1 A465 Heads of the Valleys Dualling Sections 5 and 6 Dowlais Top to Hirwaun SUMMARY PROOF OF EVIDENCE Highways Engineering Document WG by Jonathan Thirkettle MARCH 2018

2 1. Introduction 1.1 I am Jonathan Thirkettle. I am a Highways Technical Consultant at Jacobs Engineering Ltd. I have 34 years experience in the design and construction of highway schemes. 1.2 I am the Highway Design Team Leader for the development of the A465 Heads of the Valleys Dualling Section 5 and 6 Dowlais Top to Hirwaun (the Scheme). 1.3 In preparing the draft Orders design I have been supported by my team of engineers. They have worked to my instruction and I adopt their work as my own and opinions I express are my own. 1.4 My evidence will address the highway engineering aspects of the Scheme. The evidence is true and the opinions express are my true and professional opinions. 2. Existing Road 2.1 In the 1960s highway improvements were made to the A465, straightening out the route and widening the then single carriageway to its current three lane carriageway configuration. The road generally has two lanes in uphill directions and one lane in the downhill direction. 2.2 In addition to the three lane configuration, this section of the A465 contains fourteen at-grade junctions of which four are roundabouts and the remainder are T-junctions or staggered crossroads. Jonathan Thirkettle / March 18 1 of 8

3 3. Scheme Proposals Overview 3.1 The proposed Scheme comprises of approximately 17.7km of primarily on-line carriageway widening. Proposals allow for the upgrading of the existing three-lane carriageway to rural all-purpose dual carriageway (D2AP) standard. There will be a short (approximately 1.4km) section of off-line construction west of Hirwaun, and a shorter off-line section (approximately 0.8 km) east of the Taf Fechan viaduct. Design Standards 3.2 The Scheme has been designed by reference to the standards as contained in the Design Manual for Roads and Bridges (DMRB). Relaxations and Departures from Standards 3.3 Physical constraints along the Scheme length require Departure from Standards for both the mainline and side roads. These Departures from Standards are at present being considered, informally, by the Welsh Government. Junctions 3.4 The Scheme includes six full movement grade separated junctions as follows (from west to east): - Hirwaun; - Croesbychan; - Baverstock; - A470; - Prince Charles Hospital; and, - Dowlais Top. Jonathan Thirkettle / March 18 2 of 8

4 Design Speed 3.5 A design speed of 120B kph has been selected for the full length of the Scheme. 3.6 In common with the other sections of the A465 adjoining Sections 5 and 6, the Scheme will be signed at the national speed limit. Non-Motorised User Provision 3.7 A segregated Non-Motorised User path would be provided adjacent to sections of the Scheme. Drainage 3.8 The Scheme drainage strategy has been developed to allow for surface water runoff from the highway corridor to be captured and attenuated such that discharge rates to watercourses are not increased. 3.9 Surface water attenuation would generally be accomplished by the use of ponds, or where this is not practical, by the use of underground tanks or oversized pipes Attenuation ponds are designed such that they will remain largely dry for the majority of the time i.e. they will only retain water for the immediate period after a rainfall event The Scheme crosses a number of minor watercourses and rivers. Flows would be maintained via either bridges, culverts or watercourse diversions. Road Lighting 3.12 Hirwaun junction would be fully lit with lighting provided on the mainline through the junction and on the slip roads The other junctions at Croesbychan, Baverstock, A470, Prince Charles Hospital and Dowlais would be partially lit with only the on/off conflict points lit as a minimum. Jonathan Thirkettle / March 18 3 of 8

5 3.14 The remainder of the Scheme would not be provided with road lighting. Road Restraint Systems 3.15 The Scheme would be provided with a vehicle restraint system (steel/aluminium safety barriers) where required in verges to protect motorists from any hazards including highway infrastructure, structures, rock faces and embankments The central median of the Scheme mainline would be provided with a permanent vertical concrete safety barrier for the full length of the Scheme. Pavement 3.17 The majority of the mainline would have low-noise surfacing. Between Croesbychan and Baverstocks (where noise impact is not as significant an issue as for the remainder of the Scheme) and at junctions, more durable surfacing could be used. Intelligent Transport Systems and Communication Apparatus 3.18 Four 100mm diameter ducts are to be provided for the entire length of the Scheme. At structures, two 150mm diameter ducts are to be provided Four 100mm diameter cross-carriageway connector ducts are to be provided across the mainline at approximately every 500m Two longitudinal blown fibre cables are to be installed within the mainline verge for the length of the Scheme. The blown fibre cables are to be located within one of the 100mm diameter longitudinal ducts Five variable message signs are to be provided throughout the Scheme. Jonathan Thirkettle / March 18 4 of 8

6 Lay-Bys and Maintenance Bays 3.22 The Scheme would be provided with two lay-bys in each direction. Laybys would have a full standard Type A layout with taper diverge and kerbed segregation island Emergency roadside telephones are proposed at each of the lay-bys Police Observation Platforms (POPs) would be provided at the back of the four proposed lay-bys. Whilst not generally a requirement for D2AP type roads, the inclusion of POPs has been at the request of the Welsh Government. Signs and Road Markings 3.25 Junction Advanced Direction Signing (ADS) would be based on a twosign junction approach. Side-road signage is more typically based on a single-sign ADS approach In additional to directional signage, the Scheme would be provided with regulatory and information signage All mandatory signage would be illuminated. Non-illuminated signage would be reflectorised All Scheme road signs and road markings would be bilingual. 4. Differences to the made Line Order Overview 4.1 The made Line Order (1999) for the A465 Abergavenny to Hirwaun dualling shows the entire route of the main new A465 trunk road. The draft Amendment Order provides for changes that are required to achieve the Sections 5 and 6 Scheme. The amendments to the Line Order are summarised as follows.: Slight relocation of the Hirwaun roundabout due to the presence of an existing gas main; Jonathan Thirkettle / March 18 5 of 8

7 Provision of a new full movement grade separated junction at Croesbychan; Introduction of a split alignment at Nant Hir; Updated junction layout at Baverstock; Removal of westbound climbing lane between Baverstock and the A470; Development of junction layout at the A470/A465 intersection; Removal of split junction at Gurnos and provision of a full movement grade separated junction at Prince Charles Hospital. Hirwaun Junction 4.2 This change resulted in a south-easterly shift of the new Hirwaun junction when compared to 1999 Line Order plan in order to avoid a trunk gas main. An additional re-configuration of the Tower Road realignment has also been introduced. Croesbychan Junction 4.3 The 1999 Line Order made provision for the removal of the existing access to the A465 at Croesbychan. However, options for the introduction of a grade-separated junction at Croesbychan were assessed following a series of Public Information Exhibitions (PIEs) in December The provision of a grade-separated junction at Croesbychan also provides a means of incorporating the proposed Cynon Valley Gateway (Aberdare Bypass) Scheme being promoted by Rhondda Cynon Taf County Borough Council. Jonathan Thirkettle / March 18 6 of 8

8 Split Alignment at Nant Hir 4.5 Following Optioneering workshops it was deemed more cost-effective to introduce a split alignment over the Nant Hir Reservoir (with the retention of the existing bridge structure to take westbound traffic and a new structure to take eastbound traffic). This is in comparison to the 1999 Line Order which made provisions for a widening of the existing structure to take both east- and westbound traffic. Baverstock Junction 4.6 The significant change at the Baverstock junction is the inversion of the dumb-bell junction configuration. The 1999 Line Order showed the mainline passing beneath the dumb-bell link road in a substantial cut. Due to the necessity to reduce the amount of excavation in rock, the mainline is indicated in the current design as passing over the link road on embankment. 4.7 Additionally, Swansea Road is indicated as running parallel with the mainline to connect into the southern dumb-bell roundabout in the current version of the design. Removal of Climbing Lane 4.8 The 1999 Line Order made provision for a climbing lane and downhill arrestor bed between Baverstock and the A470 junction. 4.9 Design development has incorporated improvements to the vertical alignment of the proposed highway. As a result, it has been determined that both the climbing lane and the arrestor bed are no longer required. A470 Junction 4.10 Relatively minor amendments have been made from the teardrop junction configuration included in the 1999 Line Order to allow for full movement at both of the dumb-bell roundabouts. Jonathan Thirkettle / March 18 7 of 8

9 Removal of split junction at Gurnos and provision of a full movement grade separated junction at Prince Charles Hospital, Gurnos 4.11 Half-junctions at Gurnos and Galon Uchaf included in the original 1999 Line Order have been replaced with a full-movement junction at Prince Charles Hospital. This change significantly improves traffic flows within Gurnos and Galon Uchaf as it provides a connection to the proposed link road to Pant Industrial Estate, removing heavy goods vehicles from the Gurnos Ring Road. Updated slip road provision at Dowlais 4.12 In comparison to the 1999 Line Order, the eastbound diverge and westbound merge at Dowlais have been shifted outwards to allow space for the dual carriageway to be routed through the junction. 5. Conclusion 5.1 The proposed highway has been designed by reference to the geometric design standards contained the Design Manual for Roads and Bridges. However, Departures from Standards have been identified and are deemed necessary due to physical and environmental constraints. 5.2 As the Scheme design has developed, the design team have consulted with statutory bodies, landowners and local residents. The comments and suggestions received have been assessed and incorporated into the Scheme design where appropriate. 5.3 The highway engineering design meets the requirements of all road users including cyclists, pedestrians and other non-motorised users. 5.4 Land identified in the draft Compulsory Purchase Order is only that which is essential for the Scheme. Jonathan Thirkettle / March 18 8 of 8

A465 Heads of the Valleys Dualling Sections 5 and 6: Dowlais Top to Hirwaun PROOF OF EVIDENCE: Highways Engineering Document WG 1.3.

A465 Heads of the Valleys Dualling Sections 5 and 6: Dowlais Top to Hirwaun PROOF OF EVIDENCE: Highways Engineering Document WG 1.3. A465 Heads of the Valleys Dualling Sections 5 and 6: Dowlais Top to Hirwaun PROOF OF EVIDENCE: Highways Engineering Document WG 1.3.1 By Jonathan Thirkettle March 2018 PROOF OF EVIDENCE: Highways Engineering

More information

SCHEME DESIGN AND ENGINEERING

SCHEME DESIGN AND ENGINEERING THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL LINK CLASSIFIED ROAD) SIDE ROADS ORDER 2013 THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL LINK) COMPULSORY PURCHASE ORDER 2013 THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL

More information

A465 Heads of the Valleys Sections 5 and 6: Dowlais Top to Hirwaun

A465 Heads of the Valleys Sections 5 and 6: Dowlais Top to Hirwaun A465 Blaenau r Cymoedd A465 Heads of the Valleys Adrannau 5 + 6: Dowlais Top - Hirwaun Sections 5 + 6: Dowlais Top - Hirwaun www.cymru.gov.uk A465 Heads of the Valleys Sections 5 and 6: Dowlais Top to

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT

CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT 2.1 General topics 2.1.1 Changes since previous audit Do the conditions for which the scheme was originally designed still apply? (for example, no changes to

More information

SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane

SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane Exception Report Client Officer Rudo Beremauro Date 20 January 2015 RSA /Project Sponsor s Contents Section 3 Project Sponsor's

More information

Hospital Link Project Project Update September 2017

Hospital Link Project Project Update September 2017 Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

PART 5 TD 51/03 SEGREGATED LEFT TURN LANES AND SUBSIDIARY DEFLECTION ISLANDS AT ROUNDABOUTS SUMMARY

PART 5 TD 51/03 SEGREGATED LEFT TURN LANES AND SUBSIDIARY DEFLECTION ISLANDS AT ROUNDABOUTS SUMMARY DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 6 SECTION 3 ROAD GEOMETRY HIGHWAY FEATURES PART 5 TD 51/03 SEGREGATED LEFT TURN LANES AND SUBSIDIARY DEFLECTION ISLANDS AT ROUNDABOUTS SUMMARY This document sets

More information

LET US KNOW WHAT YOU THINK

LET US KNOW WHAT YOU THINK A164 and Jock s Lodge Junction Improvement Scheme Funding Bid PUBLIC CONSULTATION November 2017 Public Exhibition to be held at Beverley Racecourse on Wednesday 8 th November 2017 between 9.30 am and 6.45

More information

Hospital Link Project Project Update November 2017

Hospital Link Project Project Update November 2017 Hospital Link Project Project Update November 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

NRA New Divided Road Types: Type 2 and Type 3 Dual - Carriageways

NRA New Divided Road Types: Type 2 and Type 3 Dual - Carriageways NRA New Divided Road Types: Type 2 and Type 3 Dual - Carriageways DN-GEO-03059 December 2007 DN Design Technical TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland

More information

11 CHECKLISTS Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT

11 CHECKLISTS Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT 11 CHECKLISTS 11.1 Master Checklists All Stages CHECKLIST 1 FEASIBILITY STAGE AUDIT 1.1 General topics 1. Scope of project; function; traffic mix 2. Type and degree of access to property and developments

More information

A6 Manchester Airport Relief Road

A6 Manchester Airport Relief Road A6 Manchester Airport Relief Road Status Date Author Approved for Issue (AECOM) Approved for Issue (Grontmij) P0 18 July 2014 Adam Richardson Martin Houghton Martin Williamson P1 06 August 2014 Tony Hickman

More information

Guidance on Minor Improvements to National Roads (Including Erratum No. 1)

Guidance on Minor Improvements to National Roads (Including Erratum No. 1) Volume 6 Section 1 Part 1 NRA TA 85/11 Guidance on Minor Improvements to National Roads November 2011 (Including Erratum No. 1, February 2012) St. Martin s House, Waterloo Road, Dublin 4. Tel:+353 1 660

More information

Marcus Jones, TRL. Presented by Name Here Job Title - Date

Marcus Jones, TRL. Presented by Name Here Job Title - Date Segregation Insert the title and of priority your at presentation junctions: a here discussion Marcus Jones, TRL Presented by Name Here Job Title - Date Background: TfL cycle facility trials Infrastructure

More information

Appendix A Type of Traffic Calming Measures Engineering Solutions

Appendix A Type of Traffic Calming Measures Engineering Solutions Appendix A Type of Traffic Calming Measures Engineering Solutions PHYSICAL MEASURES Central Hatching The major consideration of this feature is that, these markings can only be laid down the centre of

More information

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design Cycle traffic and the Strategic Road Network Sandra Brown, Team Leader, Safer Roads- Design Highways England A Government owned Strategic Highways Company Department for Transport Road Investment Strategy

More information

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department) To: From: Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering Date: March 20, 2001 Subject: Roadway Geometric Design Criteria Project: TH 14/218 Design-Build Project, SP 7408-29,

More information

CONSTRUCTION SPECIFICATION

CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES CONTROL OF TRAFFIC C201 CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C201 ISSUE: NO:1 October 2007 TABLE OF CONTENTS CLAUSE CONTENTS

More information

Design and Installation of Low Level Cycle Signals

Design and Installation of Low Level Cycle Signals Transport for London Surface Transport Management System Document Guidance Note Design and Installation of Low Level Cycle Signals Document reference: SQA-0651 - Issue: Draft out of date information. 1

More information

The Location and Layout of Lay-bys and Location Markers

The Location and Layout of Lay-bys and Location Markers The Location and Layout of Lay-bys and Location Markers DN-GEO-03046 December 2010 DN Design Standards TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII)

More information

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,

More information

Proposed: Temporary Traffic Management Design Guidance

Proposed: Temporary Traffic Management Design Guidance Current Temporary Traffic Management Guidance Structure: Chapter 8 Traffic Signs Manual First published in 1996, updated 2007 Addendum in 2010 Guidance for the Control and Management of Traffic at Road

More information

CONTROL AND COMMUNICATIONS PROVISION PART 1 TD 46/05 MOTORWAY SIGNALLING SUMMARY

CONTROL AND COMMUNICATIONS PROVISION PART 1 TD 46/05 MOTORWAY SIGNALLING SUMMARY DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 9 SECTION 1 NETWORK - TRAFFIC CONTROL AND COMMUNICATIONS STANDARDS OF PROVISION PART 1 TD 46/05 MOTORWAY SIGNALLING SUMMARY This issue of TD 46 incorporates Interim

More information

GEOMETRIC DESIGN OF ROUNDABOUTS AND TRAFFIC S IGNAL SIGNAL CONTROLLED

GEOMETRIC DESIGN OF ROUNDABOUTS AND TRAFFIC S IGNAL SIGNAL CONTROLLED TD 16/07 and TD 50/04 GEOMETRIC DESIGN OF ROUNDABOUTS AND TRAFFIC SIGNAL CONTROLLED JUNCTIONS DMRB Vol 6 File 6 0 ROUNDABOUTS: INTRODUCTION Principles Roundabout Types Entry Deflection Capacity Visibility

More information

NRA New Divided Road Types: Type 2 and Type 3 Dual-carriageways

NRA New Divided Road Types: Type 2 and Type 3 Dual-carriageways NRA New Divided Road Types: Type 2 and Type 3 Dual-carriageways BENEFITS of the TYPE 2 and TYPE 3 DUAL CARRIAGEWAY ROAD TYPE There are significant safety and economic benefits associated with the Type

More information

Draft letter to Designers and Managing Agents INTERIM ADVICE NOTE 43/02: CANTILEVER AND PORTAL GANTRY VMS

Draft letter to Designers and Managing Agents INTERIM ADVICE NOTE 43/02: CANTILEVER AND PORTAL GANTRY VMS Draft letter to Designers and Managing Agents INTERIM ADVICE NOTE 43/02: CANTILEVER AND PORTAL GANTRY VMS This Interim Advice Note announces amendments to a series of guidelines related to cantilever and

More information

M6 Junction 10 Public Consultation

M6 Junction 10 Public Consultation M6 Junction 10 Public Consultation December 2015 Introduction Walsall Council and Highways England are developing plans to provide a long term improvement to M6 junction 10. We are holding this non-statutory

More information

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation Frascati Road and Temple Hill Route Improvements Outline Design Report to Accompany Public consultation September 2013 Background: Dún Laoghaire-Rathdown is committed to providing high quality pedestrian

More information

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN 8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN The Transportation Services Committee recommends the adoption of the recommendation contained in the following report

More information

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017 A127/A130 Fairglen Interchange Improvement Schemes Information Leaflet February 2017 1 2 Foreword By Councillor Kevin Bentley Essex is continuing to grow as a vibrant economic hub and as a fantastic place

More information

Derby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN. Date: 20 th November, 2018.

Derby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN. Date: 20 th November, 2018. Your Ref: Derby City Council Air Quality - Preferred Option Nov 2018 Derby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN Date: 20 th November, 2018. 1. Introduction: 1.1. Derby Cycling

More information

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21 DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION

CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION Title: Prepared by: A9 Dualling Project: Dalraddy to Slochd Murray Ferguson, Director of Planning and Rural Development and Gavin Miles, Head of Planning

More information

Welcome. Knutsford to Bowdon Improvement. Start of works exhibition November An executive agency of the Department for Transport

Welcome. Knutsford to Bowdon Improvement. Start of works exhibition November An executive agency of the Department for Transport Start of works exhibition November 2014 Welcome Scheme plan A56 Bowdon A56 M56 Booth Bank Junction 8 M56 Millington Lane Cherry Tree Lane Junction 7 Millington Hall Lane Rostherne Mere Rostherne Lane N140519

More information

TERM CONTRACT FOR THE MANAGEMENT AND MAINTENANCE OF THE SCOTTISH TRUNK ROAD NETWORK NORTH EAST UNIT

TERM CONTRACT FOR THE MANAGEMENT AND MAINTENANCE OF THE SCOTTISH TRUNK ROAD NETWORK NORTH EAST UNIT TERM CONTRACT FOR THE MANAGEMENT AND MAINTENANCE OF THE SCOTTISH TRUNK ROAD NETWORK NORTH EAST UNIT A90 LAURENCEKIRK ROAD SAFETY SCHEME MONITORING STUDY Client: Transport Scotland Trunk Road and Bus Operations

More information

Rhebogue Neighbourhood Greenway. Road Safety Audit Stage 2

Rhebogue Neighbourhood Greenway. Road Safety Audit Stage 2 Rhebogue Neighbourhood Greenway Road Safety Audit Stage 2 Report Number: 12/007/00/00057 July 2014 Mid West National Road Design Office Lissanalta House, Dooradoyle County Limerick Tel: 061 496 800 Fax:

More information

The Wincheap Society

The Wincheap Society The Wincheap Society s on sections of: Thanington 4th Arm Slip Road, Walking, Cycling & Horse-Riding Assessment & Review Report, by Peter Brett Associates, October 2017, on behalf of Pentland Properties

More information

APPENDIX L. Design Criteria

APPENDIX L. Design Criteria APPENDIX L Design Criteria DRAFT PRELIMINARY DESIGN CRITERIA Page 1 of 18 APPROVALS MANAGER, ENGINEERING CITY OF HAMILTON MANAGER, ENGINEERING REGION OF HALTON DATE This Design Criteria for the New East-West

More information

PART 5 TD 51/17 SUMMARY

PART 5 TD 51/17 SUMMARY DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 6 SECTION 3 ROAD GEOMETRY HIGHWAY FEATURES PART 5 TD 51/17 SEGREGATED LEFT TURN LANES AND SUBSIDIARY DEFLECTION ISLANDS AT ROUNDABOUTS SUMMARY This document sets

More information

APPENDIX F: TECHNICAL NOTE 22 (VICARAGE ROAD JUNCTION)

APPENDIX F: TECHNICAL NOTE 22 (VICARAGE ROAD JUNCTION) APPENDIX F: TECHNICAL NOTE 22 (VICARAGE ROAD JUNCTION) West Midlands Interchange Transport Assessment DCO Submission WEST MIDLANDS INTERCHANGE SUBJECT: Technical Note 22 Review of Vicarage Road Junction

More information

Introduction Methodology Study area and data collection Results and recommendation Conclusion References

Introduction Methodology Study area and data collection Results and recommendation Conclusion References Introduction Methodology Study area and data collection Results and recommendation Conclusion References It is formal procedure for assessing accident potential and safety performance in the provision

More information

Progress update on the Sustainable Movement Corridor scheme Guildford Borough Council, June 2016

Progress update on the Sustainable Movement Corridor scheme Guildford Borough Council, June 2016 Progress update on the Sustainable Movement Corridor scheme Guildford Borough Council, June 2016 1. Introduction The concept of the Sustainable Movement Corridor (hereafter the SMC ) was first developed

More information

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement:

Purpose: Financial Implications and Impact Statement: It is estimated that the cost to implement: Various Modifications Lower Jarvis Street and Lake Shore Boulevard East; Lower Jarvis Street, east side, between Lake Shore Boulevard East and The Esplanade - 45-77 Lower Jarvis Street; and Lower Jarvis

More information

The existing site constraints which may be encountered for the A428 scheme proposals are divided into sections as follows.

The existing site constraints which may be encountered for the A428 scheme proposals are divided into sections as follows. Project: A428 Study To: Cambridgeshire County Council Subject: Tidal Bus lane Review From: Atkins Date: 24 May 2016 cc: Introduction As part of the A428 Corridor Study to improve the bus journey time between

More information

SECTION 12 ROAD MARKINGS AND DELINEATION

SECTION 12 ROAD MARKINGS AND DELINEATION SECTION 12 ROAD MARKINGS AND DELINEATION (Blank Page) MANUAL OF TRAFFIC SIGNS AND MARKINGS - Part III: Motorways and Expressways 12-1 12.1 GENERAL 12.1.1 INTRODUCTION The markings and delineation details

More information

RAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings

RAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings RAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings Location: Crossing No. Date of On-Site Inspection: (Day) / / (Night) / / Weather: CHECKLIST 5. - GENERAL TOPICS Level of control

More information

Geometric Design of Junctions (priority junctions, direct accesses, roundabouts, grade separated and compact grade separated junctions)

Geometric Design of Junctions (priority junctions, direct accesses, roundabouts, grade separated and compact grade separated junctions) Geometric Design of Junctions (priority junctions, direct accesses, roundabouts, grade separated and compact grade separated junctions) June 2017 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About

More information

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto

More information

Sandyford Cycle Route (Kilgobbin / Drummartin Link Road)

Sandyford Cycle Route (Kilgobbin / Drummartin Link Road) Sandyford Cycle Route (Kilgobbin / Drummartin Link Road) Public Consultation Report on Submissions Client: Dun Laoghaire-Rathdown County Council Date: May 2018 Job Number: 15_116B Clifton Scannell Emerson

More information

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening We are here today to present the draft plan for the Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening project

More information

Roads and public rights of way

Roads and public rights of way Roads and public rights of way This factsheet outlines how the effects of the Proposed Scheme on roads and public rights of way (PRoW) along the line of route would be managed. Version 1.0 Last updated:

More information

DRAFT OPERATIONAL RESPONSIBILITY FOR PUBLIC ROADS IN WESTERN AUSTRALIA DRAFT VERSION 2

DRAFT OPERATIONAL RESPONSIBILITY FOR PUBLIC ROADS IN WESTERN AUSTRALIA DRAFT VERSION 2 DRAFT OPERATIONAL RESPONSIBILITY FOR PUBLIC ROADS IN WESTERN AUSTRALIA DRAFT VERSION 2 DECEMBER 2009 TABLE OF CONTENTS PART 1 INTRODUCTION...1 1. Purpose of Document...1 2. Consultation...1 3. Roads Which

More information

Traffic Control Inspection Checklist Segment:

Traffic Control Inspection Checklist Segment: Traffic Control Inspection Checklist Segment: Simon Contractors Simon Contractors Originator: Description Reviewed by: Initials Date Distribution: Traffic Quality Manager, Site Assistant Traffic Manager

More information

Chelmsford City Growth Package

Chelmsford City Growth Package Chelmsford City Growth Package Public Consultation Document Volume 2 West Chelmsford July - August 2017 Chelmsford City Growth Package Public Consultation Document - Volume 2 - West Chelmsford Contents

More information

Design Workshops Summary of all Feedback January 2017

Design Workshops Summary of all Feedback January 2017 Histon Road Corridor Design Workshops Summary of all Feedback January 2017 CITY DEAL AND GROWTH Commitment to Growth: Government, County, City and District Emerging Local Plans: 33,000 new homes 45,000

More information

Policy Statement. Objective. Context. References and Supporting Documentation

Policy Statement. Objective. Context. References and Supporting Documentation Policy Statement Subject Placement of Distribution Poles Along Roads With Speed Limits Not Exceeding 70km/h Approved by Robert Rogerson Signature & Date Distribution Standards and Policy Manager Authorised

More information

Traffic Assets Section Proposed Removal of Street Lighting Road Safety Review Report No 48

Traffic Assets Section Proposed Removal of Street Lighting Road Safety Review Report No 48 Street Lighting Section Unique Reference: o. 48 Traffic Assets Section Report o 48 Reviewer: Ellie Briggs, BEng (Hons) CEng MICE Highway Classification / umber Road / Street ame: District / Settlement:

More information

Agenda Item 34. N11 - Brewery Road Improvement Scheme

Agenda Item 34. N11 - Brewery Road Improvement Scheme Agenda Item 34 N11 - Brewery Road Improvement Scheme Public Consultation Report on Submissions Client: Dún Laoghaire-Rathdown County Council Date: November 2017 Job Number: 13_066A Document Pack Page 11

More information

Appendix D Stage 1 Road Safety Audit

Appendix D Stage 1 Road Safety Audit N2 Monaghan Town to Emyvale Road Improvements Part 8 Application Description of Proposed Development Appendi D N2 Monaghan Town to Emyvale, County Monaghan Proposed Pavement and Minor Improvement Scheme

More information

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016 Context. Author: Parish Clerk 2 The Draft Integrated Transport Policy (DITS) sets out a vision and objectives, and identifies a detailed programme of interventions to support the Maidstone Borough Local

More information

Auckland Transport Code of Practice 2013

Auckland Transport Code of Practice 2013 P age 234 9 Roadside Restraint Devices 9.1 Scope This chapter includes the following: Road Safety Barrier Systems Fences Railings Bollards Sight Rails It excludes: Fences and restraints required within

More information

Road Link Design. Incorporating TA 43/03 (Guidance on Road Link Design) Volume 6 Section 1 Part 1 NRA TD 9/03. April Note:

Road Link Design. Incorporating TA 43/03 (Guidance on Road Link Design) Volume 6 Section 1 Part 1 NRA TD 9/03. April Note: Volume 6 Section 1 Part 1 NRA TD 9/03 Road Link Design Incorporating TA 43/03 (Guidance on Road Link Design) Note: NRA TD 9/04, NRA TD 9/05 and NRA TD 9/07 Also incorporates NRA TA 43/03 April 2003 St.

More information

IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING

IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING BBAG BRIEFING NOTE EMAIL: BERMUDABRIDGEAGP@BTINTERNET.COM WWW.FACEBOOK.COM/GROUPS/BERMUDABRIDGEAG TWITTER @BERMUDABRIDGEAG CYCLING BBAG BRIEFING NOTE

More information

Bramshaw traffic calming proposal

Bramshaw traffic calming proposal - 1 - Bramshaw traffic calming proposal Initial options appraisal report July 2017 - 2-1. Project background Hampshire Country Council has commissioned Test Valley Borough Council to carry out an option

More information

Evaluation of Road Safety Audit Reports

Evaluation of Road Safety Audit Reports Evaluation of Road Safety Audit Reports Peter Monahan 5 th April 2016 Task Overview Review sample of RSA Reports in TII Database and: 1. Identify the most commonly recurring Problems or category of Problems

More information

Introduction to the NRA Design Manual for Roads and Bridges

Introduction to the NRA Design Manual for Roads and Bridges Volume 0 Section 0 Part A 0.0.A Introduction to the NRA Design Manual for Roads and Bridges July 2011 St. Martin s House, Waterloo Road, Dublin 4. Tel:+353 1 660 2511 Fax +353 1 668 0009 Email : info@nra.ie

More information

SECTION 12 ROAD MARKINGS AND DELINEATION

SECTION 12 ROAD MARKINGS AND DELINEATION SECTION 12 20 June 2009 Part 3: Motorways and Expressways CONTENTS Reference Page Page Number Date SECTION 12: MARKINGS AND DELINEATION 12.1 GENERAL... 12-1 June 2009 12.1.1 INTRODUCTION... 12-1 June 2009

More information

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport LONDON BOROUGH OF RICHMOND UPON THAMES Cabinet Member Decision DATE: January 2012 REPORT OF: LEAD OFFICER: SUBJECT: WARDS: The Cabinet Member for Highways & Streetscene Aurang Zeb - Head of Highways &

More information

COUNTY ROAD 22 HORSESHOE VALLEY ROAD. Municipal Class Environmental Assessment. simcoe.ca

COUNTY ROAD 22 HORSESHOE VALLEY ROAD. Municipal Class Environmental Assessment. simcoe.ca OCTOBER 2014 Municipal Class Environmental Assessment COUNTY ROAD 22 HORSESHOE VALLEY ROAD Project A Truck Climbing Lanes Project B Intersection Improvements simcoe.ca CORPORATE COMMUNICATIONS DEPARTMENT

More information

DMURS - Practical Implications

DMURS - Practical Implications Comhairle Contae Fhine Gall DMURS - Practical Implications Sean McGrath. 13 November 2013 Planning and Strategic Infrastructure Department DMURS Practical Implications What DMURS means for: Street Layouts

More information

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer Colerain Avenue Roadway Improvements Sponsored by Hamilton County Engineer Participants Lead Agency: Hamilton County Engineer Review and Approval: Ohio Department of Transportation Design Engineer: Edwards

More information

MAGNA PARK Lutterworth. DHL SUPPLY CHAIN: Design and Access Statement. June

MAGNA PARK Lutterworth. DHL SUPPLY CHAIN: Design and Access Statement. June DHL SUPPLY CHAIN: Design and Access Statement June 2015 CONTENTS SECTION - The Access Proposals 9.1. Site Access 140 9.2. Mere Lane 140 9.3. A5 140 9.4. Footpaths, cycle ways and bridleways 142 SECTION

More information

INTERIM ADVICE NOTE 144/16 DIRECTIONAL SIGNS ON MOTORWAY AND ALL-PURPOSE TRUNK ROADS GRADE SEPARATED JUNCTIONS

INTERIM ADVICE NOTE 144/16 DIRECTIONAL SIGNS ON MOTORWAY AND ALL-PURPOSE TRUNK ROADS GRADE SEPARATED JUNCTIONS INTERIM ADVICE NOTE 144/16 DIRECTIONAL SIGNS ON MOTORWAY AND ALL-PURPOSE TRUNK ROADS GRADE SEPARATED JUNCTIONS Summary This document sets out guidance for the use of directional signs at motorway and allpurpose

More information

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02 1 VicRoads Access Management Policies May 2006 Ver 1.02 VicRoads Access Management Policies May 2006 Version 1.02 2 VicRoads Access Management Policies May 2006 Ver 1.02 FOREWORD FOR ACCESS MANAGEMENT

More information

Improving the A1 in Northumberland Public consultation. November December North of Ellingham

Improving the A1 in Northumberland Public consultation. November December North of Ellingham A1 Improving the A1 in Northumberland Public consultation November December 2016 North of Ellingham Improving the A1 in Northumberland In autumn 2014, the government announced the first Road Investment

More information

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

Maynooth Cycling Submission on North South Corridor

Maynooth Cycling Submission on North South Corridor Maynooth Cycling Submission on North South Corridor Maynooth Cycling welcomes the intention to improve facilities and quality of service for pedestrians and cyclists in Maynooth. In particular, we strongly

More information

IH 20 RANGER HILL PUBLIC MEETING

IH 20 RANGER HILL PUBLIC MEETING IH 20 RANGER HILL PUBLIC MEETING AUGUST 25, 2015 IH 20, Eastland County, TX CSJ 0007-06-084 IH 20 from 3.5 mi. East of LP 254 to SH 16 (Ranger Hill) August 25, 2015 Agenda Introductions Purpose of the

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

Naas to Kill Cycle Scheme - Reference P

Naas to Kill Cycle Scheme - Reference P Naas to Kill Cycle Scheme - Reference P82017.014 Kildare County Council October 2017 Document history Job number: 5139616 Document ref: 5139616DG017 Revision Purpose description Originated Checked Reviewed

More information

Review of Guidelines for Cycleway Safety Fencing

Review of Guidelines for Cycleway Safety Fencing Review of Guidelines for Cycleway 1.0 PURPOSE 1.1 This document is meant to provide a review of available reference documents for determining appropriate fencing requirements for cycleway paths and shared

More information

4. Guided Bus Explained

4. Guided Bus Explained 4. Guided Bus Explained Contents 1 INTRODUCTION... 2 Structure of this report... 2 2 KERB GUIDED BUS... 3 Overview... 3 Kerb guidance... 3 Figures Figure 2.1 Figure 2.2 Figure 2.3 Figure 2.4 Figure 2.5

More information

10 SHERFORD Town Code

10 SHERFORD Town Code Key Fixes (Ref: Masterplan Book, section 4a. Land Use Budget and Key Fixes ) The Town Plan designs and allocates buildings, streets and spaces as accurately as possible in the understandable absence of

More information

Sevenways Roundabout, and the need for a Road Safety Scheme:

Sevenways Roundabout, and the need for a Road Safety Scheme: Sevenways Roundabout, and the need for a Road Safety Scheme: The way the current roundabout has evolved has obviously created an environment that is dangerous for all road users, motorists, cyclists and

More information

Helen Hughes Senior Project Manager

Helen Hughes Senior Project Manager Helen Hughes Senior Project Manager hhughes@nra.ie What is a 2+1 Road? A road with two lanes in one direction and one in in the other The two lane section is provided alternately for each direction of

More information

10.0 CURB EXTENSIONS GUIDELINE

10.0 CURB EXTENSIONS GUIDELINE 10.0 CURB EXTENSIONS GUIDELINE Road Engineering Design Guidelines Version 1.0 March 2017 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services

More information

Terwillegar Drive Expressway Draft Concept Plan

Terwillegar Drive Expressway Draft Concept Plan Terwillegar Drive Expressway Draft Concept Plan Anthony Henday Drive to Whitemud Drive November 28 5:00-8:00 p.m. December 1 10:00 a.m. - 3:00 p.m. Let s Talk Today you can: Learn about the new direction

More information

Appendix B Option 1 Design, Plans and Estimates

Appendix B Option 1 Design, Plans and Estimates 19 Appendix B Option 1 Design, Plans and Estimates Opus International Consultants Ltd Design Details All options where designed using NZTA MOTSAM part 2, NCC Land development manual 2010 and Cycling

More information

Interim Report on the Development of Road Safety Infrastructure Facility Design Standard for the Asian Highway Network

Interim Report on the Development of Road Safety Infrastructure Facility Design Standard for the Asian Highway Network Development of Road Infrastructure Safety Facility Standards Expert Group Meeting on Asian Highway United Nations Economic and Social Commission for Asia and the Pacific 3-4 October 2016 Interim Report

More information

CHECKLIST 4: PRE-OPENING STAGE AUDIT

CHECKLIST 4: PRE-OPENING STAGE AUDIT CHECKLIST 4: PRE-OPENING STAGE AUDIT 4.1 General topics 4.1.1 Changes since previous audit; translation of design into practice General check: have any matters that have changed since a previous audit

More information

Road Safety Audit training course. Motorways - safety issues of the motorway design

Road Safety Audit training course. Motorways - safety issues of the motorway design Road Safety Audit training course Motorways - safety issues of the motorway design Jesper Mertner, Road safety auditor, COWI A/S 1 ROAD SAFETY AUDITING COURSE Content 1. Safety 2. Cross sections 3. Horizontal

More information

H8 Signs, Supports and Poles

H8 Signs, Supports and Poles Alberta Infrastructure and Transportation Roadside Design Guide November 2007 H8 Signs, Supports and Poles H8.1 Introduction This section identifies the appropriate roadside safety treatment for signs,

More information

EXHIBIT U THE SCOPE DOCUMENT

EXHIBIT U THE SCOPE DOCUMENT EXHIBIT U THE SCOPE DOCUMENT 1. Introduction 1.1 Purpose of the Scope Document The Scope Document provides an overview of the Route 495 HOT Lanes in Virginia Project as description of the Concessionaire

More information

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR SAY Consultation open from 24 September to 5 November 2018 Contents Introduction 3 Background 4 Springwood Drive Roundabout

More information

Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS

Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS Overview Highway Functions and Classifications Highway Design Components Design Control

More information

Cycle Traffic and The Strategic Road Network. John Parkin and Phil Jones Presenting on behalf of Highways England

Cycle Traffic and The Strategic Road Network. John Parkin and Phil Jones Presenting on behalf of Highways England Society of Road Safety Auditors Annual Conference Monday 20 th and Tuesday 21 st June 2016 Cycle Traffic and The Strategic Road Network John Parkin and Phil Jones Presenting on behalf of Highways England

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

WestConnex Stage 1A: M4 Widening

WestConnex Stage 1A: M4 Widening WestConnex Stage 1A: M4 Widening Church Street to Homebush Bay Drive Final Detail Design As Built Bicycle Path Safety Audit Detail Design Stage October 2016, Revision 4 www.smec.com TABLE OF CONTENTS 1.

More information