The Millbrae Station is owned and operated by the Bay Area Rapid Transit District and is served by Caltrain

Size: px
Start display at page:

Download "The Millbrae Station is owned and operated by the Bay Area Rapid Transit District and is served by Caltrain"

Transcription

1 Appendix B Millbrae Station Key features The Millbrae Station is owned and operated by the Bay Area Rapid Transit District and is served by Caltrain and BART, which connects to San Francisco International Airport. The station has three tracks: two used by Caltrain, and one by BART. Most passengers traveling on both systems must go through the elevated concourse level to descend to their train platform. Table B-3: Bicycle profile Millbrae station Total rack spaces 28 Occupied rack spaces 17 Total locker spaces 53 Rented lockers 16 AM passenger boardings, northbound (NB) 308 AM passenger boardings, southbound (SB) 643 AM passenger boardings with bikes, NB 11 AM passenger boardings with bikes, SB 15 Observed bumps (number, time, direction) 3, AM, SB Coat hanger Bicycle rack Recent station history The Millbrae intermodal station opened in 2003 when BART to SFO service commenced. Station plans Neither BART nor Caltrain has plans to modify the Millbrae station. The City of Millbrae s 1998 Millbrae Station Area Specific Plan calls for redeveloping 116 acres around the BART/Caltrain Station over a 25 year horizon. The Plan envisions redeveloping the west side surface parking lots to mixed use, transit oriented development, including a civic plaza and open space, as well as upgrading El Camino Real to an urban boulevard. Millbrae station is one of the regional hub stations identified in MTC s Transit Connectivity Plan. Bicyclist data The Millbrae station has the smallest number and proportion of passengers boarding with a bicycle of the ten stations profiled in this chapter. Bicycle access to station Approaching the Millbrae station from the west/el Camino Real is very challenging. El Camino Real is intimidating for all but the most experienced cyclists. Serra Avenue, Linden Avenue, California Avenue and Murchison Drive have less traffic, but provide a more circuitous biking route to the station. These streets also lack bicycle oriented way finding signs. There are no vehicular left turns or crosswalks on southbound El Camino Real between Victoria and Millbrae avenues. The Millbrae Avenue overcrossing of the tracks has no bicycle lanes. Bicycle parking There are five distinct bicycle parking areas at the Millbrae Caltrain/BART station. There are eight coat hanger bicycle rack spaces under the Millbrae Avenue overcrossing, which are outdated and poorly lit. 54 Caltrain Bicycle Parking and Access Plan

2 Station Details There are four sets of modified inverted U racks (with a wider arch), whose design is unique to this station, which are located south of the escalators on the east side of the station and in three southbound Caltrain platform locations: two sets north of the lockers (one of which is hidden from view by the lockers) and one set near the main ticket vending/validators machines. When bicycle parking was surveyed, half of the rack spaces near the escalator and the more visible of the two near the lockers were occupied. The racks with the highest visibility across from the BART fare gates were fully occupied; and there were no bicycles parked at the racks hidden by the lockers. No bicycles were locked to other fixtures at this station. Caltrain and BART each administer bike lockers at the Millbrae station. Most are located on the west side of the tracks. Some blocks of lockers lack rental contact information. Bicycle access to platforms All Caltrain passengers, except those heading southbound from the west side of the station and those transferring from northbound Caltrain to BART, must go up to the station concourse before descending to the Caltrain platforms. There are elevators between each platform and the concourse, but elevator destinations are poorly marked. Stairways are not equipped with bike channels and bicycles may not be carried on escalators. Station signage is confusing to Caltrain and BART passengers with and without bicycles alike. Recommendations Near-term Caltrain responsibility Upgrade 46 keyed lockers to electronic lockers and relocate bicycle racks from the southbound platform closer to the existing racks that are located in the middle of the southbound platform near the base of the stairs Replace coat hanger bike racks under the Millbrae Avenue overcrossing with inverted U racks. Post rental information at all blocks of bicycle lockers. Multi-agency responsibility Work with Caltrans and the City of Millbrae to install bicycle way finding signage between El Camino Real and the station via Serra and Linden avenues and California and Murchison drives. (Short term) Work with Caltrans and the City of Millbrae to develop pedestrian crossings of El Camino at Victoria Avenue, Chadbourne Avenue and/or Isabel Alley to facilitate bicycle and pedestrian access from the west. (Long term) Work with the City of Millbrae and the San Mateo County chapter of the Silicon Valley Bicycle Coalition when the Millbrae Station Area Specific Plan is implemented to ensure construction of bikeways from El Camino Real to the station. Define an alignment for a short path on the west side of the Caltrain tracks between Linden Avenue and Hillcrest Boulevard to eliminate the need to ride on El Camino Real north of Millbrae Avenue. Hidden bicycle racks Caltrain Bicycle Parking and Access Plan 55

3 Appendix B Work with BART to install stairway channels to provide an alternative to elevator access for passengers with bicycles. Work with BART to develop a clear, unified signage program throughout the Millbrae station based on MTC regional hub way finding signage guidelines, especially maps inside the station to bicycle parking and the bicycle train car. All passengers would benefit from better signage of both systems platforms, each platform s direction and destinations, ticket vending machines, and buses and shuttles that serve the station. Work with BART to post rental information at all blocks of bicycle lockers. 56 Caltrain Bicycle Parking and Access Plan

4 Station Details See following pages for illustrations of issues and recommendations Caltrain Bicycle Parking and Access Plan 57

5 Appendix B 58 Caltrain Bicycle Parking and Access Plan

6 Station Details Caltrain Bicycle Parking and Access Plan 59

7 Appendix B Way finding sign Existing inverted U bicycle racks San Mateo Station Key features San Mateo station is located in downtown San Mateo, an active and vibrant district. There is an underground parking garage beneath the station. The northbound platform is very narrow and access is constrained. Signage at the station is clear, plentiful and attractively designed. Recent station history No recent improvements have been made to the station since 2002, when it was renovated to include a pedestrian plaza and underground parking. Station plans In 2008, the San Mateo County Transportation Authority (SMCTA) plans to conduct a study to identify alternative grade separation options for the existing at grade highway rail crossings near the station. Bicyclist data Passengers with bicycles boarding in the morning peak period are evenly split between the two directions. Bicycle access to station Primary access to the San Mateo station is from First Street, at the opposite end of the station as the bicycle car. There is a continuous fence along the outside edge of the northbound platform, which blocks direct access to the station by bicyclists and pedestrians traveling along Railroad Avenue from surrounding neighborhoods. Although there is a pathway on the other side of the fence leading to the nearby neighborhoods, there is no opening in the fence to connect the path to the platform. Table B-4: Bicycle profile San Mateo station Total rack spaces 6 Occupied rack spaces 3 Total locker spaces 24 Rented lockers 15 AM passenger boardings, northbound (NB) 327 AM passenger boardings, southbound (SB) 362 AM passenger boardings with bikes, NB 20 AM passenger boardings with bikes, SB 26 Observed bumps (number, time, direction) 3, AM, SB Bicycle parking The bicycle lockers at this station are administered by the City of San Mateo. The station s only bicycle racks inverted U racks constructed in the surface parking lot were installed too close to the wall to allow adequate access. Additionally, these racks were installed in the incorrect direction; in order for each rack to accommodate its full potential of two bicycles they must be installed parallel to one another, rather than in a line (see Appendix D). There are no racks for bumped bicycles on either platform. 60 Caltrain Bicycle Parking and Access Plan

8 Station Details Bicycle access to platforms Way finding and informational signage at the San Mateo Caltrain station is ample and attractive. There are elevators and stairways (with stair channels for bicycles) from each platform to the underground parking garage. The garage provides a grade separated platform crossing at this station; passengers may also cross the tracks along First Street. Bicyclists exiting the elevators on either platform are reported to have unintended conflicts with passing pedestrians. Passengers with bicycles headed for northbound trains have to walk a long way to the north end of the northbound platform, which is very narrow and constrained. Bicyclists can ride through the surface parking lot to get closer to the north end of the southbound platform before dismounting to walk on the platform. The northern end of the southbound platform where the bicycle car lands is the narrowest portion of the platform. Long-term Caltrain responsibility Provide a connection (ramp or stairs) through the fence leading from the north end of the northbound platform to Railroad Avenue, which would benefit all passengers, and discourage cyclists from riding on the platform. Multi-agency responsibility Work with the City of San Mateo to take over management of the bicycle lockers, as the City wishes to relinquish responsibility. See following pages for illustrations of issues and recommendations Stairway channel Recommendations Near-term Caltrain responsibility Convert 18 existing keyed lockers to electronic lockers, install 18 new electronic lockers, and move two bicycle rack spaces to be available for bumped bicycles. Pave part of the existing unpaved area adjacent to the north end of the southbound platform for two bike rack spaces for bumped bikes. Relocate existing bicycle racks to the station plaza area for better convenience and visibility. Fence at north end of northbound platform Caltrain Bicycle Parking and Access Plan 61

9 Appendix B 62 Caltrain Bicycle Parking and Access Plan

10 Station Details Caltrain Bicycle Parking and Access Plan 63

11 Appendix B Route through Bay Meadows when gate is closed Hillsdale Station Key features The Hillsdale station has especially long, narrow platforms that are elevated between 15 and 20 feet above street level, the result of a recent reconstruction project. Recent station history In 2005, the Hillsdale Station platforms were extended to the north to their current location. Station plans The San Mateo County Transportation Authority is performing a study to examine alternatives to grade separate the existing at grade highway rail crossings at 25th Avenue and either 28 th or 31st Avenue. Some of the alternatives being studied require the station to be relocated to the north. A grade separation project could begin construction as early as 2011 if it does not impact railroad operations or relocate the station. The City of San Mateo is reviewing the proposed Bay Meadows Phase II project, which could include multistory office buildings alongside the northbound tracks, as part of a larger mixed use transit oriented development. Under this plan, Delaware Street could be extended to Pacific Boulevard. Table B-5: Bicycle profile Hillsdale station Total rack spaces 12 Occupied rack spaces 3 Total locker spaces 22 Rented lockers 11 AM passenger boardings, northbound (NB) 745 AM passenger boardings, southbound (SB) 300 AM passenger boardings with bikes, NB 36 AM passenger boardings with bikes, SB 14 Observed bumps (number, time, direction) 3, PM, NB Bicycle access to station From the east: The City of San Mateo has recently constructed a multi use trail, known as the Franklin Path, from the Bay Meadows Phase I development that ends at Pacific Avenue at the southern edge of the east parking lot of the Hillsdale Station. There are no bicycle lanes on Pacific Avenue, but the City of San Mateo is awaiting the completion of the nearby Bay Meadows Phase II project before making roadway configuration changes in the area. Passengers who access the station by bike from the north can travel through the east Bay Meadows/Caltrain parking lot. However, when the gate is closed, cyclists are forced to weave between parked cars and onto a walkway. There are no bicycle lanes on Hillsdale Boulevard, the primary east/west roadway near the station, where it goes under the tracks. The Hillsdale Boulevard overcrossing/intersection of El Camino Real, and El 64 Caltrain Bicycle Parking and Access Plan

12 Station Details Camino Real itself, are intimidating for all but the most experienced bicyclists. Bicycle parking There is no bicycle parking on the east side of the station. Two ribbon racks and twenty two lockers are installed near the station building in the west side parking lot on asphalt, which has settled and is no longer level. As a result, four of the lockers are inoperable. Cyclists report that calls to the posted locker rental number at the City of San Mateo, which manages the lockers, are not returned. Bicycle access to platforms Access from the street and station parking lots to either platform at the Hillsdale station is via stairs (none of which have stairway channels) and ADA ramps (on which bicyclists can walk their bikes). Since stairs and ramps land at the center and south end of the platform, the location of these facilities adds a slight detour for passengers with bicycles destined for the north bicycle cars. There are at grade crossings between platforms at the north and south ends of the platforms; however the relative distance of these crossings from the stairs and ADA ramps tempts some cyclists to ride on the platform between the stairs/ramps and the at grade crossings. Some cyclists report also using the at grade crossings to avoid riding on Hillsdale Avenue to cross the tracks on through trips (i.e. from west San Mateo to Bay Meadows.) This is an especially important situation to address at this station because both platforms are relatively narrow. Mini highs (to facilitate boarding Bombardier trains) are located on both platforms at this station. The stairway to the southbound platform from the south parking lot on the west side of the tracks (at the south west corner of El Camino Real and Hillsdale Avenue) does not have a stairway channel. Neither is there an ADA accessible ramp. Using this stairway allows cyclists to avoid crossing busy East Hillsdale Boulevard. Passengers report that the at grade crossing arm gates at this station malfunction more frequently than at other stations (usually coming down in the absence of trains). Some cyclists suggest widening the at grade crossings; however FRA, PUC and Caltrain safety regulations and standards that govern the design and operation of these crossings prevent widening. Recommendations Near-term Caltrain responsibility Convert eight existing keyed lockers to electronic lockers, and retain two keyed lockers by the station building in the west parking lot. Install two to six bicycle rack spaces in the east and west parking lots for bumped bicycles, as close to the stairways as possible. Install 20 electronic and two keyed bicycle lockers in the east parking, some of which can be relocated and upgraded from existing lockers in the west parking lot. Reinstall west parking lot bicycle lockers on a level concrete pad. Long-term Caltrain responsibility Install stairway channels on the stairway from the south west parking lot to the southbound platform. Track crossing gate arm Caltrain Bicycle Parking and Access Plan 65

13 Appendix B Multi-agency responsibility Work with the City of San Mateo to take over management of the bicycle lockers, as the City wishes to relinquish responsibility. Work with Bay Meadows to provide an opening in the fence (separate from the walkway opening) along the Bay Meadows/east parking lot to allow cyclists to conveniently travel north south. (Shortterm.) Work with the City of San Mateo, Caltrans, and the San Mateo County Transportation Authority to install bicycle lanes on Hillsdale Boulevard and El Camino Real. (Long term.) Work with the City of San Mateo to ensure installation of bicycle lanes on Pacific Avenue as part of the Bay Meadows Phase II project. Work with the San Mateo County Transportation Authority to ensure that all grade separation projects include bicycle lanes. 66 Caltrain Bicycle Parking and Access Plan

14 Station Details See following pages for illustrations of issues and recommendations Caltrain Bicycle Parking and Access Plan 67

15 Appendix B 68 Caltrain Bicycle Parking and Access Plan

16 Station Details Caltrain Bicycle Parking and Access Plan 69

17 Appendix B Ribbon racks along platform Redwood City Station Key features The Redwood City Caltrain station serves as the timedtransfer station for passengers changing to/from limited stop trains. The station is in revitalized downtown Redwood City, which is becoming a vibrant and active district, and is immediately adjacent to and accessible from Sequoia Station shopping center. Recent station history The ADA ramp from Sequoia Station to the southbound platform was rebuilt in Station plans The San Mateo County Transportation Authority will be conducting a footprint study for potential grade separations of the railroad tracks near the station. As a result, the station could be shifted north or south in the long term. The City of Redwood City s Downtown Precise Plan was adopted in 2007 as a blueprint for redevelopment of the area. Bicycle access to station Redwood City ordinance No. 320, 2 makes it unlawful to ride or propel any bicycle upon any sidewalk of any street within the City. Broadway and Marshall Street provide access to the north end of the Redwood City station, including the crossing between platforms. There are also two pedestrian entrances directly from Winslow Street and Middlefield Road to the northbound platform. Sequoia Station shopping center and its expansive parking lot extend from El Camino Real and Jefferson Street to the Caltrain station, with direct pedestrian access to the southbound platform. Access to the southbound platform from the SamTrans parking lot by the bus bays is very visible. From the southbound platform looking north, the Broadway station exit through the City plaza is difficult to see. Hardscape and landscape design also narrows access through the City plaza. Table B-6: Bicycle profile Redwood City station Total rack spaces 20 Occupied rack spaces 20 Total locker spaces 52 Rented lockers 52 AM passenger boardings, northbound (NB) 545 AM passenger boardings, southbound (SB) 235 AM passenger boardings with bikes, NB 45 AM passenger boardings with bikes, SB 23 Observed bumps (number, time, direction) 5, PM, NB Bicycle parking There are ribbon racks adjacent to the southbound platform, which are full much of the time, in part due to their convenient and secure location within sight of 70 Caltrain Bicycle Parking and Access Plan

18 Station Details many passers by. There is no bicycle parking on the northbound side of the station. There are coat hanger and inverted U racks located in the City plaza adjacent to the southbound platform. These racks were improperly installed too close to the platform fence to be usable. Bicycle lockers on elevated concrete pads are located in the parking lot across Broadway from the station. To reach the lockers from the station requires a circuitous walk up Perry Street in order to cross Broadway legally. This area is dimly lit at night. There are no bicycle lockers on the east (northbound) side of the station. Bicycle access to platforms The northbound platform is very narrow and constrained. The fence that runs along the northbound platform limits access to the station to three narrow pedestrian access points: ADA ramps at the north and south ends, and a small set of stairs at the center of the platform. The grade differential between the platform and the street level is less than three feet. There is no at grade crossing within the station at the north end; passengers must exit the station and cross the tracks along Broadway. The central stairs leading from the northbound platform to the east are somewhat obscured by shelters and newspaper racks. The south entrance is a dog leg ADA ramp with handrails; able bodied passengers have been observed hopping over the fence at the at grade crossing to get directly to the Middlefield Road sidewalk to avoid the longer ADA route. There is an at grade crossing between the platforms near this south ramp entrance within the station. The southbound platform is much wider than the northbound platform. The southern stretch of the platform near Sequoia Station shopping center is bordered by a sloped, paved median. Cyclists have been observed riding along the west side of median, which is the delivery access path to some Sequoia Station businesses. There is a set of stairs and an ADA ramp from the Sequoia Station courtyard leading to the southbound platform near the at grade platform crossing. Recommendations Near-term Caltrain responsibility Relocate the 52 lockers from the north Broadway parking lot and install 26 lockers to the Caltrain surface parking lot adjacent to the southbound platform (parking spaces # ). Upgrade 22 of the 26 lockers to electronic day use lockers Create another opening in the southern end of the fence at Winslow/Middlefield Road for stair access to the southbound platform, near the existing ramp. Provide way finding signage to bicycle parking. Long-term Caltrain responsibility Consider installing two bicycle rack spaces on the sloped strip between the southbound platform and the shopping center. This would require building up strip to allow level parking. Inverted U bicycle racks in plaza Fence along northbound platform Caltrain Bicycle Parking and Access Plan 71

19 Appendix B Choke point in plaza access Multi-agency responsibility Work with the City of Redwood City to install bicycle racks at street level near the Winslow Street entrance to the northbound platform. Work with the City of Redwood City to install eight keyed and 53 electronic bicycle lockers east of the station, possibly in the northern tip of the southeastern parking lot, between the white storage shed and the tracks, and a rack at the base of the stairs at the end of Winslow Street. Some of these lockers may be relocated and upgraded from the existing lockers in the north Broadway parking lot. Work with the City of Redwood City to widen the landscaped choke point at the northern end of the southbound platform to facilitate access to plaza. Fence that separates northbound platform from Winslow Street/ Middlefield Road 72 Caltrain Bicycle Parking and Access Plan

20 Station Details See following pages for illustrations of issues and recommendations Caltrain Bicycle Parking and Access Plan 73

21 Appendix B 74 Caltrain Bicycle Parking and Access Plan

22 Station Details Caltrain Bicycle Parking and Access Plan 75

Transportation 6. A. Transit Center Circulation and Access. 1. Transit Center Circulation

Transportation 6. A. Transit Center Circulation and Access. 1. Transit Center Circulation Transportation 6 This chapter describes the transportation system in and around the Hillsdale Station Area, with a focus on the Transit Center at the relocated Hillsdale Caltrain Station. The transportation

More information

See Figure 38, Existing Nonmotorized Connections.

See Figure 38, Existing Nonmotorized Connections. Nonmotorized Connections Existing Nonmotorized Connections Pedestrian, vehicle and bike traffic access and movements are confined primarily to Penny Drive on campus. Due to the steep slope along the length

More information

Multi-Modal Traffic Analysis. Parisi and Associates

Multi-Modal Traffic Analysis. Parisi and Associates Mill Valley to Corte Madera Bicycle and Pedestrian Corridor Study Appendix D: Multi-Modal Traffic Analysis Prepared by Parisi and Associates August 2009 Appendix D - Multi-Modal Traffic Analysis Table

More information

Existing Transportation System

Existing Transportation System < Open for Additional Text Transportation System Existing Transportation System This section describes vehicular transportation associated with Children s. transportation are described in a separate section

More information

Bike San Mateo County San Mateo County Bicycle Plan Recommendations August 30, 2010

Bike San Mateo County San Mateo County Bicycle Plan Recommendations August 30, 2010 Policy and Procedures Develop and Implement a Complete Streets Policy to comply with DD-64-R1 and AB1358 Commencing January 1, 2011, AB1358 requires that the legislative body of a city or county, upon

More information

C/CAG. Sunnybrae Elementary School Walking and Bicycling Audit. San Mateo-Foster City School District JUNE 2013

C/CAG. Sunnybrae Elementary School Walking and Bicycling Audit. San Mateo-Foster City School District JUNE 2013 Sunnybrae Elementary School Walking and Bicycling Audit JUNE 2013 San Mateo-Foster City School District C/CAG City/County Association of Governments of San Mateo County SUNNYBRAE ELEMENTARY SCHOOL WALKING

More information

SETTINGS AND OPPORTUNITIES MOBILITY & ACCESS

SETTINGS AND OPPORTUNITIES MOBILITY & ACCESS 7 mobility & access how do people use el camino what is it like to drive on el camino/to park along el camino what is the pedestrian experience like what is the role of transit along the corridor what

More information

REDWOOD CITY STREETCAR - ALTERNATIVES ANALYSIS

REDWOOD CITY STREETCAR - ALTERNATIVES ANALYSIS REDWOOD CITY STREETCAR - ALTERNATIVES ANALYSIS The purpose of this document is to ennumerate the analysis of alternatives for a streetcar along the Broadway Corriodor of Redwood City. The six alternatives

More information

Caltrain Bicycle Access and Parking Plan: Implementation Strategy

Caltrain Bicycle Access and Parking Plan: Implementation Strategy Caltrain Bicycle Access and Parking Plan: Implementation Strategy December 2014 Acknowledgements Caltrain Bicycle Advisory Committee Caltrain staff would like to acknowledge both the current and former

More information

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

7/23/2017 VIA  . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 7/23/2017 VIA EMAIL Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: 65 th Street Apartments (DR17-220) Dear Mr. Hanebutt:

More information

CURBSIDE ACTIVITY DESIGN

CURBSIDE ACTIVITY DESIGN 5 CURBSIDE ACTIVITY DESIGN This chapter provides design guidance for separated bike lanes adjacent to curbside activities including parking, loading and bus stops. Typical configurations are presented

More information

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD Appendix T CCMP 3.3.4 TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD 3.3.4 Trail Traffic and Transportation Design Multi-use trails have certain design standards, which vary depending on the agency that

More information

summary of issues and opportunities

summary of issues and opportunities 1 summary of issues and opportunities EXECUTIVE SUMMARY CHAPTER 2: HISTORY - 3: LAND USE This first chapter is an overview of lessons learned from analysis of the existing conditions on El Camino as well

More information

RE: Park Plaza Walgreens (P12-016)

RE: Park Plaza Walgreens (P12-016) 12/5/2014 VIA EMAIL David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Blvd., 3rd Floor Sacramento, CA 95811 RE: Park Plaza Walgreens (P12-016) Dear Mr. Hung:

More information

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS

01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS 01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS Existing Bus Stop Existing US101 On-ramp Existing POC Old Redwood Highway Rich Street City ROW Environmental Study Limit Industrial Way NO DESIGNATED

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Route 29 Solutions Route 29 Solutions Projects www.route29solutions.org October 10, 2014 Route 29 Widening to Six Lanes Albemarle County This project will widen a 1.8-mile segment of Route 29 from four

More information

Active Transportation Facility Glossary

Active Transportation Facility Glossary Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike

More information

11/28/2016 VIA

11/28/2016 VIA 11/28/2016 VIA EMAIL Ethan Meltzer, Assistant Planner City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, Ca 95811 RE: Natomas Corporate Center Commercial Building

More information

Executive Summary Route 30 Corridor Master Plan

Executive Summary Route 30 Corridor Master Plan Route Corridor Master Plan Project Overview The Route Corridor Master Plan is a coordinated multimodal transportation and land use plan for the entire stretch of Route through East Whiteland Township,

More information

8/31/2016 VIA . RE: Freeport Arco Fuel Station (P16-039)

8/31/2016 VIA  . RE: Freeport Arco Fuel Station (P16-039) 8/31/2016 VIA EMAIL Garrett Norman, Assistant Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: Freeport Arco Fuel Station (P16-039)

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on CAPITAL Large Category Projects Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on 07-27-18 1 La Mesa University Ave Pedestrian

More information

6/14/2013 VIA . Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd Sacramento, CA 95814

6/14/2013 VIA  . Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd Sacramento, CA 95814 6/14/2013 VIA EMAIL Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd RE: Sacramento Natural Foods Co-Op (P13-025) Dear Mr. Compton: WALKSacramento appreciates

More information

RZC Appendix 8A Marymoor Subarea Street Requirements

RZC Appendix 8A Marymoor Subarea Street Requirements RZC Appendix 8A Marymoor Subarea Street Requirements For additional design details for Marymoor Subarea infrastructure, refer to the 2017 Marymoor Subarea Infrastructure Planning Report. STREET REQUIREMENTS

More information

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.

WHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building. CEDAR-ISLES-DEAN NEIGHBORHOOD ASSOCIATION ( CIDNA ) RESOLUTION OPPOSING A DRUG STORE DRIVE THRU, AND COMMENDING DORAN COMPANIES FOR PROPOSING MITIGATING AMENITIES INCLUDING NEW LANDSCAPING AND A DEDICATED

More information

San Jose Transportation Policy

San Jose Transportation Policy San Jose Transportation Policy Protected Intersections in LOS Policies to Support Smart Growth Presented by: Manuel Pineda City of San Jose Department of Transportation Bay Area Map San Francisco Oakland

More information

City of Walnut Creek TELEGRAPH AVENUE BART LINE SELF-GUIDED TOD TOUR 19TH STREET BART STATION

City of Walnut Creek TELEGRAPH AVENUE BART LINE SELF-GUIDED TOD TOUR 19TH STREET BART STATION TELEGRAPH AVENUE City of Walnut Creek BART LINE SELF-GUIDED TOD TOUR 19TH STREET BART STATION Self-Guided TOD Tour With the Walnut Creek BART Station located squarely within its boundaries, the West Downtown

More information

Table #6 VISION CHARACTERISTICS

Table #6 VISION CHARACTERISTICS Table #6 VISION White Flint is a place to live, work, play, shop, and walk with sufficient density to encourage quality redevelopment. Vibrant streets and consistent streetscapes are important. CHARACTERISTICS

More information

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO TRAFFIC ACTION PLAN Laurie Meadows Neighborhood CITY OF SAN MATEO Draft January 2017 Table of Contents Introduction... 2 The Traffic Forum Process... 5 Neighborhood Traffic Issues... 7 Neighborhood Recommendations

More information

5 CIRCULATION AND STREET DESIGN

5 CIRCULATION AND STREET DESIGN 5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

9/21/2016 VIA . RE: The Knot (DR16-270)

9/21/2016 VIA  . RE: The Knot (DR16-270) 9/21/2016 VIA EMAIL Garrett Norman, Assistant Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: The Knot (DR16-270) Dear Mr. Norman:

More information

EXECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES

EXECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES EECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES Topic and Purpose In 2007, the Mayor of Ottawa s Task Force on Transportation suggested adding a

More information

CHAPTER 4. CIRCULATION

CHAPTER 4. CIRCULATION CITY OF SAN MATEO CHAPTER 4. CIRCULATION This Chapter describes the pedestrian and automobile circulation system within the Corridor Plan area, as well as design and access considerations for the Hillsdale

More information

5/31/2016 VIA . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811

5/31/2016 VIA  . Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811 5/31/2016 VIA EMAIL Arwen Wacht City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811 RE: El Pollo Loco (P16-028) Dear Ms. Wacht: WALKSacramento has reviewed

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

12/4/2016 VIA  . RE: Grocery Outlet Del Paso (DR16-328) 12/4/2016 VIA EMAIL Ethan Meltzer, Assistant Planner City of Sacramento Community Development Department 300 Richards Blvd, 3 rd Floor Sacramento, CA 95811 RE: Grocery Outlet Del Paso (DR16-328) Dear Mr.

More information

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

5/7/2013 VIA  . RE: University Village Safeway Expansion (P13-019) 5/7/2013 VIA EMAIL David Hung, Associate Planner Community Development Department, Current Planning Division City of Sacramento 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: University Village

More information

section 4 Existing Conditions, Issues, and Options

section 4 Existing Conditions, Issues, and Options section 4 Existing Conditions, Issues, and Options 4.0 Existing Conditions, Issues, and Options This section analyzes each segment of the corridor on a street to street basis. Each segment is discussed

More information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction: Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency

More information

11/3/2017 VIA . RE: River Oaks Phase 2 (P17-051)

11/3/2017 VIA  . RE: River Oaks Phase 2 (P17-051) 11/3/2017 VIA EMAIL Ethan Meltzer, Assistant Planner City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 98811 RE: River Oaks Phase 2 (P17-051) Dear Mr. Meltzer:

More information

10/30/2012 VIA

10/30/2012 VIA 10/30/2012 VIA EMAIL David Hung, Associate Planner Community Development Department, Current Planning Division City of Sacramento 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811 RE: The Cannery On-Site

More information

Station 1: Street & Sidewalk Upgrades

Station 1: Street & Sidewalk Upgrades Station 1: Street & Sidewalk Upgrades Existing no left turn; Potential left turn arrow, see Circulation Study boards for more information Thru-lane guidance Improved lead-in green bike lane 17TH ST CASTRO

More information

3/10/2016 VIA th Street, Suite 203 Sacramento, CA

3/10/2016 VIA th Street, Suite 203 Sacramento, CA 3/10/2016 VIA EMAIL Arwen Wacht, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: Natomas Fountains (P16-012) Dear Ms. Wacht:

More information

Chapter 7 Nonmotorized Facilities

Chapter 7 Nonmotorized Facilities Chapter 7 Nonmotorized Facilities What is in this chapter? This chapter discusses existing and proposed pedestrian and bicycle facilities referred to as nonmotorized facilities along the SR 520 corridor.

More information

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) New benches Plant evergreen trees Widen existing sidewalk from 1.5m to 1.8m Marked crosswalk 1.8m wide sidewalk Add pedestrian oriented lights

More information

David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA

David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA June 13, 2016 VIA EMAIL David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 959811 RE: Fire Station 14 (DR16-128) Dear Mr.

More information

NOTICE OF PREPARATION. Environmental Programs 3331 North First Street, Building B-2 San Jose, CA

NOTICE OF PREPARATION. Environmental Programs 3331 North First Street, Building B-2 San Jose, CA NOTICE OF PREPARATION May 29, 2018 To: Reviewing Agencies and Organizations From: Santa Clara Valley Transportation Authority Environmental Programs 3331 North First Street, Building B-2 San Jose, CA 95134-1927

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

Memorandum. Sunday, July 13, Saturday, July 19, 2014

Memorandum. Sunday, July 13, Saturday, July 19, 2014 Memorandum To: David Lowin, Brooklyn Bridge Park Corporation From: Daniel Schack, AICP, PTP Date: Re: Brooklyn Bridge Park Pier 5/6 Loop Road Traffic Study Project No: 14-01-2407 At the request of Brooklyn

More information

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013

Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013 Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013 OVERALL LAND USE CONCEPT Overall Broadway Valdez District: 95.5 acres (35.1 acres right-of ways + 60.4 acres developable land) Plan Subareas:

More information

Ravenswood Avenue Railroad Crossing Project Community Outreach Meeting Presentation May 2, Ravenswood Avenue Railroad Crossing Project

Ravenswood Avenue Railroad Crossing Project Community Outreach Meeting Presentation May 2, Ravenswood Avenue Railroad Crossing Project Ravenswood Avenue Railroad Crossing Project Community Outreach Meeting Presentation May 2, 2016 Agenda Welcome & Introduction Project Background & Purpose Project Overview Small Group Breakouts / Reporting

More information

Millbrae Serra Station Development Millbrae, California

Millbrae Serra Station Development Millbrae, California Millbrae Serra Station Development Millbrae, California Transportation Demand Management Plan Prepared for: Mr. Vincent A. Muzzi, Millbrae Serra Station, LLC June 15, 2016 Hexagon Transportation Consultants,

More information

Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014

Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014 Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks Thomas Jefferson Working Group Meeting #6 November 10, 2014 2 3 INTRODUCTION 4 Goal of our work: Identify and assess multi-modal

More information

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008 SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008 To assist VTA and Member Agencies in the planning, development and programming of bicycle improvements in Santa Clara County. Vision Statement To establish,

More information

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...

More information

FONTAINE AVENUE STUDY Final Report

FONTAINE AVENUE STUDY Final Report FONTAINE AVENUE STUDY Final Report March 28, 2005 FONTAINE AVENUE STUDY City of Charlottesville March 28, 2005 Renaissance Planning Group Kenneth Schwartz, FAIA, AICP Director of Design Leigh Wilkerson,

More information

Transportation Corridor Studies: Summary of Recommendations

Transportation Corridor Studies: Summary of Recommendations Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field

More information

City of Davis East Covell Corridor Plan

City of Davis East Covell Corridor Plan Community Open House #2 January 22, 2014 6:00 8:00 p.m. Veterans Memorial Center, Club Room City of Davis Introduction The (ECCP) is a taking a comprehensive look at the existing transportation systems

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

REQUIREMENTS FOR TRAFFIC CONTROL PLAN SUBMISSION

REQUIREMENTS FOR TRAFFIC CONTROL PLAN SUBMISSION REQUIREMENTS FOR TRAFFIC CONTROL PLAN SUBMISSION A draft traffic control plan, consistent with the following applicable conditions, must be included in every permit application submitted to the City of

More information

TRANSPORTATION COMMISSION Agenda Staff Report

TRANSPORTATION COMMISSION Agenda Staff Report TRANSPORTATION COMMISSION Agenda Staff Report Agenda Item No. 5.a DATE: JULY 31, 2014 TO: FROM: SUBJECT: TRANSPORTATION COMMISSION COMMUNITY DEVELOPMENT DEPARTMENT - PLANNING DRAFT OLYMPIC CORRIDOR PREFERRED

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

Accommodating Pedestrians in the Work Zone

Accommodating Pedestrians in the Work Zone Accommodating Pedestrians in the Work Zone Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However,

More information

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County. Transportation PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN NON-MOTORIZED PLAN CONTENTS Goals, Policies, and Action Strategies Table 4 (Bike Facility Classifications and Descriptions) Table 5 (Bike Facility

More information

San Mateo County Comprehensive Bicycle and Pedestrian Plan Open House

San Mateo County Comprehensive Bicycle and Pedestrian Plan Open House San Mateo County Comprehensive Bicycle and Pedestrian Plan Open House October 28, 2010 Presented to San Mateo County residents and interested parties by Lauren Ledbetter, Alta Planning + Design Matt Haynes,

More information

10/8/2014 VIA . RE: CVS Pharmacy (P13-002) Revised August 2014

10/8/2014 VIA  . RE: CVS Pharmacy (P13-002) Revised August 2014 10/8/2014 VIA EMAIL David Hung, Associate Planner Community Development Department, Current Planning Division City of Sacramento 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: CVS Pharmacy

More information

Appendix B - Street Sections

Appendix B - Street Sections Appendix B - Street Sections 6TH STREET CORRIDOR PLAN STREET SECTIONS The street sections in Appendix B include recommended improvements to streets for North Glenwood. They include existing conditions

More information

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS RT 81 Corridor Study CLINTON ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS View north on High Street, with potential improvements to the streetscape Draft Recommendations November 8 th, 2018 TOWN OF CLINTON

More information

4/14/2017 VIA . Miriam Lim, Junior Planner City of Sacramento Community Development Department 300 Richards, 3 rd Floor Sacramento, CA 95811

4/14/2017 VIA  . Miriam Lim, Junior Planner City of Sacramento Community Development Department 300 Richards, 3 rd Floor Sacramento, CA 95811 4/14/2017 VIA EMAIL Miriam Lim, Junior Planner City of Sacramento Community Development Department 300 Richards, 3 rd Floor Sacramento, CA 95811 RE: Mack & Franklin Development (P17-016) Dear Ms. Lim:

More information

City of Seattle Edward B. Murray, Mayor

City of Seattle Edward B. Murray, Mayor City of Seattle Edward B. Murray, Mayor Department of Transportation Scott Kubly, Director Eastlake Community Council 117 E Louisa St. #1 Seattle, WA 98102-3278 January 28, 2016 RE: Roosevelt to Downtown

More information

March 2008 FINAL DRAFT. Supplemental Bikeway Design Guidelines

March 2008 FINAL DRAFT. Supplemental Bikeway Design Guidelines March 2008 FINAL DRAFT Supplemental Bikeway Design Guidelines Prepared for: Marin County Department of Public Works Marin County Unincorporated Area Bicycle and Pedestrian Master Plan Prepared by: Alta

More information

11/3/2014 VIA . WALKSacramento has reviewed the Stockton and T Mixed-Use project at 3675 T Street in the

11/3/2014 VIA  . WALKSacramento has reviewed the Stockton and T Mixed-Use project at 3675 T Street in the 11/3/2014 VIA EMAIL Antonio Ablog Planning Department City of Sacramento 300 Richards Boulevard Sacramento, CA 95811 RE: Design Review for Stockton and T Mixed-Use (P14-042) Dear Mr. Ablog: WALKSacramento

More information

Dear Mr. Tweed: Sincerely, Min Zhou, P.E. Vice President

Dear Mr. Tweed: Sincerely, Min Zhou, P.E. Vice President December 17, 2012 Mr. Steve Tweed City of Long Beach, Department of Public Works Traffic & Transportation Bureau, 10 th Floor City Hall 333 West Ocean Boulevard Long Beach, CA 90802 Subject: Broadway and

More information

Complete Streets Checklist Process

Complete Streets Checklist Process Complete Streets Policies and Procedures Complete Streets Checklist Process Background MTC Resolution 3765 calls for all projects funded through MTC s programs and fund sources to consider the accommodations

More information

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections Roadway Cross-Sections Medford s roadway cross-section standards apply to new and reconstructed roads. The crosssections take into consideration roadway function and operational characteristics, including

More information

6/22/2018 VIA . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

6/22/2018 VIA  . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670 6/22/2018 VIA EMAIL Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670 RE: Quick Quack Car Wash (DD9801) Dear Ms. Goulart: WALKSacramento

More information

ADA on Construction. Guidance for Section C Plan Preparers

ADA on Construction. Guidance for Section C Plan Preparers ADA on Construction Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However, good planning can minimize

More information

Polk Streetscape Project

Polk Streetscape Project What is this project? The Polk Streetscape Project is an effort to improve safety for everyone traveling on Polk Street between Union and McAllister streets. Also included in this project are paving, sewer

More information

Circulation and Parking

Circulation and Parking CHAPTER 6 Circulation and Parking A. Introduction This chapter describes the circulation recommendations for the Downtown Hemet Specific Plan, which includes recommendations for improving the roadway network,

More information

Traffic Impact Memorandum. May 22, 2018

Traffic Impact Memorandum. May 22, 2018 BISHOP PROFESSIONAL DEVELOPMENT BUILDING Proposed Land-use Change & Parking Modification 3601 SW 31st Street Topeka, Kansas 66614 CFS Project No. 185077 Traffic Impact Memorandum May 22, 2018 Prepared

More information

STONY PLAIN ROAD STREETSCAPE

STONY PLAIN ROAD STREETSCAPE Jasper Place Revitalization Strategy: Vision The people involved in the Jasper Place Revitalization Strategy envision: Goal 1: Feeling safe in our community Create a community where feeling safe is common--where

More information

Upper Market Street Bike Lane Project

Upper Market Street Bike Lane Project Upper Market Street Bike Lane Project 17th Street to Octavia Boulevard 6 30 2010 SAN FRANCISCO, CALIFORNIA Agenda San Francisco & Sustainable Transportation Project Goals Outreach & Coordination Project

More information

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07 25th Avenue Road Diet Project A One Year Evaluation Transportation Fund for Clean Air Project #05R07 Submitted by: The San Francisco Municipal Transportation Agency Dan Provence May 22, 2009 EXECUTIVE

More information

CPC Parking Lot Riverside Drive. Transportation Rationale

CPC Parking Lot Riverside Drive. Transportation Rationale CPC Parking Lot Transportation Rationale Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 September 2015 Novatech File: 114093 Ref: R-2015-153 Table of Contents 1.0 INTRODUCTION...

More information

Complete Streets. Designing Streets for Everyone. Sarnia

Complete Streets. Designing Streets for Everyone. Sarnia Complete Streets Designing Streets for Everyone Sarnia Complete Streets ~ Sarnia ~ 2018 Introduction Our City is made up of a network of streets that we use to go for a walk, cycle to work, drive to the

More information

North Avenue Rail Station Accessibility Assessment

North Avenue Rail Station Accessibility Assessment North Avenue Rail Station Accessibility Assessment Joel Anders, Arnaud Huguet, and Alex Poznanski 30 July 2012 Table of Contents EXECUTIVE SUMMARY... 1 MISSION STATEMENT... 2 INTRODUCTION... 2 CROSSWALKS

More information

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2. Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW

More information

Agenda Item # Page # RECOMMENDATION

Agenda Item # Page # RECOMMENDATION TO: FROM: SUBJECT: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON FEBRUARY 2, 2016 JOHN BRAAM, P. ENG. MANAGING DIRECTOR, ENVIRONMENTAL & ENGINEERING SERVICES AND CITY ENGINEER FIELD MARSHAL WOLSELEY

More information

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community Riverside Station A green, transit-oriented community October 6, 2011 TONIGHT S AGENDA: 1. Project Update (5 min.) 2. Master Plan Update (10 min.) 3.Traffic Plan Update (10 min.) Questions & Answers MASTER

More information

This chapter describes the proposed circulation system and transportation alternatives associated with

This chapter describes the proposed circulation system and transportation alternatives associated with 5.0 Circulation 5.1 OVERVIEW This chapter describes the proposed circulation system and transportation alternatives associated with West Landing, and summarize the information contained in the Existing

More information

Road Diets FDOT Process

Road Diets FDOT Process Florida Department of TRANSPORTATION Road Diets FDOT Process Humberto Castillero, PE, PTOE Roadway Design Office Purpose of Guide Develop a statewide lane elimination review process Balance state & local

More information

INDOT Complete Streets Guideline & Policy

INDOT Complete Streets Guideline & Policy INDOT Complete Streets Guideline & Policy INTRODUCTION The Complete Streets guidelines build upon multiple efforts and promote a multimodal transportation system that is integrated and sustains land use

More information

Blair/Williamson Intersection Expressed Needs

Blair/Williamson Intersection Expressed Needs Blair/Williamson Intersection Expressed Needs NORTH Blair Street is a barrier for pedestrians and bicycles Relocate Capitol City Trail crossing from Blair Street and John Nolen Drive intersection to Williamson

More information

3/20/2015 VIA . Teresa Haenggi, Associate Planner Community Development Department 300 Richards Blvd. Sacramento, CA 95811

3/20/2015 VIA  . Teresa Haenggi, Associate Planner Community Development Department 300 Richards Blvd. Sacramento, CA 95811 3/20/2015 VIA EMAIL Teresa Haenggi, Associate Planner Community Development Department 300 Richards Blvd. Sacramento, CA 95811 RE: Ice Blocks (P14-062) Dear Ms. Haenggi: WALKSacramento has reviewed the

More information

9/22/2014 VIA . RE: Butano Apartments Pre App (PAMP )

9/22/2014 VIA  . RE: Butano Apartments Pre App (PAMP ) 9/22/2014 VIA EMAIL Surinder Singh, Senior Planner Planning and Environmental Review Division Sacramento County 827 7th Street, Second Floor RE: Butano Apartments Pre App (PAMP2014-00012) Dear Mr. Singh:

More information

Addendum to Mitigated Negative Declaration

Addendum to Mitigated Negative Declaration Addendum Date: Case No.: 2014.1499E Project Title: (MDSP) - Mission Valencia Green Gateway Streetscape Project Original: 2008.1075, MDSP Mitigated Negative Declaration Project Sponsor: Charlie Ream, San

More information

Welcome to the Quebec Alternatives Analysis Public Meeting

Welcome to the Quebec Alternatives Analysis Public Meeting Welcome to the Public Meeting Please sign in. Public Comment Please fill out a comment card and tell us what you think. Check back or comment any time at: www.quebecalternatives.com Project Area Technical

More information

TRANSPORTATION TRAINING TOPICS. April 6, 2010

TRANSPORTATION TRAINING TOPICS. April 6, 2010 TRANSPORTATION TRAINING TOPICS April 6, 2010 Roles of Transportation Providers Context and Policy Makers Division of Transportation and Traffic Other City Operations Other Transportation Operators CMA

More information

PRESS RELEASE San Joaquin Council of Governments

PRESS RELEASE San Joaquin Council of Governments PRESS RELEASE San Joaquin Council of Governments For Immediate Release February 23, 2018 Contact: Nicole Gorham, 235-0582 gorham@sjcog.org SJCOG Board Awards $19.63 Million in Measure K Bicycle, Pedestrian,

More information