1 New Mexico Transportation Funding Challenges Rocky Mountain Pavement Preservation Partnership Meeting October 29-31, 2008 Ernest Archuleta, P.E. Field Operations Division Director 1

2 NMDOT DISTRICT OFFICES 5,315 Lane Miles 6,239 Lane Miles 3,345 Lane Miles 2,248 Lane Miles 5,649 Lane Miles 7,650 Lane Miles 6 Districts with a total of 30,446 lane miles District 1 = 5,649 lane miles District 2 7,650 lane miles our largest District and has no interstate miles District 3 2,248 lane miles our smallest district, but the most urban District 4 6,239 lane miles District 5 5,315 lane miles District 6 3,345 lane miles I and I 40 are our interstate system. With over 40% of heavy truck traffic occuring on I40 2

3 Total Lane Miles In New Mexico s State Highway System (In Thousands) FY99 FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 FY08 FY09 Over the last 10 years, NMDOT has seen a increase of 3,200 in lane miles in NM This is approximately a 12% increase 3

4 Patrols in NM Patrols LANE MILES D1 12 5, D2 16 7, D3 5 2, D4 16 6, D5 21 5, D6 12 3, TOTAL 82 30, New Mexico has a total of 82 Patrols with 746 FTEs among the 6 Districts covering those 30,446 lane miles. This is a statewide average of 371 lane miles per patrol and lane miles per FTE While lane miles across the state have increased 12% during the last 10 years, in that same time frame our forces have only increased 6%. 4

5 Maintenance Budget Trend (In Millions) $80.0 $70.0 $60.0 $50.0 $40.0 $30.0 $20.0 $10.0 $- $75.9 $75.9 $64.5 $54.0 $56.0 $55.7 $55.7 $58.6 $58.6 $62.7 $63.5 FY99 FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 FY08 FY09 While NMDOT has seen about a 41% increase in budget over the last 10 years, generally that increase has been very slow and gradual. From 1999 to 2007, our budget was mostly flat with only minor increases every couple of years. However, we experienced an 18% increase in 2008 due to a special legislative appropriation. In 08 we received a one time appropriation of $42 million from General Fund to address our maintenance program. 5

6 NMDOT Transportation Needs NMDOT Overall Needs 20 year projection Based on HERS-ST Model, 2005 Gap in Funding per Year Routine Maintenance Pavement Preservation GRIP I GRIP II Rail Runner Operations Unfunded Capital Improvements Bridge Deficiencies Bridge Replacement Bridge Maintenance $16.7 Billion $21.8 mil/yr $54.2 mil/yr $445 mil $87 mil $18 mil/yr $386 mil/yr for 20 yr $43.3 mil/yr for 5 yr $25.3 mil/yr $12.6 mil/yr Routine Maintenance FY07, Needs=$65.4 mil, Actuals= $43.6 mil, Gap = $21.8 mil Pavement Preservation Unfunded Construction, Congestion Need = 566 mil/yr, Ave Constr Program = 180 mil/yr, Gap = $386 mil/yr Bridges spend $26mil/yr currently, Bridge Deficiencies 239 deficient state owned bridges Cost to replace all structurally deficient bridges 1,730,037 $125/sf = $216.3 million $216.3 million / 5 yrs = $43.3 million/yr, bridge 5 yr plan Bridge Replacements Should be replacing 25 bridges/yr based on 50 yr design life, (1267 br/50 yr/br) Ave cost to replace 1 bridge = $1,012,500 Ave cost to replace 25 bridges = $25.3 million/yr Double for associated roadwork, $25.3 x 2 = 50.6 mil/yr Less current budget of $26 mil/yr = roughly $25.3 mil/yr Bridge Maintenance Should be doing preventative maint on 25 bridges/yr 25br x $62.50/sf x 8100sf/br = $12.6 mil/yr 6

7 Needs - Statewide Bridge Program $216.3 Mil Replacement Cost Deficient Bridge Deck Area 2,400,000 Deficient Bridge Deck Area (S.F.) 2,300,000 2,200,000 2,100,000 2,000,000 1,900,000 1,800,000 1,700,000 1,600, million S. F 1.90 million S.F million S.F QUARTER The 239 deficient bridges equate to a Deficient bridge deck area of 1.73 million SF Bridge replacement costs Average $125 dollars/sf $216.3 million Replacement Cost - needed to replace Structurally Deficient bridges in today s dollars Bridge replacement only does not include roadway work generally associated with bridge construction Embankment for approaches and departures Drainage, Paving, concrete medians, lighting, signalization, guardrail, signing Detours $432.6 million Construction Cost - Can easily double replacement cost for actual construction cost This number will increase each year due to inflation. Replacement costs continue to rise with each year of do nothing alternative. 7

8 Needs Routine Maintenance $21.8 million gap in funding FY07 $70,000,000 $60,000,000 $50,000,000 $40,000,000 $30,000,000 $20,000,000 $10,000,000 $0 $33,852,496 $44,612,272 Routine Maintenance Expenditures Needs vs Actuals $10,759,776 FY03 FY04 FY05 FY06 FY07 Actuals Needs Gap Linear (Needs) Linear (Actuals) Last 5 yrs, Avg Exp = $37.1 mil/yr Avg Needs = $50.1 million/yr $43,572,226 $65,435,206 $21,862,980 Routine Maint costs continue to rise $21.8 million gap in funding for FY07 Gap growing since FY04 Routine Maint becomes more reactive vs proactive This slide is a snapshot of Routine Maintenance Expenditures vs. Needs over the last 5 yrs. Routine Maintenance all typical roadside and roadway maintenance excluding pavement treatments Erosion & Drainage Repair, Sign replacement, Mowing, Shoulder widening, Pot Hole Patching, Litter Pickup Routine Maintenance Expenditures average $37.1 million/yr over the last 5 yrs. Needs averaged $50.1 million/yr. This is an average GAP of $13.1 million/yr The gap in addressing all Routine Maintenance needs has been growing for the last 4 yrs. Last year the gap was over $21 million. The Gap will continue to grow as available funding falls short of meeting the Needs. 8

9 Chip Seal - Cost per Lane Mile Cost and Highway Lane Miles Chip Sealed $9,000 Benchmark 5-6 Year Cycle 2,500 Miles FY Cost Per Lane Mile $8,000 $7,000 $6,000 $5,000 $4,000 $3,000 $2,000 COST PER MILE $8,025 $8,024 2,407 2,423 2,308 2,266 $6,893 $6,401 Funding Gap to 2,011 $5,498 Benchmark- 1,887 1,851 $5,274 1,113 Lane Miles $4,890 or $8.9 Million $4,636 $4,480 1,433 1,387 $3,801 1,087 3,000 2,000 1,000 Miles Accomplished $1,000 $ Fiscal Year 0 Chipseal Cost Per Lane Mile Lane Miles Accomplished 9

10 Escalation of Average Costs Pavement Preservation Treatments Pavement Preservation Treatments Cost/Lane Mile 5 Years Ago Cost/Lane Mile Today Percent Increase Fog Sealing $1,045 $1,156 11% Crack Sealing $3,600 $14, % Chip Sealing $4,852 $ % Open Graded Friction Course (OGFC) Overlay $10,920 $32, % 2 Hot Mix Overlay $34,027 $80, % Heater Scarification & Overlay (Cutler) $9,504 $64, % Microsurfacing $37,500 $58,560 56% Cold Mill/Inlay $175,000 $359, % Cold In-Situ Recycle Overlay $200,000 $350,000 75% Rehabilitation $500,000 $750,000 50% Reconstruction $1,125,000 $1,835,000 63% 10

11 Crude Facts Variation of oil grades from extra heavy to sour 42 Gallons per barrel sold in 10,000 units Crude Oil is separated into fractions by fractional Distillation process 29% produced in Middle East 19% of supply provided to North America Largest oil refinery in Venezuela Produces 957,000 barrels per day Crude oil prices have dropped 57% since July from $140/bl to $60.53/ bl. 11

12 What s happening in NM? Increase in asphalt index price $500/ton in June Estimated $30 million impact to active construction program New price index developed and published for use in July program let and into the future to respond to unprecedented instability in asphalt market Possible project completion delay due to supply issue related to price increases Operations, Design and Finance working on impacts to construction, design and funding impacts to statewide program Adjustments to maintenance program (price agreement) in progress. Current Asphalt Price Index is $735/ ton Estabilished a NM Index rack prices provided from 4 NM suppliers 12

13 Conclusions Transportation Needs far outweigh available funding Federal revenue streams are decreasing with more emphasis being placed on States to pick up slack Current level of funding will not sustain New Mexico s transportation needs into the future Options in Transportation Funding are needed 13

Pavement Management Program

Pavement Management Program Pavement Management Program Public Works Department January 5, 2016 Chad Butzow, P.E. Deputy Director Field Operation Services Public Works Department Brian Martineau Pavement Manager Public Works Department

More information

Secondary Road Program

Secondary Road Program Secondary Road Program Joint Legislative Transportation Oversight Committee October 5, 2012 1 Secondary Roads Program The Big Picture The Secondary Road System Needs and Project Types Paved and Unpaved

More information

GDOT Fiscal 2015 Year 2017 GDOT PowerPoint. Title Page

GDOT Fiscal 2015 Year 2017 GDOT PowerPoint. Title Page GDOT Fiscal 2015 Year 2017 GDOT PowerPoint Savannah Post SAME Title Page Annual Programs Review Sub Titles K. Joe Carpenter, Jr., P.E. Body Text Director Division of P3/Program Delivery June 15, 2016 Transportation

More information

Kentucky s Surface Transportation System

Kentucky s Surface Transportation System Kentucky s Surface Transportation System ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit

More information

GDOT GDOT PowerPoint. Title Page

GDOT GDOT PowerPoint. Title Page GDOT 20152017 GDOT PowerPoint Savannah Post SAME Title Page Annual Programs Review Sub Titles Matt Bennett Body Text Program Manager June 14, 2017 Transportation Funding Act of 2015 (HB170) 2015 GDOT Your

More information

Keeping good roads good

Keeping good roads good Pavement Preservation (PP) in the State of California- Protecting Their Road and Street Investment R. Gary Hicks PhD, PE CP2 Center, Chico CA Prepared for the 3 rd International Pavement Maintenance Technology

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

Tacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force

Tacoma Streets 101. City of Tacoma - Citizen Neighborhood Street Improvement and Safety Task Force 1 Tacoma Streets 101 2 Streets Maintenance Overview Type and amount of streets Condition and types of construction Maintenance and repair methods and costs Sample Project Philosophy/Selection Criteria

More information

FUTURE MOBILITY IN TEXAS: The Cost of Meeting the State s Need for Safe and Efficient Mobility

FUTURE MOBILITY IN TEXAS: The Cost of Meeting the State s Need for Safe and Efficient Mobility FUTURE MOBILITY IN TEXAS: The Cost of Meeting the State s Need for Safe and Efficient Mobility OCTOBER 2012 202-466-6706 www.tripnet.org Founded in 1971, TRIP, of Washington, DC is a nonprofit organization

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

City of Davis Pavement Management Program

City of Davis Pavement Management Program City of Davis Pavement Management Program Davis Street and Bike Path System 163 centerline miles of streets (33 million square feet) 34.6 miles of arterials 21% 22.8 miles of collectors 14% 103.9 miles

More information

POTHOLES IN EDMONTON. Updated: April 4, 2013

POTHOLES IN EDMONTON. Updated: April 4, 2013 Updated: April 4, 2013 Abstract Every year the City of Edmonton spends a few million dollars to fill a few hundred thousand potholes. Are potholes just a fact of life, or can we do something about them?

More information

Southeaster Pavement Preservation Partnership 2010 Update Welcome to Tennessee. Michael J. Doran, P.E. Maintenance Division

Southeaster Pavement Preservation Partnership 2010 Update Welcome to Tennessee. Michael J. Doran, P.E. Maintenance Division Southeaster Pavement Preservation Partnership 2010 Update Welcome to Tennessee Michael J. Doran, P.E. Maintenance Division Why are we here today? The Solution Background Information Geographic Locations

More information

Fairfax County Transportation Funding and Roadway Service Delivery Study. Study Update Transportation Advisory Commission

Fairfax County Transportation Funding and Roadway Service Delivery Study. Study Update Transportation Advisory Commission Fairfax County Transportation Funding and Roadway Service Delivery Study Study Update Transportation Advisory Commission May 4, 2010 Past Studies Aug. 1965 The Financial Effects of the Incorporation of

More information

APPENDIX E Activity Defect Assignment

APPENDIX E Activity Defect Assignment APPENDIX E Activity Defect Assignment Activity Defect Pct Applicable 2010-ML - SHALLOW PATCHING (STN - 2010-TL - SHALLOW PATCHING (STN - 2020-ML - DEEP PATCHING (STN - 2020-TL - DEEP PATCHING (STN - 2030-ML

More information

land transport road assets

land transport road assets land transport road assets land transport road assets Otago Region Information as at June 2007 land transport road assets 2 Purpose of this publication Land Transport New Zealand annually publishes comparative

More information

Smoothing Out the Bumpy Road Ahead

Smoothing Out the Bumpy Road Ahead Julie Hannah, P.E. Technical Services and Asset Management May 11, 2017 Smoothing Out the Bumpy Road Ahead Nationwide D = Poor, At Risk Conditions & Capacity Pavement Condition & Congestion Nationwide

More information

4-County Big Oil Oil Impacts Analysis Dunn, McKenzie, Mountrail, & Williams Counties in association with:

4-County Big Oil Oil Impacts Analysis Dunn, McKenzie, Mountrail, & Williams Counties in association with: 4-County Big Oil Oil Impacts Analysis Dunn, McKenzie, Mountrail, & Williams Counties in association with: In association with: Interim Energy Development and Transmission Legislative Committee March 8,

More information

land transport road assets

land transport road assets land transport road assets land transport road assets Westland District West Coast Region Information as at June 2006 land transport road assets 2 Purpose of this publication Land Transport New Zealand

More information

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,

More information

Why We do Preventive Maintenance

Why We do Preventive Maintenance Why We do Preventive Maintenance James S. Moulthrop, P.E. Executive Director FP 2 Inc. North Dakota Asphalt Conference March 28-29, 2017 Bismarck, ND Presentation Outline What is FP 2 Inc.? Mission Preventive

More information

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 City Street and County Road Maintenance Program The preservation and keeping of public street and road rights-of-way

More information

Utah Department of Transportation Division of Asset Management taking care of what we have

Utah Department of Transportation Division of Asset Management taking care of what we have Utah Department of Transportation Division of Asset Management taking care of what we have Utah Department of Transportation State of Utah Update Rocky Mountain Pavement Preservation Partnership October

More information

Driving Indiana s Economic Growth

Driving Indiana s Economic Growth Driving Indiana s Economic Growth IRI/PCR/RUT Field Verification Kumar P. Dave Manager, Road & Pavement Asset Management & Programming, INDOT 03-06-2012 Organization Chart Pavement Division, INDOT David

More information

Florida Department of TRANSPORTATION. Asphalt Update. Howie Moseley State Bituminous Materials Engineer

Florida Department of TRANSPORTATION. Asphalt Update. Howie Moseley State Bituminous Materials Engineer Florida Department of TRANSPORTATION Asphalt Update Howie Moseley State Bituminous Materials Engineer Acknowledgements Jim Musselman Rhonda Taylor Curtis Curl My Background Graduate of the University of

More information

Theodore Roosevelt Expressway (TRE) Annual Meeting. Jane E. Berger PE, Programming Engineer North Dakota Department of Transportation Nov.

Theodore Roosevelt Expressway (TRE) Annual Meeting. Jane E. Berger PE, Programming Engineer North Dakota Department of Transportation Nov. Theodore Roosevelt Expressway (TRE) Annual Meeting Jane E. Berger PE, Programming Engineer North Dakota Department of Transportation Nov. 14, 2012 Williston Minot Dickinson Bismarck Increase in oil production

More information

District Construction Projects

District Construction Projects District 7 2014 Construction Projects Ohio Department of Transportation District 7 AUG-116/197-8.22/5.10 Auglaize County Projects 2014 AUG-65-13.19 AUG-VAR AUG-196-4.15 AUG-67-3.45 AUG-VAR AUG-Heritage

More information

Otter Tail County 2040 Transportation Plan. Asset Management Peer Exchange

Otter Tail County 2040 Transportation Plan. Asset Management Peer Exchange Otter Tail County 2040 Transportation Plan Asset Management Peer Exchange Study Purpose and Goals 1. Leverage existing tools 2. Analyze existing road conditions 3. Comparison of funding versus road conditions

More information

TIBC Road Maintenance Subcommittee Meeting Washington Plaza Hotel, Thomas Circle, Wash DC November 15, 2018

TIBC Road Maintenance Subcommittee Meeting Washington Plaza Hotel, Thomas Circle, Wash DC November 15, 2018 TIBC Road Maintenance Subcommittee Meeting Washington Plaza Hotel, Thomas Circle, Wash DC November 15, 2018 Purpose: Establish a workgroup of Bureau of Indian Affairs and TIBC members to analyze, record,

More information

TRAFFIC FIELD OPERATIONS (1 of 7) - ADMINISTRATION

TRAFFIC FIELD OPERATIONS (1 of 7) - ADMINISTRATION TRAFFIC FIELD OPERATIONS (1 of 7) - ADMINISTRATION Field Operations Director 003513 Sr. Community Educator 003542 Asst. Field Operations Director 001046 Stormwater Operations Analyst 003833 Special Projects

More information

ADOT Maintenance Data Collection Guide

ADOT Maintenance Data Collection Guide ADOT Maintenance Data Collection Guide January 1, 2009 Prepared for Arizona Department of Transportation Prepared by Jani Demaree and Cambridge Systematics, Inc. 100 CambridgePark Drive, Suite 400 ADOT

More information

HIR on Oklahoma Turnpikes

HIR on Oklahoma Turnpikes HIR on Oklahoma Turnpikes Tammy Robinson, P.E., Division Engineer EST, Inc. Stephen A. Cross, PhD, PE Professor, Oklahoma State Executive Director Pavement Recycling & Reclaiming Center HIR on Oklahoma

More information

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES April 1, 2017 WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES Table of Contents

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

State Highway and Bridge Funds

State Highway and Bridge Funds State Highway and Bridge Funds Highway and bridge construction funds are a mix of state and federal monies. At the federal level, there has not been an increase in the tax on gasoline since 1994. The federal

More information

ITEM 3 ATTACHMENT A RESOLUTION NO

ITEM 3 ATTACHMENT A RESOLUTION NO ITEM 3 ATTACHMENT A RESOLUTION NO. 2018-1575 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CALABASAS, CALIFORNIA, ADOPTING THE FISCAL YEAR 2017-18 LIST OF PROJECTS FUNDED BY SB 1: THE ROAD REPAIR AND

More information

News Release Eastern Oregon Region 5

News Release Eastern Oregon Region 5 News Release Eastern Oregon Region 5 Morrow, Umatilla, Wallowa, Union, Baker, Grant, Harney, and Malheur Counties Oregon Department of Transportation Date: May 22, 2015 NR number: 150522015 For more information:

More information

Transportation in Washoe County. Lee Gibson, Executive Director February 15, 2011

Transportation in Washoe County. Lee Gibson, Executive Director February 15, 2011 Transportation in Washoe County Lee Gibson, Executive Director February 15, 2011 RTC OF WASHOE COUNTY Metropolitan Planning Organization Meet long term needs Deliver federal funding Program projects in

More information

YAVAPAI COUNTY PUBLIC WORKS

YAVAPAI COUNTY PUBLIC WORKS YAVAPAI COUNTY PUBLIC WORKS PROVIDES ENGINEERING, ROADWAY MAINTENANCE, SOLID WASTE, AIRPORTS AND EMERGENCY MANAGEMENT SERVICES FLOOD CONTROL DISTRICT, SPECIAL DISTRICTS (EXCEPT ROAD IMPROVEMENT DISTRICTS)

More information

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Miami County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #

More information

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement. 1. I 271 WIDENING & RESURFACING - PID 89458 Project consists of major reconstruction, widening and bridge deck replacement. Project will accomplish widening from 4 to 6 lanes, including redecking and widening

More information

Culpeper District. Albemarle County Monthly Report October, 2011

Culpeper District. Albemarle County Monthly Report October, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

2008 REPORT OF THE HIGHWAY COMMISSIONER

2008 REPORT OF THE HIGHWAY COMMISSIONER Ozaukee County Highway Department 410 South Spring Street P.O. Box 994 Port Washington, Wisconsin 53074-0994 Robert Dreblow Highway Commissioner Phone 262-238-8331 Fax 262-238-8343 2008 REPORT OF THE HIGHWAY

More information

Rigby / Jefferson County Transportation Plan

Rigby / Jefferson County Transportation Plan Rigby / Jefferson County Transportation Plan 105085/07-863 Chapter 1 - Introduction... 1 Chapter 2 - Rigby / Jefferson County Highway System... 5 Chapter 3 Condition of the Existing Roadway System...

More information

2018 ROAD MAINTENANCE PROGRAM

2018 ROAD MAINTENANCE PROGRAM 2018 ROAD MAINTENANCE PROGRAM John Tiger Anastasi Town of Bethlehem Superintendent of Highways June 27, 2018 AGENDA Why do we maintain our roads? How is the Road Maintenance Plan developed? The process

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

KY s s RSA Evolution. Jo Anne Tingle, PE Kentucky Transportation Cabinet (KYTC) AASHTO TIG/FHWA RSA PEER Exchange Little Rock, AR - April 29, 2008

KY s s RSA Evolution. Jo Anne Tingle, PE Kentucky Transportation Cabinet (KYTC) AASHTO TIG/FHWA RSA PEER Exchange Little Rock, AR - April 29, 2008 KY s s RSA Evolution Jo Anne Tingle, PE Kentucky Transportation Cabinet (KYTC) AASHTO TIG/FHWA RSA PEER Exchange Little Rock, AR - April 29, 2008 Presentation Outline KY s s RSA History How we decided

More information

FUNDING SOURCES CHAPTER 6

FUNDING SOURCES CHAPTER 6 CHAPTER 6 6.1 BICYCLE 6.1.1 Local 6.1.2 Regional 6.1.3 State 6.1.4 Federal 6.1.5 Public Facilities 6.1.6 Bicycle Registration and Licensing Fees 6.1.7 Summary Table 6.1 of Bicycle Funding Sources 6 2 6.2

More information

El Dorado County / Tahoe Roadwork Schedule

El Dorado County / Tahoe Roadwork Schedule Today s Date: Friday, August 3, 2012, #12-220 District: District 3 - Marysville, http://www.dot.ca.gov/dist3 Jody Jones, District Director Contact: Deanna Shoopman deanna_shoopman@dot.ca.gov 530. 741.4566

More information

TEXAS DEPARTMENT OF TRANSPORTATION. Condition of Texas Pavements

TEXAS DEPARTMENT OF TRANSPORTATION. Condition of Texas Pavements TEXAS DEPARTMENT OF TRANSPORTATION Condition of Texas Pavements PMIS Annual Report FY 2007-2010 Condition of Texas Pavements Pavement Management Information System (PMIS) Annual Report FY 2007-2010 Prepared

More information

Looking Ahead and Looking Back: An Examination of NJDOT s and NJT s 2014 Capital Program

Looking Ahead and Looking Back: An Examination of NJDOT s and NJT s 2014 Capital Program Looking Ahead and Looking Back: An Examination of NJDOT s and NJT s 2014 Capital Program The New Jersey Department of Transportation s (NJDOT) and New Jersey TRANSIT s (NJT) Transportation Capital Program

More information

Transportation Day at the Capitol. Charlie Zelle Commissioner, MnDOT Feb. 16, 2017

Transportation Day at the Capitol. Charlie Zelle Commissioner, MnDOT Feb. 16, 2017 Transportation Day at the Capitol Charlie Zelle Commissioner, MnDOT Feb. 16, 2017 State Transportation System Highways 59.1 billion annual vehicle miles traveled 33.1 billion on trunk highways Bridges

More information

LOCAL REVENUE MEASURE ANNUAL COMMUNITY REPORT

LOCAL REVENUE MEASURE ANNUAL COMMUNITY REPORT LOCAL REVENUE MEASURE ANNUAL COMMUNITY REPORT Fiscal Year SLO Swim Center Pool: The Local Revenue Measure paid for the replacement of the shell plaster at the SLO Swim Center s pool at Sinsheimer Park,

More information

C ITY OF B EDFORD H EIGHTS

C ITY OF B EDFORD H EIGHTS C ITY OF B EDFORD H EIGHTS T ABLE OF C ONTENTS 1. Executive Summary... 2 2. Background... 3 3. PART I: 2016 Pavement Condition... 8 4. PART II: 2018 Current Backlog... 13 5. PART III: Maintenance &

More information

Arkansas State Highway and Transportation Department. Springdale Chamber of Commerce Leadership Springdale Tuesday, February 3, 2015

Arkansas State Highway and Transportation Department. Springdale Chamber of Commerce Leadership Springdale Tuesday, February 3, 2015 Arkansas State Highway and Transportation Department Springdale Chamber of Commerce Leadership Springdale Tuesday, February 3, 2015 Arkansas Highway Commission Dick Trammel, Chairman Rogers Thomas B. Schueck,

More information

Reserve Study Navigation Options

Reserve Study Navigation Options Reserve Study Navigation Options Each of these buttons will navigate you to the corresponding sheet. On each sheet, there is a corresponding button to return to this sheet. Data Pages Reports and Graphs

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: City of Livermore Date: 12/4/2017 Primary Point of Contact Name: Debbie

More information

Highway Construction

Highway Construction Ohio Department of Transportation Traffic Advisory DISTRICT 1 KIRK SLUSHER, P.E., DISTRICT DEPUTY DIRECTOR 1885 North McCullough St. Lima, Ohio 45801 www.transportation.ohio.gov/dist1 www.facebook.com/odotdistrict1;

More information

Highway User Fee Funding Of Local Roads in Illinois. NOT Equitable. NOT Sustainable. October 20, 2015

Highway User Fee Funding Of Local Roads in Illinois. NOT Equitable. NOT Sustainable. October 20, 2015 Highway User Fee Funding Of Local Roads in Illinois NOT Equitable. NOT Sustainable. October 20, 2015 1 Illinois Compiled Statutes References Illinois Tax Handbook for Legislators, Legislative Research

More information

January 22, Steve Salwei, NDDOT

January 22, Steve Salwei, NDDOT 1 January 22, 2015 Steve Salwei, NDDOT The number of miles driven on State highways have increased. From 2010-2012 North Dakota saw a 22% increase in traffic statewide and a 53% increase in traffic in

More information

Pavement Management Report. City Council Meeting of May 21, 2013

Pavement Management Report. City Council Meeting of May 21, 2013 Pavement Management Report City Council Meeting of May 21, 2013 Previous Meetings Summary In February, we presented the 2012 pavement survey and our consultant presented general pavement management strategies

More information

ENGINEERING DRIVER SAFETY INTO PAVEMENT PRESERVATION

ENGINEERING DRIVER SAFETY INTO PAVEMENT PRESERVATION ENGINEERING DRIVER SAFETY INTO PAVEMENT PRESERVATION 2015 TxDOT Short Course Miguel Arellano, P.E. Austin District Pavement Engineer October 13, 2015 Table of Contents 1 Goals: Overall Reduction in Crashes

More information

SUMMARY OF TRANSPORTATION INVESTMENTS

SUMMARY OF TRANSPORTATION INVESTMENTS Santa Cruz County 2016 Measure D: Transportation Improvement Expenditure Plan - Approved by over 2/3 of Santa Cruz County voters on November 8, 2016 - Overview Measure D, the 2016 Transportation Improvement

More information

STATE TRANSPORTATION COMMISSION HEARING

STATE TRANSPORTATION COMMISSION HEARING STATE TRANSPORTATION COMMISSION HEARING Twelve Year Program Update Tom Zilla: Centre County MPO Jim Saylor: SEDA-COG RPO Amy Kessler: North Central RPO PennDOT District 2-0 State College, PA October 8,

More information

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2)

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2) October 2004 REVISIONS (2) Chapter 11 HORIZONTAL ALIGNMENT SUPERELEVATION DEVELOPMENT 11.3(2) Chapter 12 VERTICAL ALIGNMENT VERTICAL CURVES PASSING SIGHT DISTANCE 12.5(2) VERTICAL CURVES STOPPING SIGHT

More information

Paul Vraney Bureau of Project Development 02/11/2016

Paul Vraney Bureau of Project Development 02/11/2016 Paul Vraney Bureau of Project Development 02/11/2016 ADA background & alterations definition Design considerations Provide sufficient layout data Curb ramp selection Maximum curb ramp and gutter slopes

More information

Kentucky Highway District 7

Kentucky Highway District 7 Kentucky Highway District 7 ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

Paving for Progress Municipal Streets Seminar

Paving for Progress Municipal Streets Seminar Paving for Progress Municipal Streets Seminar November 15, 2017 Doug Wilson, PE City of Cedar Rapids Paving for Progress Program Manager State and National Rankings $10,996,122 Prior Funding: General Obligation

More information

MNDOT PAVEMENT DESIGN MANUAL

MNDOT PAVEMENT DESIGN MANUAL MNDOT PAVEMENT DESIGN MANUAL Chapter 6 Ramps, Shoulders, Turn Lanes & Miscellaneous Pavements MnDOT Pavement Engineer Date Contents Introduction... 1 600 Ramps and Loops... 1 610 - Shoulders... 2 620 -

More information

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Pavements Asphalt pavement has long been a popular road construction material. In areas

More information

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 Prepared by Planning and Research Division Arkansas State

More information

PAVEMENT FUNCTIONAL SURFACE CHARACTERISTICS

PAVEMENT FUNCTIONAL SURFACE CHARACTERISTICS PAVEMENT FUNCTIONAL SURFACE CHARACTERISTICS Midwestern Pavement Preservation Partnership Updated 12-01-04 By Roger M. Larson, APTech Phone/Fax 703-455-7681 rlarson@pavementsolutions.com Pavement Functional

More information

Low Traffic Volume LR 159 Low Traffic Preservation

Low Traffic Volume LR 159 Low Traffic Preservation Pavement Preservation Group Study Findings Adriana Vargas, Ph.D. PG Study State DOTs must preserve existing infrastructure with limited resources Preservation treatments can extend life of pavement Insufficient

More information

Shenango Valley MPO. State Transportation Commission 2015 Twelve Year Program Development

Shenango Valley MPO. State Transportation Commission 2015 Twelve Year Program Development State Transportation Commission 2015 Twelve Year Program Development Regional results of the survey and public feedback from August thru November 2013 Shenango Valley MPO Version 01-2014 Mobility Concerns

More information

Culpeper District. Albemarle County Monthly Report September, 2011

Culpeper District. Albemarle County Monthly Report September, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

Lake Waterford Community Association Meeting. November 15, 2016

Lake Waterford Community Association Meeting. November 15, 2016 Lake Waterford Community Association Meeting November 15, 2016 Introduction Staff Introduction Project Overviews - Completed Projects - Pavement Management Program - Pasadena Road Sidewalk Improvements

More information

I-90 Corridor Performance Corridor Result

I-90 Corridor Performance Corridor Result I-90 Corridor Performance Corridor Result Statewide Result 87.1% 86.9% 0% 3.2% Ride Quality Good--% of miles 65.4% 70.2% Ride Quality Poor--% of miles 0% 3.7% 73 MPH N/A Measure Corridor Context The corridor

More information

Nevada s Transportation Infrastructure and Future Transportation Needs

Nevada s Transportation Infrastructure and Future Transportation Needs Nevada s Transportation Infrastructure and Future Transportation Needs Susan Martinovich, P.E. Director Interim Legislative Committee on Transportation Nov. 13, 2007 State Transportation Board of Directors

More information

Program Update. Relationship: RP, RTIP, Budget, POF. Board of Directors Item 16 February 22, Board of Directors Item 16 Feb 22,

Program Update. Relationship: RP, RTIP, Budget, POF. Board of Directors Item 16 February 22, Board of Directors Item 16 Feb 22, Program Update Board of Directors Item 16 February 22, 2019 Relationship: RP, RTIP, Budget, POF 2019 2020 2025 2030 2035 2040 2045 2050 Contains ten-year capital program budget 2 Board of Directors Item

More information

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,

More information

Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT. February 12, 2015

Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT. February 12, 2015 Pavement and Asset Management from a City s Perspective Mike Rief, PE, DBIA and Andrea Azary, EIT February 12, 2015 What is Pavement Management? At a Network Level: Pavement management refers to a systematic

More information

NEVADA DEPARTMENT OF TRANSPORTATION STATE HIGHWAY PRESERVATION REPORT

NEVADA DEPARTMENT OF TRANSPORTATION STATE HIGHWAY PRESERVATION REPORT NEVADA DEPARTMENT OF TRANSPORTATION STATE HIGHWAY PRESERVATION REPORT February 2015 State of Nevada Department of Transportation State Highway Preservation Report Report to the 2015 Legislature As Required

More information

VDOT s Pavement Management Program. Presented by: Tanveer Chowdhury Maintenance Division, VDOT March 05, 2010

VDOT s Pavement Management Program. Presented by: Tanveer Chowdhury Maintenance Division, VDOT March 05, 2010 VDOT s Pavement Management Program Presented by: Tanveer Chowdhury Maintenance Division, VDOT March 05, 2010 Outline Pavement Management network and project level Pavement Data Collection and QA/QC Data

More information

2016 FACT SHEET ENGINEERING STREET OPERATIONS. Engineering Street Operations net 2016 budget is $5,199,900 WHAT IS ENGINEERING STREET OPERATIONS?

2016 FACT SHEET ENGINEERING STREET OPERATIONS. Engineering Street Operations net 2016 budget is $5,199,900 WHAT IS ENGINEERING STREET OPERATIONS? WHAT IS STREET OPERATIONS? This section maintains approximately 570 km of major, collector and residential roads throughout Saanich. Some of the major programs include road surface treatments (pothole

More information

City of Lakewood. Public Works Transportation. Transportation Division Current and Future Projects Division Manager: Weston Ott, P.E.

City of Lakewood. Public Works Transportation. Transportation Division Current and Future Projects Division Manager: Weston Ott, P.E. City of Lakewood Public Works Transportation Transportation Division Current and Future Projects Division Manager: Weston Ott, P.E. June 15, 2017 Transportation Photos S. Tacoma Way: looking north between

More information

Lithuanian Roads. LITHUANIA in Europe. Territory km 2 Population LITHUANIAN ROAD ADMINISTRATION

Lithuanian Roads. LITHUANIA in Europe. Territory km 2 Population LITHUANIAN ROAD ADMINISTRATION Lithuanian Roads LITHUANIAN ROAD ADMINISTRATION LITHUANIA in Europe Territory 65 300 km 2 Population 3 491 000 General road network information State roads Main roads 1724,3 km National roads 4864,0 km

More information

Florida s Turnpike System Projected Debt Service Coverage Ratio ($000)*

Florida s Turnpike System Projected Debt Service Coverage Ratio ($000)* Florida s Turnpike System Projected Debt Service Coverage Ratio ($000)* Fiscal Year Toll Concession Total Gross O&M Expenses** Net Existing Annual Senior Debt Service Requirement*** Senior Debt Service

More information

OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO CONSTRUCTION CONTRACT AWARD

OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO CONSTRUCTION CONTRACT AWARD STAFF REPORT MEETING DATE: June 7, 2016 TO: FROM: City Council Russ Thompson, Public Works Director Gosia Woodfin, Assistant Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213

More information

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study Welcome Thank you for your interest in the Lewis & Clark Viaduct Concept Study Please use the arrows in the upper left hand corner to navigate through the presentation. Use the envelope icon to ask a question

More information

Field guide for Accessible Public Rights-of-Way Edition

Field guide for Accessible Public Rights-of-Way Edition Field guide for Accessible Public Rights-of-Way 2015 Edition BRIEFING MEMO SUBJECT: Department of Justice/Department of Transportation Joint Technical Assistance on Title II of the Americans with Disabilities

More information

FY 2005 TRANSPORTATION CAPITAL PROGRAM

FY 2005 TRANSPORTATION CAPITAL PROGRAM Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the

More information

VIII. Project Prioritization & Implementation

VIII. Project Prioritization & Implementation Transportation Plan 2030 July 2006 VIII. Project Prioritization & Implementation Public Transit Service Investigation into the development of a demand responsive service route system through a process

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them? Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy

More information

Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota. Transportation Research

Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota. Transportation Research 2007-18 Performance of Ultra-Thin Bounded Wearing Course (UTBWC) Surface Treatment on US-169 Princeton, Minnesota Take the steps... Research...Knowledge...Innovative Solutions! Transportation Research

More information

Advanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP)

Advanced Construction Techniques. Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) CM 510 Concrete Pavements ACCELERATED CONSTRUCTION OF URBAN INTERSECTIONS WITH PORTLAND CEMENT CONCRETE PAVEMENT (PCCP) Pavements Asphalt pavement has long been a popular road construction material. In

More information

Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE

Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation NOVEMBER 2001 CTRE PAVED SHOULDERS ON PRIMARY HIGHWAYS IN IOWA: AN ANALYSIS OF SHOULDER SURFACING CRITERIA, COSTS, AND BENEFITS EXECUTIVE SUMMARY Sponsored by the Office of Traffic and Safety of the Iowa Department of Transportation

More information

City of Coquitlam. Pavement Management Technology. Profile/GPS/Videolog Vehicle. Pavement Management System. SUBSURFACE PROFILING - Road Radar

City of Coquitlam. Pavement Management Technology. Profile/GPS/Videolog Vehicle. Pavement Management System. SUBSURFACE PROFILING - Road Radar City of Coquitlam System Road Condition Analysis Parameters % Cracking Structural (Deflection) Rideability (Roughness) Rutting Traffic Volumes % Trucks Different Policy Models Min Cost - based on a minimum

More information

Public Transport Asset Management

Public Transport Asset Management Public Transport Asset Management 17 maintenance shops Bank 885 miles of track Workshop and Training on Urban Transport Planning and Reform. Baku, April 14-16, 2009 Key Public Transport Activities Service

More information

Toward Zero Deaths Maintaining a Safer Roadway Workshop

Toward Zero Deaths Maintaining a Safer Roadway Workshop Toward Zero Deaths Maintaining a Safer Roadway Workshop Mike Marti, Primary Author SRF Consulting Group June 2010 Research Project Final Report #2010RIC03 Technical Report Documentation Page 1. Report