Stakeholder Update. Agenda. Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads
|
|
- Terence Dawson
- 5 years ago
- Views:
Transcription
1 1 Stakeholder Update May 21, Agenda Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads Proposed Evaluation Criteria Next Steps 1
2 Project/Schedule Review Public Involvement and Stakeholder Coordination Phase 1: Existing Conditions Inventory Review Phase 2: Develop Preliminary and Final Plan Develop Implementation Plan Committee and Board Presentations 2018 Jan. Feb. March April May Jun. July August Sept. Oct TASKS 5 # Project Tasks Stakeholder Review Meetings Presentations Workshops Project Update Public Engagement comments Themes: Safety Complete sidewalk, bike lane and path gaps on major roads Local sidewalk needs Connect Greenways Develop canal as paths where possible Connect Immokalee Paths/multi use trail wherever possible (i.e. along Collier Blvd) Bike/Walk access to the Beaches Safe road/trail crossing (i.e. Davis Blvd) 2
3 Project Update Public Engagement Meetings/Workshops Open House #2 August, location /TBD 5 April 3 at 7:00 pm, Everglades City Council March 19 Comm. Taylor Town Hall meeting, Livingston Rd, Naples March 8 Comm. Taylor Town Hall meeting, Naples City Hall March 7 Marco Island Farmers' Market, Veterans Park, 901 Park Avenue Ongoing Immokalee outreach with the Immokalee CRA February 22 NCH Farmers' Market, 311 9th St N February 21 Immokalee CRA, 1155 Roberts Ave, Immokalee February 6 Bayshore CRA, 3570 Bayshore Drive February 4 Golden Gate Farmers' Market, Collier Boulevard January 27 VBR Farmers' Market at the corner of VBR and Airport Pulling January 17 Open House #1 at Veterans Park, 1895 Veterans Park Drive Needs Identification Strategy Safety Equity Need Transit stops Connectivity Where there are no facilities yet Population Density Considered (discussion today) 6 Develop Multiple lists Safety corridors and intersections, major roads (collector, arterial), greenways, local roads 3
4 Needs Identification Strategy project sources MPO Walkability Studies Tier 1 recommendations Bayshore, Immokalee, Naples Manor, Golden Gate (pending); Future Walkability Studies Road Safety Audits (RSA) US 41 from Commercial Drive to Guilford Rd; Airport Pulling Rd from US 41 to Estey Dr; Future RSAs, intersection safety studies, high crash locations, corridors Gaps in Sidewalk, Path and Bike Lane networks on Collector and Arterial Roads (based on inventory) (analysis applicability of population) 7 LRTP Cost Feasible Plan Capacity Projects must meet/exceed standards for biking and walking Proposed needs Local Roads Walkability Study Tier 1 8 Many of the recommendations have been constructed Under discussion Addition of Golden Gate Tier 1 recommendations Local sidewalks not in Walkability Studies Access to transit sidewalk gaps within ¾ mile 4
5 Sidewalk Needs (all) Collectors and Arterials 9 Bicycle Needs (All) Collectors and Arterials 10 5
6 Population density as Evaluation Criteria 11 Committee request $$ should go where the people are Population density analysis Persons per acre Average by TAZ A TAZ usually consists of one or more census blocks, block groups, or census tracts = 3 person per acre Average by Block Group smallest census area = 4 persons per acre Population by block group Environmental justice needs (poverty, minority, no vehicle) and high crash areas 12 6
7 Population by TAZ 13 TAZ population Crashes + Equity Areas 14 7
8 Proposed Bicycle Needs Collectors and Arterials 15 Bicycle Lane Miles 16 Bike Lane Criteria Miles Crash (3+) + EJ Areas (Med, high, very high) (no bike lanes) 7.1 Crash (3+) + EJ Areas (Med, high, very high) + Population TAZ (3/acre) 6.4 Crash (3+) + EJ Areas (Med, high, very high) + Population Block Group (4/acre) 4.3 EJ Criteria no bike lane 60.1 Equity Criteria one side 2.7 No bike lanes Bike lane on one side
9 Proposed Walking Needs (Collectors and Arterials) 17 Sidewalk Miles 18 Sidewalk criteria Miles Crash (3+) + Equity Areas (Med, high, very high) (no sidewalk, either side) 0.2 Crash (3+) + Equity Areas (Med, high, very high) (sidewalk one side) 0.9 Crash (3+) + Equity Areas (Med, high, very high) + Population TAZ (3/acre) 0.8 Crash (3+) + Equity Areas (Med, high, very high) + Population Block Group (4/acre) 0.5 EJ Criteria no sidewalk 97.4 EJ Criteria sidewalk on one side 11.8 No Sidewalk Existing sidewalk on one side
10 Evaluation Criteria 19 Criteria Collector/Arterial High Crash Equity (Environmental Justice) Criteria Local Roads Safety Increase safety for people who walk and ride in Collier County Connectivity Enhance the network of efficient, convenient bicycle and pedestrian facilities in Collier County Equity/livability Increase transportation choice and community livability through the development of an integrated multi modal system Economic Development Promote tourism and economic opportunities by developing a safe, connected network of biking and walking facilities Community Support Readiness Major Road Bicycle or Pedestrian Access Proposed Policy Concepts 20 Roadway 6 ft sidewalk one side, trail other side (roadway cross section) ALL capacity projects Consistent handling of begin/end bike lanes Wider shoulders on high speed roadways Pedestrian crossing opportunities (signalized, long blocks) Trail / roadway crossings signalized Buffered bicycle lanes should be considered BEFORE standard bike lanes on all resurfacing and capacity projects Bike lanes (minimum) all resurfacing and capacity projects 10
11 Proposed Policy Concepts Land Development Code Connections between developments and the bike/ped network Interconnections between developments Bicycle parking 21 New Development / Redevelopment standards for bike/ped facilities within a development Coordination with Public Works (i.e. Storm water, infrastructure) reconstruction = opportunities, etc. Education for bicyclists AND drivers Enforcement Partnerships for grants, etc. Next Steps Project update Needs Identification Strategy Proposed needs Local, safety Collectors, Arterials Greenways, connectivity Proposed Evaluation Criteria Next Steps Finalize needs, list, maps Develop planning level costs Develop/refine policy support Update program support strategies Funding sources Workshop, Committee meetings Draft Report 22 11
12 Discussion/Questions? 23 THANK YOU! Bike needs Crash and Equity 24 12
13 Walking needs Crash and Equity 25 13
Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017
Downtown Naples Mobility and Connectivity Study Naples City Council Presentation January 2017 Agenda 1. Introduction 2. Scope Review 3. Project Schedule 4. Existing Conditions 5. Public Charrette 6. Mobility
More informationCITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies
CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN Section VIII Mobility Element Goals, Objectives, and Policies Adopted August 6, 2015 by Ordinance No. 1591 VIII MOBILITY ELEMENT Table of Contents Page Number
More informationSR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street
Welcome and Introduction Sign-in and comment sheets Restrooms and exits Meeting agenda and timeline Meeting goals / expectations Provide input to guide study recommendations Actively participate throughout
More informationPhysical Implications of Complete Streets Policies
Presentation Overview Physical Implications of Complete Norm Cox, ASLA, LLA Landscape Architect Ann Arbor, Michigan, 10:45 to Noon What Are Complete Streets? What Matters to Bicyclists and Pedestrians
More informationEXECUTIVE SUMMARY. Vision
Vision Walking and bicycling in Salt Lake City will be safe, convenient, comfortable, and viable transportation options that connect people to places, foster recreational and economic development opportunities,
More informationThank you for attending
Improving mobility safety comfort WELCOME Thank you for attending The purpose of this meeting is to: Learn about the project Prioritize potential walking and biking improvements on Snelling Ave Gather
More informationWALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE
NASHVILLE, TENNESSEE EXECUTIVE SUMMARY Executive Summary A world-class multi-modal transportation system is essential to a vibrant city and better quality of life. -Mayor Barry The WalknBike plan aims
More informationCity of Charlottesville Bicycle and Pedestrian Master Plan Update
City of Charlottesville Bicycle and Pedestrian Master Plan Update September 17, 2014 I. Welcome and meeting overview II. Project status update III. Network overview IV. Break-out groups Pedestrian Network
More informationScope: Stakeholder and Staff Training Bicycle and Pedestrian Crash Data Analysis Stakeholder and Public Workshops Development of Infrastructure,
Scope: Stakeholder and Staff Training Bicycle and Pedestrian Crash Data Analysis Stakeholder and Public Workshops Development of Infrastructure, Outreach and Coordination Strategies Documentation and Presentations
More informationCastro Valley Municipal Advisory Council March 19, 2018
Castro Valley Municipal Advisory Council March 19, 2018 1 Background 2 Draft Bicycle Vision and Pedestrian Networks 3 Next Steps 4 Updates Agenda 2 PROJECT AREA: Unincorporated Areas of Alameda County
More informationMASTER BICYCLE AND PEDESTRIAN PLAN
VILLAGE OF NORTHBROOK MASTER BICYCLE AND PEDESTRIAN PLAN DRAFT PLAN OPEN HOUSE May 2, 2018 AGENDA 1. Community Engagement 2. Vision and Goals 3. General Structure of Plan 4. Recommendations Overview 5.
More information2018 Transportation Alternatives Program (TAP) Application Presentation to Palm Beach TPA BRANT BRIDGE CONNECTION LOOP EXTENSION ON CARL BOLTER DR
2018 Transportation Alternatives Program (TAP) Application Presentation to Palm Beach TPA BRANT BRIDGE CONNECTION LOOP EXTENSION ON CARL BOLTER DR Project Location N N Connecting South Delray Beach Existing
More information» Draft Recommendations» Discussion» Next Steps. Plan for Walking and Biking
SAC Meeting Plan #3 for September Walking and 12, Biking 2018 » Draft Recommendations» Discussion» Next Steps Plan for Walking and Biking » Stakeholder and Public Outreach» Background data collection and
More informationLinking Transportation and Health in Nashville & Middle Tennessee
Linking Transportation and Health in Nashville & Middle Tennessee Fit Nation New Orleans CPPW Mentoring Grant Built Environment Program May 14, 2011 Local Transportation Planning Framework Federal U.S.
More informationHennepin County Bicycle and Pedestrian Planning
Hennepin County Bicycle and Pedestrian Planning 1 Value of bicycle and sidewalk systems Safety Livability Mobility Health Personal Finances Economic Sustainability Clean Air Recreation Parking and congestion
More informationMajor Bike Routes 102 Avenue Workshop April 21, 2015
Major Bike Routes 102 Avenue Workshop April 21, 2015 Our Purpose Today Provide context on how Major Bike Routes fit into Edmonton s future Share information on what we heard in our last phase, and how
More informationComplete Streets Workshop Follow-up. April 27, 2011 Rockledge City Hall
Complete Streets Workshop Follow-up April 27, 2011 Rockledge City Hall Agenda Complete Streets draft briefing presentation and sample policy language Share your Complete Streets projects and post workshop
More informationCitizen Advisory Group Meeting #8 May 5, Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING.
Citizen Advisory Group Meeting #8 May 5, 2010 Welcome. Today s meeting will focus on: Land Use & Transportation CHARLOTTEPLANNING.ORG Meeting Agenda Handouts: o Meeting Agenda o Summary of East Seventh
More informationWest Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road
West Dimond Blvd Jodhpur St to Sand Lake CSS Transportation Project Summary Municipality of Anchorage Project # 05 005 Project Manager: John Smith, P.E. (MOA PM&E) Project Administrator: Julie Makela,
More informationCity of Gainesville Transportation/Roadway Needs PROJECT SUMMARY
A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St
More informationProposed. City of Grand Junction Complete Streets Policy. Exhibit 10
Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel
More informationCTDOT Pedestrian and Bicycle Safety Initiatives
CTDOT Pedestrian and Bicycle Safety Initiatives 2017 Northeast Transportation Safety Conference Mark F. Carlino, P.E. Traffic Engineering Division Chief Bureau of Engineering and Construction Connecticut
More informationGoal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.
Non-Motorized Transportation Plan (NMTP) Draft Vision, Goal and,, Tri-County Regional Planning Commission (TCRPC) Purpose The purpose of the Tri-County Regional Planning Commission (TCRPC) Non-Motorized
More informationCity of Jacksonville Mobility Fee Update
City of Jacksonville Mobility Fee Update 2017 Preliminary Analysis May 3, 2017 Carnival Cruise lines photo credit Presentation Overview Public Outreach Process Pedestrian and Bicycle Master Plan Study
More informationThe Pedestrian Safety Action Plan
The Pedestrian Safety Action Plan Lydia Kelly Bicycle Pedestrian Transportation Planner The San Antonio Bexar County MPO Planning Area and Partners Northeast Partnership Greater Bexar County Council of
More informationTOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN
TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN Americans Want Choices 55% of Americans would rather drive less & walk more. Transit use is growing faster than population or highway travel.
More informationCity of Birmingham Draft Multi-modal Transportation Plan
City of Birmingham Draft Multi-modal Transportation Plan City Commission Public Hearing Monday, November 25, 2013 7:30 pm Norman Cox, PLA, ASLA The Greenway Collaborative, Inc. Ann Arbor, Michigan The
More informationTransportation Planning Division
Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meeting Stakeholder Interviews Data Collection Design Principles Tool Box Recommendations Schedule Moving Forward North
More informationTime of Change We Are Growing We Are An Attractive Place To Live We Are Age Diverse + Living Longer 50000 40000 30000 20000 10000 0 2010 Census Job Density Housing Sheds Transit Sheds The Project FUNDING
More informationGoodlettsville Bicycle and Pedestrian Plan Executive Summary
Goodlettsville Bicycle and Pedestrian Plan July 2010 In Cooperation with the Nashville Area Metropolitan Planning Executive Organization Summary Introduction Progressive and forward thinking communities
More informationCONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach
CONNECTIVITY PLAN Adopted December 5, 2017 City of Virginia Beach CONTENTS 1.0 Background & Purpose... 2 2.0 Existing Inventory & Analysis... 3 ViBe District Existing Walking Conditions... 4 3.0 ViBe District
More informationRoad Diets FDOT Process
Florida Department of TRANSPORTATION Road Diets FDOT Process Humberto Castillero, PE, PTOE Roadway Design Office Purpose of Guide Develop a statewide lane elimination review process Balance state & local
More informationCity of Wilsonville 5 th Street to Kinsman Road Extension Project
City of Wilsonville 5 th Street to Kinsman Road Walking Tour & Neighborhood Workshop Summary Report Public Outreach Overview On July 18 th, 2017, the City of Wilsonville hosted a neighborhood walking tour
More informationFinancial Project ID No(s).: and ETDM No(s).: and 14181
Palm Beach Metropolitan Planning Organization (MPO) Presentation I-95 at Boynton Beach Boulevard Interchange and I-95 at Gateway Boulevard Interchange Project Development and Environment Study Palm Beach
More information2014 Wisconsin Tribal Transportation Conference. Matt Halada Transportation Planner NE Region
2014 Wisconsin Tribal Transportation Conference Matt Halada Transportation Planner NE Region Implementing Wisconsin s Pedestrian and Bicycle Accommodations Law (Complete Streets) Tools and methods for
More informationBicycle Master Plan Goals, Strategies, and Policies
Bicycle Master Plan Goals, Strategies, and Policies Mobilizing 5 This chapter outlines the overarching goals, action statements, and action items Long Beach will take in order to achieve its vision of
More informationBike/Multipurpose Trail Study for Glynn County, Georgia MAY 16, 2016
Bike/Multipurpose Trail Study for Glynn County, Georgia MAY 16, 2016 Agenda» Project Status Update» Draft Recommendations Overview» Next Steps» Questions/Discussion Project Overview» Comprehensive Bikeway
More informationBicycle-Pedestrian Master Plan: Chapters 3 and 4 Distribution
Bicycle-Pedestrian Master Plan: Chapters 3 and 4 Distribution Finksburg Planning and Citizens Council March 22, 2018 Overview Progress Citizen Outreach Vision Chapter 3 - Existing Conditions Chapter 4
More informationPlant City Walk-Bike Plan
Plant City Walk-Bike Plan Plant City Commute Mode Share 2.2% 1.4% 2.9% Drove alone 10.2% Carpooled Public transportation (0.1%) Walked Used a Bike (0.4%) 82.9% Taxicab, motorcycle, or other means Worked
More informationPerformance Criteria for 2035 Long Range Transportation Plan
Minimizing Impacts on Natural, Historic, Cultural or Archeological Resources 2035 LRTP Weighting Factor: 7% Objective 1.1: Use appropriate planning and design criteria to protect and enhance the built
More information5. Pedestrian System. Accomplishments Over the Past Five Years
5. Pedestrian System Accomplishments Over the Past Five Years The Alamo Area Metropolitan Planning Organization (MPO) and its partner agencies recognize the importance of improving pedestrian mobility.
More informationMassDOT s Transportation Choice and Healthy Transportation Policy Initiatives
MassDOT s Transportation Choice and Healthy Transportation Policy Initiatives Jackie DeWolfe, Director of Sustainable Mobility, MassDOT Michelle Danila, Complete Streets Engineer, MassDOT ACEC April 2018
More informationChapter 5. Complete Streets and Walkable Communities.
Chapter 5. Complete Streets and Walkable Communities. 5.1 Description of Complete Streets. Cities throughout the world, and specifically the United States, are coming to embrace a new transportation and
More informationWestgate/Belvedere Homes Community Redevelopment Agency. Belvedere Heights. Streetlights & Sidewalks Improvements Project.
Westgate/Belvedere Homes Community Redevelopment Agency Belvedere Heights Streetlights & Sidewalks Improvements Project Phase II TPA 2018 Transportation Alternatives Program (TAP) BTPAC Presentation Thursday,
More informationCity of Novi Non-Motorized Master Plan 2011 Executive Summary
City of Novi Non-Motorized Master Plan 2011 Executive Summary Prepared by: February 28, 2011 Why Plan? Encouraging healthy, active lifestyles through pathway and sidewalk connectivity has been a focus
More informationACTIVE TRANSPORTATION
ACTIVE TRANSPORTATION Mobility 2040 Supported Goals Improve the availability of transportation options for people and goods. Support travel efficiency measures and system enhancements targeted at congestion
More informationAppendix C 3. Bicycle / Pedestrian Planning
Appendix C 3. Bicycle / Pedestrian Planning BICYCLE/PEDESTRIAN PLANNING 2005 Master Plan GOAL: Provide for safe and convenient bicycle and pedestrian circulation throughout the City. Develop a city-wide
More informationMaking Phoenix Streets Complete. City of Phoenix Complete Streets Initiative
Making Phoenix Streets Complete City of Phoenix Complete Streets Initiative City of Phoenix Planning Commission March 2014 Presentation Outline What are Complete Streets? Benefits of Complete Streets Complete
More informationCHAPTER 3: Vision Statement and Goals
Davidson Walks & Rolls: Active Transportation Master Plan CHAPTER 3 Contents: Overview Vision Statement Measurable Goals Public Outreach CHAPTER 3: Vision Statement and Goals Overview The vision statement
More informationSTUDY ADVISORY COMMITTEE. October 8, 2015
STUDY ADVISORY COMMITTEE October 8, 2015 Study Purpose evaluate the long-term transportation strategies and investments needed to sustain the county s economic health and quality of life in the coming
More information2015 Florida Main Street Annual Conference. Complete Streets Equal Stronger Main Streets
WHAT ARE COMPLETE STREETS? CASE STUDIES COMPLETING YOUR MAIN STREET 2015 Florida Main Street Annual Conference St. Petersburg, Florida August 19, 2015 WHAT ARE COMPLETE STREETS? CASE STUDIES COMPLETING
More informationBikeable/Walkable Community Plan. Oct. 11, 2012 City Council Workshop
Bikeable/Walkable Community Plan Oct. 11, 2012 City Council Workshop Background 2006 - O Fallon s population was 72,477. Citizen Survey showed a strong interest in additional bike & pedestrian opportunities.
More informationRochester Downtown Bicycle Study 2009
Rochester Downtown Bicycle Study 2009 Relationship of ROCOG Long Range Transportation Plan to Rochester Comprehensive Plan Regional Long Range Transportation Plan (LRTP) is prepared under the auspices
More informationLiving Streets Policy
Living Streets Policy Introduction Living streets balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, enhance community identity, create
More informationExhibit 1 PLANNING COMMISSION AGENDA ITEM
Exhibit 1 PLANNING COMMISSION AGENDA ITEM Project Name: Grand Junction Circulation Plan Grand Junction Complete Streets Policy Applicant: City of Grand Junction Representative: David Thornton Address:
More information122 Avenue: 107 Street to Fort Road
: 107 Street to Fort Road November 24, 2015 4:30 8:00 p.m. Meeting Purpose Summarize project work completed to date Share results of public input from Phase 1 Share the draft concept plan and proposed
More informationWe believe the following comments and suggestions can help the department meet those goals.
The Honorable Secretary Anthony Foxx The Secretary of Transportation United States Department of Transportation 1200 New Jersey Avenue, SE Washington, DC 20590 August 30, 2013 Dear Secretary Foxx, Thank
More informationBicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013
Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013 2005 Master Plan GOAL: Provide for safe and convenient bicycle and pedestrian circulation throughout the City. Develop a city
More informationTotal Project Cost Federal Funds Local Match
General Information Project Title: Ala Wai Pedestrian and Bicycle Safety and Mobility Project Project Location, street, zip code, and facility name: Ala Wai Boulevard between Kapahulu Avenue and Ala Moana
More informationDr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018
Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 What s Happening The City plans to mill and resurface Dr. M.L.
More informationBelvedere Heights Streetlights & Sidewalks Improvements Project
Westgate/Belvedere Homes Community Redevelopment Agency Belvedere Heights Streetlights & Sidewalks Improvements Project Phase I MPO 2017 Transportation Alternatives Program (TAP) BTPAC Special Workshop
More informationTonight is for you. Learn everything you can. Share all your ideas.
Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.
More informationCity of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015
City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015 McPhail Transportation Planning Services Ltd. AGENDA 6:00 7:00 pm Viewing Boards / Q & A with the Team 7:00 7:50
More informationCOMPLETE STREETS A STEP FORWARD ITE District 10/FSITE Annual Meeting November 3, 2015
COMPLETE STREETS A STEP FORWARD 2015 ITE District 10/FSITE Annual Meeting November 3, 2015 About Lakeland Incorporated: 1885 Population: 100,728 Area: Approx. 75 sq. mi Major Employers: Publix, Lakeland
More informationRegional Bicycle System Master Study. Preliminary Results Update
Regional Bicycle System Master Study Preliminary Results Update Transportation Committee October 21, 2013 Introduction Study Goals Guiding Principles Bicycle Study System Elements Analysis Approach Proposed
More informationBus Rapid Transit Plans
Twin Cities Region Bus Rapid Transit Plans ULI Minnesota Workshop Connecting Bus Rapid Transit to the Community December 15, 2009 John Levin Director of Service Development Metro Transit Metropolitan Area
More informationBay to Bay Boulevard Complete Streets Project
Bay to Bay Boulevard Complete Streets Project Dale Mabry Highway to Bayshore Boulevard February 08, 2018 Photo Source: Tampa Bay Times Alessandra Da Pra Meeting Format Introduction Resurfacing Information
More information54 th Avenue North Complete Streets Concept Plan
54 th Avenue North Complete Streets Concept Plan June 2018 TABLE OF CONTENTS Introduction and Purpose...1 Existing Conditions...5 Stakeholder and Public Outreach...15 Preferred Options West Segment...19
More informationAgency Advisory Group Meeting #3 and Walk Audit Anchorage Non-Motorized Plan
Agency Advisory Group Meeting #3 and Walk Audit Anchorage Non-Motorized Plan Friday, May 18 th Walk Audit 10:00-11:30 AM Meeting 11:30 AM 1:00 PM Municipal Planning Department, 4700 Elmore Road, Training
More informationWashington County, Oregon
Washington County, Oregon Photo add here 1 Washington County, Oregon Total population: 536,370 City population: 320,000 Based on 2010 Census Rural population: 26,000 Urban Unincorporated Population: 190,000
More informationCongress Avenue. Palm Beach MPO Subcommittee Meetings December 2017
1 Congress Avenue Palm Beach MPO Subcommittee Meetings December 2017 2 Agenda Study Purpose Study Process Multimodal Alternatives Development Next Steps *ACTION ITEM: CONFIRM ALTERNATIVES TO MOVE INTO
More informationBroadway Complete Streets Project
Broadway Complete Streets Project Megan Johnson, P.E. Associate Civil Engineer James Pangburn, P.E. Consultant Project Manager After the construction of the highway system, Broadway was cut off
More informationPine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session
Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session February 20, 2018 Meeting Agenda Study Overview Existing Conditions Access Management Potential Gateway Features
More informationBroward Complete Streets Advisory Committee (CSAC) Meeting. Monday, September 24, 2018
Broward Complete Streets Advisory Committee (CSAC) Meeting Monday, September 24, 2018 HOUSEKEEPING Please make sure you have signed in and have an agenda. This meeting is being recorded. Please introduce
More informationComprehensive Bicycle Master Plan 2014 ITE-IMSA Spring Conference March 6, 2014
Comprehensive Bicycle Master Plan 2014 ITE-IMSA Spring Conference March 6, 2014 Street Transportation Department Inventory of Bikeways (October 7, 2013) 22 bike bridges 20 bike tunnels 420 miles of bike
More informationPerryville TOD and Greenway Plan
Perryville TOD and Greenway Plan Greenway Glossary Pathway: A bicycle and pedestrian path separated from motorized vehicular traffic by an open space, barrier or curb. Multi-use paths may be within the
More informationGoals, Objectives, and Policies
Goals, Objectives, and Policies ADVISORY GROUP INPUT PUBLIC INPUT SNS PREVIOUS STUDIES RBPP Goals Vision Statement Southern Nevada will develop a safe, connected, and convenient walking and bicycling system
More informationWELCOME. Traffic & Parking Commission Special Meeting May 30, Iteris, Inc. All rights reserved.
WELCOME Traffic & Parking Commission Special Meeting May 30, 2018 WORKSHOP #2 CONCEPTS FOR IMPROVEMENT MAY 30, 2018 Agenda 1. Welcome 10 min 2. Project Presentation 25 min 3. Roundtable Dialogue 50 min
More informationCity of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE
Welcome Welcome to the third community meeting for the Issaquah-Fall City Road Improvements Project. AGENDA 6:00 p.m. Welcome and sign-in 6:10 p.m. Presentation 6:50 p.m. Open house Learn about the roadway
More informationCITY OF BLOOMINGTON COMPLETE STREETS POLICY
CITY OF BLOOMINGTON COMPLETE STREETS POLICY POLICY OBJECTIVE: The City of Bloomington will enhance safety, mobility, accessibility and convenience for transportation network users of all ages and abilities,
More informationRhode Island Moving Forward Long-Range Transportation Plan 2040 Municipal Roundtable Newport County
Rhode Island Moving Forward Long-Range Transportation Plan 2040 Municipal Roundtable Newport County www.planri.com PlanRI2040@gmail.com Municipal Roundtable Meeting Summary Date/time: Location: Wednesday,
More informationOverview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?
Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy
More informationOrange County s Transportation Planning and Multimodal Corridor Plan
Orange County Transportation Planning Division Orange County s Transportation Planning and Multimodal Corridor Plan Presentation to UCF LIFE November 11, 2014 Alissa Barber Torres, Ph.D., AICP, PLS Presentation
More informationThank you for this opportunity to discuss with you how we can work together to make our streets more complete.
Thank you for this opportunity to discuss with you how we can work together to make our streets more complete. 1 2 3 Thank you for this opportunity to discuss with you how we can work together to make
More informationAgenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN
PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations
More informationUSDOT Bicycle and Pedestrian Safety Initiative: Safer People and Safer Streets. Barbara McCann, USDOT Office of Policy
{ USDOT Bicycle and Pedestrian Safety Initiative: Safer People and Safer Streets Barbara McCann, USDOT Office of Policy 4 Steps from policy to practice Creating multi-modal streets means: 1. Change Decision-Making
More informationSTATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013)
Appendix P.1 STATUS OF 2009 PEDESTRIAN MASTER PLAN (AS OF DECEMBER 2013) The 2009 Pedestrian Master Plan establishes 21 core recommendations in three goal areas to improve pedestrian transportation in
More informationNorth Avenue Corridor Study
North Avenue Corridor Study City Council October 6, 2014 Presentation Outline Project Initiation & Process Corridor Conditions & Issues Vision & Goals Concept Development - Development/Evaluation Implementation
More informationUS 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue
41 US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue EXECUTIVE SUMMARY DRAFT FEBRUARY 2019 Project Overview The US 41 Complete Streets Corridor Planning Study,
More informationBicycle Master Plan for Greenville, SC Presentation to City Council June 13, 2011
Bicycle Master Plan for Greenville, SC Presentation to City Council June 13, 2011 In collaboration with: Alta Planning + Design Fuss & O Neill Darrohn Engineering DNA Creative Bicycle Master Plan Advisory
More informationEvolving Roadway Design Policies for Walking and Bicycling
Evolving Roadway Design Policies for Walking and Bicycling The 2016 Michigan Transportation Planning Conference Kalamazoo, MI July 13, 2016 Title 23 of the Code of Federal Regulations Title 23 was originally
More informationClackamas County Comprehensive Plan
ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They
More informationREGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES
REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES November 16, 2011 Deb Humphreys North Central Texas Council of Governments Bicycle and Pedestrian Advisory Committee Snapshot of the Guide 1. Introduction
More informationBicycle and Pedestrian Connectivity Study Phase 2
Connectivity Study Phase 2 Process PROCESS OUTCOMES Phase Prepared By STEP I Public Participation and Outreach 1. RTP Outreach activities, and development of the Bike and Ped Task Force Phase 1 2011 OCPC
More informationSolana Beach Comprehensive Active Transportation Strategy (CATS)
Solana Beach Comprehensive Active Transportation Strategy (CATS) 3.0 Goals & Policies The Solana Beach CATS goals and objectives outlined below were largely drawn from the Solana Beach Circulation Element
More information42nd Ave N Reconstruction
CITY OF MINNEAPOLIS 42nd Ave N Reconstruction Community Meeting #2 May 2016 6:00 7:30 p.m. 5/16/2016 1 Purpose of Meeting Inform: Provide an overview of project, identify anticipated scope of work, and
More informationCity Birmingham Multi-Modal Transportation Plan Visioning Workshop Results Meeting
City Birmingham Multi-Modal Transportation Plan Visioning Workshop Results Meeting Monday, January 28, 2013 7:30 PM, City Hall Norman Cox, PLA, ASLA. Ann Arbor, Michigan. www.greenwaycollab.com Community
More informationHennepin County Transportation Department
Hennepin County Transportation Department Complete Streets Design and Implementation Prepared for the Complete Streets Task Force Craig Twinem, P.E. Design Division Manager Tom Johnson, P.E. Transportation
More informationGood Neighbor Plan Initiative Update. Transportation & Trinity River Project Committee 9 September 2013 Dallas Love Field Phase One Final Report
Good Neighbor Plan Initiative Update Transportation & Trinity River Project Committee 9 September 213 Dallas Love Field Phase One Final Report PURPOSE As briefed to the Transportation and Environmental
More informationStatewide Pedestrian and Bicycle Transportation Plan and Economic Impact Study. Kick off Meeting November 28, Your Planning Team
Statewide Pedestrian and Bicycle Transportation Plan and Economic Impact Study Kick off Meeting November 28, 2018 Your Team Alta + Design Statewide planning efforts in 18 states Bike/ped network planning
More information