CPC Parking Lot Riverside Drive. Transportation Brief

Size: px
Start display at page:

Download "CPC Parking Lot Riverside Drive. Transportation Brief"

Transcription

1 CPC Parking Lot 2785 Riverside Drive Transportation Brief Prepared By: NOVATECH Suite 2, 24 Michael Cowpland Drive Ottawa, Ontario K2M P6 7 / 5 / 25 Novatech File: 49 Ref: R-25-22

2 July 5 th, 25 City of Ottawa Planning and Growth Management Branch Laurier Ave. W., 4th Floor Ottawa, ON KP J Attention: Mr. Wally Dubyk, C.E.T. Project Manager, Infrastructure Approvals Dear Sir: Reference: Canada Post Accessory Parking Lot 2785 Riverside Drive Transportation Overview Our File No.: 49 This Transportation Brief has been prepared in support of a Site Plan Control (SPC) application for 2785 Riverside Drive. The structure and format of this report follow the 26 City of Ottawa Transportation Impact Assessment (TIA) Guidelines. A checklist of the documentation requirements as outlined in Appendix C of the TIA guidelines is attached with reference to corresponding report sections. A PDF version of this report and copies of the electronic software files are provided on the enclosed disk. We trust that the Transportation Brief will be to your satisfaction; please call if you have any questions as you complete your review of the study. Yours truly, NOVATECH Meghan Whitehead, P.Eng. Transportation Engineer M:\24\49\DATA\Reports\Traffic\49 - Transportation Brief.docx Suite 2, 24 Michael Cowpland Drive, Ottawa ON K2M P6 Tel: Fax:

3 Documentation and Reporting Checklist Report Context (Section.) Description of the development (include all of the following that are known at the time of the application): Municipal address; Location relative to major elements of the existing transportation system Existing land uses or permitted use provisions in the Official Plan, Zoning By-law, etc.; Proposed land uses and relevant planning regulations to be used in the analysis; Proposed development size (building size, number of residential units, etc.) and location on site; Estimated date of occupancy; Planned phasing of development; Proposed number of parking spaces (not relevant for Registration of Plans of Subdivision); and Proposed access points and type of access (full turns, right-in/ right-out, turning restrictions, etc.). Study area; Time periods and phasing; and Horizon years (include reference to phased development). The TB must include a key plan that shows the general location of the development in relation to the surrounding area. The TB must also provide a draft site plan or development concept of a suitable scale that shows the general location of the development and the proposed access locations. If the proposed development/ redevelopment is to be constructed in phases, a description must be provided for each phase, identifying the proposed timing of implementation. Existing Conditions (Section 2.) Existing roads and ramps in the study area, including jurisdiction, classification, number of lanes, and posted speed limit; Existing intersections, indicating type of control, lane configurations, turning restrictions, and any other relevant data (e.g., extraordinary lane widths, grades, etc.); Existing access points to adjacent developments (both sides of all roads bordering the site); Existing transit system, including stations and stops; Existing on- and off-road bicycle facilities and pedestrian sidewalks and pathway networks; Existing system operations (V/C, LOS); and Major trip generators/ attractors within the Study Area should be indicated. M:\24\49\DATA\Reports\Traffic\49 - Transportation Brief.docx Suite 2, 24 Michael Cowpland Drive, Ottawa ON K2M P6 Tel: Fax:

4 The TB report must include figures documenting the existing travel demands by mode. A photographic inventory of the transportation network elements in the vicinity of the proposed access points would be beneficial to staff in their review of the Consultant s report. Demand Forecasting (Section.) Trip generation forecasts Impact Analysis (Section 4.) Qualitative assessment of impacts on capacity; non-auto modes; on-site circulation; community Mitigation Measures and Site Design Characteristics (Section 5.-7.) The TB must identify all mitigation measures required to offset network impacts from the development. The TB must also identify key site design features required to implement the Official Plan and Transportation Master Plan policies regarding site development. The TB must include all of the following, where they are required by the subject development: Location and timing of proposed changes to existing traffic controls at intersections (e.g., new traffic signals, Stop signs, etc.); Mitigation measures required to offset impacts on the surface and Rapid Transit networks; New or modified elements of the bicycle and pedestrian networks; Community impact mitigation measures; and Proposed TDM features or programs to support the site development. M:\24\49\DATA\Reports\Traffic\49 - Transportation Brief.docx Suite 2, 24 Michael Cowpland Drive, Ottawa ON K2M P6 Tel: Fax:

5 Transportation Brief 2785 Riverside Drive Table of Contents. INTRODUCTION.... PROPOSED DEVELOPMENT ANALYSIS PARAMETERS EXISTING CONDITIONS ROADWAY FACILITIES Brookfield Road Riverside Drive STUDY AREA INTERSECTIONS EXISTING PEDESTRIAN FACILITIES EXISTING BICYCLE FACILITIES EXISTING TRANSIT FACILITIES EXISTING TRAFFIC VOLUMES TRAVEL DEMAND FORECASTING TRIP GENERATION TRIP DISTRIBUTION Vehicular Traffic Transit Trips INTERSECTION ANALYSIS EXISTING TRAFFIC TOTAL TRAFFIC PROVISIONS FOR NON-AUTO MODES ON-SITE DESIGN PROPOSED ACCESS PARKING TRANSPORTATION DEMAND MANAGEMENT CONCLUSIONS AND RECOMMENDATIONS...5 Appendices APPENDIX A - SITE PLAN APPENDIX B - OC TRANSPO SYSTEM MAP APPENDIX C - TRAFFIC COUNTS AND SIGNAL TIMING PLANS APPENDIX D - SYNCHRO REPORTS Novatech i

6 Transportation Brief 2785 Riverside Drive Tables Table : ITE Vehicle Trip Generation... 7 Table 2: Person Trips... 7 Table : Site Generated Person Trips by Mode of Transportation... 8 Table 4: Site Access by Trip Direction... Table 5: Top Origins of AM Trips to Alta Vista... Table 6: Existing Peak Hour Intersection Operations...2 Table 7: Future Peak Hour Intersection Operations... Figures Figure : Study Area and Site... Figure 2: OC Transpo Stop and Station Locations... 5 Figure : Existing Peak Hour Traffic Volumes... 6 Figure 4: Peak Hour Site Trips... 9 Figure 5: Peak Hour Total Traffic... Novatech ii

7 Transportation Brief 2785 Riverside Drive. INTRODUCTION The following Transportation Brief (TB) has been prepared as requested by the City as part of a Site Plan Control (SPC) application for a parking lot expansion located at 2785 Riverside Drive. This Transportation Brief outlines the transportation impacts associated with the proposed parking expansion. The subject site forms part of the Canada Post Campus (CPC) located between Brookfield Road and Heron Road, as shown in Figure. Figure : Study Area and Site The proposed parking lot is located at the site of a recently demolished building (shown in Figure ) and intended to serve future tenants of Building C. The site plan for the proposed parking lot is provided in Appendix A. The subject site is bounded by the following: To the north and west, office developments; To the east, the Airport Parkway/Bronson Avenue; To the south, commercial development and a high school. Novatech Page

8 Transportation Brief 2785 Riverside Drive. Proposed development The proposed parking expansion consists of converting a recently demolished building and parking lot immediately west of Building C into additional parking to accommodate potential tenants of Building C. Twenty (2) spaces previously existed at this location and are proposed to be replaced with a total of 2 spaces. The existing -space parking lot with access on Brookfield Road will also be removed as part of the SPC application. The modifications to the parking will result in a net increase of 8 spaces. A single controlled access to the new parking lot will be provided along the private access road. Access to the parking lot will be provided through the existing accesses along Brookfield Road and Heron Road. No changes to the geometry and configuration of the existing access off Brookfield Road or Heron Road are proposed as part of this SPC application..2 Analysis Parameters The study area for this report was confirmed with City staff, and includes the proposed site accesses along Brookfield Road as well as the intersection of Riverside Drive & Brookfield Road. The selected time period for analysis is the weekday AM and PM peak hours as they represent the worst case combination of site generated traffic and adjacent street traffic. Evaluation of the study area intersections have been completed for the existing and total traffic conditions. 2. EXISTING CONDITIONS 2. Roadway Facilities 2.. Brookfield Road Brookfield Road is a major collector that runs on an east-west alignment within the study area. Brookfield Road has a four-lane undivided urban cross section, and meets Hog s Back Road at Riverside Drive where it continues west with a two-lane undivided urban cross section. Neither Brookfield Road nor Hog s Back Road are designated as truck routes. Brookfield Road has a posted speed of 5km/h while Hog s Back Road has a posted speed of 6km/h. The City of Ottawa Official Plan (OP) identifies a requirement to protect a Right-of-Way (ROW) of 26m along Brookfield Road and Hog s Back Road Riverside Drive Riverside Drive is an arterial roadway that runs on a north-south alignment. Riverside Drive typically has a four lane urban divided cross-section, but widens to six lanes with additional auxiliary lanes through the study area between Heron Road and Brookfield Road. Riverside Drive is a designated truck route with a posted speed limit of 6km/h through the study area. The City of Ottawa OP identifies a requirement to protect a ROW of 44.5m between Heron Road and Brookfield Road, reducing to 7.5m immediately north and south of the study area. Novatech Page 2

9 Transportation Brief 2785 Riverside Drive 2.2 Study Area Intersections The lane configurations at each of the study area intersections can be summarized as follows: Brookfield Road / Riverside Drive Four leg signalized intersection; The northbound and southbound approaches consists of three through lanes, a channelized right turn lane and a left turn lane; and The eastbound and westbound approaches consist of a single through lane, a channelized right turn lane and a single left turn lane. Brookfield Road / Site Access This intersection is a three legged unsignalized intersection; The north leg is a two-lane road with an inbound lane and an outbound lane; and The eastbound and westbound approaches consist of two lanes in each direction with no dedicated turning lanes. Brookfield Road / Site Access 2 This intersection is a three legged signalized intersection; The north leg is a two-lane road with an inbound lane and an outbound lane; and The eastbound and westbound approaches consist of two lanes in each direction with no dedicated turning lanes. 2. Existing Pedestrian Facilities Pedestrian facilities are currently provided along the study area roadways as follows: A concrete sidewalk is provided along the north side of Brookfield Road; An asphalt sidewalk is provided along the south side of Brookfield Road; A concrete sidewalk is provided along one side of all roadways internal to the Canada Post Campus; Concrete sidewalks are provided along both sides of Riverside Drive through the study area; Concrete sidewalks are provided along both sides of Heron Road through the study area; An asphalt pathway connects the pedestrian network within the site with the O-Train Confederation Station; A grade-separated crossing of Heron Road with a pedestrian sidewalk is available on the north-east corner of the Canada Post Campus. Crosswalks with push button actuation and depressed curbs are provided along all legs of the signalized intersections within the area with the exception of the west leg of the Riverside Drive / Heron Road intersection where pedestrian crossings are banned. Novatech Page

10 Transportation Brief 2785 Riverside Drive 2.4 Existing Bicycle Facilities The City of Ottawa Primary Urban Cycling Network in the 2 Transportation Master Plan (TMP) identifies Brookfield Road, Riverside Drive, and Heron Road as spine routes. The site is currently connected to the Sawmill Creek Pathway with connections to the on-street bike lanes on Bronson Avenue, the local cycling route along Brookfield Road, and connections further south to the Alta Vista, Hunt Club and Greenboro neighbourhoods. The site is also connected to the Hog s Back Road pathway with connections to the Rideau Canal Pathway, the Rideau River Pathway, and the on-road cycling lanes along Prince of Wales Drive. 2.5 Existing Transit Facilities A copy of the 2 OC Transpo system map for the study area is included in Appendix B. This report describes all existing transit facilities within a five minute walk of the subject site, which equates to a distance of approximately 4m for local stops and 6m for rapid transit stops. Rapid Transit The O-Train Trillium Line Confederation Station is located immediately east of the Canada Post Campus and approximately 5m from Building C. The O-Train has been recently upgraded with current service operating on a 2min frequency. The Transitway s Heron Station is located approximately 8m from Building C, with a walking distance of approximately km. Heron Station is served by Transitway Routes 97, 98, 99 and 6, express routes to/from the south, as well as several local routes. Local Service Bus stops #42 and #569 are located along Heron Road, approximately 5m north of Building C and serve Routes and 8 which both operate on an 8-min frequency during peak periods. Local routes 87 and 4 travel along Brookfield Road and through the CPC site between Brookfield Road and Heron Road with stops less than 5m from Building C. Stop numbers #4 and #69 are located immediately adjacent to Building C on the west side and stop numbers #428 and #49 are located immediately south of Building C on Brookfield Road. Route 87 typically serves the local stops every -2 minutes during peak periods while Route 4 provides service only in the peak direction with a minute frequency. The location of the OC Transpo stops and stations in the area are shown in Figure 2. Novatech Page 4

11 Transportation Brief 2785 Riverside Drive Figure 2: OC Transpo Stop and Station Locations 2.6 Existing Traffic Volumes Weekday AM and PM peak hour traffic counts were completed by the City of Ottawa at the following study area intersections on the dates indicated: Brookfield Road / Riverside Drive Friday June 6 th, 24; Novatech undertook traffic counts for the weekday AM and PM peak periods at Brookfield Road and both site accesses on Thursday July 9 th, 25. In addition, spot counts during the AM and PM peak periods were undertaken at the Heron Road access to the site on the same date. The through movements along Brookfield Road were estimated based on the Riverside Drive / Brookfield Road count as it reflected the higher non-summer time period. Existing AM and PM peak hour traffic volumes are shown in Figure. Peak hour summary sheets of the above traffic counts are included in Appendix C. Novatech Page 5

12

13 Transportation Brief 2785 Riverside Drive. TRAVEL DEMAND FORECASTING. Trip Generation Building C has a gross floor area of approximately, square feet of office space and the current occupancy level is approximately %. Current employees in Building C are assumed to be relocated on-site and therefore the existing trips have not been removed from the existing road network. Tenants in Building C are anticipated as early as 25 with the new tenant fully occupying the building over the next five years. It has been conservatively assumed that the building will be fully occupied by a new tenant as early as 25. Trips generated by the proposed development have been estimated using the peak hour rate identified in the Institute of Transportation Engineers (ITE) Trip Generation Manual, 9th Edition for a general office building (LU7). The peak hour vehicle trips generated by the proposed development are outlined in Table below. Table : ITE Vehicle Trip Generation ITE GFA AM Peak (VPH) PM Peak (VPH) Land Use Code (s.f.) IN OUT TOTAL IN OUT TOTAL General Office 7, The trip generation surveys compiled in the ITE Trip Generation Manual only record vehicle trips, and the sites surveyed are typically located in suburban locations in the United States where non-auto modes of transportation typically have a modal share of % or less. Where multiple modes of transportation are readily available, it is considered good practice to express projected trip generation volumes in terms of person trips, instead of vehicle trips. To convert ITE vehicle trip rates to person trip rates an adjustment factor of.42 has been used to account for non-auto usage and vehicle occupancy. The person trip generation is summarized in Table 2. Land Use IN (VPH ) Table 2: Person Trips Vehicle Trips OUT TOTAL (VPH) (VPH) AM Peak Hour PM Peak Hour Person Trip Factor x.42 x.42 IN (PPH 2 ) Person Trips OUT (PPH) TOTAL (PPH) The number of trips by mode of transportation has been estimated based on the 2 TRANS O-D Survey Report specific to the Confederation Heights traffic zones. A full breakdown of the projected person trips by modal share and arrival/departure is shown in Table. Novatech Page 7

14 Transportation Brief 2785 Riverside Drive Table : Site Generated Person Trips by Mode of Transportation Travel Mode Modal Share AM Peak PM Peak IN OUT TOTAL IN OUT TOTAL Total Person Trips Auto Driver 62% Auto Passenger % Transit 22% Non-Motorized 6% The ITE Traffic Engineering Handbook 5 th Edition (999) included typical peak hour trips as a percentage of total parking stalls. For an office development with 2 parking stalls, this data suggests approximately inbound trips and -2 outbound trips during the AM peak hour. This estimation supports the peak hour trip generation presented in Table..2 Trip Distribution.2. Vehicular Traffic The origins of auto driver work trips to Alta Vista as identified in the 2 OD data was reviewed and used as a basis for identifying the trip distribution pattern for vehicle trips. The distribution of vehicular trips generated by the proposed development has been derived with appropriate consideration given to several key factors, including: The size and nature of the proposed development; Existing traffic patterns; The location of the site access with respect to the adjacent roadway system; and The principles of logical trip routing. The distribution of vehicular trips generated by the proposed development during the weekday AM and PM peak hours can be summarized as follows: 45% to/from the north via Bronson Avenue and Riverside Drive (evenly split); 25% to/from the south via Riverside Drive and the Airport Parkway (evenly split); 5% to/from the west via Heron Road and Hog s Back Road (evenly split); 5% to/from the east via Heron Road. The distribution of site trips across all site accesses has been identified with consideration to routings and a review of existing site access data collected on July 9 th, 25. The distribution by site access is summarized in Table 4. The projected peak hour trips generated by the proposed development are shown in Figure 4. The projected total traffic volumes are shown in Figure 5. Novatech Page 8

15

16

17 Transportation Brief 2785 Riverside Drive Table 4: Site Access by Trip Direction Access Inbound Outbound Heron Road 25% 4% Brookfield Road (West) 75% 6% Brookfield Road (East) % %.2.2 Transit Trips The distribution of transit trips to and from the proposed development has been derived from AM work trip data compiled from the 2 TRANS O-D Survey Report. The top origins for all AM work trips arriving in the Alta Vista District are summarized in Table 5. Table 5: Top Origins of AM Trips to Alta Vista AM Peak % Transit % All Trips Origin of Arrivals Trips Alta Vista 6% 5% Orleans 4% 7% Hunt Club 9% % Inner Area 8% % Merivale 7% 9% Based on the data presented in Table 5, the top origins for all work trips destined to the Alta Vista District in the AM peak are the Alta Vista, Orleans, Hunt Club, Inner Area and Merivale areas. Those from Orleans, Hunt Club, and the Inner Area are likely to use the O-Train to access the site. Those from Alta Vista and Merivale are likely to use Routes and 8 along Heron Road. With peak transit volumes of approximately 6 passengers per hour distributed over several bus routes and the O-Train, capacity constraints are not anticipated. 4. INTERSECTION ANALYSIS 4. Existing Traffic Intersection capacity analysis has been completed for the existing traffic condition during the weekday AM and PM peak hours. The analysis is based on the existing roadway and lane configurations within the study area, and traffic signal timing data obtained from the Public Works & Service Department. The signal timings are included in Appendix C. The results of the analysis are summarized in Table 6 for the weekday AM and PM peak hours. Detailed reports are included in Appendix D. Novatech Page

18 Transportation Brief 2785 Riverside Drive Table 6: Existing Peak Hour Intersection Operations AM Peak PM Peak Intersection Max v/c Max v/c LOS Movement or Delay or Delay LOS Movement Brookfield Road / Riverside Drive. E EBL.99 E EBL Brookfield Road / Access 5.5s C SB 4.2s B SB Brookfield Road / Access 2.44 A EB.8 A SB Note: - Signalized Intersection Brookfield Road / Riverside Drive The eastbound left turn movement and northbound through movement are both currently operating at capacity at the Brookfield Road / Riverside Drive intersection during the AM peak hour. The eastbound, westbound and southbound left turn movements are currently operating at a LOS E during the PM peak hour. The queue length associated with the eastbound left turn movement is currently expected to exceed the available storage and block the eastbound through and right turn lanes during both the AM and PM peak hours. Optimizing the existing timing plan and lengthening the cycle to s would somewhat improve operations. Optimizing the existing peak hour signal timing plan is not anticipated to improve the eastbound left turn queuing. It is not anticipated that widening of Hog s Back Road and lengthening the storage lane would be pursued and therefore peak hour delay for eastbound movements is anticipated to remain. Brookfield Road / Accesses & 2 Both accesses to the Canada Post Campus are operating at a good Level of Service C or better during both the AM and PM peak hours. 4.2 Total Traffic Intersection capacity analysis has been completed for the projected total traffic volumes, which are the sum total of the existing traffic and traffic likely to be generated by the future tenants of Building C. The following analysis assumes optimized signal timings at the Riverside Drive / Brookfield Road intersection. The results of the analysis are summarized in Table 7 for the weekday AM and PM peak hours. Detailed reports are included in Appendix D. Novatech Page 2

19 Transportation Brief 2785 Riverside Drive Intersection Table 7: Future Peak Hour Intersection Operations AM Peak PM Peak Max v/c Max v/c LOS Movement LOS Movement or Delay or Delay Brookfield Road / Riverside Drive.99 E EBL.95 E WBL Brookfield Road / Access 22.7 C SB 2.8 C SB Brookfield Road / Access 2.45 A EB.8 A SB Note: - Signalized Intersection Under the total traffic scenario, all movements are expected to continue to operate at an acceptable LOS E or better during both the AM and PM peak periods. The eastbound left turn movement at Riverside Drive and Brookfield Road is expected to continue to block the through and right turn movements, consistent with the existing conditions. All other turn lanes are sufficiently long to accommodate the peak hour traffic demands associated with the proposed development. The eastbound left turn movement on Brookfield Road into the CPC site during the AM peak hour is relatively high at 225vph and 29vph for the existing and future traffic scenarios, respectively. However, the existing traffic on Brookfield Road is relatively low allowing the median lane to operate as a de facto left turn lane for site traffic. All movements along Brookfield Road are expected to continue to operate at a LOS C or better and the eastbound median lane is expected to continue to operate as de facto left turn lane during the AM peak period. 5. PROVISIONS FOR NON-AUTO MODES As previously identified in Section 2., existing sidewalks are provided along Heron Road, Riverside Drive, and Brookfield Road adjacent to the site. Sidewalks are also provided along one side of all internal roadways within the Canada Post site. A new sidewalk is proposed along the west side of the access road between the north end of the proposed parking lot and Brookfield Road. A depressed and continuous concrete sidewalk is provided across the vehicular access to the new parking lot. This new sidewalk will provide a clear and comfortable pedestrian connection between the proposed parking lot and Building C. The pedestrian crossings at the existing all-way stop between Building C and the proposed parking lot will be modified to be consistent with typical all-way stop crossing locations. As outlined in Section 2.4, the site is well connected to the cycling network in the area. Improvements to Brookfield Road to improve the cycling environment were included as part of the OCP as a Phase project. Heron Road forms part of a Cross-Town Bikeway with proposed improvements to the east identified as a Phase project and connections to the west proposed as part of the Baseline Road Transit Intensive Corridor work. Novatech Page

20 Transportation Brief 2785 Riverside Drive As part of the OCP, the Confederation Heights area was also identified as a major employment node and projects were prioritized with the goal of increasing the cycling modal share to these sites. The CPC is well served by transit with access to the O-Train Confederation Station and several local routes. In addition, the future Baseline Transit Intensive Corridor will provide further transit priority to routes travelling along Heron Road. 6. ON-SITE DESIGN 6. Proposed Access Access to the proposed parking lot will be provided through an all movement driveway along the existing private roadway on the west end of the site. The inbound and outbound movements will be separated by a.7m wide dividing median to facilitate the gate-controlled access. The total width of the two-way access is 6.7m with m wide inbound and outbound lanes. All existing private approaches to the CPC site will be maintained without alteration. The location and spacing of the existing access driveways is compliant with the minimum requirements of the City of Ottawa s Private Approach By-law. The internal roadway on the west end of the CPC site will be maintained at the existing width of m which exceeds the typical maximum width of 9m for a private approach. However, this approach operates as a local road through the site and is used by OC Transpo with bus stops in both directions located immediately north of Brookfield Road. 6.2 Parking Building C The existing Building C consists of approximately 9,29m 2 GFA of office space. The subject site is located in Area C of Schedule to the ZBL. Minimum vehicular parking space requirements for the existing development are.8 per m 2 of gross floor area. Maximum vehicular parking space requirements for the existing development located within 6m of a rapid transit station are 2.7 per m 2 of gross floor area. To serve Building C, a minimum of 67 parking spaces and a maximum of 25 parking spaces would be permitted. The proposed parking lot satisfies these requirements with a total of 2 spaces. None of the new parking spaces will be reserved for visitors or persons with disabilities. There are existing spaces reserved for these purposes immediately across from the Building C main entrance in an existing lot. Minimum bicycle parking space requirements are identified in the ZBL as per 25m 2 of gross floor area. Based on the foregoing, the ZBL identifies a minimum requirement of 7 bicycle parking spaces to be provided for Building C. There is an existing bicycle parking rack located at the rear entrance to Building C and a second rack immediately across the street from the main entrance to Building C. Each of these racks may hold approximately bicycles and therefore it is recommended that an additional 7 bicycle parking spaces be provided immediately adjacent to Building C. Novatech Page 4

21 Transportation Brief 2785 Riverside Drive Canada Post Campus The greater Canada Post Campus includes a total of 64,65m 2 of gross floor area (excluding Building C and the recently demolished Building F). There will be a total of 2,82 parking spaces available on-site to serve the remaining buildings. Due to the proximity to rapid transit, the maximum allowable parking for this office land use is,745 spaces; resulting in a surplus of 7 spaces. 7. TRANSPORTATION DEMAND MANAGEMENT The City of Ottawa has developed a comprehensive Transportation Demand Management (TDM) strategy as part of its efforts to reduce automobile dependency. TDM measures can reduce transportation infrastructure requirements by encouraging people to change their travel mode, timing or destination. The Canada Post Campus conforms to the City s TDM initiatives by providing easy access to local pedestrian, cycling and transit systems as outlined above. Parking permits for the site are also limited; encouraging the use of alternate modes of transportation. 8. CONCLUSIONS AND RECOMMENDATIONS Based on the results of the foregoing analysis, the main conclusions and recommendations of this report are as follows: Based on the projected transit trip volumes associated with the proposed development, no capacity problems are anticipated on any of the adjacent transit routes, or at any of the nearby bus stops. All traffic movements within the study area are currently operating at a LOS E or better during the AM and PM peak hours. The eastbound left turn movement at Riverside Drive/ Brookfield Road exceeds the available storage and blocks the through and right turn lanes; the delay may be longer than estimated by Synchro. The addition of site generated traffic volumes is anticipated to slightly increase the traffic demand in the area. Modifications to the existing signal timing plans at Riverside Drive/ Brookfield Road will allow all movements to continue to operate at an acceptable LOS E or better during the AM and PM peak hours. The eastbound left turn movement is expected to continue to queue back and block the through and right turn movements; consistent with the existing operations. The increase in delay at the Brookfield Road/Access intersection attributable to the traffic generated by the proposed parking lot is considered to be marginal compared to the existing delay. No modifications to the existing private approaches for the CPC site are recommended as part of this SPC application. The location and spacing of the existing private approach driveways is compliant with the minimum requirements of the City of Ottawa s Private Approach By-law. The existing roadway width on the western access road exceeds the City s typical maximum width of 9m but accommodates OC Transpo bus stops in both the northbound and southbound directions. Novatech Page 5

22

23 Transportation Brief 2785 Riverside Drive APPENDIX A - SITE PLAN Novatech

24

25 Transportation Brief 2785 Riverside Drive APPENDIX B - OC TRANSPO SYSTEM MAP Novatech

26

27 Transportation Brief 2785 Riverside Drive APPENDIX C - TRAFFIC COUNTS AND SIGNAL TIMING PLANS Novatech

28 Public Works - Traffic Services Turning Movement Count - Full Study Diagram RIVERSIDE BROOKFIELD RD/HOG'S BACK RD Survey Date: Start Time: 6-Jun-4 7: WO#: Device: 27 Jamar Technologies, Inc RIVERSIDE DR Tota Heavy Vehicles Cars BROOKFIELD RD/HOG'S BACK RD : 8: Cars Heavy Vehicles Tota Comments 25-Jun-25 Page of

29 Public Works - Traffic Services Turning Movement Count - Peak Hour Diagram RIVERSIDE BROOKFIELD RD/HOG'S BACK RD Survey Date: 6-Jun-4 WO No: 27 Start Time: 7: Device: Jamar Technologies, Inc Cars RIVERSIDE DR Heavy Vehicles BROOKFIELD RD/HOG'S BACK RD AM Period Peak Hour 7:45 8: Cars Heavy Vehicles Tota Comments

30 Public Works - Traffic Services Turning Movement Count - Peak Hour Diagram RIVERSIDE BROOKFIELD RD/HOG'S BACK RD Survey Date: 6-Jun-4 WO No: 27 Cars RIVERSIDE DR Heavy Vehicles BROOKFIELD RD/HOG'S BACK RD MD Period Peak Hour :45 2: Cars Heavy Vehicles Tota Comments

31 Public Works - Traffic Services Turning Movement Count - Peak Hour Diagram RIVERSIDE BROOKFIELD RD/HOG'S BACK RD Survey Date: 6-Jun-4 WO No: 27 Cars RIVERSIDE DR Heavy Vehicles BROOKFIELD RD/HOG'S BACK RD PM Period Peak Hour 6:5 7: Cars Heavy Vehicles Tota Comments 25-Jun-25 Page of

32 Public Works - Traffic Services Turning Movement Count - Full Study Summary Report RIVERSIDE BROOKFIELD RD/HOG'S BACK RD Work Order 27 Survey Date: 7: Period LT 6-Jun-4 Northbound ST RIVERSIDE DR RT NB TOT Southbound 8: LT ST RT Northbound: Eastbound: SB TOT STR TOT 295 Total Observed U-Turns Full Study Southbound: Westbound: BROOKFIELD RD/HOG'S BACK RD Eastbound LT ST 74 RT 8 EB TOT LT 5 Westbound ST 52 RT AADT Factor.8 WB TO 4 STR TOT 67 Grand Total 66 8: 9: : : : 2: : : : 6: : 7: : 8: Total Equ 2Hr Note: These values are calculated by multiplying the totals by the appropriate expansion factor..9 Avg 2Hr Note: These volumes are calculated by multiplying the Equivalent 2 hr. totals by the AADT factor..8 Avg 24Hr Note: These volumes are calculated by multiplying the Average Daily 2 hr. totals by 2 to 24 expansion factor.. Comments: Note: U-Turns are included in Totals. 25-Jun-25 Page of

33 N TOT LT Grand Total W.O. 222 STR TOT W TOT RT ST Westbound LT Southbound: Westbound: E TOT Page of RT Comment: 29 ST BROOKFIELD RD/HOG'S BACK RD Eastbound LT Total Observed U-Turns Northbound: Eastbound: STR TOT S TOT RT Public Works - Traffic Services Turning Movement Count - 5 Minute Summary Report 9278 Southbound 565 ST RT Jun-4 ST RIVERSIDE DR Northbound LT : 6:5 6: 6:45 7: 7:5 : :5 : 5:5 5: 5:45 : :45 2: 2:5 2: 2:45 8: 8:45 9: 9:5 9: 9:45 25-Jun-25 TOTAL: RIVERSIDE BROOKFIELD RD/HOG'S BACK RD Survey Date: 7:5 7: 7:45 8: 8:5 7:5 7: 7:45 Note: U-Turns are included in Totals. 7: 7:45 8: 47 5:45 6: 6:5 6: 6:45 7: 2:45 : :5 5: 5:5 5: 9:45 : :45 2: 2:5 2: 8:5 8: 8:45 9: 9:5 9: Time Period 7: 7:5 7: 7:45 8:

34 Public Works - Traffic Services Work Order 27 Turning Movement Count - Pedestrian Volume Report Count Date: 6-Jun-4 RIVERSIDE BROOKFIELD RD/HOG'S BACK RD Start Time: 7: Time Period NB Approach (E or W Crossing) SB Approach (E or W Crossing) Total EB Approach (N or S Crossing) WB Approach (N or S Crossing) Total Grand Total 7: 7:5 7: 7:45 7: 8: 8:5 8: 8:45 8: 9: 9:5 9: 9:45 9: : :45 2: 2:5 : 2: 2:45 : :5 2: 5: 5:5 5: 5:45 5: 7: 7:5 7: 7:45 7: Total 7:5 7: 2 7:45 8: 8: 4 5 8:5 8: 2 2 8: : 4 9: 7 4 9: : 2 2 9:45 : : :45 2: : : 2 2 2: :45 2 : 4 4 :5 : : :5 5: 2 2 5:45 6: 2 6: 6: 6:5 6:5 6: : 6: :45 7: 6: 7: : : 7:45 8: 2 2 8: Comment: 25-Jun-25 Page of

35 Public Works - Traffic Services Turning Movement Count - Heavy Vehicle Report RIVERSIDE BROOKFIELD RD/HOG'S BACK RD W.O. 27 Survey Date: 6-Jun-4 RIVERSIDE DR BROOKFIELD RD/HOG'S BACK RD Time Period Northbound LT ST RT N TOT Southbound LT ST RT S TOT STR TOT Eastbound Westbound E LT ST RT LT ST TOT RT W TOT STR TOT Grand Total 7: 8: : 9: : : : 2: : : : 6: : 7: : 8: Total : Heavy Vehicles are vehicles having one rear axle with four or more wheels, or having two or more rear axles. These vehicles include most O.C. Transpo, school and inter-city buses. Further, they ARE included in the Turning Movement Count Summary Printed on: 25-Jun-25 Page of

36 Public Works - Traffic Services Turning Movement Count - Cyclist Volume Report Work Order 27 RIVERSIDE BROOKFIELD RD/HOG'S BACK RD Count Date: 6-Jun-4 Start Time: 7: RIVERSIDE DR BROOKFIELD RD/HOG'S BACK RD Time Period 7: 8: 9: Northbound Southbound Street Total Eastbound Westbound 8: : : 2 2 : 2: 2: : : 6: 2 2 6: 7: : Total 8: Comment: Street Total Grand Total Note: These volumes consists of bicycles only (no mopeds or motorcycles) and ARE NOT included in the Turning Movement Count Summary. 25-Jun-25 Page of

37 24 Michael Cowpland Drive, Suite 2 Kanata ON, K2M P6 Weather: Overcast Serial Number: T2-6 Collected By: Harry Hu Notes: File Name : Brookfield&West Access Site Code : 492 Start Date : 9/7/25 Page No : *** BREAK *** Groups Printed- Passenger Vehicles - Light Trucks - Heavy Trucks Canada Post Southbound Brookfield Road Westbound Brookfield Road Eastbound Start Time Right Left Peds App. Total Right Thru Peds App. Total Thru Left Peds App. Total Int. Total 7: AM :5 AM : AM :45 AM Total : AM :5 AM : AM :45 AM Total : AM :5 AM : AM :45 AM Total : AM :45 AM Total : PM :5 PM : PM :45 PM Total *** BREAK *** :5 PM *** BREAK *** Total *** BREAK *** : PM :5 PM : PM :45 PM Total : PM :5 PM : PM :45 PM Total

38 24 Michael Cowpland Drive, Suite 2 Kanata ON, K2M P6 Weather: Overcast Serial Number: T2-6 Collected By: Harry Hu Notes: File Name : Brookfield&West Access Site Code : 492 Start Date : 9/7/25 Page No : 2 Groups Printed- Passenger Vehicles - Light Trucks - Heavy Trucks Canada Post Southbound Brookfield Road Westbound Brookfield Road Eastbound Start Time Right Left Peds App. Total Right Thru Peds App. Total Thru Left Peds App. Total Int. Total 5: PM :5 PM : PM :45 PM Total Grand Total Apprch % Total % Passenger Vehicles % Passenger Vehicles Light Trucks % Light Trucks Heavy Trucks % Heavy Trucks

39 24 Michael Cowpland Drive, Suite 2 Kanata ON, K2M P6 Weather: Overcast Serial Number: T2-6 Collected By: Harry Hu Notes: File Name : Brookfield&West Access Site Code : 492 Start Date : 9/7/25 Page No : Canada Post Out In Total Right Left Peds Brookfield Road Out In Total Left Thru Peds North 9/7/25 7: AM 9/7/25 5:45 PM Passenger Vehicles Light Trucks Heavy Trucks Right Thru Peds Out In Total Brookfield Road

40 24 Michael Cowpland Drive, Suite 2 Kanata ON, K2M P6 Weather: Overcast Serial Number: T2-6 Collected By: Harry Hu Notes: File Name : Brookfield&West Access Site Code : 492 Start Date : 9/7/25 Page No : 4 Canada Post Southbound Brookfield Road Westbound Brookfield Road Eastbound Start Time Right Left Peds App. Total Right Thru Peds App. Total Thru Left Peds App. Total Int. Total Peak Hour Analysis From 7: AM to 9:45 AM - Peak of Peak Hour for Entire Intersection Begins at 7:45 AM 7:45 AM : AM :5 AM : AM Total Volume % App. Total PHF Canada Post Out In Total Right 2 Left 7 Peds Peak Hour Data Brookfield Road Out In Total Left Thru Peds North Peak Hour Begins at 7:45 AM Passenger Vehicles Light Trucks Heavy Trucks 5 2 Right Thru Peds Out In Total Brookfield Road

41 24 Michael Cowpland Drive, Suite 2 Kanata ON, K2M P6 Weather: Overcast Serial Number: T2-6 Collected By: Harry Hu Notes: File Name : Brookfield&West Access Site Code : 492 Start Date : 9/7/25 Page No : 5 Canada Post Southbound Brookfield Road Westbound Brookfield Road Eastbound Start Time Right Left Peds App. Total Right Thru Peds App. Total Thru Left Peds App. Total Int. Total Peak Hour Analysis From : AM to :45 PM - Peak of Peak Hour for Entire Intersection Begins at :45 AM :45 AM : PM :5 PM : PM Total Volume % App. Total PHF Canada Post Out In Total Right 9 Left Peds Peak Hour Data Brookfield Road Out In Total Left Thru Peds North Peak Hour Begins at :45 AM Passenger Vehicles Light Trucks Heavy Trucks 24 2 Right Thru Peds Out In Total Brookfield Road

42 24 Michael Cowpland Drive, Suite 2 Kanata ON, K2M P6 Weather: Overcast Serial Number: T2-6 Collected By: Harry Hu Notes: File Name : Brookfield&West Access Site Code : 492 Start Date : 9/7/25 Page No : 6 Canada Post Southbound Brookfield Road Westbound Brookfield Road Eastbound Start Time Right Left Peds App. Total Right Thru Peds App. Total Thru Left Peds App. Total Int. Total Peak Hour Analysis From 2: PM to 5:45 PM - Peak of Peak Hour for Entire Intersection Begins at 4: PM 4: PM :5 PM : PM :45 PM Total Volume % App. Total PHF Canada Post Out In Total Right Left 5 Peds Peak Hour Data Brookfield Road Out In Total Left Thru Peds North Peak Hour Begins at 4: PM Passenger Vehicles Light Trucks Heavy Trucks 5 Right Thru Peds Out In Total 8 48 Brookfield Road

43 24 Michael Cowpland Drive, Suite 2 Kanata ON, K2M P6 Weather: Overcast Serial Number: T2-62 Collected By: Mako Cekic Notes: File Name : Brookfield&East Access Site Code : 49 Start Date : 9/7/25 Page No : *** BREAK *** Groups Printed- Passenger Vehicles - Light Trucks - Heavy Trucks Canada Post Southbound Brookfield Road Westbound Brookfield Road Eastbound Start Time Right Left Peds App. Total Right Thru Peds App. Total Thru Left Peds App. Total Int. Total 7: AM :5 AM : AM :45 AM Total : AM :5 AM : AM :45 AM Total : AM :5 AM : AM :45 AM Total : AM :45 AM Total : PM :5 PM : PM :45 PM Total : PM :5 PM *** BREAK *** Total *** BREAK *** : PM :5 PM : PM :45 PM Total : PM :5 PM : PM :45 PM Total

44 24 Michael Cowpland Drive, Suite 2 Kanata ON, K2M P6 Weather: Overcast Serial Number: T2-62 Collected By: Mako Cekic Notes: File Name : Brookfield&East Access Site Code : 49 Start Date : 9/7/25 Page No : 2 Groups Printed- Passenger Vehicles - Light Trucks - Heavy Trucks Canada Post Southbound Brookfield Road Westbound Brookfield Road Eastbound Start Time Right Left Peds App. Total Right Thru Peds App. Total Thru Left Peds App. Total Int. Total 5: PM :5 PM : PM :45 PM Total Grand Total Apprch % Total % Passenger Vehicles % Passenger Vehicles Light Trucks % Light Trucks Heavy Trucks 2 % Heavy Trucks.5.2.2

45 24 Michael Cowpland Drive, Suite 2 Kanata ON, K2M P6 Weather: Overcast Serial Number: T2-62 Collected By: Mako Cekic Notes: File Name : Brookfield&East Access Site Code : 49 Start Date : 9/7/25 Page No : Canada Post Out In Total Right Left Peds Brookfield Road Out In Total Left Thru Peds North 9/7/25 7: AM 9/7/25 5:45 PM Passenger Vehicles Light Trucks Heavy Trucks Right Thru Peds 4 4 Out In Total Brookfield Road

46 24 Michael Cowpland Drive, Suite 2 Kanata ON, K2M P6 Weather: Overcast Serial Number: T2-62 Collected By: Mako Cekic Notes: File Name : Brookfield&East Access Site Code : 49 Start Date : 9/7/25 Page No : 4 Canada Post Southbound Brookfield Road Westbound Brookfield Road Eastbound Start Time Right Left Peds App. Total Right Thru Peds App. Total Thru Left Peds App. Total Int. Total Peak Hour Analysis From 7: AM to 9:45 AM - Peak of Peak Hour for Entire Intersection Begins at 7:5 AM 7:5 AM : AM :45 AM : AM Total Volume % App. Total PHF Canada Post Out In Total Right 7 Left Peds Peak Hour Data Brookfield Road Out In Total Left Thru Peds North Peak Hour Begins at 7:5 AM Passenger Vehicles Light Trucks Heavy Trucks 54 Right Thru Peds Out In Total Brookfield Road

47 24 Michael Cowpland Drive, Suite 2 Kanata ON, K2M P6 Weather: Overcast Serial Number: T2-62 Collected By: Mako Cekic Notes: File Name : Brookfield&East Access Site Code : 49 Start Date : 9/7/25 Page No : 5 Canada Post Southbound Brookfield Road Westbound Brookfield Road Eastbound Start Time Right Left Peds App. Total Right Thru Peds App. Total Thru Left Peds App. Total Int. Total Peak Hour Analysis From : AM to :45 PM - Peak of Peak Hour for Entire Intersection Begins at :45 AM :45 AM : PM :5 PM : PM Total Volume % App. Total PHF Canada Post Out In Total Right 47 Left Peds Peak Hour Data Brookfield Road Out In Total Left Thru Peds North Peak Hour Begins at :45 AM Passenger Vehicles Light Trucks Heavy Trucks Right Thru Peds Out In Total Brookfield Road

CPC Parking Lot Riverside Drive. Transportation Rationale

CPC Parking Lot Riverside Drive. Transportation Rationale CPC Parking Lot Transportation Rationale Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 September 2015 Novatech File: 114093 Ref: R-2015-153 Table of Contents 1.0 INTRODUCTION...

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd. 9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major

More information

December 15, City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor Ottawa, ON K1P 1J1

December 15, City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor Ottawa, ON K1P 1J1 December 15, 2017 City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor Ottawa, ON K1P 1J1 Attention: Mr. Wally Dubyk, C.E.T. Project Manager, Infrastructure Approvals Dear

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Quickie Convenience Stores Larny Holdings Ltd. c/o PBC Group April 15, 2015 115-615 Report_1.doc D. J. Halpenny

More information

St. Stefan Serbian Orthodox Church 1989 and 1993 Prince of Wales Drive, Ottawa REVISED TRANSPORTATION BRIEF

St. Stefan Serbian Orthodox Church 1989 and 1993 Prince of Wales Drive, Ottawa REVISED TRANSPORTATION BRIEF St. Stefan Serbian Orthodox Church 1989 and 1993 Prince of Wales Drive, Ottawa REVISED TRANSPORTATION BRIEF Prepared By: NOVATECH ENGINEERING CONSULTANTS LTD. Suite 200, 240 Michael Cowpland Drive Ottawa,

More information

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Momentum Planning & Communications 1165 Greenlawn Crescent Ottawa, ON K1L 6C2 June 29, 2015 115-618 Brief_1.doc

More information

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates

More information

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

350 SPARKS STREET, OTTAWA HOTEL AND RESIDENTIAL DEVELOPMENT. Transportation Study. Prepared For: Morguard Real Estate Investment Trust.

350 SPARKS STREET, OTTAWA HOTEL AND RESIDENTIAL DEVELOPMENT. Transportation Study. Prepared For: Morguard Real Estate Investment Trust. SPARKS STREET, OTTAWA HOTEL AND RESIDENTIAL DEVELOPMENT Transportation Study Prepared For: Morguard Real Estate Investment Trust June, BA Consulting Group Ltd. St. Clair Avenue West, Suite Toronto, ON

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

19 July 2016 OUR REF:

19 July 2016 OUR REF: 19 July 2016 OUR REF: 602263-01000 194168 Ontario Ltd. 320 McRae Street Ottawa, ON K1Z 5R8 Attention: Brian Casagrande Dear Brian: Re: 320 McRae/1976 Scott Redevelopment CTS Addendum #1 This Addendum has

More information

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: 1649362 Ontario Inc. c/o Manor Park Management 231 Brittany Drive, Suite D Ottawa ON K1K 0R8 July

More information

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for: HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October

More information

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc

More information

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 February 27, 2014 113-584 Overview_1.doc D. J. Halpenny

More information

485 Ancaster Avenue. Transportation Impact Assessment. Engineering. Planning. Landscape Architecture

485 Ancaster Avenue. Transportation Impact Assessment. Engineering. Planning. Landscape Architecture Engineering Land / Site Development Municipal Infrastructure Environmental / Water Resources Traffic / Transportation Structural Recreational 485 Ancaster Avenue Transportation Impact Assessment Planning

More information

CastleGlenn Consultants Inc.

CastleGlenn Consultants Inc. February 1 st, 2010 CastleGlenn Consultants Inc. Engineers, Project Managers & Planners Mr. Kevin Yemm Planning and Land Development Richraft Ltd. 2280 St. Laurent Boulevard Suite 201 Ottawa, Ontario (Tel:

More information

M E M O R A N D U M M:\2017\117036\DATA\CORRESPONDENCE\MEMOS\ WINDSORPARKSURVEY.DOCX

M E M O R A N D U M M:\2017\117036\DATA\CORRESPONDENCE\MEMOS\ WINDSORPARKSURVEY.DOCX M E M O R A N D U M DATE: NOVEMBER 24, 217 TO: FROM: RE: CC: WALLY DUBYK, CITY OF OTTAWA JENNIFER LUONG 126-4 HUNT CLUB ROAD RETIREMENT RESIDENCE TRIP GENERATION NEIL MALHOTRA, JIM BURGHOUT (CLARIDGE HOMES)

More information

Having held a public hearing, that Council approve:

Having held a public hearing, that Council approve: 3. MODIFICATIONS TO MERIVALE ROAD FROM FALLOWFIELD ROAD TO OLD HIGHWAY 16 TO ACCOMMODATE THE GROWTH WITHIN THE SOUTH MERIVALE BUSINESS PARK - PUBLIC HEARING COMMITTEE RECOMMENDATIONS Having held a public

More information

BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: Ontario Limited.

BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: Ontario Limited. BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: 2534189 Ontario Limited April 6, 2018 117-668 TIA Report_2.doc D. J. Halpenny & Associates

More information

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged. Stantec Consulting Ltd. 1331 Clyde Avenue, Suite 4 Ottawa ON K2C 3G4 Tel: (613) 722-442 Fax: (613) 722-2799 May 14, 213 File: 1638823 Robinson Park Development Corp. 5699 Power Road Ottawa, ON, K1G 3N4

More information

192 & 196 Bronson Avenue / 31 Cambridge Street

192 & 196 Bronson Avenue / 31 Cambridge Street Bronson Inc. July 213 192 & 196 Bronson Avenue / 31 Cambridge Street TRANSPORTATION BRIEF Prepared by: Study 192 Bronson Type Avenue July 213 Study Transportation Name Brief February 211 TB Check List

More information

APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS

APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS MEMO : Peter Steacy, P.Eng. Date: December 3, 2014 : Ian Borsuk, P.Eng. Job No.: 3414015-000 Subject: City of Ottawa O-Train Extension Planning & EA Study

More information

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: First Bay Properties Inc. 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 August 8, 2017 117-663 Brief_1.doc

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited 2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief Paradigm Transportation Solutions Limited March 217 March 217 Project: 1627 Diana Vlasic, M.C.I.P., R.P.P Metropolitan Consulting 445 Paletta

More information

Parking Lot P6C Transportation Impact Assessment

Parking Lot P6C Transportation Impact Assessment Transportation Carleton University Parking Lot P6C Transportation Impact Assessment Prepared by: AECOM 302 1150 Morrison Drive 613 820 8282 tel Ottawa, ON, Canada K2H 8S9 613 820 8338 fax www.aecom.com

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

December TRANSPORTATION BRIEF 1-19 Beechwood Avenue, Ottawa, ON TRANSPORTATION INFORMATION TE WATER

December TRANSPORTATION BRIEF 1-19 Beechwood Avenue, Ottawa, ON TRANSPORTATION INFORMATION TE WATER December 2012 TRANSPORTATION BRIEF 1-19 Beechwood Avenue, Ottawa, ON TRANSPORTATION INFORMATION TE WATER 1-19 Beechwood Avenue Mixed Use Development Transportation Brief prepared for: Minto Communities

More information

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 151714A Table of Contents Table of Contents I. INTRODUCTION... 2 II. EXISTING CONDITIONS... 5 III. 215 EXISTING TRAFFIC CONDITIONS... 6

More information

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY DECEMBER 2012 READ, VOORHEES & ASSOCIATES TORONTO, ONTARIO Read, Voorhees & Associates

More information

List of Exhibits...ii

List of Exhibits...ii One Brickell Traffic Study TABLE OF CONTENTS List of Exhibits...ii EXECUTIVE SUMMARY...1 1. INTRODUCTION...2 1.1 Study Area...2 1.2 Study Objective...5 2. EXISTING TRAFFIC CONDITIONS...6 2.1 Data Collection...6

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012 Update for the May 31 st, 2012 Traffic Impact Study Prepared for Broccolini Construction 111-23596-00 September 20 th, 2012 2611 Queensview Drive, Suite 300, Ottawa, Ontario CANADA K2B 8K2 Telephone: 613-829-2800

More information

Marina Loft (DRC 51-R-12)

Marina Loft (DRC 51-R-12) Marina Loft (DRC 51-R-12) traffic study prepared for: Cymbal Development OCtober 2012 Traf Tech October 1, 2012 Mr. Asi Cymbal - President Cymbal Development 3470 North Miami Avenue Upper Suite Miami,

More information

Proposed Residential Building Bank at Fifth (99 Fifth Avenue)

Proposed Residential Building Bank at Fifth (99 Fifth Avenue) Transportation Impact Assessment Second Submission Proposed Residential Building Bank at Fifth (99 Fifth Avenue) Prepared for Minto Communities Canada by IBI Group May 8, 2018 IBI GROUP TRANSPORTATION

More information

TRANSPORTATION IMPACT STUDY

TRANSPORTATION IMPACT STUDY Dundas MEP Developments Inc. City of Toronto 219 and 231 Dundas Street East, Proposed Mixed-Use Development TRANSPORTATION IMPACT STUDY 9782/2 April 216 LEA Consulting Ltd. Consulting Engineers & Planners

More information

Chapter 2 Current and Future Conditions

Chapter 2 Current and Future Conditions Chapter 2 Current and Future Conditions 2.1 An Overview of Ottawa s Transportation System The City of Ottawa is home to about 870,700 people. The city covers an area of 2,760 square kilometres of which

More information

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for: NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony

More information

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for oad & Traffic Management Road & Traffic Management R Atlantic Traffic Engineering Specialists Draft Report Traffic Impact Study Superstore, Wal-Mart, and Kent Development Yarmouth, Nova Scotia Prepared

More information

Waterford Lakes Small Area Study

Waterford Lakes Small Area Study Waterford Lakes Small Area Study Existing Traffic Conditions PREPARED FOR: ORANGE COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION ORLANDO, FLORIDA PREPARED WITH: INWOOD CONSULTING ENGINEERS

More information

1223 Michael Street, Suite 100, Ottawa, Ontario, K1J 7T2 P: l F: l

1223 Michael Street, Suite 100, Ottawa, Ontario, K1J 7T2 P: l F: l 1223 Michael Street, Suite 100, Ottawa, Ontario, K1J 7T2 P: +1 613.738.4160 l F: +1 613.739.7105 l www.parsons.com City of Ottawa 2017 TIA Guidelines Date July 3, 2018 TIA Screening Form Project 116 York

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

May 5, 2009 File:

May 5, 2009 File: MMM Group Limited Suite 600 1455 West Georgia Street Vancouver, BC V6G 2T3 t: 604-685-9381 f: 604-683-8655 www.mmm.ca May 5, 2009 File: 50-09001-007 1420 1055 West Hastings Street Vancouver, BC V6E 2E9

More information

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc. Magnolia Place Traffic Impact Analysis Prepared for: City of San Mateo Prepared by: Hexagon Transportation Consultants, Inc. Updated January 4, 2010 Table of Contents 1. Introduction...1 2. Existing Conditions...6

More information

Classification Criteria

Classification Criteria SCHEDULE D TO RECOMMENDED OFFICIAL PLAN AMENDMENT NO. 40 SCHEDULE C-4 Road Criteria Criteria Traffic Service Objective Land Service/Access Typical Daily Traffic Volume Flow characteristics Travel Speed

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study

More information

REDEVELOPMENT TRAFFIC IMPACT STUDY

REDEVELOPMENT TRAFFIC IMPACT STUDY REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport

More information

Kanata North Catholic Elementary School

Kanata North Catholic Elementary School December 216 Kanata North Catholic Elementary School Transportation Brief SITE Potential Future Development Trillium Woods Prepared for: Bryden Martel Architects Inc Prepared by: KANATA NORTH CATHOLIC

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

COMMITTEE RECOMMENDATIONS. That Council approve:

COMMITTEE RECOMMENDATIONS. That Council approve: 4. MODIFICATIONS TO INNES ROAD (REGIONAL ROAD 30) AND TENTH LINE ROAD (REGIONAL ROAD 47) TO ACCOMMODATE THE DEVELOPMENT OF THE TRINITY COMMONS SHOPPING CENTRE COMMITTEE RECOMMENDATIONS That Council approve:

More information

Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9.

Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9. Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9 Prepared By: URS Canada Inc. 4 th Floor, 30 Leek Crescent Richmond Hill, Ontario L4B

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

Traffic Study North Shore School District 112

Traffic Study North Shore School District 112 Traffic Study North Shore School District 112 Proposed Expansion of Northwood Junior High School Prepared By: May 1, 2015 1. Introduction Kenig, Lindgren, O Hara, Aboona, Inc. (KLOA, Inc.) has been retained

More information

2. Executing a legal agreement with respect to (1) above.

2. Executing a legal agreement with respect to (1) above. 3. INSTALLATION OF TRAFFIC CONTROL SIGNALS AT HUNT CLUB AND PAUL ANKA TO ACCOMMODATE THE DEVELOPMENT OF A GAS BAR, CONVENIENCE STORE AND CAR WASH COMMITTEE RECOMMENDATIONS That Council approve the installation

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing

More information

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY Prepared for: City of Thornton And Colorado Department of Transportation Prepared by: 11 Blake Street, Suite 2 Denver, Colorado 822 Contact: Brian Bern, PE, PTOE

More information

Bank Street Retail/Hotel Development

Bank Street Retail/Hotel Development M a y 214 89-9 Bank Street Retail/Hotel Development Transportation Brief Google 214 Bing 214 Prepared for: Prepared by: Study 89-9 Type Bank Street May 214 Study Retail/Hotel Name Development February

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: Orleans Gardens Shopping Centre Inc. 2851 John Street, Suite 1 Markham, ON K3R 5R7

More information

3.2.2 Proposed Road Network within Phase 1B Lands

3.2.2 Proposed Road Network within Phase 1B Lands 3.2.2 Proposed Road Network within Phase 1B Lands Figure 3.1 also shows the proposed road network within the Premier Gateway Phase 1B Employment Area lands, which features two collector roads providing

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY TRAFFIC IMPACT STUDY for the GLEN ELLEN COUNTRY CLUB SENIOR RESIDENTIAL REDEVELOPMENT 84 Millis, Massachusetts Prepared by: McMahon Associates, Inc. Prepared for: Toll Brothers, Inc. August 216 DRAFT

More information

Transportation Impact Study Guidelines AS ADOPTED BY REGION OF WATERLOO COUNCIL SEPTEMBER 18, 2013 REPORT NO. P

Transportation Impact Study Guidelines AS ADOPTED BY REGION OF WATERLOO COUNCIL SEPTEMBER 18, 2013 REPORT NO. P Transportation Impact Study Guidelines AS ADOPTED BY REGION OF WATERLOO COUNCIL SEPTEMBER 18, 2013 REPORT NO. P-13-088 HOUSEKEEPING EDITS APPLIED UPDATED TO FILE VERSION 4, JULY 22, 2014 TABLE OF CONTENTS

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

Low Level Road Improvements Traffic Analysis. Report

Low Level Road Improvements Traffic Analysis. Report Low Level Road Improvements Traffic Analysis Report June, 22 Table of Contents. INTRODUCTION.... LOW LEVEL ROAD PROJECT....2 STUDY AREA....2. West-End Corridor Improvements... 2.2.2 East-End Corridor Improvements...

More information

EXECUTIVE SUMMARY. Page 1 of 6

EXECUTIVE SUMMARY. Page 1 of 6 EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the

More information

b. executing legal agreements with respect to the above.

b. executing legal agreements with respect to the above. 4. MODIFICATIONS TO RIVERSIDE DRIVE BETWEEN UPLANDS DRIVE AND KIMBERWICK CRESCENT TO ACCOMMODATE COGNOS EXPANSION COMMITTEE RECOMMENDATION Having held a public hearing, that Council approve the construction

More information

Multnomah County Courthouse Relocation. Transportation Alternatives Analysis Technical Memorandum: FINAL

Multnomah County Courthouse Relocation. Transportation Alternatives Analysis Technical Memorandum: FINAL Multnomah County Courthouse Relocation Portland, Oregon Transportation Alternatives Analysis Technical Memorandum: FIL Prepared for Multnomah County Facilities and Property Management Division 41 N Dixon

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

RÉGION D OTTAWA-CARLETON

RÉGION D OTTAWA-CARLETON 8 REGION OF OTTAWA-CARLETON RÉGION D OTTAWA-CARLETON REPORT RAPPORT Our File/N/Réf. Your File/V/Réf. 50 23-00-R030-H DATE 14 July 2000 TO/DEST. FROM/EXP. SUBJECT/OBJET Co-ordinator Transportation Committee

More information

TRAFFIC STUDY GUIDELINES Clarksville Street Department

TRAFFIC STUDY GUIDELINES Clarksville Street Department TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two

More information

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS...

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... IX 1 INTRODUCTION... 1 1.1 Project Overview... 1 1.2 Analysis Scenarios...

More information

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Aaron Elias, Bill Cisco Abstract As part of evaluating the feasibility of a road diet on Orange Grove Boulevard in Pasadena,

More information

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM July 2014 FINAL (SR 43) Project Development and Environment Study From State Road 60 (Adamo Drive) to I-4 (SR 400) Hillsborough County, Florida Work Program Item

More information

2. executing a legal agreement with respect to the above.

2. executing a legal agreement with respect to the above. 2. MODIFICATIONS TO INNES ROAD AND BLAIR ROAD INTERSECTION TO ACCOMMODATE THE CONSTRUCTION OF THE INNES CENTRE - PUBLIC HEARING COMMITTEE RECOMMENDATION Having held a public hearing, that Council approve

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

Corporation of the Town of Oakville. December 16, 2013

Corporation of the Town of Oakville. December 16, 2013 Corporation of the Town of Oakville Transportation Impact Analysis and Parking Study for Proposed Secondary School, Oakville Draft Final Report Submitted by: HDR Corporation 100 York Boulevard, Suite 300

More information

SECTION 1 - TRAFFIC PLANNING

SECTION 1 - TRAFFIC PLANNING SECTION 1 - TRAFFIC PLANNING 1.1 TRAFFIC OPERATIONS 1.1.1 Roadway Functional Classification The Multnomah County Comprehensive Framework Plan s Policy 34: Trafficways and the Functional Classification

More information

RE: 100 VARLEY LANE TRANSPORTATION OVERVIEW

RE: 100 VARLEY LANE TRANSPORTATION OVERVIEW IBI Group 400 333 Preston Stret Ottawa ON K1S 5N4 Canada tel 613 225 1311 fax 613 225 9868 April 28, 2014 Mr. Ed Blaszynski Project Manager Infrastructure Approvals Development Review Urban Services Branch

More information

Donahue Drive Corridor Traffic Operational Evaluation

Donahue Drive Corridor Traffic Operational Evaluation Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748 City of Barrie Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report Project Number: JDE 1748 Date Submitted: June 12 th, 2017 06/12/17 John Northcote, P.Eng. Professional License

More information

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study To: Ms. Susan C. Ryan Spaulding Youth Center 72 Spaulding Road Northfield, NH 03276 Date: September 7, 2017 Project #: 52455.00 From: Robin Bousa Director of Transportation Systems Re: Spaulding Youth

More information

Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) Final Report

Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) Final Report Consultant Services for Updating Intersections Operations to Accommodate Bi-Directional Cycle Tracks Harbord Street and Hoskin Avenue (Queens Park Crescent to Ossington Avenue) January 30, 2014 Consultant

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

6060 North Central Expressway Mixed-Use Site Dallas, Texas

6060 North Central Expressway Mixed-Use Site Dallas, Texas Volume 1 Traffic Impact Analysis 6060 North Central Expressway Mixed-Use Site Dallas, Texas April 30, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #063238300 Registered Firm F-928 Traffic

More information

December 4, Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA Attn: Kathy Marshall. Dear Board Members:

December 4, Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA Attn: Kathy Marshall. Dear Board Members: December 4, 28 Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA 86 Attn: Kathy Marshall RE: RAMSHEAD MERRIMAC, MA Dear Board Members: Bayside Engineering, Inc. has received the MDM Transportation

More information

South Street Campus Lands Development. City of London TRANSPORTATION IMPACT ASSESSMENT

South Street Campus Lands Development. City of London TRANSPORTATION IMPACT ASSESSMENT South Street Campus Lands Development City of London TRANSPORTATION IMPACT ASSESSMENT TW1387 South Street Campus Lands Development City of London TRANSPORTATION IMPACT ASSESSMENT May 2013 South Street

More information

Figure 1: Vicinity Map of the Study Area

Figure 1: Vicinity Map of the Study Area ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove

More information