B A B HCM 2 Control Delay 11.2 HCM 2 Level of Service B HCM 2 Volume to Capacity ratio.33 Actuated Cycle Length (s) 6. Sum of lost time (s) 12. Intersection Capacity Utilization 88.7% ICU Level of Service E Analysis Period (min) 15 c Critical Lane Group B17_Sarnia Traffic Study CIMA Canada Inc. 1/17/218

36 HCM Unsignalized Intersection Capacity Analysis Existing Conditions 9: Michigan Ave & Marcin Rd Timing Plan: AM Peak Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Free Free Stop Grade % % % Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) 93 px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p queue free % cm capacity (veh/h) Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 Volume Total Volume Left 3 15 Volume Right 3 9 csh Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS A B Approach Delay (s) Approach LOS B Average Delay.6 Intersection Capacity Utilization 17.1% ICU Level of Service A Analysis Period (min) 15 B17_Sarnia Traffic Study CIMA Canada Inc. 1/17/218

37 HCM Unsignalized Intersection Capacity Analysis Existing Conditions 11: Newell St & Michigan Ave Timing Plan: AM Peak Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Free Free Stop Stop Grade % % % % Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) 197 px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p queue free % cm capacity (veh/h) Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 SB 1 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS A A A B Approach Delay (s) Approach LOS A B Average Delay.9 Intersection Capacity Utilization 17.9% ICU Level of Service A Analysis Period (min) 15 B17_Sarnia Traffic Study CIMA Canada Inc. 1/17/218

38 Queues Existing Conditions 3: Christina St N & Michigan Ave Timing Plan: PM Peak Lane Group EBT WBT NBL NBT SBL SBT Lane Group Flow (vph) v/c Ratio Control Delay Queue Delay Total Delay Queue Length 5th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio B17_Sarnia Michigan Ave_Traffic Study CIMA Canada Inc. 1/17/218

39 HCM Signalized Intersection Capacity Analysis Existing Conditions 3: Christina St N & Michigan Ave Timing Plan: PM Peak Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) 1% % % % 2% % 2% % 2% 5% % 1% Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot c.9.6 v/s Ratio Perm c v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service B B B B B B Approach Delay (s) Approach LOS B B B B HCM 2 Control Delay 13.9 HCM 2 Level of Service B HCM 2 Volume to Capacity ratio.33 Actuated Cycle Length (s) 7. Sum of lost time (s) 12. Intersection Capacity Utilization 13.3% ICU Level of Service G Analysis Period (min) 15 c Critical Lane Group B17_Sarnia Michigan Ave_Traffic Study CIMA Canada Inc. 1/17/218

40 Queues Existing Conditions 6: Colborne Rd & Michigan Ave Timing Plan: PM Peak Lane Group EBT WBT NBT NBR SBT Lane Group Flow (vph) v/c Ratio Control Delay Queue Delay..... Total Delay Queue Length 5th (m) Queue Length 95th (m) Internal Link Dist (m) Turn Bay Length (m) 33. Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio B17_Sarnia Michigan Ave_Traffic Study CIMA Canada Inc. 1/17/218

41 HCM Signalized Intersection Capacity Analysis Existing Conditions 6: Colborne Rd & Michigan Ave Timing Plan: PM Peak Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) % 1% % 2% 2% 2% % 2% 1% 3% 2% 3% Turn Type Perm NA Perm NA Perm NA Free Perm NA Protected Phases Permitted Phases Free 4 Actuated Green, G (s) Effective Green, g (s) Actuated g/c Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm.11 c.15 c v/c Ratio Uniform Delay, d Progression Factor Incremental Delay, d Delay (s) Level of Service B B B A B Approach Delay (s) Approach LOS B B A B HCM 2 Control Delay 1.6 HCM 2 Level of Service B HCM 2 Volume to Capacity ratio.33 Actuated Cycle Length (s) 6. Sum of lost time (s) 12. Intersection Capacity Utilization 91.4% ICU Level of Service F Analysis Period (min) 15 c Critical Lane Group B17_Sarnia Michigan Ave_Traffic Study CIMA Canada Inc. 1/17/218

42 HCM Unsignalized Intersection Capacity Analysis Existing Conditions 9: Michigan Ave & Marcin Rd Timing Plan: PM Peak Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Free Free Stop Grade % % % Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) 93 px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p queue free % cm capacity (veh/h) Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 Volume Total Volume Left Volume Right 11 5 csh Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS A B Approach Delay (s) Approach LOS B Average Delay.5 Intersection Capacity Utilization 25.9% ICU Level of Service A Analysis Period (min) 15 B17_Sarnia Michigan Ave_Traffic Study CIMA Canada Inc. 1/17/218

43 HCM Unsignalized Intersection Capacity Analysis Existing Conditions 11: Newell St & Michigan Ave Timing Plan: PM Peak Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Free Free Stop Stop Grade % % % % Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) 197 px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p queue free % cm capacity (veh/h) Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 SB 1 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS A A A B Approach Delay (s) Approach LOS A B Average Delay.8 Intersection Capacity Utilization 25.6% ICU Level of Service A Analysis Period (min) 15 B17_Sarnia Michigan Ave_Traffic Study CIMA Canada Inc. 1/17/218

REDEVELOPMENT TRAFFIC IMPACT STUDY

REDEVELOPMENT TRAFFIC IMPACT STUDY REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport

More information

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd. 9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major

More information

George Street Transportation Impact Study. Paradigm Transportation Solutions Limited

George Street Transportation Impact Study. Paradigm Transportation Solutions Limited George Transportation Impact Study Paradigm Transportation Solutions Limited January 217 Project Summary Project Number 16191 January 217 Client Wastell Homes 5-1895 Blue Heron Drive London ON N6H 5L9

More information

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama.

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama. Traffic Impact Study Crestline Piggly Wiggly Mountain Brook, Alabama Prepared for: Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama September 214 Revision 1 October 214 Crestline Piggly Wiggly Mountain

More information

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study Traffic Study To: From: James M. Moore, Director of Planning & Building Services, Town of Fairfax David Parisi, PE, TE, Parisi Transportation Consulting Date: October 14, 216 Subject: Victory Village Senior

More information

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012 Update for the May 31 st, 2012 Traffic Impact Study Prepared for Broccolini Construction 111-23596-00 September 20 th, 2012 2611 Queensview Drive, Suite 300, Ottawa, Ontario CANADA K2B 8K2 Telephone: 613-829-2800

More information

MEMO DRAFT VIA . Mr. Terry Bailey Foremost Development Company. To: Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink.

MEMO DRAFT VIA  . Mr. Terry Bailey Foremost Development Company. To: Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink. MEMO DRAFT VIA EMAIL To: From: Mr. Terry Bailey Foremost Development Company Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink Date: August 29, 214 Re: Proposed Apartments City of Walled

More information

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748 City of Barrie Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report Project Number: JDE 1748 Date Submitted: June 12 th, 2017 06/12/17 John Northcote, P.Eng. Professional License

More information

HUMC/Mountainside Hospital Redevelopment Plan

HUMC/Mountainside Hospital Redevelopment Plan Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 11 Parsippany, NJ 754 862.27.59 PREPARED

More information

February 13, Mr. Chuck Marshall Stewart's Shops Corp. PO Box 435 Saratoga Springs, NY 12866

February 13, Mr. Chuck Marshall Stewart's Shops Corp. PO Box 435 Saratoga Springs, NY 12866 February 13, 2017 Mr. Chuck Marshall Stewart's Shops Corp. PO Box 435 Saratoga Springs, NY 12866 Re: Modified Entrance Layout - Revised Traffic Assessment and Sight Distance Analysis Proposed Stewart's

More information

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged. Stantec Consulting Ltd. 1331 Clyde Avenue, Suite 4 Ottawa ON K2C 3G4 Tel: (613) 722-442 Fax: (613) 722-2799 May 14, 213 File: 1638823 Robinson Park Development Corp. 5699 Power Road Ottawa, ON, K1G 3N4

More information

STRATEGY 4 INC Mainway, City of Burlington. [ Month Year ] Project No.: TRAFFIC IMPACT AND PARKING STUDY APRIL 2018

STRATEGY 4 INC Mainway, City of Burlington. [ Month Year ] Project No.: TRAFFIC IMPACT AND PARKING STUDY APRIL 2018 STRATEGY 4 INC. TRAFFIC IMPACT AND PARKING STUDY 3257 Mainway, City of Burlington Project No.: 27-675 APRIL 28 [ Month Year ] April 7, 28 Reference No. 27-675 Mr. Jeff Kenny Strategy 4 Inc. 262 Bristol

More information

Travel Demand Management Plan

Travel Demand Management Plan Travel Demand Management Plan Linden Corner at 43 rd Street & Upton Avenue South AUTHORIZED PROPERTY REPRESENTATIVE: By Dated: Mark Dwyer Linden Hills Redevelopment, LLC 4632 Washburn Avenue South Minneapolis,

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property

Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property Prepared for: Premier Gold Mines Limited Prepared by: Stantec Consulting Ltd. November 2014

More information

Student Housing Development

Student Housing Development Traffic Impact Study for the proposed Student Housing Development City of Oneonta Otsego County, New York Project No. 3259 December 212 Revised February 13, 212 Prepared For: Newman Development Group,

More information

Bank Street Retail/Hotel Development

Bank Street Retail/Hotel Development M a y 214 89-9 Bank Street Retail/Hotel Development Transportation Brief Google 214 Bing 214 Prepared for: Prepared by: Study 89-9 Type Bank Street May 214 Study Retail/Hotel Name Development February

More information

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for: HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Technical Memo. Steve Gramm, SDDOT. RE: Phase 1, Task 100: Baseline Analysis. To: From: Steve Hoff, HDR Engineering, Inc.

Technical Memo. Steve Gramm, SDDOT. RE: Phase 1, Task 100: Baseline Analysis. To: From: Steve Hoff, HDR Engineering, Inc. Technical Memo To: Steve Gramm, SDDOT From: Steve Hoff, Engineering, Inc. Project: I-190/Silver Street Study CC: Date: 6//010 Job No: DOT Contract 41044, Order PD-0-09 RE: Phase 1, Task 100: Baseline Analysis

More information

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: 1649362 Ontario Inc. c/o Manor Park Management 231 Brittany Drive, Suite D Ottawa ON K1K 0R8 July

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

ENKA INTERMEDIATE SCHOOL

ENKA INTERMEDIATE SCHOOL TRANSPORTATION IMPACT ANALYSIS Prepared for Buncombe County Schools ENKA INTERMEDIATE SCHOOL Asheville, NC Project Number: 13-71 8/1/13 www.davenportworld.com DAVENlORT Transportation Impact Analysis Enka

More information

TRAFFIC IMPACT REPORT CASTLE PINES APARTMENTS CASTLE PINES, COLORADO

TRAFFIC IMPACT REPORT CASTLE PINES APARTMENTS CASTLE PINES, COLORADO TRAFFIC IMPACT REPORT CASTLE PINES APARTMENTS CASTLE PINES, COLORADO APRIL 12, 218 REV. JULY 16, 218 Prepared for: Davis Development 43 Corporate Center Dr Suite 21 Stockbridge, GA 3281 Prepared by: 112

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

Syracuse University University Place Road Closure

Syracuse University University Place Road Closure Transportation Impact Study for the proposed Syracuse University University Place Road Closure City of Syracuse, Onondaga County, NY March 216 Project No. 3613 Prepared For: Syracuse University Office

More information

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates

More information

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

192 & 196 Bronson Avenue / 31 Cambridge Street

192 & 196 Bronson Avenue / 31 Cambridge Street Bronson Inc. July 213 192 & 196 Bronson Avenue / 31 Cambridge Street TRANSPORTATION BRIEF Prepared by: Study 192 Bronson Type Avenue July 213 Study Transportation Name Brief February 211 TB Check List

More information

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Momentum Planning & Communications 1165 Greenlawn Crescent Ottawa, ON K1L 6C2 June 29, 2015 115-618 Brief_1.doc

More information

February 24, 2017 Project #: 20076

February 24, 2017 Project #: 20076 February 24, 217 Project #: 276 Jinde Zhu Washington County Department of Land Use and Transportation 14 SW Walnut Street MS 17 Hillsboro, Oregon 97213 RE: Sunset Ridge Phase 2 Access Report and Zone Change

More information

EXECUTIVE SUMMARY. Page 1 of 6

EXECUTIVE SUMMARY. Page 1 of 6 EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the

More information

Alfred Street Baptist Church (301 Alfred Street) Supplemental Traffic Analysis Based on Comments Received at Meeting on November 16, 2016

Alfred Street Baptist Church (301 Alfred Street) Supplemental Traffic Analysis Based on Comments Received at Meeting on November 16, 2016 To: Cc: From: Re: Subject: Ravindra Raut City of Alexandria, VA Bob Garbacz Katye North City of Alexandria, VA Larry Sefcik Grady Vaughan, EIT Wells + Associates, Inc. (31 Alfred Street) Supplemental Traffic

More information

4. Include the associated years anticipated for the short term and long term analysis in the

4. Include the associated years anticipated for the short term and long term analysis in the 2nd DE Review SM ROCHA, LLC responses to City comments are provided within. 8. Trip distribution is displayed in Figure 6. Distribution assumes SFA and commercial traffic combined for most conservative

More information

SUNY Uptown Campus and Harriman State Office Campus Traffic Impact Study for the Emerging Technology and Entrepreneurship Complex (ETEC) Building

SUNY Uptown Campus and Harriman State Office Campus Traffic Impact Study for the Emerging Technology and Entrepreneurship Complex (ETEC) Building SUNY Uptown Campus and Harriman State Office Campus Traffic Impact Study for the Emerging Technology and Entrepreneurship Complex (ETEC) Building State University of New York at Albany City of Albany,

More information

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM To: Thomas Cummings February 17, 2011 Holbrook Public Works Superintendent From: Re:

More information

S. Johnston (IBI Group)

S. Johnston (IBI Group) IBI GROUP 100 175 Galaxy Boulevard Toronto ON M9W 0C9 Canada tel 416 679 1930 fax 416 675 4620 ibigroup.com Memorandum To/Attention Project File Date October 15, 2013 From A. Ortlieb Project No 24RX12.0246.00

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Quickie Convenience Stores Larny Holdings Ltd. c/o PBC Group April 15, 2015 115-615 Report_1.doc D. J. Halpenny

More information

Signal Warrant Studies

Signal Warrant Studies Signal Warrant Studies Seven Locations Piqua, Ohio December 12, 217 Signal Warrant Studies Seven Locations Piqua, Ohio TABLE OF CONTENTS Executive Summary... 3 Introduction... 5 Study Location... 5 Data

More information

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 February 27, 2014 113-584 Overview_1.doc D. J. Halpenny

More information

February 8, Ms. Jamie Jun, Esq. Fromhold Jaffe & Adams 789 East Lancaster Avenue, Suite 220 Villanova, PA 19085

February 8, Ms. Jamie Jun, Esq. Fromhold Jaffe & Adams 789 East Lancaster Avenue, Suite 220 Villanova, PA 19085 WWW.TRAFFICPD.COM February 8, 2016 Ms. Jamie Jun, Esq. Fromhold Jaffe & Adams 789 East Lancaster Avenue, Suite 220 Villanova, PA 19085 Re: Kohelet Yeshiva School Lower Merion Township, Montgomery County,

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

Kanata North Catholic Elementary School

Kanata North Catholic Elementary School December 216 Kanata North Catholic Elementary School Transportation Brief SITE Potential Future Development Trillium Woods Prepared for: Bryden Martel Architects Inc Prepared by: KANATA NORTH CATHOLIC

More information

Prepared for Lutheran Services Carolinas. Project Number: /07/2017. Trinity Landing. New Hanover County, NC

Prepared for Lutheran Services Carolinas. Project Number: /07/2017. Trinity Landing. New Hanover County, NC Prepared for Lutheran Services Carolinas Project Number: 16273 4/7/217 Trinity Landing New Hanover County, NC Trinity Landing Transportation Impact nalysis Prepared for Lutheran Services Carolinas New

More information

Multnomah County Courthouse Relocation. Transportation Alternatives Analysis Technical Memorandum: FINAL

Multnomah County Courthouse Relocation. Transportation Alternatives Analysis Technical Memorandum: FINAL Multnomah County Courthouse Relocation Portland, Oregon Transportation Alternatives Analysis Technical Memorandum: FIL Prepared for Multnomah County Facilities and Property Management Division 41 N Dixon

More information

December TRANSPORTATION BRIEF 1-19 Beechwood Avenue, Ottawa, ON TRANSPORTATION INFORMATION TE WATER

December TRANSPORTATION BRIEF 1-19 Beechwood Avenue, Ottawa, ON TRANSPORTATION INFORMATION TE WATER December 2012 TRANSPORTATION BRIEF 1-19 Beechwood Avenue, Ottawa, ON TRANSPORTATION INFORMATION TE WATER 1-19 Beechwood Avenue Mixed Use Development Transportation Brief prepared for: Minto Communities

More information

ATTACHMENT A EXISTING TRAFFIC ENVIRONMENT

ATTACHMENT A EXISTING TRAFFIC ENVIRONMENT ATTACHMENT A EXISTING TRAFFIC ENVIRONMENT a partnership of EXISTING CONDITIONS AND OPPORTUNITIES REPORT Public Review Draft December 217 Bascom Avenue Complete Streets Study Existing Data Review: Traffic

More information

25 May 2018 OUR REF:

25 May 2018 OUR REF: 25 May 2018 OUR REF: 476088-01000 Roderick Lahey Architect Inc. 56 Beech Street Ottawa, ON K1S 3J6 Attention: Robert Verch Dear Rob: Re: 929 Richmond Road Transportation Impact Assessment Addendum #1 1.

More information

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM To: Martha White, Natick Town Administrator February 17, 2011 Eric Nascimento, MassDOT

More information

Oregon Country Fair Events

Oregon Country Fair Events Oregon Country Fair Events Traffic Impact Analysis Lane County, Oregon September, 5 Oregon Country Fair Events Traffic Impact Analysis. Introduction The purpose of this report is to provide a Traffic Impact

More information

2.0 LANE WIDTHS GUIDELINE

2.0 LANE WIDTHS GUIDELINE 2.0 LANE WIDTHS GUIDELINE Road Engineering Design Guidelines Version 2.0.1 May 2018 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services initiated

More information

LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY

LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY Prepared for: Liberty Tree Academy Prepared by: 161 Blake Street, Suite 2 Denver, Colorado 822 Contact: David Kline, PE, PTOE (33)-572-2 On Behalf of: Liberty

More information

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: Orleans Gardens Shopping Centre Inc. 2851 John Street, Suite 1 Markham, ON K3R 5R7

More information

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study

More information

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY DECEMBER 2012 READ, VOORHEES & ASSOCIATES TORONTO, ONTARIO Read, Voorhees & Associates

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for oad & Traffic Management Road & Traffic Management R Atlantic Traffic Engineering Specialists Draft Report Traffic Impact Study Superstore, Wal-Mart, and Kent Development Yarmouth, Nova Scotia Prepared

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY 675 Millcreek Drive, Unit 1 Mississauga, Ontario L5N 5M4 T: 416.213.7121 F: 95.89.8499 www.transtech.co TRAFFIC IMPACT STUDY PROPOSED MOSQUE DEVELOPMENT 4269 REGIONAL ROAD 25 TOWN OF OAKVILLE PREPARED

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) Final Report

Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) Final Report Consultant Services for Updating Intersections Operations to Accommodate Bi-Directional Cycle Tracks Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) January 30, 2014 Consultant

More information

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION PLANNING ORGANIZATIO BOSTON REGION MPO NMETROPOLITAN BOSTON REGION METROPOLITAN PLANNING ORGANIZATION Richard A. Davey, MassDOT Secretary and CEO and MPO Chairman Karl H. Quackenbush, Executive Direcr,

More information

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT Prepared by: In Association with: November 2013 EXECUTIVE SUMMARY Patton Township, in partnership

More information

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015 Implementing Complete Streets in Ottawa October 1, 2015 The Essentials Complete Streets Implementation Framework will become part of the routine delivery of City transportation projects Approach uses every

More information

NO BUILD TRAFFIC OPERATIONS

NO BUILD TRAFFIC OPERATIONS 3. 23 NO BUILD TRAFFIC OPERATIONS This section addresses the operations of the transportation system and details how it would be expected to function under year 23 No Build conditions with the projected

More information

joint access drive. will be

joint access drive. will be Date: To: From: Subject: June 22, 2015 Bradley Reiner, PE Bowman Consulting David R. Kline, PE, PTOE, Incline Associates Thornton Self-Storage Traffic Analysis (DRAFT) - Thornton, Colorado INTRODUCTION

More information

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: First Bay Properties Inc. 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 August 8, 2017 117-663 Brief_1.doc

More information

Road Conversion Study Plumas Street

Road Conversion Study Plumas Street Plumas Street Phase I Submitted to The Regional Transportation Commission of Washoe County Submitted by Zong Tian, Ph.D., P.E. Saeedeh Farivar Haiyuan Li, Ph.D. Center for Advanced Transportation Education

More information

10.0 CURB EXTENSIONS GUIDELINE

10.0 CURB EXTENSIONS GUIDELINE 10.0 CURB EXTENSIONS GUIDELINE Road Engineering Design Guidelines Version 1.0 March 2017 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services

More information

AMEC Earth and Environmental. Bovaird Drive Environmental Assessment. Traffic Study Final Report. August Excellence in Transportation Planning

AMEC Earth and Environmental. Bovaird Drive Environmental Assessment. Traffic Study Final Report. August Excellence in Transportation Planning AMEC Earth and Environmental Bovaird Drive Environmental Assessment Traffic Study Final Report August Excellence in Transportation Planning AMEC Earth and Environmental Bovaird Drive Class EA Traffic

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

Gateway Transportation Study

Gateway Transportation Study Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213 Back of

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

DRAFT Step 3 Roundabout Evaluation

DRAFT Step 3 Roundabout Evaluation DRAFT Step 3 Roundabout Evaluation Geometric and Operational Analysis SR 655 (Recker Highway) at Thornhill Road Polk County, Florida Financial Management Number: 436560-1-22-01 Federal-Aid Project Number:

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

Chapter Capacity and LOS Analysis of a Signalized I/S Overview Methodology Scope Limitation

Chapter Capacity and LOS Analysis of a Signalized I/S Overview Methodology Scope Limitation Chapter 37 Capacity and LOS Analysis of a Signalized I/S 37.1 Overview The Highway Capacity Manual defines the capacity as the maximum howdy rate at which persons or vehicle can be reasonably expected

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Fieldgate. Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton

Fieldgate. Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton Fieldgate Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton September 214 September 23 214 Ms Debbie Pacchiarotti Our

More information

APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS

APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS MEMO : Peter Steacy, P.Eng. Date: December 3, 2014 : Ian Borsuk, P.Eng. Job No.: 3414015-000 Subject: City of Ottawa O-Train Extension Planning & EA Study

More information

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc

More information

March 11, Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA Walnut Street Traffic Assessment

March 11, Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA Walnut Street Traffic Assessment March 11, 2015 Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA 01940 Re: Walnut Street Traffic Assessment Dear Board of Selectmen Members: As requested, BETA Group, Inc. (BETA)

More information

Clay Street Realignment Project Traffic Study

Clay Street Realignment Project Traffic Study Final Clay Street Realignment Project Traffic Study November 24, 2009 Prepared for: City of Placerville RS07-2466 2990 Lava Ridge Court, Suite 200 Roseville, CA 95661 (916) 773-1900 Fax (916) 773-2015

More information

Congestion Mitigation at IH 27 and U.S. Hwy 70 in Plainview, TX

Congestion Mitigation at IH 27 and U.S. Hwy 70 in Plainview, TX 2010 Congestion Mitigation at IH 27 and U.S. Hwy 70 in Plainview, TX Hongchao Liu, Hao Xu, and Rhett Dollins Multidisciplinary Research in Transportation Texas Tech University Mulidisciplinary Research

More information

Arterial Traffic Analysis Some critical concepts. Prepared by Philip J. Tarnoff

Arterial Traffic Analysis Some critical concepts. Prepared by Philip J. Tarnoff Arterial Traffic Analysis Some critical concepts Prepared by Philip J. Tarnoff Agenda Fundamentals Signal timing concepts Actuated signal controllers Developing timing plans Types of signal control First

More information

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015 Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative

More information

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District No Turn on Red Regulations STAFF REPORT ACTION REQUIRED Date: June 1, 2010 To: From: Toronto and East York Community Council Director, Transportation Services, Toronto and East York District Wards: Trinity

More information

South Street Campus Lands Development. City of London TRANSPORTATION IMPACT ASSESSMENT

South Street Campus Lands Development. City of London TRANSPORTATION IMPACT ASSESSMENT South Street Campus Lands Development City of London TRANSPORTATION IMPACT ASSESSMENT TW1387 South Street Campus Lands Development City of London TRANSPORTATION IMPACT ASSESSMENT May 2013 South Street

More information

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for: NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

TRANSPORTATION IMPACT STUDY

TRANSPORTATION IMPACT STUDY Dundas MEP Developments Inc. City of Toronto 219 and 231 Dundas Street East, Proposed Mixed-Use Development TRANSPORTATION IMPACT STUDY 9782/2 April 216 LEA Consulting Ltd. Consulting Engineers & Planners

More information

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc.

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc. CITY OF OAKLAND 27th Street Bikeway Feasibility and Design Final Report (v3) March 23, 2007 PREPARED BY: Kimley-Horn and Associates, Inc. Table of Contents 1. Introduction 3 2. 27 th Street/Bay Place Corridor

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

Appendices. Appendix J: Traffic Study

Appendices. Appendix J: Traffic Study Appendices Appendix J: Traffic Study The Platinum Triangle Subsequent EIR The Planning Center Appendices This page intentionally left blank. The Platinum Triangle Subsequent EIR The Planning Center TRAFFIC

More information

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Date: April 16 th, 2015 To: From: Re: Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Darian Nagle-Gamm, Traffic Engineering Planner Highway 6 (2 nd Street) /

More information

TRAFFIC OPERATIONS ANALYSIS REPORT. Pacheco Boulevard Alignment Study and Alternatives Analysis

TRAFFIC OPERATIONS ANALYSIS REPORT. Pacheco Boulevard Alignment Study and Alternatives Analysis TRAFFIC OPERATIONS ANALYSIS REPORT Pacheco Boulevard Alignment Study and Alternatives Analysis PREPARED FOR: CITY OF MARTINEZ AND CONTRA COSTA COUNTY OCTOBER 2016 FINAL REPORT Prepared By: under contract

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information