1 Traffic Impact Study, Premier Gold Mines Limited, Hardrock Property Prepared for: Premier Gold Mines Limited Prepared by: Stantec Consulting Ltd. November 2014

2 <Original signed by> <Original signed by> <Original signed by> <Original signed by>

3 TRAFFIC IMPACT STUDY, PREMIER GOLD MINES LIMITED, HARDROCK PROPERTY Table of Contents 1.0 INTRODUCTION BACKGROUND SCOPE AND OBJECTIVES EXISTING CONDITIONS ROADS AND TRAFFIC CONTROL TRAFFIC VOLUME EXISTING TRAFFIC OPERATIONS TRAFFIC FORECASTS HORIZON YEARS AND BACKGROUND GROWTH SITE TRIP GENERATION SITE TRIP DISTRIBUTION SITE TRAFFIC ASSIGNMENT & TOTAL TRAFFIC TRAFFIC IMPACT ASSESSMENT SITE ACCESS TRAFFIC OPERATIONS CONCLUSIONS AND RECOMMENDATIONS List of Appendices Appendix A Traffic Data Appendix B Existing Synchro Analysis Output Appendix C Future Synchro Analysis Output List of Tables Table 1 Highway Seasonal Weekly Traffic Volumes Table 2 Highway 11 Historical Daily Traffic Volumes Table 3 Existing Base Year (2014) Conditions Peak Hour LOS Analysis Table 4 Employee Trips By Shift Table 5 Site Generated Traffic Table 6 Employee Distribution by Municipality and Related Trip Distribution Table Future Total Traffic Site Traffic Peak Hours Peak Hour LOS Analysis Table Future Total Traffic Site Traffic Peak Hours Peak Hour LOS Analysis Table Future Total Traffic Site Traffic Peak Hours Peak Hour LOS Analysis Table Future Total Traffic Observed Peak Hours Peak Hour LOS Analysis Table Future Total Traffic Observed Peak Hours Peak Hour LOS Analysis Table Future Total Traffic Observed Peak Hours Peak Hour LOS Analysis pg v:\01650\active\ premier gold\report\rpt_premier_gold_tis_2014_11_05.docx i

4 TRAFFIC IMPACT STUDY, PREMIER GOLD MINES LIMITED, HARDROCK PROPERTY List of Figures Figure 1 Site Location Figure 2 Conceptual Site Plan Figure 3A Existing Peak Hour Traffic Volumes Observed Peak Hours Figure 3B Existing Peak Hour Traffic Volumes Site Traffic Peak Hours Figure 4A 2018 Future Background Peak Hour Traffic Volumes Observed Peak Hours Figure 4B 2018 Future Background Peak Hour Traffic Volumes Site Traffic Peak Hours Figure 5A 2023 Future Background Peak Hour Traffic Volumes Observed Peak Hours Figure 5B 2023 Future Background Peak Hour Traffic Volumes Site Traffic Peak Hours Figure 6A 2028 Future Background Peak Hour Traffic Volume Observed Peak Hours Figure 6B 2028 Future Background Peak Hour Traffic Volumes Site Traffic Peak Hours Figure 7 Site Traffic Volumes Site Traffic Peak Hours Figure 8A 2018 Future Total Peak Hour Traffic Volumes Site Traffic Peak Hours Figure 8B 2018 Future Total Peak Hour Traffic Volumes Observed Peak Hours Figure 9A 2023 Future Total Peak Hour Traffic Volumes Site Traffic Peak Hours Figure 9B 2023 Future Total Peak Hour Traffic Volumes Observed Peak Hours Figure 10A 2028 Future Total Peak Hour Traffic Volumes Site Traffic Peak Hours Figure 10B 2028 Future Total Peak Hour Traffic Volumes Observed Peak Hours pg v:\01650\active\ premier gold\report\rpt_premier_gold_tis_2014_11_05.docx ii

5 TRAFFIC IMPACT STUDY, PREMIER GOLD MINES LIMITED, HARDROCK PROPERTY Introduction 1.0 INTRODUCTION 1.1 BACKGROUND Premier Gold Mines Limited (Premier) retained Stantec Consulting Ltd. (Stantec) to prepare a Traffic Impact Study (TIS) for the Hardrock Mine property. The Hardrock property (Project) is located in a relatively remote area of Ontario, approximately 280 km north east of Thunder Bay. The Project is located just a few kilometers south of the community of Geraldton (at the intersection of Highway 584 and Highway 11), which is part of the amalgamated Town of Greenstone, Ontario (Figure 1). Highway 11 traverses the property in an east west direction immediately north of the project site. Small town sites related to historic mine operations lie to the northwest (MacLeod Townsite) and to the east (Hard Rock Townsite). The Project is generally anticipated to include an open pit mining operation with an on-site processing facility, waste rock and tailings disposal sites, water treatment facility and serviced plant site. As the ore body is located beneath Highway 11, a highway re-alignment will also be required. This will also require the relocation of the existing Highway 11/Michael Power Boulevard (Secondary Highway 584) intersection and the addition of a mine site access on Highway 11. A conceptual site plan for the realignment of Highway 11, which also illustrates the approximate location of the subject site access, is presented as Figure SCOPE AND OBJECTIVES The scope of this Study includes reviewing existing Highway 11 traffic conditions as well as preparing and analyzing traffic forecasts related to the development of the proposed mine. Due to the rural nature of this section of Highway 11, the Study Area has been limited to the Highway 11/Michael Power Boulevard intersection and the proposed site access intersection on Highway 11. It is anticipated that the mine could be operational by Therefore, and in accordance with the Ministry of Transportation of Ontario (MTO) Traffic Impact Study Guidelines, the future horizon years to be analyzed include 2018 (opening year) and five and 10 years after opening (i.e. 2023, and 2028). The objective of the Study is to identify and recommend road, safety, and traffic control improvements that are required to accommodate the proposed re-alignment. pg v:\01650\active\ premier gold\report\rpt_premier_gold_tis_2014_11_05.docx 1.1

6 Figure 1 N.T.S N Impacted Section of Highway 11 Site Location

7 N.T.S N Figure 2 Conceptual Site Plan

8 TRAFFIC IMPACT STUDY, PREMIER GOLD MINES LIMITED, HARDROCK PROPERTY Existing Conditions 2.0 EXISTING CONDITIONS 2.1 ROADS AND TRAFFIC CONTROL The existing road and traffic control characteristics for the subject section of Highway 11 and Michael Power Boulevard are described below: Highway 11 is designated part of the Trans-Canada Highway and the subject section of the highway is currently defined by MTO as Commuter Tourist Recreation as of Prior to its current road pattern designation, this section of Highway 11 was previously defined as Low Tourist and Intermediate Tourist ; In the Study Area, Highway 11 runs east-west and has a two lane rural cross-section with gravel shoulders, white edge of pavement markings, a dashed yellow centre line except in no-passing zones, and a posted maximum speed limit of 70 km/h; Michael Power Boulevard (Secondary Highway 584) is currently defined by the MTO as Suburban Commuter as of 2010; In the Study Area, Michael Power Boulevard runs north-south and has a two lane crosssection, gravel shoulders, white edge of pavement markings, a dashed yellow centre line except in no-passing zones, and a posted maximum speed limit of 80 km/h; and The intersection of Highway 11 and Michael Power Boulevard is a four leg intersection (south leg is named Hardrock Road) with stop control on the northbound and southbound approaches and illumination. An eastbound auxiliary left-turn lane and channelized southbound and westbound right-turn lanes are provided. 2.2 TRAFFIC VOLUME Traffic data was provided by MTO, including intersection turning movement counts for Highway 11/Michael Power Boulevard for 2011 and Additionally, weekly volume summaries for the 2011 spring, summer and fall seasons were provided for the locations of Highway 11, 1.0 km west of Michael Power Boulevard, and 31.0 km west of Longlac CNR Rail. The MTO document Provincial Highways Traffic Volumes has also been reviewed in regard to historical volumes and trends. All traffic data has been provided for reference in Appendix A. pg v:\01650\active\ premier gold\report\rpt_premier_gold_tis_2014_11_05.docx 2.2

9 TRAFFIC IMPACT STUDY, PREMIER GOLD MINES LIMITED, HARDROCK PROPERTY Existing Conditions A summary of the most recent Highway 11 daily traffic volumes is presented in Table 1. Table 1 Highway Seasonal Weekly Traffic Volumes 1 Location Spring Summer Fall 1.0 km West of Michael Power Boulevard (Highway 584) LHRS/Offset: 17880/0.0 TVIS#: April 18 April 24 ADT: 1,393 AADT: 1,379 DHV: 135 Directional: 45/55 August 18 August 24 ADT: 1,690 AADT: 1,589 DHV: 156 Directional: 49/51 September 16 September 22 ADT: 1,767 AADT: 1,785 DHV: 175 Directional: 37/63 April 18 April 24 August 18 August 24 September km West of Longlac September 22 CNR O/H ADT: 1,558 ADT: 1,848 ADT: 2,125 AADT: 1,542 AADT: 1,737 AADT: 2,146 LHRS/Offset: 17870/29.38 DHV: 151 DHV: 170 DHV: 210 TVIS#: Directional: 46/54 Directional: 49/51 Directional: 43/57 1LHRS linear highway referencing system; TVIS traffic volume information system; ADT average daily traffic; AADT annual average daily traffic; DHV design hour volume The volumes above are considered unofficial by MTO since they have not been fully vetted within their data processing system. Historical daily traffic volumes along Highway 11 are presented in Table 2. Table 2 Highway 11 Historical Daily Traffic Volumes 1 Location Year AADT SADT WADT ,950 2,500 1, ,950 2,550 1, ,950 2,550 1,600 From MacLeod Provincial Park ,950 2,550 1,600 Road to Michael Power Boulevard ,850 2,350 1,500 (Highway 584) ,900 2,350 1, ,900 2,350 1, km Section ,900 2,350 1, ,900 2,350 1, ,900 2,300 1, ,900 2,300 1,600 pg v:\01650\active\ premier gold\report\rpt_premier_gold_tis_2014_11_05.docx 2.3

10 TRAFFIC IMPACT STUDY, PREMIER GOLD MINES LIMITED, HARDROCK PROPERTY Existing Conditions Table 2 Highway 11 Historical Daily Traffic Volumes 1 Location Year AADT SADT WADT ,700 2,250 1, ,500 2,000 1, ,500 2,000 1, ,500 2,000 1,150 From Michael Power Boulevard ,450 1,950 1,100 (Highway 584) to Goldfield Road ,400 1,750 1, km Section ,650 2,050 1, ,400 1,750 1, ,600 2,000 1, ,350 1,650 1, ,500 1,850 1,250 1AADT annual average daily traffic; SADT summer average daily traffic; WADT weekday average daily traffic The most recent daily traffic volume data shows that the subject section of Highway 11 carries less than 2,000 vehicles per day. This can be considered to be a very low volume highway, and one that operates well within capacity. For context, a two lane highway that exhibits near capacity or capacity conditions during the peak hours would typically have a daily traffic volume in the order of 15,000 vehicles per day. The existing base year (2014) peak hour traffic volumes for the intersection of Highway 11/ Michael Power Boulevard are shown in Figure 3A. The a.m. peak hour is 9:15 10:15 a.m., and the p.m. peak hour is 2:00 3:00 p.m. Since the proposed mine site trips are not anticipated to occur during the existing peak hours, the base year peak hour traffic volumes have been prorated according to the daily traffic counts to estimate the hourly volumes at other times (i.e. during the times in which the peak hour site trips will occur). The temporal aspects of the site traffic characteristics are discussed in detail in Section 3.2 of the report. The prorated traffic volumes, which represent background traffic during the hours when site traffic would be highest, i.e. site traffic peaks of 6:30 7:30 a.m. and 5:30 6:30 p.m., are illustrated in Figure 3B. pg v:\01650\active\ premier gold\report\rpt_premier_gold_tis_2014_11_05.docx 2.4

11 Highway 584 (Michael Power Boulevard) Highway 11 Highway Hardrock Road 9:15-10:15 AM 123 Figure 3A 2:00-3:00 PM 123 N.T.S Existing Base Year (2014) Traffic Volumes Observed Peak Hours

12 AM 0.32 PM 0.84 Highway 584 (Michael Power Boulevard) Highway 11 Highway Hardrock Road 6:30-7:30 AM 123 Figure 3B 5:30-6:30 PM 123 N.T.S Existing Base Year (2014) Traffic Volumes Site Traffic Peak Hours

13 TRAFFIC IMPACT STUDY, PREMIER GOLD MINES LIMITED, HARDROCK PROPERTY Existing Conditions 2.3 EXISTING TRAFFIC OPERATIONS The quality of intersection operations is typically measured in terms of level of service (LOS). The LOS is assigned on the basis of average delay per vehicle and includes deceleration delay, queue move-up time, stopped delay, and final acceleration delay. For signalized intersections, LOS ranges from LOS A for 10 seconds or less average delay to LOS F for average delay greater than 80 seconds. For unsignalized intersections, the LOS ranges from LOS A for 10 seconds or less average delay to LOS F for average delay greater than 50 seconds. Acceptable operations are generally considered to be LOS C or better. However, during peak hours, a LOS D may be considered acceptable for through movements and the overall intersection, and a LOS E may be considered acceptable for turning movements. Similar to LOS, the v/c ratio for signalized intersections is calculated as a whole (sum of critical movements), and for individual movements. For unsignalized intersections, LOS is only calculated for those movements that conflict with opposing free-flow traffic and is not defined for the intersection as a whole. While the LOS and v/c ratio for each movement are related, they are calculated independently. Therefore it is possible to have a poor level of service associated with a high v/c ratio. The designation LOS F does not automatically imply that the intersection or movement is over capacity, nor does a LOS better than E automatically imply that unused capacity is available. To assess the traffic operations during the peak periods, a LOS analysis was undertaken for the Study Area intersection using TrafficWare s Synchro 8.0 Software, which implements the methods of the 2000 Highway Capacity Manual. The key parameters and assumptions used within the analysis included: Existing lane configurations; Heavy vehicle percentages as derived from the traffic data; Calculated peak hour factor from traffic data. It is noted that this factor adjusts the hourly volumes to better represent conditions during the peak 15 minutes of intersection operations; and Synchro default values for all other inputs. The results of the operational analysis of the observed peak hour volumes are shown in Table 3. The Synchro analysis outputs have been provided for reference in Appendix B. pg v:\01650\active\ premier gold\report\rpt_premier_gold_tis_2014_11_05.docx 2.5

14 TRAFFIC IMPACT STUDY, PREMIER GOLD MINES LIMITED, HARDROCK PROPERTY Existing Conditions Table 3 Existing Base Year (2014) Conditions Peak Hour Level of Service Analysis AM Peak Hour PM Peak Hour Intersection Approach/Movement LOS 1 D 2 v/c 3 Q 4 LOS 1 D 2 v/c 3 Q 4 Left A A < 1 EB Highway 11/ Through/Right Unopposed Movement Michael Power Left/Through A < WB Boulevard Right (Channelized) Unopposed Movement NB Left/Thru/Right A A < 1 Unsignalized Left/Through A A SB Right (Channelized) Unopposed Movement 1 Level of Service (A to F representing best to worst); 2 Delay in Seconds; 3 Volume to Capacity ratio; 4 95 th Percentile Queue in Metres; 5 No Left Turn Volume Under existing base year for the observed peak hours (9:15 10:15 a.m., and 2:00 3:00 p.m.), the intersection of Highway 11/Michael Power Boulevard operates at the highest level of service (LOS A) and with each movement well within its theoretical capacity. Therefore, it can also be concluded that under existing conditions, the lower off peak hour volumes during what would be the site traffic peak times (6:30 7:30 a.m., and 5:30 6:30 p.m.) would also have the same excellent level of service, but with lower volume to capacity ratios. pg v:\01650\active\ premier gold\report\rpt_premier_gold_tis_2014_11_05.docx 2.6

15 TRAFFIC IMPACT STUDY, PREMIER GOLD MINES LIMITED, HARDROCK PROPERTY Traffic Forecasts 3.0 TRAFFIC FORECASTS 3.1 HORIZON YEARS AND BACKGROUND GROWTH Based on information provided by Premier, it has been assumed the opening year for mine operations would be Following MTO Traffic Impact Study Guidelines, periods of five years (2023) and 10 years (2028) after the opening year have been used for the assessment of future conditions. Through the examination of historical daily volume traffic data, it is clear that there has been no growth on the subject section of Highway 11. To err on the side of caution, a nominal growth rate of 0.5% per year has been used to estimate future background traffic for the following conditions: 2018 Opening year - Figure 4A (base year peaks), Figure 4B (site peaks); Five years from build-out (2023) Figure 5A (base year peaks), Figure 5B (site peaks); and 10 years from build-out (2028) Figure 6A (base year peaks), Figure 6B (site peaks). 3.2 SITE TRIP GENERATION Detailed information regarding the anticipated employee complement and shift times was provided by Premier. It has been assumed that each employee will generate one vehicle trip either to or from the site, and the resultant volume of employee site trips by shift are summarized in Table 4. Table 4 Employee Trips By Shift 1 # of Employees/Trips Personnel Shift: Mon Fri Shift: 7 Days In/7Days Shift: 7 Days In/7Days Out Out Arrival: 6:30 7:30 a.m. Departure: 4:30 p.m. Arrival: 5:30 a.m. Departure: 6:15 p.m. Arrival: 5:30 p.m. Departure: 6:15 a.m G&A Service Technical Services Maintenance Supervision Operation Operation Mill and Assay Lab TOTAL Assumed one vehicle trip per employee. pg v:\01650\active\ premier gold\report\rpt_premier_gold_tis_2014_11_05.docx 3.7

16 GR 0.5% YR 4 Highway 584 (Michael Power Boulevard) Highway 11 Highway Hardrock Road 9:15-10:15 AM 123 Figure 4A 2:00-3:00 PM 123 N.T.S 2018 Future Background Traffic Volumes Observed Peak Hours

17 GR 0.5% YR 4 Highway 584 (Michael Power Boulevard) Highway 11 Highway Hardrock Road 6:30-7:30 AM 123 Figure 4B 5:30-6:30 PM 123 N.T.S 2018 Future Background Traffic Volumes Site Traffic Peak Hours

18 GR 0.5% YR 9 Highway 584 (Michael Power Boulevard) Highway 11 Highway Hardrock Road 9:15-10:15 AM 123 Figure 5A 2:00-3:00 PM 123 N.T.S 2023 Future Background Traffic Volumes Observed Peak Hours

19 GR 0.5% YR 9 Highway 584 (Michael Power Boulevard) Highway 11 Highway Hardrock Road 6:30-7:30 AM 123 Figure 5B 5:30-6:30 PM 123 N.T.S 2023 Future Background Traffic Volumes Site Traffic Peak Hours

20 GR 0.5% YR 14 Highway 584 (Michael Power Boulevard) Highway 11 Highway Hardrock Road 9:15-10:15 AM 123 Figure 6A 2:00-3:00 PM 123 N.T.S 2028 Future Background Traffic Volumes Observed Peak Hours

21 GR 0.5% YR 14 Highway 584 (Michael Power Boulevard) Highway 11 Highway Hardrock Road 6:30-7:30 AM 123 Figure 6B 5:30-6:30 PM 123 N.T.S 2028 Future Background Traffic Volumes Site Traffic Peak Hours

22 TRAFFIC IMPACT STUDY, PREMIER GOLD MINES LIMITED, HARDROCK PROPERTY Traffic Forecasts As discussed previously, it is shown above that the arrivals/departures of employee site traffic would occur earlier than the existing observed a.m. peak hour and later than the existing observed p.m. peak hour. With respect to truck traffic, Premier advised that all truck traffic would be contained within the site and there would be no truck traffic travelling to/from Highway 11 via the proposed site access. The employee trip information was organized into one hour time periods for forecasting and analysis. This represents a conservative approach (err on the high side) whereby all of the shift traffic that would occur within the 5:30 7:30 a.m. and 4:30 6:30 p.m. two hour periods were combined within one hour periods (assumed 6:30 7:30 a.m. and 5:30 6:30 p.m. for the purpose of establishing background traffic conditions). The resultant site trip generation within the site peak hours is shown in Table 5. Assumptions Day shift arrivals and departures combined for a.m. inbound and p.m. outbound, respectively Night shift departures and arrivals used for a.m. outbound and p.m. inbound, respectively Table 5 Site Generated Traffic Vehicle Trips A.M. Site Peak Hour P.M. Site Peak Hour (6:30 7:30 a.m.) (5:30 6:30 p.m.) In Out Total In Out Total SITE TRIP DISTRIBUTION Premier provided information regarding the anticipated home origins for the employees of the proposed mine. This information is presented in Table 6 along with the related directional trip distribution on Highway 11 and Michael Power Boulevard. pg v:\01650\active\ premier gold\report\rpt_premier_gold_tis_2014_11_05.docx 3.8

23 TRAFFIC IMPACT STUDY, PREMIER GOLD MINES LIMITED, HARDROCK PROPERTY Traffic Forecasts Table 6 Employee Distribution by Municipality and Related Trip Distribution Municipality To/From Via Percentage Geraldton/Nakina North Highway 584 (Michael Power Boulevard) 40% Longlac East Highway 11 40% Thunder Bay/ Beardmore/ Nipigon West Highway 11 20% TOTAL 100% 3.4 SITE TRAFFIC ASSIGNMENT & TOTAL TRAFFIC The site traffic was assigned to the Study Area road network based on the trip distribution. The resultant site traffic assignments are illustrated in Figure 7. To facilitate sensitivity testing of the potential site traffic impacts, two scenarios have been examined for traffic forecasting: Site Traffic Peak Hours scenario this forecasts represents a combination of site peak trips with the future background traffic during the site peak hours (i.e. not concurrent with the existing observed peak hours), which can also be considered to be the most likely forecast scenario; and Observed Peak Hours scenario this alternative forecast represents a worst case by combining the site peak trips with the future background traffic during the observed peak hours. It provides a sensitivity test of a higher volume scenario. The total traffic volumes for the opening year horizon (2018) are illustrated in Figure 8A and Figure 8B for the Site Traffic Peak Hours and Observed Peak Hours scenarios, respectively. The total traffic volumes for the five years after opening year horizon (2023) are illustrated in Figure 9A and Figure 9B, for the Site Traffic Peak Hours and Observed Peak Hours scenarios, respectively. The total traffic volumes for the ten years after opening horizon (2028) are illustrated in Figure 10A and Figure 10B, for the Site Traffic Peak Hours and Observed Peak Hours scenarios, respectively. pg v:\01650\active\ premier gold\report\rpt_premier_gold_tis_2014_11_05.docx 3.9

24 Premier Gold Mines Site Access Highway 584 (Michael Power Boulevard) Highway 11 Highway 11 (Re-Aligned) To/From % In Out Total North HWY % AM East HWY 11 40% PM West HWY 11 20% 100% AM Peak Hour 123 Figure 7 PM Peak Hour 123 N.T.S Site Traffic Traffic Volumes Site Traffic Peak Hours

25 Premier Gold Mines Site Access Highway 584 (Michael Power Boulevard) Highway 11 Highway 11 (Re-Aligned) :30-7:30 AM 123 Figure 8A 5:30-6:30 PM 123 N.T.S 2018 Future Total Traffic Volumes Site Traffic Peak Hours

26 Premier Gold Mines Site Access Highway 584 (Michael Power Boulevard) Highway 11 Highway 11 (Re-Aligned) :15-10:15 AM 123 Figure 8B 2:00-3:00 PM 123 N.T.S 2018 Future Total Traffic Volumes Observed Peak Hours

27 Premier Gold Mines Site Access Highway 584 (Michael Power Boulevard) Highway 11 Highway 11 (Re-Aligned) :30-7:30 AM 123 Figure 9A 5:30-6:30 PM 123 N.T.S 2023 Future Total Traffic Volumes Site Traffic Peak Hours

28 Premier Gold Mines Site Access Highway 584 (Michael Power Boulevard) Highway 11 Highway 11 (Re-Aligned) :15-10:15 AM 123 Figure 9B 2:00-3:00 PM 123 N.T.S 2023 Future Total Traffic Volumes Observed Peak Hours

29 Premier Gold Mines Site Access Highway 584 (Michael Power Boulevard) Highway 11 Highway 11 (Re-Aligned) :30-7:30 AM 123 Figure 10A 5:30-6:30 PM 123 N.T.S 2028 Future Total Traffic Volumes Site Traffic Peak Hours

30 Premier Gold Mines Site Access Highway 584 (Michael Power Boulevard) Highway 11 Highway 11 (Re-Aligned) :15-10:15 AM 123 Figure 10B 2:00-3:00 PM 123 N.T.S 2028 Future Total Traffic Volumes Observed Peak Hours

31 TRAFFIC IMPACT STUDY, PREMIER GOLD MINES LIMITED, HARDROCK PROPERTY Traffic Impact Assessment 4.0 TRAFFIC IMPACT ASSESSMENT 4.1 SITE ACCESS For the purposes of this report, it has been assumed that the site access will be at a location along Highway 11 that meets the MTO sight line requirements for a design speed 20 km/h higher than the anticipated posted maximum speed limit of 90 km/h (i.e. design speed 110 km/h). The peak hour traffic forecasts for the Highway 11/Site Access intersection have been reviewed with regard to the MTO left turn lane warrants as well as the MTO guidelines for determining the need for right turn lanes or tapers. With the relatively low site traffic and low through traffic volumes, it was found that auxiliary left or right turn lanes on Highway 11 would not be required at the site access. Notwithstanding the results of the technical review of the site access volumes, it would be prudent from a safety perspective to provide a westbound left turn lane (minimum 15m storage, parallel lane, taper, and run-out lane to correspond to the selected design speed) and an eastbound right turn taper and lane on Highway 11 at the proposed site access. The rationale for these improvements relates to the higher operating speeds on this type of highway, the potential for employee traffic to arrive in a relatively short period of time in advance of a shift, and the safety benefits related to maintaining free flow traffic with more uniform speeds on Highway 11 by facilitating turning movements in a separate and exclusive turning lane. The site access leg of the intersection should have one lane inbound and one lane outbound. In addition, it would be prudent from a safety perspective to provide illumination at the proposed Highway 11/Site Access intersection due to the expected time of arrivals/departures for shift traffic that include night time (dark) conditions. The combination of auxiliary turn lanes and illumination at the subject intersection would be generally consistent with the current design of the Highway 11/Michael Power Boulevard intersection. 4.2 TRAFFIC OPERATIONS A review of the traffic forecasts for both Study Area intersections relative to the Ontario Traffic Manual Book 12 traffic signal justification methodology was conducted and it was found that the traffic forecasts would be well below the traffic volume thresholds used to identify a potential need for signalization. Therefore, an operational analysis was conducted using the same methodology and parameters as in the analysis of existing conditions, which includes stop control on the minor approach to intersections with Highway 11. For this analysis, it has been assumed that the auxiliary turn lane improvements discussed above would be in place at the proposed employee site access intersection on Highway 11. As well, it has been assumed that with a realignment of Highway 11, the new Michael Power Boulevard pg v:\01650\active\ premier gold\report\rpt_premier_gold_tis_2014_11_05.docx 4.10

32 TRAFFIC IMPACT STUDY, PREMIER GOLD MINES LIMITED, HARDROCK PROPERTY Traffic Impact Assessment intersection would have the same lane arrangements as under existing conditions with the exception that it would be configured as a T-intersection with no south leg. The analysis results for the Site Traffic Peak Hours scenario are provided in Table 7, Table 8, and Table 9 for the 2018, 2023, and 2028 horizon years, respectively. As a sensitivity test with higher peak hour traffic forecasts, the analysis results for the alternative Observed Peak Hours scenario are provided in Table 10, Table 11, and Table 12, for the 2018, 2023, and 2028 horizon years, respectively. The Synchro analysis outputs have been provided for reference in Appendix C. Table Future Total Traffic Conditions Site Traffic Peak Hours Scenario Peak Hour Level of Service Analysis AM Peak Hour PM Peak Hour Intersection Approach/Movement LOS 1 D 2 v/c 3 Q 4 LOS 1 D 2 v/c 3 Q 4 Highway 11/ Through Unopposed Movement EB Employee Site Right Unopposed Movement Access Left A A WB Through Unopposed Movement Unsignalized NB Left/Right A A Left A A Highway 11/ EB Through Unopposed Movement Michael Power Through Unopposed Movement Boulevard WB Right (Channelized) Unopposed Movement Left A < 1 B Unsignalized SB Right (Channelized) A A Level of Service (A to F representing best to worst); 2 Delay in Seconds; 3 Volume to Capacity ratio; 4 95 th Percentile Queue in Metres pg v:\01650\active\ premier gold\report\rpt_premier_gold_tis_2014_11_05.docx 4.11

33 TRAFFIC IMPACT STUDY, PREMIER GOLD MINES LIMITED, HARDROCK PROPERTY Traffic Impact Assessment Table Future Total Traffic Conditions Site Traffic Peak Hours Scenario Peak Hour Level of Service Analysis AM Peak Hour PM Peak Hour Intersection Approach/Movement LOS 1 D 2 v/c 3 Q 4 LOS 1 D 2 v/c 3 Q 4 Highway 11/ Through Unopposed Movement EB Employee Site Right Unopposed Movement Access Left A A WB Through Unopposed Movement Unsignalized NB Left/Right A A Left A A Highway 11/ EB Through Unopposed Movement Michael Power Through Unopposed Movement Boulevard WB Right (Channelized) Unopposed Movement Left A < 1 B Unsignalized SB Right (Channelized) A A Level of Service (A to F representing best to worst); 2 Delay in Seconds; 3 Volume to Capacity ratio; 4 95 th Percentile Queue in Metres Table Future Total Traffic Conditions Site Traffic Peak Hours Scenario Peak Hour Level of Service Analysis AM Peak Hour PM Peak Hour Intersection Approach/Movement LOS 1 D 2 v/c 3 Q 4 LOS 1 D 2 v/c 3 Q 4 Highway 11/ Through Unopposed Movement EB Employee Site Right Unopposed Movement Access Left A A WB Through Unopposed Movement Unsignalized NB Left/Right A A Left A A Highway 11/ EB Through Unopposed Movement Michael Power Through Unopposed Movement Boulevard WB Right (Channelized) Unopposed Movement Left A < 1 B Unsignalized SB Right (Channelized) A A Level of Service (A to F representing best to worst); 2 Delay in Seconds; 3 Volume to Capacity ratio; 4 95 th Percentile Queue in Metres pg v:\01650\active\ premier gold\report\rpt_premier_gold_tis_2014_11_05.docx 4.12

34 TRAFFIC IMPACT STUDY, PREMIER GOLD MINES LIMITED, HARDROCK PROPERTY Traffic Impact Assessment Table Future Total Traffic Conditions Observed Peak Hours Alternative Scenario Peak Hour Level of Service Analysis AM Peak Hour PM Peak Hour Intersection Approach/Movement LOS 1 D 2 v/c 3 Q 4 LOS 1 D 2 v/c 3 Q 4 Highway 11/ Through Unopposed Movement EB Employee Site Right Unopposed Movement Access Left A A WB Through Unopposed Movement Unsignalized NB Left/Right A A Left A A Highway 11/ EB Through Unopposed Movement Michael Power Through Unopposed Movement Boulevard WB Right (Channelized) Unopposed Movement Left B B Unsignalized SB Right (Channelized) A A Level of Service (A to F representing best to worst); 2 Delay in Seconds; 3 Volume to Capacity ratio; 4 95 th Percentile Queue in Metres Table Future Total Traffic Conditions Observed Peak Hours Alternative Scenario Peak Hour Level of Service Analysis AM Peak Hour PM Peak Hour Intersection Approach/Movement LOS 1 D 2 v/c 3 Q 4 LOS 1 D 2 v/c 3 Q 4 Highway 11/ Through Unopposed Movement EB Employee Site Right Unopposed Movement Access Left A A WB Through Unopposed Movement Unsignalized NB Left/Right A A Left A A Highway 11/ EB Through Unopposed Movement Michael Power Through Unopposed Movement Boulevard WB Right (Channelized) Unopposed Movement Left B B Unsignalized SB Right (Channelized) A A Level of Service (A to F representing best to worst); 2 Delay in Seconds; 3 Volume to Capacity ratio; 4 95 th Percentile Queue in Metres pg v:\01650\active\ premier gold\report\rpt_premier_gold_tis_2014_11_05.docx 4.13

35 TRAFFIC IMPACT STUDY, PREMIER GOLD MINES LIMITED, HARDROCK PROPERTY Traffic Impact Assessment Table Future Total Traffic Conditions Observed Peak Hours Alternative Scenario Peak Hour Level of Service Analysis AM Peak Hour PM Peak Hour Intersection Approach/Movement LOS 1 D 2 v/c 3 Q 4 LOS 1 D 2 v/c 3 Q 4 Highway 11/ Through Unopposed Movement EB Employee Site Right Unopposed Movement Access Left A A WB Through Unopposed Movement Unsignalized NB Left/Right A A Left A A Highway 11/ EB Through Unopposed Movement Michael Power Through Unopposed Movement Boulevard WB Right (Channelized) Unopposed Movement Left B B Unsignalized SB Right (Channelized) A A Level of Service (A to F representing best to worst); 2 Delay in Seconds; 3 Volume to Capacity ratio; 4 95 th Percentile Queue in Metres The operational analysis results for the Site Traffic Peak Hours scenario indicate that during the anticipated peak hours in which the conservatively estimated employee site trips will primarily be occurring (6:30 7:30 a.m. and 5:30 6:30 p.m.), the Study Area intersections would function at LOS B or better and well within their theoretical capacities during both the a.m. and p.m. peak hours for all horizon years. Similarly, the sensitivity analysis of the Observed Peak Hours scenario, which assumed that the conservatively estimated employee site trips would be added to the observed street peak hour volumes (9:15 10:15 a.m., and 2:00 3:00 p.m.) also shows that the intersections would operate at LOS B or better and well within capacity during the a.m. and p.m. peak hours for all horizon years. The only differences in the operational measures of effectiveness are slight increases in the volume to capacity ratios. The operational analysis indicates that the additional traffic generated by the proposed mine development could easily be accommodated with the assumed intersection lane configurations at both the Highway 11/Michael Power Boulevard and Highway 11/Site Access intersections. pg v:\01650\active\ premier gold\report\rpt_premier_gold_tis_2014_11_05.docx 4.14

36 TRAFFIC IMPACT STUDY, PREMIER GOLD MINES LIMITED, HARDROCK PROPERTY Conclusions and Recommendations 5.0 CONCLUSIONS AND RECOMMENDATIONS The conclusions of the Traffic Impact Study are as follows: a) The existing baseline daily traffic volumes on the subject section of Highway 11 are relatively low (most recent data less than 2,000 vehicles per day), and the historical traffic volumes indicate that this area has experienced virtually no growth in traffic since the year b) Under existing conditions, the Highway 11/Michael Power Boulevard intersection operates at a very good level of service and well within capacity during the weekday a.m. and p.m. peak hours. c) With the addition of traffic that would be generated by employees and service deliveries of the proposed mine, and with conventional intersection improvements (i.e. auxiliary turn lanes or tapers on Highway 11), it is concluded that the traffic forecasts associated with the proposed development could easily be accommodated at both the Highway 11/Michael Power Boulevard and Highway 11/Site Access intersections in each of the 2018, 2023, and 2028 horizon years. The recommendations of the Traffic Impact Study are as follows: a) Provide an auxiliary westbound left turn lane (minimum 15m storage, parallel lane, taper, and run-out lane to correspond to the selected design speed) and an eastbound right turn lane and taper on Highway 11 at the site access, and provide one lane inbound and one lane outbound on the site access leg of the intersection. b) Once the design alternative for the required realignment of Highway 11 is finalized (through the ongoing Environmental Assessment) along with the location of the proposed mine site access, confirm that the sight distance at the proposed access is acceptable for a highway with a 90 km/h maximum posted speed limit (assumed 110 km/h design speed). c) Prepare design drawings for the Highway 11/Site Access intersection with the auxiliary turn lane improvements identified in a) above and design drawings for the Highway 11/ Michael Power Boulevard intersection with essentially the same lane arrangements as the existing intersection of these two roads. pg v:\01650\active\ premier gold\report\rpt_premier_gold_tis_2014_11_05.docx 5.15

37 Appendix A Traffic Data

38 <Original signed by>

39 <Original signed by>

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64 Highway Location Description Dist Year Patt Type AADT SADT SAWDT WADT AR 2009 LT 1,150 1,500 1, LT 1,200 1,550 1, LONGLAC CEMETERY RD(S) LT 2,200 2,950 3,000 1, LT 2,200 2,950 3,000 1, LT 2,100 2,800 2,850 1, LT 2,050 2,750 2,800 1, LT 2,000 2,700 2,700 1, LT 1,900 2,550 2,550 1, LT 1,900 2,550 2,550 1, IT 1,900 2,400 2,400 1, IR 1,800 2,050 1,950 1, IR 1,750 2,100 1,900 1, IC 1,750 1,950 2,000 1, IC 1,650 1,850 1,750 1, IC 1,650 1,850 1,850 1, IC 1,600 1,750 1,800 1, LONGLAC-CNR OH-E ABUT CTR 1,200 1,550 1,450 1, CTR 1,250 1,550 1,500 1, LT 1,250 1,800 1, LT 1,300 1,800 1, LT 1,350 1,850 1,800 1, UC 1,400 1,450 1,550 1, UC 1,400 1,500 1,550 1, UC 1,400 1,500 1,550 1, UC 1,400 1,500 1,650 1, UC 1,400 1,450 1,650 1, UC 1,450 1,550 1,700 1, UC 1,600 1,700 1,850 1, UC 1,650 1,750 1,950 1, UC 1,650 1,750 1,950 1, UC 1,800 1,900 2,100 1, UC 2,000 2,100 2,350 1, UC 1,800 1,900 2,100 1, UC 1,750 1,850 2,050 1, UC 1,700 1,800 2,000 1, UC 1,500 1,600 1,750 1, UC 1,750 1,850 1,750 1, C 1,550 1,700 1,750 1, C 1,800 2,000 2,000 1, MCLEOD PROVINCIAL PARK ROAD CTR 1,600 2,050 1,950 1, CTR 1,650 2,050 1,950 1, LT 1,650 2,400 2,300 1, LT 1,700 2,350 2,250 1, LT 1,800 2,500 2,400 1, Traffic Volumes Publication Page 234 of 992

65 Highway Location Description Dist Year Patt Type AADT SADT SAWDT WADT AR 1993 CTR 1,850 2,300 2,200 1, CTR 1,900 2,450 2,300 1, CTR 1,950 2,500 2,400 1, IT 2,000 2,650 2,550 1, IT 2,050 2,700 2,650 1, IT 2,100 3,550 2,700 1, IT 2,150 2,750 2,750 1, IT 1,950 2,500 2,500 1, IT 1,950 2,550 2,500 1, IT 1,950 2,550 2,500 1, IT 1,950 2,550 2,500 1, IT 1,850 2,350 2,350 1, CTR 1,900 2,350 2,250 1, CTR 1,900 2,350 2,250 1, CTR 1,900 2,350 2,350 1, CTR 1,900 2,350 2,300 1, CTR 1,900 2,300 2,250 1, CTR 1,900 2,300 2,200 1, SEC HWY 584(N)TO GERALDTON LT 1,550 2,100 2,100 1, LT 1,600 2,150 2,150 1, LT 1,650 2,200 2,250 1, LT 1,700 2,250 2,300 1, LT 1,500 2,000 2,050 1, LT 1,500 2,000 2,050 1, LT 1,500 2,000 2,050 1, LT 1,450 1,950 1,950 1, CTR 1,400 1,750 1,650 1, CTR 1,650 2,050 1,950 1, CTR 1,400 1,750 1,700 1, CTR 1,600 2,000 1,950 1, CTR 1,350 1,650 1,600 1, CTR 1,500 1,850 1,750 1, GOLDFIELD RD(S) CTR 900 1,150 1, CTR 950 1,200 1, CTR 950 1,150 1, CTR 950 1,150 1, CTR 950 1,150 1, LT 950 1,300 1, LT 1,400 1,950 1,950 1, LT 1,550 2,150 2,150 1, LT 1,850 2,500 2,500 1, LT 1,850 2,500 2,500 1, LT 1,800 2,400 2,450 1, LT 1,800 2,400 2,450 1, Traffic Volumes Publication Page 235 of 992

66 Appendix B Existing Synchro Analysis Output

67 HCM Unsignalized Intersection Capacity Analysis 3: Hardrock Road/Highway 584-Michael Power Boulevard & Highway 11 9/26/2014 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) 5 Median type None None Median storage veh) Upstream signal (m) px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 SB 1 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS A A A Approach Delay (s) Approach LOS A A Intersection Summary Average Delay 5.3 Intersection Capacity Utilization 21.0% ICU Level of Service A Analysis Period (min) 15 9/26/2014 Existing 2014 AM Synchro 8 Report Page 1

68 HCM Unsignalized Intersection Capacity Analysis 3: Hardrock Road/Highway 584-Michael Power Boulevard & Highway 11 9/26/2014 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) 5 Median type None None Median storage veh) Upstream signal (m) px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 SB 1 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS A A A A Approach Delay (s) Approach LOS A A Intersection Summary Average Delay 4.9 Intersection Capacity Utilization 24.3% ICU Level of Service A Analysis Period (min) 15 9/26/2014 Existing 2014 PM Synchro 8 Report Page 1

69 Appendix C Future Synchro Analysis Output

70 HCM Unsignalized Intersection Capacity Analysis 3: Highway 11 & Highway 584-Michael Power Boulevard 10/15/2014 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Volume (veh/h) Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS A A A Approach Delay (s) Approach LOS A Intersection Summary Average Delay 4.4 Intersection Capacity Utilization 19.0% ICU Level of Service A Analysis Period (min) AM (Most Likely Scenario) Synchro 8 Report Page 1

71 HCM Unsignalized Intersection Capacity Analysis 6: Site Access & Highway 11 10/15/2014 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Volume (veh/h) Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS A A Approach Delay (s) Approach LOS A Intersection Summary Average Delay 6.0 Intersection Capacity Utilization 24.5% ICU Level of Service A Analysis Period (min) AM (Most Likely Scenario) Synchro 8 Report Page 2

72 HCM Unsignalized Intersection Capacity Analysis 3: Highway 11 & Highway 584-Michael Power Boulevard 10/15/2014 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Volume (veh/h) Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS A B A Approach Delay (s) Approach LOS A Intersection Summary Average Delay 4.4 Intersection Capacity Utilization 21.2% ICU Level of Service A Analysis Period (min) PM (Most Likely Scenario) Synchro 8 Report Page 1

73 HCM Unsignalized Intersection Capacity Analysis 6: Highway 11 10/15/2014 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Volume (veh/h) Sign Control Free Free Stop Grade 0% 0% 0% Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (m) px, platoon unblocked vc, conflicting volume vc1, stage 1 conf vol vc2, stage 2 conf vol vcu, unblocked vol tc, single (s) tc, 2 stage (s) tf (s) p0 queue free % cm capacity (veh/h) Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 Volume Total Volume Left Volume Right csh Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS A A Approach Delay (s) Approach LOS A Intersection Summary Average Delay 5.6 Intersection Capacity Utilization 25.7% ICU Level of Service A Analysis Period (min) PM (Most Likely Scenario) Synchro 8 Report Page 2

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012 Update for the May 31 st, 2012 Traffic Impact Study Prepared for Broccolini Construction 111-23596-00 September 20 th, 2012 2611 Queensview Drive, Suite 300, Ottawa, Ontario CANADA K2B 8K2 Telephone: 613-829-2800

More information

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748 City of Barrie Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report Project Number: JDE 1748 Date Submitted: June 12 th, 2017 06/12/17 John Northcote, P.Eng. Professional License

More information

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd. 9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major

More information

REDEVELOPMENT TRAFFIC IMPACT STUDY

REDEVELOPMENT TRAFFIC IMPACT STUDY REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport

More information

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged. Stantec Consulting Ltd. 1331 Clyde Avenue, Suite 4 Ottawa ON K2C 3G4 Tel: (613) 722-442 Fax: (613) 722-2799 May 14, 213 File: 1638823 Robinson Park Development Corp. 5699 Power Road Ottawa, ON, K1G 3N4

More information

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama.

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama. Traffic Impact Study Crestline Piggly Wiggly Mountain Brook, Alabama Prepared for: Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama September 214 Revision 1 October 214 Crestline Piggly Wiggly Mountain

More information

Student Housing Development

Student Housing Development Traffic Impact Study for the proposed Student Housing Development City of Oneonta Otsego County, New York Project No. 3259 December 212 Revised February 13, 212 Prepared For: Newman Development Group,

More information

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study Traffic Study To: From: James M. Moore, Director of Planning & Building Services, Town of Fairfax David Parisi, PE, TE, Parisi Transportation Consulting Date: October 14, 216 Subject: Victory Village Senior

More information

George Street Transportation Impact Study. Paradigm Transportation Solutions Limited

George Street Transportation Impact Study. Paradigm Transportation Solutions Limited George Transportation Impact Study Paradigm Transportation Solutions Limited January 217 Project Summary Project Number 16191 January 217 Client Wastell Homes 5-1895 Blue Heron Drive London ON N6H 5L9

More information

February 24, 2017 Project #: 20076

February 24, 2017 Project #: 20076 February 24, 217 Project #: 276 Jinde Zhu Washington County Department of Land Use and Transportation 14 SW Walnut Street MS 17 Hillsboro, Oregon 97213 RE: Sunset Ridge Phase 2 Access Report and Zone Change

More information

MEMO DRAFT VIA . Mr. Terry Bailey Foremost Development Company. To: Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink.

MEMO DRAFT VIA  . Mr. Terry Bailey Foremost Development Company. To: Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink. MEMO DRAFT VIA EMAIL To: From: Mr. Terry Bailey Foremost Development Company Michael J. Labadie, PE Steven J. Russo, E.I.T. Fleis & VandenBrink Date: August 29, 214 Re: Proposed Apartments City of Walled

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 February 27, 2014 113-584 Overview_1.doc D. J. Halpenny

More information

Michigan Avenue Traffic Study

Michigan Avenue Traffic Study City of Sarnia Michigan Avenue Traffic Study Final Report November 29, 218 B17 SUBMITTED BY CIMA CANADA INC. 4 327 Harvester Road Burlington, ON L7N 3G7 T 289 288-287 F 289 288-285 cima.ca CONTACT Stephen

More information

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Quickie Convenience Stores Larny Holdings Ltd. c/o PBC Group April 15, 2015 115-615 Report_1.doc D. J. Halpenny

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

EXECUTIVE SUMMARY. Page 1 of 6

EXECUTIVE SUMMARY. Page 1 of 6 EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for: HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October

More information

STRATEGY 4 INC Mainway, City of Burlington. [ Month Year ] Project No.: TRAFFIC IMPACT AND PARKING STUDY APRIL 2018

STRATEGY 4 INC Mainway, City of Burlington. [ Month Year ] Project No.: TRAFFIC IMPACT AND PARKING STUDY APRIL 2018 STRATEGY 4 INC. TRAFFIC IMPACT AND PARKING STUDY 3257 Mainway, City of Burlington Project No.: 27-675 APRIL 28 [ Month Year ] April 7, 28 Reference No. 27-675 Mr. Jeff Kenny Strategy 4 Inc. 262 Bristol

More information

Travel Demand Management Plan

Travel Demand Management Plan Travel Demand Management Plan Linden Corner at 43 rd Street & Upton Avenue South AUTHORIZED PROPERTY REPRESENTATIVE: By Dated: Mark Dwyer Linden Hills Redevelopment, LLC 4632 Washburn Avenue South Minneapolis,

More information

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates

More information

HUMC/Mountainside Hospital Redevelopment Plan

HUMC/Mountainside Hospital Redevelopment Plan Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 11 Parsippany, NJ 754 862.27.59 PREPARED

More information

SUNY Uptown Campus and Harriman State Office Campus Traffic Impact Study for the Emerging Technology and Entrepreneurship Complex (ETEC) Building

SUNY Uptown Campus and Harriman State Office Campus Traffic Impact Study for the Emerging Technology and Entrepreneurship Complex (ETEC) Building SUNY Uptown Campus and Harriman State Office Campus Traffic Impact Study for the Emerging Technology and Entrepreneurship Complex (ETEC) Building State University of New York at Albany City of Albany,

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY 675 Millcreek Drive, Unit 1 Mississauga, Ontario L5N 5M4 T: 416.213.7121 F: 95.89.8499 www.transtech.co TRAFFIC IMPACT STUDY PROPOSED MOSQUE DEVELOPMENT 4269 REGIONAL ROAD 25 TOWN OF OAKVILLE PREPARED

More information

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

February 13, Mr. Chuck Marshall Stewart's Shops Corp. PO Box 435 Saratoga Springs, NY 12866

February 13, Mr. Chuck Marshall Stewart's Shops Corp. PO Box 435 Saratoga Springs, NY 12866 February 13, 2017 Mr. Chuck Marshall Stewart's Shops Corp. PO Box 435 Saratoga Springs, NY 12866 Re: Modified Entrance Layout - Revised Traffic Assessment and Sight Distance Analysis Proposed Stewart's

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Bank Street Retail/Hotel Development

Bank Street Retail/Hotel Development M a y 214 89-9 Bank Street Retail/Hotel Development Transportation Brief Google 214 Bing 214 Prepared for: Prepared by: Study 89-9 Type Bank Street May 214 Study Retail/Hotel Name Development February

More information

Benga Mining Limited Grassy Mountain Coal Project Appendix 8: Traffic Impact Assessment. Appendix 8 Traffic Impact Assessment

Benga Mining Limited Grassy Mountain Coal Project Appendix 8: Traffic Impact Assessment. Appendix 8 Traffic Impact Assessment Benga Mining Limited Grassy Mountain Coal Project Appendix 8: Traffic Impact Assessment Appendix 8 Traffic Impact Assessment August 216 Riverdale Resources Proposed Coal Mine near Blairmore AB Traffic

More information

LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY

LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY Prepared for: Liberty Tree Academy Prepared by: 161 Blake Street, Suite 2 Denver, Colorado 822 Contact: David Kline, PE, PTOE (33)-572-2 On Behalf of: Liberty

More information

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: 1649362 Ontario Inc. c/o Manor Park Management 231 Brittany Drive, Suite D Ottawa ON K1K 0R8 July

More information

APPENDIX D Traffic Impact Study (Draft Report)

APPENDIX D Traffic Impact Study (Draft Report) ENVIRONMENTAL IMPACT ASSESSMENT (EIA) REGISTRATION, TRAFFIC IMPACT STUDY (DRAFT REPORT), AND WATER SUPPLY SOURCE ASSESSMENT (WSSA): CAMPING PLAGE ABOITEAU BEACH, CAP-PELÉ, NB APPENDIX D (Draft Report)

More information

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM To: Thomas Cummings February 17, 2011 Holbrook Public Works Superintendent From: Re:

More information

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for: NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

Oregon Country Fair Events

Oregon Country Fair Events Oregon Country Fair Events Traffic Impact Analysis Lane County, Oregon September, 5 Oregon Country Fair Events Traffic Impact Analysis. Introduction The purpose of this report is to provide a Traffic Impact

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

Syracuse University University Place Road Closure

Syracuse University University Place Road Closure Transportation Impact Study for the proposed Syracuse University University Place Road Closure City of Syracuse, Onondaga County, NY March 216 Project No. 3613 Prepared For: Syracuse University Office

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

Road Conversion Study Plumas Street

Road Conversion Study Plumas Street Plumas Street Phase I Submitted to The Regional Transportation Commission of Washoe County Submitted by Zong Tian, Ph.D., P.E. Saeedeh Farivar Haiyuan Li, Ph.D. Center for Advanced Transportation Education

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Momentum Planning & Communications 1165 Greenlawn Crescent Ottawa, ON K1L 6C2 June 29, 2015 115-618 Brief_1.doc

More information

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY DECEMBER 2012 READ, VOORHEES & ASSOCIATES TORONTO, ONTARIO Read, Voorhees & Associates

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

joint access drive. will be

joint access drive. will be Date: To: From: Subject: June 22, 2015 Bradley Reiner, PE Bowman Consulting David R. Kline, PE, PTOE, Incline Associates Thornton Self-Storage Traffic Analysis (DRAFT) - Thornton, Colorado INTRODUCTION

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

February 8, Ms. Jamie Jun, Esq. Fromhold Jaffe & Adams 789 East Lancaster Avenue, Suite 220 Villanova, PA 19085

February 8, Ms. Jamie Jun, Esq. Fromhold Jaffe & Adams 789 East Lancaster Avenue, Suite 220 Villanova, PA 19085 WWW.TRAFFICPD.COM February 8, 2016 Ms. Jamie Jun, Esq. Fromhold Jaffe & Adams 789 East Lancaster Avenue, Suite 220 Villanova, PA 19085 Re: Kohelet Yeshiva School Lower Merion Township, Montgomery County,

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

ENKA INTERMEDIATE SCHOOL

ENKA INTERMEDIATE SCHOOL TRANSPORTATION IMPACT ANALYSIS Prepared for Buncombe County Schools ENKA INTERMEDIATE SCHOOL Asheville, NC Project Number: 13-71 8/1/13 www.davenportworld.com DAVENlORT Transportation Impact Analysis Enka

More information

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT Prepared by: In Association with: November 2013 EXECUTIVE SUMMARY Patton Township, in partnership

More information

TRAFFIC IMPACT REPORT CASTLE PINES APARTMENTS CASTLE PINES, COLORADO

TRAFFIC IMPACT REPORT CASTLE PINES APARTMENTS CASTLE PINES, COLORADO TRAFFIC IMPACT REPORT CASTLE PINES APARTMENTS CASTLE PINES, COLORADO APRIL 12, 218 REV. JULY 16, 218 Prepared for: Davis Development 43 Corporate Center Dr Suite 21 Stockbridge, GA 3281 Prepared by: 112

More information

AMEC Earth and Environmental. Bovaird Drive Environmental Assessment. Traffic Study Final Report. August Excellence in Transportation Planning

AMEC Earth and Environmental. Bovaird Drive Environmental Assessment. Traffic Study Final Report. August Excellence in Transportation Planning AMEC Earth and Environmental Bovaird Drive Environmental Assessment Traffic Study Final Report August Excellence in Transportation Planning AMEC Earth and Environmental Bovaird Drive Class EA Traffic

More information

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina Prepared for Longbranch Development Prepared by January 13, 219 ii Table of Contents Subject Page Signature Page... i Table of Contents...

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

Kanata North Catholic Elementary School

Kanata North Catholic Elementary School December 216 Kanata North Catholic Elementary School Transportation Brief SITE Potential Future Development Trillium Woods Prepared for: Bryden Martel Architects Inc Prepared by: KANATA NORTH CATHOLIC

More information

Troutbeck Farm Development

Troutbeck Farm Development Troutbeck Farm Development Willistown Township, Chester County PA For Submission To: Willistown Township Last Revised: October, 4 TPD# INLM.A. 5 E. High Street Suite 65 Pottstown, PA 9464 6.36.3 TPD@TrafficPD.com

More information

3.2.2 Proposed Road Network within Phase 1B Lands

3.2.2 Proposed Road Network within Phase 1B Lands 3.2.2 Proposed Road Network within Phase 1B Lands Figure 3.1 also shows the proposed road network within the Premier Gateway Phase 1B Employment Area lands, which features two collector roads providing

More information

Technical Memo. Steve Gramm, SDDOT. RE: Phase 1, Task 100: Baseline Analysis. To: From: Steve Hoff, HDR Engineering, Inc.

Technical Memo. Steve Gramm, SDDOT. RE: Phase 1, Task 100: Baseline Analysis. To: From: Steve Hoff, HDR Engineering, Inc. Technical Memo To: Steve Gramm, SDDOT From: Steve Hoff, Engineering, Inc. Project: I-190/Silver Street Study CC: Date: 6//010 Job No: DOT Contract 41044, Order PD-0-09 RE: Phase 1, Task 100: Baseline Analysis

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

Signal Warrant Studies

Signal Warrant Studies Signal Warrant Studies Seven Locations Piqua, Ohio December 12, 217 Signal Warrant Studies Seven Locations Piqua, Ohio TABLE OF CONTENTS Executive Summary... 3 Introduction... 5 Study Location... 5 Data

More information

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for oad & Traffic Management Road & Traffic Management R Atlantic Traffic Engineering Specialists Draft Report Traffic Impact Study Superstore, Wal-Mart, and Kent Development Yarmouth, Nova Scotia Prepared

More information

4. Include the associated years anticipated for the short term and long term analysis in the

4. Include the associated years anticipated for the short term and long term analysis in the 2nd DE Review SM ROCHA, LLC responses to City comments are provided within. 8. Trip distribution is displayed in Figure 6. Distribution assumes SFA and commercial traffic combined for most conservative

More information

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited 2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief Paradigm Transportation Solutions Limited March 217 March 217 Project: 1627 Diana Vlasic, M.C.I.P., R.P.P Metropolitan Consulting 445 Paletta

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: Orleans Gardens Shopping Centre Inc. 2851 John Street, Suite 1 Markham, ON K3R 5R7

More information

Donahue Drive Corridor Traffic Operational Evaluation

Donahue Drive Corridor Traffic Operational Evaluation Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

FAIRFIELD - RYAN S CORNER TRAFFIC IMPACT ANALYSIS LOUDOUN COUNTY, VIRGINIA

FAIRFIELD - RYAN S CORNER TRAFFIC IMPACT ANALYSIS LOUDOUN COUNTY, VIRGINIA FAIRFIELD - RYAN S CORNER TRAFFIC IMPACT ANALYSIS LOUDOUN COUNTY, VIRGINIA Submitted on behalf of: Fairfield Residential Prepared by: Wells + Associates, Inc. 1420 Spring Hill Road, Suite 00 McLean, Virginia

More information

Grant Avenue Streetscape

Grant Avenue Streetscape REPORT TYPE GOES HERE Grant Avenue Streetscape PREPARED FOR City of Manassas 9027 Center Street Manassas, VA 20110 PREPARED BY 8300 Boone Boulevard Suite 700 Vienna, Virginia 22182 571.389.8121 July 31,

More information

Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) Final Report

Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) Final Report Consultant Services for Updating Intersections Operations to Accommodate Bi-Directional Cycle Tracks Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) January 30, 2014 Consultant

More information

6060 North Central Expressway Mixed-Use Site Dallas, Texas

6060 North Central Expressway Mixed-Use Site Dallas, Texas Volume 1 Traffic Impact Analysis 6060 North Central Expressway Mixed-Use Site Dallas, Texas April 30, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #063238300 Registered Firm F-928 Traffic

More information

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015 Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative

More information

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT November 2016 TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT & Aspinwall Borough, Sharpsburg Borough & O Hara Township, Allegheny County, Pennsylvania Prepared for: Riverfront

More information

Operational Ranking of Intersections: A Novel Prioritization Methodology

Operational Ranking of Intersections: A Novel Prioritization Methodology Operational Ranking of Intersections: A Novel Prioritization Methodology Reza Omrani, Ph.D. Transportation Engineer CIMA+ 3027 Harvester Road, Suite 400 Burlington, ON L7N 3G7 Reza.Omrani@cima.ca Pedram

More information

Draft. Multi-Modal Transportation Study and Improvement Plan for the Highway 38 Corridor in Verona, ON. Prepared for: Township of South Frontenac

Draft. Multi-Modal Transportation Study and Improvement Plan for the Highway 38 Corridor in Verona, ON. Prepared for: Township of South Frontenac Multi-Modal Transportation Study and Improvement Plan for the Highway 38 Corridor in Verona, ON Prepared for: Township of South Frontenac Prepared by: Stantec Consulting Ltd. Sign-off Sheet This document

More information

Multnomah County Courthouse Relocation. Transportation Alternatives Analysis Technical Memorandum: FINAL

Multnomah County Courthouse Relocation. Transportation Alternatives Analysis Technical Memorandum: FINAL Multnomah County Courthouse Relocation Portland, Oregon Transportation Alternatives Analysis Technical Memorandum: FIL Prepared for Multnomah County Facilities and Property Management Division 41 N Dixon

More information

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Date: April 16 th, 2015 To: From: Re: Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Darian Nagle-Gamm, Traffic Engineering Planner Highway 6 (2 nd Street) /

More information

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: First Bay Properties Inc. 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 August 8, 2017 117-663 Brief_1.doc

More information

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212

More information

192 & 196 Bronson Avenue / 31 Cambridge Street

192 & 196 Bronson Avenue / 31 Cambridge Street Bronson Inc. July 213 192 & 196 Bronson Avenue / 31 Cambridge Street TRANSPORTATION BRIEF Prepared by: Study 192 Bronson Type Avenue July 213 Study Transportation Name Brief February 211 TB Check List

More information

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,

More information

Appendices. Appendix J: Traffic Study

Appendices. Appendix J: Traffic Study Appendices Appendix J: Traffic Study The Platinum Triangle Subsequent EIR The Planning Center Appendices This page intentionally left blank. The Platinum Triangle Subsequent EIR The Planning Center TRAFFIC

More information

March 11, Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA Walnut Street Traffic Assessment

March 11, Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA Walnut Street Traffic Assessment March 11, 2015 Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA 01940 Re: Walnut Street Traffic Assessment Dear Board of Selectmen Members: As requested, BETA Group, Inc. (BETA)

More information

Design Traffic Technical Memorandum

Design Traffic Technical Memorandum State Road 7 Extension PD&E Study Design Traffic Technical Memorandum Palm Beach County, FL October 2010 State Road 7 Extension PD&E Study Design Traffic Technical Memorandum Palm Beach County, FL Prepared

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Introduction The Georgia Department of Transportation (GDOT) prepared a

More information

FORM A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION

FORM A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION FORM 901.3.A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION The following information is required from all applicants directly or indirectly accessing any collector or arterial road or as otherwise

More information

USA Parkway Traffic Operations Analysis, Roundabout Option. Pedro Rodriguez, NDOT; Bryan Gant, Jacobs; Randy Travis, NDOT

USA Parkway Traffic Operations Analysis, Roundabout Option. Pedro Rodriguez, NDOT; Bryan Gant, Jacobs; Randy Travis, NDOT Technical Memorandum TO: Hoang Hong, NDOT DATE: September 21, 2012 FROM: SUBJECT: COPIES: John Karachepone, Jacobs USA Parkway Traffic Operations Analysis, Pedro Rodriguez, NDOT; Bryan Gant, Jacobs; Randy

More information

Arterial Traffic Analysis Some critical concepts. Prepared by Philip J. Tarnoff

Arterial Traffic Analysis Some critical concepts. Prepared by Philip J. Tarnoff Arterial Traffic Analysis Some critical concepts Prepared by Philip J. Tarnoff Agenda Fundamentals Signal timing concepts Actuated signal controllers Developing timing plans Types of signal control First

More information

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM

CENTRAL TRANSPORTATION PLANNING STAFF MEMORANDUM CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM To: Martha White, Natick Town Administrator February 17, 2011 Eric Nascimento, MassDOT

More information

South Street Campus Lands Development. City of London TRANSPORTATION IMPACT ASSESSMENT

South Street Campus Lands Development. City of London TRANSPORTATION IMPACT ASSESSMENT South Street Campus Lands Development City of London TRANSPORTATION IMPACT ASSESSMENT TW1387 South Street Campus Lands Development City of London TRANSPORTATION IMPACT ASSESSMENT May 2013 South Street

More information

3.9 - Transportation and Traffic

3.9 - Transportation and Traffic Transportation and Traffic 3.9 - Transportation and Traffic This section describes the potential transportation and traffic effects of project implementation on the project site and its surrounding area.

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

Project Niagara. within the Town of Niagara-on-the-Lake

Project Niagara. within the Town of Niagara-on-the-Lake Traffic Traffic Impact Impact Study Study Project Niagara within the Town of Niagara-on-the-Lake Prepared for: Project Niagara July 2009 Traffic Impact Study PROJECT NIAGARA Niagara-On-The-Lake, Ontario

More information