1 2017 (FY 21,22,23) Ohio CMAQ Project Selection Executive Committee September 14, 2017

2 Eligible Applicants Cities Counties Port Authorities Transportation Improvement Districts (TID) Transit Authorities Other units of government eligible to sign contracts with ODOT Public Private Partnerships

3 FHWA capital funding program Eligible Activities Must be spent on transportation projects in air quality nonattainment or maintenance areas and demonstrate emissions reduction. Air quality area includes Butler, Clermont, Hamilton and Warren OKI limits funding to urbanized area only 20% local match Categories Demand Management Transportation Control Measures Intelligent Transportation Systems Pedestrian and Bicycle Programs Shared Ride Traffic Flow Improvements Transit Improvements Freight/Intermodal

4 Ohio Statewide Urban CMAQ Committee (OSUCC) Statewide process for 8 largest MPO s in Ohio Developed statewide process and application Cost effectiveness in reducing congestion and vehicle emissions is a priority

5 Call for FY applications received $34 million requested Funding Available $35 M available based OKI annual allocation prior to statewide program

6 OSUCC Scoring (100 points max) Criteria Max Points Available 1 Project Type 10 2 Cost Effectiveness (per emission reduced) 20 3 Other Benefits (safety, fixed route transit, bike/ped, freight EJ) 10 4 Existing Modal Level-of-Service 15 5 Positive Impact on Level-of-Service 15 6 Status of Project 10 7 Non-Federal Match of Requested CMAQ Funds 10 8 History of Project Delivery (0, -5 or -10 point deduction) 0 9 Regional Priority 10

7 Schedule Date April 2017 May 9, 2017 June 30, 2017 August 8, 2017 September 12, 2017 September 14, 2017 September 15, 2017 By November 30, 2017 By December 31, 2017 Action Call for Projects CMAQ workshop Applications due Prioritization subcommittee meeting ICC Recommended Approval Executive Committee Approval Projects submitted to OSUCC OSUCC identifies the recommended program of projects MPO Executive Directors approve projects for funding Application OKI Staff Scoring Prioritization Subcommittee ICC/OKI Board OSUCC MPO Executive Directors

8 Clermont Co TID-Aicholtz Rd Roundabouts Roundabouts at Eastgate Square Drive, Glen Este- Withamsville Rd (west) and Glen Este-Withamsville Rd (east) Amount Requested: $5,000,000

9 Cincinnati-Babson Extension Provide new connection between Babson Place and Hetzel Street Amount Requested: $2,860,000 New capacity is not CMAQ eligible Not recommended

10 Cincinnati-Uptown SMART Center Multi-modal transportation facility with Metro fixed route bus hub with amenities. Amount Requested: $6,600,000

11 Cincinnati-Thornton Av Improvements Dedicated crossing for pedestrian and bicycle movement across River Road and the railroads where none exists today. Amount Requested: $923,460

12 Fairfield-Gilmore/I-275 Ramp Extend existing southbound drop lane and add additional turn lane for ramp to WB I-275 Amount Requested: $784,000

13 Great Parks-Little Miami Trail Beechmont Construct 12 wide multi-use trail from the existing trail termini north of Beechmont Avenue, crossing Little Miami River via new bridge utilizing existing bridge foundations. Amount Requested: $4,320,000

14 Lebanon-Countryside YMCA Trail Construct a paved multi-use path from the existing path at the intersection of Deerfield and East St. to existing trail at the YMCA. Extend path south to Turtlecreek Union Road and over Byp 48 to Bike Park. Amount Requested: $927,755

15 Mason-US42 Roundabouts Convert two existing stop-controlled T intersections Bethany and Mason-Morrow-Millgrove Rd) to roundabouts. Construct a multi-use path. Amount Requested: $2,751,535

16 Montgomery-Pfeiffer Rd Roundabout Replace the existing 4-way stop at Pfeiffer and Deerfield with a roundabout Amount Requested: $893,575

17 Mt.Healthy-Upgrade Signals Upgrade traffic signal system with new equipment and software. Amount Requested: $923,287

18 Owensville-SR 132 and US 50 intersections Add turn lanes and upgrade signals with interconnection at the two intersections of US50 and SR132. Amount Requested: $1,572,123

19 Oxford-Oxford Area Trail Phase 3 Segment D, Chestnut Connector, Segment B east and High School Connector. Amount Requested: $1,500,000

20 Silverton-Montgomery Road Signals Upgrade signals at Highland Avenue, Sampson Lane and Elwynne Drive. Retrofit signal at Plainfield. Access Management improvements. Amount Requested: $2,374,845

21 SORTA-Bus Replacements Replacement of ten 40 diesel buses. Amount Requested: $3,103,400

22 Scoring Results Project Name Total Points Owensville-SR 132 and US 50 Intersection Improvements 80 SORTA-Transit Rolling Stock Replacement 77 Mt. Healthy-Signal System 66 Mason-US 42 Roundabouts 59 Fairfield-South Gilmore/I-275 Ramp "Y" Improvements 56 Montgomery-Pfeiffer Road and Deerfield Road Roundabout 56 Cincinnati-Uptown SMART Center 54 Hamilton County-Great Parks Little Miami Scenic Trail-Beechmont Connector 54 Silverton-Montgomery Road Corridor Improvements 40 Clermont County TID-Aicholtz Rd Roundabouts 37 Cincinnati-Thorton Avenue Improvements 35 Lebanon-Countryside YMCA Trail Extension and Realignment 35 Oxford-Area Trail Phase 3 31

23 Regional Priority (10 pts) Measure Points First Priority Project 10 Second Priority Project 7 Third Priority Project 4 Fourth Priority Project 2 All Other 0

24 Project Name Draft Funding Plan Phase CMAQ $ Requested Clermont County TID-Aicholtz Rd Roundabouts CO $5,000,000 Cincinnati-Uptown SMART Center CO $6,600,000 Cincinnati-Thornton Avenue Improvements CO $923,460 Fairfield-South Gilmore/I-275 Ramp "Y" Improvements Hamilton County-Great Parks Little Miami Scenic Trail-Beechmont Connector CO CO $784,000 $4,320,000 Lebanon-Countryside YMCA Trail Extension and Realignment CO $927,755 Mason-US 42 Roundabouts RW & CO 2,771,535 Montgomery-Pfeiffer Road and Deerfield Road Roundabout CO $893,575 Mt. Healthy-Signal System CO $923,287 Owensville-SR 132 and US 50 Intersection Imrpovements PE, DD, RW & CO $1,572,123 Oxford-Phase 3 Chestnut Fields Connector CO $1,500,000 Silverton-Montgomery Road Corridor Improvements RW & CO $2,374,845 SORTA-Transit Rolling Stock Replacement CO $3,103,400 TOTAL REQUEST $31,673,980

2017 (FY 21,22,23) Ohio CMAQ Prioritization

2017 (FY 21,22,23) Ohio CMAQ Prioritization 2017 (FY 21,22,23) Ohio CMAQ Prioritization Intermodal Coordinating Committee September 12, 2017 Eligible Applicants Cities Counties Port Authorities Transportation Improvement Districts (TID) Transit

More information

PREFERRED ALTERNATIVE IMPLEMENTATION PLAN. Prepared for. Ohio Department of Transportation, District South SR 741 Lebanon, Ohio 45036

PREFERRED ALTERNATIVE IMPLEMENTATION PLAN. Prepared for. Ohio Department of Transportation, District South SR 741 Lebanon, Ohio 45036 HAM-32F-0.00 PID 86461 PREFERRED ALTERNATIVE IMPLEMENTATION PLAN Prepared for Ohio Department of Transportation, District 8 505 South SR 741 Lebanon, Ohio 45036 Prepared by URS Corporation 564 White Pond

More information

Basalt Creek Transportation Refinement Plan Recommendations

Basalt Creek Transportation Refinement Plan Recommendations Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for

More information

Thank you for attending

Thank you for attending Improving mobility safety comfort WELCOME Thank you for attending The purpose of this meeting is to: Learn about the project Prioritize potential walking and biking improvements on Snelling Ave Gather

More information

Clackamas County Comprehensive Plan

Clackamas County Comprehensive Plan ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They

More information

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco Capital Needs In 2006, the Mayor and Board of Supervisors approved San

More information

County of Fairfax, Virginia. Department of Transportation

County of Fairfax, Virginia. Department of Transportation Fairfax County Parkway History 2 Planning began 50 years ago 1960s Washington s Regional Transportation Plan Recommends improved north/south travel Construct Capital Beltway and outer beltway Outer beltway

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements

Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements Scott King, Senior Aviation Planner Jason Gately, Senior Aviation Planner Preston Beck, Associate Planner

More information

Best Southwest Transportation Committee. North Central Texas Council of Governments Transportation Department

Best Southwest Transportation Committee. North Central Texas Council of Governments Transportation Department Best Southwest Transportation Committee North Central Texas Council of Governments Transportation Department The The Regional Regional Veloweb Veloweb Review Review NCTCOG Bicycle and Pedestrian Program

More information

Maryland State Highway Mobility Report. Morteza Tadayon

Maryland State Highway Mobility Report. Morteza Tadayon Maryland State Highway Mobility Report Morteza Tadayon Background Mobility is a Key Performance Area (KPA) in the SHA Business Plan SHA adopts a performance based approach Monitors Highway System to identify

More information

Comprehensive Collection of Stakeholder Alternatives by Mode

Comprehensive Collection of Stakeholder Alternatives by Mode 2011 Illinois Department of Transportation Comprehensive Collection of Stakeholder Alternatives by Mode October 2009 January 2011 www.dot.il.gov www.eisenhowerexpressway.com FILEY RD FILEY RD IHB RR 2

More information

Bicycle and Pedestrian

Bicycle and Pedestrian Bicycle and Pedestrian Planning for Bikeable and Walkable Communities W H O L E H E A L T H C O N F E R E N C E 0 3 / 2 2 / 2 0 1 6 R O Y G O T H I E P E N N D O T B I C Y C L E - P E D E S T R I A N C

More information

NJDOT Complete Streets Checklist

NJDOT Complete Streets Checklist Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip

More information

Most Important Part of any Plan

Most Important Part of any Plan Most Important Part of any Plan Objectives must be evaluated to determine if they have been achieved Achievement of Objectives: 10 of 13 Objectives Achieved 1 not achieved 2 not due yet Transportation

More information

Kalamazoo Area Transportation Study (KATS) Complete Streets Policy Approved: Effective: FY 2018 Projects

Kalamazoo Area Transportation Study (KATS) Complete Streets Policy Approved: Effective: FY 2018 Projects Kalamazoo Area Transportation Study (KATS) Complete Streets Policy Approved: Effective: FY 2018 Projects 1.0 Defined 2.0 Introduction/Justification 3.0 Vision & Intent 4.0 Applicability 5.0 Design 6.0

More information

R O A D W A Y S. Chapter

R O A D W A Y S. Chapter INTRODUCTION The region s roadway system carries the vast majority of person trips and is an important part of the freight movement system. Roads also provide the right of way for buses, making the roadway

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate

More information

Secondary Road Program

Secondary Road Program Secondary Road Program Joint Legislative Transportation Oversight Committee October 5, 2012 1 Secondary Roads Program The Big Picture The Secondary Road System Needs and Project Types Paved and Unpaved

More information

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Northern Virginia

More information

Rio Mills Rd/Berkmar Dr Extended Connection

Rio Mills Rd/Berkmar Dr Extended Connection SMART SCALE Application Rio Mills Rd/Berkmar Dr Extended Connection Status: Scored ID: F2-0000001408-R02 General Point of Contact Information Point of Contact Name Kevin McDermott Point of Contact Phone

More information

Seattle Transit Master Plan

Seattle Transit Master Plan Seattle Transit Master Plan Seattle City Council Transportation Committee Briefing July 26, 2011 Seattle Department of Transportation In Association with: URS Corporation SVR DKS Associates The Underhill

More information

Project Development & Environment (PD&E) Study Public Hearing January 12 th, 2006

Project Development & Environment (PD&E) Study Public Hearing January 12 th, 2006 Project Development & Environment (PD&E) Study Public Hearing January 12 th, 2006 Public Hearing Regulations Chapter 23 of United States Code 128 Title 40 of the Code of Federal Regulations Parts 1500

More information

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies Susan Shaw, PE, CCM, DBIA Megaprojects Director Northern Virginia

More information

Supervisor Cook Announces Final Plans for Braddock Road Improvement Project

Supervisor Cook Announces Final Plans for Braddock Road Improvement Project Supervisor Cook Announces Final Plans for Braddock Road Improvement Project After more than two years of study and significant community input, I am pleased to announce the final plans for the Braddock

More information

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017 Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets

More information

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations CIRCULATION AND PARKING roads and vehicular traffic The Campus Master Plan updates the campus transportation network through a multi-modal approach that encourages walking and biking while improving vehicular

More information

Palm Beach MPO Complete Streets Working Group

Palm Beach MPO Complete Streets Working Group Palm Beach MPO Complete Streets Working Group March 23, 2016 www.palmbeachmpo.org 2300 North Jog Road 4 th Floor West Palm Beach, FL 33411 561 684 4170 Agenda What are Complete Streets? Welcome Complete

More information

Rochester Downtown Bicycle Study 2009

Rochester Downtown Bicycle Study 2009 Rochester Downtown Bicycle Study 2009 Relationship of ROCOG Long Range Transportation Plan to Rochester Comprehensive Plan Regional Long Range Transportation Plan (LRTP) is prepared under the auspices

More information

Canada s Capital Region Delegation to the Velo-City Global 2010 Conference

Canada s Capital Region Delegation to the Velo-City Global 2010 Conference Canada s Capital Region Delegation to the Velo-City Global 2010 Conference Report of Findings from Visits, Meetings & Presentations In Amsterdam-Den Haag, Utrecht, Berlin & Copenhagen The Itinerary Copenhagen

More information

What Is a Complete Street?

What Is a Complete Street? Session 5 Charleen Zimmer, AICP, Zan Associates May 5-7, 2010 What Is a Complete Street? May 2010 5-1 Not a Complete Street More of a Complete Street May 2010 5-2 Benefits of Complete Streets Safety for

More information

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them? Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy

More information

Long Range Transportation Plan and Bicycle Mobility Plan

Long Range Transportation Plan and Bicycle Mobility Plan Rhode Island s Long Range Transportation Plan and Bicycle Mobility Plan State of Rhode Island DOA D I V I S I O N o f P L A N N I N G Parag Agrawal, AICP Associate Director, Division of Planning, Department

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

Orange County s Transportation Planning and Multimodal Corridor Plan

Orange County s Transportation Planning and Multimodal Corridor Plan Orange County Transportation Planning Division Orange County s Transportation Planning and Multimodal Corridor Plan Presentation to UCF LIFE November 11, 2014 Alissa Barber Torres, Ph.D., AICP, PLS Presentation

More information

Bellevue Downtown Association Downtown Bike Series

Bellevue Downtown Association Downtown Bike Series Bellevue Downtown Association Downtown Bike Series Meeting 2 Franz Loewenherz Andreas Piller Kyle Potuzak Chris Long October 26, 2017 Today s Agenda: 1) Meeting Purpose 2) 9/28 Meeting Recap 3) Candidate

More information

MEMORANDUM. Earl Haugen and UND Transportation and Traffic Coordination Committee

MEMORANDUM. Earl Haugen and UND Transportation and Traffic Coordination Committee SRF No. 7766 MEMORANDUM TO: FROM: Earl Haugen and UND Transportation and Traffic Coordination Committee Rick Lane, P.E. DATE: November 26, 2013 SUBJECT: UNIVERSITY AVE REVIEW Our review of the University

More information

Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN

Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN Public Outreach Fall 2011: Two community meetings/open houses Fall 2012: Three community meetings/open houses

More information

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE

WALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE NASHVILLE, TENNESSEE EXECUTIVE SUMMARY Executive Summary A world-class multi-modal transportation system is essential to a vibrant city and better quality of life. -Mayor Barry The WalknBike plan aims

More information

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES November 16, 2011 Deb Humphreys North Central Texas Council of Governments Bicycle and Pedestrian Advisory Committee Snapshot of the Guide 1. Introduction

More information

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017 ` SR 976 BIRD ROAD/SW 40TH STREET FROM SR 821/HEFT TO SR 5/US-1 Miami-Dade County, Florida FPID No.: 434845-4-22-01 Planning Study Project Advisory Team Meeting May 24, 2017 1 Agenda Introductions Project

More information

Rideau Canal Corridor Pedestrian Crossing Study. Queen Elizabeth Dr.: Preston St. to Laurier Ave. & Colonel By Drive: Hog s Back to Daly Ave.

Rideau Canal Corridor Pedestrian Crossing Study. Queen Elizabeth Dr.: Preston St. to Laurier Ave. & Colonel By Drive: Hog s Back to Daly Ave. Rideau Canal Corridor Pedestrian Crossing Study Queen Elizabeth Dr.: Preston St. to Laurier Ave. & Colonel By Drive: Hog s Back to Daly Ave. Background: Canal parkways evolved over past 100 years Today

More information

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m. FM 1092/Murphy Road Access Management Study Pulic Meeting #1 Wednesday, August 31, 2011 6:00 p.m. 8:00 p.m. Introductions Agency Partners H-GAC Missouri City TxDOT Introductions Consulting Team In Association

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Camden County Bus Purchase Project ID Numbers: D0601 / 068082 In the DVRPC region, a combination of fixed route, subscription, and demand responsive transit services are provided in Camden County by Senior

More information

AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014

AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014 Humboldt County Association of Governments Eureka, CA, 95501 AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014 DATE: May 1, 2014 TO: HCAOG Technical Advisory Committee (TAC) FROM:, SUBJECT: Letters of

More information

Prince George s County plans, policies, and projects

Prince George s County plans, policies, and projects Prince George s County plans, policies, and projects Over 250 projects for trails, bikeways, designated bike lanes and sidewalk construction Trail projects that improve access to Metro Sidewalk and trail

More information

Bridging the Downtown/Suburbs Divide Panel. Complete Streets Forum April 28, 2011 Daniel Haufschild, Director of Policy and Planning

Bridging the Downtown/Suburbs Divide Panel. Complete Streets Forum April 28, 2011 Daniel Haufschild, Director of Policy and Planning Bridging the Downtown/Suburbs Divide Panel Complete Streets Forum April 28, 2011 Daniel Haufschild, Director of Policy and Planning Metrolinx s Role Mission To Champion and Deliver Mobility Solutions for

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

Fairfax County Bicycle Program

Fairfax County Bicycle Program Fairfax County Bicycle Program Fairfax Bicycle Summit George Mason University October 27, 2012 Tom Biesiadny, Director Fairfax County 1 Fairfax County Comprehensive Bicycle Initiative Approved by Board

More information

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer

Colerain Avenue Roadway Improvements. Sponsored by Hamilton County Engineer Colerain Avenue Roadway Improvements Sponsored by Hamilton County Engineer Participants Lead Agency: Hamilton County Engineer Review and Approval: Ohio Department of Transportation Design Engineer: Edwards

More information

Minutes of the Joint Meeting

Minutes of the Joint Meeting Minutes of the Joint Meeting ADVISORY COMMITTEES ON TRANSPORTATION SYSTEM PLANNING AND PROGRAMMING FOR THE KENOSHA, MILWAUKEE, RACINE, ROUND LAKE BEACH, AND WEST BEND URBANIZED AREAS DATE: April 25, 2016

More information

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road West Dimond Blvd Jodhpur St to Sand Lake CSS Transportation Project Summary Municipality of Anchorage Project # 05 005 Project Manager: John Smith, P.E. (MOA PM&E) Project Administrator: Julie Makela,

More information

COMPLETE STREETS A STEP FORWARD ITE District 10/FSITE Annual Meeting November 3, 2015

COMPLETE STREETS A STEP FORWARD ITE District 10/FSITE Annual Meeting November 3, 2015 COMPLETE STREETS A STEP FORWARD 2015 ITE District 10/FSITE Annual Meeting November 3, 2015 About Lakeland Incorporated: 1885 Population: 100,728 Area: Approx. 75 sq. mi Major Employers: Publix, Lakeland

More information

Safe Routes to School

Safe Routes to School Safe Routes to School Subcommittee on Design Chicago, June 2005 Dick Albin Assistant State Design Engineer Washington State Department of Transportation Safe Routes to School Benefits of education, enforcement

More information

Proposed White Flint Separated Bike Lane Network September 2015

Proposed White Flint Separated Bike Lane Network September 2015 Proposed White Flint Separated Bike Lane Network September 2015 Abstract This report includes a proposed separated bike lane network for the White Flint Sector Plan area. Separated bike lanes create a

More information

OTTAWA AVENUE NEIGHBORHOOD

OTTAWA AVENUE NEIGHBORHOOD OTTAWA AVENUE NEIGHBORHOOD 4.17.2018 RECAP September 19, 2016 Meeting Identify concerns * needs * wants of neighborhood residents Safety Improvements Ottawa Avenue, Ayersville Avenue, Cleveland Avenue,

More information

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community

RIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community Riverside Station A green, transit-oriented community October 6, 2011 TONIGHT S AGENDA: 1. Project Update (5 min.) 2. Master Plan Update (10 min.) 3.Traffic Plan Update (10 min.) Questions & Answers MASTER

More information

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment Presented by Luciano Rabito Manager of Complete Streets Presented to Bridgewater, MA Wednesday, April 26, 2017 6:30 P.M.

More information

Community Transportation Plan

Community Transportation Plan Community Transportation Plan Appendix A: Traffic Calming CITY OF DECATUR COMMUNITY TRANSPORTATION PLAN Appendix A: City of Decatur City-wide Residential Traffic Calming Program Process & Procedures The

More information

Ulster County Non-motorized Transportation Plan

Ulster County Non-motorized Transportation Plan Ulster County Non-motorized Transportation Plan NTAC Meeting NOTES Ulster County Community College Date 08.29.07 Time: 1:00 p.m. - 3:00 p.m. Agenda Welcome /Intro Project Status Report o Project is on

More information

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017 Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road October 3, 2017 Study Area (area within a ¼-mile radius of the study intersections) Route

More information

Route 7 Corridor Study

Route 7 Corridor Study Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

On June 27, the Metropolitan

On June 27, the Metropolitan TPBnews A Publication of the National Capital Region Transportation Planning Board Volume XXII, Issue 1 July/August 2014 COG Announces Kanti Srikanth as New Transportation Planning Director On June 27,

More information

PEDESTRIAN CROSSING TREATMENTS

PEDESTRIAN CROSSING TREATMENTS PEDESTRIAN CROSSING TREATMENTS BEST PRACTICES Presented by: Doug Enderson, P.E., PTOE Cody Salo, P.E. 1 PRESENTER INTRODUCTIONS Doug Enderson, P.E., PTOE Ped Crossing Experience: ADA Design-Build ADA Inventory

More information

Pinellas County Metropolitan Planning Organization (MPO) 2014 Crash Data Report

Pinellas County Metropolitan Planning Organization (MPO) 2014 Crash Data Report Pinellas County Metropolitan Planning Organization (MPO) 2014 Crash Data Report MPO Board July 8, 2015 2 Crash Data Collection Motorcycle drove between stopped cars, ran a red light and collided with a

More information

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY HAMILTON BIKING PLAN 2015-2045 OUR VISION: A BIKE FRIENDLY CITY INTRODUCTION Biking as a travel option is experiencing a resurgence internationally and in New Zealand, growing as a familyfriendly and healthy

More information

Roundabouts A Case Study and Brief Overview

Roundabouts A Case Study and Brief Overview Roundabouts A Case Study and Brief Overview Presented by: Matt Loeffler, PE, Traffic Engineer, Butler County Ohio And Jack Pflum, PE, Transportation Planning Consultant At The Traffic Engineering Workshop,

More information

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need Chapter 2 Purpose and Need 2.1 Introduction The El Camino Real Bus Rapid Transit (BRT) Project (Project) would make transit and other transportation improvements along a 17.6-mile segment of the El Camino

More information

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects -2022 Transportation Improvement Program - DRAFT Project Number Alamo Area Commute Solutions Pgm - FY 2017 5101.0 0915-12-547 AACOG Alamo Area Commute Solutions Pgm - FY 2018 5102.0 0915-12-543 AACOG Alamo

More information

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016 Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing May 2016 Overview 10-Year Transit Development Plan Premium Transit Network Columbia Pike service concept Premium amenities

More information

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related

More information

For Immediate Release September 14, 2015 Contact: Sue Chrzan Tampa Hillsborough Expressway Authority ext.

For Immediate Release September 14, 2015 Contact: Sue Chrzan Tampa Hillsborough Expressway Authority ext. For Immediate Release September 14, 2015 Contact: Sue Chrzan Tampa Hillsborough Expressway Authority sue@tampa-xway.com 813-272-6740 ext.130 (office) U.S. Transportation Under-Secretary Peter Rogoff and

More information

Project Development & Environment (PD&E) Study. November 17, SR 90 (SW 8th Street and SW 7th Street) SW 8 th Street/SW 7 th Street PD&E Study 1

Project Development & Environment (PD&E) Study. November 17, SR 90 (SW 8th Street and SW 7th Street) SW 8 th Street/SW 7 th Street PD&E Study 1 Financial Management Number: 432639-6-22-01 Federal Aid Project Number: 0202-054-P Efficient Transportation Decision Making Number: 14230 Project Development & Environment (PD&E) Study SR 90 (SW 8th Street

More information

Comments EXECUTIVE SUMMARY

Comments EXECUTIVE SUMMARY Comments 1. Under any Alternatives, MCDOT should provide better at-grade pedestrian crossing of Georgia Avenue and Forest Glen Road, including improved crosswalks with wider medians and adequate signal

More information

Chapter 7 Nonmotorized Facilities

Chapter 7 Nonmotorized Facilities Chapter 7 Nonmotorized Facilities What is in this chapter? This chapter discusses existing and proposed pedestrian and bicycle facilities referred to as nonmotorized facilities along the SR 520 corridor.

More information

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Open House Public Meeting S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Municipality of Bethel Park, Allegheny County Bethel Park Municipal Building 5001 West Library

More information

Virginia Street Bus RAPID Transit Extension Project. Environmental Assessment (EA) Presentation Public Hearing June 22, 2017

Virginia Street Bus RAPID Transit Extension Project. Environmental Assessment (EA) Presentation Public Hearing June 22, 2017 Virginia Street Bus RAPID Transit Extension Project Environmental Assessment (EA) Presentation Public Hearing June 22, 2017 Presentation to RTC July 17, 2015 Presentation Overview Project Timeline Environmental

More information

Railroad-Highway Grade Crossing Analysis for Corridor Planning Projects

Railroad-Highway Grade Crossing Analysis for Corridor Planning Projects Railroad-Highway Grade Crossing Analysis for Corridor Planning Projects Word Count: 4,305 Submission Date: August 1, 2015 Author: Adriana Rodriguez, E.I Assistant Engineer Parsons Brinckerhoff 1420 South

More information

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

5/7/2013 VIA  . RE: University Village Safeway Expansion (P13-019) 5/7/2013 VIA EMAIL David Hung, Associate Planner Community Development Department, Current Planning Division City of Sacramento 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: University Village

More information

ITEM 3 ATTACHMENT A RESOLUTION NO

ITEM 3 ATTACHMENT A RESOLUTION NO ITEM 3 ATTACHMENT A RESOLUTION NO. 2018-1575 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CALABASAS, CALIFORNIA, ADOPTING THE FISCAL YEAR 2017-18 LIST OF PROJECTS FUNDED BY SB 1: THE ROAD REPAIR AND

More information

Total Project Cost Federal Funds Local Match

Total Project Cost Federal Funds Local Match General Information Project Title: Ala Wai Pedestrian and Bicycle Safety and Mobility Project Project Location, street, zip code, and facility name: Ala Wai Boulevard between Kapahulu Avenue and Ala Moana

More information

Oldham County Major Thoroughfare Plan

Oldham County Major Thoroughfare Plan Prepared for: Oldham County Planning & Zoning Commission Prepared by: December 2003 Table of Contents I. INTRODUCTION...1 A. Contents of Report...1 B. Purpose of Study...2 C. Related Project Documents...2

More information

SANTA MONICA BOULEVARD CORRIDOR

SANTA MONICA BOULEVARD CORRIDOR CIRCULATION ELEMENT WHITE PAPER NO. 3 SANTA MONICA BOULEVARD CORRIDOR INTRODUCTION From the 1930s to the beginning of Los Angeles freeway era, Santa Monica Boulevard, (previously Route 66, the Beverly

More information

DIRECTIONS WINTER SPORTING EVENTS ALTER. Basketball 940 East David Road, Dayton, OH 45429

DIRECTIONS WINTER SPORTING EVENTS ALTER. Basketball 940 East David Road, Dayton, OH 45429 DIRECTIONS WINTER SPORTING EVENTS ALTER Basketball 940 East David Road, Dayton, OH 45429 I-75 north to I-675 north. Take the St Rt 48 /Kettering exit (it is the 2 nd St Rt 48 exit). Bear right off the

More information

FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices

FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices FY 2017-2026 Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices November 1, 2017 Forecasted Growth Arlington continues to grow with a shift towards multi-family

More information

Findings. TSTC went line-by-line through the STIP and categorized projects into 15 categories:

Findings. TSTC went line-by-line through the STIP and categorized projects into 15 categories: Tracking the Dollars 2012-2015: A Review of Planned Transportation Investments in Connecticut and what it says about Connecticut s transportation priorities The Connecticut Department of Transportation

More information

Bridge Street Corridor Study Report

Bridge Street Corridor Study Report Bridge Street Corridor Study Report Prepared for: Prepared by: BRIDGE STREET CORRIDOR STUDY REPORT PREPARED FOR: CITY OF ARROYO GRANDE COMMUNITY DEVELOPMENT DEPARTMENT 300 EAST BRANCH STREET ARROYO GRANDE,

More information

We support several of Regional Municipality of Durham Transportation Master Plan Directions such as

We support several of Regional Municipality of Durham Transportation Master Plan Directions such as OATAC-17-26 Relates to Item 1 of the O.A.T.A.C. Report (DS-17-164) We support several of Regional Municipality of Durham Transportation Master Plan Directions such as Direction 3: Make walking and cycling

More information

County Board Workshop

County Board Workshop CH 21 Downtown Reconstruction Project County Board Workshop Tuesday, October 24, 2017 CH 21 Downtown Prior Lake Reconstruction Agenda 1) Review remaining Project Alternatives 2) Public Engagement Summary

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

Rightsizing Streets: The Seattle Experience

Rightsizing Streets: The Seattle Experience Rightsizing Streets: The Seattle Experience April 30, 2013 Brian Dougherty Seattle Department of Transportation Complete Streets 16% of households do not have a car Seniors Youth Transit riders Safety

More information

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Atwood Avenue Fair Oaks Avenue Cottage Grove Road Atwood Avenue Fair Oaks Avenue Cottage Grove Road Agenda Purpose Review project scope & goals Present design alternatives Gather feedback Answer Questions Format Open House Presentation Q&A Open House

More information

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

CITY OF BLOOMINGTON COMPLETE STREETS POLICY CITY OF BLOOMINGTON COMPLETE STREETS POLICY POLICY OBJECTIVE: The City of Bloomington will enhance safety, mobility, accessibility and convenience for transportation network users of all ages and abilities,

More information

Innovative Intersections

Innovative Intersections Innovative Intersections Things You Need to Know About FDOT D-7 Safety Academy October 19, 2016 Mark Doctor FHWA Resource Center Atlanta, GA HOW DO YOU FEEL??? about innovative intersections??? Why is

More information

Living Streets Policy

Living Streets Policy Living Streets Policy Introduction Living streets balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, enhance community identity, create

More information

CHAPTER 6: TRANSPORTATION TABLE OF CONTENTS

CHAPTER 6: TRANSPORTATION TABLE OF CONTENTS CHAPTER 6: TRANSPORTATION TABLE OF CONTENTS Introduction... 6-1 Summary of Existing Conditions... 6-1 Streets and Highways... 6-1 Pavement Surface Evaluations and Rating (PASER)... 6-2 Public Transportation...

More information

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan Application of a Complete Street initiative and how it might function operationally 8 8 Southbend to Prima Vista October 30, 2017 Presentation Agenda 2 Perspective and History Traffic projections, Levels

More information