1 ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: Orleans Gardens Shopping Centre Inc John Street, Suite 1 Markham, ON K3R 5R7 July 15, Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers P.O. Box 774, Manotick, ON K4M 1A7 Tel (613) Fax (613)

2 TABLE OF CONTENT PAGE 1. INTRODUCTION Scope of Work EXISTING ROADS AND INTERSECTIONS PROPOSED DEVELOPMENT Trip Generation Trip Generated Primary Trips and Pass-by Trips Trip Distribution TRANSPORTATION IMPACT Background and Total Traffic Volumes Traffic Analysis Site Circulation of Traffic Collision Reports Pedestrian, Cycling, and Transit Facilities JEANNE D ARC BOULEVARD/MONTCERF COURT INTERSECTION FINDINGS APPENDIX LIST OF FIGURES 1.1 SITE LOCATION PLAN EXISTING PEAK AM AND PM HOUR TRAFFIC COUNTS CONCEPTUAL SITE PLAN WEEKDAY PEAK AM AND PM HOUR PRIMARY TRIPS WEEKDAY PEAK AM AND PM HOUR PASS-BY TRIPS WEEKDAY PEAK AM AND PM HOUR BACKGROUND TRAFFIC WEEKDAY PEAK AM AND PM HOUR BACKGROUND TRAFFIC WEEKDAY PEAK AM AND PM HOUR TOTAL TRAFFIC WEEKDAY PEAK AM AND PM HOUR TOTAL TRAFFIC LIST OF TABLES 3.1 SITE INVENTORY TRIP GENERATION RATES PEAK HOUR SITE TRIPS GENERATED PRIMARY AND PASS-BY TRIPS EAST ACCESS/JEANNE D ARC LoS & Volume/Capacity (v/c) WEST ACCESS/JEANNE D ARC LoS & 95 th Percentile Queue NORTH ACCESS/ORLEANS LoS & 95 th Percentile Queue SOUTH ACCESS/ORLEANS LoS & 95 th Percentile Queue JEANNE D ARC/ORLEANS LoS & Volume/Capacity (v/c) COLLISION SUMMARY... 24

3 ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY 1. INTRODUCTION The Orleans Gardens Shopping Centre is located at the southeast corner of the intersection of Orleans Boulevard and Jeanne d Arc Boulevard (south of Ottawa Road 174) in the City of Ottawa. The existing shopping centre contains a Your Independent Grocer (YIG) at the south end, with commercial retail units (CRU) along the east portion of the site containing a mixture of retail, restaurants and commercial offices. A free-standing building is located at the northwest corner of the site which contains a Pharma Plus drug store and medical facilities. Figure 1.1 shows the location of the shopping centre. The shopping centre currently has five accesses to the site. The main accesses are a full movement access onto Orleans Boulevard controlled by a stop sign and located approximately in the middle of the site, and an access onto Jeanne d Arc Boulevard at the east limit of the site which was modified to be controlled by traffic signals in the fall of Two right-in/right-out accesses are located at the northwest corner of the site, one onto Orleans Boulevard and a second onto Jeanne d Arc Boulevard. The fifth access provides right-in/right/out access onto Orleans Boulevard and is located at the south portion of the site providing access to the YIG and some retail at the south end of the shopping centre. Orleans Gardens Shopping Centre Inc. has proposed the construction of two free-standing buildings to be located at the north end of the site adjacent to Jeanne d Arc Boulevard. The development would contain a Starbucks coffee shop and retail in one building, and a fast-food restaurant and retail in the second building. The additional development will utilize the existing shopping centre access points onto Jeanne d Arc Boulevard and Orleans Boulevard. The development is expected to be substantially completed by As part of the Site Plan Application for the project, City of Ottawa staff has requested that a transportation assessment report be prepared to address the impact of the additional traffic generated by the site. Orleans Gardens Shopping Centre Inc. has engaged the firm of D. J. Halpenny & Associated Ltd. to prepare the transportation assessment report which would examine the operation of the site accesses and the impact that the site would have on the intersection of Orleans Boulevard and Jeanne d Arc Boulevard. 1.1 Scope of Work The proposed land use and expected volume of site generated trips would require that a report be prepared which would examine the impact of the

4 2 FIGURE 1.1 SITE LOCATION PLAN

5 3 proposed development on the adjacent streets. The scope of the would be to examine the existing four accesses to the shopping centre. The fifth right-in/rightout access at the south portion of the site adjacent to the YIG would not be examined as minimal traffic from the proposed development is expected to use the access. The study would also include the analysis of the operation of the Orleans Boulevard and Jeanne d Arc Boulevard intersection. The analysis would be for the existing traffic counts, the expected traffic volumes at substantial completion of the site in 2014, and at 2019 which represents five years beyond completion. The study would use the weekday peak AM and PM hour counts which would be the critical time period for traffic in the area. The Traffic Impact Study will follow the assessment procedure as documented in the City of Ottawa Transportation Impact Assessment Guidelines. 2. EXISTING ROADS AND INTERSECTIONS The north limit of the Orleans Gardens Shopping Centre will border onto Jeanne d Arc Boulevard. The Ottawa 20/20 Transportation Master Plan (TMP) classifies Jeanne d Arc Boulevard (Ottawa Road 55) as a four-lane urban divided arterial road with a posted speed limit of 60 km./h. There are pedestrian sidewalks along both sides of the road. Orleans Boulevard borders the west limit of the site. Orleans Boulevard (Ottawa Road 56) is classified as a four-lane divided arterial road. The posted speed limit in the vicinity of the site is 60 km./h. with sidewalks along both sides of the road. The shopping centre s north access onto Jeanne d Arc Boulevard has Montcerf Court forming the north approach (southbound) to the intersection. Moncerf Court is a local street which has no sidewalks along the roadway. The street terminates at a cul-de-sac at the north end, but does provide a route to Orleans Boulevard by way of Rodin Way and Du Sommet Place. East Access/Jeanne d Arc Intersection The East Access is located at the northeast portion of the site with access onto Jeanne d Arc Boulevard. The intersection is located approximately 185 metres east of the Jeanne d Arc/Orleans intersection (centreline to centreline). Traffic signals were installed at the intersection in the fall of The intersection has the following lane configuration: Northbound Site Access - Southbound Montcerf - Eastbound Jeanne d Arc - Westbound Jeanne d Arc - one left turn lane (not painted) one through/right lane (not painted) one shared left/through/right lane one shared left/through lane one shared through/right lane one exclusive left turn lane (36 m storage) one through lane one through/right lane

6 4 West Access/Jeanne d Arc Intersection The West Access is a right-in/right-out access onto Jeanne d Arc Boulevard. The access is located approximately 70 meters east of the Jeanne d Arc/Orleans intersection (centreline to centreline). The intersection has the following lane configuration: Northbound Site Access - Eastbound Jeanne d Arc - Westbound Jeanne d Arc - one right turn lane one through lane one shared through/right lane two through lanes North Access/Orleans Intersection The North Access is a right-in/right-out access onto Orleans Boulevard, and is located approximately 82 meters south of the Jeanne d Arc/Orleans intersection (centreline to centreline). The intersection has the following lane configuration: Northbound Orleans - Southbound Orleans - Westbound Site Access - one through lane one shared through/right lane two through lanes one right turn lane South Access/Orleans Intersection The South Access is the shopping centre s main access onto Orleans Boulevard. The access is a full movement access located approximately 187 metres south of the Jeanne d Arc/Orleans intersection (centreline to centreline). The intersection is a T intersection controlled by a stop sign at the westbound site exit approach. The intersection has the following lane configuration: Northbound Orleans - Southbound Orleans - Westbound Site Access - one through lane one shared through/right lane two through lanes one exclusive left turn lane (45 m storage) one left turn lane (not painted) one right turn lane (not painted) Jeanne d Arc/Orleans Intersection The Orleans Gardens Shopping Centre is located at the southeast corner of the intersection of Jeanne d Arc Boulevard and Orleans Boulevard. There are two Jeanne d Arc/Orleans intersections, with the intersection examined in the study located at approximately 1.5 kilometres south of Ottawa Road 174. The intersection is controlled by a three phase traffic signal. All approaches to the intersection contain exclusive left turn lanes and exclusive right turn lanes which are channelized by the construction of traffic islands. The intersection has the following lane configuration:

7 5 Northbound Orleans - Southbound Orleans - Eastbound Orleans - Westbound Orleans - one left turn lane two through lanes one channelized right turn lane one left turn lane two through lanes one channelized right turn lane one left turn lane two through lanes one channelized right turn lane one left turn lane two through lanes one channelized right turn lane Figure 2.1 shows the weekday peak AM and PM hour traffic counts taken by the City of Ottawa at the intersection of Jeanne d Arc Boulevard and Orleans Boulevard on May 12, 2011, and the balanced traffic counts taken by the consultant at the two accesses onto Jeanne d Arc Boulevard on June 18, 2013 and the two site accesses onto Orleans Boulevard on June 19, PROPOSED DEVELOPMENT The Orleans Gardens Shopping Centre Inc. has proposed additional development on the existing shopping centre at 1615 Orleans Boulevard. The site is located at the southeast corner of the intersection of Jeanne d Arc Boulevard and Orleans Boulevard. The site has a total area of approximately 55,727 m 2 (13.77 acres) with 10,327 m 2 of retail space. The existing CRU is a mixture of the YIG store, small retail, restaurant, and office land uses. There is a free-standing building at the northwest corner of the site which contains a Pharma Plus and a medical facility. The site currently has five accesses. A full movement signalized access and a right-in/right-out access are located onto Jeanne d Arc Boulevard, and a full movement stop controlled access and two right-in/right-out accesses are located onto Orleans Boulevard. The proposed development will consist of one free-standing building (Pad A) which will have a total gross floor area of m 2 (6000 ft 2 ). The building will contain a Starbucks restaurant and drive-through with a floor area of m 2 (1,725 ft 2 ), and a small retail store with a floor area of m 2 (4,275 ft 2 ). The Starbucks drive-through would contain sufficient space for 11 queued vehicles. The second free-standing building will be Pad B with a gross floor area of m 2 (5,420 ft 2 ). The building will contain a fast-food restaurant with a drive-through having a floor area of m 2 (2,500 ft 2 ) with sufficient space for 11 queued vehicles, and m 2 (2,920 ft 2 ) of retail space. The additional development would utilize the existing shopping centre s accesses. The plan will provide 49 parking spaces in the vicinity of the proposed development and facilities to park bicycles. Figure 3.1 shows a conceptual site plan of the development which is expected to be completed by 2014.

8 6 FIGURE 2.1 EXISTING PEAK AM AND PM HOUR TRAFFIC COUNTS

9 7 FIGURE 3.1 CONCEPTUAL SITE PLAN

10 8 3.1 Trip Generation The trips generated from the proposed additional site development were determined using the Institute of Transportation Engineers (ITE) document, Trip Generation. The analysis utilized the average trip rates for the various land uses to calculate the trip rate for the peak AM and PM hour of the adjacent street traffic. Pad A would consist of a Starbucks coffee shop. The type of use would best be represented by the ITE category for a coffee/donut shop with a drive-through window. The remaining portion of the building would be occupied by a small retail store and would be represented by a specialty retail store land use. The use of Pad B would consist of a fast-food restaurant with drive-through and retail store as shown on the Site Plan. Table 3.1 shows the expected size and land use of both Pad A and B. Table 3.2 shows the trip generation rates and ITE land Use Code for each type of use examined in the study. TABLE 3.1 SITE INVENTORY BUILDING TYPE PAD A Starbucks Coffee Shop with Drive-Through Window Specialty Retail PAD B Fast-Food Restaurant with Drive-Through Window Specialty Retail BUILDING SIZE 1,725 ft 2 4,275 ft 2 2,500 ft 2 2,920 ft 2 TOTAL 11,420 ft 2 TABLE 3.2 TRIP GENERATION RATES LAND USE Starbucks Coffee/Donut Shop with Drive-Through Window (ITE Land Use Code 937) Fast-Food Restaurant with Drive-Through Window (ITE Land Use Code 934) Specialty Retail (ITE Land Use Code 814) TRIP GENERATION RATE Peak AM Hr. Peak PM Hr T/1000 ft T/1000 ft T/1000 ft T/1000 ft T/1000 ft 2

11 9 The trip generation rates were utilized in the determination of the expected number of peak AM and PM hour site generated trips. Patrons of shopping centres typically make multiple stops at various retail stores within the same shopping centre. Statistical data has found that 15 to 20 percent of the patrons will stop at more than one store. The study has assumed that 15 percent of the trips were shared with other uses within the shopping centre. The shared trip reduction was applied to the peak PM hour trips when the commercial and retail stores were open. During the peak AM hour only other fast-food and sit-down restaurants were open resulting in no shared trips. Table 3.3 shows the expected additional peak hour trips generated by the development of Pad A & B. TABLE 3.3 PEAK HOUR SITE TRIPS GENERATED UNIT TYPE WEEKDAY PEAK AM HR. WEEKDAY PEAK PM HR. TOTAL ENTER EXIT TOTAL ENTER EXIT Starbucks (51%) 94 (49%) (50%) 37 (50%) Fast-Food Restaurant (51%) 60 (49%) (52%) 41 (48%) Retail (44%) 11 (56%) 15% Share Trip Reduction Total Trips With the majority of trips generated by food related uses with drive-through windows for vehicular traffic, the study has not assigned a transit trip reduction to the trips generated by the site. It is recognized that there may be some walk-in patrons stopping off on their way to the bus stops which are located on Jeanne d Arc Boulevard adjacent to the site. These patrons may be considered transit trips which may reduce the number of pass-by site generated trips. The study has taken a conservative approach by not applying a reduction due to transit. Table 3.3 shows the expected site generated trips. 3.2 Trip Generated Primary Trips and Pass-By Trips The total number of site generated trips is a combination of primary trips and pass-by trips. Primary trips are trips where the primary destination is to/from the proposed development, and pass-by trips can be defined as traffic already on the adjacent street, which stops off at the development while passing by on-route to its primary destination. Coffee shops and fast-food restaurants are known to experience a high volume of pass-by trips. The Institute of Transportations Engineers (ITE) Trip Generation Handbook, March 2001, presents statistical data which shows that the pass-by and diverted link trips from fast-food restaurants with drivethrough windows can vary between 60 to 80 percent during a weekday peak PM hour time period. The study has examined the existing volume and direction of trips entering and exiting

12 10 the site and has assumed that 50 percent of the site trips would be pass-by trips and 50 percent primary trips (new trips). The primary/pass-by ratio was applied to both the peak AM and PM hour site generated trips. The site generated trips from Table 3.3 were divided into primary and pass-by trips which are presented in Table 3.4. TABLE 3.4 PRIMARY AND PASS-BY TRIPS UNIT TYPE WEEKDAY PEAK AM HR. WEEKDAY PEAK PM HR. TOTAL ENTER EXIT TOTAL ENTER EXIT Primary Trips (50%) Pass-By Trips (50%) Total Trips Trip Distribution The distribution of primary trips to the site was determined by examining the density and proximity of the surrounding residential development, and convenience of the route to the development. The peak hour primary trips were distributed to the following proportion: Peak AM & PM Hour To/From the North 10% To/From the South 30% To/From the East 20% To/From the West 40% The above distribution was used for both the peak AM and PM hours. Figure 3.2 shows the expected distribution of site generated primary trips during the weekday peak AM and PM hours. The pass-by trips were distributed to the same proportion as the peak hour background traffic volumes. The following is the distribution of pass-by site generated trips: Peak AM Hour To the North 10% From the North 50% To the South 50% From the South 10% To the East 20% From the East 20% To the West 20% From the West 20% Peak PM Hour To the North 35% From the North 20% To the South 20% From the South 35% To the East 20% From the East 25% To the West 25% From the West 20%

13 11 FIGURE 3.2 WEEKDAY PEAK AM AND PM HOUR PRIMARY TRIPS

14 12 Figure 3.3 shows the peak hour distribution of pass-by site generated trips 4. TRANSPORTATION IMPACT The study will examine the operation of the site s accesses and the Jeanne d Arc/Orleans intersection. The site accesses which will be analyzed will comprise of the East and West Accesses onto Jeanne d Arc Boulevard and the North and South Accesses onto Orleans Boulevard. The most southerly right-in/right-out access onto Orleans Boulevard located at the YIG was not examined as the proposed development would have little impact on the operation of the access. The study will analyze the operation of the intersections for the existing traffic counts, for the intersection and site accesses for the 2014 traffic volumes at substantial completion of the development, and at 2019 which represents five years beyond completion of the development. The analysis will use the Highway Capacity Software, which utilizes the intersection capacity analysis procedure as documented in the 2010 Highway Capacity Manual. For unsignalized intersections, the level of service of each lane movement is determined as a function of the delay of vehicles at the approach. The following relates the level of service of each lane movement with the expected delay at the approach. LEVEL OF SERVICE DELAY Level of Service A 0-10 sec./vehicle Little or No Delay Level of Service B >10-15 sec./vehicle Short Traffic Delays Level of Service C >15-25 sec./vehicle Average Traffic Delays Level of Service D >25-35 sec./vehicle Long Traffic Delays Level of Service E >35-50 sec./vehicle Very Long Traffic Delays Level of Service F >50 sec./vehicle Extreme Delays Demand Exceeds Capacity The expected length of queue at the critical lane movements for an unsignalized intersection was determined by the calculation of the 95 th percentile queue at the lane approach. The 95 th percentile queue length is the calculated 95 th greatest queue length out of 100 occurrences at a movement during a 15-minute peak period. The 95 th percentile queue length is a function of the capacity of a movement and the total expected traffic, with the calculated value determining the magnitude of the queue by representing the queue length as fractions of vehicles. For a signalized intersection, the operation or level of service of an intersection is determined from the volume to capacity ratio (v/c) for each lane movement as documented by the City of Ottawa in the Assessment Guidelines, October The following relates the level of service with the volume to capacity ratio at each lane movement. LEVEL OF SERVICE VOLUME TO CAPACITY RATIO Level of Service A 0 to 0.60 Level of Service B 0.61 to 0.70 Level of Service C 0.71 to 0.80 Level of Service D 0.81 to 0.90 Level of Service E 0.91 to 1.00 Level of Service F > 1.00

15 13 FIGURE 3.3 WEEKDAY PEAK AM AND PM HOUR PASS-BY TRIPS

16 Background and Total Traffic Volumes The study will examine the impact of the site generated trips at the years 2014 and The growth in background traffic was determined from historical traffic counts taken by the City of Ottawa at the years 2006, 2009 and The counts determined that the traffic volumes along Jeanne d Arc Boulevard has increased at an annual average rate of approximately 5 percent, which was probably due to the development south of Innes Road and east of Mer Bleue Road. Traffic counts showed that traffic volumes along Orleans Boulevard showed little growth. The study has therefore utilized an annual growth in background traffic volumes of 5.0 percent along Jeanne d Arc Boulevard and 2.0 percent along Orleans Boulevard. A survey of the shopping centre determined that when the traffic counts were taken, the shopping centre experienced a vacancy rate of 11.5 percent. With the normal vacancy at 5 percent, the analysis has increased the background traffic entering and exiting the site by 6.5 percent which would bring the site trips into line with the normal occupancy of the shopping centre. Figure 4.1 shows the expected 2014 peak AM and PM hour balanced background traffic volumes utilizing the above growth rates (excluding site generated trips), and Figure 4.2 the 2019 peak hour balanced background traffic volumes. The total traffic volumes are the addition of the future background traffic and the expected site generated trips (Figure 3.2) and pass-by trips (Figure 3.3). Figure 4.3 shows the 2014 total traffic volumes and Figure 4.4 the 2019 total traffic volumes. 4.2 Traffic Analysis The report will examine the operation of the four site accesses onto Jeanne d Arc Boulevard and Orleans Boulevard, and the operation of the Jeanne d Arc/Orleans intersection. The results of the analysis are discussed in detail in the following sections: East Access and Jeanne d Arc Boulevard Intersection The intersection of the East Access and Jeanne d Arc Boulevard is located approximately 185 metres east of Orleans Boulevard. The intersection is controlled by traffic signals which were installed in the fall of The traffic signals were installed to improve the movement of pedestrians crossing Jeanne d Arc Boulevard. The northbound East Access approach has sufficient width to provide exclusive left and right turn lanes. Although the pavement markings at the approach did not delineate two separate turn lanes, vehicles at the approach queued in two separate lanes, therefore the analysis assumed an exclusive left and shared through/right lane at the northbound approach. Jeanne d Arc Boulevard forms the eastbound and westbound approaches, the site access the northbound approach, and Montcerf Court the southbound approach. The operational analysis was performed for the existing 2013 traffic counts (Figure 2.1) at the intersection. The analysis utilized a two phase signal with an 80 second cycle for both the peak AM and PM hours. The analysis determined that the intersection would operate at a LoS A during both the weekday peak AM and PM hours, with all approaches functioning at a Level of Service (LoS) A.

17 15 FIGURE WEEKDAY PEAK AM AND PM HOUR BACKGROUND TRAFFIC

18 16 FIGURE WEEKDAY PEAK AM AND PM HOUR BACKGROUND TRAFFIC

19 17 FIGURE WEEKDAY PEAK AM AND PM HOUR TOTAL TRAFFIC

20 18 FIGURE WEEKDAY PEAK AM AND PM HOUR TOTAL TRAFFIC

21 19 Table 4.1 summarizes the operation of the intersection with the analysis sheets provided in the Appendix as Exhibits 1 and 2. For the expected traffic volumes at the year 2014 which would include the expected trips from the proposed Pad A & B, the operational analysis determined that the intersection would continue to operate at a LoS A during both the peak AM and PM hours. The northbound through/right movement would function at a LoS B with all remaining movements functioning at a LoS A. Table 4.1 summarizes the operation of the intersection with the analysis sheets provided as Exhibits 3 and Exhibit 4. TABLE 4.1 EAST ACCESS/JEANNE D ARC LoS & Volume/Capacity (v/c) Intersection Approach WEEKDAY PEAK AM HOUR YEAR (2019) WEEKDAY PEAK PM HOUR YEAR (2019) LoS v/c LoS v/c EB Left/Through/ Jeanne d Arc A A (A) (0.19) A A (C) (0.73) WB Left Jeanne d Arc A A (A) (0.17) A A (C) (0.73) WB Through/ Jeanne d Arc A A (C) (0.71) A A (A) (0.35) NB Left East Access A A (A) (0.35) A A (A) (0.20) NB Through/ East Access A A (A) (0.20) A B (C) (0.72) SB Left/Through/ Montcerf A A (A) (0.14) A A (A) (0.21) TOTAL LoS A A (B) (0.66) A A (C) (0.73) At the year 2019, which represents five years beyond completion of the proposed development, the intersection would operate at a LoS B during the peak AM hour and LoS C during the peak PM hour using the same traffic signal timing plan. All lane movements would function between a LoS A and LoS C. The required vehicular storage at the northbound through/right lane movement would be 32 metres (peak PM hour), with the site plan providing 55 metres of clear throat distance. The westbound Jeanne d Arc left turn movement would require 23 metres of storage (peak AM hour) with 36 metres provided. Table 4.1 summarizes the operation of the intersection with the analysis sheets provided as Exhibits 5 and Exhibit 6. West Access and Jeanne d Arc Boulevard Intersection The West Access is a right-in/right-out access which provides access onto Jeanne d Arc Boulevard. The access is located approximately 70 metres east of the Jeanne d Arc/Orleans intersection. Jeanne d Arc Boulevard forms the eastbound and westbound approaches and the West Access the northbound approach which is controlled by a stop sign.

22 20 The 2013 operational analysis determined that the northbound right turn lane movement would function at a LoS A during the peak AM hour and LoS B during the peak PM hour. The 95 th percentile queue at the northbound right turn movement would be 0.15 vehicles (7 metres) with the site plan providing 30 metres of clear throat distance. Table 4.2 summarizes the operation of the intersection with the analysis sheets for the existing traffic volumes provided as Exhibit 7 for the peak AM hour and Exhibit 8 for the peak PM hour. TABLE 4.2 WEST ACCESS/JEANNE D ARC LoS & 95 th Percentile Queue Intersection Approach WEEKDAY PEAK AM HOUR YEAR (2019) WEEKDAY PEAK PM HOUR YEAR (2019) LoS Q 95 (Veh.) LoS Q 95 (Veh.) NB West Access A A (A) (0.03) B B (C) (0.28) At the year 2014 following the completion of Pad A and Pad B, the northbound right turn movement would continue to function at a LoS A during the peak AM hour and LoS B during the peak PM hour. The analysis results are shown in Table 4.2 with the work sheets provided as Exhibits 9 and 10. For the expected traffic volumes at the year 2019, the northbound right turn movement would function at a LoS A during the peak AM hour and a LoS C during the peak PM hour. The right turn movement would experience a 95 th percentile queue of 0.28 vehicles (7 metres) during the peak PM hour with 30 metres of clear throat distance provided. Table 4.2 summarizes the year 2019 operation of the intersection, with the analysis sheets provided as Exhibits 11 and Exhibit 12. North Access and Orleans Boulevard Intersection The North Access is a right-in/right-out access onto Orleans Boulevard. The access is located approximately 82 metres south of Jeanne d Arc Boulevard. The access provides access to/from a small parking lot at the north end of Pharma Plus. Orleans Boulevard forms the northbound and southbound approaches, and the North Access the westbound right turn movement. The operational analysis determined that using the 2013 traffic counts, the westbound right turn movement functioned at a LoS A during the peak AM hour and LoS B during the peak PM hour. Table 4.3 summarizes the operation of the intersection with the analysis sheets for the existing traffic volumes provided as Exhibit 13 for the peak AM hour and Exhibit 14 for the peak PM hour. Following the construction of Pad A and Pad B, the 2014 operational analysis determined that the westbound right turn movement would continue to function at a LoS A during the peak

23 21 AM hour and LoS B during the peak PM hour. The analysis results are shown in Table 4.3 with the work sheets provided as Exhibits 15 and 16. TABLE 4.3 NORTH ACCESS/ORLEANS LoS & 95 th Percentile Queue Intersection Approach WEEKDAY PEAK AM HOUR YEAR (2019) WEEKDAY PEAK PM HOUR YEAR (2019) LoS Q 95 (Veh.) LoS Q 95 (Veh.) WB North Access A A (A) (0.00) B B (C) (0.00) At the year 2019 which is five years beyond completion, the westbound right turn movement would function at a LoS A during the peak AM hour and LoS C during the peak PM hour. With the low volume of expected traffic at the access, the 95 th percentile queue was determined to be 0.00 vehicles. The access provides 17 metres of clear throat distance. The analysis results are shown in Table 4.3 with the work sheets provided as Exhibits 17 and 18. South Access and Orleans Boulevard Intersection The South Access to the site is the main access point onto Orleans Boulevard and is located approximately 187 metres south of the Jeanne d Arc/Orleans intersection. The intersection is a full movement T intersection with Orleans Boulevard forming the northbound and southbound approaches and the South Access the westbound approach. Although the westbound exit does not have pavement markings to delineate separate left and right turn lanes, the 6 metre wide exit lane is of sufficient width to provide separate lanes which was confirmed by observations during the traffic counts and aerial photographs showing vehicles queuing in separate left and right turn lanes. The analysis has therefore assumed that the westbound exit comprises of an exclusive left and right turn lane. The 2013 traffic counts determined that the southbound Orleans left turn movement functioned at a LoS A and westbound left turn at a LoS B and right turn at a LoS A during the peak AM hour. During the peak PM hour the southbound Orleans left turn movement functioned at a LoS A and westbound left turn at a LoS E and right turn at a LoS B. The analysis results are shown in Table 4.4 with the work sheets provided as Exhibit 19 and Exhibit 20. For the post development analysis, a traffic signal warrant analysis was conducted at the South Access/Orleans intersection using the expected year 2019 traffic volumes (Figure 4.4). The warrant analysis, which is provided as Exhibit 21 in the Appendix, determined that the intersection met 87 percent of the warrants for the installation of traffic control signals. The intersection was therefore analyzed as a two-way stop controlled intersection for the 2014 and 2019 operational analysis.

24 22 TABLE 4.4 SOUTH ACCESS/ORLEANS LoS & 95 th Percentile Queue Intersection Approach WEEKDAY PEAK AM HOUR YEAR (2019) WEEKDAY PEAK PM HOUR YEAR (2019) LoS Q 95 (Veh.) LoS Q 95 (Veh.) SB Left - Orleans A A (A) (0.14) A B (B) (0.62) WB Left South Access B C (C) (0.47) E F (F) (7.71) WB South Access A B (B) (0.36) B B (B) (0.67) At the year 2014 following the completion of Pad A and Pad B, the southbound left turn movement functioned at a LoS A, and westbound left at a LoS C and right at a LoS B during the peak AM hour. During the peak PM hour the southbound movement functioned at a LoS B and westbound left at a LoS F and right at a LoS B. The low level of service at the westbound left turn movement would translate to a lane delay of 52.2 seconds. Table 4.4 summarizes the operation of the intersection with the analysis sheets provided as Exhibit 22 and Exhibit 23. For the expected 2019 traffic volumes which represent five year beyond completion of the proposed development, the southbound Orleans left turn movement would function at a LoS A during the peak AM hour, and the westbound left turn at a LoS C and right turn at a LoS B. During the peak PM hour the southbound left turn movement would function at a LoS B, and the westbound left turn at a LoS F and right turn at a LoS B. The westbound left turn movement would experience a lane delay of 86.7 seconds with a 95 th percentile queue of 7.71 vehicles (56 metres). The site plan provides a clear throat distance of 45 metres for the westbound left turn movement. Any delay at the westbound left turn movement would be within the shopping centre site and would not have an impact on the operation of the public road. The analysis results are shown in Table 4.4 with the work sheets provided as Exhibits 24 and 25. Jeanne d Arc and Orleans Boulevard Intersection The intersection of Jeanne d Arc Boulevard and Orleans Boulevard is controlled by three phase traffic signals. The signal timing plan obtained from the City of Ottawa showed a peak AM and PM hour cycle length of 80 seconds. Utilizing the existing lane geometry, signal timing plan, and 2011 traffic counts which were obtained from the City of Ottawa and provided as Exhibit 26, the intersection functioned at an overall LoS A during the peak AM hour and LoS B during the peak PM hour. Table 4.5 summarizes the operation of the intersection with the analysis sheets provided as Exhibit 27 for the peak AM hour and Exhibit 28 the peak PM hour.

25 23 At the year 2014 following the completion of Pad A and Pad B, the intersection was determined to function at a LoS B during the peak AM hour and LoS C during the peak PM hour. The traffic signal timing was adjusted to allow more green time to the westbound Jeanne d Arc Boulevard traffic in order to handle the increasing background traffic volumes. The signal cycle length remained at 80 seconds for both the peak AM and PM hours. Table 4.5 summarizes the operation of the intersection with the analysis sheets provided as Exhibit 29 for the peak AM hour and Exhibit 30 for the peak PM hour. TABLE 4.5 JEANNE D ARC/ORLEANS LoS & Volume/Capacity (v/c) Intersection Approach WEEKDAY PEAK AM HOUR YEAR (2019) WEEKDAY PEAK PM HOUR YEAR (2019) LoS v/c LoS v/c EB Left Jeanne d Arc A A (A) (0.60) A A (A) (0.20) EB Through Jeanne d Arc A A (A) (0.19) C C (D) (0.89) WB Left Jeanne d Arc A A (A) (0.10) A A (A) (0.44) WB Through Jeanne d Arc D C (D) (0.85) A A (A) (0.38) NB Left Orleans A A (A) (0.43) A A (A) (0.50) NB Through Orleans A A (C) (0.75) A C (D) (0.90) SB Left Orleans A A (A) (0.33) A A (B) (0.69) SB Through - Orleans A A (B) (0.68) A A (B) (0.68) TOTAL LoS A B (C) (0.78) B C (D) (0.89) For the expected year 2019 traffic volumes, the Jeanne d Arc/Orleans intersection would function at a LoS C during the peak AM hour and LoS D during the peak PM hour. Table 4.5 summarizes the operation of the intersection with the analysis sheets provided as Exhibit 31 and Exhibit Site Circulation of Traffic The proposed Site Plan presents an efficient movement of vehicles throughout the site. The layout of Pad A and Pad B distributes site traffic to three access points to the site. The new site generated trips would be distributed to the East Access and West Access onto Jeanne d Arc Boulevard, and to the South Access onto Orleans Boulevard. The design of the drive-through lanes provides queuing for 11 vehicles at both the Starbucks and fast-food restaurant. The drive-through aisles would not interfere with the circulation and parking of vehicles at either Pad A or Pad B.

26 24 The Site Plan provides sufficient clear through distance and space to allow for queued vehicles at the East, West and North accesses. Queuing at the South Access for westbound left turning vehicles may at times extend past the first parking aisle during peak PM hours. 4.4 Collision Reports A three year collision report summary was obtained from the City of Ottawa for the year 2010 through 2012 at the intersection of Jeanne d Arc Boulevard and Montcerf Court (East Access). The reports determined that there were 3 reported collisions over the three year time period. Of the 3 collisions, all were angular collisions which are collisions which may be reduced by the installation of traffic signals or modifications to the intersection. Table 4.3 summarizes the types of collisions reported at the intersections over the three year period, with the City of Ottawa collision reports provided in the Appendix as Exhibit 33. TABLE 4.6 COLLISION SUMMARY COLLISION DATA Jeanne d Arc/Montcerf (East Access) Intersection Year Rear-End Angular Turning Other Total Pedestrian, Cycling, and Transit Facilities The Site Plan provides sidewalks for access to Pad A and B, which extends to link with the public sidewalk along Jeanne d Arc Boulevard. The sidewalks along the proposed buildings also link to the existing shopping centre parking lot. Both buildings on Pad A and Pad B would provide bicycle racks for patrons. Jeanne d Arc Boulevard and Orleans Boulevard are both identified in the City of Ottawa TMP as an On-road Cycling Route. The site is well served by OC Transpo Regular Route 130 and Peak Hour Route 30 along Jeanne d Arc Boulevard and Regular Route 134 and Peak Hour Route 34 along Orleans Boulevard. Eastbound bus stops are located along Jeanne d Arc Boulevard adjacent to the site and westbound across the road from the site. Bus stops along Orleans Boulevard are located at the Jeanne d Arc/Orleans intersection. The location of bus stops are shown in Figure 3.1

27 25 5. JEANNE D ARC BOULEVARD / MONTCERF COURT INTERSECTION The intersection of Jeanne d Arc Boulevard and Montcerf Court (East Access) was originally a two-way stop controlled intersection with stop signs placed at the northbound East Access approach and southbound Montcerf Court approach. Due to safety concerns, the City of Ottawa conducted a study which examined the safety of pedestrians crossing Jeanne d Arc Boulevard between Montcerf Court and Champneuf Crescent. The recommendations of the study are documented in the City of Ottawa Jeanne d Arc Boulevard Safety Review: Final Report. The study determined that utilizing 2009 traffic counts, the Jeanne d Arc/Montcerf intersection did not meet the traffic control signals warrants. The report did conclude that pedestrian signals were warranted due to the volume of pedestrians crossing Jeanne d Arc Boulevard between Montcerf Court and Champneuf Crescent. The warrants were based on the installation of a fence along Jeanne d Arc Boulevard from Montcerf Court to a point east of Champneuf Crescent and closure of the Jeanne d Arc Boulevard median at Champneuf Crescent which would direct all pedestrian crossings to one location (Montcerf Court). Mid-block pedestrian signals were not recommended due to the close proximity of the two intersections (back-to-back left turn lanes) and the horizontal alignment of the road. The recommendation would be the installation of full traffic signals installed at the Jeanne d Arc/Montcerf intersection. The traffic signals were installed in the fall of 2012, but the recommended fence along the median was only installed from Montcerf Court to a point west of Champneuf Crescent, which would still allow pedestrians to cross at the Jeanne d Arc/Champneuf intersection. This study has examined the Jeanne d Arc/Montcerf intersection to determine if the intersection met the traffic or pedestrian warrants using traffic counts taken on June 18, The traffic signal warrant analysis used the 8 hour counts which are provided in Exhibit 34 and collision summary in Exhibit 33. The traffic counts and number of collisions determined that the intersection met 56 percent of the warrants for the installation of traffic control signals. The analysis sheets are provided in the Appendix as Exhibit 35. The pedestrian warrants were determined from counts also taken on June 18, 2013 which was a sunny Tuesday (high 20 ºC) which captured students walking between Garneau Catholic Secondary School and the shopping centre at noon and breaks. The pedestrian warrant analysis, which is provided as Exhibit 36, determined that the intersection met 57.5 percent of the warrants for the installation of pedestrian signals. Observations did note many students crossing Jeanne d Arc Boulevard at Champneuf Crescent to access the pathway to school. The conclusions of the signal warrant analyses were that the traffic signals at the intersection of Jeanne d Arc Boulevard and Montcerf Court (East Access) did not meet the warrants for the installation of signals.

28 26 6. FINDINGS Orleans Gardens Shopping Centre Inc. has proposed the construction of two additional freestanding buildings at the Orleans Gardens Shopping Centre at 1615 Orleans Boulevard. The shopping centre is located on a hectare site at the southeast corner of the intersection of Jeanne d Arc Boulevard and Orleans Boulevard. The shopping centre is currently occupied by Your Independent Grocery (YIG) and a mixture of retail, restaurants, office, and a drug store. The proposal includes the construction of two buildings which would contain a Starbucks, retail, and a fast-food restaurant with a drive-through window. The additional development would utilize the existing accesses to the shopping centre. The study analysis has examined four of the existing site accesses onto Jeane d Arc Boulevard and Orleans Boulevard, and the Jeanne d Arc/Orleans intersection for the impact of the additional site traffic during the weekday peak AM and PM hour of the adjacent roads. The site is expected to be substantially completed by the year The findings and recommendations of the study are summarized in the following: 1) The trip generation analysis determined that the proposed development on Pad A and B would generate 160 vehicles entering and 154 vehicles exiting the site during the peak AM hour, and 76 vehicles entering and 75 vehicles exiting during the peak PM hour. 2) The study analysis has examined the impact on four of the existing accesses to the shopping centre. The accesses examined consist of the East Access and West Access onto Jeanne d Arc Boulevard, and the North Access and South Access onto Orleans Boulevard. The most southerly right-in/right-out access at YIG was not examined as trips to/from the proposed development would have a negligible impact on the access. The traffic impact analysis determined that the proposed development on Pad A and B would generate the majority of trips during the peak AM hour when most of the retail in the shopping centre was not open, and a lower number of trips during the peak PM hour when the retail stores are open. This would tend to better distribute the peak hour traffic entering and exiting the shopping centre. The operational analysis utilizing the expected traffic volumes at the year 2019 at the four accesses and the Jeanne d Arc/Orleans intersection determined that the proposed development would have a minor impact of the intersections, with no roadway modifications required due to development. It is recommended that the signal timing at the Jeanne d Arc/Orleans intersection be reviewed to optimize the timing to accommodate the increasing background traffic volumes along Jeanne d Arc Boulevard. 3) A traffic signal warrant analysis and pedestrian warrant analysis at the Jeanne d Arc/Montcerf intersection determined that the intersection did not meet the warrants for the installation of traffic signals. 4) A Check List is provided in the Appendix as Exhibit 37.

29 27 The traffic impact analysis concluded that there would be no roadway modifications required at the shopping centre assesses onto Jeanne d Arc Boulevard and Orleans Boulevard due to the development of Pad A and Pad B. Pavement markings are recommended at the northbound approach to the East Access onto Jeanne d Arc Boulevard providing an exclusive left turn lane, and the westbound approach to the South Access onto Orleans Boulevard which would delineate separate left turn and right turn lanes. The analysis also recommended that no roadway modifications were required at the Jeanne d Arc/Orleans intersection due to the proposed development and that the traffic signal timing may need to be adjusted due to the increasing background traffic along Jeanne d Arc Boulevard. Prepared by: David J. Halpenny, P. Eng.

30 28 APPENDIX OPERATIONAL ANALYSIS WORK SHEETS COLLISION SUMMARY REPORT 8 HOUR TRAFFIC COUNTS (Jeanne d Arc/Montcerf) TRAFFIC SIGNAL WARRANTS PEDESTRIAN SIGNAL WARRANTS TRANSPORTATION IMPACT STUDY - CHECK LIST

31 29 EXHIBIT PEAK AM HOUR TOTAL TRAFFIC ANALYSIS East Access/Jeanne d Arc HCS+: Signalized Intersections Release 5.4 Analyst: Inter.: Jeanne d'arc/montcerf Period: Peak AM hour Year: Year 2013 Project ID: Orleans Gardens Shopping Centre E/W St: Jeanne d'arc Boulevard N/S St: Montcerf Crescent SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound No. Lanes LGConfig LTR L TR L TR LTR Volume Lane Width RTOR Vol _ Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left A NB Left P Thru A Thru P A P Peds X Peds X WB Left A SB Left P Thru A Thru P A P Peds X Peds X NB EB SB WB Green Yellow All Red Cycle Length: 80.0 secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio _ Eastbound Left Thru LTR Westbound Left L Thru TR # Northbound Left L Thru TR Southbound Left Thru LTR # _ Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.42 Total lost time per cycle, L = sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.48

32 30 EXHIBIT PEAK PM HOUR TOTAL TRAFFIC ANALYSIS East Access/Jeanne d Arc HCS+: Signalized Intersections Release 5.4 Analyst: Inter.: Jeanne d'arc/montcerf Period: Peak PM hour Year: Year 2013 Project ID: Orleans Gardens Shopping Centre E/W St: Jeanne d'arc Boulevard N/S St: Montcerf Crescent SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound No. Lanes LGConfig LTR L TR L TR LTR Volume Lane Width RTOR Vol _ Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left A NB Left P Thru A Thru P A P Peds X Peds X WB Left A SB Left P Thru A Thru P A P Peds X Peds X NB EB SB WB Green Yellow All Red Cycle Length: 80.0 secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio _ Eastbound Left Thru LTR # Westbound Left L Thru TR Northbound Left L Thru TR # Southbound Left Thru LTR _ Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.50 Total lost time per cycle, L = sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.57

33 31 EXHIBIT PEAK AM HOUR TOTAL TRAFFIC ANALYSIS East Access/Jeanne d Arc HCS+: Signalized Intersections Release 5.4 Analyst: Inter.: Jeanne d'arc/montcerf Period: Peak AM hour Year: Year 2014 Project ID: Orleans Gardens Shopping Centre E/W St: Jeanne d'arc Boulevard N/S St: Montcerf Crescent SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound No. Lanes LGConfig LTR L TR L TR LTR Volume Lane Width RTOR Vol _ Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left A NB Left P Thru A Thru P A P Peds X Peds X WB Left A SB Left P Thru A Thru P A P Peds X Peds X NB EB SB WB Green Yellow All Red Cycle Length: 80.0 secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio _ Eastbound Left Thru LTR Westbound Left L Thru TR # Northbound Left L # Thru TR Southbound Left Thru LTR _ Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.45 Total lost time per cycle, L = sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.52

34 32 EXHIBIT PEAK PM HOUR TOTAL TRAFFIC ANALYSIS East Access/Jeanne d Arc HCS+: Signalized Intersections Release 5.4 Analyst: Inter.: Jeanne d'arc/montcerf Period: Peak PM hour Year: Year 2014 Project ID: Orleans Gardens Shopping Centre E/W St: Jeanne d'arc Boulevard N/S St: Montcerf Crescent SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound No. Lanes LGConfig LTR L TR L TR LTR Volume Lane Width RTOR Vol _ Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left A NB Left P Thru A Thru P A P Peds X Peds X WB Left A SB Left P Thru A Thru P A P Peds X Peds X NB EB SB WB Green Yellow All Red Cycle Length: 80.0 secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio _ Eastbound Left Thru LTR # Westbound Left L Thru TR Northbound Left L Thru TR # Southbound Left Thru LTR _ Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.53 Total lost time per cycle, L = sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.60

35 33 EXHIBIT PEAK AM HOUR TOTAL TRAFFIC ANALYSIS East Access/Jeanne d Arc HCS+: Signalized Intersections Release 5.4 Analyst: Inter.: Jeanne d'arc/montcerf Period: Peak AM hour Year: Year 2019 Project ID: Orleans Gardens Shopping Centre E/W St: Jeanne d'arc Boulevard N/S St: Montcerf Crescent SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound No. Lanes LGConfig LTR L TR L TR LTR Volume Lane Width RTOR Vol _ Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left A NB Left P Thru A Thru P A P Peds X Peds X WB Left A SB Left P Thru A Thru P A P Peds X Peds X NB EB SB WB Green Yellow All Red Cycle Length: 80.0 secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio _ Eastbound Left Thru LTR Westbound Left L Thru TR # Northbound Left L # Thru TR Southbound Left Thru LTR _ Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.57 Total lost time per cycle, L = sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.66

36 34 EXHIBIT PEAK PM HOUR TOTAL TRAFFIC ANALYSIS East Access/Jeanne d Arc HCS+: Signalized Intersections Release 5.4 Analyst: Inter.: Jeanne d'arc/montcerf Period: Peak PM hour Year: Year 2019 Project ID: Orleans Gardens Shopping Centre E/W St: Jeanne d'arc Boulevard N/S St: Montcerf Crescent SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound No. Lanes LGConfig LTR L TR L TR LTR Volume Lane Width RTOR Vol _ Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left A NB Left P Thru A Thru P A P Peds X Peds X WB Left A SB Left P Thru A Thru P A P Peds X Peds X NB EB SB WB Green Yellow All Red Cycle Length: 80.0 secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio _ Eastbound Left Thru LTR Westbound Left L # Thru TR Northbound Left L Thru TR # Southbound Left Thru LTR _ Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.64 Total lost time per cycle, L = sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.73

37 35 EXHIBIT PEAK AM HOUR TOTAL TRAFFIC ANALYSIS West Access/Jeanne d Arc HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak AM hour Intersection: West Access/Jeanne d'arc Analysis Year: Year 2013 Project ID: Orleans Gardens Shopping Centre East/West Street: Jeanne d'arc Boulevard North/South Street: West Access Intersection Orientation: EW Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Raised curb / 1 RT Channelized? Lanes Configuration T TR T Upstream Signal? No No Minor Street: Approach Northbound Southbound Movement Volume 0 Peak Hour Factor, PHF 0.92 Hourly Flow Rate, HFR 0 Percent Heavy Vehicles 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / / Lanes 1 Configuration R Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement Lane Config R v (vph) 0 C(m) (vph) 865 v/c % queue length 0.00 Control Delay 9.2 LOS A Approach Delay Approach LOS

38 36 EXHIBIT PEAK PM HOUR TOTAL TRAFFIC ANALYSIS West Access/Jeanne d Arc HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak PM hour Intersection: West Access/Jeanne d'arc Analysis Year: Year 2013 Project ID: Orleans Gardens Shopping Centre East/West Street: Jeanne d'arc Boulevard North/South Street: West Access Intersection Orientation: EW Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Raised curb / 1 RT Channelized? Lanes Configuration T TR T Upstream Signal? No No Minor Street: Approach Northbound Southbound Movement Volume 21 Peak Hour Factor, PHF 0.92 Hourly Flow Rate, HFR 22 Percent Heavy Vehicles 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / / Lanes 1 Configuration R Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement Lane Config R v (vph) 22 C(m) (vph) 458 v/c % queue length 0.15 Control Delay 13.3 LOS B Approach Delay 13.3 Approach LOS B

39 37 EXHIBIT PEAK AM HOUR TOTAL TRAFFIC ANALYSIS West Access/Jeanne d Arc HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak AM hour Intersection: West Access/Jeanne d'arc Analysis Year: Year 2014 Project ID: Orleans Gardens Shopping Centre East/West Street: Jeanne d'arc Boulevard North/South Street: West Access Intersection Orientation: EW Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Raised curb / 1 RT Channelized? Lanes Configuration T TR T Upstream Signal? No No Minor Street: Approach Northbound Southbound Movement Volume 8 Peak Hour Factor, PHF 0.92 Hourly Flow Rate, HFR 8 Percent Heavy Vehicles 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / / Lanes 1 Configuration R Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement Lane Config R v (vph) 8 C(m) (vph) 848 v/c % queue length 0.03 Control Delay 9.3 LOS A Approach Delay 9.3 Approach LOS A

40 38 EXHIBIT PEAK PM HOUR TOTAL TRAFFIC ANALYSIS West Access/Jeanne d Arc HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak PM hour Intersection: West Access/Jeanne d'arc Analysis Year: Year 2014 Project ID: Orleans Gardens Shopping Centre East/West Street: Jeanne d'arc Boulevard North/South Street: West Access Intersection Orientation: EW Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Raised curb / 1 RT Channelized? Lanes Configuration T TR T Upstream Signal? No No Minor Street: Approach Northbound Southbound Movement Volume 28 Peak Hour Factor, PHF 0.92 Hourly Flow Rate, HFR 30 Percent Heavy Vehicles 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / / Lanes 1 Configuration R Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement Lane Config R v (vph) 30 C(m) (vph) 444 v/c % queue length 0.22 Control Delay 13.7 LOS B Approach Delay 13.7 Approach LOS B

41 39 EXHIBIT PEAK AM HOUR TOTAL TRAFFIC ANALYSIS West Access/Jeanne d Arc HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak AM hour Intersection: West Access/Jeanne d'arc Analysis Year: Year 2019 Project ID: Orleans Gardens Shopping Centre East/West Street: Jeanne d'arc Boulevard North/South Street: West Access Intersection Orientation: EW Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Raised curb / 1 RT Channelized? Lanes Configuration T TR T Upstream Signal? No No Minor Street: Approach Northbound Southbound Movement Volume 8 Peak Hour Factor, PHF 0.92 Hourly Flow Rate, HFR 8 Percent Heavy Vehicles 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / / Lanes 1 Configuration R Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement Lane Config R v (vph) 8 C(m) (vph) 806 v/c % queue length 0.03 Control Delay 9.5 LOS A Approach Delay 9.5 Approach LOS A

42 40 EXHIBIT PEAK PM HOUR TOTAL TRAFFIC ANALYSIS West Access/Jeanne d Arc HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak PM hour Intersection: West Access/Jeanne d'arc Analysis Year: Year 2019 Project ID: Orleans Gardens Shopping Centre East/West Street: Jeanne d'arc Boulevard North/South Street: West Access Intersection Orientation: EW Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Eastbound Westbound Movement Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Raised curb / 1 RT Channelized? Lanes Configuration T TR T Upstream Signal? No No Minor Street: Approach Northbound Southbound Movement Volume 29 Peak Hour Factor, PHF 0.92 Hourly Flow Rate, HFR 31 Percent Heavy Vehicles 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / / Lanes 1 Configuration R Delay, Queue Length, and Level of Service Approach EB WB Northbound Southbound Movement Lane Config R v (vph) 31 C(m) (vph) 359 v/c % queue length 0.28 Control Delay 16.0 LOS C Approach Delay 16.0 Approach LOS C

43 41 EXHIBIT PEAK AM HOUR TOTAL TRAFFIC ANALYSIS North Access/Orleans HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak AM hour Intersection: North Access/Orleans Analysis Year: Year 2013 Project ID: Orleans Gardens Shopping Centre East/West Street: Orleans Boulevard North/South Street: North Access Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Raised curb / 1 RT Channelized? Lanes Configuration T TR T Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement Volume 0 Peak Hour Factor, PHF 0.92 Hourly Flow Rate, HFR 0 Percent Heavy Vehicles 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / / Lanes 1 Configuration R Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config R v (vph) 0 C(m) (vph) 768 v/c % queue length 0.00 Control Delay 9.7 LOS A Approach Delay Approach LOS

44 42 EXHIBIT PEAK PM HOUR TOTAL TRAFFIC ANALYSIS North Access/Orleans HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak PM hour Intersection: North Access/Orleans Analysis Year: Year 2013 Project ID: Orleans Gardens Shopping Centre East/West Street: Orleans Boulevard North/South Street: North Access Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Raised curb / 1 RT Channelized? Lanes Configuration T TR T Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement Volume 1 Peak Hour Factor, PHF 0.92 Hourly Flow Rate, HFR 1 Percent Heavy Vehicles 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / / Lanes 1 Configuration R Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config R v (vph) 1 C(m) (vph) 643 v/c % queue length 0.00 Control Delay 10.6 LOS B Approach Delay 10.6 Approach LOS B

45 43 EXHIBIT PEAK AM HOUR TOTAL TRAFFIC ANALYSIS North Access/Orleans HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak AM hour Intersection: North Access/Orleans Analysis Year: Year 2014 Project ID: Orleans Gardens Shopping Centre East/West Street: Orleans Boulevard North/South Street: North Access Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Raised curb / 1 RT Channelized? Lanes Configuration T TR T Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement Volume 0 Peak Hour Factor, PHF 0.92 Hourly Flow Rate, HFR 0 Percent Heavy Vehicles 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / / Lanes 1 Configuration R Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config R v (vph) 0 C(m) (vph) 755 v/c % queue length 0.00 Control Delay 9.8 LOS A Approach Delay Approach LOS

46 44 EXHIBIT PEAK PM HOUR TOTAL TRAFFIC ANALYSIS North Access/Orleans HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak PM hour Intersection: North Access/Orleans Analysis Year: Year 2014 Project ID: Orleans Gardens Shopping Centre East/West Street: Orleans Boulevard North/South Street: North Access Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Raised curb / 1 RT Channelized? Lanes Configuration T TR T Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement Volume 1 Peak Hour Factor, PHF 0.92 Hourly Flow Rate, HFR 1 Percent Heavy Vehicles 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / / Lanes 1 Configuration R Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config R v (vph) 1 C(m) (vph) 636 v/c % queue length 0.00 Control Delay 10.7 LOS B Approach Delay 10.7 Approach LOS B

47 45 EXHIBIT PEAK AM HOUR TOTAL TRAFFIC ANALYSIS North Access/Orleans HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak AM hour Intersection: North Access/Orleans Analysis Year: Year 2019 Project ID: Orleans Gardens Shopping Centre East/West Street: Orleans Boulevard North/South Street: North Access Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Raised curb / 1 RT Channelized? Lanes Configuration T TR T Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement Volume 0 Peak Hour Factor, PHF 0.92 Hourly Flow Rate, HFR 0 Percent Heavy Vehicles 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / / Lanes 1 Configuration R Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config R v (vph) 0 C(m) (vph) 727 v/c % queue length 0.00 Control Delay LOS A Approach Delay Approach LOS

48 46 EXHIBIT PEAK PM HOUR TOTAL TRAFFIC ANALYSIS North Access/Orleans HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak PM hour Intersection: North Access/Orleans Analysis Year: Year 2019 Project ID: Orleans Gardens Shopping Centre East/West Street: Orleans Boulevard North/South Street: North Access Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Raised curb / 1 RT Channelized? Lanes Configuration T TR T Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement Volume 1 Peak Hour Factor, PHF 0.92 Hourly Flow Rate, HFR 1 Percent Heavy Vehicles 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / / Lanes 1 Configuration R Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config R v (vph) 1 C(m) (vph) 601 v/c % queue length 0.00 Control Delay 11.0 LOS B Approach Delay 11.0 Approach LOS B

49 47 EXHIBIT PEAK AM HOUR TOTAL TRAFFIC ANALYSIS South Access/Orleans HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak AM hour Intersection: South Access/Orleans Analysis Year: Year 2013 Project ID: Orleans Gardens Shopping Centre East/West Street: Orleans Boulevard North/South Street: South Access Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Raised curb / 1 RT Channelized? Lanes Configuration T TR L T Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles 2 2 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / / Lanes 1 1 Configuration L R Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config L L R v (vph) C(m) (vph) v/c % queue length Control Delay LOS A B A Approach Delay 12.7 Approach LOS B

50 48 EXHIBIT PEAK PM HOUR TOTAL TRAFFIC ANALYSIS South Access/Orleans HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak PM hour Intersection: South Access/Orleans Analysis Year: Year 2013 Project ID: Orleans Gardens Shopping Centre East/West Street: Orleans Boulevard North/South Street: South Access Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Raised curb / 1 RT Channelized? Lanes Configuration T TR L T Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles 0 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / / Lanes 1 1 Configuration L R Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config L L R v (vph) C(m) (vph) v/c % queue length Control Delay LOS A E B Approach Delay 29.3 Approach LOS D

51 49 EXHIBIT TRAFFIC SIGNAL WARRANT ANALYSIS South Access/Orleans

52 50 EXHIBIT PEAK AM HOUR TOTAL TRAFFIC ANALYSIS South Access/Orleans HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak AM hour Intersection: South Access/Orleans Analysis Year: Year 2014 Project ID: Orleans Gardens Shopping Centre East/West Street: Orleans Boulevard North/South Street: South Access Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Raised curb / 1 RT Channelized? Lanes Configuration T TR L T Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles 2 2 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / / Lanes 1 1 Configuration L R Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config L L R v (vph) C(m) (vph) v/c % queue length Control Delay LOS A C B Approach Delay 12.2 Approach LOS B

53 51 EXHIBIT PEAK PM HOUR TOTAL TRAFFIC ANALYSIS South Access/Orleans HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak PM hour Intersection: South Access/Orleans Analysis Year: Year 2014 Project ID: Orleans Gardens Shopping Centre East/West Street: Orleans Boulevard North/South Street: South Access Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Raised curb / 1 RT Channelized? Lanes Configuration T TR L T Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles 0 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / / Lanes 1 1 Configuration L R Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config L L R v (vph) C(m) (vph) v/c % queue length Control Delay LOS B F B Approach Delay 37.6 Approach LOS E

54 52 EXHIBIT PEAK AM HOUR TOTAL TRAFFIC ANALYSIS South Access/Orleans HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak AM hour Intersection: South Access/Orleans Analysis Year: Year 2019 Project ID: Orleans Gardens Shopping Centre East/West Street: Orleans Boulevard North/South Street: South Access Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Raised curb / 1 RT Channelized? Lanes Configuration T TR L T Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles 2 2 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / / Lanes 1 1 Configuration L R Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config L L R v (vph) C(m) (vph) v/c % queue length Control Delay LOS A C B Approach Delay 12.8 Approach LOS B

55 53 EXHIBIT PEAK PM HOUR TOTAL TRAFFIC ANALYSIS South Access/Orleans HCS+: Unsignalized Intersections Release 5.6 TWO-WAY STOP CONTROL SUMMARY Analysis Time Period: Peak PM hour Intersection: South Access/Orleans Analysis Year: Year 2019 Project ID: Orleans Gardens Shopping Centre East/West Street: Orleans Boulevard North/South Street: South Access Intersection Orientation: NS Study period (hrs): 0.25 Vehicle Volumes and Adjustments Major Street: Approach Northbound Southbound Movement Volume Peak-Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles Median Type/Storage Raised curb / 1 RT Channelized? Lanes Configuration T TR L T Upstream Signal? No No Minor Street: Approach Westbound Eastbound Movement Volume Peak Hour Factor, PHF Hourly Flow Rate, HFR Percent Heavy Vehicles 0 0 Percent Grade (%) 0 0 Flared Approach: Exists?/Storage / / Lanes 1 1 Configuration L R Delay, Queue Length, and Level of Service Approach NB SB Westbound Eastbound Movement Lane Config L L R v (vph) C(m) (vph) v/c % queue length Control Delay LOS B F B Approach Delay 59.9 Approach LOS F

56 54 EXHIBIT PEAK AM AND PM HOUR TRAFFIC COUNTS Jeanne d Arc/Orleans

57 55 EXHIBIT PEAK AM HOUR TOTAL TRAFFIC ANALYSIS Jeanne d Arc/Orleans HCS+: Signalized Intersections Release 5.4 Analyst: Inter.: Jeanne d'arc/orleans Period: Peak AM hour Year: Year 2011 Project ID: Orleans Gardens Shopping Centre E/W St: Jeanne d'arc Boulevard N/S St: Orleans Boulevard SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound No. Lanes LGConfig L T L T L T L T Volume Lane Width RTOR Vol _ Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left P NB Left A A Thru P Thru A Peds X Peds X WB Left P SB Left A A Thru P Thru A Peds X Peds X NB EB SB WB Green Yellow All Red Cycle Length: 80.0 secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio _ Eastbound Left L Thru T Westbound Left L Thru T # Northbound # Left L Thru T # Southbound Left L Thru T _ Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.50 Total lost time per cycle, L = 9.60 sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.57

58 56 EXHIBIT PEAK PM HOUR TOTAL TRAFFIC ANALYSIS Jeanne d Arc/Orleans HCS+: Signalized Intersections Release 5.4 Analyst: Inter.: Jeanne d'arc/orleans Period: Peak PM hour Year: Year 2011 Project ID: Orleans Gardens Shopping Centre E/W St: Jeanne d'arc Boulevard N/S St: Orleans Boulevard SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound No. Lanes LGConfig L T L T L T L T Volume Lane Width RTOR Vol _ Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left P NB Left A A Thru P Thru A Peds X Peds X WB Left P SB Left A A Thru P Thru A Peds X Peds X NB EB SB WB Green Yellow All Red Cycle Length: 80.0 secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio _ Eastbound Left L Thru T # Westbound Left L Thru T Northbound Left L Thru T # Southbound # Left L Thru T _ Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.59 Total lost time per cycle, L = 9.60 sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.67

59 57 EXHIBIT PEAK AM HOUR TOTAL TRAFFIC ANALYSIS Jeanne d Arc/Orleans HCS+: Signalized Intersections Release 5.4 Analyst: Inter.: Jeanne d'arc/orleans Period: Peak AM hour Year: Year 2014 Project ID: Orleans Gardens Shopping Centre E/W St: Jeanne d'arc Boulevard N/S St: Orleans Boulevard SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound No. Lanes LGConfig L T L T L T L T Volume Lane Width RTOR Vol _ Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left P NB Left A A Thru P Thru A Peds X Peds X WB Left P SB Left A A Thru P Thru A Peds X Peds X NB EB SB WB Green Yellow All Red Cycle Length: 80.0 secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio _ Eastbound Left L Thru T Westbound Left L Thru T # Northbound # Left L Thru T # Southbound Left L Thru T _ Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.57 Total lost time per cycle, L = 9.60 sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.64

60 58 EXHIBIT PEAK PM HOUR TOTAL TRAFFIC ANALYSIS Jeanne d Arc/Orleans HCS+: Signalized Intersections Release 5.4 Analyst: Inter.: Jeanne d'arc/orleans Period: Peak PM hour Year: Year 2014 Project ID: Orleans Gardens Shopping Centre E/W St: Jeanne d'arc Boulevard N/S St: Orleans Boulevard SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound No. Lanes LGConfig L T L T L T L T Volume Lane Width RTOR Vol _ Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left P NB Left A A Thru P Thru A Peds X Peds X WB Left P SB Left A A Thru P Thru A Peds X Peds X NB EB SB WB Green Yellow All Red Cycle Length: 80.0 secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio _ Eastbound Left L Thru T # Westbound Left L Thru T Northbound Left L Thru T # Southbound # Left L Thru T _ Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.66 Total lost time per cycle, L = 9.60 sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.75

61 59 EXHIBIT PEAK AM HOUR TOTAL TRAFFIC ANALYSIS Jeanne d Arc/Orleans HCS+: Signalized Intersections Release 5.4 Analyst: Inter.: Jeanne d'arc/orleans Period: Peak AM hour Year: Year 2019 Project ID: Orleans Gardens Shopping Centre E/W St: Jeanne d'arc Boulevard N/S St: Orleans Boulevard SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound No. Lanes LGConfig L T L T L T L T Volume Lane Width RTOR Vol _ Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left P NB Left A A Thru P Thru A Peds X Peds X WB Left P SB Left A A Thru P Thru A Peds X Peds X NB EB SB WB Green Yellow All Red Cycle Length: 80.0 secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio _ Eastbound Left L Thru T Westbound Left L Thru T # Northbound # Left L Thru T # Southbound Left L Thru T _ Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.68 Total lost time per cycle, L = 9.60 sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.78

62 60 EXHIBIT PEAK PM HOUR TOTAL TRAFFIC ANALYSIS Jeanne d Arc/Orleans HCS+: Signalized Intersections Release 5.4 Analyst: Inter.: Jeanne d'arc/orleans Period: Peak PM hour Year: Year 2019 Project ID: Orleans Gardens Shopping Centre E/W St: Jeanne d'arc Boulevard N/S St: Orleans Boulevard SIGNALIZED INTERSECTION SUMMARY Eastbound Westbound Northbound Southbound No. Lanes LGConfig L T L T L T L T Volume Lane Width RTOR Vol _ Duration 0.25 Area Type: All other areas Signal Operations Phase Combination EB Left P NB Left A A Thru P Thru A Peds X Peds X WB Left P SB Left A A Thru P Thru A Peds X Peds X NB EB SB WB Green Yellow All Red Cycle Length: 80.0 secs CAPACITY AND LOS WORKSHEET Capacity Analysis and Lane Group Capacity Adj Adj Sat Flow Green --Lane Group-- Appr/ Lane Flow Rate Flow Rate Ratio Ratio Capacity v/c Mvmt Group (v) (s) (v/s) (g/c) (c) Ratio _ Eastbound Left L Thru T # Westbound Left L Thru T Northbound Left L Thru T # Southbound # Left L Thru T _ Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.78 Total lost time per cycle, L = 9.60 sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.89

63 61 EXHIBIT 33 COLLISION SUMMARY REPORT Jeanne d Arc/Montcerf (East Access)

64 62 EXHIBIT 34 8 HOUR TRAFFIC COUNTS (June 18, 2013) Jeanne d Arc/Montcerf (East Access)

65 63 EXHIBIT 35 TRAFFIC SIGNAL WARRANTS Jeanne d Arc/Montcerf (East Access)

66 64

67 65 EXHIBIT 36 PEDESTRIAN SIGNAL WARRANTS Jeanne d Arc/Montcerf (East Access)

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Momentum Planning & Communications 1165 Greenlawn Crescent Ottawa, ON K1L 6C2 June 29, 2015 115-618 Brief_1.doc

More information

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for: HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October

More information

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: 1649362 Ontario Inc. c/o Manor Park Management 231 Brittany Drive, Suite D Ottawa ON K1K 0R8 July

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Quickie Convenience Stores Larny Holdings Ltd. c/o PBC Group April 15, 2015 115-615 Report_1.doc D. J. Halpenny

More information

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: First Bay Properties Inc. 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 August 8, 2017 117-663 Brief_1.doc

More information

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 February 27, 2014 113-584 Overview_1.doc D. J. Halpenny

More information

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates

More information

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for: NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony

More information

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc

More information

BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: Ontario Limited.

BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: Ontario Limited. BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: 2534189 Ontario Limited April 6, 2018 117-668 TIA Report_2.doc D. J. Halpenny & Associates

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study

More information

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

Traffic Impact Statement

Traffic Impact Statement Traffic Impact Statement Mixed Use Development, US 41 and Old Trail Drive aka Tide-Starbucks 4900 9 th Street North General Development Site Plan (GDSP) Collier County, FL 10/6/2015 Prepared for: Prepared

More information

EXECUTIVE SUMMARY. Page 1 of 6

EXECUTIVE SUMMARY. Page 1 of 6 EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the

More information

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY DECEMBER 2012 READ, VOORHEES & ASSOCIATES TORONTO, ONTARIO Read, Voorhees & Associates

More information

REDEVELOPMENT TRAFFIC IMPACT STUDY

REDEVELOPMENT TRAFFIC IMPACT STUDY REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged. Stantec Consulting Ltd. 1331 Clyde Avenue, Suite 4 Ottawa ON K2C 3G4 Tel: (613) 722-442 Fax: (613) 722-2799 May 14, 213 File: 1638823 Robinson Park Development Corp. 5699 Power Road Ottawa, ON, K1G 3N4

More information

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd. 9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major

More information

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina Prepared for Longbranch Development Prepared by January 13, 219 ii Table of Contents Subject Page Signature Page... i Table of Contents...

More information

Co-ordinator Transportation Committee. Director, Mobility Services and Corporate Fleet Services Environment and Transportation Department

Co-ordinator Transportation Committee. Director, Mobility Services and Corporate Fleet Services Environment and Transportation Department 28 REGIONAL MUNICIPALITY OF OTTAWA-CARLETON MUNICIPALITÉ RÉGIONALE D OTTAWA-CARLETON REPORT RAPPORT Our File/N/Réf. Your File/V/Réf. 25 23-97-R016 DATE 15 April 1997 TO/DEST. FROM/EXP. SUBJECT/OBJET Co-ordinator

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for oad & Traffic Management Road & Traffic Management R Atlantic Traffic Engineering Specialists Draft Report Traffic Impact Study Superstore, Wal-Mart, and Kent Development Yarmouth, Nova Scotia Prepared

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

List of Exhibits...ii

List of Exhibits...ii One Brickell Traffic Study TABLE OF CONTENTS List of Exhibits...ii EXECUTIVE SUMMARY...1 1. INTRODUCTION...2 1.1 Study Area...2 1.2 Study Objective...5 2. EXISTING TRAFFIC CONDITIONS...6 2.1 Data Collection...6

More information

2016 Church Street Access Study. 100 Clinton Square 126 North Salina Street, Suite 100 Syracuse, NY

2016 Church Street Access Study. 100 Clinton Square 126 North Salina Street, Suite 100 Syracuse, NY 2016 Church Street Access Study 100 Clinton Square 126 North Salina Street, Suite 100 Syracuse, NY 13202 www.smtcmpo.org Syracuse Metropolitan Transportation Council Final Report February 23, 2016 This

More information

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited 2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief Paradigm Transportation Solutions Limited March 217 March 217 Project: 1627 Diana Vlasic, M.C.I.P., R.P.P Metropolitan Consulting 445 Paletta

More information

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY 675 Millcreek Drive, Unit 1 Mississauga, Ontario L5N 5M4 T: 416.213.7121 F: 95.89.8499 www.transtech.co TRAFFIC IMPACT STUDY PROPOSED MOSQUE DEVELOPMENT 4269 REGIONAL ROAD 25 TOWN OF OAKVILLE PREPARED

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY TRAFFIC IMPACT STUDY for the GLEN ELLEN COUNTRY CLUB SENIOR RESIDENTIAL REDEVELOPMENT 84 Millis, Massachusetts Prepared by: McMahon Associates, Inc. Prepared for: Toll Brothers, Inc. August 216 DRAFT

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives Prepared for: The Town of Caledon August 9 Transportation Solutions Ltd. 43 Forest Road Cambridge, ON N1S 3B4

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

Troutbeck Farm Development

Troutbeck Farm Development Troutbeck Farm Development Willistown Township, Chester County PA For Submission To: Willistown Township Last Revised: October, 4 TPD# INLM.A. 5 E. High Street Suite 65 Pottstown, PA 9464 6.36.3 TPD@TrafficPD.com

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study To: Ms. Susan C. Ryan Spaulding Youth Center 72 Spaulding Road Northfield, NH 03276 Date: September 7, 2017 Project #: 52455.00 From: Robin Bousa Director of Transportation Systems Re: Spaulding Youth

More information

INTERSECTION OPERATIONAL ANALYSIS AND NECESSARY RECOMMENDATIONS CIVL 440 Project

INTERSECTION OPERATIONAL ANALYSIS AND NECESSARY RECOMMENDATIONS CIVL 440 Project INTERSECTION OPERATIONAL ANALYSIS AND NECESSARY RECOMMENDATIONS CIVL 44 Project INTERSECTION: 16TH AVENUE & EAST MALL FOR AM PEAK HOUR Group Work: Syed Shafaat Ali Shah (2347426) Mohammad Moudud Hasan

More information

Traffic Study North Shore School District 112

Traffic Study North Shore School District 112 Traffic Study North Shore School District 112 Proposed Expansion of Northwood Junior High School Prepared By: May 1, 2015 1. Introduction Kenig, Lindgren, O Hara, Aboona, Inc. (KLOA, Inc.) has been retained

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

Fieldgate. Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton

Fieldgate. Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton Fieldgate Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton September 214 September 23 214 Ms Debbie Pacchiarotti Our

More information

Patuxent Green Golf Course

Patuxent Green Golf Course Patuxent Green Golf Course Laurel, Maryland February 23, 2018 Traffic Impact Analysis Prepared for: ADC Builders Alan Cohen 2701 Tower Oaks Boulevard, Suite 200 Rockville, Maryland 20852 TABLE OF CONTENTS

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

Capital Region Council of Governments

Capital Region Council of Governments March 23, 2018 Capital Region Council of Governments PROJECT CONCEPT REPORT Realignment of Swamp and Northfield Road s approaches to Route 44 (Boston Turnpike) Town of Coventry SUMMARY: The Town of Coventry

More information

3.2.2 Proposed Road Network within Phase 1B Lands

3.2.2 Proposed Road Network within Phase 1B Lands 3.2.2 Proposed Road Network within Phase 1B Lands Figure 3.1 also shows the proposed road network within the Premier Gateway Phase 1B Employment Area lands, which features two collector roads providing

More information

2. Existing Conditions

2. Existing Conditions 2. Existing Conditions The existing traffic and parking conditions on the site and the surrounding area were reviewed based on the study methodology in Section 1.2. 2.1 Existing Land Use The portion of

More information

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff MEMORANDUM DATE March 1, 212 TO Town of Milton FROM RE Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff FFY 211 Safety and Operations Analyses at Selected Boston Region MPO Intersections:

More information

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. 1.0 EXECUTIVE SUMMARY King Soopers #116, a grocery marketplace anchored commercial development, is proposed

More information

Proposed Addition to Pickering Islamic Centre

Proposed Addition to Pickering Islamic Centre TRAFFIC IMPACT STUDY, PARKING STUDY, SITE CIRCULATION REVIEW & TDM PLAN Proposed Addition to Pickering Islamic Centre 265 Brock Road City of Pickering, Ontario Prepared for: Pickering Islamic Centre Masjid

More information

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT November 2016 TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT & Aspinwall Borough, Sharpsburg Borough & O Hara Township, Allegheny County, Pennsylvania Prepared for: Riverfront

More information

Signal Warrant Studies

Signal Warrant Studies Signal Warrant Studies Seven Locations Piqua, Ohio December 12, 217 Signal Warrant Studies Seven Locations Piqua, Ohio TABLE OF CONTENTS Executive Summary... 3 Introduction... 5 Study Location... 5 Data

More information

The Cape Cod Five Cents Savings Bank

The Cape Cod Five Cents Savings Bank TRAFFIC IMPACT AND ACCESS STUDY The Cape Cod Five Cents Savings Bank Hyannis, Massachusetts PREPARED FOR The Cape Cod Five Cents Savings Bank 19 West Road Orleans, Massachusetts 0263 PREPARED BY 1 Walnut

More information

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748 City of Barrie Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report Project Number: JDE 1748 Date Submitted: June 12 th, 2017 06/12/17 John Northcote, P.Eng. Professional License

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

CastleGlenn Consultants Inc.

CastleGlenn Consultants Inc. February 1 st, 2010 CastleGlenn Consultants Inc. Engineers, Project Managers & Planners Mr. Kevin Yemm Planning and Land Development Richraft Ltd. 2280 St. Laurent Boulevard Suite 201 Ottawa, Ontario (Tel:

More information

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study Traffic Study To: From: James M. Moore, Director of Planning & Building Services, Town of Fairfax David Parisi, PE, TE, Parisi Transportation Consulting Date: October 14, 216 Subject: Victory Village Senior

More information

Road Conversion Study Plumas Street

Road Conversion Study Plumas Street Plumas Street Phase I Submitted to The Regional Transportation Commission of Washoe County Submitted by Zong Tian, Ph.D., P.E. Saeedeh Farivar Haiyuan Li, Ph.D. Center for Advanced Transportation Education

More information

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for:

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for: TRAFFIC IMPACT STUDY For Creekside Thornton, Colorado August 215 November 215 Revised: August 216 Prepared for: Jansen Strawn Consulting Engineers 45 West 2 nd Avenue Denver, Colorado 8223 Prepared by:

More information

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine Draft Study STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine SUBMITTED TO: BANGOR AREA COMPREHENSIVE TRANSPORTATION SYSTEM SUBMITTED BY: I MAY 23, 2017 DRAFT STILLWATER AVENUE STUDY FINAL REPORT Table

More information

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT Prepared by: In Association with: November 2013 EXECUTIVE SUMMARY Patton Township, in partnership

More information

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc. Magnolia Place Traffic Impact Analysis Prepared for: City of San Mateo Prepared by: Hexagon Transportation Consultants, Inc. Updated January 4, 2010 Table of Contents 1. Introduction...1 2. Existing Conditions...6

More information

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama.

Traffic Impact Study. Crestline Piggly Wiggly Mountain Brook, Alabama. Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama. Traffic Impact Study Crestline Piggly Wiggly Mountain Brook, Alabama Prepared for: Goodwyn, Mills and Cawood, Inc. Birmingham, Alabama September 214 Revision 1 October 214 Crestline Piggly Wiggly Mountain

More information

Chapter 16: Traffic and Parking A. INTRODUCTION

Chapter 16: Traffic and Parking A. INTRODUCTION Chapter 6: Traffic and Parking A. ITRODUCTIO This chapter examines the potential traffic and parking impacts of the proposed Fresh Kills Park roads. The analysis of transit and pedestrians is presented

More information

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Date: April 16 th, 2015 To: From: Re: Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Darian Nagle-Gamm, Traffic Engineering Planner Highway 6 (2 nd Street) /

More information

Atlanta Braves Stadium and Mixed- Use Development

Atlanta Braves Stadium and Mixed- Use Development Transportation Analysis Atlanta Braves Stadium and Mixed- Use Development DRI #2381 Cobb County, Georgia Prepared for: BRED Co., LLC Prepared by: Kimley-Horn and Associates, Inc. 817 West Peachtree Street

More information

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 151714A Table of Contents Table of Contents I. INTRODUCTION... 2 II. EXISTING CONDITIONS... 5 III. 215 EXISTING TRAFFIC CONDITIONS... 6

More information

Waterford Lakes Small Area Study

Waterford Lakes Small Area Study Waterford Lakes Small Area Study Existing Traffic Conditions PREPARED FOR: ORANGE COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION ORLANDO, FLORIDA PREPARED WITH: INWOOD CONSULTING ENGINEERS

More information

Gateway Transportation Study

Gateway Transportation Study Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213 Back of

More information

Marina Loft (DRC 51-R-12)

Marina Loft (DRC 51-R-12) Marina Loft (DRC 51-R-12) traffic study prepared for: Cymbal Development OCtober 2012 Traf Tech October 1, 2012 Mr. Asi Cymbal - President Cymbal Development 3470 North Miami Avenue Upper Suite Miami,

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998 R1500 : Traffic Safety at 25 Avenue and 128 Street Intersection Corporate NO: R1500 Report COUNCIL DATE: May 25, 1998 REGULAR COUNCIL TO: Mayor & Council DATE: April 27, 1998 FROM: General Manager, Engineering

More information

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION 5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION Having held a public hearing, that Council approve the preliminary designs

More information

Having held a public hearing, that Council approve:

Having held a public hearing, that Council approve: 3. MODIFICATIONS TO MERIVALE ROAD FROM FALLOWFIELD ROAD TO OLD HIGHWAY 16 TO ACCOMMODATE THE GROWTH WITHIN THE SOUTH MERIVALE BUSINESS PARK - PUBLIC HEARING COMMITTEE RECOMMENDATIONS Having held a public

More information

COMMITTEE RECOMMENDATIONS. That Council approve:

COMMITTEE RECOMMENDATIONS. That Council approve: 4. MODIFICATIONS TO INNES ROAD (REGIONAL ROAD 30) AND TENTH LINE ROAD (REGIONAL ROAD 47) TO ACCOMMODATE THE DEVELOPMENT OF THE TRINITY COMMONS SHOPPING CENTRE COMMITTEE RECOMMENDATIONS That Council approve:

More information

Traffic Analysis and Design Report. NW Bethany Boulevard. NW Bronson Road to NW West Union Road. Washington County, Oregon

Traffic Analysis and Design Report. NW Bethany Boulevard. NW Bronson Road to NW West Union Road. Washington County, Oregon Traffic Analysis and Design Report NW Bethany Boulevard NW Bronson Road to NW West Union Road Washington County, Oregon May 2011 Table of Contents Table of Contents Section 1 Executive Summary... 2 Section

More information

AMEC Earth and Environmental. Bovaird Drive Environmental Assessment. Traffic Study Final Report. August Excellence in Transportation Planning

AMEC Earth and Environmental. Bovaird Drive Environmental Assessment. Traffic Study Final Report. August Excellence in Transportation Planning AMEC Earth and Environmental Bovaird Drive Environmental Assessment Traffic Study Final Report August Excellence in Transportation Planning AMEC Earth and Environmental Bovaird Drive Class EA Traffic

More information

EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA

EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA T R A F F I C I M P A C T A N A LY S I S EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA April 217 T R A F F I C I M P A C T A N A LY S I S EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA Submitted

More information

December 4, Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA Attn: Kathy Marshall. Dear Board Members:

December 4, Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA Attn: Kathy Marshall. Dear Board Members: December 4, 28 Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA 86 Attn: Kathy Marshall RE: RAMSHEAD MERRIMAC, MA Dear Board Members: Bayside Engineering, Inc. has received the MDM Transportation

More information

CPC Parking Lot Riverside Drive. Transportation Brief

CPC Parking Lot Riverside Drive. Transportation Brief CPC Parking Lot 2785 Riverside Drive Transportation Brief Prepared By: NOVATECH Suite 2, 24 Michael Cowpland Drive Ottawa, Ontario K2M P6 7 / 5 / 25 Novatech File: 49 Ref: R-25-22 July 5 th, 25 City of

More information

FINAL Albertville Business Park AUAR Update Traffic Study

FINAL Albertville Business Park AUAR Update Traffic Study FINAL Albertville Business Park AUAR Update Traffic Study Prepared for City of Albertville, MN July 20, 2017 SRF No. 10060.00 Table of Contents Introduction... 1 Existing Conditions... 1 Data Collection...

More information