OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

Size: px
Start display at page:

Download "OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc."

Transcription

1 OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Canada Inc. December 15, Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers P.O. Box 774, Manotick, ON K4M 1A7 - Tel (613) Fax (613)

2 TABLE OF CONTENTS PAGE 1. INTRODUCTION Scope of Work EXISTING ROADWAY NETWORK PROPOSED DEVELOPMENT Trip Generation Trip Distribution TRANSPORTATION IMPACT Background Traffic Volumes Total Traffic Volumes Traffic Analysis Site Circulation Transportation Demand Management (TDM) FINDINGS AND RECOMMENDATIONS APPENDIX LIST OF FIGURES 1.1 SITE LOCATION PLAN EXISTING WEEKDAY PEAK AM AND PM HOUR TRAFFIC COUNTS CONCEPTUAL SITE PLAN WEEKDAY PEAK AM AND PM HOUR SITE GENERATED TRIPS YEAR 2017 WEEKDAY PEAK AM AND PM HOUR BACKGROUND TRAFFIC YEAR 2022 WEEKDAY PEAK AM AND PM HOUR BACKGROUND TRAFFIC YEAR 2017 WEEKDAY PEAK AM AND PM HOUR TOTAL TRAFFIC YEAR 2022 WEEKDAY PEAK AM AND PM HOUR TOTAL TRAFFIC LIST OF TABLES 3.1 SITE INVENTORY TRIP GENERATION RATES PEAK HOUR SITE TRIPS GENERATED ANOKA/BANK - LoS & Delay BANK/HERON - LoS & Volume to Capacity (v/c)... 16

3 OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF 1. INTRODUCTION The owners of land at 1625/1629 Bank Street have prepared a Site Plan for the development of a 1,702 m 2 parcel of land. The land is located on the southeast corner of the intersection of Bank Street and Anoka Street and has a municipal address of 1625 Bank Street. The development will consist of a two storey building which would have the first floor dedicated as retail space and the second floor as office space. The site will have one access onto Anoka Street which accesses the surface parking which provides 20 spaces. The development is expected to be completed and substantially occupied by late 2016 or The location of the site is shown in Figure 1.1. The owner of the property has retained the firm of D. J. Halpenny & Associates Ltd. to prepare a traffic study report in support of the Site Plan Application for the land. The study will determine the expected volume of site generated trips during the weekday peak AM and PM hours, and examine the impact of the site trips on the adjacent roads at the completion of the development. The study will determine the operation of the intersections in close proximity to the site, and recommend roadway modifications if required due to the development of the site. 1.1 Scope of Work The scope of the traffic study is to examine the operation of the site access with respect to its proximity to the intersection of Anoka Street and Bank Street, and the operation of adjacent intersections which may be impacted by the traffic generated by the development. The number of new site generated trips and gross floor area of the proposed office/retail building would not trigger the requirement of a Transportation Assessment Study as documented in the City of Ottawa Transportation Impact Assessment Guidelines, As part of the Site Plan Application, City of Ottawa staff has requested that a report be prepared in support of the submission. The report will address the operation of the site access onto Anoka Street, the intersection of Anoka Street and Bank Street, and intersection of Bank Street and Heron Road. The traffic analysis will be completed for the existing traffic counts taken in 2014 and 2015, traffic at the year 2017 when the development is expected to be completed, and at the year 2022 which represents five years beyond completion of the development. The time period for the study was taken as the weekday peak AM and PM hours of the adjacent streets which is when both the trips to/from the office and retail building and the background traffic volumes on the adjacent streets would be the highest.

4 2 FIGURE 1.1 SITE LOCATION PLAN

5 3 2. EXISTING ROADWAY NETWORK The site is located along the east side of Bank Street approximately 85 m south of the Bank/Heron intersection (centreline to centreline). Bank Street is a north-south roadway designated as an arterial road in the City of Ottawa Transportation Master Plan. Bank Street is a four lane road with a shared left turn lane along the centre of the road in the vicinity of the site, with raised medians at the approaches to the Bank/Heron intersection which control turning movements at the intersection. Bank Street has a posted speed limit of 50 km./h. with no cycling lanes. Pedestrian sidewalks exist along both sides of the roadway. Parking is prohibited along both sides of Bank Street. The 2014 traffic counts along Bank Street past the site determined that the Annual Average Daily Traffic volume (AADT) was approximately 25,000 vehicles. The north limit of the site borders on Anoka Street. Anoka Street is an east-west local street with a two lane rural cross section. The pavement width is approximately 6.5 m with no shoulders. The street has no sidewalks and parking is prohibited along the south side of the road. The speed limit is unposted at 50 km./h. The surrounding neighbourhood consists of residential housing with the exception of development along Bank Street. The surrounding streets (eg. Collins Avenue, Erie Avenue, Edgehill Place) are designated as local streets. The streets are two lane streets with no sidewalks. Heron Road is an east-west arterial road located approximately 85 m north of the site. The road has a four lane divided cross section with a posted speed limit of 50 km./h. There are no cycling lanes on Heron Road in the vicinity of Bank Street. Parking is prohibited along both sides of Heron Road. Pedestrian sidewalks exist along both sides of Heron Road. The Bank/Heron intersection is controlled by traffic signals with Bank Street forming the northbound and southbound approaches, and Heron Road the eastbound and westbound approaches. The intersection has signs prohibiting U Turns at the northbound and southbound Bank Street approaches and eastbound Heron Road approach. The intersection has the following lane configuration: Northbound Bank Street - Southbound Bank Street - Eastbound Heron Road - Westbound Heron Road - 2 left turn lanes (115 m vehicular storage) 1 through lane 1 shared through/right lane (channelized right) 1 left turn lane 1 through lane 1 shared through/right lane (channelized right) 1 left turn lane 2 through lanes 1 right turn lane (channelized) 1 left turn lane 2 through lanes 1 right turn lane The Anoka/Bank intersection is a T intersection with Bank Street forming the northbound and southbound approaches and Anoka Street forming the westbound approach. The intersection is

6 4 controlled by a stop sign at the Anoka Street approach. Turning movements at the intersection are restricted to right-in/right-out movements onto Anoka Street which are controlled by a raised centre median along Bank Street. The Anoka Street approach consists of one right turn lane, and Bank Street consists of two northbound through lanes with no exclusive turn lanes onto Anoka Street. The northbound approach to the Bank/Heron intersection has double left turn lanes which extend approximately 115 m, and would extend past the Anoka/Bank intersection which is 65 m south of the stop bar at the northbound approach to the Bank/Heron intersection. Figure 2.1 shows the existing traffic volumes for the weekday peak AM and PM hours. The counts at the Bank/Heron and Erie/Bank intersections were taken by City of Ottawa staff in 2014, and the counts at the Anoka Street and Collins Street approaches taken by the consultant in The Bank Street traffic was balanced south from Bank/Heron to the Anoka/Bank and Collins/Bank intersections. Exhibit 1 in the Appendix provides the 2014 City of Ottawa counts at the Bank/Heron intersection, and Exhibit 2 the counts at the Erie/Bank intersection. 3. PROPOSED DEVELOPMENT The site at 1625 Bank Street comprises of the two properties at 1625 and 1629 Bank Street. Each property currently has one residential home on the land with a total area of approximately 1,702 m 2. Both properties are zoned AM1 [1913] General Urban Area Arterial Mainstreet, and the development also makes use of a residential lot at the rear currently zoned R2F for parking. Development in the area is mainly residential to the east of the site, with properties along Bank Street comprising of commercial and retail uses. The proposed development will consist of one two storey mixed use building which will contain retail on the ground floor and offices on the second floor. The total gross floor area of the building would be 750 m 2 (8,073 ft 2 ). The site would provide 20 parking spaces for vehicles and storage for 4 bicycles. The site is expected to be completed by the end of 2016 or The site will have one access onto Anoka Street which is adjacent to the north limit of the site. The site access will be located approximately 50 m east of the curb line along Bank Street. Figure 3.1 presents a conceptual site plan of the development. 3.1 Trip Generation The report will examine the trips from the proposed retail and office uses. Table 3.1 lists the uses and size of development on site. LAND USE TABLE 3.1 SITE INVENTORY AREA RETAIL USE Ground Floor 467 m 2 5,027 ft 2 OFFICE USE Second Floor 283 m 2 3,046 ft 2

7 5 FIGURE 2.1 EXISTING WEEKDAY PEAK AM AND PM HOUR TRAFFIC COUNTS

8 6 FIGURE 3.1 CONCEPTUAL SITE PLAN

9 7 The trips were determined utilizing the statistical data published in the Institute of Transportation Engineers (ITE) document, Trip Generation, 9 th Edition. The trip generation analysis used the average trip rates for a Specialty Retail Center and Single Tenant Office Building land use for the time period of the peak hour of the adjacent street traffic. Table 3.2 presents the average trip rates during the weekday peak AM and PM hour time periods for the proposed uses of the building. The trip rate is not provided for the peak AM hour for the retail land use as the retail is not expected to be open between 7:30 AM and 9:00 AM which is the peak time period of the adjacent street traffic. TABLE 3.2 TRIP GENERATION RATES LAND USE TRIP GENERATION RATE Peak AM Hr. Peak PM Hr. Specialty Retail Center (ITE Land Use 826) T/1000 ft 2 Single Tenant Office Building (ITE Land Use 715) 1.80 T/1000 ft T/1000 ft 2 The number of site generated trips from the proposed office/retail building utilized the trip rates of Table 3.2 and the proportion of trips entering and exiting the site as documented in the ITE manual. The City of Ottawa Transportation Master Plan 2013 has identified the 2011 peak morning period as having a transit share of 22.4%, with a share expected to increase to 26.0% by the year Public transit is readily available with OC Transpo Regular Route 1 travelling along Bank Street past the site. With the frequency of service and close proximity of bus stops to the site, the analysis has applied a 25% transit share reduction to the site generated trips to account for shared trips with transit. The analysis has assumed that the retail on site will be a primary destination of trips. Table 3.3 shows the expected weekday peak AM and PM hour site generated trips for the office/retail building. TABLE 3.3 PEAK HOUR SITE TRIPS GENERATED UNIT TYPE WEEKDAY PEAK AM HR. WEEKDAY PEAK PM HR. TOTAL ENTER EXIT TOTAL ENTER EXIT Retail Development (44%) 8 (56%) Office Development 6 5 (89%) 1 (11%) 5 1 (15%) 4 (85%) 25% Transit Share Reduction TOTAL SITE TRIPS

10 8 3.2 Trip Distribution The site generated trips in Table 3.3 were distributed onto the surrounding roads utilizing the peak AM and PM hour traffic counts taken by the City of Ottawa on May 15, 2014 at the Bank/Heron intersection. The distribution of background traffic would best represent the origin/destination trip pattern of commuters travelling to and from work during the weekday peak AM and PM hours. The trips generated by the site were proportioned along the adjacent roads to the following distribution for both the weekday peak AM and PM hours: To/From the north and along Bank Street 15% To/From the south along Bank Street 30% To/From the east along Heron Road 30% To/From the west along Heron Road 25% Figure 3.2 shows the expected distribution of site trips for the proposed office/retail building during the weekday peak AM and PM hours. 4. TRANSPORTATION IMPACT The study will examine the operation of the Anoka/Bank intersection and the impact the intersection would have on the operation of the site access onto Anoka Street. The analysis will also examine the operation of the Bank/Heron intersection. The time periods for the analysis would be for the existing traffic counts and the expected traffic at the year 2017 at the completion of the development, and at the year 2022 which represents five years beyond completion. The analysis will use the Highway Capacity Software, which utilizes the intersection capacity analysis procedure as documented in the Highway Capacity Manual For unsignalized intersections, the level of service of each lane movement is determined as a function of the delay of vehicles at the approach. The following relates the level of service of each lane movement with the expected delay at the approach. LEVEL OF SERVICE DELAY Level of Service A 0-10 sec./vehicle Little or No Delay Level of Service B >10-15 sec./vehicle Short Traffic Delays Level of Service C >15-25 sec./vehicle Average Traffic Delays Level of Service D >25-35 sec./vehicle Long Traffic Delays Level of Service E >35-50 sec./vehicle Very Long Traffic Delays Level of Service F >50 sec./vehicle Extreme Delays Demand Exceeds Capacity The expected length of queue at the critical lane movements for an unsignalized intersection was determined by the calculation of the 95 th percentile queue at the lane approach. The 95 th percentile queue length is the calculated 95 th greatest queue length out of 100 occurrences at a movement during a 15-minute peak period. The 95 th percentile queue length is a function of the

11 9 FIGURE 3.2 WEEKDAY PEAK AM AND PM HOUR SITE GENERATED TRIPS

12 10 capacity of a movement and the total expected traffic, with the calculated value determining the magnitude of the queue by representing the queue length as fractions of vehicles. For a signalized intersection, the operation or level of service of an intersection is determined from the volume to capacity ratio (v/c) for each lane movement as documented by the City of Ottawa in the Transportation Impact Study Assessment Guidelines, October The following relates the level of service with the volume to capacity ratio at each lane movement. LEVEL OF SERVICE VOLUME TO CAPACITY RATIO Level of Service A 0 to 0.60 Level of Service B 0.61 to 0.70 Level of Service C 0.71 to 0.80 Level of Service D 0.81 to 0.90 Level of Service E 0.91 to 1.00 Level of Service F > Background Traffic Volumes The background traffic volumes along Bank Street and Heron Road would represent the expected traffic volumes which would not include the expected trips from the proposed office/retail development. The increase in background traffic was determined from historical traffic counts taken by the City of Ottawa at the intersection of Bank Street and Heron Road. The volume of traffic was compared between the July 4, 2001 and May 15, 2014 counts, with the Annual Average Daily Traffic (AADT) determining that the traffic increased at an annual compounded rate of percent. The study has therefore assumed an annual compounded rate of increase in traffic of 1.0 percent which would account for future development outside the immediate area. The following are the background traffic growth factors which were applied to the existing traffic counts (Figure 2.1) at all approaches to the intersections examined in the study: To 2017 To Traffic Counts at 1% annual growth Since the traffic along Bank Street at Anoka Street was balanced with the 2014 Bank/Heron intersection, the growth factors above were applied to all approaches to the Anoka/Bank intersection. The expected traffic at the Collins/Bank intersection was also increased to reflect the expected future traffic from the proposed development at 1637 Bank Street (Collins/Bank intersection). Figure 4.1 shows the expected 2017 traffic and Figure 4.2 the 2022 background traffic volumes (excluding the expected trips from the proposed development). 4.2 Total Traffic Volumes The total expected 2017 and 2022 weekday peak AM and PM hour traffic was determined by the addition of the site trips from the proposed development which are shown in Figure 3.2, and the background traffic shown in Figures 4.1 and Figure 4.2. The result is the expected total traffic volumes which will be examined in the study and are shown in Figure 4.3 and Figure 4.4.

13 11 FIGURE 4.1 YEAR 2017 WEEKDAY PEAK AM AND PM HOUR BACKGROUND TRAFFIC

14 12 FIGURE 4.2 YEAR 2022 WEEKDAY PEAK AM AND PM HOUR BACKGROUND TRAFFIC

15 13 FIGURE 4.3 YEAR 2017 WEEKDAY PEAK AM AND PM HOUR TOTAL TRAFFIC

16 14 FIGURE 4.4 YEAR 2022 WEEKDAY PEAK AM AND PM HOUR TOTAL TRAFFIC

17 Traffic Analysis The has determined the existing and future operation of the Anoka/Bank and Bank/Heron intersections, and examined the impact that the Anoka/Bank intersection would have on the operation of the site access. The time period for the analysis would be the weekday peak AM and PM hours of the adjacent roads for the existing traffic counts and expected traffic at the years 2017 and The results of the analysis are discussed in detail in the following sections: Anoka Street and Bank Street Intersection The Anoka/Bank intersection is located west of the site access onto Anoka Street. The Anoka/Bank intersection is a T intersection with Bank Street forming the northbound and southbound approaches, and Anoka Street the westbound stop controlled approach. The turning movements to/from Anoka Street are controlled to right-in/right-out movements by a raised median along the centre of Bank Street. Southbound trips entering the site are expected to turn left onto Collins Avenue or make a U Turn on Bank Street at Collins Avenue. Trips exiting the site and travelling southbound are expected to access Bank Street from left turn movements from the Erie/Bank intersection which is controlled by traffic signals and contains sufficient capacity for the additional westbound left turn movements. The operational analysis using the existing 2015 traffic along Anoka Street and 2014 along Bank Street determined that the westbound Anoka right turn movement functions at a Level of Service (LoS) B during both the peak AM and PM hours. The 95 th percentile queue at the westbound Anoka Street approach would be 0.11 vehicles with an approach delay of 13.6 seconds during the peak AM hour. Table 4.1 summarizes the existing operation of the intersection with the analysis sheets provided in the Appendix as Exhibit 3 for the peak AM hour and Exhibit 4 for the peak PM hour. TABLE 4.1 ANOKA/BANK LoS & Delay Intersection Approach WEEKDAY PEAK AM HR. YEAR (2022) WEEKDAY PEAK PM HR. YEAR (2022) LoS Delay (sec.) LoS Delay (sec.) WB Right - Anoka Street B B (B) (14.4) B B (B) (12.3) At the year 2017 when the development is expected to be completed, the westbound Anoka right turn movement is expected to function at a LoS B during both the peak AM and PM hours. Table 4.1 summarizes the operation of the intersection with the analysis sheets provided as Exhibit 5 and 6.

18 16 The westbound Anoka right turn movement is expected to continue to operate at a LoS B during both the 2022 peak AM and PM hours with an approach delay of 14.4 seconds which occurred during the peak AM hour. The westbound approach would experience a 95 th percentile queue of 0.13 vehicles during the peak AM hour which would not interfere with the operation of the site access which is located 50 m east of the curb line of the intersection (7 vehicles). The operation of the intersection is summarized in Table 4.1 with the analysis provided as Exhibit 7 and Exhibit 8. There would be no requirement for modification to the Anoka/Bank intersection due to the additional trips from the site. Bank Street and Heron Road Intersection The intersection of Bank Street and Heron Road is controlled by traffic signals with four phases during the peak AM and PM hours. Bank Street forms the northbound and southbound approaches, and Heron Road the eastbound and westbound approaches. All approaches have exclusive left turn lanes, two through lanes, and exclusive or shared right turn lanes. The intersection currently functions at a LoS E during both the peak AM and PM hours using the 2014 traffic counts and existing traffic signal timing plan obtained from the City of Ottawa. The operation of the intersection is summarized in Table 4.2 with the analysis sheets provided as Exhibit 9 for the peak AM hour and Exhibit 10 for the peak PM hour. TABLE 4.2 BANK/HERON LoS & Volume to Capacity (v/c) Intersection Approach WEEKDAY PEAK AM HR. YEAR (2022) WEEKDAY PEAK PM HR. YEAR (2022) LoS v/c LoS v/c EB Left Heron Road E E (F) (1.05) D D (E) (0.94) EB Through Heron Road A A (A) (0.54) C C (D) (0.84) WB Left Heron Road A A (A) (0.37) C E (F) (1.14) WB Through Heron Road F F (F) (1.12) F F (F) (1.15) WB Right Heron Road A A (A) (0.24) A A (A) (0.20) NB Left Bank Street C C (C) (0.79) A A (B) (0.61) NB Through Bank Street B B (C) (0.71) B B (B) (0.67) SB Left Bank Street E E (F) (1.01) D D (D) (0.88) SB Right Bank Street A A (A) (0.52) E E (F) (1.02) Total Intersection E E (F) (0.99) E F (F) (1.04)

19 17 As the background traffic increases, the operation of the intersection decreases. The operational analysis determined that the intersection would operate at a LoS E during the 2017 peak AM hour and a LoS F during the peak PM hour. Table 4.2 summarizes the operation of the intersection with the analysis provided as Exhibit 11 and 12. At the year 2022 which represents five years beyond completion of the development, the intersection was determined to function at a LoS F during both the peak AM and PM hour time periods. The northbound Bank Street through and right turn movements would require vehicular storage for potential queuing of approximately 150 m during the peak AM hour and 120 m during the peak PM hour. The Anoka/Bank intersection is located approximately 65 m south of the stop bar at the northbound approach to the Bank/Heron intersection. The northbound queue may periodically extend past the Anoka/Bank intersection during peak hours resulting in a further delay for the westbound Anoka Street right turn movements onto Bank Street. The queue would clear every signal cycle. The small volume of trips generated by the site and assigned to the Bank/Heron intersection would result in a minor impact on the operation of the intersection. Table 4.2 summarizes the operation of the intersection with the analysis provided as Exhibit 13 and Exhibit 14. There would be no requirement for modification to the Bank/Heron intersection due to the additional trips from the site. 4.4 Site Circulation The site would have one access onto Anoka Street located approximately 50 m east of Bank Street. The access would be 6.7 m in width and would provide one lane entering and one lane exiting the site. The Site Plan provides 20 parking spaces including 1 barrier free space which are all easily accessible from the parking lot aisles. The layout of the parking lot provides an efficient movement of vehicles throughout the site. The Site Plan provides a connection from the building accesses to the existing sidewalk along Bank Street, and a connection to the proposed sidewalk along Anoka Street which will be extended from Bank Street to the site access. There will be good pedestrian access to the parking lot from the building accesses. 4.5 Transportation Demand Management (TDM) The City of Ottawa is implementing Transportation Demand Management (TDM) measures as a plan to reduce peak hour traffic along the City s transportation network. The site comprises of an office and retail component which can take advantage of all modes of transportation. The Site Plan does serve the principals of TDM by locating the site in close proximity to pedestrian, cycling and transit facilities. The following will list the facilities which would reduce the volumes of peak hour vehicular traffic: 1. The site is located on Bank Street with direct access to the municipal sidewalks along Bank Street and Heron Road. The site is in close proximity to residential development

20 18 which has the potential to reduce vehicular trips for both office and retail uses. The sidewalks also provide safe access to other retail and restaurants in the area. 2. OC Transpo Regular Route 1 travels along Bank Street providing access to downtown routes and the Greenboro Transit Station at South Keys. The site is also approximately one kilometer from the Heron Transitway stop. 3. Bank Street, Heron Road and Alta Vista Drive are all designated as primary cycling routes in the City of Ottawa Transportation Master Plan (TMP). The Site Plan provides a bicycle rack for the storage of 4 bicycles near the Anoka Street entrance to the building. 5. FINDINGS AND RECOMMENDATIONS A Site Plan has been prepared for the owners of land at the 1625 Bank Street property which is located at the southeast corner of the Anoka/Bank intersection. The site comprises of two municipal lots at 1625 and 1629 Bank Street. The proposal is to replace the two existing residential homes with a two storey building which will contain retail on the ground floor and an office use on the second floor. The site will have one access onto Anoka Street with 20 on-site parking spaces which includes 1 barrier free space. The has examined the operation of the Anoka/Bank and Bank/Heron intersections and the impact that the Anoka/Bank intersection may have on the operation of the site access onto Anoka Street. The analysis was completed for the existing 2014/2015 traffic counts, for the expected 2017 traffic at the completion of the development, and at the year 2022 which represents five years beyond completion. The time period of the analysis would be the weekday peak AM and PM hour traffic of the adjacent roads which is when the peak hour of site trips are expected. The findings and recommendations of the study are summarized in the following: 1) The trip generation analysis determined that the development would generate 4 new trips entering and 1 trip exiting the site during the peak AM hour, and 5 new trips entering and 9 trips exiting the site during the peak PM hour. The number of new site generated trips would not trigger the requirement of a Transportation Impact Assessment report as documented in the City of Ottawa Transportation Impact Assessment Guidelines. This was prepared to assess the impact of the new development on the adjacent roads. 2) The site access onto Anoka Street would be constructed as a private approach with a width of 6.7 m. The access would have one lane entering and one lane exiting the site. The access would be located approximately across from a residential driveway on the north side of Anoka Street. There would be no requirement for roadway modifications to Anoka Street at the site access. 3) The traffic impact analysis examined the operation of the Anoka/Bank intersection utilizing the existing lane geometry and traffic controls. The operation analysis determined that the proposed development would have a minor impact on the operation

21 19 of the intersection with the expected 2022 level of service of the intersection remaining the same as that of the existing traffic counts. The westbound Anoka Street approach would not produce a queue which would interfere with the operation of the site access onto Anoka Street. There would be no requirement for intersection modifications due to the development of the site. 4) The Bank/Heron intersection is located north of the site. The operational analysis used the existing lane geometry and traffic signal timing plan. The analysis determined that the intersection currently (2014 counts) functions at a Level of Service E during both peak AM and PM hours. With the increasing background traffic from future development, the expected 2022 Level of Service would decrease to an F during both the peak AM and PM hours which would result in longer queuing and delays at the approaches. The site would add few trips to the intersection and the minor impact would not be responsible for any future intersection modifications. 5) Site trips assigned to the south would likely use the intersection of Erie/Bank which is controlled by traffic signals. The intersection contains sufficient capacity for the expected site trips destined to the south along Bank Street. 6) A Check List is provided in the Appendix as Exhibit 15. Prepared by: David J. Halpenny, M. Eng., P. Eng.

22 20 APPENDIX TRAFFIC COUNTS OPERATIONAL ANALYSIS WORK SHEETS TRANSPORTATION BRIEF - CHECKLIST

23 21 EXHIBIT PEAK AM HOUR TRAFFIC COUNT BANK/HERON

24 PEAK PM HOUR TRAFFIC COUNT BANK/HERON

25 23 EXHIBIT PEAK AM HOUR TRAFFIC COUNT BANK/ERIE

26 PEAK PM HOUR TRAFFIC COUNT BANK/ERIE

27 25 EXHIBIT PEAK AM HOUR TOTAL TRAFFIC ANOKA/BANK HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak AM Hour Intersection: Bank/Anoka Analysis Year: Year 2014 Project ID: /1629 Bank Street East/West Street: Anoka Street North/South Street: Bank Street Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement L T R L T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? Lanes Configuration T TR T Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement L T R L T R Volume 14 Peak Hour Factor, PHF 0.92 Hourly Flow Rate, HFR 15 Percent Heavy Vehicles 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / / Lanes 1 Configuration R Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config R v (vph) 15 C(m) (vph) 432 v/c % queue length 0.11 Control Delay 13.6 LOS B Approach Delay 13.6 Approach LOS B

28 26 EXHIBIT PEAK PM HOUR TOTAL TRAFFIC ANOKA/BANK HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak PM Hour Intersection: Bank/Anoka Analysis Year: Year 2014 Project ID: /1629 Bank Street East/West Street: Anoka Street North/South Street: Bank Street Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement L T R L T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? Lanes Configuration T TR T Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement L T R L T R Volume 11 Peak Hour Factor, PHF 0.92 Hourly Flow Rate, HFR 11 Percent Heavy Vehicles 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / / Lanes 1 Configuration R Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config R v (vph) 11 C(m) (vph) 548 v/c % queue length 0.06 Control Delay 11.7 LOS B Approach Delay 11.7 Approach LOS B

29 27 EXHIBIT PEAK AM HOUR TOTAL TRAFFIC ANOKA/BANK HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak AM Hour Intersection: Bank/Anoka Analysis Year: Year 2017 Project ID: /1629 Bank Street East/West Street: Anoka Street North/South Street: Bank Street Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement L T R L T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? Lanes Configuration T TR T Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement L T R L T R Volume 15 Peak Hour Factor, PHF 0.92 Hourly Flow Rate, HFR 16 Percent Heavy Vehicles 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / / Lanes 1 Configuration R Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config R v (vph) 16 C(m) (vph) 418 v/c % queue length 0.12 Control Delay 14.0 LOS B Approach Delay 14.0 Approach LOS B

30 28 EXHIBIT PEAK PM HOUR TOTAL TRAFFIC ANOKA/BANK HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak PM Hour Intersection: Bank/Anoka Analysis Year: Year 2017 Project ID: /1629 Bank Street East/West Street: Anoka Street North/South Street: Bank Street Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement L T R L T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? Lanes Configuration T TR T Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement L T R L T R Volume 17 Peak Hour Factor, PHF 0.92 Hourly Flow Rate, HFR 18 Percent Heavy Vehicles 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / / Lanes 1 Configuration R Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config R v (vph) 18 C(m) (vph) 529 v/c % queue length 0.11 Control Delay 12.0 LOS B Approach Delay 12.0 Approach LOS B

31 29 EXHIBIT PEAK AM HOUR TOTAL TRAFFIC ANOKA/BANK HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak AM Hour Intersection: Bank/Anoka Analysis Year: Year 2022 Project ID: /1629 Bank Street East/West Street: Anoka Street North/South Street: Bank Street Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement L T R L T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? Lanes Configuration T TR T Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement L T R L T R Volume 16 Peak Hour Factor, PHF 0.92 Hourly Flow Rate, HFR 17 Percent Heavy Vehicles 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / / Lanes 1 Configuration R Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config R v (vph) 17 C(m) (vph) 398 v/c % queue length 0.13 Control Delay 14.4 LOS B Approach Delay 14.4 Approach LOS B

32 30 EXHIBIT PEAK PM HOUR TOTAL TRAFFIC ANOKA/BANK HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak PM Hour Intersection: Bank/Anoka Analysis Year: Year 2022 Project ID: /1629 Bank Street East/West Street: Anoka Street North/South Street: Bank Street Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement L T R L T R Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Undivided / RT Channelized? Lanes Configuration T TR T Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement L T R L T R Volume 18 Peak Hour Factor, PHF 0.92 Hourly Flow Rate, HFR 19 Percent Heavy Vehicles 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / / Lanes 1 Configuration R Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config R v (vph) 19 C(m) (vph) 510 v/c % queue length 0.12 Control Delay 12.3 LOS B Approach Delay 12.3 Approach LOS B

33 31 EXHIBIT PEAK AM HOUR TOTAL TRAFFIC BANK/HERON HCS+: Signalized Intersections Release 5.4 Analyst: Inter.: Bank/Heron Period: Peak AM Hour Year: Year 2014 Project ID: /1629 Bank Street E/W St: Heron Road N/S St: Bank Street SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes LGConfig L T L T R L T L T Volume Lane Width RTOR Vol 80 _ Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left A P NB Left A A Thru A P Thru A P Right Right Peds X X Peds X X WB Left P SB Left A Thru P Thru P Right P Right Peds X Peds X NB Right EB Right SB Right WB Right Green Yellow All Red Cycle Length: secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio _ Eastbound # Left L Thru T Right Westbound Left L Thru T # Right R Northbound Left L Thru T # Right Southbound Left L # Thru T Right _ Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.79 Total lost time per cycle, L = sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.87

34 32 EXHIBIT PEAK PM HOUR TOTAL TRAFFIC BANK/HERON HCS+: Signalized Intersections Release 5.4 Analyst: Inter.: Bank/Heron Period: Peak PM Hour Year: Year 2014 Project ID: /1629 Bank Street E/W St: Heron Road N/S St: Bank Street SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes LGConfig L T L T R L T L T Volume Lane Width RTOR Vol 60 _ Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left A P NB Left A Thru A P Thru P Right Right Peds X X Peds X WB Left P SB Left A Thru P Thru P Right P Right Peds X Peds X NB Right EB Right SB Right WB Right Green Yellow All Red Cycle Length: secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio _ Eastbound # Left L Thru T Right Westbound Left L Thru T # Right R Northbound Left L Thru T Right Southbound Left L # Thru T # Right _ Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.84 Total lost time per cycle, L = sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.97

35 33 EXHIBIT PEAK AM HOUR TOTAL TRAFFIC BANK/HERON HCS+: Signalized Intersections Release 5.4 Analyst: Inter.: Bank/Heron Period: Peak AM Hour Year: Year 2017 Project ID: /1629 Bank Street E/W St: Heron Road N/S St: Bank Street SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes LGConfig L T L T R L T L T Volume Lane Width RTOR Vol 80 _ Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left A P NB Left A A Thru A P Thru A P Right Right Peds X X Peds X X WB Left P SB Left A Thru P Thru P Right P Right Peds X Peds X NB Right EB Right SB Right WB Right Green Yellow All Red Cycle Length: secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio _ Eastbound # # Left L Thru T Right Westbound Left L Thru T Right R Northbound Left L Thru T # Right Southbound Left L # Thru T Right _ Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.84 Total lost time per cycle, L = 5.60 sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.88

36 34 EXHIBIT PEAK PM HOUR TOTAL TRAFFIC BANK/HERON HCS+: Signalized Intersections Release 5.4 Analyst: Inter.: Bank/Heron Period: Peak PM Hour Year: Year 2017 Project ID: /1629 Bank Street E/W St: Heron Road N/S St: Bank Street SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes LGConfig L T L T R L T L T Volume Lane Width RTOR Vol 60 _ Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left A P NB Left A Thru A P Thru P Right Right Peds X X Peds X WB Left P SB Left A Thru P Thru P Right P Right Peds X Peds X NB Right EB Right SB Right WB Right Green Yellow All Red Cycle Length: secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio _ Eastbound # Left L Thru T Right Westbound Left L Thru T # Right R Northbound Left L Thru T Right Southbound Left L # Thru T # Right _ Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.86 Total lost time per cycle, L = sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 1.00

37 35 EXHIBIT PEAK AM HOUR TOTAL TRAFFIC BANK/HERON HCS+: Signalized Intersections Release 5.4 Analyst: Inter.: Bank/Heron Period: Peak AM Hour Year: Year 2022 Project ID: /1629 Bank Street E/W St: Heron Road N/S St: Bank Street SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes LGConfig L T L T R L T L T Volume Lane Width RTOR Vol 80 _ Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left A P NB Left A A Thru A P Thru A P Right Right Peds X X Peds X X WB Left P SB Left A Thru P Thru P Right P Right Peds X Peds X NB Right EB Right SB Right WB Right Green Yellow All Red Cycle Length: secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio _ Eastbound # # Left L Thru T Right Westbound Left L Thru T Right R Northbound Left L Thru T # Right Southbound Left L # Thru T Right _ Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.94 Total lost time per cycle, L = 5.60 sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.99

38 36 EXHIBIT PEAK PM HOUR TOTAL TRAFFIC BANK/HERON HCS+: Signalized Intersections Release 5.4 Analyst: Inter.: Bank/Heron Period: Peak PM Hour Year: Year 2022 Project ID: /1629 Bank Street E/W St: Heron Road N/S St: Bank Street SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound L T R L T R L T R L T R No. Lanes LGConfig L T L T R L T L T Volume Lane Width RTOR Vol 60 _ Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left A P NB Left A Thru A P Thru P Right Right Peds X X Peds X WB Left P SB Left A Thru P Thru P Right P Right Peds X Peds X NB Right EB Right SB Right WB Right Green Yellow All Red Cycle Length: secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio _ Eastbound # Left L Thru T Right Westbound Left L Thru T # Right R Northbound Left L Thru T Right Southbound Left L # Thru T # Right _ Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.90 Total lost time per cycle, L = sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 1.04

39 37 EXHIBIT 15 TRANSPORTATION BRIEF - CHECKLIST

40 38

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Momentum Planning & Communications 1165 Greenlawn Crescent Ottawa, ON K1L 6C2 June 29, 2015 115-618 Brief_1.doc

More information

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: 1649362 Ontario Inc. c/o Manor Park Management 231 Brittany Drive, Suite D Ottawa ON K1K 0R8 July

More information

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for: HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 February 27, 2014 113-584 Overview_1.doc D. J. Halpenny

More information

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Quickie Convenience Stores Larny Holdings Ltd. c/o PBC Group April 15, 2015 115-615 Report_1.doc D. J. Halpenny

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates

More information

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: Orleans Gardens Shopping Centre Inc. 2851 John Street, Suite 1 Markham, ON K3R 5R7

More information

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: First Bay Properties Inc. 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 August 8, 2017 117-663 Brief_1.doc

More information

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc

More information

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for: NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony

More information

BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: Ontario Limited.

BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: Ontario Limited. BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: 2534189 Ontario Limited April 6, 2018 117-668 TIA Report_2.doc D. J. Halpenny & Associates

More information

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd. 9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

REDEVELOPMENT TRAFFIC IMPACT STUDY

REDEVELOPMENT TRAFFIC IMPACT STUDY REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport

More information

CPC Parking Lot Riverside Drive. Transportation Brief

CPC Parking Lot Riverside Drive. Transportation Brief CPC Parking Lot 2785 Riverside Drive Transportation Brief Prepared By: NOVATECH Suite 2, 24 Michael Cowpland Drive Ottawa, Ontario K2M P6 7 / 5 / 25 Novatech File: 49 Ref: R-25-22 July 5 th, 25 City of

More information

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged. Stantec Consulting Ltd. 1331 Clyde Avenue, Suite 4 Ottawa ON K2C 3G4 Tel: (613) 722-442 Fax: (613) 722-2799 May 14, 213 File: 1638823 Robinson Park Development Corp. 5699 Power Road Ottawa, ON, K1G 3N4

More information

List of Exhibits...ii

List of Exhibits...ii One Brickell Traffic Study TABLE OF CONTENTS List of Exhibits...ii EXECUTIVE SUMMARY...1 1. INTRODUCTION...2 1.1 Study Area...2 1.2 Study Objective...5 2. EXISTING TRAFFIC CONDITIONS...6 2.1 Data Collection...6

More information

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

EXECUTIVE SUMMARY. Page 1 of 6

EXECUTIVE SUMMARY. Page 1 of 6 EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Signal Warrant Studies

Signal Warrant Studies Signal Warrant Studies Seven Locations Piqua, Ohio December 12, 217 Signal Warrant Studies Seven Locations Piqua, Ohio TABLE OF CONTENTS Executive Summary... 3 Introduction... 5 Study Location... 5 Data

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY 675 Millcreek Drive, Unit 1 Mississauga, Ontario L5N 5M4 T: 416.213.7121 F: 95.89.8499 www.transtech.co TRAFFIC IMPACT STUDY PROPOSED MOSQUE DEVELOPMENT 4269 REGIONAL ROAD 25 TOWN OF OAKVILLE PREPARED

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY DECEMBER 2012 READ, VOORHEES & ASSOCIATES TORONTO, ONTARIO Read, Voorhees & Associates

More information

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study Traffic Study To: From: James M. Moore, Director of Planning & Building Services, Town of Fairfax David Parisi, PE, TE, Parisi Transportation Consulting Date: October 14, 216 Subject: Victory Village Senior

More information

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for oad & Traffic Management Road & Traffic Management R Atlantic Traffic Engineering Specialists Draft Report Traffic Impact Study Superstore, Wal-Mart, and Kent Development Yarmouth, Nova Scotia Prepared

More information

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012

Place Vanier 250 Montreal Road Transportation Impact Study Addendum. Prepared for Broccolini Construction September 20 th, 2012 Update for the May 31 st, 2012 Traffic Impact Study Prepared for Broccolini Construction 111-23596-00 September 20 th, 2012 2611 Queensview Drive, Suite 300, Ottawa, Ontario CANADA K2B 8K2 Telephone: 613-829-2800

More information

Gateway Transportation Study

Gateway Transportation Study Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213 Back of

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY TRAFFIC IMPACT STUDY for the GLEN ELLEN COUNTRY CLUB SENIOR RESIDENTIAL REDEVELOPMENT 84 Millis, Massachusetts Prepared by: McMahon Associates, Inc. Prepared for: Toll Brothers, Inc. August 216 DRAFT

More information

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina Prepared for Longbranch Development Prepared by January 13, 219 ii Table of Contents Subject Page Signature Page... i Table of Contents...

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

Proposed Addition to Pickering Islamic Centre

Proposed Addition to Pickering Islamic Centre TRAFFIC IMPACT STUDY, PARKING STUDY, SITE CIRCULATION REVIEW & TDM PLAN Proposed Addition to Pickering Islamic Centre 265 Brock Road City of Pickering, Ontario Prepared for: Pickering Islamic Centre Masjid

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama.

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama. Traffic Impact Study Crestline Piggly Wiggly Mountain Brook, Alabama Prepared for: Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama September 214 Revision 1 October 214 Crestline Piggly Wiggly Mountain

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

THE LANDMARK AT TALBOT PARK

THE LANDMARK AT TALBOT PARK TRAFFIC IMPACT STUDY FOR THE LANDMARK AT TALBOT PARK IN NORFOLK, VA INTERMODAL ENGINEERING, P.C. OCTOBER, 200 The Landmark at Talbot Park is a proposed redevelopment of the existing apartments along the

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

Co-ordinator Transportation Committee. Director, Mobility Services and Corporate Fleet Services Environment and Transportation Department

Co-ordinator Transportation Committee. Director, Mobility Services and Corporate Fleet Services Environment and Transportation Department 28 REGIONAL MUNICIPALITY OF OTTAWA-CARLETON MUNICIPALITÉ RÉGIONALE D OTTAWA-CARLETON REPORT RAPPORT Our File/N/Réf. Your File/V/Réf. 25 23-97-R016 DATE 15 April 1997 TO/DEST. FROM/EXP. SUBJECT/OBJET Co-ordinator

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited 2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief Paradigm Transportation Solutions Limited March 217 March 217 Project: 1627 Diana Vlasic, M.C.I.P., R.P.P Metropolitan Consulting 445 Paletta

More information

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748 City of Barrie Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report Project Number: JDE 1748 Date Submitted: June 12 th, 2017 06/12/17 John Northcote, P.Eng. Professional License

More information

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc. Magnolia Place Traffic Impact Analysis Prepared for: City of San Mateo Prepared by: Hexagon Transportation Consultants, Inc. Updated January 4, 2010 Table of Contents 1. Introduction...1 2. Existing Conditions...6

More information

APPENDIX C Additional Traffic Data

APPENDIX C Additional Traffic Data APPENDIX C Additional Traffic Data Raleigh and Heiden Properties FEIS F- ATTACHMENT Response.8- Traffic Count WEEKENDPEAK5MINUTECOUNTSPROJECTRaleighandHeidenPropertiesLOCATIONCR6,andCR9DATEFridayAugust6,TIME:PMto6:PM5MinuteTraficCR6SBCR9EBCR6NBSTARTENDleftthrurightTotalleftthrurightTotalleftthrurightTotalleftthrurightTotalGRANDTIMETIME56TAL-------------------:PM:5PM56:5PM:PM666566:PM:5PM685886:5PM:PM555585:PM:5PM5856889:5PM:PM8656:PM:5PM955656885:5PM:PM65986858:PM:5PM66855:5PM:PM69898:PM:5PM895858959:5PM:PM8589:PM:5PM85569:5PM:PM586985:PM:5PM55859565:5PM5:PM886559655:PM5:5PM56699595:5PM5:PM668955:PM5:5PM666856555:5PM6:PM95885-------------------TAL85896959688668

More information

Traffic Impact Statement

Traffic Impact Statement Traffic Impact Statement Mixed Use Development, US 41 and Old Trail Drive aka Tide-Starbucks 4900 9 th Street North General Development Site Plan (GDSP) Collier County, FL 10/6/2015 Prepared for: Prepared

More information

HUMC/Mountainside Hospital Redevelopment Plan

HUMC/Mountainside Hospital Redevelopment Plan Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 11 Parsippany, NJ 754 862.27.59 PREPARED

More information

ENKA INTERMEDIATE SCHOOL

ENKA INTERMEDIATE SCHOOL TRANSPORTATION IMPACT ANALYSIS Prepared for Buncombe County Schools ENKA INTERMEDIATE SCHOOL Asheville, NC Project Number: 13-71 8/1/13 www.davenportworld.com DAVENlORT Transportation Impact Analysis Enka

More information

December TRANSPORTATION BRIEF 1-19 Beechwood Avenue, Ottawa, ON TRANSPORTATION INFORMATION TE WATER

December TRANSPORTATION BRIEF 1-19 Beechwood Avenue, Ottawa, ON TRANSPORTATION INFORMATION TE WATER December 2012 TRANSPORTATION BRIEF 1-19 Beechwood Avenue, Ottawa, ON TRANSPORTATION INFORMATION TE WATER 1-19 Beechwood Avenue Mixed Use Development Transportation Brief prepared for: Minto Communities

More information

St. Stefan Serbian Orthodox Church 1989 and 1993 Prince of Wales Drive, Ottawa REVISED TRANSPORTATION BRIEF

St. Stefan Serbian Orthodox Church 1989 and 1993 Prince of Wales Drive, Ottawa REVISED TRANSPORTATION BRIEF St. Stefan Serbian Orthodox Church 1989 and 1993 Prince of Wales Drive, Ottawa REVISED TRANSPORTATION BRIEF Prepared By: NOVATECH ENGINEERING CONSULTANTS LTD. Suite 200, 240 Michael Cowpland Drive Ottawa,

More information

George Street Transportation Impact Study. Paradigm Transportation Solutions Limited

George Street Transportation Impact Study. Paradigm Transportation Solutions Limited George Transportation Impact Study Paradigm Transportation Solutions Limited January 217 Project Summary Project Number 16191 January 217 Client Wastell Homes 5-1895 Blue Heron Drive London ON N6H 5L9

More information

Marina Loft (DRC 51-R-12)

Marina Loft (DRC 51-R-12) Marina Loft (DRC 51-R-12) traffic study prepared for: Cymbal Development OCtober 2012 Traf Tech October 1, 2012 Mr. Asi Cymbal - President Cymbal Development 3470 North Miami Avenue Upper Suite Miami,

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

Paul VI Redevelopment. Traffic Impact Study

Paul VI Redevelopment. Traffic Impact Study ATTACHMENT 5 Paul VI Redevelopment Traffic Impact Study April 18, 2017 PAUL VI REDEVELOPMENT TRAFFIC IMPACT STUDY CITY OF FAIRFAX, VIRGINIA Prepared for: IDI GROUP COMPANIES Prepared by: Wells + Associates,

More information

2. Existing Conditions

2. Existing Conditions 2. Existing Conditions The existing traffic and parking conditions on the site and the surrounding area were reviewed based on the study methodology in Section 1.2. 2.1 Existing Land Use The portion of

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

Student Housing Development

Student Housing Development Traffic Impact Study for the proposed Student Housing Development City of Oneonta Otsego County, New York Project No. 3259 December 212 Revised February 13, 212 Prepared For: Newman Development Group,

More information

Troutbeck Farm Development

Troutbeck Farm Development Troutbeck Farm Development Willistown Township, Chester County PA For Submission To: Willistown Township Last Revised: October, 4 TPD# INLM.A. 5 E. High Street Suite 65 Pottstown, PA 9464 6.36.3 TPD@TrafficPD.com

More information

Road Conversion Study Plumas Street

Road Conversion Study Plumas Street Plumas Street Phase I Submitted to The Regional Transportation Commission of Washoe County Submitted by Zong Tian, Ph.D., P.E. Saeedeh Farivar Haiyuan Li, Ph.D. Center for Advanced Transportation Education

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

INTERSECTION OPERATIONAL ANALYSIS AND NECESSARY RECOMMENDATIONS CIVL 440 Project

INTERSECTION OPERATIONAL ANALYSIS AND NECESSARY RECOMMENDATIONS CIVL 440 Project INTERSECTION OPERATIONAL ANALYSIS AND NECESSARY RECOMMENDATIONS CIVL 44 Project INTERSECTION: 16TH AVENUE & EAST MALL FOR AM PEAK HOUR Group Work: Syed Shafaat Ali Shah (2347426) Mohammad Moudud Hasan

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study

More information

Parking Lot P6C Transportation Impact Assessment

Parking Lot P6C Transportation Impact Assessment Transportation Carleton University Parking Lot P6C Transportation Impact Assessment Prepared by: AECOM 302 1150 Morrison Drive 613 820 8282 tel Ottawa, ON, Canada K2H 8S9 613 820 8338 fax www.aecom.com

More information

CPC Parking Lot Riverside Drive. Transportation Rationale

CPC Parking Lot Riverside Drive. Transportation Rationale CPC Parking Lot Transportation Rationale Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 September 2015 Novatech File: 114093 Ref: R-2015-153 Table of Contents 1.0 INTRODUCTION...

More information

Travel Demand Management Plan

Travel Demand Management Plan Travel Demand Management Plan Linden Corner at 43 rd Street & Upton Avenue South AUTHORIZED PROPERTY REPRESENTATIVE: By Dated: Mark Dwyer Linden Hills Redevelopment, LLC 4632 Washburn Avenue South Minneapolis,

More information

joint access drive. will be

joint access drive. will be Date: To: From: Subject: June 22, 2015 Bradley Reiner, PE Bowman Consulting David R. Kline, PE, PTOE, Incline Associates Thornton Self-Storage Traffic Analysis (DRAFT) - Thornton, Colorado INTRODUCTION

More information

Classification Criteria

Classification Criteria SCHEDULE D TO RECOMMENDED OFFICIAL PLAN AMENDMENT NO. 40 SCHEDULE C-4 Road Criteria Criteria Traffic Service Objective Land Service/Access Typical Daily Traffic Volume Flow characteristics Travel Speed

More information

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff MEMORANDUM DATE March 1, 212 TO Town of Milton FROM RE Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff FFY 211 Safety and Operations Analyses at Selected Boston Region MPO Intersections:

More information

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 151714A Table of Contents Table of Contents I. INTRODUCTION... 2 II. EXISTING CONDITIONS... 5 III. 215 EXISTING TRAFFIC CONDITIONS... 6

More information

192 & 196 Bronson Avenue / 31 Cambridge Street

192 & 196 Bronson Avenue / 31 Cambridge Street Bronson Inc. July 213 192 & 196 Bronson Avenue / 31 Cambridge Street TRANSPORTATION BRIEF Prepared by: Study 192 Bronson Type Avenue July 213 Study Transportation Name Brief February 211 TB Check List

More information

Donahue Drive Corridor Traffic Operational Evaluation

Donahue Drive Corridor Traffic Operational Evaluation Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

TECHNICAL MEMORANDUM. Kevin Even, P.E. Village Engineer and Public Works Director Village of Waunakee. From: Kevin Wehner, P.E. KL Engineering, Inc.

TECHNICAL MEMORANDUM. Kevin Even, P.E. Village Engineer and Public Works Director Village of Waunakee. From: Kevin Wehner, P.E. KL Engineering, Inc. TEHIL MEMORUM To: Kevin Even, P.E. Village Engineer and Public Works irector Village of Waunakee 400 King James Way, uite 200 Madison, Wisconsin 3719 608-663-1218 www.klengineering.com From: Kevin Wehner,

More information

Capital Region Council of Governments

Capital Region Council of Governments March 23, 2018 Capital Region Council of Governments PROJECT CONCEPT REPORT Realignment of Swamp and Northfield Road s approaches to Route 44 (Boston Turnpike) Town of Coventry SUMMARY: The Town of Coventry

More information

DRAFT Davidson Elementary School Expansion Transportation Impact Analysis

DRAFT Davidson Elementary School Expansion Transportation Impact Analysis DRAFT Davidson Elementary School Expansion Transportation Impact Analysis Prepared for: Town of Davidson 216 S. Main Street Davidson, NC 28036 Prepared by: Stantec Consulting Services Inc. 2127 Ayrsley

More information

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine Draft Study STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine SUBMITTED TO: BANGOR AREA COMPREHENSIVE TRANSPORTATION SYSTEM SUBMITTED BY: I MAY 23, 2017 DRAFT STILLWATER AVENUE STUDY FINAL REPORT Table

More information

Michigan Avenue Traffic Study

Michigan Avenue Traffic Study City of Sarnia Michigan Avenue Traffic Study Final Report November 29, 218 B17 SUBMITTED BY CIMA CANADA INC. 4 327 Harvester Road Burlington, ON L7N 3G7 T 289 288-287 F 289 288-285 cima.ca CONTACT Stephen

More information

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives Prepared for: The Town of Caledon August 9 Transportation Solutions Ltd. 43 Forest Road Cambridge, ON N1S 3B4

More information

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

CastleGlenn Consultants Inc.

CastleGlenn Consultants Inc. February 1 st, 2010 CastleGlenn Consultants Inc. Engineers, Project Managers & Planners Mr. Kevin Yemm Planning and Land Development Richraft Ltd. 2280 St. Laurent Boulevard Suite 201 Ottawa, Ontario (Tel:

More information

FINAL Albertville Business Park AUAR Update Traffic Study

FINAL Albertville Business Park AUAR Update Traffic Study FINAL Albertville Business Park AUAR Update Traffic Study Prepared for City of Albertville, MN July 20, 2017 SRF No. 10060.00 Table of Contents Introduction... 1 Existing Conditions... 1 Data Collection...

More information

December 4, Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA Attn: Kathy Marshall. Dear Board Members:

December 4, Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA Attn: Kathy Marshall. Dear Board Members: December 4, 28 Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA 86 Attn: Kathy Marshall RE: RAMSHEAD MERRIMAC, MA Dear Board Members: Bayside Engineering, Inc. has received the MDM Transportation

More information

May 5, 2009 File:

May 5, 2009 File: MMM Group Limited Suite 600 1455 West Georgia Street Vancouver, BC V6G 2T3 t: 604-685-9381 f: 604-683-8655 www.mmm.ca May 5, 2009 File: 50-09001-007 1420 1055 West Hastings Street Vancouver, BC V6E 2E9

More information

Patuxent Green Golf Course

Patuxent Green Golf Course Patuxent Green Golf Course Laurel, Maryland February 23, 2018 Traffic Impact Analysis Prepared for: ADC Builders Alan Cohen 2701 Tower Oaks Boulevard, Suite 200 Rockville, Maryland 20852 TABLE OF CONTENTS

More information

Figure 1: Vicinity Map of the Study Area

Figure 1: Vicinity Map of the Study Area ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove

More information

TRANSPORTATION IMPACT STUDY

TRANSPORTATION IMPACT STUDY Dundas MEP Developments Inc. City of Toronto 219 and 231 Dundas Street East, Proposed Mixed-Use Development TRANSPORTATION IMPACT STUDY 9782/2 April 216 LEA Consulting Ltd. Consulting Engineers & Planners

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information