1

2

3 Local Sustainable Transport Fund - Application Form Local transport authority name(s)*: East Sussex County Council Senior Responsible Owner name and position: Kieran McNamara, Assistant Director Policy Economy, Transport and Environment Department Bid Manager name and position: Jon Wheeler, Team Manager Infrastructure & Development, Economy, Transport and Environment Department Contact telephone number: address: jonathan.wheeler@eastsussex.gov.uk Postal address: County Hall, St Anne s Crescent, LEWES, East Sussex, BN7 1UE Website address for published bid: Application Form Contents Page Section A Project Description and Funding Profile 1 Section B The Local Challenge 3 Section C Programme Section D Value for Money 16 Section E Deliverability 20 8 Appendices Appendix 1 Appendix 2 Appendix 3 Appendix 4 Appendix 5 Letters/ s of support East Sussex Coastal Towns Programme Pictorial Maps Detailed Costs Programme Delivery Structure Programme Output Milestones

4 SECTION A - Project description and funding profile A1. Project name: East Sussex Coastal Towns Better travel to Work & Education A2. Headline Description A2.1 East Sussex Coastal Towns Better travel to Work & Education will deliver a programme of integrated sustainable transport measures, for people commuting for work and education purposes to the four coastal towns of Newhaven, Eastbourne, Bexhill and Hastings, and their respective surrounding hinterlands. A2.2 The four towns form the County Council priority areas for regeneration and development with over 200,000 sqm of employment space and nearly 12,000 homes planned over the next 20 years, which will result in a considerable increase in goods and people coming into these towns. A2.3 The LSTF programme will also tackle congestion arising from over half of all journeys to work and education currently being undertaken by car. The programme will focus on the key routes into and within the towns, improving end to end journey experiences and enabling greater sustainable travel choice, thereby increasing the town s economic potential, reducing vehicle kilometres in these towns by 10,916,073 vehicle kilometres, producing economic benefits amounting to 1,374,115 and reducing carbon emissions by 8,552 tonnes over the programme period. A2.4 The development of the programme has been shaped by key partners in the county, some of which will help deliver elements of the programme (section A9) and the overall content of the programme is in synergy with the overall objectives of our Local Transport Plan , as well as the area based packages for the four towns in the LTP Implementation Plan for the period 2011/12 15/16 (sections C3 & C4). A2.5 Our LSTF programme for Bexhill and Hastings will complement the proposed Bexhill Hastings Link Road as part of a wider package of transport improvements for the two towns. The strategic connectivity improvements that the Link Road will bring to the area will enable us to lock in the benefits of reduced traffic on the existing A259 with a complementary package of sustainable transport measures as identified in our LTSF programme as well as our LTP Implementation Plan 2011/12 15/16. A3. Geographical Area A3.1 The bid area includes the coastal towns of Newhaven, Eastbourne, Bexhill and Hastings and their surrounding hinterlands. Bexhill is situated in the district of Rother; Newhaven is in Lewes district, whilst Eastbourne and Hastings are both boroughs. The bid area is home to 338,960 people, over half of the county s population. A3.2 Approximately four fifths of East Sussex is covered by landscape designations, of both national and international significance. The proximity of Newhaven and Eastbourne to the recently designated South Downs National Park (SDNP) means that they act as gateways into the park whilst Hastings is on the edge of the High Weald, an Area of Outstanding Natural Beauty (AONB)

5 A4. Type of bid: Small Projects Tranche 2 bid A5. Total Programme cost ( m): 7.711m A6. Total DfT funding contribution sought ( m): 4.920m A7. Spend Profile Total Revenue funding sought 615, , ,594 1,823,980 Capital funding sought 314,750 1,068,850 1,712,420 3,096,020 DfT Funding Contribution Total (A6) 930,300 1,718,686 2,271,014 4,920,000 Local Contributions (A8) 1,219, , ,685 2,790,685 Programme Total (A5) 2,149,300 2,518,686 3,042,399 7,710,685 A8. Local Contribution A8.1 The local contributions identified relate to commitments in our Integrated Transport Capital Programme for 2012/13 using East Sussex County Council funding, development contributions and contributions (capital or inkind) from external partners as identified in section A9 below. Organisation/Partner Contribution ( ) East Sussex County Council Integrated Transport Capital Programme ( ) 730,000 Section 106 contributions included in the Integrated Transport Programme (2012/13) 489,000 Section 106 contributions held and likely to be spent in the programme period 661,685 Brighton & Hove Bus & Coach Company (Combined contribution this bid and Lewes/SDNPA bid 60,000 Stagecoach 450,000 Southern Railway 400,000 Total 2,790,685 N.B Brighton & Hove Buses have provided 100,000 of contribution, 60,000 for this bid and 40,000 for the Travel Choices for Lewes bid. A9. Partnership bodies A9.1 Our LSTF package has been designed in partnership with public, private and third sector organisations. The following partners will deliver elements of the bid; evidence of their willingness to be part of the delivery of these elements, provided in Appendix 1. Partner Role/Responsibility Delivery partner East Sussex The County Council, as lead partner, will coordinate the delivery of County Council the programme. A number of the elements of the bid will also be delivered through existing County Council resources, particularly the marketing and promotion elements of the programme. Hastings Borough Council, Rother District Council, Lewes District Council, Eastbourne The Borough and District Councils will be key partners in the delivery of a number of elements of the programme. They will help the County Council with liaison with local communities and the business community in the roll out the revenue measures and implementation of capital infrastructure improvements which support economic growth and cut carbon emissions in their Funding partner - 2 -

6 Partner Role/Responsibility Delivery partner Borough Council respective towns. Sustrans Job Centre Plus Sussex Community Rail Partnership Action in Rural Sussex (AiRS) Brighton & Hove Bus and Coach Company Brighton & Hove City Council Stagecoach Kent County Council Public Health Department, ESCC Partnership and Provision team, Children s Services, ESCC Delivery of the Bike It scheme (Package CT4) in schools, colleges and businesses in Newhaven, Eastbourne, Bexhill and Hastings, as well as cycle maintenance alongside local cycle groups. Deliver and work in partnership with all relevant partners on the delivery of the Wheels 2 Work scheme (Package CT5), especially through the national Work Programme delivered by the Department for Work and Pensions, to target people who face transport barriers in accessing employment and education. Promote the new Seaford-Brighton community rail partnership line at Seaford, Bishopstone and Newhaven Town stations, and the existing Marshlink line at Eastbourne, Bexhill, Hastings and intervening stations (Package CT1). As a Work Programme provider, AiRS will be a key partner in the delivery of the Wheels 2 Work and Education (Package CT5) scheme alongside the other Work Programme providers. They will help to develop it following the operator tender process, over the LSTF period, into a self sustaining social enterprise. Upgrade on-bus equipment and operate and maintain its elements of the GPRS RTPI system in East Sussex. (Package CT2). Operate and maintain the GPRS RTPI system on East Sussex County Council s behalf for the western part of East Sussex (Package CT2). Provide the necessary on bus equipment and resources to operate and maintain elements of the GPRS RTPI system in the eastern part of East Sussex (Package CT2). Operate and maintain the GPRS RTPI system on East Sussex County Council s behalf for the eastern part of East Sussex (Package CT2). Take forward work on active travel to encourage employees to reduce their carbon footprint (Packages CT1 and CT3) Promoting Wheels 2 Work through range of youth networks and directly to young people and their parent/carers. Identify appropriate young people that could benefit from the Wheels to Work & Education Scheme (Package CT5). Funding partner SECTION B The Local Challenge B1. The Local Context B1.1 The LSTF programme area is focused on the coastal towns of Newhaven, Eastbourne, Bexhill and Hastings, where over half of the county jobs are located. High proportions of people live and work in their home town, often travelling less than 5km by car to work. This trend, combined with a poor strategic road network causes localised congestion on the routes into the towns and within the town centres. Therefore our programme will target coastal town residents travelling less than 5km by car and in -commuters travelling by car to access jobs and education. B1.2 These coastal towns have similar characteristics and challenges, hence they have been grouped together and a programme of measures has been developed to address these challenges. Key challenges and characteristics are: High concentration of public administration, health and education jobs; - 3 -

7 Pockets of deprivation and lower than average skill levels and wages; Regeneration a priority across all coastal towns; Additional housing and employment over the next 20 years; Level of strategic transport connectivity affects businesses; and Impact of congestion on transport network affects journey time reliability. Employment & Deprivation B1.3 The coastal towns provide half of the county s jobs; in 2009, there were a total of 163,400 jobs in the county, of which 82,200 or 50.3% were based in the coastal towns. B1.4 There are high concentrations of jobs in the Public administration, Education and Health sectors (public sector) in the programme area. This is particularly high in Bexhill (44%), Hastings (42%) and Eastbourne (39%) compared with a national average of 29%. Newhaven is less reliant on these sectors, with the predominant employment being manufacturing, which provides just under a quarter of the town s employment. B1.5 The types of jobs available are reflected in the wages and the value of the economy, with the coastal towns in East Sussex sitting within a county that is significantly less affluent than the wider south east; with a Gross Value Added (GVA) at only two-thirds of the UK average, and The Earnings index showing that wages within these areas are below that of GB and the south east (ranging from 85.8 in Eastbourne to 99.4 in Lewes) 1. B1.6 Compared to unemployment rates in the South East 5.9% and GB 7.7%, Eastbourne (7.1%) and Rother (7.7%) have slightly lower or equal rates of unemployment. Hastings has a high unemployment rate at 10.2% 2. This highlights the potential incidence of deprivation in these coastal towns, and is reflective of the fact that Hastings is the 19 th most deprived local authority area in England 3. B1.7 In recognition of the need for additional intervention in the coastal communities the South East Local Enterprise Partnership (SELEP), of which East Sussex is a partner, has as one of its four objectives: Promote investment in our coastal communities: Some of our coastal communities are already exceptionally prosperous but others suffer from significant deprivation. Others however, offer considerable unrealised potential and the possibility of significant economic growth we are clear that we must focus on promoting investment in Clacton, Jaywick, Hastings, Bexhill, Newhaven, Eastbourne, Harwich, Sheerness, Margate, Folkestone, Dover, Southend and Sandwich. Economic development and growth B1.8 Key spatial objectives within the emerging Local Plans for the four coastal towns include the level of new housing and employment that will be delivered, which will help support economic growth. The creation of new jobs to attract higher skilled types of employment is also a key focus, with regeneration regarded as a particular priority for coastal towns. B1.9 In Newhaven, anticipated development is mainly focused around Eastside by Newhaven Harbour, including the regeneration of existing vacant or underused industrial sites 4. Newhaven Port has recently published its Port Masterplan for the next 20 to 30 years which will focus on a range of measures with the ultimate aim of job creation and securing a sustainable future for the port. B1.10 In Eastbourne, 5,022 dwellings and 55,430sq m of employment land will be delivered by 2027 within the built up area boundary, including 1,242 new dwellings in the town centre, and up to a maximum of 150 new dwellings in Sovereign Harbour 5 which also has potential for an additional 3,000 jobs. Also in Eastbourne town centre, the Arndale Centre is proposing retail expansion which, if approved, would provide 14,000 sq m of retail space for up to 20 new retail units, generating up to 500 new jobs. 1 ASHE Nomis: Model based Jul 10 Jun11 3 IMD Lewes District emerging Core Strategy, The Eastbourne Plan,

8 B1.11 Rother District Council s Core Strategy sets out proposals for 100,000sq m of business space and up to 2,250 dwellings over the plan period of which the Bexhill Hastings Link Road would specifically deliver 51,500 sq m of business land development and 1,200 dwellings at North East Bexhill and support around 3,548 jobs for Bexhill and Hastings. 6. In Hastings, in the region of 100,000 sq m of employment space and 3,418 new dwellings are proposed in the Borough to be provided between 2011 and 2028 with housing likely to be spread across the town in small scale (no more than 200 units) developments 7 Connectivity B1.12 Road network: East Sussex has a poor strategic road network and all routes to the coastal towns of Hastings, Bexhill, Eastbourne and Newhaven suffer from severe congestion, especially during peak hours which affects the reliability of business journeys. Further information is set out in section B2. B1.13 Congestion arising from a heavy reliance on car journeys impacts on air quality. The A259 at Glyne Gap between Bexhill and Hastings is one of the two designated Air Quality Management Areas (AQMA) in East Sussex, which would be addressed by the wider package of transport improvements for Bexhill and Hastings which includes the Bexhill Hastings Link Road, locking in the benefits for buses on the existing A259 with complementary public transport improvements and our LSTF programme for the two towns. There are also air quality issues in Newhaven town centre which are likely to result in Lewes District Council declaring an AQMA in the town in the next 12 months. Technological opportunities B1.14 Current broadband connectivity is varied however, improving it will also reduce some reliance on the private car through, for example, an increase in home working and increased internet shopping. Broadband Delivery UK has allocated million to East Sussex to deliver superfast broadband, and ESCC has agreed to increase this by 15 million from the capital budget. The County s objective is to provide all homes and businesess with broadband speeds of up to 100mbps by B2 Evidence B2.1 This information summarises the key transport issues in the four coastal towns which are the focus of this bid. Further information is available in Chapter 3 and Background Paper B of the East Sussex Local Transport Plan Context B2.2 As shown n the map in section A3, the A27/A259 trunk roads and East Coastway rail line provides the strategic transport links between all four of the coastal towns. Newhaven and Eastbourne are connected respectively to the A27 via the A26 and A2270/A22, whilst the A259, part of the county road network, provides a link between these two. The East Coastway rail service runs between Brighton and Ashford serving Eastbourne, Bexhill and Hastings amongst other stations. Newhaven station is linked by the Seaford branch line, which connects into the East Coastway route at Lewes. Travel Patterns B2.3 Over half of the coastal town residents drive to work, with this figure ranging from 54.4% in Newhaven town to as high as 58.1% in Bexhill. Travel patterns in these coastal towns are consistent with the rest of the country, as car travel is the preferred mode especially for people travelling less than 5km to work from where they live. B2.4 In terms of in-commuting journeys, Figure 1 shows that more than 50% of people commute into each of the coastal towns by car -54% in Newhaven, 58% in Bexhill 55% in Eastbourne and 55% in Hastings. 8 6 Rother Core Strategy, Hastings Local Development Framework - Core Strategy Informal Consultation, East Sussex in Figures 2001 census data - 5 -

9 Percentage of all workers Local Sustainable Transport Fund Tranche 2 bid East Sussex County Council February 2012 B2.5 Coastal town residents are more likely to travel by car for short journeys of under 5km s compared to the national average. This high reliance on the private car for short journeys brings about a number of transport related issues that impact on the local economy and the level of carbon emissions arising from vehicles. The total number of commuters is approximately 55,000 driving 85,577,720 vehicle kilometres per year. Total numbers of school trips by car are approximately 19,600 amounting to around 23,383,000 vehicle kilometres per year. Figure 1: Commuting & the Coastal Towns 100% 80% 60% 40% Cycle Walking Bus Rail Passenger Driving Work at home 20% 0% Eastbourne Hastings Newhaven Bexhill B2.6 There are significant opportunities to influence travel behaviour towards walking, cycling, bus and rail travel. Bus patronage in Hastings, Eastbourne and Newhaven (between 5.4 and 5.9%) is higher than the average for the county (4%). Rail passenger figures would increase further with improved publicity of rail services and information on using trains, especially in relation to local journeys. In Newhaven, 16.7% of people walk to work. Whilst only 1.7% of people cycle to work across the county, in Eastbourne this is higher at 3.5% which can be attributed to the relatively flat topography of the town. Newhaven B2.7 The A259, which runs east-west through the middle of the town forms the town centre ring road, creates severance and congestion issues for commuters and local residents who wish to access the shops and employment areas in the town. Levels of nitrogen dioxide close to the national limits have been recorded in areas beside the A259 in the centre of Newhaven, and it is anticipated that Lewes District Council will declare the town centre as an AQMA in the next 12 months. B2.8 The town has two functioning railway stations, offering direct train services to Lewes, Seaford and Brighton. The number of passenger journeys from Newhaven Town station has increased by 35% from 114,677 in 2004/05 to 154,341 in 2009/10. B2.9 The town has good access to bus services, and journey time reliability for the every 10 minute service between Brighton and Eastbourne has been enhanced through the delivery of a bus priority corridor between Brighton and Peacehaven. However, only 6% of people commute into the town by bus and there is scope to increase the numbers. Most people (34%) who commute to Newhaven do so from within the district 9. B2.10 National Cycle Route NCN2 passes through Newhaven and forms part of the Avenue Verte, London to Paris cycle route. This route offers considerable potential to encourage more cycling within the town. The NCN2 cycle route connects Seaford and Newhaven, but the section between Newhaven and Peacehaven needs improving. 9 East Sussex in Figures,

10 Eastbourne B % of people in Eastbourne live and work in the borough, and with over 80% of the town s working population living within 5 kms of their place of work, there is great potential to further increase these levels. Most employees travel to work by car, with more people travelling into the town to work rather than outcommuting. B2.12 Most employees travel to work by car with more people travelling into the town to work rather than outcommuting and consequently key sections of road and key junctions remain under stress from current traffic levels. B2.13 A Station Travel Plan for Eastbourne Station has been developed by Southern, in liaison with ESCC, to identify ways by which access and facilities at the station can be improved. Interchange with bus services is a five minute walk away from the station and Stagecoach operates regular services within Eastbourne town, to its immediate hinterland and longer distance services to Hailsham and Uckfield. There are bus links to Hastings, and Brighton & Hove Buses operate a service to Brighton. B2.14 The relatively flat landscape of Eastbourne means that utility cycling levels in the town are higher than elsewhere in the county and the town benefits from a number of dedicated cycle routes including the National Cycle Route 21 (NCN 21) which enters the borough from the north, serving utility and recreational cyclists. The majority of the existing cycle routes are in the east of the town and have been developed as the Sovereign Harbour and Lottbridge Drove retail areas have grown. In contrast, the western side of Eastbourne has very limited cycling infrastructure despite this area accommodating the hospital, schools, colleges and University of Brighton campus. A recently approved Eastbourne Cycling Strategy, jointly developed by ESCC and Eastbourne Borough Council, identifies new and improved cycle routes and facilities, which would make cycling a more attractive option for residents and visitors to Eastbourne. Bexhill and Hastings B2.15 There is a high reliance on jobs outside the district, with net out-commuting of 16, 800 workers 10, equivalent to 17.2% of the workforce. Rother has the highest proportion of people who work at or from home than in any other district in the South East 11. B2.16 Traffic congestion occurs not only at peak hours, but throughout the day on the link between Glyne Gap roundabout and Harley Shute Road (A259), along Hastings seafront and in the Old Town (especially during the holiday season), and on the Ridge (A2100/B2093). The wider package of transport improvements for Bexhill and Hastings which includes our LSTF programme, improvements identified in our LTP Implementation Plan and the strategic connectivity improvements, and links to new housing and employment that the Bexhill Hastings Link Road will bring, will complement one another in addressing these issues. Parking in Hastings is administered through civil parking enforcement and a controlled parking zone for the town centre, but there is no similar regime in Bexhill. B2.17 Rail journeys from Hastings stations (Hastings, West St Leonards, St Leonards Warrior Square and Ore) have increased by 12% from 1,101,888 in 2004/05 to 1,321,711 in /10. The number of people using Bexhill station has increased by 37% from 469,187 in 2004/05 to 644,387 in 2009/10. This increase in rail use corresponds with a reduction in car journeys over the same period, highlighting a major shift towards rail travel. B2.18 The Hastings Quality Bus Partnership (QBP), involving Stagecoach, ESCC and Hastings Borough Council, was set up in 2002 to increase bus patronage, improve punctuality and journey time, and to make bus travel more attractive and accessible in the town. Since 2002, bus patronage in Hastings has increased by over 30%. The focus of the QBP is now particularly on punctuality of services and the A259 has been identified as a priority.. A QBP for Bexhill is currently being developed, focusing on services currently provided along the A259. The reduction of traffic on the A259 corridor between the two towns resulting from the delivery of the Bexhill Hastings Link Road would enable wider public transport improvements, some of which would come forward as part of our LSTF programme, to be provided and lock in these benefits. This will help to address issues of accessibility to services and jobs for those without access to a car and give improved travel choices to all residents. 10 Out commuting Bexhill and Hastings, East Sussex in Figures, Rother Core Strategy,

11 B2.19 A core network of cycling corridors has been identified in Hastings through the development of their emerging Local Plan. These routes, radiating from the core cycle route through the town, the NCN2 route along the seafront, provide links to the town centre, and main residential and employment centres. In Bexhill, a similar cycling route network has been identified, radiating northwards to the key residential and employment areas from the NCN2 route along the seafront. B3. Objectives B3.1 The overall aim of the East Sussex Coastal Towns programme is: To make it better for people commuting to work and education in the four coastal towns of Newhaven, Eastbourne, Bexhill and Hastings by providing attractive low carbon alternatives to the car. B3.2 Our LSTF objectives complement the objectives of Local Transport Plan and the overall LTP strategy of supporting sustainable economic growth by: Supporting economic growth by implementing sustainable travel measures that support future development Reducing traffic congestion on the routes into and within the four coastal towns, Recognising and addressing barriers to car drivers opting for low carbon alternatives both physical and perceived Improving travel choices to enable greater levels of walking, cycling, bus, rail and car sharing, and Reducing carbon emissions. B3.3 The methodology for evaluating how these objectives will be achieved is outlined in Section E of the bid. SECTION C East Sussex Better travel for Work and Education Programme Bid C1. Programme Description C1.1 Our LSTF programme specifically target car based commuters travelling to key employment and education centres, by providing attractive and practical alternatives to driving,. In partnership with public, private and third sector organisations, we will improve end to end journey experiences and overcome the barriers associated with using sustainable travel options enabling people travelling less than 5km to switch from private car to walking, cycling or bus; or if they are travelling longer distance over 5km, to opt for bus, rail or car sharing. C1.2 This will be achieved by: Working with a range of businesses, organizations, colleges and schools to deliver the programme of measures for employees and students within the four towns and their rural hinterland, Implementing a package of complementary revenue and capital measures which deliver improvements for pedestrians, cyclists and users of public transport. C1.3 Our LSTF programme will contribute to the effective reduction in localised congestion on the routes to and within the four coastal towns and the consequences of this on the functioning of the local economy and carbon emissions from transport. C1.4 The programme s five inter-linked elements will provide benefits wider than the targeted group and will complement proposed measures identified for delivery as part of the East Sussex LTP Implementation Plan up to 2015/16 12, the Bexhill Hastings Link Road and its package of complementary sustainable transport measures for walking, cycling and public transport journeys and support the overall LTP strategy of supporting sustainable economic growth. C1.5 Travel Choices for Work and Education is the overarching LSTF brand name and builds on existing county branding for travel in East Sussex to promote the programme s benefits to residents and businesses. The package is shown pictorially in Appendix 2. C1.6 The overall programme will be managed by a LSTF Programme Manager based at East Sussex County Council. 12 The LTP is available on the East Sussex County Council website - 8 -

12 Element CT1 - Supporting Travel Behaviour Change Summary Measure Where will it be delivered Who it will target Marketing Programme Newhaven, Eastbourne, Bexhill and Hastings Employers and educational establishments across the four towns Initial launch campaign Travel Choices for Work and Education Travel Choice website enhancements Newhaven, Eastbourne, Bexhill and Hastings Newhaven, Eastbourne, Bexhill and Hastings Employers and educational establishments across the four towns Employers and educational establishments across the four coastal towns C1.7 An initial marketing campaign using the Travel Choices for Work & Education brand will provide a platform to launch our programme to motivate behaviour change. Targeted at all key employers, the campaign will challenge people to try changing one car journey to work with an alternative sustainable travel option, whether by car sharing, using public transport or walking for part of the journey or cycling, in exchange for sustainable travel incentives. C1.8 Using the overarching TravelChoice branding, a Marketing Programme has been designed alongside phased delivery of specific measures across the programme period. C1.9 Branding integrates printed and online material: sustainable travel maps, leaflets, timetables and information published in in house workplace and education publications. Working with delivery partners, we will further increase LTSF s reach through social media and marketing techniques appropriate to our target audience and provide branded sustainable travel incentives to motivate a change in travel behaviour. C1.10 Travel Choices for Work & Education will also be promoted via the County Council s existing TravelChoice website. Revenue investment will be utilised to upgrade the website to include dedicated LSTF branding providing a one-stop-shop for information about walking, cycling, bus, rail and car sharing, and provide supportive information for activities delivered throughout the LSTF programme period particularly under CT2, CT3 and CT4. Element CT2 - Enabling Low Carbon Alternatives to Driving Summary Measure Where will it be delivered Who it will target Upgrade existing Real Time Passenger Information system Eastbourne, Newhaven Existing and new bus users. People travelling to work and students travelling to education or skills training Introduce Real Time Passenger Information System Bexhill, Hastings Existing and new bus users in Bexhill and Hastings Promotion of Real Time Passenger Eastbourne, Newhaven, Bexhill, Existing and new bus users Information System Hastings Bus waiting facilities Improvements Eastbourne, Newhaven, Bexhill, Hastings Existing and new bus users Pedestrian links to public transport Delivery of cycle infrastructure Consistent signing of walking and cycling routes from residential areas to employment and education sites Eastbourne, Newhaven, Bexhill, Hastings Eastbourne, Newhaven, Bexhill, Hastings Eastbourne, Newhaven, Bexhill, Hastings Residents, employees, and students travelling within, into and out of the coastal towns Residents, employees and students making journeys under 5 kms Residents who live and work in the coastal towns, especially those within 5km - 9 -

13 Measure Where will it be delivered Who it will target New or upgraded pedestrian/cyclist crossing facilities Eastbourne, Newhaven, Bexhill, Hastings Residents, employees, and students travelling within, into and out of the coastal towns Extension to existing cycle routes Bexhill, Eastbourne Residents, employees, and students travelling within, into and out of the coastal towns, especially those within 5km C1.11 This element will create an environment conducive to sustainable travel through targeted investment in sustainable transport infrastructure on key commuter routes/corridors to employment and educational establishments, and where future development will be delivered. Combined with bespoke social marketing and the initiatives described in Packages CT1, CT3 & CT4, this will make public transport, walking or cycling more attractive choices. C1.12 To make bus travel an attractive and reliable alternative, this element will deliver Real Time Passenger Information (RTPI), providing a consistent approach to travel information across the four towns and across the county boundaries. This will provide accurate and reliable passenger information by providing people with the greater comfort of knowing when their bus will arrive, fostering greater confidence in bus services and increasing bus patronage. It will be focused on the routes between:- Newhaven and Eastbourne including on Brighton & Hove Buses routes 12, 13, 14 and Stagecoach routes The Loop, 1/1A, 3, 51, 55and 99, Bexhill and Hastings - including on Stagecoach routes 20/20A, 21/21A, 22/22A, 26/26A, 98, 99 and 100. This would complement and lock in the benefits for public transport on the existing A259 corridor that would come forward as part of the complementary package of sustainable transport measures delivered alongside the Bexhill Hastings Link Road. C1.13 Working in partnership with the two key bus operators across the four towns - Brighton & Hove Buses in Newhaven and Eastbourne and Stagecoach in Eastbourne, Bexhill and Hastings - together with Brighton & Hove City Council and Kent County Council, the following will be delivered:- Brighton & Hove Buses and Stagecoach will upgrade their on bus equipment to utilise GPRS technology, which is proven technology for modern RTPI systems. East Sussex County Council will work in partnership with key employers and organisations to identify locations for RTPI signs. These will also be delivered at rail stations, together with access to information via the bus operator websites and mobile phones. Maintenance Support will be provided by Brighton & Hove City Council and Kent County Council (or their agents) through a formal agreement for the systems in the western and eastern parts of the country respectively" C1.14 A considerable financial benefit of providing RTPI as part of this package is that it builds on the upgrading of Brighton & Hove s GPRS system being delivered as part of the City Council s successful Tranche 1 LSTF bid. It will enable East Sussex to invest in upgrading its elements of the RTPI infrastructure on the 10 minute frequency route between Brighton Newhaven Eastbourne, supporting the 1.6m investment already made in bus priority on the A259 between Newhaven and Brighton and enable the upgrade of existing, and installation of additional, signs in Newhaven and Eastbourne. All Brighton & Hove bus services will be immediately visible on the RTPI signs in Newhaven and Eastbourne. C1.15 In Bexhill and Hastings RTPI will be provided by building upon the operational RTPI system used in Kent by Stagecoach and Kent County Council, to achieve further financial benefits of sharing systems across boundaries. Although two different systems will be used in the western and eastern parts of the county, there is a commonality in the information provided to both which will enable seamless transition of buses between the systems on routes between Eastbourne and Bexhill/Hastings. C1.16 The investment will also provide a framework for other commercial bus operators and local East Sussex County Council subsidised services in the immediate hinterland of the four coastal towns, to be added to the system at a later date. C1.17 To complement RTPI, specifically to improve end to end journey experience for commuting to work and education, the following measures will be delivered:

14 Improvements to walking routes from residential areas that link with key bus corridors, for example Peacehaven Newhaven. Improvements to bus stop waiting areas on the key commuter bus corridors where real time passenger information bus stop signs will be installed and this would complement the wider public transport improvements on the A259 corridor that would come forward alongside the Bexhill Hastings Link Road. A marketing campaign and promotion of the new scheme on key bus corridors including Bexhill Hastings and to key employers, in collaboration with the bus operators. This will interlink with packages CT1 and CT4. C1.18 With over half of residents living and working in the four towns travelling less than 5km, walking or cycling is a viable alternative for these journeys. Improvements will be made to walking and cycling infrastructure by delivering new infrastructure, filling missing links and providing consistent signing across the four towns. Examples include: delivery of walking and cycle route infrastructure: Eastbourne Langney to Sovereign Harbour and the Sovereign Centre (link with LTP3 funded Horsey Way cycle route) Improvements for pedestrian links into Bexhill town centre and routes to the seafront consistent signing of walking and cycling routes from residential areas to employment and education sites across the four towns, including:- Green Lungs pedestrian and cycle link, Hastings - Linking the three Country Parks of Combe Valley (between Bexhill and Hastings), Alexandra Park (central Hastings) and Fairlight (a nationally designated country park east of Hastings) - referred to as the Green Lungs - west to east across Hastings through the residential areas to employment centres (industrial estates) and the town centre. The proposed routes will also support development emerging through the Hastings Local Plan, and link into the proposed greenway that would be delivered as part of the Bexhill Hastings Link Road. Newhaven - on key corridors to the town centre and industrial estates from the residential areas (South Heighton, Denton and Harbour Heights). de-clutter the streets of unnecessary signage, therefore providing improvements to the public realm, and will also inform people who choose to walk or cycle of the most appropriate and safest routes to use. new or upgraded pedestrian/cyclist crossing facilities: Eastbourne Upgrade a crossing on the NCN 21 at Cross Levels Way/Lottbridge Drove roundabout. Hastings and Ore Rail Station pedestrian links to Hastings rail station from the town centre and to Ore Station from the Ore Valley Millennium Community extension to existing cycle routes: Bexhill New connection from the NCN2 coastal cycle route (which links Hastings and Bexhill) to St Richards Catholic College. Element CT3 - Working together for travel behaviour change Summary Measure Where will it be delivered Who it will target Active Travel Co-ordinator employed by Public Health Dept Bexhill, Hastings, Eastbourne, Newhaven Employees at key places of employment and education (119 organisations) across the coastal towns Personalised packages of measures within organisations and local business Bexhill, Hastings, Eastbourne, Newhaven Employees at key places of employment and education (119 organisations) across the coastal towns C1.19 A key engagement method is fundamental in order to ensure that organisations, businesses and educational establishments participate, and are receptive to the range of marketing campaigns, sustainable travel initiatives and infrastructure measures that will be delivered

15 C1.20 To achieve this, an Active Travel Co-ordinator will be employed by the Public Health team to work with organisations, businesses and educational establishments across the four towns. As the main point of contact for the programme, the Active Travel Co-ordinator will deliver active travel planning and develop a personalised package of measures from the sustainable travel initiatives, marketing campaigns and infrastructure that will be delivered as part of the programme in CT1, CT2 & CT4. The Co-ordinator will facilitate collaboration between organisations and help ensure sustainable travel is embedded into an organisation s culture through its processes, plans and strategies. C1.21 To support engagement with organisations, local businesses and educational establishments, existing relationships developed through other County Council business related projects such as the green business project Local Carbon Essentials. All schools across the coastal towns developed travel plans as part of the DfT/DfE Travelling to School Initiative, therefore we will utilise the existing relationships established during this programme of work. We will target a number of key organisations and businesses including: C.1.22 Public sector employees: examples include borough and district councils, and hospitals Eastbourne District and Hastings Conquest Hospitals Large private sector employers: examples include Hastings Direct, SAGA (Hastings), Gardners Books (Eastbourne), Newhaven Port & Properties Key Places of education: including Sussex Coast College, Bexhill College, Brighton University Campus Eastbourne, the University Centres 1 & 2 Hastings, the South Downs College Eastbourne and colleges, secondary and primary schools across the four towns. Engagement of small and medium enterprises to deliver measure as a collective: through existing business support networks for example the Chambers of Commerce and the Federation of Small Businesses. Along with the number of active travel initiatives that will be provided and the promotion of bus and rail travel, we will promote the benefits of home working enabled by improvements to broadband in the county at business breakfasts in the towns, as a mechanism to help reduce workplace travel. C1.23 Working alongside the Active Travel Co-ordinator and using existing ESCC resources, large organisations in the four towns that are not currently signed up to the County s TravelChoice website will be targeted to sign up to an enhanced website and car share database referred to in CT1. C1.24 To support businesses and organisations, an online forum hosted on the TravelChoice website will be developed to enable the sharing of good practice. An online sustainable travel toolkit will also be developed to provide continued support following the end of the programme. Element CT4 - Let s Get Moving Summary Measure Where will it be delivered Who it will target Active Travel Initiatives including Bike It Bexhill, Hastings, Eastbourne, Newhaven Employees and students at key establishments who travel less than 5km Walking and Cycling Challenges Bexhill, Hastings, Eastbourne, Newhaven Key workplaces and schools within the coastal towns Adult Cycle Training Bikeability Training Level 3 Bexhill, Hastings, Eastbourne, Newhaven Residents of and employees within the coastal towns Cycle Parking Advanced Stop Lines at key junctions Cycle Maintenance Initiative Promotion of existing walking/cycling routes Across the four towns & key employers/educational establishments Bexhill, Hastings, Eastbourne, Newhaven Bexhill, Hastings, Eastbourne, Newhaven Bexhill, Hastings, Eastbourne, Newhaven Key destinations for cyclists, including key employment areas Existing and new cyclists travelling within, into and out of the coastal towns Residents and employees within the coastal towns New cyclists and pedestrians travelling for work/education purposes

16 C1.25 Equipping people with training, or bringing a fun and competitive element that improves people s confidence to try sustainable ways of travel will help achieve long term travel behaviour change to sustainable modes. C1.26 Working closely with the Active Travel Co-ordinator, Sustrans and ESCC will deliver a package of measures called Active Travel that combines training, challenges and initiatives to make sustainable travel a viable option for journeys to work and education. This will be targeted at schools, colleges and organisations and businesses where walking and cycling is a viable option to driving for people who live less than 2km if walking, or less then 5km, if cycling, from their workplace or school. This element will be closely supported by the measures identified in element CT3 of the programme. C1.27 Delivery of the Bike It Initiative will provide intensive support to promote cycling within organisations and schools, including incentive schemes, events, training and maintenance training. This would target over 100 employers and schools over the programme period. C1.28 An annual Walking & Cycling Challenge will be offered to all workplaces and schools to motivate and encourage involvement in a four town wide event, to promote active travel to work. C1.29 Bespoke promotions of existing walking/cycling routes to targeted employers, schools and colleges, to demonstrate how local routes link with employment in the towns. This will be complemented by Bike It at larger organisations and for smaller organisations Cycle Training - Bikeability Training Level 3 will be delivered. This should support and enable more people to travel with confidence and safety on roads and cycle routes in the town. C1.30 The initiatives will be supported by the delivery of cycle parking at key trip attractors, employment centres and in the town centres along with advanced stop lines at key junctions. C1.31 To support these initiatives investment will be provided to local cycle groups to provide cycle maintenance equipment to allow the organisation to work alongside the Bike It Initiative and cycle training with employers, to provide a Dr Bike initiative. Element CT5 - Wheels 2 Work & Education and Jobcentre Plus Initiatives Summary Measure Where will it be delivered Who it will target Wheels to Work & Education Eastbourne, Newhaven, Bexhill, Hastings and their immediate hinterlands New employees in the coastal towns to access employment or skills training. 40 Job Seekers/NEETS annually 120 over the bid period Travelling to training and work opportunities resource materials for Job Centre Plus Community Transport grants to offer transport solutions for young people Eastbourne, Newhaven, Bexhill, Hastings and their immediate hinterlands Eastbourne, Newhaven, Bexhill, Hastings and their immediate hinterlands New employees in the coastal towns to access employment. All Job Centre Plus clients applying for job seekers allowance from August 2012 will be provided with advice Young people in the coastal towns in order to access employment and education. Young people identified through East Sussex County Council - Partnership Manager (Education, Employment & Training)

17 C1.32 With rising unemployment rates in the four coastal towns, we will work in partnership with Jobcentre Plus, Work Programme providers and ESCC Children s Services (Education, Employment and Training team) to deliver this element by targeting people returning to work or who are accessing training and /or work experience. C1.33 Transport is often cited as a barrier to accessing employment and training by clients being supported by Jobcentre Plus and young people. These barriers include the cost of travel; the time travel takes often incurring two separate bus journeys or one train and one bus journey, the lack of appropriate travel choices or simply being unaware of the travel choices that are available. In addition, people increasingly have to look beyond their local area for work opportunities, these initiatives will help support this through journey planning. C1.34 Working in partnership, the County Council and Jobcentre Plus will develop bespoke resources to improve the support and advice Job Centre Plus staff and Work Programme staff provide to job seekers in relation to travelling to training and work opportunities. This will be through website development, staff training and leaflets. Rising unemployment is resulting in people having to look beyond their local area for job opportunities and this initiative will provide support. C1.35 To provide improved access to employment opportunities and remove the transport barriers associated with this, a Wheels 2 Work and Education scheme will be delivered. The key delivery partners include Action in Rural Sussex (AiRS) who are the key work programme provider in this part of the county, along with Job Centre Plus and the County Council Children Services department. The scheme will be subject to a tendering process and will make cycles, electric bikes and mopeds available to people for a low fee over a year, after which time they will have the opportunity to purchase the cycle or moped. C1.36 This initiative will be targeted at job seekers across the bid area identified through the Job Centre and the Work Programme provider for those people who are returning to work. It will also target the most vulnerable year olds not in education, employment or training (NEETS), these young people will be identified through the County Council NEETS Partnership Manager. C1.37 To identify candidates eligibility, criteria will be developed that include consideration of income, whether the job is temporary or permanent, full or part time, location of the new job or training, the frequency of the transport links to the job and transport costs. This initiative has the potential to support 40 people annually and over 100 within the programme period. C1.38 As part of the continuation strategy, the key aim will be to develop the scheme into a social enterprise, which will maximise the opportunity to support more people in the future. We have been developing contacts with local businesses and with moped and electric bike distributors in order to ensure their support and possible sponsorship if the scheme is funded through the LSTF. C1.38 This will also deliver additional transport solutions for young people living in the rural hinterland that rely on access to the four coastal towns for employment, training opportunities and services. C1.39 A grants scheme for Community Transport providers will also be provided to offer transport solutions for young people to access employment, training opportunities and services to reduce the issues surrounding rural isolation. Working in partnership with Children s Services, young people will be identified through existing NEET support programmes (Work Pairing, LEARN and Apprenticeships) Young people taking up an apprenticeship may have to travel further afield to take up the learning element of the apprenticeship if it is being delivered in a college or other providers premises, thus causing another transport barrier and cost implication when the person is already on low income. C1.40 ESCC will offer one-off grants to Community Transport providers to enhance existing community transport schemes and establish new ones. CT Providers will have the opportunity to apply for one-off grants of up to 10,000 (minimum of 4 available) and up to 5,000 (minimum 4 available) over the programme period. This will build on the investment made in Community Transport over the last few years, initialling using County Council funding and latterly using Government s Community Transport grant funding. C2. Package Costs C2.1 A detailed breakdown of the costs for each of the elements is included in Appendix 3. Whilst we have costed for a LSTF Programme Manager in this and our joint bid with the South Downs National Park, subject to the success of our bids, we believe that only one Programme Manager is necessary to deliver either or both programmes. Further details of the delivery structure are outlined in section E

Cycle network linking Wolverhampton city centre and Bilston town centre with employment sites and residential areas:

Cycle network linking Wolverhampton city centre and Bilston town centre with employment sites and residential areas: Context and Problems Corridor length 12.3 km; Population within 800m 59,922; Jobs within 800m 59,100; Unemployment 11%; Average Index of Multiple Deprivation 46; Households with no car 45%; Proportion

More information

Local Sustainable Transport Fund 15/16 Revenue Application Form

Local Sustainable Transport Fund 15/16 Revenue Application Form Local Sustainable Transport Fund 15/16 Revenue Application Form Local transport authority name(s): East Sussex County Council Bid Manager Name and position: Jonathan Wheeler, Team Manager, Strategic Economic

More information

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016 Context. Author: Parish Clerk 2 The Draft Integrated Transport Policy (DITS) sets out a vision and objectives, and identifies a detailed programme of interventions to support the Maidstone Borough Local

More information

9. Parking Supporting Statement

9. Parking Supporting Statement 9. Parking Supporting Statement Content 1. Setting the Scene 2. Vision 3. Parking and the Shared Priorities 4. Issues 5. Delivery Programme in the first Plan Period 2001/02 2005/06 6. Good Practice 7.

More information

Local Sustainable Transport Fund

Local Sustainable Transport Fund I II III Sustainable travel in Greater Manchester: The journey to a low carbon economy Greater Manchester has a vision of sustainable commuting at the heart of its blueprint for a low carbon economy, as

More information

PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK

PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK Elaine Brick Principal Transport Planner AECOM Abstract Smarter Travel funding was awarded to the Chartered Institute of Highways and Transportation

More information

Walking and Cycling Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland

Walking and Cycling Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland Walking and Cycling Action Plan Summary A Catalyst for Change The Regional Transport Strategy for the west of Scotland 2007-2021 Strathclyde Partnership for Transport Contents Purpose...2 Issues, Constraints

More information

London Cycle Network Annual Report 2000

London Cycle Network Annual Report 2000 London Cycle Network Annual Report 2000 A cycle network for London by 2005 A cycle network for London by 2005 The London Cycle Network will: provide local links between residential neighbourhoods, railway

More information

University of Leeds Travel Plan

University of Leeds Travel Plan University of Leeds Travel Plan 2015-2018 Contents 1: Introduction 1.1 What is a Travel Plan? 1.2 Why do we need one? 1.3 Sustainability Strategy 2: Overview 2.1 The bigger picture 2.2 The City scale 2.3

More information

Active Travel Strategy Dumfries and Galloway

Active Travel Strategy Dumfries and Galloway Active Travel Strategy Dumfries and Galloway Our Active Travel Strategy The agreed Interventions for Dumfries and Galloway Council s Local Transport Strategy includes an action to Develop an Active Travel

More information

Contents Location Map Welcome and Introduction Travel Plan Management Science Park Accessibility Walking Cycling Bus Rail Car Sharing Contact Details

Contents Location Map Welcome and Introduction Travel Plan Management Science Park Accessibility Walking Cycling Bus Rail Car Sharing Contact Details Contents Contents Location Map Welcome and Introduction Travel Plan Management Science Park Accessibility Walking Cycling Bus Rail Car Sharing Contact Details 1 2 3 5 7 9 11 13 15 17 19 Thames Valley Science

More information

Active travel and economic performance: A What Works review of evidence from cycling and walking schemes

Active travel and economic performance: A What Works review of evidence from cycling and walking schemes 1 Making the economic case for active travel Active travel and economic performance: A What Works review of evidence from cycling and walking schemes Active Travel Toolkit Slide Pack July 2017 Active travel

More information

WEST YORKSHIRE LTP CYCLE PROSPECTUS

WEST YORKSHIRE LTP CYCLE PROSPECTUS WEST YORKSHIRE LTP CYCLE PROSPECTUS The West Yorkshire Ambition: To be recognised as a great place for safe cycling, inspiring more people to cycle more often. INTRODUCTION Cycling is low cost, environmentally

More information

SUSTAINABLE TRAVEL TOWNS: RESULTS AND LESSONS

SUSTAINABLE TRAVEL TOWNS: RESULTS AND LESSONS SUSTAINABLE TRAVEL TOWNS: RESULTS AND LESSONS Joe Finlay Sustainable Travel Team Department for Transport (UK) Introduction I will: Give brief background on the Sustainable Travel Towns and the projects

More information

What s the issue for transport in Cardiff?

What s the issue for transport in Cardiff? Demand for travel The number of commuters travelling to work in Cardiff has increased from 190,000 in 2001 to 198,000 in 2010, with some 124,000 Cardiff residents travelling across the city daily to their

More information

Cambridgeshire Local Transport Plan Policies and Strategy

Cambridgeshire Local Transport Plan Policies and Strategy Cambridgeshire Local Transport Plan 2011 2026 Policies and Strategy John Onslow Acting Executive Director of Environment Services Cambridgeshire County Council Shire Hall Castle Hill Cambridge CB3 0AP

More information

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025 ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025 May 2016 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable.

More information

GD 0043/18 ACTIVE TRAVEL STRATEGY

GD 0043/18 ACTIVE TRAVEL STRATEGY GD 0043/18 ACTIVE TRAVEL STRATEGY 2018-2021 May 2018 Minister s Introduction There is strong evidence that regular physical activity reduces the risk of a range of health conditions. The best way to increase

More information

Active Travel Towns Funding Scheme Project Proposal. Sligo. Sligo Local Authorities

Active Travel Towns Funding Scheme Project Proposal. Sligo. Sligo Local Authorities Active Travel Towns Funding Scheme 2014-2016 Project Proposal for Sligo by Sligo Local Authorities Introduction Over the last two years, Sligo Local Authorities have implemented years 1 & 2 of their 5

More information

Appendix N(b): Portishead Station Outline Travel Plan

Appendix N(b): Portishead Station Outline Travel Plan Portishead Branch Lane (MetroWest Phase 1): Environment Impact Assessment Appendix N(b): Portishead Station Outline Travel Plan Prepared for West of England Councils September 2017 1 The Square Temple

More information

Launceston's Transport Futures. Greater travel options for the people of Launceston

Launceston's Transport Futures. Greater travel options for the people of Launceston Launceston's Transport Futures Greater travel options for the people of Launceston Final Draft 13 Jan 2014 1 Page Number Executive summary 3 What is Transport Futures? 4 Vision 6 Economy, access and liveability

More information

Living Streets response to the Draft London Plan

Living Streets response to the Draft London Plan Living Streets response to the Draft London Plan Contents Living Streets response to the Draft London Plan... 1 About Living Streets... 2 Summary... 2 Consultation response... 3 Chapter 1: Planning London

More information

Capital Project Business Case Bexhill & Hastings Movement & Access Programme

Capital Project Business Case Bexhill & Hastings Movement & Access Programme Capital Project Business Case Bexhill & Hastings Movement & Access Programme Version control Document ID LS/BHMAP Version V2 Author Lisa Simmonds/Tessa Sweet-Escott Document status FINAL Authorised by

More information

Government transport policy

Government transport policy Government transport policy and the implications for planning RTPI TPS Transport Planning Network James Harris P o l i c y a n d N e t w o r k s M a n a g e r R o y a l To w n P l a n n i n g I n s t i

More information

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development BELFAST RAPID TRANSIT Ciarán de Búrca Director, Transport Projects Division Department for Regional Development Objectives of Belfast Rapid Transit To provide a modern, safe, efficient and high quality

More information

DOE Climate Change Proposals

DOE Climate Change Proposals DOE Climate Change Proposals Sustrans response to Proposals for Taking Forward NI Climate Change Legislation January 2016 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable.

More information

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria,

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria, 1.0 Introduction 1.1 The Transport Assessment has been prepared on behalf of Eon and Roger Bullivant Ltd in respect of the proposed mixed use sustainable urban extension of Drakelow Park. 1.2 The methodology

More information

Transport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age.

Transport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age. Transport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age 30 th March 2015 1 Presentation Overview Roles and responsibilities Snapshot of Key Challenges

More information

National Transport Awards Cambridge Park & Ride

National Transport Awards Cambridge Park & Ride National Transport Awards Cambridge Park & Ride What Cambridgeshire has achieved q An award winning scheme focussed on quality. q Four sites, with a fifth site due to be built later this year. q 950,000

More information

Nottingham Cycle City Frequently Asked Questions

Nottingham Cycle City Frequently Asked Questions Nottingham Cycle City Frequently Asked Questions About the scheme How much money is to be spent on cycling? And where is the money from? We have 6.1 million in Growth Fund which we will be investing directly

More information

PEDESTRIAN ACTION PLAN

PEDESTRIAN ACTION PLAN ATTACHMENT 2 CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN This page intentionally left blank EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY Setting the Stage

More information

Final Plan 20 December 2016

Final Plan 20 December 2016 Final Plan 20 December 2016 Introduction Aims of the Travel Plan How do we travel? Understanding travel behaviours? The University Master Plan and its implications Galway City sustainable transport policies

More information

Chapter Title. 1. Introduction Outline of Our LSTF Programme Outputs vs. Outcomes Background to LSTF in Merseyside 3

Chapter Title. 1. Introduction Outline of Our LSTF Programme Outputs vs. Outcomes Background to LSTF in Merseyside 3 Merseyside LSTF Baseline Report Content Chapter Title Page 1. Introduction 1 1.1 Outline of Our LSTF Programme 1 1.2 Outputs vs. Outcomes 2 2. Background to LSTF in Merseyside 3 2.1 Merseyside LSTF 3 2.2

More information

Birmingham Connected. Edmund Salt. Transportation Policy Birmingham City Council

Birmingham Connected. Edmund Salt.   Transportation Policy Birmingham City Council Birmingham Connected Edmund Salt Transportation Policy Birmingham City Council www.birmingham.gov.uk/connected Birmingham Connected the story so far Broadly following EU Guidance We ve done all of this

More information

Rochester Area Bike Sharing Program Study

Rochester Area Bike Sharing Program Study roc bike share Rochester Area Bike Sharing Program Study Executive Summary ~ January 2015 JANUARY 2015 8484 Georgia Avenue, Suite 800 Silver Spring, MD 20910 3495 Winton Pl., Bldg E, Suite 110 Rochester,

More information

Sandwell General Hospital Travel Plan 2014

Sandwell General Hospital Travel Plan 2014 Sandwell General Hospital Travel Plan 2014 Travel Plan Survey Dated 24 th June 2013 Travel plan finalised March 2014 Prepared by Michael Raynor, JMP Consultants Ltd Site Address Lyndon, West Bromwich,

More information

Cycling and Walking Investment Strategy & Local Cycling and Walking Infrastructure Plans

Cycling and Walking Investment Strategy & Local Cycling and Walking Infrastructure Plans Cycling and Walking Investment Strategy & Local Cycling and Walking Infrastructure Plans 1 Investing in cycling and walking contributes to a broad range of cross-cutting policy objectives Cycling and walking

More information

Loughborough University Travel Planning

Loughborough University Travel Planning Document Ti tle Client Name Loughborough University Travel Planning Loughborough University Travel Plan Executive Summary 2015-2020 23 December 2015 Loughborough University Travel Planning Project no:

More information

A1307 Haverhill to Cambridge: Approval to consult on transport improvement concepts

A1307 Haverhill to Cambridge: Approval to consult on transport improvement concepts Report To: Greater Cambridge City Deal Executive Board 3 March 2016 Lead Officer: Graham Hughes, Executive Director of Economy, Transport and Environment, Cambridgeshire County Council A1307 Haverhill

More information

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013 Douglas Land Use and Transportation Strategy (DLUTS) Summary August 2013 Background Douglas is a large and popular residential suburb of approximately 30,000 persons on the periphery of Cork City along

More information

2. Context. Existing framework. The context. The challenge. Transport Strategy

2. Context. Existing framework. The context. The challenge. Transport Strategy Transport Strategy Providing quality connections Contents 1. Introduction 2. Context 3. Long-term direction 4. Three-year priorities 5. Strategy tree Wellington City Council July 2006 1. Introduction Wellington

More information

Part 3: Active travel and public transport planning in new housing developments

Part 3: Active travel and public transport planning in new housing developments 1 Linking active travel and public transport to housing growth and planning Part 3: Active travel and public transport planning in new housing developments Active Travel Toolkit Slide Pack July 2017 Linking

More information

Speed Limit Policy Isle of Wight Council

Speed Limit Policy Isle of Wight Council APPENDIX B Speed Limit Policy Isle of Wight Council 2009 Contents Section 1 Introduction 1.1 Links with the Local Transport Plan Section 2 Speed Limits on Urban Roads and Residential Areas 2.1 20mph Limits

More information

LEEDS BECKETT UNIVERSITY. Transport Strategy

LEEDS BECKETT UNIVERSITY. Transport Strategy LEEDS BECKETT UNIVERSITY Transport Strategy 2016-2021 2 3 Contents 1. Introduction 1. Introduction...3 Scope of the Document...3 Vision...3 Key Successes...3 2. Our Travel Behaviour...4 Staff and Student

More information

ABERDEEN: CITY OF THE FUTURE

ABERDEEN: CITY OF THE FUTURE ABERDEEN: CITY OF THE FUTURE A contribution towards discussions on a future transport strategy for Aberdeen and its Region Prepared by the Centre for Transport Research University of Aberdeen June 2010

More information

Map 1 shows the two roads, and how they fit into the public transport network in and around Cambridge.

Map 1 shows the two roads, and how they fit into the public transport network in and around Cambridge. Milton Road and Histon Road corridors bus priority infrastructure 1. Purpose The County Council would like to understand in more detail, the options to deliver the most effective corridor-based public

More information

Transportation Master Plan Advisory Task Force

Transportation Master Plan Advisory Task Force Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved

More information

Bristol City Council has produced a draft Bristol Transport Strategy document.

Bristol City Council has produced a draft Bristol Transport Strategy document. Bristol Transport Strategy Summary Document Introduction Bristol City Council has produced a draft Bristol Transport Strategy document. The Strategy fills a gap in transport policy for Bristol. We have

More information

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design Cycle traffic and the Strategic Road Network Sandra Brown, Team Leader, Safer Roads- Design Highways England A Government owned Strategic Highways Company Department for Transport Road Investment Strategy

More information

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description University of Victoria Campus Cycling Plan Terms of Reference 1.0 Project Description The Campus Cycling Plan, a first for the University, will provide a comprehensive and coordinated approach to support

More information

The role of the Authority in promoting sustainable transport. Gerry Murphy South East Regional Assembly 27 th May 2011

The role of the Authority in promoting sustainable transport. Gerry Murphy South East Regional Assembly 27 th May 2011 The role of the Authority in promoting sustainable transport Gerry Murphy South East Regional Assembly 27 th May 2011 Who we are National Transport Authority established on 1 st December 2009 Dublin Transport

More information

Strategy for Walking & Cycling Action Plan

Strategy for Walking & Cycling Action Plan Strategy for Walking & Cycling Action Plan To achieve higher levels of walking and cycling activity, the destinations which people access have to be available within suitable distances and designed to

More information

A future cycle route network for North Staffordshire mb/08/16 Need for a strategy. Existing cycle route network

A future cycle route network for North Staffordshire mb/08/16 Need for a strategy. Existing cycle route network Need for a strategy 1. The government s aim is to double cycling levels nationally by 2025 [note 1]. This would bring significant health, environmental, economic and traffic benefits [note 2]. It is widely

More information

Using parking policy and parking levies to tackle transport and environmental issues

Using parking policy and parking levies to tackle transport and environmental issues Using parking policy and parking levies to tackle transport and environmental issues Stephen Joseph, Chief Executive Campaign for Better Transport Campaign for Better Transport Charitable trust promoting

More information

Guildford Borough (Draft)

Guildford Borough (Draft) ITEM Annex Page 7 Guildford Borough (Draft) Forward Programme Part A This is a work in progress and its completion is subject to the adoption of the Local Plan and Infrastructure Delivery Schedule November

More information

CYCLING CHARTER ACTION PLAN EXECUTIVE SUMMARY

CYCLING CHARTER ACTION PLAN EXECUTIVE SUMMARY CYCLING CHARTER ACTION PLAN EXECUTIVE SUMMARY THE VISION OF THE CYCLING CHARTER To realise the full potential of cycling s contribution to the health and wealth of the West Midlands creating more sustainable

More information

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY HAMILTON BIKING PLAN 2015-2045 OUR VISION: A BIKE FRIENDLY CITY INTRODUCTION Biking as a travel option is experiencing a resurgence internationally and in New Zealand, growing as a familyfriendly and healthy

More information

High frequency bus services operating to Little Island; Creation of a new Park and Ride site and train station at North Esk;

High frequency bus services operating to Little Island; Creation of a new Park and Ride site and train station at North Esk; Cork County Council 7 th December 2018 Dear Adrian O Neill (aoneill@jbbarry.ie) The Transport and Mobility Forum, Cork (TMF) is a representative group of organisations who have a common interest in sustainable

More information

CHAPTER 7.0 IMPLEMENTATION

CHAPTER 7.0 IMPLEMENTATION CHAPTER 7.0 IMPLEMENTATION Achieving the vision of the Better Streets Plan will rely on the ability to effectively fund, build and maintain improvements, and to sustain improvements over time. CHAPTER

More information

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE 21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE 21.07-1 Connectivity and Choice Transport connectivity and mode choice are critical to achieving productive, sustainable and socially just cities. Travel

More information

Service Business Plan

Service Business Plan Service Business Plan Service Name Transportation Planning Service Type Public Service Owner Name Kaylan Edgcumbe Budget Year 2019 Service Owner Title Service Description Manager of Transportation Planning

More information

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017 A127/A130 Fairglen Interchange Improvement Schemes Information Leaflet February 2017 1 2 Foreword By Councillor Kevin Bentley Essex is continuing to grow as a vibrant economic hub and as a fantastic place

More information

GETTING WHERE WE WANT TO BE

GETTING WHERE WE WANT TO BE CAMBRIDGESHIRE & peterborough GETTING WHERE WE WANT TO BE A GREEN PARTY TRANSPORT POLICY CONTENTS Our Campaign Priorities 4 Bus Franchising 6 Supporting Active Transport 8 Workplace Parking Levy 9 Tackling

More information

Kelowna On the Move. Pedestrian and Bicycle Master Plan

Kelowna On the Move. Pedestrian and Bicycle Master Plan Kelowna On the Move Pedestrian and Bicycle Master Plan Executive Summary April 2016 Purpose of the Plan The Pedestrian and Bicycle Master Plan identifies infrastructure, planning, and policy requirements

More information

WEST HATCH HIGH SCHOOL THE BEST THAT I CAN BE. School Travel Plan

WEST HATCH HIGH SCHOOL THE BEST THAT I CAN BE. School Travel Plan WEST HATCH HIGH SCHOOL THE BEST THAT I CAN BE School Travel Plan Policy reviewed June 2017 TABLE OF CONTENTS Context... 3 Purpose... 3 Scope... 3 1.0 Introduction... 4 2.0 Existing Conditions... 4 3.0

More information

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Exhibit 1 PLANNING COMMISSION AGENDA ITEM Exhibit 1 PLANNING COMMISSION AGENDA ITEM Project Name: Grand Junction Circulation Plan Grand Junction Complete Streets Policy Applicant: City of Grand Junction Representative: David Thornton Address:

More information

Greater Cambridge City Deal Executive Board & Joint Assembly

Greater Cambridge City Deal Executive Board & Joint Assembly Greater Cambridge City Deal Executive Board & Joint Assembly Welcome to the Call for Evidence on tackling congestion in Cambridge Launch Event 11 th November 2015 Bob Menzies Service Director: Strategy

More information

Wayfinding and Walking in London. Lilli Matson Transport for London May 2013

Wayfinding and Walking in London. Lilli Matson Transport for London May 2013 Wayfinding and Walking in London Lilli Matson Transport for London May 2013 I want to make walking in London as attractive and enjoyable as possible by making walking count Mayor of London Boris Johnson

More information

Your views are important. Please fill in a form before you leave. Or alternatively

Your views are important. Please fill in a form before you leave. Or alternatively Drum Property Group is delighted to welcome you to this exhibition which sets out our initial proposals for a mixed-use development at Stead s Place, Edinburgh. We are keen to hear the views of local people

More information

Regional Cycle Programme Update

Regional Cycle Programme Update Agenda Item 10 (ii) Regional Cycle Programme Update Glossary Auckland Council Auckland Transport Cycle Action Auckland New Zealand Transport Agency Regional Cycle Network (AC) (AT) (CAA) (NZTA) (RCN) Executive

More information

CSRM Modelling Summary Report for Cambridge and South Cambridgeshire Local Plans July 2013

CSRM Modelling Summary Report for Cambridge and South Cambridgeshire Local Plans July 2013 CSRM Modelling Summary Report for Cambridge and South Cambridgeshire Local Plans July 2013 Prepared by WSP Group and Atkins EXECUTIVE SUMMARY This Summary Report outlines the work undertaken by WSP Group

More information

End of the motor car age: the evidence and what could follow

End of the motor car age: the evidence and what could follow 1 of 18 End of the motor car age: the evidence and what could follow Kiron Chatterjee and Geoff Dudley Centre for Transport & Society UWE, Bristol Gary Numan - sign of the times? Here in my car I feel

More information

Technical note. 1. Introduction

Technical note. 1. Introduction Project: A428 study - Phase 2 To: Adrian Shepherd Subject: Park & Ride site locations From: Atkins Date: Jun 3, 2016 cc: Ashley Heller 1. Introduction 1.1. Purpose of Technical Note The purpose of this

More information

Phone: Ref No: 06/2018/0884

Phone: Ref No: 06/2018/0884 Development Directorate Preston City Council Town Hall Lancaster Road Preston PR1 2RL FAO Ben Sandover Phone: 01772 533855 Email: david.allen@lancashire.gov.uk Ref No: 06/2018/0884 Date: 20 September 2018

More information

Reflections on our learning: active travel, transport and inequalities

Reflections on our learning: active travel, transport and inequalities Reflections on our learning: active travel, transport and inequalities Jill Muirie Glasgow Centre for Population Health Active travel definition Active travel refers to walking, cycling or using some other

More information

DRAFT for a State Policy for Healthy Spaces and Places

DRAFT for a State Policy for Healthy Spaces and Places DRAFT for a State Policy for Healthy Spaces and Places 1 DRAFT State Policy for Healthy spaces and Places 1. Purpose To encourage the use and development of land that builds healthy communities through

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012 CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012 Item 31, Report No. 39, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan

More information

Greater Bristol Bus Network Major Scheme Business Case. Chapter 2. Strategic

Greater Bristol Bus Network Major Scheme Business Case. Chapter 2. Strategic Greater Bristol Bus Network Major Scheme Business Case Chapter 2 Strategic i ii 2. Strategic INTRODUCTION 2.1 In our July 2005 Programme Entry bid submission to the Department we described how the Greater

More information

Cambridge Access and Capacity Study

Cambridge Access and Capacity Study Report To: Greater Cambridge City Deal Executive Board 9 June 2016 Lead Officer: Graham Hughes, Executive Director, Economy and Environment, Cambridgeshire County Council Cambridge Access and Capacity

More information

CONTENTS PREFACE 1.0 INTRODUCTION AND SCOPE 2.0 POLICY AND GOVERNANCE 3.0 SUMMARY OF PROGRESS 4.0 NATURE OF DEMAND 5.0 TRAVEL AND PARKING INITIATIVES

CONTENTS PREFACE 1.0 INTRODUCTION AND SCOPE 2.0 POLICY AND GOVERNANCE 3.0 SUMMARY OF PROGRESS 4.0 NATURE OF DEMAND 5.0 TRAVEL AND PARKING INITIATIVES CONTENTS PREFACE 1.0 INTRODUCTION AND SCOPE 2.0 POLICY AND GOVERNANCE 3.0 SUMMARY OF PROGRESS 4.0 NATURE OF DEMAND 5.0 TRAVEL AND PARKING INITIATIVES 6.0. TARGETS PREFACE The University of St Andrews has

More information

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails Chapter 7 Transportation Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails 7.1 TRANSPORTATION BACKGROUND The District of Maple Ridge faces a number of unique

More information

Report to Cabinet. 18 May 2016

Report to Cabinet. 18 May 2016 Agenda Item 8 Report to Cabinet 18 May 2016 Subject: Presenting Cabinet Member: Proposed CCTV Enforcement of Traffic Contraventions in a Bus Lane (Key Decision Ref. No. HE030) Highways and Environment

More information

North West Non-Technical Summary of the Transport Assessment September 2011

North West Non-Technical Summary of the Transport Assessment September 2011 North West Non-Technical Summary of the Transport Assessment September 2011 Introduction This is a Non-Technical Summary of the findings of the Transport assessment work undertaken for the proposed North

More information

The Value of Cycle Tourism

The Value of Cycle Tourism The Value of Cycle Tourism Opportunities for the Scottish economy SUMMARY REPORT Ivan Zovko June 2013 www.scottishviewpoint.com Executive Summary BACKGROUND, SCOPE AND PURPOSE OF THE REPORT This report

More information

Local Transport Plans and sustainable transport

Local Transport Plans and sustainable transport Local Transport Plans and sustainable transport Stephen Joseph, Director, Campaign for Better Transport Challenges Climate change: transport is responsible for a quarter of UK carbon dioxide emissions

More information

North Coast Corridor:

North Coast Corridor: North Coast Corridor: Connecting People, Transportation & Environment Legislative Hearing: 11.8.10 1 North Coast Corridor Region s Lifeline A Regional Strategy Mobility, Economy & Environment North Coast

More information

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm IAN WHITE ASSOCIATES Crawley Station Gateway Public Realm contents 1. objectives & client brief 2. site appraisal 3. best practice guidance 4. design concept 1. objectives & client brief Crawley Train

More information

City of Perth Cycle Plan 2029

City of Perth Cycle Plan 2029 Bicycling Western Australia s response City of Perth Cycle Plan 2029 2012-2021 More People Cycling More Often ABOUT BICYCLING WESTERN AUSTRALIA Bicycling Western Australia is a community based, not-for-profit

More information

Joint Response to the Department for Transport Consultation on the Station Champions Report on Better Rail Stations. February 2010

Joint Response to the Department for Transport Consultation on the Station Champions Report on Better Rail Stations. February 2010 Joint Response to the Department for Transport Consultation on the Station Champions Report on Better Rail Stations Joint Response to the Better Rail Stations Consultation This response has been prepared

More information

A VISION... A city where it s normal for everyone to travel more sustainably every day, and the culture of sustainable travel is celebrated.

A VISION... A city where it s normal for everyone to travel more sustainably every day, and the culture of sustainable travel is celebrated. A VISION... Imagine a city where everyone, no matter who they are, can get around easily. A city where it is enjoyable, easy, convenient and affordable for everyone to get from A to B and where the transport

More information

Our journey a 20 year Transport Manifesto for the North East

Our journey a 20 year Transport Manifesto for the North East Our journey a 20 year Transport Manifesto for the North East Sustrans submission to North East Combined Authority (NECA). March 2016 Summary Sustrans is a leading UK charity enabling people to travel by

More information

Report to COUNCIL for decision

Report to COUNCIL for decision 17 152 Title: Section: Prepared by: Olympic Pool Business Case Community & Recreation Andrew White (Community & Recreation Manager) Meeting Date: 18 May 2017 Legal Financial Significance = Medium Report

More information

Planning for tennis in your Local Government Area. A resource from Tennis Australia

Planning for tennis in your Local Government Area. A resource from Tennis Australia Planning for tennis in your Local Government Area A resource from Tennis Australia Part 1 July 2016 ABOUT THIS RESOURCE This resource forms part of Tennis Australia's Local Government Engagement Program.

More information

Westminster s Joint Health and Wellbeing Strategy

Westminster s Joint Health and Wellbeing Strategy Westminster s Joint Health and Wellbeing Strategy 2013 2016 Response from Sustrans General comments From a strategic perspective, Sustrans welcomes the Health and Wellbeing Strategy s focus on encouraging

More information

Capital and Strategic Planning Committee. Item III - B. April 12, WMATA s Transit-Oriented Development Objectives

Capital and Strategic Planning Committee. Item III - B. April 12, WMATA s Transit-Oriented Development Objectives Capital and Strategic Planning Committee Item III - B April 12, 2018 WMATA s Transit-Oriented Development Objectives Page 24 of 76 Washington Metropolitan Area Transit Authority Board Action/Information

More information

British Road Safety: Presentation 28/10/2009 by Duncan Price, Deputy Head, Road User Safety Division

British Road Safety: Presentation 28/10/2009 by Duncan Price, Deputy Head, Road User Safety Division British Road Safety: Presentation 28/10/2009 by Duncan Price, Deputy Head, Road User Safety Division New British Road Safety Strategy Vulnerable Road Users Driving During Business Delivery with Local Organisations

More information

Manchester City Council Report for Resolution. Evaluation of phase 1 and 2 of 20mph programme

Manchester City Council Report for Resolution. Evaluation of phase 1 and 2 of 20mph programme Manchester City Council Report for Resolution Report to: Executive 8 March 2017 Subject: Report of: Evaluation of phase 1 and 2 of 20mph programme Interim Director of Highways Summary This report provides

More information

ENFIELD TOWN THE REVISED DESIGN

ENFIELD TOWN THE REVISED DESIGN TOWN THE REVISED DESIGN We re turning Enfield into a borough that encourages walking and cycling, a place that s easy for all of us to get around however we choose to travel. A greener place, with safer

More information

Cambridgeshire s Local Sustainable Transport Fund (LSTF) bid

Cambridgeshire s Local Sustainable Transport Fund (LSTF) bid From:- Please reply to: Councillor Ian Bates Box No RES1108 Shire Hall, Castle Hill, Cambridge CB3 0AP Telephone:- Cambridge (01223) 699173 E-Mail: ian.bates@cambridgeshire.gov.uk Dear Sir/Madam, Cambridgeshire

More information

UK Integrated Behaviour Change Programmes

UK Integrated Behaviour Change Programmes UK Integrated Behaviour Change Programmes 17 th November 2009 ACT TDM Summit Conference Daniel Johnson, Transport for London Nicky Ward, Steer Davies Gleave Structure 1. UK travel behaviour change 2. An