1 Report To: Greater Cambridge City Deal Executive Board 9 June 2016 Lead Officer: Graham Hughes, Executive Director, Economy and Environment, Cambridgeshire County Council Cambridge Access and Capacity Study Purpose 1. To review the outcomes of the Cambridge Access Study and the Call for Evidence on tackling congestion in Cambridge, and to decide on next steps. 2. This report sets out a proposed Congestion Reduction package to meet the objectives and achieve the vision of the Greater Cambridge City Deal, as set out in paragraphs 8 to 13 below. It recommends engaging with the public and stakeholders to gather their views on the package, prior to the Board considering whether to take the package forward at its meeting in January Recommendations 3. It is recommended that: a. The Board notes the Call for Evidence Analysis and the Cambridge Access Study Long List and Short List Reports and outcomes. b. The Board agrees the policy approach for a Congestion Reduction package, incorporating: Better bus services and expanded usage of Park and Rides Better pedestrian and cycling infrastructure Better streetscape and public realm Peak Congestion Control Points in the weekday morning and evening peak periods A Workplace Parking Levy On-Street Parking Controls (including Residents Parking) Smart Technology Travel Planning c. The Board notes the consultation and engagement principles appended to this report (see Appendix D) and agree the principles of the engagement process on the proposed Congestion Reduction package, to commence in July d. That, subject to the agreement of recommendation b), the Board endorses the proposal for a trial implementation of Peak Congestion Control Points, possibly on a phased basis in late 2017 using an experimental Traffic Regulation Order. A consultation on the Order would be held during the experimental period.
2 Executive Summary / Reasons for Recommendations 4. The strategic objectives for the Greater Cambridge City Deal and the transport vision and objectives are summarised in paragraphs 8 to 13 below. To achieve them, it is essential that congestion and delay are addressed and that capacity in and around the City Centre for pedestrians, cyclists and public transport users is increased. 5. This report sets out the work that has been undertaken by the Cambridge Access Study and the analysis of responses to the Call for Evidence on tackling congestion in Cambridge. A shortlist of measures that could be successful as part of a package in achieving the vision and objectives has been set out by the Cambridge Access Study. On the basis of the work undertaken, this report recommends a proposed Congestion Reduction package set out in Appendix B that would deliver the vision and objectives. The key elements of the Congestion Reduction package are noted in recommendation b) above. The proposed package would: provide for more, and more reliable, public transport trips on key routes into the city, deliver better conditions for cyclists and pedestrians in many areas, improve the Public Realm remove many through trips by private car from the city during peak periods, allow for further investment in public transport provision, and; allow for investment in infrastructure in the later tranches of the Greater Cambridge City Deal transport programme as part of the local funding contribution to the programme. 6. Alternative interventions that have been shortlisted by the Access Study such as road user charging might achieve similar benefits, but are assessed as being more challenging in terms of deliverability in a reasonable timescale, affordability, and in terms of fairness and equity. 7. Proposals for engagement on the proposed Congestion Reduction package are set out, as are indications of timescales in which individual elements could be delivered and the links with the delivery of the wider Greater Cambridge City Deal programme. Background Growth, Transport and the Greater Cambridge City Deal 8. The submission Local Plans for Cambridge and South Cambridgeshire (see Background Documents below) set out the vision for sustainable economic and housing growth in the Greater Cambridge area to The Greater Cambridge City Deal supports these plans, by ensuring the transport infrastructure needed can be delivered. The strategic objectives of the City Greater Cambridge City Deal are: to nurture the conditions necessary to enable the potential of Greater Cambridge to create and retain the international high-tech businesses of the future; to better target investment to the needs of the Greater Cambridge economy by ensuring those decisions are informed by the needs of businesses and other key stakeholders such as the universities; to markedly improve connectivity and networks between clusters and labour markets so that the right conditions are in place to drive further growth; and to attract and retain more skilled people by investing in transport and housing whilst maintaining a good quality of life, in turn allowing a long-term increase in jobs emerging from the internationally competitive clusters and more university spin-outs.
3 9. Over the past 20 years, measures such as the Cambridge Core Traffic Scheme, Park and Ride and the Busway have been very successful at providing capacity for new trips into Cambridge by sustainable modes of transport. However, the amount of vehicular traffic travelling into the city has remained constant over this period, and congestion has worsened. 10. With the further housing and economic growth that is planned for the Greater Cambridge area, conditions on the transport network will get worse still if we do not take action to provide new transport capacity and manage congestion. If we do nothing, time spent in congested conditions is forecast to more than double by Radical interventions are needed to provide new transport capacity and allow for rational decisions by car drivers to change their travel behaviour to more reliable and convenient alternatives. Greater Cambridge Transport Vision and Objectives 11. The transport vision for Greater Cambridge (the vision) is that it should be easy to get into, out of, and around Cambridge by public transport, by bike and on foot. 12. To achieve this, the aim is that despite the anticipated growth in journeys of about 30% by 2031, there will be a reduction in peak hour vehicular traffic of 10-15% from 2011 levels. This reduction is broadly equivalent to the reduction in traffic that is seen in the morning peak period when schools are on their half term break. 13. The Greater Cambridge City Deal s transport strategy objectives (the objectives) are: To ensure transport in Greater Cambridge supports economic growth and the continuation of the Cambridge Phenomenon To bring about a step change in the quality and reliability of public transport in Greater Cambridge by tackling congestion, investing in the infrastructure needed for quicker, more reliable public transport journeys and working in partnership with public transport providers. To reallocate road space to public transport, cycling and walking to encourage journeys using these modes and reduce traffic volumes. To encourage continued growth in the numbers of people cycling in and into Greater Cambridge. To use the opportunities that road space reallocation, congestion reduction, and infrastructure projects offer to improve air quality, the public realm and the historic and natural environment. The Cambridge Access Study 14. Consultant Mott MacDonald was commissioned to undertake the Cambridge Access Study, which has considered the effectiveness and deliverability of potential options to achieve the vision and meet the objectives, with a specific focus on the interventions that will address access and capacity in and around the city centre. It considers what packages of measures might be most effective in this respect. The process for the Access Study is shown diagrammatically in Figure The Access Study has several outputs, which are available on the Greater Cambridge City Deal s website (see Background Papers below). These are the: Access Audit Report (July 2015) Call for Evidence Analysis (May 2016) Long List Report (May 2016) Short List Report (May 2016)
4 16. The content of the Call for Evidence analysis, Long List Report and Short List Report are considered in detail below. Figure 1: Access Study process The Cambridge Access Study Call for Evidence on tackling congestion 17. In November 2015, a Call for Evidence was launched to gather views, ideas and evidence aimed at tackling congestion in Cambridge. Written evidence was invited and interested parties presented their ideas at three public hearings held on the 16th, 18th and 30th November. Figure 2: Call for Evidence analysis of suggestions
5 18. Submissions were published on the Greater Cambridge City Deal s website (see Background Papers below) and an initial summary of them was presented to the Joint Assembly on 17 December 2015 and to the Executive Board on 15 January At the 15 January meeting, the Executive Board agreed the criteria for assessing submissions to the Call for Evidence. These criteria were also used in the assessment of other interventions being considered by the Access Study. 20. The Call for Evidence Analysis has been published on the Greater Cambridge City Deal s website (see Background Papers below). Figure 2 provides a summary of the sifting of suggestions made by respondents. 21. It should be noted that many suggestions made by different respondents duplicate each other, and the overall number of 365 suggestions significantly overstates the number of discrete suggestions. Duplicate suggestions were consolidated in the second sift of interventions. The table in Appendix A provides some detail on this; for example, cycle network improvements into the city from surrounding areas were suggested 17 times. 22. Suggested interventions that did not meet the sifting criteria may still be considered in other areas of the Greater Cambridge City Deal s programme. For example, the proposal to remove side road junctions on main roads is being considered in the design of the Milton Road and Histon Road schemes. Long List Report 23. The Long List Report (available on the Cambridge Access Study website see Background Papers below) considers potential interventions to meet eight outputs: 1. Deliver a comprehensive and attractive Park and Ride service 2. Deliver a comprehensive and attractive local bus network 3. Deliver an increased rail mode share 4. Deliver an increased cycling mode share 5. Deliver an increased walking mode share 6. Deliver a smarter network for smarter users 7. Deliver efficient freight and servicing management 8. Directly address city centre traffic growth 24. The interventions were sifted against the same criteria as agreed by the Executive Board and used in the third sift of suggestions made to the Call for Evidence. Value for Money Implementation Fairness Effectiveness Economic Impact Dependencies and broader benefits Environmental Impact and Design 25. The Long List Report identified 44 interventions (see Appendix C) as having potential to contribute to achieving the outputs noted above, and that met the sifting criteria agreed by the Executive Board. These included 30 interventions that were also suggested by respondents to the Call for Evidence, as noted in Figure 2 above. Of the short-listed interventions, it is those under the theme Demand Management and Fiscal Measures that are either: Not included in current plans, or Considered to be most likely to be able to deliver the desired outputs as part of a wider package.
6 26. The interventions shortlisted in this theme are: Smart access controls at existing key congested links Road-space reallocation to non-car modes Workplace Parking Levy Road user charging Parking / loading controls on key bus routes 27. The following sections provide commentary on a proposed Congestion Reduction package based around two of these interventions and discuss alternative options. The proposed Congestion Reduction package 28. Assessment of the ideas from the Call for Evidence and the Access study work show that improving City Centre access and tackling congestion requires a blend of measures to manage demand for private car use and improve the attractiveness of alternatives. This report therefore puts forward a proposed Congestion Reduction package, which is discussed in more detail in Appendix B. It has eight key elements: Better bus services and expanded usage of Park and Rides Better pedestrian and cycling infrastructure Better streetscape and public realm Peak Congestion Control Points in the weekday morning and evening peak periods A Workplace Parking Levy On-Street Parking Controls (including Residents Parking) Smart Technology Travel Planning 29. The package aims to provide reliable and seamless journeys for bus users, cyclists and pedestrians on key routes into the city. Additional investment in public transport infrastructure and services and pedestrian and cycling infrastructure would therefore be made. This would add to and enhance the investment already planned in new capacity in the three tranches of the Greater Cambridge City Deal s overall transport programme. 30. Peak Congestion Control Points in the morning and evening peak periods would reallocate road space in and around the city centre, prioritising buses, cyclists and pedestrians and restricting general vehicular traffic on key routes for this purpose. Improved streetscape and public realm would also be sought as part of the design of these interventions, taking advantage of the opportunity that less demand from vehicles for road space in these areas would bring. 31. A Workplace Parking Levy (WPL) would tackle problems associated with traffic congestion by providing revenue funding for local transport and by acting as an incentive for employers to manage and potentially reduce their workplace parking. Income raised would fund specific measures to address congestion and provide new sustainable transport capacity to address the travel needs of employers and their staff. Employers would have the opportunity to influence and input into the choice of and design of measures to be funded. 32. Additional on-street parking controls including new Residents Parking zones would be used to manage problems that might occur due to displacement of trips due to the Peak Congestion Control Points and WPL.
7 33. Improvements to traffic signals and control systems would assist in the management of the transport network, and would allow greater priority to be given to pedestrians, cyclists and buses. Better public transport, pedestrian and cycling infrastructure, and better streetscape and public realm 34. The Access Study supports the need for more investment in Park and Ride and in other measures to support the extension of bus services. The Congestion Reduction package would involve some or all of: extended routes to more necklace villages, extended operating hours for services to take better account of the variable working patterns of people working in the city and at its main employment hubs, new express bus services from surrounding towns, and additional Park and Ride and rural interchange capacity at existing or already planned new sites, or at further new sites as necessary 35. Cambridge North railway station will open in May 2017 and the Greater Cambridge City Deal programme will support the ongoing development of proposals for a station at Addenbrooke s, which is one of the shortlisted Access Study interventions. 36. Junction priority will continue to be developed for cyclists, pedestrians, and buses, including on radial routes and the Inner Ring Road, and opportunities for improvements in concert with the Peak Congestion Control Points would be sought. 37. Reduced peak time traffic would create opportunities for improvements to streetscape and public realm, for example on Hills Road between Station Road and the City Centre. These will be identified as part of the ongoing development and design of measures in the wider Greater Cambridge City Deal programme. 38. The Congestion Reduction package would have some implications for the Trunk Road network, including on the A14 and the M11. Consideration will be given to the targeted deployment of the Cambridge City Council s A14 Mitigation Fund of 1.5M on measures included in the Cambridge Access programme. Peak Congestion Control Points 39. Peak Congestion Control Points would limit or ban general vehicular traffic on key routes during the morning and evening peak periods where such interventions would lead to a significant benefit to buses, pedestrians and cyclists. The Cambridge Core Scheme currently has six such points in the city centre. Six Peak Congestion Control Point options have been modelled for the purposes of proof of concept. These are: Options that place Peak Congestion Control Points on the inner ring road. o Option 1; on Grange Road, Queens Road and East Road. o Option 2; on Grange Road, Queens Road, East Road, Elizabeth Way and Maids Causeway. Options that place Peak Congestion Control Points on key bus routes. o Option 3; on Hills Road. o Option 4; on East Road, Hills Road and Mill Road. o Option 5; on East Road, Hills Road, Mill Road and Coldhams Lane. An option that is a combination of Options 1 and 5 above: o Option 6; on Grange Road, Queens Road, East Road, Hills Road, Mill Road and Coldhams Lane.
8 40. The six options are shown illustratively in Figure B1 in Appendix B, along with more detail on how the options were developed. 41. All of these options were tested as simple full peak period closure schemes, allowing no general traffic access through any of the potential new Peak Congestion Control Points in the peaks. They do not therefore represent detailed proposed schemes; at this point in time they demonstrate the potential of the approach. Therefore before final implementation, they will be refined to ensure they meet the objectives of the City Deal and provide the correct balance of outcomes for all users. 42. Options 1, 5 and 6 show potential for significant improvements on the parts of the network that are most problematic for public transport journeys. The modelling work included an initial assessment of the potential for modal shift to public transport, walking and cycling as a result of the peak period closures in these three options. A summary of the initial assessment of the impacts of these three options on forecast traffic flows and on mode share of trips are detailed in Appendix B. Further detail is included in the Short List Report (see Background Papers below). 43. Options 2, 3 and 4 are not recommended to be taken forward as: Option 2 was assessed as having too great a level of negative impacts for relatively little benefit over Option 1. Option 3 was assessed as having only local benefits on Hills Road rather than the wider benefits seen in the other options. Option 4 led to significant additional traffic on Coldhams Lane which would be difficult to deal with. By contrast, Option 5 redistributes this traffic onto routes where it is likely to be easier to deal with and therefore is preferred over Option 4. Proposed experimental implementation of Peak Congestion Control Points 44. For the Peak Congestion Control Points, the most significant success factors will be the extent to which travellers change their behaviour and the reliability of bus services is improved. Modelling can only go so far in predicting these behavioural changes. 45. The implementation of a small number of Peak Congestion Control Points is relatively simple, and they could be refined on the ground relatively easily. Given the challenge of accurately predicting how people will respond, and the fact that there is a pressing need to address current congestion, it is considered that an experimental approach is the best way to take this element of the proposed package forward. 46. Option 6 is most effective in reducing congestion in Cambridge but requires the greatest level of change in travel behaviour. Officers recommend that the Board agrees to present Option 6 as the preferred Peak Congestion Control Point option. Its implementation could be phased in order to allow drivers to adapt to the changes. Further work would be undertaken on the most appropriate phasing and this, together with further assessment of impacts, would be reported to the Board in January The preferred option would then be worked up and tested via an experimental Traffic Regulation Order for implementation from late The experimental order process permits some phasing of interventions to be introduced and tested during the trial. Early provision of extra capacity for public transport, walking and cycling trips 48. Initial work has been undertaken to identify the additional capacity in the public transport network that could be available in 2017 alongside the experimental implementation of Peak Congestion Control Points.
9 Cambridge North Station will be open from May Initial assessment indicates that the five Cambridge and two Busway Park and Ride sites currently have spare parking capacity that could cater for at least 60% of the total mode shift away from car use for trips into the city that might be seen with the Peak Congestion Control Points if a scheme were implemented in Stagecoach currently deploys additional vehicles to try and maintain service frequency in congested conditions. Removing congestion on key routes would give an immediate improvement in reliability for these services and opportunity for the additional vehicles to be used to increase frequency of services or to be deployed on new routes. In addition, the bus companies have indicated that, given sufficient notice, they would provide extra buses and increased frequencies to meet the demand from the day of implementation. 49. As the Peak Congestion Control Point proposals were worked up, opportunities to reallocate road space to provide better facilities for public transport, pedestrians and cyclists or to improve the public realm would be investigated. However, permanent implementation of such schemes would probably need to be delayed until after the experimental order period when any permanent changes had been confirmed. Workplace Parking Levy 50. In order to deliver high quality public transport, revenue funding is needed. The Greater Cambridge City Deal delivers significant amounts of infrastructure funding from Government, but no revenue funding. It is therefore recommended that the introduction of a Workplace Parking Levy (WPL) should be an integral part of the overall Congestion Reduction package, as this would provide an on-going income stream that would then be invested in transport in the Greater Cambridge area to meet the transport needs of employers and employees. 51. The WPL proposal is modelled on the approach taken in Nottingham. A potential Cambridge WPL zone based on the Nottingham approach is shown in the map in Appendix B. The Nottingham scheme covers employers premises where there are more than 10 parking spaces in use which broadly equates to the largest 10% of employers in Nottingham. Between them, these employers account for around 63% of workplace parking capacity in Nottingham. Small employers are therefore not affected. 52. The Nottingham scheme charges employers 1.50 per weekday per car park space. The employer may or may not choose to pass that on to its employees; the experience in Nottingham is that many do. 53. A bespoke Cambridge scheme developed on similar principles would be expected to generate revenue of 7-11M per annum. It is important to note that the main impact of WPL on congestion is in its ability to bring in funding that can be invested in the provision of additional transport capacity. On its own, a WPL would not be expected to reduce congestion and improve network conditions significantly. Nottingham has forecast a reduction in traffic growth of 7% as a result of its WPL. 54. If the Board agrees to pursue the recommended package, a Cambridge scheme would be developed engaging with employers ahead of consultation in On-street parking controls including Residents Parking Zones 55. Further expansion of on-street parking controls including Residents Parking zones would reduce the availability of on-street commuter parking, to help to ensure that trips not directly affected by the Peak Congestion Control Points do not increase, in
10 particular where the implementation of WPL results in displacement of parking onto neighbouring streets. 56. The Greater Cambridge City Deal Executive Board is not responsible for the policy on Residents Parking in Cambridge. Instead, that policy is made by the County Council and implemented by the Cambridge Joint Area Committee (CJAC); a joint committee of the County and City Councils. CJAC is currently reviewing Residents Parking Policy in Cambridge. Officers recommend that the Executive Board works with CJAC on the review of the policy, timescales for which are set out in Appendix B. It could be appropriate for the Greater Cambridge City Deal to fund the implementation of new Residents Parking zones if they assist in meeting objectives for City Centre access. Potential timescales for the delivery of the Congestion Reduction package 57. Parts 2 and 3 of Appendix B set out potential timescales for the implementation of the proposed Congestion Reduction package. 58. There could be experimental implementation of Peak Congestion Control Points from late With the advantage of experience gained in Nottingham, a Workplace Parking Levy could be implemented in 3 years, subject to statutory processes. 60. If, following the public and stakeholder engagement on the Congestion Reduction package set out herein, the Board wishes to progress the package, the elements of the approach would be worked up in detail. Work would be undertaken to develop and refine Peak Congestion Control Point options that would be tested experimentally. Further modelling of the approach and the Congestion Reduction package would be undertaken, and optimised solutions sought. Opportunities for reallocation of roadspace around experimental Peak Congestion Control Points would also be identified. 61. Implementation of the Peak Congestion Control Point options would initially be through the use of an Experimental Traffic Regulation Order for up to eighteen months. There would be no formal public consultation on the detail of proposals prior to implementation, as the formal public consultation would be undertaken during the experiment period, allowing people to judge and comment on the impacts directly. Links with the prioritised Tranche 1 programme 62. Cities that have had the most obvious success in catering for new travel demand without gridlock are typically characterised by the ability of large numbers of people to travel on the public transport network or by bike or on foot more effectively and reliably than in a car. However, even in these places, congestion remains. 63. The proposed Congestion Reduction package relies upon additional non-car transport capacity being provided to cater for displaced car trips reliably and conveniently by public transport, walking and cycling. The demand management measures in the Congestion Reduction package will only succeed if this capacity is provided. The proposed package outlined above and the proposed infrastructure schemes already in development therefore provide a comprehensive package and are not alternative approaches. 64. The Greater Cambridge City Deal s wider transport programme will deliver the infrastructure needed for this capacity to be provided. Work on the Access Study has not identified options for managing demand within the city that would remove the need for other City Deal interventions, such as the Milton Road, Histon Road or Cambourne to Cambridge schemes in tranche 1 of the programme.
11 65. The timetable in Part 3 of Appendix B sets out how Greater Cambridge City Deal Tranche 1 scheme implementation might tie in with the implementation of the proposed Congestion Reduction package. Links with Tranches 2 and 3 of the Greater Cambridge City Deal programme 66. The detail of the proposed Congestion Reduction package if and when worked up would inform the programming of the Tranche 2 and 3 programmes. Access Study Short List Report 67. The Short List Report produced by Mott MacDonald as part of the Cambridge Access Study (see Background papers below) takes stock of the outcomes of the Call for Evidence Report and the Long List Report. It considers in more detail the interventions that were shortlisted. Work on the Short List Report directly informed the development of the Congestion Reduction package. The Short List report contains further more detailed analysis of the shortlisted interventions. Potential alternatives to the proposed package 68. The Access Study has considered numerous policy approaches and potential schemes, including the 365 individual suggestions made by respondents to the Call for Evidence on tackling congestion. The process by which these policy approaches and schemes have been assessed is set out above. Congestion charging 69. An alternative option that might achieve similar benefits to the proposed Congestion Reduction package would involve the introduction of a congestion charging scheme. This policy approach could be similar to the proposed package, but would replace the WPL, and potentially some Peak Congestion Control Points and on-street parking controls with a congestion charge. A morning peak period congestion charge of 5 would be likely to raise 40-44M per annum. 70. A congestion charge would be likely to be effective in reducing car journeys, and would allow for a greater level of investment in alternative capacity, but it would also involve a greater financial burden on individuals, particularly those living outside the City, than the proposed Congestion Reduction package in order to be effective. It would be likely dependant on the type of charging scheme to affect all drivers in the city during its hours of operation. 71. Given its wider impacts, a congestion charge would have greater dependency on the delivery of supporting infrastructure to provide new non-car capacity that would require a longer period before implementation, with an attendant delay in realising benefits. It would also be more costly to implement and more costly and onerous to run, and would penalise people who might not have alternative choices to travelling by car in the charging zone. 72. On the basis of experience in London, it is also likely that a charge would need to rise at a much faster rate than inflation to maintain the benefits of a scheme. The price of the London scheme doubled from 5 to 10 in the eight years after it came into effect in 2003, and it is now A feature of the London scheme is that while traffic levels have reduced, traffic speeds have still declined in the period since the scheme was implemented. However, Transport for London considers that this is due to measures that they implemented to
12 improve the urban environment, increase road safety and prioritise public transport, pedestrian and cycle traffic, which have reduced the capacity of the road network. 74. In a Cambridge context, similar reallocation of road space, such as more bus lanes or even Peak Congestion Control Points, might still be required to achieve the levels of public transport service and reliability needed to deliver the overall outcomes that are sought. Iterations of the proposed Congestion Reduction package or of a Congestion charging policy approach 75. Both the recommended Congestion Reduction package and the alternative congestion charging-based package could be varied in a number of different ways. Elements could be added or removed from either package. While this might lead to packages that were perceived as easier to agree and implement, packages that removed elements would be less likely to achieve the transport vision of Greater Cambridge and the transport objectives of the Greater Cambridge City Deal. For example, removal of the WPL from the proposed Congestion Reduction package would have two main negative impacts It would remove the revenue stream that would permit further investment in public transport services and further infrastructure to improve non-car options. It would remove a cost factor that might encourage modal shift. Do-nothing 76. This is not recommended. Modelling undertaken in support of the Cambridge and South Cambridgeshire Local Plans indicated that a do-nothing approach would result in a more than 30% increase in traffic, and time spent in congested conditions more than doubling by It was clear from the Call for Evidence that there is a general acceptance that there are significant problems on the transport network, and that with planned growth, interventions are needed to ensure the transport network continues to support the area s economy and caters for an increasing demand for travel. Other options that were suggested in the Call for Evidence but are not recommended to be taken forward Tunnels 77. Tunnelling options are not recommended to be taken forward primarily due to high costs and impracticality. The Access Study considered indicative costs of a system involving four tunnel portals and around 5,000 yards of bus tunnel underneath the city centre. Using the cost of the Limehouse Link tunnel in London s Docklands as a benchmark, and adjusting for inflation, this system would be likely to cost around 1.15B. Tunnel portals would need a large amount of space; it is highly doubtful that three of the portals shown in the option considered by Mott MacDonald could be delivered. Alternative locations for such portals in Cambridge are not obvious. Officers do not believe that an affordable, practically deliverable bus tunnel scheme is possible. Inbound flow control 78. Inbound flow control or gating could potentially deliver congestion relief, although there is a high risk that it would fail in this regard as it would allow the release of suppressed demand for travel by car within the city. The impact would fall only on drivers from outside of Cambridge, who typically have fewer alternative travel options available to them. It would not provide good alternative travel options to those
13 travelling from outside the city while it would allow those within the city to travel more easily. It is also unclear how the system would work in the evening peak period. Public and stakeholder engagement, July to October It is recommended that the proposed Congestion Reduction package be communicated to the public using a variety of activities, media channels, and materials from July to October This engagement would set out clearly the proposed Congestion Reduction package and the reasoning behind it, and invite qualitative feedback on it. This feedback would be recorded and collated and fed back to the Joint Assembly and Executive Board at their January 2017 meetings. At this point, the Executive Board would be asked to consider whether to progress the Congestion Reduction package. 81. The July October 2016 public and stakeholder engagement would focus on: Engaging with people on the proposed Congestion Reduction package, on what it involves, how it fits together and what it aims to achieve, seeking to build their understanding of it and listening to their feedback. Communicating how the Call for Evidence and Access Study informed the development of the proposed Congestion Reduction package. Communicating how, when and by whom the different elements of the Congestion Reduction package would be implemented. Involving stakeholders in the development of the detail of proposals. 82. This will provide the public and stakeholders with a full understanding of the proposed Congestion Reduction package, the policy approach behind it, and the future benefits of the package, informing their feedback to the engagement process. 83. Engagement activities and materials will be prepared, held and disseminated in a wide variety of platforms, locations and media to ensure an inclusive and proactive participation from the spectrum of audiences that would currently or in the future benefit from or be affected by the proposed Congestion Reduction package. 84. Appendix D provides details of the consultation and engagement principles that apply to transport infrastructure schemes delivered by the Greater Cambridge City Deal. Options 85. In considering the recommendation in this paper, a number of options are available to the Executive Board. 86. Recommendation b): the Board could: Agree the proposed Congestion Reduction package Request that further work is undertaken to develop further the proposed Congestion Reduction package, instead of agreeing it now Ask officers to work up a different policy option or options Make minor changes to the proposed package while keeping to the current timescale. The scope for such changes is likely to be limited while maintaining the planned timescales. 87. Recommendation c): the Board could: Agree the public and stakeholder engagement proposals and timescales. Defer the start of the public and stakeholder engagement proposals to September, allowing more detail to be worked up and presented.
14 88. Recommendation d): Officers consider that an experimental implementation would be the most effective way of introducing and gauging the impact of the Peak Congestion Control Point options, and would give the flexibility to quickly modify or iterate the Peak Congestion Control Points to achieve better results. Officers recommend that the Board does not accept recommendation b) as it stands if it does not also accept recommendation d). Implications 89. In the writing of this report, taking into account financial, legal, staffing, risk management, equality and diversity, climate change, community safety and any other key issues, the following implications have been considered: Financial and other resources 90. The proposed Congestion Reduction package would lead to expenditure on the development and implementation of the measures included in it. Through the Workplace Parking Levy it would bring a revenue stream that could generate 7-11M per annum that would be invested in transport infrastructure and services. 91. There could be a need to identify revenue funding to pump prime the early delivery of new public transport services ahead of the introduction of the Peak Congestion Control Points and again before the introduction of the Workplace Parking Levy. Legal 92. Specific statutory processes related to delivery of specific interventions are referred to in the report and appendices. Staffing 93. Recruitment processes are underway for delivery team staff for the Cambridge Access programme. For a Workplace Parking Levy, the option to buy in expertise from Nottingham is also available and is recommended. Risk Management 94. The proposed Congestion Reduction package has a number of strands that fit together, and includes some challenging measures that are likely to lead to much public and stakeholder interest. Effective communication and clear messaging will be needed and the public and stakeholder engagement will need to be open and well managed. 95. The experimental introduction of the Peak Congestion Control Points offers an opportunity to test and tweak the scheme. However, as the scheme relies on behaviour change, time may be needed for new travel patterns to become established, and resolve may be needed to stay with the scheme while this happens. Equality and Diversity 96. The proposed Congestion Reduction package seeks to avoid interventions that would have unfair implications for residents of different areas and to avoid any social impacts. Nonetheless, care would be needed in the detailed design of the Peak Congestion Control Point, Workplace Parking Levy and on-street parking proposals to ensure such impacts were not realised.
15 97. The options of road pricing and of flow control by gating have not been recommended to be taken forward in part because they would have differential impacts in Cambridge and South Cambridgeshire that could be seen as discriminating against South Cambridgeshire residents who worked in the city. Climate Change and Environmental 98. If the proposed Congestion Reduction package is successful in achieving mode shift away from the private car to public transport, walking and cycling, transport emissions in the Greater Cambridge area will be reduced. Consultation responses and Communication 99. The report details the responses and presentations that were made Call for Evidence on Tackling Congestion in Cambridge in November Proposals for public and stakeholder engagement on the proposed Congestion Reduction package between June and October 2016 are also detailed. Appendix D details the Greater Cambridge City Deal s engagement principles. Background Papers Cambridge Access Study The Cambridge Access Study web page can be found at: The following reports are available on this webpage: Audit Report (July 2015) Call for Evidence Analysis (May 2016) Long List Report (May 2016) Short List Report (May 2016) Call for Evidence In addition, further details of the Call for Evidence can be accessed from the Cambridge Access Study web page, including: Written submissions to the Tackling Congestion: Call for Evidence. Presentations made at the Tackling Congestion: Call for Evidence hearings. Initial Summary of the evidence received, including notes of the Tackling Congestion: Call for Evidence hearings and of the Traffic Generators meeting. Presentations made at the Traffic Generators meeting. Greater Cambridge City Deal transport infrastructure programme First tranche Great Cambridge City Deal transport schemes, 2015/16 to 2019/20 Transport policy context Third Cambridgeshire Local Transport Plan Policies and Strategy document Long Term Transport Strategy document
16 Transport Strategy for Cambridge and South Cambridgeshire The Transport Strategy for Cambridge and South Cambridgeshire can be viewed at: Planning policy context Local Plans Cambridge Local Plan South Cambridgeshire Local Plan Report Author: Bob Menzies, Director of Strategy and Development Cambridgeshire County Council Telephone: List of Appendices Appendix A: Appendix B: Appendix C: Appendix D: Call for Evidence main themes The proposed Congestion Reduction package Shortlisted interventions from the Access Study Engagement principles
17 Appendix A Summary of main themes and ideas raised by respondents to the Call for Evidence Theme / Suggestion Demand Management & Fiscal Measures Number of representations Further limiting access to the city centre and further Selective Road Closures (Includes: extension of Core Scheme, pedestrianisation etc.) 14 Further Parking Controls (Includes: more residents parking zones, reductions in city centre car parks, 20 reduction in free street parking) Road Pricing (Includes: Congestion charge various forms suggested for testing) 22 Workplace Parking Levy (Includes: taxing private non-residential parking in the city) 8 Gating and Queue Redistribution 4 Tourist Tax 2 Technology Smart Traffic Management (Includes: syncing signals more efficiently and further use of SCOOT system) 10 Data Collection Tools 2 Smart Card Tickets, RTPI, Journey Planning etc. (Includes: multi-modal, multi-operator tickets too) 5 Autonomous Vehicles 2 Public Transport Infrastructure & Service Improvements Bus Lanes, Tidal-flow Bus Lanes, Bus Priority Measures 10 Bus Rapid Transit 5 More Attractive Bus Journeys (Includes: reliability, nicer buses, quality bus partnerships and contacts) 16 Rail Investment (Includes: new stations, re-opening old lines, increasing capacity 5 Underground Public Transport Systems (Includes: tunnelling for buses, metros etc.) 9 Transport Hubs & Interchanges (Includes: new ones, upgrades to existing and linking of modes) 9 Upgrading/Improving Park and Ride (Includes: Removing charge, new P&R sites, extending capacity of current sites, 28 longer operation of services and free/discounted travel on P&R) Infrastructure Improvements for Active Modes Enhanced Cycle Networks (in/from rural areas) (Includes: more cycle lanes, more segregation of cycle lanes, links to services 17 and Cambridge, joining the villages etc.) Enhanced Cycle Networks (urban/city) 25 (Includes: more cycle lanes, more segregation of cycle lanes) Further Cycle Priority at Junctions 11 (Includes: priority at junctions etc.) Cycle Parking (Includes new city centre facility, additional, secure racks at 11 businesses/schools/leisure etc.) Improved Pedestrian Facilities 7
18 Theme / Suggestion Highway Capacity Enhancements Number of representations Junction Improvements (Includes: measures aimed at traffic flow improvements) 9 New Roads (Includes: orbital movements to the east of the city and a southern relief road) 6 Re-Classify Roads by Use 1 Promote / priority for Motorcycles/Scooters (Includes use of bus lanes) 3 Behavioural Change Last Mile Delivery & Consolidation Points and More Management of Delivery Vehicles 9 (Includes reducing freight/hgvs etc.) Tackling School & Sixth Form Traffic (Includes. using P&R sites as drop-off pick up, spreading hour of opening 15 Peak hour spreading (Includes business hour change) 5 Car Clubs & Car Sharing 4 Low Emission Vehicles (Includes: electric vehicles, driverless vehicles etc.) 2
19 Appendix B: The proposed Congestion Reduction package Tackling Cambridge s Congestion The Strategy and vision for Greater Cambridge Local Plans for Cambridge and South Cambridgeshire set out the vision for sustainable growth in the Greater Cambridge area to The Transport Strategy for Cambridge and South Cambridgeshire was developed in parallel with the Local Plans and sets out the strategy approach and infrastructure needed to address the transport demands that come with the planned growth in a sustainable way. The Greater Cambridge City Deal supports these plans, by ensuring the transport infrastructure needed can be delivered. The strategic objectives of the City Greater Cambridge City Deal are: to nurture the conditions necessary to enable the potential of Greater Cambridge to create and retain the international high-tech businesses of the future; to better target investment to the needs of the Greater Cambridge economy by ensuring those decisions are informed by the needs of businesses and other key stakeholders such as the universities; to markedly improve connectivity and networks between clusters and labour markets so that the right conditions are in place to drive further growth; and to attract and retain more skilled people by investing in transport and housing whilst maintaining a good quality of life, in turn allowing a long-term increase in jobs emerging from the internationally competitive clusters and more university spin-outs. The transport vision for Greater Cambridge is that it should be easy to get into, out of and around Cambridge by public transport, by bike and on foot. The aim is that, despite the anticipated growth in journeys of about 30% by 2031, there will be a reduction in peak hour traffic of 10-15% by 2031, using 2011 as a baseline. This aim is based on pragmatism as well as being grounded in national and local policy; there is not space on the transport network to cater for the increase in travel demand that will be seen with planned growth if travel behaviour does not move away from private car use. The Greater Cambridge City Deal transport strategy objectives are: To ensure transport in Greater Cambridge supports economic growth and the continuation of the Cambridge Phenomenon To bring about a step change in the quality and reliability of public transport in Greater Cambridge by tackling congestion, investing in the infrastructure needed for quicker, more reliable public transport journeys and working in partnership with public transport providers. To reallocate road space to public transport, cycling and walking to encourage journeys using these modes and reduce traffic volumes. To encourage continued growth in the numbers of people cycling in Greater Cambridge. To use the opportunities from road space reallocation, congestion reduction, and infrastructure projects offer to improve air quality, the public realm and the historic and natural environment.
20 Part 1: The Proposed Package The proposal on which engagement would take place in the summer and autumn 2016 will be a package of measures to reduce peak time traffic flows and congestion, improving bus reliability, conditions for cyclists and pedestrians, and creating opportunities to improve the public realm. The package consists of the following elements. Better bus services and expanded usage of Park and Rides Better pedestrian and cycling infrastructure Better streetscape and public realm Peak Congestion Control Points in the weekday morning and evening peak periods A Workplace Parking Levy On-Street Parking Controls (including Residents Parking) Smart Technology Travel Planning The following sections describe each element of the proposed package. 1 Better public transport A key objective of the proposed Congestion Reduction package is to remove congestion on the key bus corridors, which would result in an immediate improvement in bus reliability and reduced journey times. Tranche 1 of the Greater Cambridge City Deal already includes significant infrastructure to improve bus journey times and reliability on key routes into Cambridge from new settlements. The Cambourne to Cambridge, A1307 and Western Orbital schemes all include consideration of new Park and Ride provision. Stagecoach currently deploys additional vehicles to try and maintain service frequency in congested conditions. Removing congestion on key radial and city centre routes would give an immediate improvement in reliability and frequency for services that use these routes and opportunity for the redeployment of the extra vehicles on new routes. In addition, the bus companies have indicated that, given sufficient notice, they would provide extra buses and increased frequencies to meet the demand from the day of implementation of the Peak Congestion Control Points element of the proposed Congestion Reduction package. Initial assessment indicates that the current five Cambridge and two Busway Park and Ride sites have spare parking capacity that could cater for the total mode shift away from car use for trips into the city that might be seen with the Peak Congestion Control Points if implemented in In reality, rail, cycling and other bus services would also cater for many of these trips. However, additional buses are likely to be needed to cater for the shift away from car use; these could be on new routes or supplement existing Park and Ride services. Additional Park and Ride car park capacity will still be needed to cater for future growth. Advance funding of further service enhancements prior to the implementation of a Workplace Parking Levy (WPL) would also need to be considered. Potential new interchange sites that might be relatively quickly developed would be identified as part of the development of the proposed Congestion Reduction package, including adjacent to railway stations in the Greater Cambridge area and beyond. WPL could be used to fund this infrastructure. The new Cambridge North Station will open in May This will eliminate the need to cross the city to access the rail network, and will allow access to employment in North Cambridge by rail. The Access Study also includes the proposed new station to serve Addenbrooke s, the Biomedical Campus and the south of the city in the shortlist of interventions to tackle congestion in the city.
21 2 Better cycling infrastructure The Peak Congestion Control Points will reduce traffic on key routes in Cambridge resulting in an immediate improvement in conditions for cyclists. Opportunities for quick wins for cyclists will be identified, such as the re-allocation of road space. High quality cycling infrastructure to enable people to cycle easily and safely around Greater Cambridge is already being delivered with Cycle City Ambition Grant schemes either complete or being implemented this year. Tranche 1 of the Greater Cambridge City Deal includes the Chisholm Trail and Cross-City cycling routes. All other tranche 1 schemes, and moving forward, tranche 2 and 3 schemes include significant new cycling facilities. A proposal is being developed to provide a comprehensive network for commuting into Cambridge from surrounding settlements. WPL could be used to find this infrastructure. 3 Better streetscape and public realm The removal of traffic in the busiest periods from key routes would allow for improvements to the streetscape and public realm. Where less space is needed for motor vehicles, and where maximum throughput of vehicles is no longer the key factor, a better balance between movement and place can be achieved. Opportunities for improvements would be identified as part of the proposed Congestion Reduction package development. The permanent implementation of such measures would be as part of the final implementation of a Peak Congestion Control Point scheme, if it were confirmed following the trial implementation using the experimental Traffic Regulation order process. 4 Peak Congestion Control Points in the weekday morning and evening peak periods To provide the road space needed to increase the capacity and reliability of bus services, improve conditions for pedestrians and cyclists and manage congestion, Peak Congestion Control Points in and around the city centre would limit access to buses, cyclists, and taxis in the peak periods. The Peak Congestion Control Points would be located at key points on the network, with the aim of using the minimum number of restrictions to give the maximum traffic reduction effect across the widest part of the network. The closures will limit cross city car journeys, which have the greatest impact on congestion. Six Peak Congestion Control Point options have been subject to initial testing. These are shown indicatively in Figure B1 and are as follows: Options that place Peak Congestion Control Points on the Ring Road. o Option 1; on Grange Road, Queens Road and East Road. o Option 2; on Grange Road, Queens Road, East Road, Elizabeth Way and Maids Causeway. Options that place Peak Congestion Control Points on key Bus Routes. o Option 3; on Hills Road. o Option 4; on East Road, Hills Road and Mill Road. o Option 5; on East Road, Hills Road, Mill Road and Coldhams Lane. An option that is a combination of the two approaches above. o Option 6; on Grange Road, Queens Road, East Road, Hills Road, Mill Road and Coldhams Lane. Options 1 and 2 were proposed to test the concept of cutting the ring road to prevent through movements. Option 1 effectively cuts the ring road in two places (East Road is informally the Inner ring road). Option 2 cuts it in three places.
22 Options 3, 4 and 5 were proposed to test the concept of reducing general traffic on key routes for public transport, walking and cycling where congestion is particularly problematic. Option 3 focuses specifically on Hills Road which is the busiest road in the city for buses, and also one of the most congested, particularly in the evening peak period. Options 4 and 5 iterate from Option 3 to manage where traffic is displaced to. Both Options 4 and 5 also cut East Road; informally the inner ring road. Option 6 combines Options 1 and 5 to see if the benefits from both could be achieved without severe negative impacts. Of these six options: Option 1 would provide benefits in the north of the city but less so in the south. Option 2 was assessed as having too great a level of negative impacts for relatively little benefit over Option 1. Option 3 would provide local benefits on Hills Road rather than the wider benefits seen in the other options. Option 4 provides good benefits on East Road, Hills Road and East Road, but would lead to significant additional traffic on Coldhams Lane that would be difficult to deal with. Option 5 is an iteration of Option 4, and redistributes this traffic away from Coldhams Lane onto routes where it is likely to be easier to deal with and therefore is preferred over Option 4. Option 6 is most effective in reducing congestion in Cambridge but requires the greatest level of change in travel behaviour. On the basis of the initial assessment, the benefits seen in Options 1, 5 and 6 are worth pursuing. Option 6 provides the greatest level of benefits, and the level of behaviour change that might be facilitated by this option is likely to be needed to cater for the population and economic growth occurring in the Greater Cambridge area. The most significant success factor will be the extent to which travellers change their behaviour, and transport modelling can only go so far in predicting these behavioural changes. The implementation of a small number of Peak Congestion Control Points is relatively simple, and they could be tweaked relatively easily. Given the challenge of accurately predicting how people will respond, and the fact that there is a pressing need to address current congestion, it is considered that an experimental approach is the best way to take this element of the proposed Congestion Reduction package forward. Initial public and stakeholder engagement in the summer / autumn of 2016 would focus on effectively communicating the proposed Congestion Reduction package and the role of Peak Congestion Control Points in it. More detailed technical work would be undertaken to refine a Peak Congestion Control Points scheme that could be tested through an Experimental Traffic Regulation Order from late This work would include consideration of variations of the closure points by location, time, and whether all movements would be barred. Potential options for phasing of implementation to allow drivers to adapt to the changes would also be investigated. This work would be reported to the Executive Board in January The experimental approach would take place without further formal public consultation prior to implementation, although informal consultation would take place with the emergency services, bus operators, the Road Haulage Association and Freight Transport Association as required by the regulations. Public consultation on the experiment would take place post implementation. Details of the experimental Traffic Regulation Order process would be set out in the engagement on the proposed package from July 2016.
23 Figure B1: Peak Congestion Control Point options 1, 2 and 3 (Control point locations shown are indicative only) (c). Crown copyright and database rights 2016 Ordnance Survey
24 Figure B2: Peak Congestion Control Point options 4, 5 and 6 (Control point locations shown are indicative only) (c). Crown copyright and database rights 2016 Ordnance Survey
25 It is proposed that for the experiment the closures would only operate Monday to Friday from 7am to 10am, and from 4pm to 6:30pm. These times are proposed to minimise the number of drivers that seek to travel earlier or later to avoid the closures. The procedures do allow for the experiment to be varied, but it is better to aim for a more onerous restriction and relax it if necessary than the other way round. These details may be refined as part of the development of the Peak Congestion Control scheme. To permit enforcement by Automatic Number Plate Recognition cameras, the closure points would be designated as bus gates. The County Council will be replacing the existing rising bollards in the city with camera enforcement in the 2016/17 financial year and already has in place arrangements for purchasing equipment and operating camera enforcement. It is proposed that access through the closure points would be limited to: cyclists, scheduled service buses, local taxis, and emergency vehicles. These are the groups permitted through the existing core scheme closure points. The current Cambridge core traffic scheme allows private hire cars access through the existing closure points; however it is considered that this may not be appropriate for these closures. It is relatively simple and cheap to register a vehicle as a private hire car with no obligation to accept a hire and where apps such as Uber have been deployed there have been large increases in numbers of private hire cars. As with the current core scheme vehicles would need to be registered and authorised to use the closure points. Unauthorised vehicles would be liable to a penalty charge. Disabled drivers would not be exempt. As with the core traffic scheme, in special circumstances exceptional authorisation may be permitted; for example, in the case of a doctor s surgery in close vicinity to a closure point. The closure points would be sited at, or close to, points where vehicles can turn, with appropriate signs in place both at the closure point and in advance. The existing system of Variable Message Signs will be used to give advance warning of the closures, and would be augmented if necessary. 5 Workplace Parking Levy A Workplace Parking Levy (WPL) would act with smart Peak Congestion Control Points to further reduce numbers of commuter car trips to employer s premises in Cambridge and help to ensure that car trips not directly affected by the Peak Congestion Control Points do not increase. However, the primary purpose of the WPL would be to bring a revenue stream that would fund infrastructure and sustainable transport improvements, including supporting public transport provision. This investment would be targeted at sustainable transport capacity that would provide for the travel demand of employers. The proposal for engagement on WPL as part of the package will use the successful Nottingham scheme as an illustrative example, including Nottingham s charging levels, exemptions for small businesses, licensing and enforcement arrangements. In the Nottingham scheme exemptions for those with ten or fewer spaces mean that only 10% of employers are required to pay the levy; however these employers have around 63% of the workplace parking spaces in Nottingham. The annual charge per parking space in Nottingham is 375 (equivalent to 1.50 per working day). If this figure were applied to Cambridge, a WPL scheme could raise revenue in the order of 7m to 11m per annum. The levy is applied to spaces actually used. Employers apply for a license for the spaces they use, including exempt spaces, and the Council regularly monitors usage to establish that the number of spaces is correct. Visitor and customer parking are excluded.
26 Nottingham City Council applies WPL to the whole city. A proposed zone covering Cambridge and adjoining urban fringes in South Cambridgeshire is shown on the map in Figure B3. Figure B3 Proposed zone for a Workplace Parking Levy for Cambridge The area is bounded to the north by the A14 and to the west by the M11. All of Cherry Hinton is included; in addition, in the vicinity of Addenbrooke s and Cherry Hinton the area includes the identified South Cambridgeshire Local Plan Allocations that adjoin the boundary with the City. The WPL would therefore cover the Cambridge City area, excluding the small areas to the north of the A14 and the west of the M11, and include those parts of South Cambridgeshire within the A14 and M11, and that are allocated for development in the fringe areas in the draft South Cambridgeshire Local Plan. The proposed Congestion Reduction package engagement over the summer / autumn of 2016 would include a programme for adapting the Nottingham scheme to ensure it is appropriate to the Cambridge conditions; this would include consideration of:
A1307 Haverhill to Cambridge: Approval to consult on transport improvement concepts
Report To: Greater Cambridge City Deal Executive Board 3 March 2016 Lead Officer: Graham Hughes, Executive Director of Economy, Transport and Environment, Cambridgeshire County Council A1307 Haverhill
More informationMarch Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016
Context. Author: Parish Clerk 2 The Draft Integrated Transport Policy (DITS) sets out a vision and objectives, and identifies a detailed programme of interventions to support the Maidstone Borough Local
More informationMap 1 shows the two roads, and how they fit into the public transport network in and around Cambridge.
Milton Road and Histon Road corridors bus priority infrastructure 1. Purpose The County Council would like to understand in more detail, the options to deliver the most effective corridor-based public
More informationGreater Cambridge City Deal Executive Board & Joint Assembly
Greater Cambridge City Deal Executive Board & Joint Assembly Welcome to the Call for Evidence on tackling congestion in Cambridge Launch Event 11 th November 2015 Bob Menzies Service Director: Strategy
More informationGETTING WHERE WE WANT TO BE
CAMBRIDGESHIRE & peterborough GETTING WHERE WE WANT TO BE A GREEN PARTY TRANSPORT POLICY CONTENTS Our Campaign Priorities 4 Bus Franchising 6 Supporting Active Transport 8 Workplace Parking Levy 9 Tackling
More information9. Parking Supporting Statement
9. Parking Supporting Statement Content 1. Setting the Scene 2. Vision 3. Parking and the Shared Priorities 4. Issues 5. Delivery Programme in the first Plan Period 2001/02 2005/06 6. Good Practice 7.
More informationTransport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age.
Transport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age 30 th March 2015 1 Presentation Overview Roles and responsibilities Snapshot of Key Challenges
More informationBELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development
BELFAST RAPID TRANSIT Ciarán de Búrca Director, Transport Projects Division Department for Regional Development Objectives of Belfast Rapid Transit To provide a modern, safe, efficient and high quality
More informationReport to: Greater Cambridge Partnership Executive Board 4 July Transport Strategy - Future Public Transport Requirements
Report to: Greater Cambridge Partnership Executive Board 4 July 2018 Lead officer: Peter Blake GCP Transport Director Transport Strategy - Future Public Transport Requirements 1. Purpose 1.1. This paper
More informationMILTON ROAD LLF PROJECT UPDATE
Greater Cambridge City Deal MILTON ROAD LLF PROJECT UPDATE 9 th May 2017 Project objectives Comprehensive priority for buses in both directions wherever practicable; Additional capacity for sustainable
More informationTackling Peak-time Congestion in Cambridge
HAVE YOUR SAY Tackling Peak-time Congestion in Cambridge Inside this information leaflet you will find out ways in which the Greater Cambridge City Deal is proposing to tackle congestion in Cambridge this
More informationCAMBOURNE TO CAMBRIDGE BETTER PUBLIC TRANSPORT PROJECT PHASE 2 PUBLIC CONSULTATION MADINGLEY MULCH ROUNDABOUT TO CAMBOURNE
CAMBOURNE TO CAMBRIDGE BETTER PUBLIC TRANSPORT PROJECT PHASE 2 PUBLIC CONSULTATION MADINGLEY MULCH ROUNDABOUT TO CAMBOURNE Have your say on proposals for a new public transport link and Park & Ride facility
More informationUpdate June 2018 OUR 2017 PUBLIC ENGAGEMENT
Update June 2018 Hi, Let s Get Wellington Moving (LGWM) is developing a Recommended Programme of Investment (RPI) that meets our programme objectives and supports the city s and region s growth. As part
More informationDesign Workshops Summary of all Feedback January 2017
Histon Road Corridor Design Workshops Summary of all Feedback January 2017 CITY DEAL AND GROWTH Commitment to Growth: Government, County, City and District Emerging Local Plans: 33,000 new homes 45,000
More informationTechnical note. 1. Introduction
Project: A428 study - Phase 2 To: Adrian Shepherd Subject: Park & Ride site locations From: Atkins Date: Jun 3, 2016 cc: Ashley Heller 1. Introduction 1.1. Purpose of Technical Note The purpose of this
More information2. Context. Existing framework. The context. The challenge. Transport Strategy
Transport Strategy Providing quality connections Contents 1. Introduction 2. Context 3. Long-term direction 4. Three-year priorities 5. Strategy tree Wellington City Council July 2006 1. Introduction Wellington
More informationABERDEEN: CITY OF THE FUTURE
ABERDEEN: CITY OF THE FUTURE A contribution towards discussions on a future transport strategy for Aberdeen and its Region Prepared by the Centre for Transport Research University of Aberdeen June 2010
More informationBristol City Council has produced a draft Bristol Transport Strategy document.
Bristol Transport Strategy Summary Document Introduction Bristol City Council has produced a draft Bristol Transport Strategy document. The Strategy fills a gap in transport policy for Bristol. We have
More informationDeveloping a Birmingham Transport Space Allocation policy. David Harris Transport Policy Manager Economy Directorate Birmingham City Council
Developing a Birmingham Transport Space Allocation policy David Harris Transport Policy Manager Economy Directorate Birmingham City Council Birmingham s Sustainable Urban Mobility Plan Birmingham Connected
More informationTransportation Master Plan Advisory Task Force
Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved
More informationActive Travel Strategy Dumfries and Galloway
Active Travel Strategy Dumfries and Galloway Our Active Travel Strategy The agreed Interventions for Dumfries and Galloway Council s Local Transport Strategy includes an action to Develop an Active Travel
More informationFinal Plan 20 December 2016
Final Plan 20 December 2016 Introduction Aims of the Travel Plan How do we travel? Understanding travel behaviours? The University Master Plan and its implications Galway City sustainable transport policies
More informationCAMBRIDGE SOUTH WEST PARK & RIDE
CAMBRIDGE SOUTH WEST PARK & RIDE Have your say on: Extra Park & Ride spaces to the south west of Cambridge Bus priority measures into the city centre CREATING MORE PARK & RIDE SPACES The existing Park
More informationNottingham Cycle City Frequently Asked Questions
Nottingham Cycle City Frequently Asked Questions About the scheme How much money is to be spent on cycling? And where is the money from? We have 6.1 million in Growth Fund which we will be investing directly
More informationRegional Bus Priority
Regional Bus Priority Recommendation(s) That the Board: i) Notes the systematic review for bus priority measures on the proposed Frequent Transit Network (FTN). Executive summary The New Network public
More informationLiving Streets response to the Draft London Plan
Living Streets response to the Draft London Plan Contents Living Streets response to the Draft London Plan... 1 About Living Streets... 2 Summary... 2 Consultation response... 3 Chapter 1: Planning London
More informationUniversity of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description
University of Victoria Campus Cycling Plan Terms of Reference 1.0 Project Description The Campus Cycling Plan, a first for the University, will provide a comprehensive and coordinated approach to support
More informationGD 0043/18 ACTIVE TRAVEL STRATEGY
GD 0043/18 ACTIVE TRAVEL STRATEGY 2018-2021 May 2018 Minister s Introduction There is strong evidence that regular physical activity reduces the risk of a range of health conditions. The best way to increase
More informationDouglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013
Douglas Land Use and Transportation Strategy (DLUTS) Summary August 2013 Background Douglas is a large and popular residential suburb of approximately 30,000 persons on the periphery of Cork City along
More informationWEST YORKSHIRE LTP CYCLE PROSPECTUS
WEST YORKSHIRE LTP CYCLE PROSPECTUS The West Yorkshire Ambition: To be recognised as a great place for safe cycling, inspiring more people to cycle more often. INTRODUCTION Cycling is low cost, environmentally
More informationBirmingham Connected. Edmund Salt. Transportation Policy Birmingham City Council
Birmingham Connected Edmund Salt Transportation Policy Birmingham City Council www.birmingham.gov.uk/connected Birmingham Connected the story so far Broadly following EU Guidance We ve done all of this
More informationStanding Committee on Policy and Strategic Priorities
POLICY REPORT Report Date: January 15, 2019 Contact: Steve Brown Contact No.: 604.873.9733 RTS No.: 12955 VanRIMS No.: 08-2000-20 Meeting Date: January 30, 2019 TO: FROM: SUBJECT: Standing Committee on
More informationWEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS
Page 1 of 9 EXECUTIVE SUMMARY Alberta Transportation ( AT ) is preparing to construct the final sections of the Calgary Ring Road. This includes the South West Ring Road ( SWRR ) (from Lott Creek Blvd
More informationUniversity of Leeds Travel Plan
University of Leeds Travel Plan 2015-2018 Contents 1: Introduction 1.1 What is a Travel Plan? 1.2 Why do we need one? 1.3 Sustainability Strategy 2: Overview 2.1 The bigger picture 2.2 The City scale 2.3
More informationONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT
One Size Doesn t Fit All S Corbett, C Chenery Page 1 ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT Authors/Presenters: Sam Corbett, Principal Transport
More informationUsing parking policy and parking levies to tackle transport and environmental issues
Using parking policy and parking levies to tackle transport and environmental issues Stephen Joseph, Chief Executive Campaign for Better Transport Campaign for Better Transport Charitable trust promoting
More informationPERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK
PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK Elaine Brick Principal Transport Planner AECOM Abstract Smarter Travel funding was awarded to the Chartered Institute of Highways and Transportation
More informationCycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design
Cycle traffic and the Strategic Road Network Sandra Brown, Team Leader, Safer Roads- Design Highways England A Government owned Strategic Highways Company Department for Transport Road Investment Strategy
More informationCSRM Modelling Summary Report for Cambridge and South Cambridgeshire Local Plans July 2013
CSRM Modelling Summary Report for Cambridge and South Cambridgeshire Local Plans July 2013 Prepared by WSP Group and Atkins EXECUTIVE SUMMARY This Summary Report outlines the work undertaken by WSP Group
More informationInitial ideas for bus and cycle links
Initial ideas for bus and cycle links HAVE YOUR SAY The Greater Cambridge City Deal working in partnership: Please complete the survey inside this leaflet or online at: www.gccitydeal.co.uk/a1307 by 1
More informationCycle network linking Wolverhampton city centre and Bilston town centre with employment sites and residential areas:
Context and Problems Corridor length 12.3 km; Population within 800m 59,922; Jobs within 800m 59,100; Unemployment 11%; Average Index of Multiple Deprivation 46; Households with no car 45%; Proportion
More informationDetermining bicycle infrastructure preferences A case study of Dublin
*Manuscript Click here to view linked References 1 Determining bicycle infrastructure preferences A case study of Dublin Brian Caulfield 1, Elaine Brick 2, Orla Thérèse McCarthy 1 1 Department of Civil,
More informationBuilding a sustainable world city: the role of transport and land use in London. London s relationship with transport
Building a sustainable world city: the role of transport and land use in London Peter Wright Policy Manager, TfL Overview London s relationship with transport Past Current Future Questions? 1 London s
More informationWellington Public Transport Spine Study
Wellington Public Transport Spine Study Study purpose Feasibility study Options for a high quality, high frequency PT system Key action from Ngauranga to Airport Corridor Plan (2008) Long-term outlook
More informationNorth West Non-Technical Summary of the Transport Assessment September 2011
North West Non-Technical Summary of the Transport Assessment September 2011 Introduction This is a Non-Technical Summary of the findings of the Transport assessment work undertaken for the proposed North
More informationANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025
ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025 May 2016 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable.
More informationLaunceston's Transport Futures. Greater travel options for the people of Launceston
Launceston's Transport Futures Greater travel options for the people of Launceston Final Draft 13 Jan 2014 1 Page Number Executive summary 3 What is Transport Futures? 4 Vision 6 Economy, access and liveability
More informationReport to Cabinet. 18 May 2016
Agenda Item 8 Report to Cabinet 18 May 2016 Subject: Presenting Cabinet Member: Proposed CCTV Enforcement of Traffic Contraventions in a Bus Lane (Key Decision Ref. No. HE030) Highways and Environment
More informationLEEDS BECKETT UNIVERSITY. Transport Strategy
LEEDS BECKETT UNIVERSITY Transport Strategy 2016-2021 2 3 Contents 1. Introduction 1. Introduction...3 Scope of the Document...3 Vision...3 Key Successes...3 2. Our Travel Behaviour...4 Staff and Student
More informationCAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION
CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION Title: Prepared by: A9 Dualling Project: Dalraddy to Slochd Murray Ferguson, Director of Planning and Rural Development and Gavin Miles, Head of Planning
More informationExhibit 1 PLANNING COMMISSION AGENDA ITEM
Exhibit 1 PLANNING COMMISSION AGENDA ITEM Project Name: Grand Junction Circulation Plan Grand Junction Complete Streets Policy Applicant: City of Grand Junction Representative: David Thornton Address:
More informationCONTENTS PREFACE 1.0 INTRODUCTION AND SCOPE 2.0 POLICY AND GOVERNANCE 3.0 SUMMARY OF PROGRESS 4.0 NATURE OF DEMAND 5.0 TRAVEL AND PARKING INITIATIVES
CONTENTS PREFACE 1.0 INTRODUCTION AND SCOPE 2.0 POLICY AND GOVERNANCE 3.0 SUMMARY OF PROGRESS 4.0 NATURE OF DEMAND 5.0 TRAVEL AND PARKING INITIATIVES 6.0. TARGETS PREFACE The University of St Andrews has
More informationWalking and Cycling Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland
Walking and Cycling Action Plan Summary A Catalyst for Change The Regional Transport Strategy for the west of Scotland 2007-2021 Strathclyde Partnership for Transport Contents Purpose...2 Issues, Constraints
More informationGreater Cambridge City Deal. Initial consultation on better bus, cycling and walking trips. Milton Road
Greater Cambridge City Deal Initial consultation on better bus, cycling and walking trips Milton Road Response by Kings Hedges, East and West Chesterton Labour Parties The Greater Cambridge City Deal has
More informationRochester Area Bike Sharing Program Study
roc bike share Rochester Area Bike Sharing Program Study Executive Summary ~ January 2015 JANUARY 2015 8484 Georgia Avenue, Suite 800 Silver Spring, MD 20910 3495 Winton Pl., Bldg E, Suite 110 Rochester,
More informationHigh frequency bus services operating to Little Island; Creation of a new Park and Ride site and train station at North Esk;
Cork County Council 7 th December 2018 Dear Adrian O Neill (aoneill@jbbarry.ie) The Transport and Mobility Forum, Cork (TMF) is a representative group of organisations who have a common interest in sustainable
More informationNational Transport Awards Cambridge Park & Ride
National Transport Awards Cambridge Park & Ride What Cambridgeshire has achieved q An award winning scheme focussed on quality. q Four sites, with a fifth site due to be built later this year. q 950,000
More informationService Business Plan
Service Business Plan Service Name Transportation Planning Service Type Public Service Owner Name Kaylan Edgcumbe Budget Year 2019 Service Owner Title Service Description Manager of Transportation Planning
More informationGreater Cambridge City Deal. Initial summary of responses to the Tackling Congestion: Call for Evidence
Greater Cambridge City Deal Initial summary of responses to the Tackling Congestion: Call for Evidence 9 th December 2015 Contents 1. Introduction and overview...2 2. Purpose and limitations of report...3
More informationLocal Sustainable Transport Fund
I II III Sustainable travel in Greater Manchester: The journey to a low carbon economy Greater Manchester has a vision of sustainable commuting at the heart of its blueprint for a low carbon economy, as
More informationContents Location Map Welcome and Introduction Travel Plan Management Science Park Accessibility Walking Cycling Bus Rail Car Sharing Contact Details
Contents Contents Location Map Welcome and Introduction Travel Plan Management Science Park Accessibility Walking Cycling Bus Rail Car Sharing Contact Details 1 2 3 5 7 9 11 13 15 17 19 Thames Valley Science
More informationPurpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need
Chapter 2 Purpose and Need 2.1 Introduction The El Camino Real Bus Rapid Transit (BRT) Project (Project) would make transit and other transportation improvements along a 17.6-mile segment of the El Camino
More informationAppendix 1 Transit Network Analysis
Appendix 1 Transit Network Analysis APPENDIX 1 TRANSIT NETWORK ANALYSIS The purpose of this appendix is to provide an update on the transit network analysis as it pertains to: i. SmartTrack ii. Scarborough
More informationWELCOME TO OPEN HOUSE # 1 June 14, 2017
Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE # 1 June 14, 2017 Please sign in and join our mailing list Purpose of Open House #1 & Study Area York
More informationENFIELD TOWN THE REVISED DESIGN
TOWN THE REVISED DESIGN We re turning Enfield into a borough that encourages walking and cycling, a place that s easy for all of us to get around however we choose to travel. A greener place, with safer
More informationCambridgeshire Local Transport Plan Policies and Strategy
Cambridgeshire Local Transport Plan 2011 2026 Policies and Strategy John Onslow Acting Executive Director of Environment Services Cambridgeshire County Council Shire Hall Castle Hill Cambridge CB3 0AP
More informationCity Deal: Call for Evidence
CambridgePPF Approach: Opportunity for everyone in Greater Cambridge area to benefit from a better transport system Provision of choice how to travel, whether to own a car, how children get to school etc
More informationRACQ SUBMISSION ON DRAFT BRISBANE CITY COUNCIL TRANSPORT PLAN FOR BRISBANE The Royal Automobile Club of Queensland Limited
RACQ SUBMISSION ON DRAFT BRISBANE CITY COUNCIL TRANSPORT PLAN FOR BRISBANE 2006-2026 The Royal Automobile Club of Queensland Limited 18 April 2008 Introduction The Royal Automobile Club of Queensland (RACQ)
More information21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE
21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE 21.07-1 Connectivity and Choice Transport connectivity and mode choice are critical to achieving productive, sustainable and socially just cities. Travel
More informationCity of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015
City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015 McPhail Transportation Planning Services Ltd. AGENDA 6:00 7:00 pm Viewing Boards / Q & A with the Team 7:00 7:50
More informationBicycle Master Plan Goals, Strategies, and Policies
Bicycle Master Plan Goals, Strategies, and Policies Mobilizing 5 This chapter outlines the overarching goals, action statements, and action items Long Beach will take in order to achieve its vision of
More informationOur journey a 20 year Transport Manifesto for the North East
Our journey a 20 year Transport Manifesto for the North East Sustrans submission to North East Combined Authority (NECA). March 2016 Summary Sustrans is a leading UK charity enabling people to travel by
More informationMoving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.
City of Cambridge Transportation Master Plan Public Consultation Centre March 7, 2018 5:00 8:00 PM Region of Waterloo City of Cambridge Transportation Master Plan Public Consultation Centre March 7, 2018
More informationBus and Transit Lane Review Update
Board Meeting / 25 February 2013 Agenda Item no.8(i) Bus and Transit Lane Review Update Glossary Auckland Transport New Zealand Transport Agency Transit Two Transit Three (AT) (NZTA) (T2) (T3) Executive
More informationNorth Coast Corridor:
North Coast Corridor: Connecting People, Transportation & Environment Legislative Hearing: 11.8.10 1 North Coast Corridor Region s Lifeline A Regional Strategy Mobility, Economy & Environment North Coast
More informationCHAPTER 7.0 IMPLEMENTATION
CHAPTER 7.0 IMPLEMENTATION Achieving the vision of the Better Streets Plan will rely on the ability to effectively fund, build and maintain improvements, and to sustain improvements over time. CHAPTER
More informationThe seamless journey The seamless journey: Public transport links with walking and cycling
The seamless journey The seamless journey: Public transport links with walking and cycling The PEP Workshop Kyiv, Ukraine June 8-9, 2011 Susanne Stölting UITP - A global membership UITP is... The network
More information4 Ridership Growth Study
Clause 4 in Report No. 15 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on November 16, 2017. 4 Ridership Growth Study
More informationCollege Green Submission May 2016 Executive Summary
College Green Submission May 2016 Executive Summary The advent of the Luas Cross City in 2017 will bring major changes to Dublin city. The city s central spine which will now be used by Luas, has for many
More informationPublic Consultation Centre For. Transportation Master Plan Update. Information Package
Public Consultation Centre For Transportation Master Plan Update Information Package Date Location Hours Tuesday, September 12, 2017 Wednesday, September 13, 2017 Tuesday, September 19, 2017 Cambridge
More informationRegional Transportation Needs Within Southeastern Wisconsin
Regional Transportation Needs Within Southeastern Wisconsin #118274 May 24, 2006 1 Introduction The Southeastern Wisconsin Regional Planning Commission (SEWRPC) is the official areawide planning agency
More informationLondon Cycle Network Annual Report 2000
London Cycle Network Annual Report 2000 A cycle network for London by 2005 A cycle network for London by 2005 The London Cycle Network will: provide local links between residential neighbourhoods, railway
More informationWELCOME. City of Greater Sudbury. Transportation Demand Management Plan
WELCOME City of Greater Sudbury Transportation Demand Management Plan Public Consultation Session St. Andrew s Place, Activity Hall 111 Larch Street Wednesday September 13, 2017 6:00 to 8:00 pm Welcome
More informationCorporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006
Corporate NO: C012 Report COUNCIL DATE: June 26, 2006 COUNCIL-IN-COMMITTEE TO: Mayor & Council DATE: June 22, 2006 FROM: General Manager, Engineering FILE: 0410-20(MoT/Gate) SUBJECT: Surrey Response on
More informationSpeed Limit Policy Isle of Wight Council
APPENDIX B Speed Limit Policy Isle of Wight Council 2009 Contents Section 1 Introduction 1.1 Links with the Local Transport Plan Section 2 Speed Limits on Urban Roads and Residential Areas 2.1 20mph Limits
More informationAppendix N(b): Portishead Station Outline Travel Plan
Portishead Branch Lane (MetroWest Phase 1): Environment Impact Assessment Appendix N(b): Portishead Station Outline Travel Plan Prepared for West of England Councils September 2017 1 The Square Temple
More informationPURPOSE AND NEED SUMMARY 54% Corridor Need 1. Corridor Need 2. Corridor Need 3. Corridor Need 4. Corridor Need 5
SUMMARY PURPOSE AND NEED Chapel Hill Transit ridership has increased Buses operate every 4 minutes and have standing room only Exceeding seated capacity by 12% Corridor Need 1 by more than 20 percent between
More informationROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE
ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE April, 2012 1 INTRODUCTION The need for transit service improvements in the Routes 42/55/676 corridor was identified during the Southern
More informationWelcome. Background. Goals. Vision
Welcome The formal Public Information Centre (PIC) for the Transportation Master Plan How We GO will be held in early 2017. At that time we will present the recommended transportation system for Niagara
More information1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria,
1.0 Introduction 1.1 The Transport Assessment has been prepared on behalf of Eon and Roger Bullivant Ltd in respect of the proposed mixed use sustainable urban extension of Drakelow Park. 1.2 The methodology
More informationA127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017
A127/A130 Fairglen Interchange Improvement Schemes Information Leaflet February 2017 1 2 Foreword By Councillor Kevin Bentley Essex is continuing to grow as a vibrant economic hub and as a fantastic place
More informationITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology decision. That the Mayors Council on Regional Transportation receive this report.
TO: FROM: Mayors Council on Regional Transportation Geoff Cross, Vice President of Planning and Policy DATE: September 27, 2017 SUBJECT: ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology
More informationTRANSPORT AND MOVEMENT
TRANSPORT AND MOVEMENT Movement Strategy Public Transport Cycling and Walking Road Network Parking Standards Transport Impact Assessments Traffic Management Policies DRAFT POOLBEG PLANNING SCHEME Movement
More informationWHITE PAPER: TRANSIT SERVICE FOR SOUTH SHAGANAPPI
9/27/2012 TRANSIT PLANNING WHITE PAPER: TRANSIT SERVICE FOR SOUTH SHAGANAPPI 2012 Calgary Transit 1 Table of Contents Purpose... 3 Area of Change... 3 Background... 3 Access to destinations... 5 Connecting
More informationDerby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN. Date: 20 th November, 2018.
Your Ref: Derby City Council Air Quality - Preferred Option Nov 2018 Derby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN Date: 20 th November, 2018. 1. Introduction: 1.1. Derby Cycling
More informationClimate Change Action Plan: Transportation Sector Discussion Paper: Cycling
Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling ontario.ca/climatechange Contents 1. Minister of Transportation s message... 3 2. Introduction... 5 3. Sector Overview and Support
More informationAPPENDIX B. TDM Existing Conditions
APPENDIX B TDM Existing Conditions SCARBOROUGH CENTRE TMP TRANSPORTATION DEMAND MANAGEMENT INTRODUCTION Scarborough Centre has grown into a mixed-use hub for population, transportation, and employment
More informationLoughborough University Travel Planning
Document Ti tle Client Name Loughborough University Travel Planning Loughborough University Travel Plan Executive Summary 2015-2020 23 December 2015 Loughborough University Travel Planning Project no:
More informationBerwick Health and Education Precinct: Casey Amendment C207 (Part 1) Submission to Planning Panels Victoria
Berwick Health and Education Precinct: Casey Amendment C207 (Part 1) Submission to Planning Panels Victoria August 2018 CONTENTS 1 Executive summary... 1 2 Summary of the amendment... 2 3 Submission...
More informationCycle Routes. Traffic Advisory Leaflet 3/95 March Introduction. Implementation. Project aims. Design
Traffic Advisory Leaflet 3/95 March 1995 Cycle Routes Introduction The leaflet summarises the findings of the Cycle Routes Programme. This research was undertaken for the Department of Transport by the
More information