1 Pavement Management Program Public Works Department January 5, 2016

2 Chad Butzow, P.E. Deputy Director Field Operation Services Public Works Department Brian Martineau Pavement Manager Public Works Department

3 Topics 1. Manatee County Roadway Network 2. Maintenance Plan 3. Future

4 (1) Manatee County Roadway Network 1266 Center Line Miles of Paved Roads 2620 Lane Miles 883 Center Line Miles of Local Roads 1776 Lane Miles 383 Center Line Miles of Collector Roads 844 Lane Miles

5 Pavement Condition Survey Ability to determine current condition Ability to determine it s future condition Is Objective and repeatable Pavement Condition Index (PCI)

6 Pavement Condition Index (PCI) ASTM (D6433) Numerical index, ranging from 0 for a failed pavement to a 100 for a pavement in perfect condition Roads are measured, segmented, and distresses identified PCI are calculated by identifying and measuring distresses per each roadway segment

7 Measured

8 Segmented

9 Distresses Identified

10 Examples Distresses Alligator Cracking Measured in Square Feet Longitudinal Cracking Measured in Linear Feet Alligator Cracking Longitudinal Cracking

11 PCI Established

12 MANATEE COUNTY PCI Collector (PCI) weighted average 80.38* Residential (PCI) weighted average 72.89* * Manatee County PCI data collected by Transmap Corporation, Upper Arlington, OH

13 PCI Range Categories Excellent (86-100) Very Good (71-85) Good (56-70) Fair (41-55) Poor (26-40) Very Poor (11-25) Failed (0-10) Collector (80.38) PCI Residential (72.89) PCI Network Avg (76.63) PCI

14 Total Lane Miles of Collectors Total = 844 Miles Miles 41% 329 Miles 39% Pavement Condition (PCI) Lane Miles Miles 10% 76 Miles 9% Miles 1% PCI PCI PCI PCI < 50 PCI Pavement Condition Scores Pavement Condition (PCI)

15 Total Lane Miles of Residential Total = 1776 Miles Pavement Condition (PCI) Miles 33% Lane Miles Miles 26% 408 Miles 23% 266 Miles 15% Miles 3% PCI PCI PCI PCI < 50 PCI Pavement Condition Scores Pavement Condition (PCI)

16 One of Manatee County s Largest Capital Investments? ROADWAY NETWORK To construct one mile of a two lane undivided road: a conservative estimate would be $350,000 per $350,000.00* per x 1266 miles = $440 Million Dollars *ftp://ftp.dot.state.fl.us/lts/co/estimates/cpm/summary.pdf (Rural undivided 2 Lane $2,044,323)

17 2. Maintenance Plan

18 Goals: Extend our pavements service life Maintain or Improve our PCI Budget and plan an effective strategy to maximize available funds Be proactive in our maintenance methods Communicating our methods accurately to the citizens

19 Managing vs. Maintained Pavement Management is the systematic method for routinely collecting, storing and retrieving the kind of decision-making information needed to make maximum use of limited dollars.

20 Pavement Management Program MicroPAVER Developed in the late 1970s to help DOD manage its vast inventory of pavement Recommended by American Public Works Association (APWA) Uses PCI for predicting future Maintenance and Rehabilitation (M&R) needs Ability to run Multiple Budget Analysis Proactive Approach to Pavement Management Based on your Strategies

21 Current Maintenance Strategies Non-Structural (Preventative & Preservation) Asphalt Rejuvenator $0.94 per S/Y 5-? Years of additional life Chip Seal / Cape Seal $2.77 per S/Y 5-10 Years additional life Micro Surfacing $2.94 per S/Y 8-10 Years additional life Thin Lift Asphalt $4.71 per S/Y Years additional life Structural (Rehabilitation & Reconstruction) Hot mix- asphalt (HMA) $6.92 per S/Y Years additional life Mill and Fill $10.85 per S/Y Years additional life Level and Overlay $9.71 per S/Y Years additional life Base Repair & Surface $15.40 per S/Y Years additional life Full Depth Reclaim $23.11 per S/Y Years additional life

22 Current Resurfacing Funding Major (Collectors) $2,100,000 Local (Residential) $2,100, Spending Strategies Major 98% Structural Local 66% Structural 34% Non-Structural

23 Network Budget Analysis Using MicroPAVER Major $2,000,000 at Current Funding YEAR WEIGHTED AVERAGE PCI CHANGE IN PCI ACTUAL COST # OF SEGMENTS TOTAL MILES $2,150, $2,003, $1,975, TOTAL 0.44 $6,129,

24 Network Budget Analysis PCI Calculated Changes PCI MAJOR COLLECTOR ROADS $0.00 Budget $2,000,000 Budget

25 Network Budget Analysis Using MicroPAVER Residential $2,000,000 at Current Funding YEAR WEIGHTED AVERAGE PCI CHANGE IN PCI ACTUAL COST # OF SEGMENTS TOTAL MILES $2,000, $1,998, $1,999, TOTAL 1.56 $5,998,

26 Network Budget Analysis Using MicroPAVER Residential $3,000,000 Funding YEAR WEIGHTED AVERAGE PCI CHANGE IN PCI ACTUAL COST # OF SEGMENTS TOTAL MILES $3,015, $3,012, $3,061, TOTAL 0.37 $9,088,

27 Network Budget Analysis PCI Calculated Changes PCI Local Residential Roads $0.00 Budget $2,000,000 Budget $3,000,000 Budget

28 Network Budget Analysis Using MicroPAVER Unconstrained Budget YEAR WEIGHTED AVERAGE PCI CHANGE IN PCI ACTUAL COST $41 Million $4 Million $700 K TOTAL $46 Million

29

30 Summary At current funding levels Collector Roads are stabilized and we can maintain our 80 PCI level. Residential Roads which represent 66% of our total area will require additional funding to stabilize and address deficiencies in the network with a more proactive approach to preventative maintenance. The program is an effective tool, but the human / common sense factor is required. Prices do fluctuate based on many different factors and all analysis are based on current costs.

31 3. Future

32 Goals: Extend our pavements service life Maintain or Improve our PCI Budget and plan an effective strategy to maximize available funds Be proactive in our maintenance methods Communicating our methods accurately to the citizens

33 Proactive Maintenance Methods Worst first approach does not work - Allow roads to age to get maximum value Right Treatment, Right Road, Right Time - Apply preventative maintenance strategies to better rated roads Pavement preservation in new developments - Apply rejuvenator early as a roadway accepted into network

34 Asphalt Rejuvenator 43 rd Ave Ter West Bradenton (1999) Canal Road Trailer Estates (2012)

35 Asphalt Rejuvenator 41 st Ave Cir West (1999) Cracks Less Cracks

36 Asphalt Rejuvenator 104 th Ave E off of Old Tampa Road (2012) Asphalt Rejuvenator not applied.

37 Micro Surfacing Baystate Road (2015) Hillcrest Drive (2010)

38 2015 Budget per Lane Mile Manatee County 4.2 million dollars for 2620 lane miles $1603 per lane mile Sarasota County 10 million dollars for 2300 lane miles $4347 per lane mile City of Lakeland 1.5 million for 790 lane miles $1899 per lane mile City of Sarasota 2 million for 232 center line miles Estimated 682 lane miles $ per lane mile City of Tampa 8 million dollars for 2600 lane miles $3077 per lane mile

39 Thank you. Questions?

40 Current Maintenance Strategies Non-Structural (Preventative & Preservation) Asphalt Rejuvenator $0.94 per S/Y Chip Seal / Cape Seal $2.77 per S/Y Micro Surfacing $2.94 per S/Y * Thin Lift Asphalt $4.71 per S/Y $1 million Micro = SY / SY per mile = 26 miles Structural (Rehabilitation & Reconstruction) Hot mix- asphalt (HMA) $6.92 per S/Y Mill and Fill $10.85 per S/Y Level and Overlay $9.71 per S/Y Base Repair & Surface $15.40 per S/Y Full Depth Reclaim $23.11 per S/Y $1 million Mill & Fill = SY / SY per SY = 7 miles

41 Soil Cement Asphalt Pavement Block Cracking Concrete Parking Lot Block Cracking

City of Davis Pavement Management Program

City of Davis Pavement Management Program City of Davis Pavement Management Program Davis Street and Bike Path System 163 centerline miles of streets (33 million square feet) 34.6 miles of arterials 21% 22.8 miles of collectors 14% 103.9 miles

More information

Keeping good roads good

Keeping good roads good Pavement Preservation (PP) in the State of California- Protecting Their Road and Street Investment R. Gary Hicks PhD, PE CP2 Center, Chico CA Prepared for the 3 rd International Pavement Maintenance Technology

More information

Asphalt Recycling and Pavement Preservation in Hillsborough County, Florida

Asphalt Recycling and Pavement Preservation in Hillsborough County, Florida Asphalt Recycling and Pavement Preservation in Hillsborough County, Florida Roger Cox, P.E. Manager coxw@hillsboroughcounty.org 813.272.5912 Public Works Department Systems Planning Discussion Points Hillsborough

More information

Pavement Management Report. City Council Meeting of May 21, 2013

Pavement Management Report. City Council Meeting of May 21, 2013 Pavement Management Report City Council Meeting of May 21, 2013 Previous Meetings Summary In February, we presented the 2012 pavement survey and our consultant presented general pavement management strategies

More information

Southeaster Pavement Preservation Partnership 2010 Update Welcome to Tennessee. Michael J. Doran, P.E. Maintenance Division

Southeaster Pavement Preservation Partnership 2010 Update Welcome to Tennessee. Michael J. Doran, P.E. Maintenance Division Southeaster Pavement Preservation Partnership 2010 Update Welcome to Tennessee Michael J. Doran, P.E. Maintenance Division Why are we here today? The Solution Background Information Geographic Locations

More information

Lake Waterford Community Association Meeting. November 15, 2016

Lake Waterford Community Association Meeting. November 15, 2016 Lake Waterford Community Association Meeting November 15, 2016 Introduction Staff Introduction Project Overviews - Completed Projects - Pavement Management Program - Pasadena Road Sidewalk Improvements

More information

Why We do Preventive Maintenance

Why We do Preventive Maintenance Why We do Preventive Maintenance James S. Moulthrop, P.E. Executive Director FP 2 Inc. North Dakota Asphalt Conference March 28-29, 2017 Bismarck, ND Presentation Outline What is FP 2 Inc.? Mission Preventive

More information

Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT. February 12, 2015

Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT. February 12, 2015 Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT February 12, 2015 What is Pavement Management? At a Network Level: Pavement management refers to a systematic

More information

City of Lakewood. Public Works Transportation. Transportation Division Current and Future Projects Division Manager: Weston Ott, P.E.

City of Lakewood. Public Works Transportation. Transportation Division Current and Future Projects Division Manager: Weston Ott, P.E. City of Lakewood Public Works Transportation Transportation Division Current and Future Projects Division Manager: Weston Ott, P.E. June 15, 2017 Transportation Photos S. Tacoma Way: looking north between

More information

New Mexico Transportation Funding Challenges

New Mexico Transportation Funding Challenges New Mexico Transportation Funding Challenges Rocky Mountain Pavement Preservation Partnership Meeting October 29-31, 2008 Ernest Archuleta, P.E. Field Operations Division Director 1 NMDOT DISTRICT OFFICES

More information

Tacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force

Tacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force 1 Tacoma Streets 101 2 Streets Maintenance Overview Type and amount of streets Condition and types of construction Maintenance and repair methods and costs Sample Project Philosophy/Selection Criteria

More information

The City of Port Moody 2013 Paved Road Network Condition Assessment

The City of Port Moody 2013 Paved Road Network Condition Assessment The City of Port Moody 2013 Paved Road Network Condition Assessment February 2014 Contents Objectives Data Collection Road Network Present Conditions in 2013 Road Network Assessment and Comparison to other

More information

Executive Summary. Introduction

Executive Summary. Introduction Executive Summary Introduction The future of our local economy is uncertain, but one thing we know we must manage our infrastructure smarter. State and local agencies are facing challenging times. There

More information

Driving Indiana s Economic Growth

Driving Indiana s Economic Growth Driving Indiana s Economic Growth IRI/PCR/RUT Field Verification Kumar P. Dave Manager, Road & Pavement Asset Management & Programming, INDOT 03-06-2012 Organization Chart Pavement Division, INDOT David

More information

City of Coquitlam. Pavement Management Technology. Profile/GPS/Videolog Vehicle. Pavement Management System. SUBSURFACE PROFILING - Road Radar

City of Coquitlam. Pavement Management Technology. Profile/GPS/Videolog Vehicle. Pavement Management System. SUBSURFACE PROFILING - Road Radar City of Coquitlam System Road Condition Analysis Parameters % Cracking Structural (Deflection) Rideability (Roughness) Rutting Traffic Volumes % Trucks Different Policy Models Min Cost - based on a minimum

More information

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM

City of West Des Moines PAVEMENT MANAGEMENT SYSTEM City of West Des Moines PAVEMENT MANAGEMENT SYSTEM 12/11/2018 Municipal Street Seminar (11-14-2018) JEFF NASH 1 City Background Information: - West Des Moines current census Population is around 66,000

More information

Paving for Progress Municipal Streets Seminar

Paving for Progress Municipal Streets Seminar Paving for Progress Municipal Streets Seminar November 15, 2017 Doug Wilson, PE City of Cedar Rapids Paving for Progress Program Manager State and National Rankings $10,996,122 Prior Funding: General Obligation

More information

Smoothing Out the Bumpy Road Ahead

Smoothing Out the Bumpy Road Ahead Julie Hannah, P.E. Technical Services and Asset Management May 11, 2017 Smoothing Out the Bumpy Road Ahead Nationwide D = Poor, At Risk Conditions & Capacity Pavement Condition & Congestion Nationwide

More information

POTHOLES IN EDMONTON. Updated: April 4, 2013

POTHOLES IN EDMONTON. Updated: April 4, 2013 Updated: April 4, 2013 Abstract Every year the City of Edmonton spends a few million dollars to fill a few hundred thousand potholes. Are potholes just a fact of life, or can we do something about them?

More information

VDOT s Pavement Management Program. Presented by: Tanveer Chowdhury Maintenance Division, VDOT March 05, 2010

VDOT s Pavement Management Program. Presented by: Tanveer Chowdhury Maintenance Division, VDOT March 05, 2010 VDOT s Pavement Management Program Presented by: Tanveer Chowdhury Maintenance Division, VDOT March 05, 2010 Outline Pavement Management network and project level Pavement Data Collection and QA/QC Data

More information

DEVELOPMENT OF A PAVEMENT REHABILITATION STRATEGY FOR NATIONAL ROADS IN QUEENSLAND

DEVELOPMENT OF A PAVEMENT REHABILITATION STRATEGY FOR NATIONAL ROADS IN QUEENSLAND DEVELOPMENT OF A PAVEMENT REHABILITATION STRATEGY FOR NATIONAL ROADS IN QUEENSLAND Presenter: Tyrone Toole, ARRB Group Scope Background Objectives Road network data and analysis Current and potential investment

More information

C ITY OF B EDFORD H EIGHTS

C ITY OF B EDFORD H EIGHTS C ITY OF B EDFORD H EIGHTS T ABLE OF C ONTENTS 1. Executive Summary... 2 2. Background... 3 3. PART I: 2016 Pavement Condition... 8 4. PART II: 2018 Current Backlog... 13 5. PART III: Maintenance &

More information

Pavement Management 2011 Status Report

Pavement Management 2011 Status Report Pavement Management 2011 Status Report October 2011 Chapter 1: Table of Contents 1. Introduction... 1 1.1 Pavement Management Systems - Background... 1 1.2 Evaluation Criteria for CCC Data Collection...

More information

2018 ROAD MAINTENANCE PROGRAM

2018 ROAD MAINTENANCE PROGRAM 2018 ROAD MAINTENANCE PROGRAM John Tiger Anastasi Town of Bethlehem Superintendent of Highways June 27, 2018 AGENDA Why do we maintain our roads? How is the Road Maintenance Plan developed? The process

More information

2017 Pavement Management Services Pavement Condition Report Salt Lake City, UT

2017 Pavement Management Services Pavement Condition Report Salt Lake City, UT 2017 Pavement Management Services Pavement Condition Report Salt Lake City, UT Prepared by: Data Transfer Solutions, LLC 3680 Avalon Park East Blvd., Suite 200 Orlando, FL 32828 www.dtsgis.com Table of

More information

Non-State Federal Aid Highways. Pavement Condition Ratings. H e r k i m e r a n d O n e i d a C o u n t i e s

Non-State Federal Aid Highways. Pavement Condition Ratings. H e r k i m e r a n d O n e i d a C o u n t i e s Non-State Federal Aid Highways Pavement Condition Ratings 2010 H e r k i m e r a n d O n e i d a C o u n t i e s 2010 PAVEMENT CONDITION RATINGS for the Non-State Federal Aid Highway System in Herkimer

More information

Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC)

Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC) Emerging Concrete Pavement Solutions Roller Compacted Concrete (RCC) Presented to: APWA Nor Cal November 3 rd, 2016 Presenters: Jason Shykowsi, P.E., T.E. City of Roseville Debbie Haldeman RCC Council

More information

FLORIDA DEPARTMENT OF TRANSPORTATION

FLORIDA DEPARTMENT OF TRANSPORTATION FLORIDA DEPARTMENT OF TRANSPORTATION FLEXIBLE PAVEMENT CONDITION SURVEY HANDBOOK March 2012 STATE MATERIALS OFFICE Table of Contents Title Page List of Tables... i List of Figures... ii Executive Summary...

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: City of Livermore Date: 12/4/2017 Primary Point of Contact Name: Debbie

More information

REAL WORLD PAVEMENT PRESERVATION SOLUTIONS

REAL WORLD PAVEMENT PRESERVATION SOLUTIONS Cycle INTRODUCTION Page 1 Cycle Page 2 INTRODUCTION Introduction Do the Right Thing... Definitions Preventive Maintenance vs. Reactive Maintenance Cycle Page 3 INTRODUCTION Do the Right Thing The right

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

Streets Presentation. Public Works Department. Jill Mercurio, P.E. City Engineer November 19, 2013

Streets Presentation. Public Works Department. Jill Mercurio, P.E. City Engineer November 19, 2013 Streets Presentation Public Works Department Jill Mercurio, P.E. City Engineer November 19, 2013 Street Repairs A Guide to Potholes & Pavement Failure Pavement Condition Index (PCI) Different Types of

More information

TOWN OF SHUTESBURY PAVEMENT MANAGEMENT STUDY SCENARIO 2

TOWN OF SHUTESBURY PAVEMENT MANAGEMENT STUDY SCENARIO 2 TOWN OF SHUTESBURY PAVEMENT MANAGEMENT STUDY SCENARIO 2 FRANKLIN REGIONAL COUNCIL OF GOVERNMENTS 425 Main Street, Greenfield, MA 01301 413-774-3167 June 2004 TOWN OF SHUTESBURY PAVEMENT MANAGEMENT STUDY

More information

Township of Springwater

Township of Springwater Township of Springwater Approved: November 2008 Effective: Date of Passing Next Review: TBD Department: Public Works Subject: Sidewalks Policy Number: A09 SI A. Authority This policy shall be approved

More information

land transport road assets

land transport road assets land transport road assets land transport road assets Otago Region Information as at June 2007 land transport road assets 2 Purpose of this publication Land Transport New Zealand annually publishes comparative

More information

Incorporating Sidewalks into Transportation Asset Management. Presentation by Alan S. Kercher, P.E. Kercher Engineering, Inc.

Incorporating Sidewalks into Transportation Asset Management. Presentation by Alan S. Kercher, P.E. Kercher Engineering, Inc. Incorporating Sidewalks into Transportation Asset Management Presentation by Alan S. Kercher, P.E. Kercher Engineering, Inc. Integrated Management of Infrastructure Example: Urban Environment Pavements

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

YAVAPAI COUNTY PUBLIC WORKS

YAVAPAI COUNTY PUBLIC WORKS YAVAPAI COUNTY PUBLIC WORKS PROVIDES ENGINEERING, ROADWAY MAINTENANCE, SOLID WASTE, AIRPORTS AND EMERGENCY MANAGEMENT SERVICES FLOOD CONTROL DISTRICT, SPECIAL DISTRICTS (EXCEPT ROAD IMPROVEMENT DISTRICTS)

More information

Board of County Commissioners. Regular Meeting Thursday, December 15, :30 P.M. School Board Administrative Complex

Board of County Commissioners. Regular Meeting Thursday, December 15, :30 P.M. School Board Administrative Complex Board of County Commissioners Regular Meeting Thursday, December 15, 2016 5:30 P.M. School Board Administrative Complex ROAD PRIORITIZATION Kevin Kirby, Assistant County Manager December 15, 2016 FIVE

More information

SECTION 5: PEER CITY REVIEW

SECTION 5: PEER CITY REVIEW SECTION 5: PEER CITY REVIEW 5.1 Introduction It is evident that the City of Lincoln continually strives to improve its operations and practices. To that end, a list of peer cities was developed to compare

More information

ADA Self Evaluation and Transition Plan for Public Rights-of-Way

ADA Self Evaluation and Transition Plan for Public Rights-of-Way ADA Self Evaluation and Transition Plan for Public Rights-of-Way 2014 NWPMA Conference Akmal Siddiqui WSDOT Local Programs 310 Maple Park Avenue SE Olympia, WA 98504 Phone: 360-705-7539 siddiqa@wsdot.wa.gov

More information

HIR on Oklahoma Turnpikes

HIR on Oklahoma Turnpikes HIR on Oklahoma Turnpikes Tammy Robinson, P.E., Division Engineer EST, Inc. Stephen A. Cross, PhD, PE Professor, Oklahoma State Executive Director Pavement Recycling & Reclaiming Center HIR on Oklahoma

More information

land transport road assets

land transport road assets land transport road assets land transport road assets Westland District West Coast Region Information as at June 2006 land transport road assets 2 Purpose of this publication Land Transport New Zealand

More information

GDOT GDOT PowerPoint. Title Page

GDOT GDOT PowerPoint. Title Page GDOT 20152017 GDOT PowerPoint Savannah Post SAME Title Page Annual Programs Review Sub Titles Matt Bennett Body Text Program Manager June 14, 2017 Transportation Funding Act of 2015 (HB170) 2015 GDOT Your

More information

Rigby / Jefferson County Transportation Plan

Rigby / Jefferson County Transportation Plan Rigby / Jefferson County Transportation Plan 105085/07-863 Chapter 1 - Introduction... 1 Chapter 2 - Rigby / Jefferson County Highway System... 5 Chapter 3 Condition of the Existing Roadway System...

More information

NEVADA DEPARTMENT OF TRANSPORTATION STATE HIGHWAY PRESERVATION REPORT

NEVADA DEPARTMENT OF TRANSPORTATION STATE HIGHWAY PRESERVATION REPORT NEVADA DEPARTMENT OF TRANSPORTATION STATE HIGHWAY PRESERVATION REPORT February 2015 State of Nevada Department of Transportation State Highway Preservation Report Report to the 2015 Legislature As Required

More information

2016 FACT SHEET ENGINEERING STREET OPERATIONS. Engineering Street Operations net 2016 budget is $5,199,900 WHAT IS ENGINEERING STREET OPERATIONS?

2016 FACT SHEET ENGINEERING STREET OPERATIONS. Engineering Street Operations net 2016 budget is $5,199,900 WHAT IS ENGINEERING STREET OPERATIONS? WHAT IS STREET OPERATIONS? This section maintains approximately 570 km of major, collector and residential roads throughout Saanich. Some of the major programs include road surface treatments (pothole

More information

Available online at ScienceDirect. Transportation Research Procedia 14 (2016 )

Available online at   ScienceDirect. Transportation Research Procedia 14 (2016 ) Available online at www.sciencedirect.com ScienceDirect Transportation Research Procedia 14 (2016 ) 3021 3030 6th Transport Research Arena April 18-21, 2016 Application of the HDM-4 model on local road

More information

Low Traffic Volume LR 159 Low Traffic Preservation

Low Traffic Volume LR 159 Low Traffic Preservation Pavement Preservation Group Study Findings Adriana Vargas, Ph.D. PG Study State DOTs must preserve existing infrastructure with limited resources Preservation treatments can extend life of pavement Insufficient

More information

MNDOT PAVEMENT DESIGN MANUAL

MNDOT PAVEMENT DESIGN MANUAL MNDOT PAVEMENT DESIGN MANUAL Chapter 6 Ramps, Shoulders, Turn Lanes & Miscellaneous Pavements MnDOT Pavement Engineer Date Contents Introduction... 1 600 Ramps and Loops... 1 610 - Shoulders... 2 620 -

More information

Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota. Transportation Research

Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota. Transportation Research 2007-18 Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota Take the steps... Research...Knowledge...Innovative Solutions! Transportation Research

More information

Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE

Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE PAVED SHOULDERS ON PRIMARY HIGHWAYS IN IOWA: AN ANALYSIS OF SHOULDER SURFACING CRITERIA, COSTS, AND BENEFITS EXECUTIVE SUMMARY Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation

More information

Secondary Road Program

Secondary Road Program Secondary Road Program Joint Legislative Transportation Oversight Committee October 5, 2012 1 Secondary Roads Program The Big Picture The Secondary Road System Needs and Project Types Paved and Unpaved

More information

Use of Performance Metrics on The Pennsylvania Turnpike. Pamela Hatalowich, Penn Turnpike Commission Paul Wilke, Applied Research Associates, Inc.

Use of Performance Metrics on The Pennsylvania Turnpike. Pamela Hatalowich, Penn Turnpike Commission Paul Wilke, Applied Research Associates, Inc. Use of Performance Metrics on The Pennsylvania Turnpike Pamela Hatalowich, Penn Turnpike Commission Paul Wilke, Applied Research Associates, Inc. Presentation Outline Background- Turnpike Construction

More information

City of Kingston Information Report to Rural Advisory Committee Report Number RAC

City of Kingston Information Report to Rural Advisory Committee Report Number RAC To: From: Resource Staff: City of Kingston Information Report to Rural Advisory Committee Report Number RAC-18-004 Chair and Members of Rural Advisory Committee Jim Keech, President and CEO, Utilities

More information

GDOT Fiscal 2015 Year 2017 GDOT PowerPoint. Title Page

GDOT Fiscal 2015 Year 2017 GDOT PowerPoint. Title Page GDOT Fiscal 2015 Year 2017 GDOT PowerPoint Savannah Post SAME Title Page Annual Programs Review Sub Titles K. Joe Carpenter, Jr., P.E. Body Text Director Division of P3/Program Delivery June 15, 2016 Transportation

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Complia Report Reporting Fiscal Year 20162017 AGENCY CONTACT INFORMATION Agency Name: City of Piedmont Date: 12/4/2017 Primary Point of Contact Name: Chester Nakahara

More information

I-90 Corridor Performance Corridor Result

I-90 Corridor Performance Corridor Result I-90 Corridor Performance Corridor Result Statewide Result 87.1% 86.9% 0% 3.2% Ride Quality Good--% of miles 65.4% 70.2% Ride Quality Poor--% of miles 0% 3.7% 73 MPH N/A Measure Corridor Context The corridor

More information

On Monday, December 12, 2011, you will be briefed on Pavement Markings. The material is attached for your review.

On Monday, December 12, 2011, you will be briefed on Pavement Markings. The material is attached for your review. Memorandum CITY OF DALLAS DATE December 9, 2011 TO subject Honorable Members of the Transportation & Environment Committee: Linda Koop (Chair), Sheffie Kadane (Vice Chair), Pauline Medrano, Vonciel Jones

More information

Pavement Evaluation of the Nairobi Eastern By-Pass Road

Pavement Evaluation of the Nairobi Eastern By-Pass Road International Journal of Scientific and Research Publications, Volume 8, Issue 11, November 2018 547 Pavement Evaluation of the Nairobi Eastern By-Pass Road T. M. Nyang au, S. K. Mwea & P.K. Matheri Department

More information

OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO CONSTRUCTION CONTRACT AWARD

OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO CONSTRUCTION CONTRACT AWARD STAFF REPORT MEETING DATE: June 7, 2016 TO: FROM: City Council Russ Thompson, Public Works Director Gosia Woodfin, Assistant Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213

More information

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,

More information

Otter Tail County 2040 Transportation Plan. Asset Management Peer Exchange

Otter Tail County 2040 Transportation Plan. Asset Management Peer Exchange Otter Tail County 2040 Transportation Plan Asset Management Peer Exchange Study Purpose and Goals 1. Leverage existing tools 2. Analyze existing road conditions 3. Comparison of funding versus road conditions

More information

50 Year Roads: Don't Accept Anything Less

50 Year Roads: Don't Accept Anything Less 50 Year Roads: Don't Accept Anything Less Prepared By Thomas O. Malerk Director of Transportation Engineering Florida Concrete & Products Association NACE Annual Meeting April 22, 2015 Presented by Roger

More information

THE EFFECTS OF UTILITY CUT PATCHING ON PAVEMENT LIFE SPAN AND REHABILITATION COSTS

THE EFFECTS OF UTILITY CUT PATCHING ON PAVEMENT LIFE SPAN AND REHABILITATION COSTS THE EFFECTS OF UTILITY CUT PATCHING ON PAVEMENT LIFE SPAN AND REHABILITATION COSTS Prepared for City of Santa Ana Draft Report January 1999 Prepared by M. Y. Shahin, Ph.D., P.E. Consulting Engineer RJN

More information

AMERICANS WITH DISABILITIES ACT TRANSITION PLAN LEON COUNTY FOR CURB RAMPS AND SIDEWALKS DEPARTMENT OF PUBLIC WORKS. 1 P age

AMERICANS WITH DISABILITIES ACT TRANSITION PLAN LEON COUNTY FOR CURB RAMPS AND SIDEWALKS DEPARTMENT OF PUBLIC WORKS. 1 P age AMERICANS WITH DISABILITIES ACT TRANSITION PLAN FOR CURB RAMPS AND SIDEWALKS 2015 LEON COUNTY DEPARTMENT OF PUBLIC WORKS 1 P age INTRODUCTION The goal of the Americans with Disabilities Act (ADA) Transition

More information

NEW JERSEY DEPARTMENT OF TRANSPORTATION RIDE QUALITY SPECIFICATION AND CASE STUDIES

NEW JERSEY DEPARTMENT OF TRANSPORTATION RIDE QUALITY SPECIFICATION AND CASE STUDIES NEW JERSEY DEPARTMENT OF TRANSPORTATION RIDE QUALITY SPECIFICATION AND CASE STUDIES BY NARINDER S. KOHLI, P.E. PRINCIPAL ENGINEER PAVEMENT DESIGN, NJDOT (609) 530 8140 NARINDER.KOHLI@DOT.STATE.NJ.US RIDE

More information

Kentucky s Surface Transportation System

Kentucky s Surface Transportation System Kentucky s Surface Transportation System ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit

More information

An Overview of Mn/DOT s Pavement Condition Rating Procedures and Indices (September 2015)

An Overview of Mn/DOT s Pavement Condition Rating Procedures and Indices (September 2015) An Overview of Mn/DOT s Pavement Condition Rating Procedures and Indices (September 2015) Equipment Mn/DOT currently collects pavement condition data using a Pathway Services, Inc. Digital Inspection Vehicle

More information

Gerald P. Oliveto, P.E. George Franz NJDOT

Gerald P. Oliveto, P.E. George Franz NJDOT Gerald P. Oliveto, P.E. George Franz NJDOT Bridge preservation is defined as actions or strategies that prevent, delay or reduce deterioration of bridges or bridge elements, restore the function of existing

More information

- DRAFT - PAVEMENT MANAGEMENT REPORT FOR MERCED COUNTY 2009

- DRAFT - PAVEMENT MANAGEMENT REPORT FOR MERCED COUNTY 2009 - DRAFT - PAVEMENT MANAGEMENT REPORT FOR MERCED COUNTY 2009 TABLE OF CONTENTS What is the Pavement Management? 1 Pavement Data Collection 1 Inventorying Pavement Conditions 1 Maintained Paved Mileages

More information

An Overview of Mn/DOT s Pavement Condition Rating Procedures and Indices (March 27, 2003)

An Overview of Mn/DOT s Pavement Condition Rating Procedures and Indices (March 27, 2003) An Overview of Mn/DOT s Pavement Condition Rating Procedures and Indices (March 27, 2003) Equipment Mn/DOT currently collects pavement condition data using a Pathway Services, Inc. Video Inspection Vehicle

More information

Rennick Yard Roller-Compacted Concrete Pavement

Rennick Yard Roller-Compacted Concrete Pavement RCC Pavement Council Rennick Yard Roller-Compacted Concrete Pavement February 12, 2016 Submitted By: NCE 1885 S. Arlington Ave., Suite 111 Reno, NV 89509 Phone: 775.329.4955 Site Plan and Pavement Sections

More information

Tabulation of Bids. Counties: ROUTE 202,ALEXAUKEN CREEK ROAD TO RT 179/CR514

Tabulation of Bids. Counties: ROUTE 202,ALEXAUKEN CREEK ROAD TO RT 179/CR514 Page 1 of 17 18 HNTERDON ROTE 202,ALEXAKEN CREEK ROAD TO RT 179/CR514 Quantity and nits nit Price nit Price nit Price SECTION: 0001 ROADWAY 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 153003P PROGRESS

More information

Tabulation of Bids. Counties:

Tabulation of Bids. Counties: Page 1 of 16 0001 151006M PERFORMANCE BOND AND PAYMENT BOND 0004 153003P PROGRESS SCHEDLE 0005 153005M PROGRESS SCHEDLE PDATE 0006 153011M TRAINEES 0007 154003P MOBILIZATION 0010 157004M CONSTRCTION LAYOT

More information

Building Great Neighbourhoods LANSDOWNE

Building Great Neighbourhoods LANSDOWNE Building Great Neighbourhoods LANSDOWNE We are here today to Explain how the City is investing in improving your neighbourhood and how your neighbourhood will be improved to meet current City standards.

More information

Five Years Later. Illinois Asphalt Pavement Association Annual Meeting March 9, William J. Pine, P.E. Emulsicoat, Inc. / Heritage Research

Five Years Later. Illinois Asphalt Pavement Association Annual Meeting March 9, William J. Pine, P.E. Emulsicoat, Inc. / Heritage Research I-70 Five Years Later Illinois Asphalt Pavement Association Annual Meeting March 9, 2009 William J. Pine, P.E. Emulsicoat, Inc. / Heritage Research Joint Venture: Howell Asphalt/Paving Champaign Asphalt

More information

TEXAS DEPARTMENT OF TRANSPORTATION. Condition of Texas Pavements

TEXAS DEPARTMENT OF TRANSPORTATION. Condition of Texas Pavements TEXAS DEPARTMENT OF TRANSPORTATION Condition of Texas Pavements PMIS Annual Report FY 2007-2010 Condition of Texas Pavements Pavement Management Information System (PMIS) Annual Report FY 2007-2010 Prepared

More information

Project Update May 2018

Project Update May 2018 Project Update May 2018 Dakota County, in cooperation with the City of Lakeville, is planning to reconstruct 202 nd Street West (County Road 50) from Holyoke Avenue to Cedar Avenue (County Road 23). 202

More information

Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes

Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes Advantages & Specifications for the Use of Perma-Patch for the Repair of Potholes The Pothole Solution... p.2 Specifications... p.3 Using Perma-Patch in Severe Weather... p.4 www.permapatch.com Frequently

More information

OSHTEMO TOWNSHIP COMPLETE STREETS POLICY

OSHTEMO TOWNSHIP COMPLETE STREETS POLICY APPENDIX M: COMPLETE STREETS POLICY OSHTEMO TOWNSHIP COMPLETE STREETS POLICY Adopted: 11 September 2018 Amended: 11 December 2018 I. THE COMPLETE STREETS INTENT Oshtemo Township, through this Complete

More information

Utah Department of Transportation Division of Asset Management taking care of what we have

Utah Department of Transportation Division of Asset Management taking care of what we have Utah Department of Transportation Division of Asset Management taking care of what we have Utah Department of Transportation State of Utah Update Rocky Mountain Pavement Preservation Partnership October

More information

Connecting cyclists to work. Syracuse Metropolitan Transportation Council

Connecting cyclists to work. Syracuse Metropolitan Transportation Council Connecting cyclists to work Syracuse Metropolitan Transportation Council Overview Prepared at request: NYS Department of Transportation (NYSDOT) Project Achievements Target group Purpose Process Recommendations

More information

Pavement Type Selection Not a Black or White Issue. Marvin Traylor

Pavement Type Selection Not a Black or White Issue. Marvin Traylor 1 Pavement Type Selection Not a Black or White Issue Marvin Traylor 2 A Modern Life Cycle Cost Analysis Initial Costs Out Year Costs User Delay Costs 3 Score Card PCC HMA Initial Costs Out Year Costs User

More information

CTH M HIGHWAY PROJECT CTH Q to STH 113

CTH M HIGHWAY PROJECT CTH Q to STH 113 CTH M HIGHWAY PROJECT CTH Q to STH 113 PUBLIC INFORMATIONAL MEETING #3 Wednesday, May 25, 2005 Town of Westport Administration Building 5387 Mary Lake Road 6:00 p.m. to 8:00 p.m. PUBLIC INFORMATIONAL MEETING

More information

Pavement Preservation Best Practices. Mike Bryant, South Central U.S. Territory Sales Manager

Pavement Preservation Best Practices. Mike Bryant, South Central U.S. Territory Sales Manager Pavement Preservation Best Practices Mike Bryant, South Central U.S. Territory Sales Manager Crafco Is The World s Largest Producer Of Crack Sealing Material & Equipment At Crafco, we are passionate about

More information

Final Sidewalk Feasibility Study

Final Sidewalk Feasibility Study Garfield Drive From Anastasia Drive to Elizabeth Place City of South Daytona July 23, 2009 Final Sidewalk Feasibility Study Prepared for: Prepared by: Final Sidewalk Feasibility Study Garfield Drive 2

More information

AEMA-ARRA-ISSA-PPRA Fall Meeting Recycling, Ayrton Senna Highway Brasil, & USA

AEMA-ARRA-ISSA-PPRA Fall Meeting Recycling, Ayrton Senna Highway Brasil, & USA AEMA-ARRA-ISSA-PPRA Fall Meeting 2015 Recycling, Ayrton Senna Highway Brasil, & USA CCPR (Cold Central Plant Recycling) 2012: The Ayrton Senna Highway in Brazil was rehabilitated under challenging conditions

More information

RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E.

RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project ) June 7, Presented by: Karen Dixon, Ph.D., P.E. RURAL HIGHWAY SHOULDERS THAT ACCOMMODATE BICYCLE AND PEDESTRIAN USE (TxDOT Project 0-6840) June 7, 2016 Presented by: Karen Dixon, Ph.D., P.E., TTI Team: Kay Fitzpatrick, Raul Avelar, & Subasish Das Project

More information

Proposed Road Program. Executive Summary

Proposed Road Program. Executive Summary Proposed 2015-2019 Road Program Executive Summary Executive Summary Pavement Condition Study & 2015-2019 Proposed Road Program Option 1 Maintain Current Pavement Condition Year Preliminary Budget (2015

More information

PASER Road Survey. For Berrien County, Michigan

PASER Road Survey. For Berrien County, Michigan The State of Michigan Transportation 2003-2014 PASER Road Survey For Berrien County, Michigan Prepared by the Southwest Michigan Planning Commission 376 W Main St Benton Harbor, MI 49022 (269) 925-1137

More information

Building Great Neighbourhoods BONNIE DOON

Building Great Neighbourhoods BONNIE DOON Building Great Neighbourhoods BONNIE DOON We Are Here Today To Explain the Neighbourhood Renewal Process Show you the Westwood Preliminary Design Ask for local knowledge Highlight the Local Improvement

More information

First Order Mapping of Primary and Secondary Road Network. Road Data - Rwanda. Metadata - Final version

First Order Mapping of Primary and Secondary Road Network. Road Data - Rwanda. Metadata - Final version First Order Mapping of Primary and Secondary Road Network Road Data - Rwanda Metadata - Final version 1 GEODATABASE CONTENT The geodatabase for Rwanda data (RW_Data.mdb) contains 5 feature class : 1. RW_Roads

More information

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco Capital Needs In 2006, the Mayor and Board of Supervisors approved San

More information

Minutes of the Minnesott Beach Town Commissioners' July 12,2011

Minutes of the Minnesott Beach Town Commissioners' July 12,2011 Minutes of the Minnesott Beach Town Commissioners' July 12,2011 Meeting The regular meeting of the Board of Commissioners, Town of Minnesott Beach, was held Tuesday, July 12,2011 at 7:00 pm, at the Minnesott

More information

Building Great Neighbourhoods QUEEN ALEXANDRA

Building Great Neighbourhoods QUEEN ALEXANDRA Building Great Neighbourhoods QUEEN ALEXANDRA We are here today to Explain how the City is investing in improving your neighbourhood and how your neighbourhood will be improved to meet current City standards.

More information

Paving the Way to a Sustainable Future: The City of Russell s

Paving the Way to a Sustainable Future: The City of Russell s Grant Application for USDOT 2017 TIGER Discretionary Grants Paving the Way to a Sustainable Future: The City of Russell s Transportation Reconstruction Plan Submitted by the City of Russell, Kansas Table

More information

ENGINEERING DRIVER SAFETY INTO PAVEMENT PRESERVATION

ENGINEERING DRIVER SAFETY INTO PAVEMENT PRESERVATION ENGINEERING DRIVER SAFETY INTO PAVEMENT PRESERVATION 2015 TxDOT Short Course Miguel Arellano, P.E. Austin District Pavement Engineer October 13, 2015 Table of Contents 1 Goals: Overall Reduction in Crashes

More information

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK This is Meeting 2 Unfortunately, some residents in Bellevue and Virginia Park received the wrong information for this public open house (Meeting

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St