City Council Report 915 I Street, 1 st Floor Sacramento, CA

Size: px
Start display at page:

Download "City Council Report 915 I Street, 1 st Floor Sacramento, CA"

Transcription

1 City Council Report 915 I Street, 1 st Floor Sacramento, CA File ID: January 23, 2018 Public Hearing Item 16 Title: Proposed Changes to Planned North Natomas Roadway Improvements (Noticed 01/12/2018) Location: Natomas Crossing Drive alignment between East Commerce Way and El Centro Road; Gibraltar Street/White Eagle Lane connection between Beretania Way and Windsong Street, District 1 Recommendation: Conduct a public hearing and upon conclusion pass: 1) a Resolution certifying the Supplemental Environmental Impact Report; 2) a Resolution amending the Sacramento 2035 General Plan; and 3) a Resolution amending the Bicycle Master Plan. Contact: Pelle Clarke, Associate Civil Engineer, (916) , Department of Public Works; Remi Mendoza, Associate Planner, (916) , Community Development Department. Presenter: Ryan Moore, Interim City Traffic Engineer, (916) ; Pelle Clarke, Associate Civil Engineer, (916) , Department of Public Works. Attachments: 1-Description/Analysis 2-Background 3-Maps of Project Locations 4-Draft Supplement to the 2035 General Plan EIR 5-Resolution (EIR Certification) 6-Resolution (General Plan Amendment) 7-Resolution (Bikeway Master Plan Amendment) 8-Exhibit A Revised Bikeway Map Matthew Ruyak, Interim City Attorney Mindy Cuppy, City Clerk John Colville, City Treasurer Howard Chan, City Manager Page 1 of 39

2 File ID: Public Hearing Item 16 Description/Analysis Issue Detail: The City proposes amending the Mobility Element of the 2035 General Plan to eliminate the planned roadway portion of Natomas Crossing Drive between East Commerce Way and El Centro Road from planned improvements. This facility would be replaced by an off-street bike path to accommodate bicycles and pedestrians, including an overcrossing of I-5. Additionally, the City proposes to convert the Gibraltar Street/White Eagle Lane Connection between Beretania Way and Windsong Street from a local street to a paved trail for use only by bicyclists and pedestrians. Policy Considerations: Policy Considerations: The proposal is consistent with the following 2035 General Plan goals and policies. Goal M 1.1: Comprehensive Transportation System. Provide a multimodal transportation system that supports the social, economic and environmental vision, goals, and objectives of the City, and is effectively planned, funded managed, operated, and maintained. Policy M 1.1.2: Transportation Network. The City shall manage the travel system to ensure safe operating conditions. Goal M 1.2: Multimodal System. Increase multimodal accessibility (i.e., the ability to complete desired personal or economic transactions via a range of transportation modes and routes) throughout the city and region with an emphasis on walking, bicycling, and riding transit. Policy M 1.2.1: Multimodal Choices. The City shall develop an integrated, multimodal transportation system that improves the attractiveness of walking, bicycling, and riding transit over time to increase travel choices and aid in achieving a more balanced transportation system and reducing air pollution and greenhouse gas emissions. Policy M 1.2.2: Level of Service (LOS) Standard. The City shall implement a flexible context sensitive Level of Service (LOS) standard, and will measure traffic operations against the vehicle LOS thresholds established in this policy. Policy M 1.2.3: Transportation Evaluation. The City shall evaluate discretionary projects for potential impacts to traffic operations, traffic safety, transit service, bicycle facilities, and pedestrian facilities, consistent with the City s Traffic Study Guidelines. City of Sacramento January 23, 2018 powered by Legistar Page 2 of 39

3 File ID: Public Hearing Item 16 Policy M 1.2.5: Ultimate Roadway Network. If development projects would cause or exacerbate unacceptable LOS E or F conditions, the City shall not expand the physical capacity of the planned roadway network to accommodate the project beyond that identified in (General Plan) Figure M4 and M4a (2035 General Plan Roadway Classification and Lanes). To maintain acceptable LOS E or F conditions, the City may require applicable vehicle trip reduction measures and physical improvements that increase transit use, bicycling, or walking and traffic operational improvements. Policy M 1.3.2: Eliminate Gaps. The City shall eliminate gaps in roadways, bikeways, and pedestrian networks. To this end: a. The City shall construct new multi-modal crossings of the Sacramento and American Rivers. b. The City shall plan and pursue funding to construct grade-separated crossings of freeways, rail lines, canals, creeks, and other barriers to improve connectivity. c. The City shall construct new bikeways and pedestrian paths in existing neighborhoods to improve connectivity. Goal M 2.1: Integrated Pedestrian System. Design, construct, and maintain a universally accessible, safe, convenient, integrated and well-connected pedestrian system that promotes walking. Goal M 5.1: Integrated Bicycle System. Create and maintain a safe, comprehensive, and integrated bicycle system and set of support facilities throughout the city that encourage bicycling that is accessible to all. Provide bicycle facilities, programs and services and implement other transportation and land use policies as necessary to achieve the City s bicycle mode share goal as documented in the Bicycle Master Plan. Staff finds that the proposed project provides safe pedestrian and bicycle connectivity and improves accessibility and system connectivity by removing physical and operational barriers to safe travel. Additionally, the project enhances the quality of life within the existing neighborhoods on both the east and west side of the freeway by eliminating cut through traffic that would negatively impact those neighborhoods. Economic Impacts: Not applicable. Environmental Considerations: To comply with the California Environmental Quality Act (CEQA), the City prepared a Draft supplemental environmental impact report (SEIR) that was prepared and circulated for public comment as required by CEQA. The SEIR evaluates the significant effects that could occur as a result of the proposed project, which involves City of Sacramento January 23, 2018 powered by Legistar Page 3 of 39

4 File ID: Public Hearing Item 16 amendment of planning documents, and other actions, as they relate to transportation infrastructure and funding in North Natomas. The Draft SEIR was circulated for a 45-day public review period beginning October 19, 2017 and ending December 4, Three comment letters were received (one from Regional San and two from United Auburn Indian Community). The comment letters, responses and any technical changes are included in the Final SEIR. The Final SEIR document has been prepared in accordance with CEQA and together with the Draft SEIR (and Appendices) constitutes the SEIR for the proposed project used by decisionmakers during project hearings conducted on January 11th and 23rd, The Final SEIR responds to all comments received on the Draft SEIR and revised text and/or analyses where warranted. The comments and responses, including any changes, do not alter the conclusions of the Draft SEIR. Certification of the SEIR, adoption of the Findings of Fact and Statement of Overriding Conditions by the City Council satisfy CEQA requirements relating to the project. The SEIR may be found online at Development/Planning/Environmental/Impact-Reports Sustainability: Not applicable. Commission/Committee Action: On January 11, 2018, the requested resolutions were heard by the Planning and Design Commission. The Planning and Design Commission voted unanimously to forward the project on to the City Council with a recommendation of approval. No member of the public spoke to support or oppose the project. With a vote of nine ayes, zero nays, and four absent, the Planning and Design Commission voted to forward the project to the City Council with a recommendation for approval. Rationale for Recommendation: The proposal would remove an unnecessary vehicle overcrossing and replace it with an overcrossing that better serves pedestrians and cyclists. Financial Considerations: Not applicable. Local Business Enterprise (LBE): Not applicable. City of Sacramento January 23, 2018 powered by Legistar Page 4 of 39

5 Background: The City of Sacramento certified the Master EIR and adopted the 2035 General Plan on March 3, The 2035 General Plan establishes the policy foundation for growth and development in the City of Sacramento, including the North Natomas area. The 2035 General Plan includes an updated North Natomas Community Plan (NNCP) and identifies future roadway improvements within the North Natomas community including the extension of Natomas Crossing Drive from East Commerce Way to El Centro Road as a two-lane roadway with access for pedestrian and bicycles. Since adoption of the 2035 General Plan/NNCP and during the process of updating the North Natomas Finance Plan (NNFP), concerns have been raised regarding the effects of the Natomas Crossing extension and the overcrossing on the surrounding community. The proposed project would address these concerns by eliminating the roadway portion of the future extension of Natomas Crossing Drive from East Commerce Way to El Centro Road (which includes the overcrossing of I-5) and replacing it with an off-street bike bath. The proposed project would also convert an existing street segment, the Gibraltar Street/White Eagle Lane connection, to a bike and pedestrian facility. The Project contains two components: 1) Removal of the roadway portion of Natomas Crossing Drive between East Commerce Way and El Centro Road from planned improvements. This facility would be replaced by an off-street bike path to accommodate bicycles and pedestrians, including an overcrossing of I-5, as shown in Attachment 2. Offstreet at-grade bike path connections would continue to be provided east of Duckhorn Drive and west of East Commerce Drive to the planned bike paths paralleling each side of I-5. The proposed project would not eliminate Natomas Crossing Drive east of East Commerce Way. Natomas Crossing Drive would remain unchanged in the plans for future construction between East Commerce Way and Cashaw Way, as a two-lane arterial roadway with on-street bike lanes. 2) Plans to convert the Gibraltar Street/White Eagle Lane Connection between Beretania Way and Windsong Street from a local street to a paved trail for use only by bicycles and pedestrians. Page 5 of 39

6 These project elements would be achieved through amendments to several City plans and policies. The proposed project would amend plans for future improvements. No funding, design or construction of any projects would occur at this time. At such time as the City decides to proceed with any of the improvements a process would be followed that includes public notice, coordination with affected agencies, and environmental review as required by the California Environmental Quality Act (CEQA). It is not known when such improvements would be funded and designed, but the evaluation would consider conditions as they exist at that time. The Supplemental EIR reviews the changes in policy and adopted plans, and, to the extent possible at this time, the potential effects on the physical environment. Revisions to the 2035 General Plan Mobility Element, the North Natomas Community Plan, the City Bicycle Master Plan are proposed. The following exhibits would be revised: 2035 General Plan Figure M1, Level of Service Exception Areas would be revised to remove the segment of Natomas Crossing Drive, and to add the segments of Duckhorn Drive and San Juan Road that would operate at Level of Service (LOS) F with implementation of the proposed project; 2035 General Plan Figure M3, Existing/Planned Heavy Rail Corridors, would be revised to remove the segment of Natomas Crossing Drive; 2035 General Plan Figure M4, Citywide Circulation Diagram, would be revised to remove the Natomas Crossing Drive segment; North Natomas Community Plan Figure NN-4, Conceptual Transit Corridors Map, would be revised to remove the Natomas Crossing Drive segment; and The City s Bicycle Network as set forth in the Bicycle Master Plan, would be revised to remove the on-street bicycle lanes on the Natomas Crossing Drive segment. An off-street bicycle/pedestrian trail would be shown from East Commerce Way to El Centro Road, including an overcrossing of I-5. In addition, the Gibraltar Street/White Eagle Lane Connection between Beretania Way and Windsong Street would be added. In addition to figure revisions, the proposed project includes revisions to 2035 General Plan Policy M 1.2.2, the City s Level of Service (LOS) policy. Page 6 of 39

7 Specifically, the following bullets would be added to Item D. of Policy M (new text underlined): Other LOS F Roadways - LOS F is allowed for the following roadways because expansion of the roadways would cause undesirable impacts or conflict with other community values. Duckhorn Drive: Arena Boulevard to San Juan Road San Juan Road: Duckhorn Drive to Truxel Road If the City approves the proposed project, the North Natomas Financing Plan and related development agreements would be updated to reflect the proposed changes. The proposed project involves only changes to adopted City plans. The construction of projects identified in those plans would be subject to separate review and approval if they are eventually proposed for design, construction and operation. Ultimately, the proposed project could result in the construction of a new bicycle/pedestrian trail, including a highway overcrossing, along the alignment identified for the extension of Natomas Crossing Drive. If constructed the bicycle/pedestrian trail would occur within the same alignment as the roadway extension, so the cumulative effects of constructing the trail have been adequately addressed at a programmatic level in the 2035 Master EIR. The bicycle/pedestrian trail would tend to have less severe impacts than the roadway extension, because its footprint would be substantially smaller (approximately 14 feet wide, compared to approximately 70 feet wide). The conversion of the Gibraltar Street/White Eagle Lane segment from a vehicle to a bicycle and pedestrian facility was not anticipated in the 2035 Master EIR, but this improvement would involve only minimal construction activities. The existing segment is paved, so only minor paving, re-striping, removal of any barriers for access and new signage would be required. The project-specific impacts relating to any of these actions, and confirmation that the Master EIR adequately identified and evaluated the cumulative effects, would be reviewed when the revised project is proposed for design, funding and construction. Page 7 of 39

8 Attachment 3: Project Location Future Snowy Egret Drive Future Natomas Crossing Drive Gibraltar Street/White Eagle Lane Connection Future Snowy Egret Drive Affected Roadways N No Scale SOURCE: DKS Associates, Project Location Page 8 of 39

9 Project Location Natomas Crossing Drive Section to be modified SOURCE: DKS Associates, Page 9 of 39

10 Project Location - Gibraltar Street / White Eagle Lane SOURCE: DKS Associates, Page 10 of 39

11 Attachment 4 - Draft and Final Supplement to the 2035 General Plan EIR: The SEIR may be found online at Page 11 of 39

12 RESOLUTION NO Adopted by the Sacramento City Council January 23, 2018 CERTIFYING THE SUPPLEMENTAL ENVIRONMENTAL IMPACT REPORT FOR THE 2035 GENERAL PLAN/NORTH NATOMAS ROADWAY CHANGES PROJECT SCH No BACKGROUND A. On January 11, 2017, the City Planning and Design Commission conducted a public hearing on, and forwarded to the City Council a recommendation to approve the 2035 General Plan/North Natomas Roadway Changes Project (Project). B. On January 23, 2017, the City Council conducted a public hearing, for which notice was given pursuant Sacramento City Code Section (A)(2)(c), and received and considered evidence concerning the 2035 General Plan/North Natomas Roadway Changes Project. BASED ON THE FACTS SET FORTH IN THE BACKGROUND, THE CITY COUNCIL RESOLVES AS FOLLOWS: Section 1. The City Council finds as follows: A. On March 3, 2015, the City Council certified a master environmental impact report (Master EIR) and, having reviewed and considered the information contained in the Master EIR, adopted findings of fact and statement of overriding consideration, adopted a mitigation monitoring program, and approved the 2035 General Plan. B. The 2035 General Plan/North Natomas Roadway Changes project proposes to modify the 2035 General Plan and City policies as follows: 2035 General Plan Figure M1, Level of Service Exception Areas would be revised to remove the future, planned segment of Natomas Crossing Drive from El Centro Road to East Commerce Way, including the overcrossing of Interstate 5, and to add the segments of Duckhorn Drive and San Juan Road that would operate at LOS F with implementation of the Project; 2035 General Plan Figure M3, Existing/Planned Heavy Rail Corridors, would be revised to remove the planned extension of the Natomas Crossing Drive; Rev. Page 1 of 18 Page 12 of 39

13 2035 General Plan Figure M4, Citywide Circulation Diagram, would be revised to remove the planned Natomas Crossing Drive extension; North Natomas Community Plan Figure NN-4, Conceptual Transit Corridors Map, would be revised to remove the planned Natomas Crossing Drive extension; and The City s Bicycle Network as set forth in the Bicycle Master Plan would be revised to remove the on-street bicycle lanes on the Natomas Crossing Drive segment. An off-street bicycle/pedestrian trail would be shown from East Commerce Way to El Centro Road, including an overcrossing of Interstate 5. In addition, the Gibraltar Street/White Eagle Lane Connection between Beretania Way and Windsong Street would be added. In addition to the above figure revisions, the 2035 General Plan/North Natomas Roadway Changes Project includes revisions to 2035 General Plan Policy M Specifically, the following bullets would be added to Item D. of Policy M (new text underlined): Other LOS F Roadways - LOS F is allowed for the following roadways because expansion of the roadways would cause undesirable impacts or conflict with other community values. Duckhorn Drive: Arena Boulevard to San Juan Road San Juan Road: Duckhorn Drive to Truxel Road C. Staff determined that the changes proposed as part of the project would require the preparation of a supplemental EIR (SEIR), and that only minor additions and changes were necessary to make the previously certified Master EIR adequate for the Project. A supplement to the previously certified Master EIR was then prepared to address the project changes. Section 2. Section 3. The City Council certifies that the SEIR was prepared, published, circulated and reviewed in accordance with the requirements of CEQA, the State CEQA Guidelines and the Sacramento Local Environmental Procedures, and that the SEIR constitutes an adequate, accurate, objective and complete Final Environmental Impact Report in full compliance with the requirements of CEQA, the State CEQA Guidelines and the Sacramento Local Environmental Procedures. The City Council certifies that the Final Master EIR as revised by the SEIR has been presented to it, that the City Council has reviewed and considered the information contained in the Final Master EIR as revised by the SEIR prior to Rev. Page 2 of 18 Page 13 of 39

14 acting on the Project, and that the Master EIR and SEIR reflect the City Council s independent judgment and analysis. Section 4. Section 5. Section 6. Section 7. Pursuant to CEQA Guidelines Sections and 15093, and in support of its approval of the Project, the City Council adopts the attached Findings of Fact and Statement of Overriding Considerations in support of approval of the Project as set forth in the attached Exhibit A of this Resolution. Pursuant to CEQA section and CEQA Guidelines section 15091, and in support of its approval of the Project, the City Council adopts the Mitigation Monitoring Program to require all reasonably feasible mitigation measures be implemented by means of Project conditions, agreements, or other measures, as set forth in the Mitigation Monitoring Program, Exhibit B of Resolution No , certifying the Master EIR and adopting the Mitigation Monitoring Program for the 2035 General Plan. The North Natomas Roadway Changes SEIR did not identify any mitigation measures in addition to those adopted for the 2035 General Plan, and would not require revisions or additions to the 2035 General Plan Mitigation Monitoring Program. The City Council directs that, upon approval of the Project, the City Manager shall file a notice of determination with the County Clerk of Sacramento County and, if the Project requires a discretionary approval from any state agency, with the State Office of Planning and Research, pursuant to the provisions of CEQA section Pursuant to Guidelines section 15091(e), the documents and other materials that constitute the record of proceedings upon which the City Council has based its decision are located in and may be obtained from, the Office of the City Clerk at 915 I Street, Sacramento, California. The City Clerk is the custodian of records for all matters before the City Council. Table of Contents: Exhibit A - CEQA Findings of Fact and Statement of Overriding Considerations for the 2035 General Plan/North Natomas Roadway Changes Project Rev. Page 3 of 18 Page 14 of 39

15 Exhibit A Findings of Fact and Statement of Overriding Considerations for the 2035 General Plan/North Natomas Roadway Changes Project Description of the Project The 2035 General Plan/North Natomas Roadway Changes project (Project) proposes to modify the 2035 General Plan and City policies as follows: 2035 General Plan Figure M1, Level of Service Exception Areas would be revised to remove the segment of Natomas Crossing Drive from El Centro Road to East Commerce, including the overcrossing of Interstate 5, and to add the segments of Duckhorn Drive and San Juan Road that would operate at LOS F with implementation of the Project; 2035 General Plan Figure M3, Existing/Planned Heavy Rail Corridors, would be revised to remove the segment of Natomas Crossing Drive; 2035 General Plan Figure M4, Citywide Circulation Diagram, would be revised to remove the Natomas Crossing Drive segment; North Natomas Community Plan Figure NN-4, Conceptual Transit Corridors Map, would be revised to remove the Natomas Crossing Drive segment; and The City s Bicycle Network as set forth in the Bicycle Master Plan, would be revised to remove the on-street bicycle lanes on the planned Natomas Crossing Drive extension segment. An off-street bicycle/pedestrian trail would be shown from East Commerce Way to El Centro Road, including an overcrossing of Interstate 5. In addition, the Gibraltar Street/White Eagle Lane Connection between Beretania Way and Windsong Street would be added. In addition to figure revisions, the Project includes revisions to 2035 General Plan Policy M 1.2.2, the City s level of service policy. Specifically, the following bullets would be added to Item D. of Policy M (new text underlined): Other LOS F Roadways - LOS F is allowed for the following roadways because expansion of the roadways would cause undesirable impacts or conflict with other community values. Duckhorn Drive: Arena Boulevard to San Juan Road San Juan Road: Duckhorn Drive to Truxel Road Rev. Page 4 of 18 Page 15 of 39

16 Findings Required Under CEQA 1. Procedural Findings The City Council of the City of Sacramento finds as follows: a. A Notice of Preparation of the Draft SEIR was filed with the Office of Planning and Research and each responsible and trustee agency, and was circulated for public comments from July 5, 2017 through August 4, b. A Notice of Completion (NOC) and copies of the Draft SEIR were distributed to the Office of Planning and Research on October 19, 2017, to those public agencies that have jurisdiction by law with respect to the Project, or which exercise authority over resources that could be affected by the Project, and to other interested parties and agencies as required by law. The comments of such persons and agencies were sought. c. An official 45-day public comment period for the Draft SEIR was established by the Office of Planning and Research. The public comment period began on October 19, 2017, and ended on December 4, d. A Notice of Availability (NOA) of the Draft SEIR was mailed to all interested groups, organizations, and individuals who had previously requested notice in writing on October 19, The NOA stated that the City of Sacramento had completed the Draft SEIR and that copies were available at the City of Sacramento, Community Development Department, 300 Richards Boulevard, Third Floor, Sacramento, California The letter also indicated that the official 45-day public review period for the Draft SEIR would end on December 4, e. A public notice was placed in the Daily Recorder on October 19, 2017, which stated that the Draft SEIR was available for public review and comment. f. A public notice was posted in the office of the Sacramento County Clerk on October 19, g. A copy was posted online at the Community Development Department web site for environmental documents. h. Following closure of the public comment period, all comments received on the Draft SEIR during the comment period, the City s written responses to the significant environmental points raised in those comments were added to the Draft SEIR to produce the Final SEIR. Rev. Page 5 of 18 Page 16 of 39

17 2. Record of Proceedings The contents of the record of proceedings shall be as set forth in subdivision (e) of Public Resources Code Section In particular, the following information is incorporated by reference and made part of the record supporting these findings: a. The Draft and Final SEIR and all documents relied upon or incorporated by reference; b. The City of Sacramento 2035 General Plan, adopted March 3, 2015, and all updates. c. The Master Environmental Impact Report for the City of Sacramento 2035 General Plan certified on March 3, 2015, and all updates; d. The Mitigation Monitoring Program for the 2035 General Plan. e. Findings of Fact and Statement of Overriding Considerations for the Adoption of the Sacramento 2035 General Plan adopted March 3, 2015, and all updates; f. Planning and Development Code of the City of Sacramento, as amended as of the date of this Resolution; g. Zoning Ordinance of the City of Sacramento; h. North Natomas Community Plan; i. All records of decision, staff reports, memoranda, maps, exhibits, letters, synopses of meetings, and other documents approved, reviewed, relied upon, or prepared by any City commissions, boards, officials, consultants, or staff relating to the Project. j. Any other materials required by Public Resources Code Section , or other applicable law, to be included in the record of proceedings. 3. Findings Overview CEQA requires that the lead agency adopt mitigation measures or alternatives, where feasible, to substantially lessen or avoid significant environment impacts that would otherwise occur. Mitigation measures or alternatives are not required, however, where such changes are infeasible or where the responsibility for the project lies with some other agency. (CEQA Guidelines, 15091, sub. (a), (b).) Rev. Page 6 of 18 Page 17 of 39

18 In cases in which a project s significant effects cannot be mitigated or avoided, an agency, after adopting proper findings, may nevertheless approve the project if it first adopts a statement of overriding considerations setting forth the specific reasons why the agency found that the benefits of the project outweigh the significant effects on the environment. (Public Resources Code, Section 21081, sub. (b); see also, CEQA Guidelines, Sections 15093, 15043, sub.(b).) In the Statement of Overriding Considerations found at the end of these Findings, the City identifies the specific economic, social, and other considerations that, in its judgment, outweigh the significant environmental effects that the Project will cause. These findings do not attempt to describe the full analysis of each environmental impact contained in the Final SEIR. Instead, a full explanation of these environmental findings and conclusions can be found in the Final SEIR and these findings hereby incorporate by reference the discussion and analysis in the Final SEIR supporting the determination regarding the impacts of the Project and mitigation measures designed to address those impacts. In making these findings, the City Council ratifies, adopts and incorporates in these findings the determinations and conclusions of the Final SEIR relating to environmental impacts and mitigation measures. Supplement to the 2035 General Plan Master EIR As a Supplement to the 2035 General Plan Master EIR, the SEIR evaluates whether the changes could result in a new significant impact that was not evaluated in the Master EIR and/or substantially increase the severity of significant impacts that were identified in the Master EIR. The Project would not alter the conclusions of the Master EIR in any impact area other than transportation. No changes in land use are proposed, so there would not be an increase in development activity over the levels evaluated in the Master EIR. No new development would be funded or constructed as a result of the Project. Construction-related impacts would be reduced, because the bicycle/pedestrian trail and overcrossing would have a smaller footprint than a roadway (DSEIR, page 1-3). The reduced scope of construction would result in reduced potential for loss or disturbance of biological and cultural resources, and decreases in construction-related noise and air pollutant emissions. Construction-related activities would also be required to convert the Gibraltar Street/White Eagle Lane connection from a street to a bike/pedestrian path. However, because this street segment is already paved, only minor improvements would be needed, such as restriping and signage. These issues are not addressed further in the SEIR. The Project would result in a redistribution of traffic in the study area (DSEIR Chapter 4). This would result in very minor changes in traffic-related impacts, such as operational air emissions, greenhouse gas emissions, and traffic noise. These changes would not alter the conclusions of the Master EIR (DSEIR, page 1-3). The Project would not increase Rev. Page 7 of 18 Page 18 of 39

19 development levels, or otherwise substantially alter the City s ability to achieve its GHG reduction goals; therefore, the impact would remain less than significant. Similarly, the project increase in vehicle miles traveled and local redistribution of trips would result in nominal increases in air pollutant emissions and noise levels on local streets, but not enough to alter the conclusions of the Master EIR. Therefore, the analysis and conclusions in the Master EIR regarding traffic-related impacts (e.g., air quality, GHG and noise) would remain unchanged. In addition, because the Project would not alter land use designations or locations, or development levels, the growth inducement and other CEQA considerations discussed in Chapter 6 of the Draft Master EIR would not be affected by the Project (with the exception of cumulative traffic impacts, which are addressed in Chapter 4 of the DSEIR), and are therefore not addressed further in the DSEIR. In support of its approval of the Project, the City Council makes the following findings for each of the significant environmental effects and alternatives of the Project identified in the Final EIR as revised by the SEIR pursuant to Section of CEQA and section of the CEQA Guidelines: A. Impacts Found to be Less Than Significant and Thus Requiring No Mitigation. Under CEQA, no mitigation measures are required for impacts that are less than significant. (Pub. Resources Code, Section 21002; CEQA Guidelines, Section , subd. (a)(3), ) Based on substantial evidence in the whole record of this proceeding, the City Council finds that implementation of the Project will not result in any significant impacts in the following areas and that these impact areas, therefore, do not require mitigation. Transportation and Circulation Impact 4-1 Impact 4-2 Impact 4-3 Impact 4-4 Impact 4-5 The proposed project could affect pedestrian and bicycle circulation. The proposed project would change traffic volumes on study area roadway segments. Construction of the proposed project could affect the local street network. The proposed project would contribute to cumulative changes in the pedestrian, bicycle and transit systems. The proposed project would contribute to cumulative increases in traffic on some roadway segments. Rev. Page 8 of 18 Page 19 of 39

20 B. Significant or Potentially Significant Impacts Mitigated to a Less Than Significant Level. The Project would not result in any significant impacts that were not identified in the Master EIR. No new or revised mitigation measures were identified to reduce or avoid Project impacts. The Project would comply with the applicable mitigation measures identified in Section A of the CEQA Findings of Fact and Statement of Overriding Considerations and the Mitigation Monitoring Program for the Master EIR. With the exception of the cumulative impact on area freeways (see Sections C and D, below), adopted mitigation measures identified in Section A of the 2035 Master EIR Findings would reduce the impacts of the Project to a less-than-significant level. C. Significant or Potentially Significant Impacts for which Mitigation is Outside the City s Responsibility and/or Jurisdiction. Mitigation measures to mitigate, avoid, or substantially lessen the following significant environmental impact of the Project, are within the responsibility and jurisdiction of another public agency and not the City. Pursuant to section 21081(a)(2) of the Public Resources Code and section 15091(a)(2) of the CEQA Guidelines, the City Council, based on the evidence in the record before it, specifically finds that implementation of these mitigation measures can and should be undertaken by the other public agency. The City will request, but cannot compel implementation of the identified mitigation measures described. The impact and mitigation measures and the facts supporting the determination that mitigation is within the responsibility and jurisdiction of another public agency and not the City, are set forth below. Notwithstanding the disclosure of this impact, the City Council elects to approve the Project due to the overriding considerations set forth below in Section F, the statement of overriding considerations. Transportation and Circulation Impact 4-6 The Project would contribute to cumulative increases in traffic on study area freeway segments. Interstate 5 (I-5) between Interstate 80 (I-80) and Arena Boulevard is projected to operate at LOS F with or without the Project (DSEIR Table 4-5). The Project would result in a daily increase in traffic volumes of about 300 vehicles on the segment of I-5 between Arena Boulevard and I-80, which is an increase of approximately 0.14 percent (DSEIR Table 4-5 and DSEIR page 4-27). This minor increase would likely be imperceptible given the anticipated congested conditions on the freeway system. Furthermore, the effect would be limited to only a portion of I-5. Nonetheless, because the Project would exacerbate traffic congestion on I-5, the project contribution to cumulative I-5 traffic would be considered a significant impact. Rev. Page 9 of 18 Page 20 of 39

21 Mitigation Measures: None available. Finding: The finding that the Project would have a significant impact on a segment of I-5 is consistent with the Master EIR findings (page 38, Impact , and Master EIR Table ). The Master EIR found that the 2035 General Plan would result in potentially significant traffic impacts based on the Caltrans LOS threshold and related significance standards for fifteen freeway segments, including the segment of I-5 from Arena Boulevard to I-80. Implementation of policy M would require that the City support State highway expansion and management plans consistent with the SACOG MTP/SCS (Master EIR Findings, page 38). All freeway improvement projects contained in the MTP/SCS were incorporated into the 2035 General Plan transportation analysis. In addition, implementation of Program 17 would require creation of a City development impact fee program that would fund multi-modal projects that would further alleviate congestion on the freeway segments identified above. However, the extent to which the impacts on freeways would be alleviated by City impact fee policies could not be determined, because this would be a new fee program. Further, because Caltrans has the decision-making authority on implementing improvements to the above freeway segments, the City of Sacramento cannot guarantee implementation and/or the timing of State highway improvements. It is also not certain that improvements to State highways have been identified that would substantially reduce impacts to all of these freeway segments. Feasible mitigation measures beyond the impact-reducing provisions of the proposed 2035 General Plan policies were not available. For these reasons, the Master EIR concluded that the impact of the General Plan on area freeways would remain significant and unavoidable. Similarly, the City of Sacramento cannot guarantee the implementation and/or the timing of the State highway improvements that would reduce the Project impact on the segment of I-5 between I-80 and Arena Boulevard. Therefore, this impact would remain significant and unavoidable. D. Significant and Unavoidable Impacts. With the exception of the impact described below, the Project would not increase the severity of the significant and unavoidable impacts identified in the Master EIR Findings. Nor would the Project result in a new significant and unavoidable impact that was not evaluated in the Master EIR. The following significant environmental impact of the Project is unavoidable and cannot be mitigated in a manner that would substantially lessen the significant impact. Notwithstanding disclosure of this impact, the City Council elects to approve the Project due to overriding considerations as set forth below in Section F, the statement of overriding considerations. Rev. Page 10 of 18 Page 21 of 39

22 Transportation and Circulation Impact 4-6 The Project would contribute to cumulative increases in traffic on study area freeway segments. Interstate 5 (I-5) between Interstate 80 (I-80) and Arena Boulevard is projected to operate at LOS F with or without the Project (DSEIR Table 4-5). The Project would result in a daily increase in traffic volumes of about 300 vehicles on the segment of I-5 between Arena Boulevard and I-80, which is an increase of approximately 0.14 percent (DSEIR Table 4-5 and DSEIR page 4-27). This minor increase would likely be imperceptible given the anticipated congested conditions on the freeway system. Furthermore, the effect would be limited to only a portion of I-5. Nonetheless, because the Project would exacerbate traffic congestion on I-5, the project contribution to cumulative I-5 traffic would be considered a significant impact. Mitigation Measures: None available. Finding: The finding that the Project would have a significant impact on a segment of I-5 is consistent with the Master EIR findings (page 38, Impact , and Master EIR Table ). The Master EIR found that the 2035 General Plan would result in potentially significant traffic impacts based on the Caltrans LOS threshold and related significance standards for fifteen freeway segments, including the segment of I-5 from Arena Boulevard to I-80. Implementation of policy M would require that the City support State highway expansion and management plans consistent with the SACOG MTP/SCS (Master EIR Findings, page 38). All freeway improvement projects contained in the MTP/SCS were incorporated into the 2035 General Plan transportation analysis. In addition, implementation of Program 17 would require creation of a City development impact fee program that would fund multi-modal projects that would further alleviate congestion on the freeway segments identified above. However, the extent to which the impacts on freeways would be alleviated by City impact fee policies could not be determined, because this would be a new fee program. Further, because Caltrans has the decision-making authority on implementing improvements to the above freeway segments, the City of Sacramento cannot guarantee implementation and/or the timing of State highway improvements. It is also not certain that improvements to State highways have been identified that would substantially reduce impacts to all of these freeway segments. Feasible mitigation measures beyond the impact-reducing provisions of the proposed 2035 General Plan policies were not available. For these reasons, the Master EIR concluded that the impact of the General Plan on area freeways would remain significant and unavoidable. Similarly, the City of Sacramento cannot guarantee the implementation and/or the timing of the State highway improvements that would reduce the Project impact on the segment of I-5 between I-80 and Arena Boulevard. Therefore, this impact would remain significant and unavoidable. Rev. Page 11 of 18 Page 22 of 39

23 E. Project Alternatives. The City Council has considered the project alternatives presented and analyzed in the Final SEIR and presented during the comment period and public hearing process. Some of these alternatives have the potential to avoid or reduce certain significant or potentially significant environmental impacts, as set forth below. The City Council finds, based on specific economic, legal, social, technological, or other considerations, that these alternatives are infeasible. Based on the impacts identified in the Final SEIR and other reasons summarized below, and as supported by substantial evidence in the record, the City Council finds that approval and implementation of the Project as proposed is the most desirable, feasible, and appropriate action and hereby rejects the other alternatives and other combinations and/or variations of alternatives as infeasible based on consideration of the relevant factors set forth in CEQA Guidelines Section , subdivision (f). (See also CEQA Guidelines, Section 15091, subd. (a)(3).) Each alternative and the facts supporting the finding of infeasibility of each alternative are set forth below. In making these determinations, the City Council is aware that CEQA defines feasibility to mean capable of being accomplished in a successful manner within a reasonable period of time, taking into account economic, environmental, social, legal, and technological factors. The Council is also aware that under CEQA case law the concept of feasibility encompasses (i) the question of whether a particular alternative promotes the underlying goals and objectives of a project and (ii) the question of whether an alternative is desirable from a policy standpoint to the extent that desirability is based on a reasonable balancing of the relevant economic, environmental, social, legal, and technological factors. Alternatives Considered and Dismissed from Further Consideration An alternative that would alter the land use patterns and/or intensity within the study area is not analyzed in the SEIR. The Master EIR evaluated a full range of alternatives to the 2035 General Plan. One of these alternatives would increase transit corridors and reduce transportation impacts. A second alternative would alter land use patterns and the amount of development, but the traffic impacts would be similar to the 2035 General Plan (Master EIR page 5-1 and Table 5-6). The Project would not affect land uses in the study area, and the effect of the Project is due to a redistribution of trips rather than an increase in trips. For these reasons, the SEIR alternatives focus on the circulation network, not land use. Because the impact of the Project on I-5 is primarily the result of removing a road segment in a particular location, adding another connection outside of the study area would not improve conditions on the segment of I-5 that would be adversely affected by the Project. Therefore, an off-site alternative is not evaluated. Rev. Page 12 of 18 Page 23 of 39

24 In order to avoid or lessen the effect of the Project on I-5, a connection of East Commerce Way to El Centro Road would need to be constructed between San Juan Road and Arena Boulevard. Most of the area east of I-5 is already built out. Some rightof-way for the Natomas Crossing Drive extension has been retained, and there is no development in this area other than a community garden west of Sparrow Drive. Relocating the connection to the north or south of the Project alignment would not be feasible, because it would require the removal of existing homes, which would displace existing residents and disrupt existing neighborhoods. Therefore, the only alternatives to the Project that are considered in this EIR would occur within the Natomas Crossing Drive extension. Summary of Alternatives Considered The following alternatives to the Project are evaluated in the SEIR: 1. No Project Alternative: The Natomas Crossing Drive extension between El Centro Road and East Commerce Way would remain in the 2035 General Plan, North Natomas Community Plan and Bicycle Master Plan. In addition, the Gibraltar Street/White Eagle Lane connection would remain a local street, and would not be converted to a bicycle/pedestrian path. 2. Local Street Conversion/Retention of Natomas Crossing Drive Extension: The Natomas Crossing Drive extension would be retained, so there would not be any amendments to the 2035 General Plan, North Natomas Community Plan or Bicycle Master Plan. Therefore, the extension would be constructed. Alternative 2 would, however, convert the Gibraltar Street/White Eagle Lane connection to a bike/pedestrian path, the same as the Project. 3. Gibraltar Street/White Eagle Lane Conversion Only: This alternative would retain the Gibraltar Street/White Eagle Lane conversion to a bike/pedestrian path, the same as the Project. The Natomas Crossing Drive extension would be eliminated from planning documents, and no bicycle/pedestrian path would be planned for the extension right-of-way from East Commerce Way to El Centro Road. There would be no overcrossing of I-5 planned for bicyclists and pedestrians. Alternative 1: No Project/No Development Alternative Under the No Project Alternative, the full Natomas Crossing Drive extension, including vehicle lanes, on- and off-street bike lanes and sidewalks, would remain in the 2035 General Plan and North Natomas Community Plan. In addition, the Gibraltar Street/White Eagle Lane connection would remain a local street, and would not be converted to a bicycle/pedestrian path. Rev. Page 13 of 18 Page 24 of 39

25 Relationship of Alternative 1 to Project Objectives Most of the objectives of the 2035 General Plan would continue to be met under the No Project Alternative. However, constructing the Natomas Crossing Drive extension would be costly, which could divert funds from other priority projects. In addition, the construction of this extension would convert a corridor that is used as open space by local residents to a 70-foot wide roadway. Therefore, the No Project Alternative would not promote the maintenance of a vibrant community or contribute to the enhancement of an existing neighborhood to the extent that the Project would. Facts in Support of Finding of Infeasibility While the No Project/No Build Alternative would reduce the impact of the Project on a segment of I-5, it would not avoid the impact, which would be significant and unavoidable with or without the Project. The effect of the Project on I-5 would be minor, increasing the number of trips on the segment from I-80 to Arena Boulevard by 300 trips per day (DSEIR Table 4-5), or 0.14%, under cumulative conditions (DSEIR page 4-27). The No Project/No Build Alternative would not convert the Gibraltar Street/White Eagle Lane connection to a bicycle pedestrian/path and would convert a corridor currently used as open space by local residents to a roadway, which would not achieve the objectives of maintaining a vibrant community and/or contributing to enhancement of an existing neighborhood to the extent that the Project would. The Natomas Crossing Drive extension assumed in the 2035 General Plan would be a substantially and costly infrastructure project, composed of two vehicle through lanes, a center turn lane, parking and bike lanes, sidewalks and a trail (DSEIR, Figure 3-3). The roadway would be 59-feet wide and the required right-of-way would be 110 feet (DSEIR Figure 3-3). Retaining the high-cost Natomas Crossing Drive extension could divert funds from other priority projects, including improvements that would better achieve the 2035 General Plan objectives regarding smart growth, living more lightly, maintaining a vibrant economy and a sustainable future. For the above reasons, Alternative 1 is rejected. Alternative 2: Local Street Conversion/Retention of Natomas Crossing Drive Extension Under Alternative 2, the Natomas Crossing Drive extension would be retained, so there would not be any amendments to the 2035 General Plan, North Natomas Community Plan or Bicycle Master Plan to remove the vehicular extension. Therefore, the roadway extension would be constructed. Alternative 2 would, however, convert the Gibraltar Street/White Eagle Lane connection to a bike/pedestrian path, the same as the Project. Rev. Page 14 of 18 Page 25 of 39

26 Relationship of Alternative 2 to Project Objectives Most of the objectives of the 2035 General Plan would continue to be met under Alternative 2. However, retaining the high-cost Natomas Crossing Drive extension could divert funds from other priority projects. In addition, the construction of this extension would convert a corridor that is used as open space by local residents to a roadway. Therefore, Alternative 2 would not promote the maintenance of a vibrant community or contribute to the enhancement of an existing neighborhood to the extent that the Project would. Alternative 2 would also provide bike lanes and a bike path along the Natomas Crossing Drive alignment, and include an additional bike/pedestrian connection, which would contribute to the health of residents by promoting biking and walking within neighborhoods. Facts in Support of Finding of Infeasibility Alternative 2 would reduce the Project impact on a segment of I-5, but would not avoid the impact, which would be significant and unavoidable with or without the Project. The effect of the Project on I-5 would be minor, increasing the number of trips on the segment from I-80 to Arena Boulevard by 300 trips per day (DSEIR Table 4-5), or 0.14%, under cumulative conditions (DSEIR page 4-27). The Natomas Crossing Drive extension assumed in the 2035 General Plan would be a substantially and costly infrastructure project, composed of 2 vehicle through lanes, a center turn lane, parking and bike lanes, sidewalks and a trail (DSEIR, Figure 3-3). The roadway would be 59-feet wide and the required right-of-way would be 110 feet (DSEIR Figure 3-3). Retaining the high-cost Natomas Crossing Drive extension could divert funds from other priority projects, including improvements that would better achieve the 2035 General Plan objectives regarding smart growth, living more lightly, maintaining a vibrant economy and a sustainable future. For the above reasons, Alternative 2 is rejected. Alternative 3: Gibraltar Street/White Eagle Lane Conversion Only This alternative would retain the Gibraltar Street/White Eagle Lane conversion to a bike/pedestrian path, the same as the Project. However, the Natomas Crossing Drive extension would not be constructed, nor would a bicycle/pedestrian path be built within the extension right-of-way from East Commerce Way to El Centro Road. There would be no overcrossing of I-5 for bicyclists and pedestrians. This alternative is the same as the project described in the DSEIR Notice of Preparation. The Bicycle Master Plan would be amended to remove the on-street and off-street bike lanes along the Natomas Crossing Drive extension. The Gibraltar Street/White Eagle Lane connection would be added to the Bicycle Master Plan. Rev. Page 15 of 18 Page 26 of 39

27 Alternative 3 would eliminate the Natomas Crossing Drive extension from planning documents, so it would not be constructed in the future. Nor would the on- and offstreet bicycle and pedestrian facilities along this alignment be constructed (Impact 4-4). Under the Project the bicycle and pedestrian facilities would also provide more direct routes for bicyclists and pedestrians with more local destinations that would not require crossing I-5. Relationship of Alternative 3 to Project Objectives Most of the objectives of the 2035 General Plan would continue to be met under Alternative 3. However, Alternative 3 would not provide additional bicycle and pedestrian facilities to the extent that the Project would, so it would not contribute to the health of residents by promoting biking and walking within neighborhoods to the extent that the Project would. Facts in Support of Finding of Infeasibility Because Alternative 3 would remove the vehicular travel lanes from the Natomas Crossing extension, the impact on freeway segments would be similar to the Project. The increase in vehicles attributable to the Project on the segment of I-5 would continue to be a significant and unavoidable impact (Impact 4-6), and would not be reduced or avoided by Alternative 3. Under Alternative 3, bicyclists and pedestrians would be confined to more circuitous routes through residential neighborhoods or to using the existing unimproved right-ofway of the extension. Furthermore, Alternative 3 would reduce the bicycle network anticipated in the Bikeway Master Plan. This would be a significant impact of Alternative 3 that would not occur under the Project. Pedestrians and bicyclists wishing to cross I-5 in the study area would need to use the Arena Boulevard overcrossing or the San Juan Road undercrossing. Depending on where the bicycle or pedestrian trips originate and end, using these alternative routes could result in greater travel distances, which could deter individuals from using nonauto modes of travel, or from making the trip at all. For the above reasons, Alternative 3 is rejected. F. Statement of Overriding Considerations. The City of Sacramento has considered the information contained in and related to the Final SEIR (the Draft SEIR, Comments and Responses to those documents, and all other public comments, responses to comments, accompanying technical memoranda and staff reports, and findings included in the public record for the Project). Pursuant to Rev. Page 16 of 18 Page 27 of 39

28 Guidelines section 15092, the City Council finds that in approving the Project it has eliminated or substantially lessened all significant and potentially significant effects of the Project on the environment where feasible, as shown in Sections A through D, above. The City Council further finds that it has balanced the economic, legal, social, technological, and other benefits of the Project against the remaining unavoidable environmental risks in determining whether to approve the Project, and has determined that those benefits outweigh the unavoidable environmental risks and that those risks are acceptable. The City Council makes this statement of overriding considerations in accordance with section of the Guidelines in support of approval of the Project. Specifically, in the City Council s judgment, each of the benefits of the Project as proposed separately and independently outweigh all of the unmitigated adverse impacts and the Project should be approved. 1. The Natomas Crossing extension would be a large, costly public works project. Replacing the vehicular extension with a bicycle/pedestrian path and overcrossing would substantially reduce costs, which could then be used for other priority projects, and/or reduce fees, which would promote economic development in the North Natomas community. Eliminating costly infrastructure would support the General Plan objective of maintaining a vibrant economy. 2. The Project would enhance the neighborhood environment by providing a bike path in place of a vehicular roadway. A parkway with a bicycle/pedestrian path would be easier for pedestrians and bicyclists to cross than a 59-foot wide roadway, would increase bicycle and pedestrian connectivity between neighborhoods, and would be less noisy than a roadway. 3. The Project would reduce the potential for cut-through traffic through existing residential neighborhoods by eliminating a planned roadway along the Natomas Crossing Drive extension right-of-way. 4. The Project would be responsive to neighborhood and community input seeking increased exclusive pedestrian/bikeway access by eliminating vehicular traffic from a connection across the right-of-way of the future Snowy Egret Drive. 5. Eliminating vehicular traffic from the future overcrossing, providing a bicycle/pedestrian-only connection across Interstate 5 and converting an existing roadway to a bike and pedestrian trail would support the General Plan objectives for living more lightly, promoting healthy cities and a sustainable future by providing more direct routes for bicyclists and pedestrians with more local destinations. For example, the Project would provide a more direct route from many of the residences west of Duckhorn Drive and south of Arena Boulevard to Rev. Page 17 of 18 Page 28 of 39

29 the existing San Juan Reservoir Park to the east or the future commercial developments planned for the area between Duckhorn Drive and Interstate The Project would provide significant connectivity for the City and residents, bicyclists and pedestrians in the North Natomas Community Plan area, which would encourage and support additional non-vehicular trips by walking and bicycling and facilitates pedestrian and bicyclist access to transit. 7. Construction of the project would be consistent with Citywide goals and polices of increasing multimodal accessibility with an emphasis on walking and bicycling. 8. The Project would reduce impacts on the environment relative to the future Natomas Crossing extension. The Project would have a substantially smaller footprint than the Natomas Crossing extension, and would require less excavation. Therefore, the Project would have less potential to adversely affect biological, paleontological and cultural resources. Construction activities would be reduced, so construction-related air emissions, greenhouse gas emissions, erosion, water quality contaminants and noise would be lessened. For the reasons set forth above, the City Council finds that the ability of the Project to preserve enhance the neighborhood environment, improve pedestrian and bicycle connectivity, promote non-vehicular transportation, reduce potential impacts on natural resources, and contribute to a vibrant economy outweighs its environmental impacts. Rev. Page 18 of 18 Page 29 of 39

30 RESOLUTION NO Adopted by the Sacramento City Council J a n u a r y 2 3, AMENDI NG THE SACRAMENTO 2035 GENERAL PLAN MOBILITY ELEMENT AND THE NORTH NATOMAS COMMUNITY PLAN RELATING TO THE PROPOSED CHANGES TO PLANNED NORTH NATOMAS ROADWAY IMPROVEMENTS BACKGROUND A. On January 11, 2018, the City Planning and Design Commission conducted a public hearing on, and forwarded to the City Council a recommendation of approval of amendments to the 2035 General Plan Mobility Element and the North Natomas Community Plan to incorporate changes in eliminating the planned roadway extension of Natomas Crossing Drive from East Commerce Way to El Centro Road. B. On January 23, 2018, the City Council conducted a public hearing that was noticed in accordance with Government Code section and Sacramento City Code section at which it received and considered evidence concerning amendments to the 2035 General Plan Mobility Element and the North Natomas Community Plan to incorporate changes in eliminating the planned roadway extension of Natomas Crossing Drive from East Commerce Way to El Centro Road. BASED ON THE FACTS SET FORTH IN THE BACKGROUND, THE CITY COUNCIL RESOLVES AS FOLLOWS: Section 1. The Supplement to the 2035 General Plan Master Environmental Impact Report (MEIR), which included the proposed changes to North Natomas roadway improvements, has been adopted by resolution as of the same date set out above. Section 2. The Sacramento 2035 General Plan identifies future road segments within the North Natomas Community, including the extension of Natomas Crossing Drive between East Commerce Way and El Centro Road. The General Plan is amended to eliminate this planned roadway extension to reduce the potential for cut-through traffic through existing residential neighborhoods as a response to neighborhood and community input and concerns. The project would also enhance the neighborhood environment by providing a parkway in place of a vehicular roadway that would be designed in a way to avoid removal of the existing community garden within the existing right of way, which is a community amenity located in the Natomas Crossing Extension right of way. These revisions in the Mobility Element and the Community Plan are described below and shown 1 Page 30 of 39

31 in Exhibits A, B, C, and D: a. The Mobility Element Figure M1, Level of Service Exception Areas is revised to remove the segment of Natomas Crossing Drive between East Commerce Way and El Centro Road, and to add the segments of Duckhorn Drive and San Juan Road that would operate at Level of Service (LOS) F. b. The Mobility Element Figure M3, Existing/Planned Heavy Rail Corridors, is revised to remove the segment of Natomas Crossing Drive between East Commerce Way and El Centro Road. c. The Mobility Element Figure M4, Citywide Circulation Diagram, is revised to remove the segment of Natomas Crossing Drive between East Commerce Way and El Centro Road. d. The North Natomas Community Plan Figure NN-4, Conceptual Transit Corridors Map, is revised to remove the segment of Natomas Crossing Drive between East Commerce Way and El Centro Road. Section 3. The Sacramento 2035 General Plan Mobility Element contains Policy M 1.2.2, which establishes level of services (LOS) standards for city streets. Section D of this policy identifies a list of roadways where LOS F is allowed because expansion of the roadways would cause undesirable impacts or conflict with other community values. Eliminating the planned Natomas Crossing Drive extension will redistribute traffic in the area resulting in increased congestion for segments of Duckhorn Drive and San Juan Road causing them to operate at LOS F. Because widening these roadways would result in undesirable community effects the affected roadway segments listed below are added to section D of Policy M 1.2.2: Duckhorn Drive: Arena Boulevard to San Juan Road San Juan Road: Duckhorn Drive to Truxel Road Section 4. The Sacramento 2035 General Plan as amended, complies with section C of the Sacramento City Code in that the City Council finds the following: 1. The general plan is in full compliance with the applicable requirements of the Planning and Zoning Law and comprises a comprehensive, long-term general plan for the physical development of the city and lands located outside of the territorial limits of the city that have a relation to its planning; 2. The general plan contains the substance of each of the state-mandated elements, to the extent that the subject of the element exists within the planning area; 3. The general plan comprises an integrated, internally consistent, and compatible statement of policies for the city relating to its physical development. 1 Page 31 of 39

32 Section 5. Exhibits A, B, C, and D are incorporated into and made part of this Resolution. Table of Contents: Exhibit A - Revised Sacramento 2035 General Plan, Mobility Element, Figure M1 Vehicle Level of Service Exception Areas Exhibit B - Revised Sacramento 2035 General Plan, Mobility Element, Figure M3 Existing/Planned Heavy Rail Corridors Exhibit C - Revised Sacramento 2035 General Plan, Mobility Element, Figure M4 Citywide Circulation Diagram Exhibit D Revised North Natomas Community Plan, Figure NN-4 Conceptual Transit Corridors Map 1 Page 32 of 39

33 Exhibit A 2 Page 33 of 39

34 Exhibit B Page 34 of 39

35 Exhibit C Page 35 of 39

36 Exhibit D Figure NN-4 Conceptual Transit Corridors Map Page 36 of 39

37 RESOLUTION NO Adopted by the Sacramento City Council January 23, 2018 AMENDING THE CITY S BICYCLE MASTER PLAN TO MODIFY THE BICYCLE NETWORK IN THE NORTH NATOMAS COMMUNITY PLAN BACKGROUND A. The Supplement to the 2035 General Plan Master Environmental Impact Report, which is to be adopted concurrently with this resolution, is a comprehensive update of the 2035 General Plan. The traffic study that is contained in the Supplemental Environmental Impact Report for the 2035 General Plan analyzed the changes in the street system and bikeways within the North Natomas Community Plan. B. On January 11, 2018, the City Planning and Design Commission conducted a public hearing on the Project and forwarded to the City Council recommendation to approve amending the City Bicycle Master Plan as set forth in Exhibit A. C. On January 23, 2018, the City Council conducted a public hearing that was noticed in accordance with Sacramento City Code sections and at which it received and considered evidence concerning the Proposed Changes to North Natomas Roadway Improvements project. BASED ON THE FACTS SET FORTH IN THE BACKGROUND, THE CITY COUNCIL RESOLVES AS FOLLOWS: Section 1. Based on the verbal and documentary evidence received at the hearings on the Proposed Project, the City Council finds that amending the City Bicycle Master Plan to modify the bikeway network in the North Natomas Community Plan area is consistent with the City of Sacramento 2035 General Plan. The proposed changes support the general plan goal to create and maintain a safe, comprehensive, and integrated bicycle system and a set of support facilities throughout the city that encourage bicycling that is accessible to all. Applicable General Plan policies include the following: M4.2.2 Pedestrian and Bicycle Facilities on Bridges. The City shall identify existing and new bridges that can be built, widened, or restriped to add pedestrian and/or bicycle facilities. M Continuous Bikeway Network. The City shall provide a continuous bikeway network consisting of bike-friendly facilities connecting Page 37 of 39 residential neighborhoods with key destinations and activity centers

38 (e.g., transit facilities, shopping areas, education institutions, employment centers). M Motorists, Bicyclists, and Pedestrian Conflicts. The City shall develop safe and convenient bikeways, streets, roadways, and intersections that reduce conflicts between bicyclists and motor vehicles on streets, between bicyclists and pedestrians on multi-use trails and sidewalks, and between all users at intersections Section 2. City Council hereby amends the City s Bicycle Master Plan to modify two components of the bicycle network as described below and set forth in Exhibit A: a. The Bicycle Master Plan is revised to remove the on-street bike lane from Natomas Crossing Drive between East Commerce Way and El Centro Road and replacing that on-street facility with an off-street bike path to accommodate bicycles and pedestrians, including an overcrossing of I-5. The Bikeway Master Plan will continue to include off-street at-grade bike path connections east of Duckhorn Drive and west of East Commerce Drive to the planned bike paths paralleling each side of I-5. b. The Bicycle Master Plan is revised to convert the Gibraltar Street/White Eagle Lane connection between Beretania Way and Windsong Street from a local street to a paved bicycle/pedestrian trail. Section 3. Exhibit A is part of this Resolution. Table of Contents: Exhibit A - Revised Map of the City s Bicycle Network Page 38 of 39

39 Exhibit A- Revised Map of the City's Bicycle Network Page 39 of 39

1.0 INTRODUCTION 1.1 PURPOSE OF THIS REPORT

1.0 INTRODUCTION 1.1 PURPOSE OF THIS REPORT 1.0 INTRODUCTION This chapter provides an overview of the purpose, authorization and focus of this Recirculated Draft Environmental Impact Report (EIR), an identification of the Lead Agency, an outline

More information

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks Circulation, as it is used in this General Plan, refers to the many ways people and goods move from place to place in Elk Grove and the region. Circulation in Elk Grove includes: Motor vehicles, including

More information

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701

General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701 General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701 Meeting Agenda 1. Purpose of Scoping Meeting 2. Project Overview 3.

More information

City Council Report 915 I Street, 1 st Floor Sacramento, CA

City Council Report 915 I Street, 1 st Floor Sacramento, CA City Council Report 915 I Street, 1 st Floor Sacramento, CA 95814 www.cityofsacramento.org File ID: 2018-00041 January 16, 2018 Consent Item 09 Title: Cooperative Purchasing Agreement: Advanced Life Support

More information

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY STAFF REPORT MEETING DATE: September 13, 2016 TO: FROM: City Council Bob Brown, Community Development Director Russ Thompson, Public Works Director Patrick Filipelli, Management Analyst 922 Machin Avenue

More information

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA CITY OF SIGNAL HILL 2175 Cherry Avenue Signal Hill, CA 90755-3799 AGENDA ITEM TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: STEVE MYRTER, P. E. DIRECTOR OF PUBLIC WORKS SUBJECT: SPRING STREET

More information

City Council Report 915 I Street, 1 st Floor Sacramento, CA

City Council Report 915 I Street, 1 st Floor Sacramento, CA City Council Report 915 I Street, 1 st Floor Sacramento, CA 95814 www.cityofsacramento.org File ID: 2018-00605 May 22, 2018 Consent Item 07 Title: Supplemental Agreement: Del Rio Trail Project (K15165100)

More information

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Exhibit 1 PLANNING COMMISSION AGENDA ITEM Exhibit 1 PLANNING COMMISSION AGENDA ITEM Project Name: Grand Junction Circulation Plan Grand Junction Complete Streets Policy Applicant: City of Grand Junction Representative: David Thornton Address:

More information

RESOLUTION NO A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENLO PARK ADOPTING A COMPLETE STREETS POLICY

RESOLUTION NO A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENLO PARK ADOPTING A COMPLETE STREETS POLICY RESOLUTION NO. 6123 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENLO PARK ADOPTING A COMPLETE STREETS POLICY WHEREAS, the term Complete Streets describes a comprehensive, integrated transportation

More information

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY RESOLUTION NO. 2018-?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY WHEREAS, safe, convenient, and accessible transportation for all users is a priority of the City of Neptune

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

Bicycle Master Plan Goals, Strategies, and Policies

Bicycle Master Plan Goals, Strategies, and Policies Bicycle Master Plan Goals, Strategies, and Policies Mobilizing 5 This chapter outlines the overarching goals, action statements, and action items Long Beach will take in order to achieve its vision of

More information

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017 Bicycle and Pedestrian Chapter TPP Update Overview TAB September 20, 2017 Bicycling & Walking in the Twin Cities Where are we now? The Bike-Pedestrian system Current trends New developments Where are we

More information

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

CITY OF BLOOMINGTON COMPLETE STREETS POLICY CITY OF BLOOMINGTON COMPLETE STREETS POLICY POLICY OBJECTIVE: The City of Bloomington will enhance safety, mobility, accessibility and convenience for transportation network users of all ages and abilities,

More information

City Council Report 915 I Street, 1 st Floor Sacramento, CA

City Council Report 915 I Street, 1 st Floor Sacramento, CA City Council Report 915 I Street, 1 st Floor Sacramento, CA 95814 www.cityofsacramento.org File ID: 2018-01428 November 13, 2018 Consent Item 09 Title: Memorandum of Understanding: Reimbursement of Costs

More information

City Council Report 915 I Street, 1 st Floor Sacramento, CA

City Council Report 915 I Street, 1 st Floor Sacramento, CA City Council Report 915 I Street, 1 st Floor Sacramento, CA 95814 www.cityofsacramento.org File ID: 2017-01487 Published for 10-Day Review 12/07/2017 Review Item 01 Title: (Agreement/Contract for Review)

More information

WHEREAS, the New Jersey Department of Transportation' s Complete Streets

WHEREAS, the New Jersey Department of Transportation' s Complete Streets WHEREAS, the State Department of Transportation adopted a Complete Streets Policy ( Policy No. 703), effective December 3, 2009, for all projects funded through the Department' s Capital Program and strongly

More information

City Council Agenda Item #6-A CITY OF ALAMEDA Memorandum. To: Honorable Mayor and Members of the City Council. John A. Russo City Manager

City Council Agenda Item #6-A CITY OF ALAMEDA Memorandum. To: Honorable Mayor and Members of the City Council. John A. Russo City Manager CITY OF ALAMEDA Memorandum To: From: Honorable Mayor and Members of the City Council John A. Russo City Manager Date: January 14, 2013 Re: Adopt a Resolution Approving a Complete Streets Policy, in Accordance

More information

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Solana Beach Comprehensive Active Transportation Strategy (CATS) Solana Beach Comprehensive Active Transportation Strategy (CATS) 3.0 Goals & Policies The Solana Beach CATS goals and objectives outlined below were largely drawn from the Solana Beach Circulation Element

More information

NOTICE OF AVAILABILITY/NOTICE OF COMMENT PERIOD OF A DRAFT EIR/EIS/EIS FOR PUBLIC REVIEW AND HEARINGS

NOTICE OF AVAILABILITY/NOTICE OF COMMENT PERIOD OF A DRAFT EIR/EIS/EIS FOR PUBLIC REVIEW AND HEARINGS Tahoe Transportation District 128 Market Street, Suite 3F Stateline, NV 89449 Phone: (775) 589-5500 www.tahoetransportation.org Federal Highway Administration 650 Capitol Mall, Suite 4-100 Sacramento,

More information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction: Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency

More information

Route 7 Corridor Study

Route 7 Corridor Study Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi

More information

City Council Report 915 I Street, 1 st Floor Sacramento, CA

City Council Report 915 I Street, 1 st Floor Sacramento, CA City Council Report 915 I Street, 1 st Floor Sacramento, CA 95814 www.cityofsacramento.org File ID: 2018-00836 June 19, 2018 Consent Item 30 Title: Fourth Lease Amendment with Morton Golf LLC to Operate

More information

Bike San Mateo County San Mateo County Bicycle Plan Recommendations August 30, 2010

Bike San Mateo County San Mateo County Bicycle Plan Recommendations August 30, 2010 Policy and Procedures Develop and Implement a Complete Streets Policy to comply with DD-64-R1 and AB1358 Commencing January 1, 2011, AB1358 requires that the legislative body of a city or county, upon

More information

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN

Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN Tulsa Metropolitan Area LONG RANGE TRANSPORTATION PLAN Indian Nations Council of Governments August 2005 CONTACTING INCOG In developing the Destination 2030 Long Range Transportation Plan, INCOG s Transportation

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 11 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving traffic modifications on Twin Peaks Boulevard between Christmas

More information

Michael Parmer, Management Aide, City Manager's Office

Michael Parmer, Management Aide, City Manager's Office P139 STAFF REPORT f CITY NL- NAGER' S OFFICE RANCHO Date: C;UCAMONGA To: From: Subject: Mayor and Members of the City Council John R. Gillison, City Manager Michael Parmer, Management Aide, City Manager's

More information

Living Streets Policy

Living Streets Policy Living Streets Policy Introduction Living streets balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, enhance community identity, create

More information

I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT MEPA CONSULTATION MEETING NOVEMBER 20, 2014 BRIGHTON HIGH SCHOOL

I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT MEPA CONSULTATION MEETING NOVEMBER 20, 2014 BRIGHTON HIGH SCHOOL I-90 ALLSTON INTERCHANGE A MULTIMODAL TRANSPORTATION PROJECT MEPA CONSULTATION MEETING NOVEMBER 20, 2014 BRIGHTON HIGH SCHOOL Today s Agenda 1. 2. 3. 4. 5. Overview of the MEPA Process Project Overview

More information

Clackamas County Comprehensive Plan

Clackamas County Comprehensive Plan ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They

More information

Draft MOBILITY ELEMENET. Community Meeting May 22, 2013

Draft MOBILITY ELEMENET. Community Meeting May 22, 2013 Draft MOBILITY ELEMENET Community Meeting May 22, 2013 Agenda Presentation Ira Brown New Mobility Paradigm Movement of People Implementation Q&A Ira Brown and Dave Roseman Small Group Discussion at Each

More information

City of Novi Non-Motorized Master Plan 2011 Executive Summary

City of Novi Non-Motorized Master Plan 2011 Executive Summary City of Novi Non-Motorized Master Plan 2011 Executive Summary Prepared by: February 28, 2011 Why Plan? Encouraging healthy, active lifestyles through pathway and sidewalk connectivity has been a focus

More information

Transportation Master Plan Advisory Task Force

Transportation Master Plan Advisory Task Force Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved

More information

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx MCTC 8 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV.xlsx Madera County Transportation Commission Regional Transportation Plan / Sustainable Communities Strategy Multi-Modal Project

More information

Transportation Development Act Grant Radar Check Speed Signs

Transportation Development Act Grant Radar Check Speed Signs City Council Agenda January 18, 2017 To: From: Subject: Mayor and City Council Tim Tucker, City Engineer Transportation Development Act Grant Radar Check Speed Signs Date: January 10, 2017 Recommendation

More information

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.

Goal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another. Non-Motorized Transportation Plan (NMTP) Draft Vision, Goal and,, Tri-County Regional Planning Commission (TCRPC) Purpose The purpose of the Tri-County Regional Planning Commission (TCRPC) Non-Motorized

More information

City Council Report 915 I Street, 1 st Floor

City Council Report 915 I Street, 1 st Floor Meeting Date: 8/16/2016 Report Type: Consent Report ID: 2016-00834 16 City Council Report 915 I Street, 1 st Floor www.cityofsacramento.org Title: (Pass for Publication) Ordinances Amending Sacramento

More information

Active Transportation Infrastructure Investment A Business Case

Active Transportation Infrastructure Investment A Business Case Active Transportation Infrastructure Investment A Business Case In 2016, the Real Estate Foundation awarded the Capital Regional District a $50,000 grant for Shifting Gears: Land Use Change through Active

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 12 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various bicycle improvements and traffic modifications

More information

3.9 Recreational Trails and Natural Areas

3.9 Recreational Trails and Natural Areas 3.9 Recreational Trails and Natural Areas 3.9.1 Introduction Parks and other recreational facilities such as trails, bicycle routes, and open space are important community resources. This section discusses

More information

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN Section VIII Mobility Element Goals, Objectives, and Policies Adopted August 6, 2015 by Ordinance No. 1591 VIII MOBILITY ELEMENT Table of Contents Page Number

More information

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014

Environmental Assessment Findings & Recommendations. Public Hearing November 13, 2014 Environmental Assessment Findings & Recommendations Public Hearing November 13, 2014 Welcome! Welcome and Introductions Project and Environmental Assessment Overview Public Comments Adjourn Purpose of

More information

ACTIVE TRANSPORTATION

ACTIVE TRANSPORTATION ACTIVE TRANSPORTATION Mobility 2040 Supported Goals Improve the availability of transportation options for people and goods. Support travel efficiency measures and system enhancements targeted at congestion

More information

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10 Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel

More information

AMATS Complete Streets Policy

AMATS Complete Streets Policy AMATS Complete Streets Policy Table of Contents: Section 1. Definition of Complete Streets Section 2. Principles of Complete Streets Section 3. Complete Streets Policy Section 4. Consistency Section 5.

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

THIS PAGE INTENTIONALLY BLANK

THIS PAGE INTENTIONALLY BLANK THIS PAGE INTENTIONALLY BLANK Readers Guidance: This chapter provides responses to all comments submitted on the Draft Supplemental EIR of November 2011. All comments have been numbered and a corresponding

More information

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS Page 1 of 9 EXECUTIVE SUMMARY Alberta Transportation ( AT ) is preparing to construct the final sections of the Calgary Ring Road. This includes the South West Ring Road ( SWRR ) (from Lott Creek Blvd

More information

Transportation Development Act Grant Center Avenue Pedestrian Signal Project

Transportation Development Act Grant Center Avenue Pedestrian Signal Project CITY OF MARTINEZ CITY COUNCIL AGENDA April 15, 2015 TO: FROM: SUBJECT: DATE: Mayor and City Council Tim Tucker, City Engineer Transportation Development Act Grant Center Avenue Pedestrian Signal Project

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO.: 10.2 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various routine parking and traffic modifications. SUMMARY:

More information

Anholm Bikeway Plan Planning Commission Meeting Summary (8/14/18)

Anholm Bikeway Plan Planning Commission Meeting Summary (8/14/18) Anholm Bikeway Plan Planning Commission Meeting Summary (8/14/18) Overview: On August 14, 2018, the Planning Commission considered plans for the middle section of the Anholm Bikeway Plan, focusing on the

More information

4.11 Transportation and Traffic

4.11 Transportation and Traffic 4.11.1 Introduction This section evaluates whether implementation of the Russian River Estuary Management Project (Estuary Management Project) would result in potential adverse impacts related to transportation

More information

TABLE OF CONTENTS. Executive Summary

TABLE OF CONTENTS. Executive Summary Executive Summary Background... ES-1 Pedestrian Network... ES-2 Bikeway Network... ES-2 Collision History... ES-2 Public Input... ES-4 Conclusions and Recommendations... ES-4 1. Introduction and Setting

More information

Third Street Bridge & Corridor Project

Third Street Bridge & Corridor Project Third Street Bridge & Corridor Project Preparation for the FY2018 budget to commence October 1, 2017, includes funding to address a project that has been considered since 1994. The Third Street bridge

More information

PEDESTRIAN ACTION PLAN

PEDESTRIAN ACTION PLAN ATTACHMENT 2 CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN This page intentionally left blank EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY Setting the Stage

More information

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County. Transportation PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN NON-MOTORIZED PLAN CONTENTS Goals, Policies, and Action Strategies Table 4 (Bike Facility Classifications and Descriptions) Table 5 (Bike Facility

More information

Errata to Railyards Specific Plan Update Subsequent EIR

Errata to Railyards Specific Plan Update Subsequent EIR Errata to Railyards Specific Plan Update Subsequent EIR P15-040 SCH No. 2006032058 November 2, 2016 The Draft and Final Subsequent Environmental Impact Reports for the Railyards Specific Plan Update, KP

More information

4. Mobility and Transportation Element. Page Bikes and Pedestrians

4. Mobility and Transportation Element. Page Bikes and Pedestrians Below are the specific General Plan text changes proposed for A-16-015 and the proposed changes to Figure MT-2 Paths and Trails. In general changes consist of removing references to the Bicycle, Pedestrian

More information

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE April, 2012 1 INTRODUCTION The need for transit service improvements in the Routes 42/55/676 corridor was identified during the Southern

More information

Basalt Creek Transportation Refinement Plan Recommendations

Basalt Creek Transportation Refinement Plan Recommendations Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for

More information

3.16 TRANSPORTATION, CIRCULATION, AND PARKING Regulatory Setting Environmental Setting ROADWAY SYSTEM

3.16 TRANSPORTATION, CIRCULATION, AND PARKING Regulatory Setting Environmental Setting ROADWAY SYSTEM 3.16 TRANSPORTATION, CIRCULATION, AND PARKING This section assesses the potential for implementation of the Orchard Park Redevelopment component of the 2018 LRDP to result in impacts related to transportation,

More information

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES November 16, 2011 Deb Humphreys North Central Texas Council of Governments Bicycle and Pedestrian Advisory Committee Snapshot of the Guide 1. Introduction

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO: 10.2 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various routine parking and traffic modifications. SUMMARY:

More information

Bicycling & Walking in the Twin Cities TPP Bike/Ped Chapter Overview. Land Use Advisory Committee September 21, 2017

Bicycling & Walking in the Twin Cities TPP Bike/Ped Chapter Overview. Land Use Advisory Committee September 21, 2017 Bicycling & Walking in the Twin Cities TPP Bike/Ped Chapter Overview Land Use Advisory Committee September 21, 2017 Presentation Outline Current TPP Purpose of bike/ped chapter New developments Bike/Ped

More information

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description University of Victoria Campus Cycling Plan Terms of Reference 1.0 Project Description The Campus Cycling Plan, a first for the University, will provide a comprehensive and coordinated approach to support

More information

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions

Chapter 2. Bellingham Bicycle Master Plan Chapter 2: Policies and Actions Chapter 2 Bellingham Bicycle Master Plan Chapter 2: Policies and Actions Chapter 2: Policies and Actions The Bicycle Master Plan provides a road map for making bicycling in Bellingham a viable transportation

More information

Regional Transportation Needs Within Southeastern Wisconsin

Regional Transportation Needs Within Southeastern Wisconsin Regional Transportation Needs Within Southeastern Wisconsin #118274 May 24, 2006 1 Introduction The Southeastern Wisconsin Regional Planning Commission (SEWRPC) is the official areawide planning agency

More information

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN HARRISON STREET/OAKLAND AVENUE Community Workshop #4: Draft Plan Review December 3, 2009 D E S I G N, C O M M U N I T Y & E N V I R O N M E N T INTRODUCTIONS Key Project Staff: Alisa Shen, Project Manager,

More information

REVIEW OF LOCAL TRAFFIC FLOW / LONG RANGE PLANNING SOLUTIONS STUDY

REVIEW OF LOCAL TRAFFIC FLOW / LONG RANGE PLANNING SOLUTIONS STUDY ITEM Town of Atherton TRANSPORTATION COMMITTEE STAFF REPORT TO: FROM: MEMBERS OF THE COMMITTEE ROBERT OVADIA, PUBLIC WORKS DIRECTOR DATE: FEBRUARY 12, 2019 SUBJECT: REVIEW OF LOCAL TRAFFIC FLOW / LONG

More information

ITEM 3 ATTACHMENT A RESOLUTION NO

ITEM 3 ATTACHMENT A RESOLUTION NO ITEM 3 ATTACHMENT A RESOLUTION NO. 2018-1575 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CALABASAS, CALIFORNIA, ADOPTING THE FISCAL YEAR 2017-18 LIST OF PROJECTS FUNDED BY SB 1: THE ROAD REPAIR AND

More information

J Street and Folsom Boulevard Lane Conversion Project (T ) Before and After Traffic Evaluation

J Street and Folsom Boulevard Lane Conversion Project (T ) Before and After Traffic Evaluation J Street and Folsom Boulevard Lane Conversion Project (T15125400) Before and After Traffic Evaluation Prepared by Transportation Division June 2014 Executive Summary On February 12, 2013, the City of Sacramento

More information

North Coast Corridor:

North Coast Corridor: North Coast Corridor: Connecting People, Transportation & Environment Legislative Hearing: 11.8.10 1 North Coast Corridor Region s Lifeline A Regional Strategy Mobility, Economy & Environment North Coast

More information

Chapter 3: Multi-Modal Circulation and Streetscapes

Chapter 3: Multi-Modal Circulation and Streetscapes CHAPTER 3: MULTI-MODAL CIRCULATION AND STREETSCAPES Chapter 3: Multi-Modal Circulation and Streetscapes Overview Streetscape improvements have already been completed for Depot Street between Main Avenue

More information

City Council Report 915 I Street, 1 st Floor Sacramento, CA

City Council Report 915 I Street, 1 st Floor Sacramento, CA City Council Report 915 I Street, 1 st Floor Sacramento, CA 95814 www.cityofsacramento.org File #: 2016-01229 November 29, 2016 Consent Item 03 Title: (Pass for Publication) Ordinance Amending Subsection

More information

MEMORANDUM. David Mohlenbrok, Environmental Services Manager

MEMORANDUM. David Mohlenbrok, Environmental Services Manager MEMORANDUM DATE: August 10, 2017 TO: FROM: RE: Planning Commission Members David Mohlenbrok, Environmental Services Manager Blue Memo # 1 for Rocklin Station Project Comments Received on Initial Study/Mitigated

More information

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD Appendix T CCMP 3.3.4 TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD 3.3.4 Trail Traffic and Transportation Design Multi-use trails have certain design standards, which vary depending on the agency that

More information

San Jose Transportation Policy

San Jose Transportation Policy San Jose Transportation Policy Protected Intersections in LOS Policies to Support Smart Growth Presented by: Manuel Pineda City of San Jose Department of Transportation Bay Area Map San Francisco Oakland

More information

CITY MANUALS AND STANDARDS REVIEW

CITY MANUALS AND STANDARDS REVIEW GEORGETOWN SIDEWALK MASTER PLAN CITY MANUALS AND STANDARDS REVIEW RESOURCES AND STANDARDS As part of the Master Plan process, a review and evaluation of current City documents and policies relevant to

More information

Complete Streets: Policy to Pavement

Complete Streets: Policy to Pavement Complete Streets: Policy to Pavement Darby Watson AICP ASLA LEED AP August 2, 2012 City of Pasadena Agenda Introductions Complete Streets Policy Planning for All Modes Design and Implementation Integration

More information

City of Charlottesville Bicycle and Pedestrian Master Plan Update

City of Charlottesville Bicycle and Pedestrian Master Plan Update City of Charlottesville Bicycle and Pedestrian Master Plan Update September 17, 2014 I. Welcome and meeting overview II. Project status update III. Network overview IV. Break-out groups Pedestrian Network

More information

CONNECTING PEOPLE TO PLACES

CONNECTING PEOPLE TO PLACES CONNECTING PEOPLE TO PLACES 82 EAST BENCH MASTER PLAN 07 Introduction The East Bench transportation system is a collection of slow moving, treelined residential streets and major arteries that are the

More information

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto

More information

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM. City of Cambridge Transportation Master Plan Public Consultation Centre March 7, 2018 5:00 8:00 PM Region of Waterloo City of Cambridge Transportation Master Plan Public Consultation Centre March 7, 2018

More information

Arlington s Master Transportation Plan

Arlington s Master Transportation Plan Arlington s Master Transportation Plan The Master Transportation Plan (MTP) Adopted in eight parts Goals & Policies element and MTP Map adopted in 2007 Bicycle, Pedestrian and Demand and Systems Management

More information

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL CITY OF WEST KELOWNA COUNCIL POLICY MANUAL Page 1 of 7 DEPARTMENT: Engineering Services SUBJECT: Traffic Calming Policy (Revised June 6, 2017) Policy Statement: The provision of traffic calming measures

More information

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31 2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31 2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Part 1: General Information Funding

More information

Sandwich Pedestrian/Bicycle Planning

Sandwich Pedestrian/Bicycle Planning Sandwich Pedestrian/Bicycle Planning Improved Pedestrian and Bicycle Connections with the Cape Cod Canal Multi-use Path February 2014 Table of Contents Introduction... 1 Background... 1 Study Goals...

More information

GOAL 2A: ESTABLISH AND MAINTAIN A SAFE, CONVENIENT, AND EFFICIENT MULTI-MODAL TRANSPORTATION SYSTEM TO MOVE PEOPLE AND GOODS THROUGHOUT THE CITY.

GOAL 2A: ESTABLISH AND MAINTAIN A SAFE, CONVENIENT, AND EFFICIENT MULTI-MODAL TRANSPORTATION SYSTEM TO MOVE PEOPLE AND GOODS THROUGHOUT THE CITY. 2. TRANSPORTATION ELEMENT The purpose of this element is to assist in establishing an adequate transportation system within the City and to plan for future motorized and non-motorized traffic circulation

More information

BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes

BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes Minutes Approved as Submitted Date: 8/10/17 Initials: EC BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes June 8, 2017 The Bicycle and Trails Advisory Commission was called to order at 4:00 p.m.

More information

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY I. VISION, GOALS & PRINCIPLES VISION To improve the streets of Portland making them safer and more accessible for all users including pedestrians,

More information

Addendum to Mitigated Negative Declaration

Addendum to Mitigated Negative Declaration Addendum Date: Case No.: 2014.1499E Project Title: (MDSP) - Mission Valencia Green Gateway Streetscape Project Original: 2008.1075, MDSP Mitigated Negative Declaration Project Sponsor: Charlie Ream, San

More information

This chapter describes the proposed circulation system and transportation alternatives associated with

This chapter describes the proposed circulation system and transportation alternatives associated with 5.0 Circulation 5.1 OVERVIEW This chapter describes the proposed circulation system and transportation alternatives associated with West Landing, and summarize the information contained in the Existing

More information

TRANSPORTATION MASTER PLAN Review Citywide Recommendations, Updated List and Scoring Methodology December 6, 2018

TRANSPORTATION MASTER PLAN Review Citywide Recommendations, Updated List and Scoring Methodology December 6, 2018 NOTE: Due to lengthy Committee discussion and allotted meeting time, slides 12-35 were not presented at the meeting, but are provided here for reference. TRANSPORTATION MASTER PLAN Review Citywide Recommendations,

More information

Street Paving and Sidewalk Policy

Street Paving and Sidewalk Policy City Commission Policy 600 Street Paving and Sidewalk Policy DEPARTMENT: Public Works DATE ADOPTED: June 7, 1995 DATE OF LAST REVISION: December 10, 2014 Policy No. 600.01 AUTHORITY: PASS City of Tallahassee-Leon

More information

August 3, Bay Trail Connection With The Community

August 3, Bay Trail Connection With The Community Ms. Lina Velasco, Senior Planner City of Richmond Planning Division P.O. Box 4046 Richmond, CA 94804 Dear Ms. Velasco: August 3, 2009 73 Belvedere Ave. Richmond, CA 94801 Phone/Fax: 510-235-2835 Email:tracbaytrail@earthlink.net

More information

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations

VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment Staff Recommendations Department of Environmental Services Transportation January 28, 2017 Timeline of Transform66 June 2012: I-66

More information

C C C

C C C C-012-001 Thank you for your support for the creation of new public space and nonmotorized access between downtown and the waterfront through the Overlook Walk, the East-West Connections, and the Promenade.

More information

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

Traffic Calming Policy

Traffic Calming Policy Page 22 of Report TS-1-13 Development and Infrastructure Division Transportation Services Department Approved by: City Council on February 19, 2013 Report Number: TS-1-13 Effective: February 20, 2013 Amended:

More information

CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE FOR BROAD STREET BICYCLE BOULEVARD PROJECT

CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE FOR BROAD STREET BICYCLE BOULEVARD PROJECT City of San Luis Obispo, News Release DATE: August 1, 2017 RELEASE: Immediate CONTACT: Luke Schwartz (805) 781-7190 Transportation Planner-Engineer, Public Works CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE

More information