ROAD SAFETY AUDIT. I 495/Route 117 Interchange. Town of Bolton. August Prepared for: Massachusetts Department of Transportation Highway Division

Size: px
Start display at page:

Download "ROAD SAFETY AUDIT. I 495/Route 117 Interchange. Town of Bolton. August Prepared for: Massachusetts Department of Transportation Highway Division"

Transcription

1 ROAD SAFETY AUDIT I 495/Route 117 Interchange Town of Bolton August 2013 Prepared for: Massachusetts Department of Transportation Highway Division Prepared by: Green International Affiliates, Inc.

2 TABLE OF CONTENTS Background of Project... 1 Project Data... 1 Project Location Description... 1 Safety Issue #1. Intersection Geometry/Sight Distance... 4 Safety Issue #2. Optimized Signalization and Coordination... 7 Safety Issue #3. Road and Ramp Capacity...8 Safety Issue #4. Motorist Guidance/Signage...9 Safety Issue #5. Pavement Markings Safety Issue #6. Maintenance, Drainage and Ponding Issues...12 Safety Issue #7. Bike and Pedestrian Accommodations Summary LIST OF APPENDICES Appendix A RSA Meeting Agenda Appendix B RSA Audit Team Sign In Sheet...16 Appendix C- Detailed Crash Data Appendix D- Traffic Volume Data Appendix E- Existing Conditions Plan LIST OF TABLES Table 1 Road Safety Audit Team Members... 2 Table 2- Safety Enhancement Summary LIST OF FIGURES Figure 1- Project Location...3 Figure 2- Eastbound view on Route 117 at I-495 NB Ramps... 5 Figure 3- I-495 View of queue on I-495 off-ramp...8 Figure 4- I-495 SB right turn slip ramp... 9 Figure 5- I-495 NB sign in EB direction Figure 6- Plaza southeast of I-495 NB ramps Figure 7- Ponding at Route Figure 8- Pavement markings east of Route Road Safety Audit- I-495/Route 117 Interchange, Bolton, MA Prepared by Green International Affiliates, Inc. i

3 BACKGROUND OF PROJECT This Road Safety Audit (RSA) focuses on identifying safety issues and possible enhancements for safety improvements within the interchange of Interstate 495 (I-495) and Route 117/Main Street (RT117). This interchange is currently in the 25% Design stage, as a Massachusetts Department of Transportation (MassDOT) project, and is eligible to receive Highway Safety Improvement Program (HSIP) funding based on the high reported crashes between crash data of 132 crashes. This area has been of significant concern to both the State Police, MassDOT, and the local communities as it continues to exhibit less than desirable safety characteristics. As a result of the continued concern in the project area, MassDOT initiated a planning/ preliminary design study to develop short and long term solutions. This RSA was conducted as part of the safety assessments for the project. The safety audit team is composed of representatives from MassDOT Boston, MassDOT District 3, Boston Region Metropolitan Planning Organization (Boston Region MPO), Bolton Police Department, Town of Bolton, Stow Fire Department and Green International Affiliates, Inc. (Green). I-495 NB ramps were recently signalized by MassDOT, however the interchange continues to have high number of crashes. Green s role is to conduct the RSA meeting and effectively outline the team s observations and suggestions for safety improvements. PROJECT DATA The audit team, listed in Table 1 along with their affiliation, conducted an RSA on Wednesday, May 29 th, 2013 for the interchange of Route 117 and I-495. The agenda for this meeting can be found in Appendix A. PROJECT LOCATION DESCRIPTION This RSA evaluates safety issues of the I-495 and Route 117 interchange in Bolton, MA. As seen in Figure 1, the intersections included in this interchange area are as follows: Route 117, I-495 Southbound Ramps and Sugar Road (RT 117/I-495 SB/Sugar Rd) Route 117 and I-495 Northbound Ramps (RT 117/I-495 NB) Route 117 and Route 117 (RT 117/RT 85) The project location with respect to nearby interchanges on I-495 is shown in Figure 1. The project area is located in a rural environment off of Exit 27 off of I-495. Currently the intersections at the two I-495 ramps are signalized and the RT 117/RT 85 intersection is STOP controlled. Route 117 is a two lane road functioning as a minor arterial and Route 85 is a two lane major collector. The posted speed limit is 40mph for Route 117 within the project limits and is 25mph for both Northbound (NB) and Southbound (SB) ramps, Sugar Road and Route 85. All roads are town Road Safety Audit- I-495/Route 117 Interchange, Bolton, MA Prepared by Green International Affiliates, Inc. 1

4 owned and maintained with the exception of the road section within the interchange area including the two traffic signals, which are under the jurisdiction of MassDOT. Table 1 Road Safety Audit Team Members Road Safety Audit Team Member Title Organization/Affiliation Lisa Schletzbaum Traffic Safety Engineer MassDOT- Boston Corey O Connor Traffic Safety Engineer MassDOT- Boston Sean Sullivan Traffic Safety Intern MassDOT- Boston Lola Campbell Assistant District Traffic Engineer MassDOT Traffic Division District 3 Mark Abbott Project Manager Boston Region MPO Don Lowe Bolton Town Administrator Town of Bolton Harold E. Brown Director of Public Works Town of Bolton Vincent Alfano Chief of Police Bolton Police Department Lorraine Kenney Administrator Assistant Coordinator Bolton Police Department Mike McLaughlin Fire Chief Stow Fire Department Bill Scully Director of Transportation Planning Green International Affiliates, Inc. Shahin Shahin Senior Associate Green International Affiliates, Inc. Wing Wong Transportation/Civil Engineer Green International Affiliates, Inc. Nadia Bosan Transportation/Civil Engineer Green International Affiliates, Inc. Road Safety Audit- I-495/Route 117 Interchange, Bolton, MA 2 Prepared by Green International Affiliates, Inc.

5 1:1 GREEN INTERNATIONAL AFFILIATES, INC. L:.IJ CiVIL AND STRucnJRAL ENGINEERS FIGURE1 STUDY AREA 1 495/ROUTE 1171mRCHANGE IMPROVEMENT STUDY BOLTON,MA

6 ROAD SAFETY AUDIT OBSERVATIONS In conducting the I-495/Route 117 Interchange Road Safety Audit, safety issues and possible corrective actions to reduce the safety risk were determined based on team discussions and field observations on Wednesday, May 29 th, Safety issues that were identified included: Signalization Optimization and Coordination; Route 85 island and road geometry; I-495 NB Ramps queuing onto I-495 breakdown lane; I-495 NB ramps geometry and westbound traffic visibility; Route 117 truck and general capacity; High percentage of truck usage; Misuse of lanes by motorists; Vehicle queuing heading eastbound in the morning peak hour and westbound in the evening peak hour. Many of these issues can or need to be addressed by long term solutions, but some could be addressed in the short term. The following paragraphs describe the issues and possible actions. The identified issues by the RSA team have some similarities and commonalities and consequently, were grouped into major categories. SAFETY ISSUE #1. INTERSECTION GEOMETRY/SIGHT DISTANCE Observations: RT 117/I-495 SB/Sugar Rd In the morning peak hour, queues west of Sugar Road can extend towards the office parks approximately 1,200 feet west of I-495 SB. It was noted by team members that the eastbound right turning vehicles are not able to get to the channelized right turn because they are at the back of the long queues., which may attribute to reported crashes west of the project area. The geometry of the right turn off-ramp seems to encourage high turn speed and vehicles encroach on Route 117 centerline. RT 117/I-495 NB The highest percentage of crashes occurs at the intersection of RT 117/I-495 NB. These have typically been rear-end type from right turning vehicles exiting I-495. Police noted three different scenarios they have observed from these accidents: 1) Motorists having to look behind them to see westbound thru traffic and collide with vehicles that have not left the queue in front of them; 2) Road Safety Audit- I-495/Route 117 Interchange, Bolton, MA Prepared by Green International Affiliates, Inc. 4

7 Motorists using the left turn lane on the I-495 NB ramps to turn right onto Route 117, bypassing the right turn queue and causing conflicts with vehicles turning right in the right turn lane; and 3) Motorists using the right turn lane as two lanes, and try to turn simultaneously. In summary, the geometry/angle of entry of the right turn ramp lane at Route 117 westbound and the width (or lack of markings) on the left turn lane were likely factors related to the above. It was also noted by the team members that the trees located in the northwest quadrant of the ramps within the loop obscure the view of the queue on Route 117 from vehicles on the ramp exiting I-495 northbound. When driving on the off-ramp team members noted that the turning radius leaving I-495 seemed too sharp of a turn, did not have roadway delineation (chevron signs) or an exit speed warning sign. RT 117/RT 85 Figure 2- Eastbound view on Route 117 at I-495 NB Ramps Accidents that occur at Route 85 are mainly angle type with the Northbound left movement and vehicles on Route 117. Several rear-end type accidents on Route 117 occurred from vehicles stopping short for vehicles exiting Route 85. It was observed that when driving on the Route 85 approach, it was noted that a tendency could exist to drive to the left of the island possibly due to the geometry or level of guidance; which may cause vehicles to exit Route 85 at less advantageous angles and risk a head-on collision with a vehicle turning onto Route 85 from Route 117. Trucks have been noted to crossover the island when turning left from Route 85. Town officials noted that there may be many crashes into the island. Perennial landscaping within the island, located to the left of the left turning vehicles on Route 85, is tall and obstructs the vision of looking to the west. There is also a utility pole located within the island that obscures the view of eastbound vehicles from vehicles turning left onto Route 117 from Route 85. It was also observed that bushes on the eastern corner can also obscure the view of westbound through motorists from motorists turning left at the Route 85 approach. The geometry on the corner rounding from Route 117 eastbound to Route 85 Southbound is poorly defined. While truck turning must be accommodated from both eastbound and westbound directions, the current conditions have resulted in an unpaved area with rutting and ponding occurring. The area is sometimes used by trucks for a rest area and these parked trucks may block visibility of drivers exiting RT 85. Road Safety Audit- I-495/Route 117 Interchange, Bolton, MA Prepared by Green International Affiliates, Inc. 5

8 Finally, it was noted that the angle of intersection is somewhat less than 90 degrees that may create some turning difficulties. Enhancements: 1. A lane can be added to the eastbound Route 117 approach to the channelized right turn onto I-495 SB ramps which may alleviate eastbound rear-end type accidents occurring to the west of the project area. This extension can make the I-495 SB on-ramp more accessible during peak hours. 2. Trees within the inner loop of the I-495 NB off-ramp can be removed and/or trimmed back to increase visibility for motorists exiting I The I-495 NB ramp advisory speed can be reviewed to determine if it is the correct speed to use for the I-495 NB ramp radius, and determine the need to install additional delineation. 4. The I-495 NB off ramp can be modified to have two lanes turning right and an add-lane can be designed for vehicles to exit onto more efficiently to accommodate high right turning volumes; by allowing left turn vehicles to exit in their own lane, this in turn will reduce the number of vehicles waiting to exit. 5. Alignment at Route 85 can be modified to form a 90 degree angle and better accommodate vehicles approaching Route 117 to turn left. The island can also be modified (i.e. cutback nose) to eliminate any obstruction from the left turning movement. 6. Landscaping within the island on Route 85 can be trimmed, replaced with low growing shrubs or eliminated to improve visibility for exiting motorists. The pole located on the island could be relocated. 7. Bolton regulations allow for landscaping to be removed or trimmed if it causes safety issues, except for the plants that were grandfathered in because they were planted before the regulation was passed. Landscaping located on east corner of Route 85 at Route 117 should be trimmed or removed; however, this may require working with homeowner if outside the public layout. 8. At the intersection of Route 117 and Route 85, define right turn pavement/curb edge for western corner of intersection. 9. Add warning signage on I-495 NB approach to exit EXPECT BACKUPS BETWEEN 4PM-6PM to address the inability for motorists to see around the corner during peak hours. 10. Provide painted gore with hash lines and warning signage such as KEEP RIGHT on Route 85 to notify northbound vehicles that have a natural inclination to drive left of the approaching island. Road Safety Audit- I-495/Route 117 Interchange, Bolton, MA Prepared by Green International Affiliates, Inc. 6

9 SAFETY ISSUE #2. OPTIMIZED SIGNALIZATION AND COORDINATION Observations: RT 117/I-495 SB/Sugar Rd A major issue throughout the Route 117 area is the peak period congestion at the two signals of RT 117/I-495 SB/Sugar Rd and RT 117/I-495 NB. At Sugar Road, approximately 70% of reported eastbound and westbound accidents on Route 117 are due to vehicles not being able to turn left onto Sugar Road from Route 117 because there is no protected phase and an inadequate number of gaps in the westbound flow, particularly during the PM peak period. With the high morning and evening peak hour volume on Route 117 at this location, left turning motorists attempt to make the turn and are hit by oncoming traffic. It was noted by team members that the green light timing is unused at Sugar Road when vehicles turn right onto Route 117 from Sugar Road (i.e. turn on RED) and the approach continues to receive the green light when there is no demand. Green time should not be given to Sugar Road when there are no vehicles present. As a result, vehicles on Route 117 are delayed unnecessarily for Sugar Road that has no vehicles on it with the queue building up and affecting the relative safety risk. RT 117/I-495 NB Similar to RT 117/I-495 SB/Sugar Rd, the signal at the I-495 NB ramps also has wasted green time for the left turn movement from Route 117 onto the I-495 NB on-ramp. Vehicles have completed their turn during the permitted phase, and the protected phase activates after there are no vehicles in the turn lane. This delays westbound traffic and this may contribute to the long westbound queue that forms, particularly during the PM peak period. Westbound queues, due to the signal at the I-495 SB ramps, extend onto the I-495 NB ramps and periodically into the breakdown lane of I-495. This is a safety issue for vehicles traveling through on I-495 as well as motorists queued to exit the highway. RT 117/RT 85 Similarly to RT 117/I-495 SB/Sugar Rd Eastbound left turning vehicles, approximately 25% of reported crashes at the RT 117/RT 85 intersection are directly related to left turning vehicles exiting Rout 85, this may be due to having inadequate number of gaps to complete the turn. This location is currently stop controlled, and posted speed limits for the Route 117 Eastbound and Westbound approach is 40 mph. The current conditions indicate difficulty for vehicles to exiting Route 85 to safely cross Route 117 into the westbound lane, particularly during the peak periods. Road Safety Audit- I-495/Route 117 Interchange, Bolton, MA Prepared by Green International Affiliates, Inc. 7

10 Enhancements: 1. The signal at RT 117/I 495 SB/Sugar Rd intersection and the signal at the RT 117/I 495 NB intersection are intended to be coordinated and this should be checked. 2. Verify if Sugar Road crash history warrants a short protected phase for the Route 117 EB left turn movement at Sugar Road. This may also require an evaluation of existing equipment capability. 3. Optimize the signal timing for the two existing Route 117 signalized intersections. 4. Verify that the existing detection equipment is functioning correctly at the intersections. Consider installing some delay to the Sugar Road approach so that if the vehicle waiting has left, the Sugar Road/I 495 SB approach will be skipped. 5. Improve the traffic control at the RT 117/RT 85 intersection. At this time, this could include Evaluating if Route 85 meets MUTCD warrants for a signal at RT 117/RT 85 and possibly coordinate with the existing signals to safely accommodate left turning vehicles. 6. Evaluate the feasibility of a roundabout at Route 85 and see if acquisition of land is required. SAFETY ISSUE #3. ROAD AND RAMP CAPACITY Observations: It was noted by team members that the westbound queues on Route 117 during the evening peak hour can extend to as far as Stow. As mentioned previously, the I 495 NB ramps regularly extend onto I 495 into the breakdown lane; this mainly occurs during the evening peak hour. While reported crashes along I 495 NB were not obtained for this audit to determine the extent of the safety issue for vehicles queuing on I 495, visual observations of this was discussed during the meeting and it is considered a safety issue. This issue may be due to vehicle limited capacity on Route 117 and the ramps. It was also mentioned at the meeting that there potentially is a development that could be located opposite the I 495 NB ramps with access to Route 117. Figure 3 I 495 View of queue on I 495 off ramp Road Safety Audit I 495/Route 117 Interchange, Bolton, MA 8 Prepared by Green International Affiliates, Inc.

11 Enhancements: 1. Determine if the current two lane road is sufficient for Route 117 and for Route 85, or if there is a need for additional lanes. 2. Determine if new routes need to be recommended through signage along Route 2 for vehicles trying to reach Stow, Hudson, Leominster and/or Lancaster and avoid using Route 117 as a cut through route, particularly related to truck traffic. When determining appropriate signage, it should be noted that the location of numbered routes in other communities should be clearly stated, otherwise these signs might be ineffective. 3. If future development is built to the east of I-495 NB ramps, then the Town should work with the developer to incorporate improvements to accommodate new traffic and/or any geometry improvement. SAFETY ISSUE #4. MOTORIST GUIDANCE/SIGNAGE Observations: Route 117 It has also been noted that trucks and vehicles use the side of the road on Route 117 to park. Vehicles also park in this location when funerals and burials occur at the cemetery on the north side of the project, presumably to use the convenience store located directly across Route 117 from the cemetery. There are currently no reported crashes due to these parked vehicles, but it can offset visibility and/or capacity of the roadway. It is also not an ideal pedestrian crossing location that results with the trucks parking. There are currently signs in this area for NO PARKING, but some are faded beyond recognition. RT 117/I-495 SB/Sugar Rd Currently there is only one yield sign (R1-2) for the I-495 SB off-ramp located on the left side of the right turn lane. When vehicles pull up to Route 117, this yield sign is located behind the driver s line of sight, which is not an ideal location. Figure 4- I-495 SB right turn slip ramp Road Safety Audit- I-495/Route 117 Interchange, Bolton, MA Prepared by Green International Affiliates, Inc. 9

12 RT 117/I-495 NB As mentioned earlier, some vehicles on the I-495 NB off-ramp use the left turn lane to bypass the right turn queue and turn right onto Route 117. According to local police, this has caused safety issues and accidents in the past. The Bolton Police Department has noted that there currently are no signs for I-495 NB ramps to define land use and to deter vehicles from making this maneuver so they are unable to enforce the law. The I-495 NB sign is also being blocked by the new signal installed for eastbound vehicles. Figure 5- I-495 NB sign in EB direction RT 117/RT 85 As indicated on the collision diagram and during discussions with RSA team members, a number of accidents may have occurred due to motorists being unaware of the advanced intersection. Currently there is a worn STOP AHEAD sign, and no warnings for this intersection on the Route 117 approach. Enhancements: 1. Signs that are no longer distinguishable can be removed and replaced with new signs where necessary. This also includes replacing the STOP AHEAD sign on Hudson Road and the NO PARKING signs on Route 117 abutting the cemetery. New parking signs at the cemetery can state NO PARKING EXCEPT FOR CEMETERY USE to clarify when parking at this location is permitted. 2. Install an intersection ahead (W2-2) sign along with Hudson Road street name (D3-1) sign for guidance along Route An additional YIELD sign (R1-2) can be installed on the I-495 SB off-ramps on the right side, and/or the existing sign can be adjusted to increase motorist awareness. 4. Relocate the I-495 NB guide sign on Route 117 facing eastbound traffic at the I-495 NB onramp to improve its visibility. 5. Install indicating LEFT LANE MUST TURN LEFT (R3-7) with arrow and ONLY pavement markings or NO RIGHT TURN (R3-1) on the I-495 NB off-ramp left turn lane. 6. Add NO PARKING signs on west side Route 85 just beyond the corner rounding from Route 117. Road Safety Audit- I-495/Route 117 Interchange, Bolton, MA Prepared by Green International Affiliates, Inc. 10

13 7. As noted above, install EXPECT BACKUPS BETWEEN 4PM-6PM on the I-495 mainline in the Northbound direction approaching the Route 117 off-ramp. SAFETY ISSUE #5. Observations: PAVEMENT MARKINGS Route 117 Narrow shoulders were noted along the roadway within the project area. These do not meet minimum widths to accommodate bicycles for through intersection area. RT 117/I-495 SB/Sugar Rd Due to the heavy congestion at the Sugar Road and I-495 SB signal, westbound vehicle queue extend back towards the bridges. From the end of this westbound left turn lane to the I-495 bridges. From the end of this westbound left turn lane to the I-495 bridges, the westbound direction becomes one wide lane with no pavement markings distinguishing between the left turn lane and the through lane, but the width of the road allows vehicles heading westbound to move around those stopped in the queue. Motorists should remain in the single lane and not bypass the queue to reach the left turn lane. It is technically a violation of the rules of the road. However, the movement occurs and it can create a potential safety hazard and confusion for motorists waiting in the queue. RT 117/I-495 NB Near the vicinity of the I-495 NB ramps is a small plaza. It has been noted that vehicles have a hard time turning out of this site based on the tire markings and the condition of the island between the two entrance/exits. This behavior may contribute to the reported crashes on the segment between I-495 NB ramps and Route 85. There are currently no pavement markings or signs distinguishing where the entrance and exits are at this location. As discussed previously, queues at RT 117/I-495 NB intersection extend into the breakdown lane of I-495. Figure 6- Plaza southeast of I-495 NB ramps The off-ramp lane currently cannot accommodate the length of the queue that develops onto I-495. Enhancements 1. Extend Route 117 westbound left turn lane on approach to I-495 SB on-ramp. Road Safety Audit- I-495/Route 117 Interchange, Bolton, MA Prepared by Green International Affiliates, Inc. 11

14 2. Evaluate the lane markings along Route 117 to create wider shoulders (i.e. 4 to 5 feet if possible) to better accommodate bicyclists and reduce safety risks for this mode. 3. Coordination with owner of plaza can be made to add pavement markings to distinguish entrance/exit. If lane widths are not efficient enough for trucks to enter and exit the plaza without driving over the island, then the island can also be modified to accommodate trucks. 4. As noted above, install left turn arrow and the legend ONLY on the I-495 NB off-ramp left turn lane to enforce the primary usage of this left lane, and to help deter vehicles from turning right from the left lane. 5. Install pavement markings to distinguish between lanes on I-495 to accommodate queue formed at the intersection of RT 117/I-495 NB for I-495 NB off ramp. SAFETY ISSUE #6. Observations: MAINTENANCE, DRAINAGE AND PONDING ISSUES Most of the reported accidents occurred during wet weather conditions, and it was observed that the road had ponding issues on Route 117 approaching Route 85 along with potholes where trucks habitually park. Over time the pavement and unpaved area can develop ruts and depressions from the heavy vehicles parked on the side of the road. During wet weather ponding occurs and obscures the potholes from vehicles and motorcyclist traveling in the project area increasing the relative safety risk. There were other ponding areas along sections of the road. It was also noted that the drainage Figure 7- Ponding at Route 85 structures within the project area are in need of cleaning and maintenance. Enhancements: 1. Patch areas of roadway where potholes are located. 2. The area on the west side of Route 85 at the intersection with Route 117 should be modified to better define the pavement edge but to allow for appropriate truck maneuvering. 3. Provide curbing along edge of road on Route 117 and Route 85 on the southeast side of the intersection and wherever necessary to deter trucks and other vehicles from parking. The Road Safety Audit- I-495/Route 117 Interchange, Bolton, MA Prepared by Green International Affiliates, Inc. 12

15 area beyond the curbing can could be seeded and landscaped which would deter vehicles from using as a parking area. 4. Lower and clean out drainage structures to accommodate ponding areas where necessary. SAFETY ISSUE #7. Observations: BIKE AND PEDESTRIAN ACCOMMODATIONS There are minimal or no accommodation for pedestrians and bicyclists within the project area with narrow shoulders and the sidewalk limited to a short section under the bridges on the north side of Route 117. The sidewalk does not connect to anything nor are crosswalks defined to guide pedestrians to the other side of the street. It was noted by team members that the majority of pedestrian movement occurs west of the project area. Bicyclist are frequent users along the corridor, several were observed traveling eastbound during the audit and according to local RSA participants, a half Figure 8- Pavement markings east of Route 85 dozen organized rides pass through the town each year. Pedestrians are not able to safely cross the RT 117/I-495 SB/Sugar Rd intersection. Enhancements: 1. Install sidewalks along the south side of the project area and handicap ramps at the intersections. 2. Install traffic signal that provides pedestrian phase for safer crossing at the intersection of RT 117/I-495 SB/Sugar Road once the sidewalks are in place. 3. Evaluate an appropriate location for crosswalks within the project area, such as at the intersection of RT 117/I-495 SB/Sugar Road, at the intersection of RT 117/RT 85 and from the convenience store to cemetery for safer pedestrian crossing. Install ADA compliant handicap ramps and sidewalks where it is determined appropriate to install crosswalks. 4. Restripe the roadway to provide wider shoulders to better accommodate bicycles along both sides of Route 117. Road Safety Audit- I-495/Route 117 Interchange, Bolton, MA Prepared by Green International Affiliates, Inc. 13

16 SUMMARY Based on the audit team members review of observations and discussions, issues and possible solutions were identified that could reduce the safety risk at the three study intersections on the I- 495 interchange ramps connecting with Route 117 in Bolton, MA. Table 2 summarizes the issues and potential enhancements to address the issues along with the estimated safety payoff, time frame, cost, and responsibility. These criteria are categorized by the following estimates and descriptions: Safety Payoff: enhancement can improve the safety of the interchange by a low (<30%), medium (30% - 70%), and high (>70%) Time frame: project can be completed within three different categories of time frame which are short-term (<1 year), mid-term (1-3 years) or long-term (>3 years) Cost: cost is estimated to be within three categories of cost which are low ($10,000), medium ($10,001-$50,000) or high (>$50,000) Responsibility: which entity or organization will be responsible for completing work. Road Safety Audit- I-495/Route 117 Interchange, Bolton, MA Prepared by Green International Affiliates, Inc. 14

17 Table 2 Proposed Safety Enhancement Summary Safety Issue Description of Issues Safety Enhancment Safety Payoff Time Frame Cost Responsibility Long eastbound queues form in the morning peak, that prevent vehicles Install additional lane to eastbound approach to I 495 SB channelized from accessing I 495 SB channelized right turn right turn Low Long Term Mid MassDOT Vehicles cannot see queue traffic on Route 117 at I 495 NB ramps Trim trees for increased visibility Mid Short Term Low MassDOT Vehicles travel on ramps at high speeds Review of ramp radius for speeds Low Short Term Low MassDOT Intersection Geometry/Sight Distance Vehicles use the one lane slip ramp at I 495 NB ramp as two lanes Evaluate modfiying I 495 NB ramp to have an additional right turn lane High Long Term High MassDOT Route 85 has a natural inclination towards the left of the island, trucks have been noted to crossover the island when turning from Route 85 Landscaping within island at Route 85 and to the east of Route 85 obscure view of Route 117 from turning vehicles There are unpaved area where rutting and ponding occur to the west of Route 85. The edge of roadway is undefined. Modify island and alignment at Hudson Road to form a 90 degree angle Mid Mid Term High Trim landscaping within Route 85 island and east of Hudson Road and relocate utility pole MassDOT/ of Bolton Low Short Term Low Town of Bolton Define curbing and pavement edge for western corner at Route 85 Mid Mid Term Low Town of Bolton When queues form vehicles wait within the breakdown lane of I 495 Install warning signs for expected queues at I 495 northbound ramps High Short Term Low MassDOT Town Optimized Signalization and Coordination Queues during the evening peak hour can extend to Stow, signal timing does not seem coordinated Provide painted gore with hash lines and warning signage such as KEEP RIGHT to notify vehicles on RT 85 of approaching island There is no protected phase for eastbound movement at RT 117/I 495 SB/Sugar Rd with inadequade gaps for eastbound left turn movements There is a wate of green time motorists that have already completed their turns coordination should be verified for RT117/I 495 SB/Sugar Rd and RT 117/I High Short Term Low MassDOT 495 NB coordination should be verified for RT117/I 495 SB/Sugar Rd and RT 117/I Low Short Term Low Town of Bolton 495 NB Evaluate existing equipment at RT 117/I 495 SB/Sugar Rd and provide a protected phase and optimize timing Mid Mid Term Mid MassDOT Verify operating conditions of detection equipment Mid Short Term Low MassDOT There exists heavy queues in the peak hours Determine efficiency of one lane for Route 117 and Route 85 Mid Short Term Low MassDOT Road and Ramp Capacity Many vehicles use Route 85 and Route 117 in the project area as a shortcut between towns Determine signage along Route 2 needed for alternative routes for Route 117 and Route 85 Low Short Term Low MassDOT/ of Bolton Town Possibly future development within the proximity of I 495 NB Ramps Work with Developer of property to incorporate improvements to accommodate new traffic and geometry of site Low Short Term Low MassDOT/ of Bolton Many signs are illegible within the project area Remove and replace indistinguishable signs where necessary Low Short Term Low Town of Bolton Collision diagram showing rear end type along legs of intersection or angle Install intersection ahead sign (W2 2) and Hudson Road street name sign Low Short Term Low Town of Bolton type between approaches at RT 117/RT 85 (D3 1) to inform motorists of approaching intersection Town Currently there is one yield sign located on the left side for I 495 SB off ramp Install additional yield sign on I 495 SB off ramp and adjust existing sign if necessary Low Short Term Low MassDOT Motorist Guidance/Signage Currently the I 495 NB guide sign for eastbound movement at RT 117/I 495 NB is blocked by the new signal Relocate I 495 guide sign for eastbound traffic Low Short Term Low MassDOT Some vehicles currently use the I 495 left turn lane for right turns Install LEFT TURN MUST TURN LEFT sign (R3 7) for I 495 NB off ramp Mid Short Term Low MassDOT Pavement Markings Trucks have and other vehicles use side of the road to park for the convenience store and cemetery Install No Parking sign west of Route 85 on south side of Route 117 Low Short Term Low Town of Bolton When queues form vehicles wait within the breakdown lane of I 495 Install warning signs for expected queues at I 495 northbound ramps High Short Term Low MassDOT Westbound through movement vehicles use the single lane to move around queue formed from stopped left turn lane There currently is no defined path for bicycles within the project area Trucks have been noted to crossover island at plaza southeast of I 495, there currently are no pavement markings at the plaza entrance/exit Extend westbound left turn lane at RT 117/I 495 SB/Sugar Rd Mid Short Term Low MassDOT Modify pavement markings to accommodate wider shoulder for bicycle lanes Install pavement markings at entrance/exit of plaza southeast of I 495 NB ramps, and/or modify island Mid Short Term Low MassDOT Low Short Term Low Property Owner/ Town of Bolton Some vehicles currently use the I 495 left turn lane for right turns Install left turn arrow and ONLY legend in the left turn lane of the I 495 NB off ramp Mid Short Term Low MassDOT There are unpaved area where rutting and ponding occur patch existing potholes in roadway Mid Mid Term Low MassDOT/ of Bolton Town Maintenance, Drainage and Ponding Issues There are unpaved area where rutting and ponding occur to the west of Route 85. The edge of roadway is undefined. modify pavement west of Route 85 to better define pavement edge that can accommodate truck movements Mid Mid Term Low Town of Bolton Bike and Pedestrian Accomodations Trucks have and other vehicles use side of the road to park for the provide curbing along edge of Route 117 near Route 85 and wherever convenience store and cemetery necessary to deter trucks from parking Mid Long Term Mid Town of Bolton Ponding is apparent within the project area Cleaning and Maintaining drainage structures Low Short Term Low Town of Bolton Install sidewalks and handicap ramps along south side of Route 117 within project area Mid Long Term High MassDOT Install pedestrian phases at RT 117/I 495 SB/Sugar Road and wherever MassDOT/ Town There are currently no accomodations for pedestrians within the project area Mid Long Term Mid appropriate of Bolton Install crosswalks at the intersection of RT 117/I 495 SB/Sugar Rd, RT 117/ Low RT 85 and convenience store to cemetery Long Term Low MassDOT There currently is no dfi defined dpath for bicycles within ihi the project area Restripe roadway to provide better bicycle accomodation along Route 117 Mid Short Term Low MassDOT

18 APPENDIX Appendix A RSA Meeting Agenda Appendix B- Detailed Crash Data Appendix C- Traffic Volume Data Appendix D- Existing Conditions Plan Road Safety Audit- I-495/Route 117 Interchange, Bolton, MA Prepared by Green International Affiliates, Inc. 16

19 Appendix A RSA Meeting Agenda Road Safety Audit at I-495/Route 117 Interchange, Bolton, MA Appendix

20 Road Safety Audit Meeting Location: Bolton Public Safety Training Room May 29, :00 AM 12:00 noon Type of meeting: Attendees: Please bring: I-495/Route 117 Interchange Road Safety Audit Invited Participants to Comprise a Multidisciplinary Team Thoughts and Enthusiasm!! 10:00 AM Welcome and Introductions 10:15 AM Review of Site Specific Material (enclosed) 11:00 AM Visit the Site Crash, Speed & Volume Summaries provided in advance Existing Geometries and Conditions Drive to LOCATION As a group, review site & identify areas for improvement 11:30 AM Post Visit Discussion / Completion of RSA Discuss observations and finalize findings Discuss potential improvements and finalize recommendations 12:00 noon Adjourn for the Day but the RSA has not ended Instructions for Participants: Before attending the RSA on DATE, participants are encouraged to drive through the project area and complete/consider elements on the RSA Prompt List (enclosed) with a focus on safety. All participants will be actively involved in the process throughout. Participants are encouraged to come with thoughts and ideas, but are reminded that the synergy that develops and respect for others opinions are key elements to the success of the overall RSA process. After the RSA meeting, participants will be asked to comment and respond to the document materials to assure it is reflective of the RSA completed by the multidisciplinary team. I-495/Route 117 Interchange Improvement Study

21 Appendix B Detailed Crash Data Road Safety Audit at I-495/Route 117 Interchange, Bolton, MA Appendix

22 ROUTE 117 (MAlN STREET) 05/30/09, 3 P, SA, C 8c 0 LEGEND D.'.'TE, Tlt.IE, D.'.Y, WE'ATHER a: PAVEr.IENT CONDITION PATH OF MOVING MOTOR VEHICLE C - CLEAR F = FOG R - RAIN PEDESTRIAN PATH FATAL NON FATAL REAR-END OOUJ~ON NIGLE COUJSION WE'ATHER SL- SLEET S =SNOW CL - CLOUDY e 0 ~ PAVEMENT D- DRY W- WET I- ICY S - SLUSHY BICYCLE MOTORCYCLE PARKED VEHICLE FIXED OBJECT OUT OF CONTROL SIDE SWIPE WEEKD.'.Y M - MOND.'.Y TU = TUESDAY W = WEDNESD.'.Y TH - THURSDAY F - FRID.'.Y SA - SATURDAY SU = SUND.'.Y NOT TO SCALE FIGURE 2.15 INTERSECTION COLLISION DIAGRAM ROUTE 117 {MAIN STREET), AND SB RAMPS/SUGAR ROAD BOLTON, MA r=l GREEN INTERNATIONAL AFFILIATES, INC. I:JI COIIU.fllll - WESTFOID, IIAIIIICIIUIET1S

23 rn a.. ~ < 0:: OJ z I() (J) "''t I ROUT 117 (MAIN LEGEND D.'.'TE. Tlt.IE, D.'.Y. WE'ATHER a: PAVEr.IENT CONDITION PATH OF MOVING MOTOR VEHICLE C - CLEAR F = FOG R - RAIN PEDESTRIAN PATH FATAL NON FATAL REAR-END OOUJ~ON NIGLE COUJSION WE'ATHER SL- SLEET S =SNOW Cl. - CLOUDY e 0 ~ PAVEWENT D- DRY W- WET I- ICY S - SLUSHY BICYCLE MOTORCYCLE PARKED VEHICLE FIXED OBJECT OUT OF CONTROL SIDE SWIPE WEEKD.'.Y M - WOND.'.Y TU = TUESDAY W = WEDNESD.'.Y TH - THURSDAY F - FRID.'.Y SA - SATURDAY SU = SUND.'.Y NOT TO SCALE FIGURE 2.16 INTERSECTION COLLISION DIAGRAM ROUTE 117 {MAIN STREET), AND NB RAMPS BOLTON, MA GREEN INTERNATIONAL AFFILIATES, INC. COIIU..fllll - WESTFOID, IIAIIIICIIUIET1S

24 ROUTE 117 (MAIN STREET) 09/28/10, 6 A, TU, R & W..-1.,. 0.. I.. 09/12/09, 12 P, SA, R & w 07/20/09, 2 P, M, CL & D , 6 A W C & I LEGEND DATE. lime. DIIY. WEATliER.t PAVEioiENT CONDmON PATH OF MOVING MOTOR VEHICLE PEDESTRIAN PATli FATAL NON FATAL REAR-END ca.lisidn ANGLE COWSION WEATHER C = CLEAR SL - SLEET F-FOG S=SNOW R - RAIN CL - CLOUDY e 0 ~ PAVEMENT D- DRY W- WET I= ICY S - SWSH'I' BICYCLE lolarorci'cle PARKED VEHICLE FIXED OBJECT OUT OF CONTROL SIDE SWIPE WEEKDAY t.t = MONDAY TU - TUESDIIY W - WEDNESDAY Tli - TliURSDAY F - FRIDAY SA - SATURDIIY SU = SUNDAY NOT TO SCALE FIGURE 2.17 INTERSECTION COLLISION DIAGRAM ROUTE 117 (MAIN STREET), AND ROUTE 85 (HUDSON ROAD) BOLTON, MA r=l GREEN INTERNATIONAL AFfiUATES, INC. 1:11 CONIUUINI - -..all

25 !7 COUJSION OCCURRED OVER <400' OF ROUTE 1 17 (t.iain smeet) AT SUGAR ROA0/ SB RAMP INTERSEcnON LEGENO DATE. lli.ie. DIIY. WEATliER.t PAVEI.IENT CONDmON PATH OF!.lOVING I.IOTOR VEHICLE BICYCLE PEDESTRIAN PATli I.IOTORCI'CLE FATAL e PARKED VEHICLE NON FATAL 0 FIXED OBJECT REAR-END COLLISION OUT OF CONTROL ANGLE COWSION SIDE SWIPE WEATHER ~ PAVEI.IENT C = CLEAR SL - SLEET D- DRY F'-FOG S=SNOW W- WET R - RAIN CL - CLOUDY I= ICY S - SWSHY WEEI<DAY t.l = MONDAY TU - TUESDIIY W - WEDNESDAY Tli - TliURSDAY F' - FRIDAY SA - SATURDIIY SU = SUNDAY NOT TO SCALE FIGURE 2.18 ROADWAY SEGMENT COLLISION DIAGRAM ROUTE 117 (MAIN ST), RAMPS SUGAR RD, & ROUTE 85 (HUDSON RD) BOLTON, MA r=l GREEN INTERNATIONAL AFfiUATES, INC. 1:11 CONIUUINI - -..all

26 LEGEND DATE. lli.ie. DIIY. WEATliER.t PAVEI.IENT CONDmON PATH OF!.lOVING I.IOTOR 1/EHICL.E BICYCLE PEDESTRIAN PATli I.IOTORCI'CL.E FATAL e PARKED 1/EHICL.E NON FATAL 0 FIXED OBJECT REAR-END COLLISION OUT OF CONTROL ANGLE COWSION SIDE SWIPE WEATHER ~ PAVEI.IENT C = CLEAR SL - SLEET D- DRY F'-FOG S=SNOW W- WET R - RAIN CL - CLOUDY I= ICY S - SWSHY WEEI<DAY t.l = MONDAY TU - TUESDIIY W - WEDNESDAY Tli - TliURSDAY F' - FRIDAY SA - SATURDIIY SU = SUNDAY NOT TO SCALE FIGURE 2.19 ROADWAY SEGMENT COLLISION DIAGRAM ROUTE 117 (MAIN ST), RAMPS SUGAR RD, & ROUTE 85 (HUDSON RD) BOLTON, MA r=l GREEN INTERNATIONAL AFfiUATES, INC. 1:11 CONIUUINI - -..all

27 Type TRAFFIC ACCIDENT SUMMARY OVERALL Route 117 (Main Street), I-495 Ramps, Sugar Road, and Route 85 (Hudson Road) Bolton, MA PI PD F T PI PD F T PI PD F T Angle Right Angle Rear - end 1 9 9* 1 8 8* * Head -on 2 2 2* Side Swipe: Opp. Dir Same dir. Turning Left * Turning Right Fixed Object Pedestrians/Bicycle Other Total PI: Personal Injury PD: Property Damage F: Fatality T: Total *One accident caused both personal injury and property damage MONTH OF THE YEAR Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total DAY OF THE WEEK Year Sun Mon Tue Wed Thu Fri Sat Total Year TIME OF DAY Total AM PM AM PM AM PM

28 Type TRAFFIC ACCIDENT SUMMARY Route 117 (Main Street) West of I-495 SB Ramps/Sugar Road Segment Bolton, MA PI PD F T PI PD F T PI PD F T Angle 1 1 Right Angle Rear - end Head -on Side Swipe: Opp. Dir. Same dir. Turning Left Turning Right Fixed Object Pedestrians/Bicycle Other 2 2 Total PI: Personal Injury PD: Property Damage F: Fatality T: Total MONTH OF THE YEAR Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total DAY OF THE WEEK Year Sun Mon Tue Wed Thu Fri Sat Total Year TIME OF DAY Total AM 1 1 PM AM PM AM PM

29 Type TRAFFIC ACCIDENT SUMMARY Route 117 (Main Street), and I-495 SB Ramps/Sugar Road Bolton, MA PI PD F T PI PD F T PI PD F T Angle * 2 2 Right Angle Rear - end * Head -on 1 1 1* Side Swipe: Opp. Dir Same dir. Turning Left 1 1 Turning Right Fixed Object Pedestrians/Bicycle Other Total PI: Personal Injury PD: Property Damage F: Fatality T: Total *One accident caused both personal injury and property damage MONTH OF THE YEAR Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total DAY OF THE WEEK Year Sun Mon Tue Wed Thu Fri Sat Total Year TIME OF DAY Total AM 1 1 PM AM 1 1 PM 1 1 AM 1 1 PM

30 Type TRAFFIC ACCIDENT SUMMARY Route 117 (Main Street) Segment Between I-495 SB Ramps/Sugar Road and I-495 NB Ramps Bolton, MA PI PD F T PI PD F T PI PD F T Angle Right Angle Rear - end Head -on Side Swipe: Opp. Dir. Same dir. Turning Left Turning Right Fixed Object Pedestrians/Bicycle Other Total PI: Personal Injury PD: Property Damage F: Fatality T: Total MONTH OF THE YEAR Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total DAY OF THE WEEK Year Sun Mon Tue Wed Thu Fri Sat Total Year TIME OF DAY Total AM PM AM PM AM PM 2 2 4

31 Type TRAFFIC ACCIDENT SUMMARY Route 117 (Main Street), and I-495 NB Ramps Bolton, MA PI PD F T PI PD F T PI PD F T Angle Right Angle Rear - end * 7 7 Head -on 1 1 1* Side Swipe: Opp. Dir. 1 1 Same dir. Turning Left Turning Right Fixed Object Pedestrians/Bicycle Other 1 1 Total PI: Personal Injury PD: Property Damage F: Fatality T: Total *One accident caused both personal injury and property damage MONTH OF THE YEAR Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total DAY OF THE WEEK Year Sun Mon Tue Wed Thu Fri Sat Total Year TIME OF DAY Total AM PM AM PM AM 1 1 PM

32 Type TRAFFIC ACCIDENT SUMMARY Route 117 (Main Street) Segment Between I-495 NB Ramps and Route 85 (Hudson Road) Bolton, MA PI PD F T PI PD F T PI PD F T Angle 1 1 Right Angle 1 1 Rear - end 1 1 Head -on Side Swipe: Opp. Dir. Same dir. Turning Left Turning Right Fixed Object Pedestrians/Bicycle Other Total PI: Personal Injury PD: Property Damage F: Fatality T: Total MONTH OF THE YEAR Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total DAY OF THE WEEK Year Sun Mon Tue Wed Thu Fri Sat Total Year TIME OF DAY Total AM 1 1 PM AM 1 1 PM AM 1 1 PM

33 Type TRAFFIC ACCIDENT SUMMARY Route 117 (Main Street), and Route 85 (Hudson Road) Bolton, MA PI PD F T PI PD F T PI PD F T Angle Right Angle Rear - end 1 1 1* Head -on Side Swipe: Opp. Dir. Same dir. Turning Left Turning Right Fixed Object Pedestrians/Bicycle Other Total PI: Personal Injury PD: Property Damage F: Fatality T: Total *One accident caused both personal injury and property damage MONTH OF THE YEAR Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total DAY OF THE WEEK Year Sun Mon Tue Wed Thu Fri Sat Total Year TIME OF DAY Total AM PM AM PM 2 AM PM 1 1 2

34 Type TRAFFIC ACCIDENT SUMMARY Route 85 (Hudson Road) Segment Bolton, MA PI PD F T PI PD F T PI PD F T Angle Right Angle Rear -end Head -on Side Swipe: Opp. Dir. Same dir. Turning Left Turning Right Fixed Object Pedestrians/Bicycle Other 1 1 Total 1 1 PI: Personal Injury PD: Property Damage F: Fatality T: Total MONTH OF THE YEAR Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total DAY OF THE WEEK Year Sun Mon Tue Wed Thu Fri Sat Total Year TIME OF DAY Total AM PM AM 1 1 PM AM PM

ROAD SAFETY AUDIT. Route 16 at Interstate 395 Town of Webster. October Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 16 at Interstate 395 Town of Webster. October Prepared For: MassDOT ROAD SAFETY AUDIT Route 16 at Interstate 395 Town of Webster October 2015 Prepared For: MassDOT Prepared By: McMahon Associates, Inc. 300 Myles Standish Blvd. Suite 201 Taunton, MA 02780 Table of Contents

More information

ROAD SAFETY AUDIT. Granite Avenue at Interstate 93 Ramps. Town of Milton. May 22, Prepared for: MassDOT

ROAD SAFETY AUDIT. Granite Avenue at Interstate 93 Ramps. Town of Milton. May 22, Prepared for: MassDOT ROAD SAFETY AUDIT Granite Avenue at Interstate 93 Ramps Town of Milton May 22, 2017 Prepared for: MassDOT Prepared by: Toole Design Group 2 Oliver Street, Suite 305 Boston, MA 02109 Table of Contents Background...

More information

ROAD SAFETY AUDIT. Route 114 at Interstate I-495 Northbound Ramps. City of Lawrence. July 30, 2015

ROAD SAFETY AUDIT. Route 114 at Interstate I-495 Northbound Ramps. City of Lawrence. July 30, 2015 ROAD SAFETY AUDIT Route 114 at Interstate I-495 Northbound Ramps City of Lawrence July 30, 2015 Prepared For: Massachusetts Department of Transportation Prepared By: Toole Design Group 33 Broad Street,

More information

ROAD SAFETY AUDIT. State Road (Route 6) Corridor Town of Dartmouth. March Prepared For: MassDOT

ROAD SAFETY AUDIT. State Road (Route 6) Corridor Town of Dartmouth. March Prepared For: MassDOT ROAD SAFETY AUDIT State Road (Route 6) Corridor Town of Dartmouth March 2015 Prepared For: MassDOT Prepared By: McMahon Associates, Inc. 300 Myles Standish Blvd. Suite 201 Taunton, MA 02780 Table of Contents

More information

ROAD SAFETY AUDIT. East Main Street (Route 123) at Route I-495 Northbound & Southbound Ramps Town of Norton. May 11, Prepared For: MassDOT

ROAD SAFETY AUDIT. East Main Street (Route 123) at Route I-495 Northbound & Southbound Ramps Town of Norton. May 11, Prepared For: MassDOT ROAD SAFETY AUDIT East Main Street (Route 123) at Route I-495 Northbound & Southbound Ramps Town of Norton May 11, 2016 Prepared For: MassDOT Prepared By: 101 Walnut Street Watertown, MA Road Safety Audit

More information

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC

More information

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff MEMORANDUM DATE March 1, 212 TO Town of Milton FROM RE Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff FFY 211 Safety and Operations Analyses at Selected Boston Region MPO Intersections:

More information

ROAD SAFETY AUDIT. Route 53 (Washington Street) High Crash Locations at Route 139 (Schoosett Street) and Route 14 (Congress Street) Town of Pembroke

ROAD SAFETY AUDIT. Route 53 (Washington Street) High Crash Locations at Route 139 (Schoosett Street) and Route 14 (Congress Street) Town of Pembroke ROAD SAFETY AUDIT Route 53 (Washington Street) High Crash Locations at Route 139 (Schoosett Street) and Route 14 (Congress Street) Town of Pembroke April 29, 2016 Prepared For: MassDOT Highway Division

More information

ROAD SAFETY AUDIT. Route 202 (East State Street)/School Street & Route 202 (West State Street)/Pleasant Street/Amherst Street Town of Granby

ROAD SAFETY AUDIT. Route 202 (East State Street)/School Street & Route 202 (West State Street)/Pleasant Street/Amherst Street Town of Granby ROAD SAFETY AUDIT Route 202 (East State Street)/School Street & Route 202 (West State Street)/Pleasant Street/Amherst Street Town of Granby March 2013 Prepared for: Massachusetts Department of Transportation

More information

VT15 / Allen Martin Drive Intersection Scoping Study

VT15 / Allen Martin Drive Intersection Scoping Study VT15 / Allen Martin Drive Intersection Scoping Study ALTERNATIVES PRESENTATION MEETING DECEMBER 19, 2016 Agenda Study Area Project Background Existing Conditions Identified Issues Proposed Alternatives

More information

Military Road Safety Improvements

Military Road Safety Improvements Military Road Safety Improvements 26 th Road North to 31 st Street North SUMMARY OF DATA REVIEW AND PRELIMINARY RECOMMENDATIONS Prepared for: Department of Environmental Services Traffic Engineering and

More information

ROAD SAFETY AUDIT. Mass Pike Interchange 6, I-291 and Burnett Road. City of Chicopee. November 4, Prepared For: MassDOT Highway Division

ROAD SAFETY AUDIT. Mass Pike Interchange 6, I-291 and Burnett Road. City of Chicopee. November 4, Prepared For: MassDOT Highway Division ROAD SAFETY AUDIT Mass Pike Interchange 6, I-291 and Burnett Road City of Chicopee November 4, 2013 Prepared For: MassDOT Highway Division Prepared By: BETA Group, Inc. Table of Contents Project Data...

More information

ROAD SAFETY AUDIT. Neponset Street Rotary/Pendergast Circle. Town of Norwood. September Prepared For: On Behalf Of:

ROAD SAFETY AUDIT. Neponset Street Rotary/Pendergast Circle. Town of Norwood. September Prepared For: On Behalf Of: ROAD SAFETY AUDIT Neponset Street Rotary/Pendergast Circle Town of Norwood September 2014 Prepared For: On Behalf Of: Westwood Marketplace Holdings LLC Prepared By: 35 New England Business Center Drive

More information

ROAD SAFETY AUDIT. Blue Hill Avenue (Route 28) and Warren Street High Crash Locations City of Boston. November 1, 2016

ROAD SAFETY AUDIT. Blue Hill Avenue (Route 28) and Warren Street High Crash Locations City of Boston. November 1, 2016 ROAD SAFETY AUDIT Blue Hill Avenue (Route 28) and Warren Street High Crash Locations City of Boston November 1, 2016 Prepared For: MassDOT Highway Division Prepared By: BETA Group, Inc. Table of Contents

More information

ROAD SAFETY AUDIT MDM. Columbia Road at Dorchester Avenue. Dorchester, MA 10/14/2016. Prepared For: MassDOT. On Behalf Of: Edens

ROAD SAFETY AUDIT MDM. Columbia Road at Dorchester Avenue. Dorchester, MA 10/14/2016. Prepared For: MassDOT. On Behalf Of: Edens ROAD SAFETY AUDIT Columbia Road at Dorchester Avenue Dorchester, MA 10/14/2016 Prepared For: MassDOT On Behalf Of: Edens Prepared By: MDM Transportation Consultants, Inc. 28 Lord Road Suite 280 Marlborough,

More information

ROAD SAFETY AUDIT. West Central Street (Route 140) at Franklin Village Drive. Town of Franklin. February 03, 2016

ROAD SAFETY AUDIT. West Central Street (Route 140) at Franklin Village Drive. Town of Franklin. February 03, 2016 ROAD SAFETY AUDIT West Central Street (Route 140) at Franklin Village Drive Town of Franklin February 03, 2016 Prepared for: Massachusetts Department of Transportation Prepared by: Howard Stein Hudson

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

ROAD SAFETY AUDIT. County Street at Hart Street. City of Taunton. January 30, Prepared For: Massachusetts Department of Transportation

ROAD SAFETY AUDIT. County Street at Hart Street. City of Taunton. January 30, Prepared For: Massachusetts Department of Transportation ROAD SAFETY AUDIT County Street at Hart Street City of Taunton January 30, 2015 Prepared For: Massachusetts Department of Transportation Prepared By: Toole Design Group 33 Broad Street, 4 th Floor Boston,

More information

Off-road Trails. Guidance

Off-road Trails. Guidance Off-road Trails Off-road trails are shared use paths located on an independent alignment that provide two-way travel for people walking, bicycling, and other non-motorized users. Trails specifically along

More information

ROAD SAFETY AUDIT. Centre Street (Route 123) at Plymouth Street. Municipality of Brockton. November, Prepared For: MassDOT

ROAD SAFETY AUDIT. Centre Street (Route 123) at Plymouth Street. Municipality of Brockton. November, Prepared For: MassDOT ROAD SAFETY AUDIT Centre Street (Route 123) at Plymouth Street Municipality of Brockton November, 2017 Prepared For: MassDOT On Behalf Of: City of Brockton Prepared By: Old Colony Planning Council 70 School

More information

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment To: Peter Cavanaugh General Electric From: David Bohn, PE Ryan White, PE Date: April 4, 217 Project #: 13421. Re: / Traffic/Intersection Assessment Consistent with the Cooperation Agreement between the

More information

MEMORANDUM. Layout Of Study Intersections And Traffic Control

MEMORANDUM. Layout Of Study Intersections And Traffic Control BOSTON REGION METROPOLITAN PLANNING ORGANIZATION Richard A. Davey, MassDOT Secretary and CEO and MPO Chairman Karl H. Quackenbush, Executive Director, MPO Staff DATE November 15, 2012 TO FROM RE Town of

More information

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT May 15, 2018 AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT TYPE OF ITEM: Discussion STATEMENT OF ISSUE The Florida Department of Transportation

More information

ROAD SAFETY AUDIT. Washington Street (Route 53) at Pleasant Street. Town of Pembroke. June 26, Prepared For: MassDOT Highway Division

ROAD SAFETY AUDIT. Washington Street (Route 53) at Pleasant Street. Town of Pembroke. June 26, Prepared For: MassDOT Highway Division ROAD SAFETY AUDIT Washington Street (Route 53) at Pleasant Street Town of Pembroke June 26, 2014 Prepared For: MassDOT Highway Division Prepared By: BETA Group, Inc. Table of Contents Project Data... 1

More information

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information

ROAD SAFETY AUDIT. South Street (Route 1A) at East Bacon Street (Route 106) and West Bacon Street Town of Plainville.

ROAD SAFETY AUDIT. South Street (Route 1A) at East Bacon Street (Route 106) and West Bacon Street Town of Plainville. ROAD SAFETY AUDIT South Street (Route 1A) at East Bacon Street (Route 106) and West Bacon Street Town of Plainville March 15, 2018 Prepared For: MassDOT On Behalf Of: Town of Plainville Prepared By: BETA

More information

Windy Ridge Elementary School

Windy Ridge Elementary School Windy Ridge Elementary School SCHOOL ROUTE PLAN For WINDY RIDGE ELEMENTARY SCHOOL LOCATION 54 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study CITY OF WEST LAKE HILLS 901 South Mopac Expressway Building V, Suite 220 Austin, Texas 78746 Texas P.E. Firm Registration No. F-929 Klotz Associates Final Report Submittal: March 20, 2015 Revised Final

More information

ROAD SAFETY AUDIT. Santilli Circle and Sweetser Circle. Municipality of Everett. March 10, Prepared For: MassDOT

ROAD SAFETY AUDIT. Santilli Circle and Sweetser Circle. Municipality of Everett. March 10, Prepared For: MassDOT ROAD SAFETY AUDIT Santilli Circle and Sweetser Circle Municipality of Everett Prepared For: MassDOT On Behalf Of: WYNN Design and Development Prepared By: AECOM 250 Apollo Drive Chelmsford, MA Road Safety

More information

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX PHASE I...2 Do Not Enter Sign...3 One-Way Sign...4 Turn Prohibition...5 Pavement Markings...6 Speed Monitoring Trailer...7 Neighborhood Speed Watch...8 Police

More information

ROAD SAFETY AUDIT. Route 38 from Route 62 to Woburn Town Line. Town of Wilmington. April 10, Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 38 from Route 62 to Woburn Town Line. Town of Wilmington. April 10, Prepared For: MassDOT ROAD SAFETY AUDIT Route 38 from Route 62 to Woburn Town Line Town of Wilmington April 10, 2017 Prepared For: MassDOT Prepared By: Green International Affiliates, Inc. 239 Littleton Road, Suite 3, Westford,

More information

PEDESTRIAN SAFETY STUDY

PEDESTRIAN SAFETY STUDY PEDESTRIAN SAFETY STUDY SR 699 (BLIND PASS RD/GULF BLVD) FROM 93 RD AVENUE TO PINELLAS BAYWAY PINELLAS COUNTY SECTION NO.: 15100 MILEPOST: 0.111 3.569 STUDY LIMITS Prepared For: Florida Department of Transportation

More information

ROAD SAFETY AUDIT. Route 135 at Route 30 Town of Westborough. January Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 135 at Route 30 Town of Westborough. January Prepared For: MassDOT ROAD SAFETY AUDIT Route 135 at Route 30 January 2016 Prepared For: MassDOT Prepared By: McMahon Associates, Inc. 300 Myles Standish Blvd. Suite 201 Taunton, MA 02780 Road Safety Audit Route 135 at Route

More information

Swamp Road Residents Study

Swamp Road Residents Study Swamp Road Residents Study SRRG Meeting with PennDot and Elected Officials Newtown and Wrightstown, PA April 25, 2008 Newtown Township Section of Swamp Road Limited Public Funds No reconstruction of a

More information

ROAD SAFETY AUDIT. Russell Street (Route 9) at North and South Maple Streets Town of Hadley. March 2014

ROAD SAFETY AUDIT. Russell Street (Route 9) at North and South Maple Streets Town of Hadley. March 2014 ROAD SAFETY AUDIT Russell Street (Route 9) at North and South Maple Streets Town of Hadley March 2014 Prepared for: Massachusetts Department of Transportation Prepared by: Howard/Stein-Hudson Associates

More information

Comments EXECUTIVE SUMMARY

Comments EXECUTIVE SUMMARY Comments 1. Under any Alternatives, MCDOT should provide better at-grade pedestrian crossing of Georgia Avenue and Forest Glen Road, including improved crosswalks with wider medians and adequate signal

More information

ROAD SAFETY AUDIT. Route 113 (Storey Avenue) at Woodman Way and Low Street. Newburyport, MA. May 27, Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 113 (Storey Avenue) at Woodman Way and Low Street. Newburyport, MA. May 27, Prepared For: MassDOT ROAD SAFETY AUDIT Route 113 (Storey Avenue) at Woodman Way and Low Street Newburyport, MA May 27, 2015 Prepared For: MassDOT Prepared By: Bayside Engineering, Inc. 600 Unicorn Park Drive Woburn, MA 01801

More information

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN TRANSIT SAFETY ASSESSMENT SR 55/US 19 AT 80 TH AVE N DRAFT JUNE

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving

More information

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report Traffic Study of Fuller Street, Cady Street, West Street and West Avenue Final Report July 2005 Prepared for: Town of Ludlow Prepared by: Pioneer Valley Planning Commission 26 Central Street West Springfield,

More information

Public Information Centre

Public Information Centre WELCOME Public Information Centre Father Tobin Road Lougheed Middle School - Library Wednesday November 7, 2012 7:00 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background The City

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

Ottawa Beach Road Study

Ottawa Beach Road Study Ottawa Beach Road Study Prepared For: Park Township September 30, 2014 Project No. G140303 OTTAWA BEACH ROAD STUDY PREPARED FOR: PARK TOWNSHIP SEPTEMBER 30, 2014 PROJECT NO. G140303 TABLE OF CONTENTS 1.0

More information

ROAD SAFETY AUDIT. May 18, Prepared For: MassDOT. On Behalf Of: Town of Milford

ROAD SAFETY AUDIT. May 18, Prepared For: MassDOT. On Behalf Of: Town of Milford ROAD SAFETY AUDIT East Main Street (Route 16) at Medway Road (Route 109), East Main Street (Route 16) at Quarry Square Driveways, East Main Street (Route 16) at Beaver Street/ Fortune Boulevard Town of

More information

ROAD SAFETY AUDIT. Falmouth Road (Route 28)/Bearses Way. Town of Barnstable. May Prepared for: Massachusetts Highway Department

ROAD SAFETY AUDIT. Falmouth Road (Route 28)/Bearses Way. Town of Barnstable. May Prepared for: Massachusetts Highway Department ROAD SAFETY AUDIT Falmouth Road (Route 28)/Bearses Way Town of Barnstable May 2009 Prepared for: Massachusetts Highway Department Prepared by: Howard/Stein-Hudson Associates 38 Chauncy Street Boston, MA

More information

CAPE COD COMMISSION 3225 MAIN STREET P.O. BOX 226 BARNSTABLE, MA (508) Fax (508) Transportation Safety Report

CAPE COD COMMISSION 3225 MAIN STREET P.O. BOX 226 BARNSTABLE, MA (508) Fax (508) Transportation Safety Report CAPE COD COMMISSION 3225 MAIN STREET P.O. BOX 226 BARNSTABLE, MA 02630 (508) 362-3828 Fax (508) 362-3136 2006 Transportation Safety Report Bourne: Otis Rotary Harwich: Route 137/Route 39 Orleans: Route

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

MEMORANDUM. Charlotte Fleetwood, Transportation Planner MEMORANDUM Date: Updated August 22, 2017 To: Organization: Charlotte Fleetwood, Transportation Planner Boston Transportation Department From: Jason DeGray, P.E., PTOE, Regional Director of Engineering

More information

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for: DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,

More information

CURBSIDE ACTIVITY DESIGN

CURBSIDE ACTIVITY DESIGN 5 CURBSIDE ACTIVITY DESIGN This chapter provides design guidance for separated bike lanes adjacent to curbside activities including parking, loading and bus stops. Typical configurations are presented

More information

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016 M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has

More information

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions This treatment provides a transition from two-way separated bike lanes to one-way

More information

ROAD SAFETY AUDIT. Damon Road. City of Northampton. October Prepared for: Massachusetts Department of Transportation

ROAD SAFETY AUDIT. Damon Road. City of Northampton. October Prepared for: Massachusetts Department of Transportation ROAD SAFETY AUDIT Damon Road City of Northampton October 2013 Prepared for: Massachusetts Department of Transportation Prepared by: Howard/Stein-Hudson Associates 38 Chauncy Street Boston, MA 02111 Table

More information

Route 117 Review of Ownership Transfer October 2014

Route 117 Review of Ownership Transfer October 2014 Route 117 Review of Ownership Transfer October 2014 Page 1 of 27 I. INTRODUCTION... 3 II. EXISTING CONDITIONS... 4 A. Town of Lancaster Site-Investigation... 4 B. Town of Bolton Site-Investigation... 9

More information

BELCHERTOWN. Intersection of Federal Steet (Route 9) and Bay Road MAY 2012

BELCHERTOWN. Intersection of Federal Steet (Route 9) and Bay Road MAY 2012 BELCHERTOWN Intersection of Federal Steet (Route 9) and Bay Road MAY 2012 Prepared Under the Direction of Pioneer Valley MPO By: Pioneer Valley Planning Commission 60 Congress Street Springfield 01104-3419

More information

Chapter 2: Standards for Access, Non-Motorized, and Transit

Chapter 2: Standards for Access, Non-Motorized, and Transit Standards for Access, Non-Motorized, and Transit Chapter 2: Standards for Access, Non-Motorized, and Transit The Washtenaw County Access Management Plan was developed based on the analysis of existing

More information

ROAD SAFETY AUDIT. Auburn Street at Southbridge Street (Route 12) Town of Auburn. March Prepared For: Massachusetts Department of Transportation

ROAD SAFETY AUDIT. Auburn Street at Southbridge Street (Route 12) Town of Auburn. March Prepared For: Massachusetts Department of Transportation ROAD SAFETY AUDIT Auburn Street at Southbridge Street (Route 12) Town of Auburn March 2017 Prepared For: Massachusetts Department of Transportation Prepared By: Vanasse Hangen Brustlin, Inc Union Station

More information

ROAD SAFETY AUDIT. Boston Road (Route 20) at Parker Street and Pasco Road to Dumaine Street City of Springfield Town of Wilbraham.

ROAD SAFETY AUDIT. Boston Road (Route 20) at Parker Street and Pasco Road to Dumaine Street City of Springfield Town of Wilbraham. ROAD SAFETY AUDIT Boston Road (Route 2) at Parker Street and Pasco Road to Dumaine Street City of Springfield Town of Wilbraham October 4, 212 Prepared For: MassDOT Highway Division Prepared By: BETA Group,

More information

A Sample Report of TRAFFIC CONTROL DEVICES REVIEW

A Sample Report of TRAFFIC CONTROL DEVICES REVIEW A Sample Report of TRAFFIC CONTROL DEVICES REVIEW Introduction We performed a peer review of traffic control devices at selected locations on the City s street system. As the result of our review, we have

More information

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO

TRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO TRAFFIC ACTION PLAN Laurie Meadows Neighborhood CITY OF SAN MATEO Draft January 2017 Table of Contents Introduction... 2 The Traffic Forum Process... 5 Neighborhood Traffic Issues... 7 Neighborhood Recommendations

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Forest Hills Improvement Initiative

Forest Hills Improvement Initiative Forest Hills Improvement Initiative Transportation Action Plan Short Term Recommendations ONLY Final Draft as of April 30, 2008 For Community Review and Feedback Prepared for: The City of Boston Boston

More information

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009 Summary: Several recent studies have assessed potential development and redevelopment opportunities in the Mercer Crossing area of Trenton, Ewing, and Lawrence. This Princeton Avenue and Spruce Street

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

Meadow Woods Elementary School

Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

Orange Center Elementary School

Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

MEMORANDUM. Nantasket Road at Kingsley Road Kingsley Road at Sumner Street Kingsley Road at Revere Street Kingsley Road at Kenberma Street

MEMORANDUM. Nantasket Road at Kingsley Road Kingsley Road at Sumner Street Kingsley Road at Revere Street Kingsley Road at Kenberma Street MEMORANDUM Date: June 28, 2012 To: From: Subject: Mr. Joseph Stigliani, Director of Public Works Kenneth J. Petraglia, P.E., PTOE Greg E. Lucas, P.E., PTOE Kingsley Road Stop Sign Warrant Analysis BETA

More information

Small Area Study U.S. Route 220 and VA Route 615 Intersection. Bath County, Virginia

Small Area Study U.S. Route 220 and VA Route 615 Intersection. Bath County, Virginia Small Area Study U.S. Route 220 and VA Route 615 Intersection Bath County, Virginia Prepared by the Central Shenandoah Planning District Commission Final Report February 2018 Table of Contents 1. INTRODUCTION...

More information

ROAD SAFETY AUDIT. Plain Street (Route 139) at Furnace Street and Proprietors Drive Town of Marshfield. June 9, 2017.

ROAD SAFETY AUDIT. Plain Street (Route 139) at Furnace Street and Proprietors Drive Town of Marshfield. June 9, 2017. ROAD SAFETY AUDIT Plain Street (Route 139) at Furnace Street and Proprietors Drive Town of Marshfield June 9, 2017 Prepared for: MassDOT On Behalf of: Vanasse & Associates, Inc. 35 New England Business

More information

ROAD SAFETY AUDIT. Rourke Bridge at Pawtucket Boulevard (Route 113) City of Lowell. October 5, Prepared For: MassDOT.

ROAD SAFETY AUDIT. Rourke Bridge at Pawtucket Boulevard (Route 113) City of Lowell. October 5, Prepared For: MassDOT. ROAD SAFETY AUDIT Rourke Bridge at Pawtucket Boulevard (Route 113) City of Lowell October, 2017 Prepared For: MassDOT Prepared By: Vanasse Hangen Brustlin, Inc 101 Walnut Street Watertown, MA 02472 Road

More information

Multi-Modal Traffic Analysis. Parisi and Associates

Multi-Modal Traffic Analysis. Parisi and Associates Mill Valley to Corte Madera Bicycle and Pedestrian Corridor Study Appendix D: Multi-Modal Traffic Analysis Prepared by Parisi and Associates August 2009 Appendix D - Multi-Modal Traffic Analysis Table

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

Lake Whitney Elementary School

Lake Whitney Elementary School Lake Whitney Elementary School SCHOOL ROUTE PLAN For LAKE WHITNEY ELEMENTARY SCHOOL LOCATION 18 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell

More information

City of Wilsonville 5 th Street to Kinsman Road Extension Project

City of Wilsonville 5 th Street to Kinsman Road Extension Project City of Wilsonville 5 th Street to Kinsman Road Walking Tour & Neighborhood Workshop Summary Report Public Outreach Overview On July 18 th, 2017, the City of Wilsonville hosted a neighborhood walking tour

More information

What Is a Complete Street?

What Is a Complete Street? Session 5 Charleen Zimmer, AICP, Zan Associates May 5-7, 2010 What Is a Complete Street? May 2010 5-1 Not a Complete Street More of a Complete Street May 2010 5-2 Benefits of Complete Streets Safety for

More information

Roundabout Evaluations in Virginia: US 15/US 50 Gilberts Corner, VA SR 106/SR 634 Prince George County, VA

Roundabout Evaluations in Virginia: US 15/US 50 Gilberts Corner, VA SR 106/SR 634 Prince George County, VA Roundabout Evaluations in Virginia: US 15/US 50 Gilberts Corner, VA SR 106/SR 634 Prince George County, VA VDOT & FHWA Roundabout Workshop September 17, 2013 Chris Tiesler, PE Presentation Outline US 15/US

More information

ROAD SAFETY AUDIT. Providence Street (Route 122A) at McKeon Road/Millbury Street. City of Worcester. July 14, Prepared For: MassDOT

ROAD SAFETY AUDIT. Providence Street (Route 122A) at McKeon Road/Millbury Street. City of Worcester. July 14, Prepared For: MassDOT ROAD SAFETY AUDIT Providence Street (Route 122A) at McKeon Road/Millbury Street City of Worcester July 14, 2016 Prepared For: MassDOT Prepared By: Stantec Consulting Services, Inc. Burlington, Massachusetts

More information

Residential Traffic Calming Program Guide. Town of Ashland, Virginia

Residential Traffic Calming Program Guide. Town of Ashland, Virginia Residential Traffic Calming Program Guide Town of Ashland, Virginia August 1, 2006 TABLE OF CONTENTS A. INTRODUCTION... 1 B. GOALS... 1 C. CRITERIA... 1 D. IDENTIFYING NEIGHBORHOOD TRAFFIC CONCERNS...

More information

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL THE FUTURE OF THE TXDOT ROADWAY DESIGN MANUAL Kenneth Mora, P.E. (Design Division) 10/10/2017 Table of contents 1 2 Reduction in FHWA design controlling criteria Innovative Intersection Guidance 3-7 8-42

More information

ROAD SAFETY AUDIT. Route 27 (Crescent Street)/Quincy Street/Massasoit Boulevard. City of Brockton. July 24,2013

ROAD SAFETY AUDIT. Route 27 (Crescent Street)/Quincy Street/Massasoit Boulevard. City of Brockton. July 24,2013 ROAD SAFETY AUDIT Route 27 (Crescent Street)/Quincy Street/Massasoit Boulevard City of Brockton July 24,2013 Prepared for: Massachusetts Department of Transportation Prepared by: Howard/Stein-Hudson Associates

More information

WELCOME Public Information Centre

WELCOME Public Information Centre WELCOME Public Information Centre Fernforest Drive Brampton Soccer Centre Community Room #2 Tuesday January 19, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS STAFF REPORT OF: January 6, 2019 SUPERVISORIAL DISTRICT: 5 SUBJECT: LOCATION: INVESTIGATOR: O Neill Drive at Roanoke Drive; Ladera Ranch; TB 922-E6 Clever

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA Addendum Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA 22406-1022 800-272-8772 This material is based upon work supported by

More information

Edgemont Village Traffic and Parking Technical Report January 2014

Edgemont Village Traffic and Parking Technical Report January 2014 Edgemont Village Traffic and Parking Technical Report January 2014 In the fall of 2013, the District of North Vancouver engaged consultants to assess existing intersection and parking conditions in Edgemont

More information

ROAD SAFETY AUDIT. Route 2/Route 68 Interchange Rotary City of Gardner. August 3, Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 2/Route 68 Interchange Rotary City of Gardner. August 3, Prepared For: MassDOT ROAD SAFETY AUDIT Route 2/Route 68 Interchange Rotary City of Gardner August 3, 2016 Prepared For: MassDOT Prepared By: Tetra Tech 100 Nickerson Avenue Marlborough, MA 01752 Road Safety Audit Route 2/Route

More information

ROAD SAFETY AUDIT. Route 3A from Evans Street to Abigail Adams State Park. Town of Weymouth. October 12, Prepared For: MassDOT

ROAD SAFETY AUDIT. Route 3A from Evans Street to Abigail Adams State Park. Town of Weymouth. October 12, Prepared For: MassDOT ROAD SAFETY AUDIT Route 3A from Evans Street to Abigail Adams State Park Town of Weymouth October 12, 2016 Prepared For: MassDOT Prepared By: Green International Affiliates, Inc. 239 Littleton Road, Suite

More information

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017 EODOT Project: ODOT Project: STA-IR 77-.50; PID 00290 Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project Summary of Public Comments Received and Responses

More information

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine Draft Study STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine SUBMITTED TO: BANGOR AREA COMPREHENSIVE TRANSPORTATION SYSTEM SUBMITTED BY: I MAY 23, 2017 DRAFT STILLWATER AVENUE STUDY FINAL REPORT Table

More information

Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy

Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy Adopted January 6, 2014 Town of Mooresville Development Services Department TOWN OF MOORESVILLE NEIGHBORHOOD TRAFFIC

More information

ROAD SAFETY AUDIT. Northampton Road (Route 9) at University Drive and Snell Street Town of Amherst. November 15, Prepared For: MassDOT

ROAD SAFETY AUDIT. Northampton Road (Route 9) at University Drive and Snell Street Town of Amherst. November 15, Prepared For: MassDOT ROAD SAFETY AUDIT Northampton Road (Route 9) at University Drive and Snell Street Town of Amherst November 15, 2016 Prepared For: MassDOT Prepared By: Greenman-Pedersen, Inc. 181 Ballardvale Street, Suite

More information

Falmouth Road Safety Audit

Falmouth Road Safety Audit Falmouth Road Safety Audit Sandwich Road: Carriage Shop Road to Hatchville Road September 2011 Prepared by the Cape Cod Commission in cooperation with the Town of Falmouth and Massachusetts Department

More information

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St. Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St. Nathan Roseberry, Senior Engineer Pam Broviak, Project Manager July 24, 2014 Agenda Project Goals Existing Roadway Conditions Traffic

More information

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07 25th Avenue Road Diet Project A One Year Evaluation Transportation Fund for Clean Air Project #05R07 Submitted by: The San Francisco Municipal Transportation Agency Dan Provence May 22, 2009 EXECUTIVE

More information

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK TRAFFIC IMPACT STUDY FOR THE DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK MARCH 14, 2017 PREPARED FOR: 1950 Brighton Henrietta Town Line Rd Rochester, NY 14623 PREPARED

More information

ROAD SAFETY AUDIT. Route 18 (Bedford Street) from Whitman Street to Central Square Town of East Bridgewater. May 14, 2014

ROAD SAFETY AUDIT. Route 18 (Bedford Street) from Whitman Street to Central Square Town of East Bridgewater. May 14, 2014 ROAD SAFETY AUDIT Route 18 (Bedford Street) from Whitman Street to Central Square Town of East Bridgewater May 14, 2014 Prepared For: MassDOT Highway Division Prepared By: BETA Group, Inc. Table of Contents

More information