1 APPENDIX H Public Consultation #

2 Segregated Bicycle Lane Pilot Project Consultation Summary Report November 5th, 00

3 Segregated Bicycle Lane Pilot Project November 5 th, 00 TABLE OF CONTENTS Introduction... Public Open House.... Location, Date and Time.... Notification....3 City of Ottawa and Consultant Project Team Attendance Open House Format Material Displayed Webpage Summary of Public Participation and Feedback Public Open House Attendance Summary of Comments Received Question : Right Turn Lane Alternatives General Comments Summary of Question and Answer Sessions Conclusions...9 APPENDICES APPENDIX A: APPENDIX B: APPENDIX C: APPENDIX D: Notification Material Display Material Comment Sheets Discussion Notes i

4 Segregated Bicycle Lane Pilot Project November 5 th, 00 Introduction The Ottawa Cycling Plan (OCP) identifies a strategy for the implementation of cycling network infrastructure and program initiatives in the City of Ottawa. When Ottawa City Council approved the OCP in July 008, a directive was given to evaluate the feasibility of an on-street, east-west dedicated cycling lane separated from traffic as a pilot project in the downtown area. In August 009, Transportation Committee provided further direction to determine whether segregated bike lanes would be appropriate in locations where pedestrian/vehicle/cycling conflicts have been identified. In March 00, a staff report responded to the Transportation Committee request regarding the transportation and financial advantages to investing in cycling infrastructure. As a result of the report findings and with direction from City Council, the City of Ottawa has initiated a pilot project for the identification of an east-west downtown segregated bike facility within the boundaries of Elgin Street in the east, Preston Street in the west, the Ottawa River to the north and Highway 47 to the south with a potential connection at the east end to the NCC Canal Pathway. To implement the bicycle lane pilot project, a study was carried out to identify and select a preferred east-west downtown corridor. The study involved a review of best practices in municipalities that have implemented segregated bicycle lanes (e.g. Toronto, Montreal, Vancouver, Portland, New York City, Amsterdam etc.) and a three-stage evaluation process to identify and select a preferred corridor. The corridor selected was Laurier Avenue between Bronson Avenue and the Rideau Canal. A preliminary design of segregated bicycle lanes on Laurier Avenue was undertaken and two technical advisory committee meetings were held in addition to numerous meetings with City staff. Following the completion of the preliminary design, a public advisory committee meeting was held followed by a public open house on November 5 th, 00. The public open house provided members of the general public with the opportunity to review the key elements of the design, and provide feedback, comments or suggestions on the project. The purpose of this report is to document and summarize the outcome of the public consultation. Public Open House. Location, Date and Time The Public Open House was held as follows: Ottawa City Hall Rotunda 0 Laurier Avenue Ottawa, ON November 5 th, 00 6:30 9:30 pm. Notification Public notification for the open houses was provided by newspaper advertisement and on the project webpage. Flyers were also sent to all addresses along and nearby Laurier Avenue within the study area to ensure all members of the community were aware of the project and public open house. McCormick Rankin Corporation November 00

5 Segregated Bicycle Lane Pilot Project November 5 th, 00.3 City of Ottawa and Consultant Project Team Attendance The following representatives from both the City of Ottawa and the Consultant Project Team were in attendance at the open houses: Mr. Colin Simpson City of Ottawa Ms. Mona Abouhenidy City of Ottawa Ms. Vivi Chi City of Ottawa Mr. Robin Bennett City of Ottawa Ms. Diane Holmes City of Ottawa Mr. Michel Bisson MRC Ms. Meghan Whitehead MRC Ms. Laura Maxwell MRC Ms. Roxane MacInnis MRC.4 Open House Format Attendees were greeted upon arrival and encouraged to sign the register as well as to submit written comments on the hand-out sheets provided. Attendees could either leave the comment sheet with the Project Team or send it by mail, fax, or to the City Project Manager. Project information was displayed around the room and representatives from the City of Ottawa and the Consultant Team were available to answer questions and discuss the project with attendees. In addition to the display material, a presentation was given by Colin Simpson followed by a question & answer session. The draft reports by MRC and Vélo Québec and the preliminary design of Laurier Avenue was made available electronically on the City s website..5 Material Displayed Material displayed at the open houses included: Welcome Terminology Advantages to segregated facilities Study Process Stage Evaluation Stage Evaluation Stage 3 Evaluation Linkages to Other Bicycle Facilities Detailed Design Elements Right-turn Treatment Alternatives Block-by-block Preliminary Designs Next steps A copy of the display material is included in Appendix B. McCormick Rankin Corporation 3 November 00

6 Segregated Bicycle Lane Pilot Project November 5 th, 00 3 Webpage The City established a webpage under the general public consultation section of the City s website to describe the pilot project and to share information about the timing, locations and material presented at the Public Open Houses at the following link: ( The comment sheets provided at the open houses, was also available on the project webpage. 4 Summary of Public Participation and Feedback 4. Public Open House Attendance The open house was held at City Hall and a separate meeting with representatives from the business and community associations within the study area was held prior to the open house. The open house session was well attended, with 78 people signed-in and an estimated 00 people present at the presentation. Based on the attendees who provided postal codes, the majority of attendees were from the downtown area, some from the Glebe and Westboro neighbourhoods, and a few individuals who travelled in from as far as Orleans, Hunt Club and Kanata. Of those that attended, 30% were residents of Laurier Avenue. 4. Summary of Comments Received Comment sheets were provided to open house attendees to gather comments or suggestions relating to the pilot project. The comment sheets were organized in two distinct sections. The first section was designed to solicit focused feedback from attendees on the potential right-turn treatments for motor vehicles at intersections. The second section was designed to gather written comments regarding the design elements recommended and their appropriateness for the segregated bicycle lane pilot project. A total of 39 comment sheets and responses have been received. Not all respondents provided answers to all of the questions. There have also been letters received both in support and opposition to the segregated bicycle lane project from local businesses. Support has been received from the Wellington West BIA, Telus, the Government of Canada, and Riverview Park Community Association while opposition has been received from the Bank Street BIA. 4.. Question : Right Turn Lane Alternatives The first question showed four possible right turn lane alternatives to be used along the segregated bicycle lane corridor and asked members of the public which of the four they felt was most appropriate for use on the proposed corridor. A total of forty-five people gave a preference or commented on the right turn lane alternatives. Of those, 8% (37) preferred Option A, 5% () preferred Option D and 3% (6) provided no preference. Option A reflects the proposed design for the right turn treatments along Laurier Avenue. McCormick Rankin Corporation 4 November 00

7 Segregated Bicycle Lane Pilot Project November 5 th, 00 The reasons provided for preferring Option A were almost all because of improved safety for cyclists as well as some people felt it provided better segregation for cyclists at intersections and it was a simpler or easier design to understand. Those preferring Option D liked that there is no conflict area between cyclists and vehicles at an intersection. While those who did not select a preferred option generally expressed a dislike for all options as well as the segregated bicycle lane pilot project. 4.. General Comments Question asked members of the public to provide comments on the design elements of the proposed pilot project. There was a wide range of feedback received relating to design elements as well as the impacts of the segregated bicycle lanes and the cycling network. These comments have been separated into the following categories: Design Elements o Pavement Markings and Signage o Driveways and Access Points o Left-Turn Bike Boxes o Buffer Treatments o Taxi Stands o Para Transpo o Loading Zones o Maintenance Concerns o Aesthetics o Bicycle Parking Impacts of Segregated Bicycle Lanes o Impacts on Property Value o Impacts on Vehicle Parking o Impacts on Traffic Traffic Flow Banned EBL at Metcalfe Banned Right-Turn-On-Red Safety Advanced Cycling Phase o Impacts on Pedestrians o Impacts on Business o Monitoring Plan Cycling Network and Connections o Route Choice o City-wide Cycling Network o East and West Cycling Connections Over the course of the consultation exercise, the public response contained several recurring themes concerning the design and implementation of the segregated bicycle lanes on Laurier Avenue. The detailed list of comments regarding the design and implementation of the segregated bicycle lanes are summarized in Table. A complete list of s and comments received are included in Appendix C. McCormick Rankin Corporation 5 November 00

8 Segregated Bicycle Lane Pilot Project November 5 th, 00 TABLE : SUMMARY OF COMMENTS ISSUES/CONCERNS/COMMENTS FREQUENCY OF RESPONSE Design Elements Pavement Markings and Signage 4 Coloured pavement markings is helpful and really stands out Blue road paint when warn may make traction more difficult for bikes and vehicles. Yield to Cyclists may cause an increase in congestion, pollution and driver frustration Work with NCC to improve signage at east end connection to QED How will parkers be warned about cyclists when opening their right doors? Driveways and Accesses 6 Signage should be used to alert vehicles exiting underground parking garages with reduced visibility The proposed right turn treatment at driveways violates the roadway engineering design principle that turning traffic use the lane closest to the direction of intended travel. Research shows increased accident rates from such designs. The parking lot entrances could cause potential conflicts or accidents Turning vehicles could block the bike lane All existing entrances and exits must be maintained Left-Turn Bike Boxes 4 Cyclists will be inconvenienced when waiting through two red light cycles to complete left turns. 3 Why no left turn pockets at Elgin? Buffer Treatments 4 Is the 30cm to 50cm buffer area wide enough? The concrete curb will reduce the width of the lanes used by cars The entire existing width of Laurier Avenue is required immediately adjacent the Lord Elgin s bus lot. Taxi Stands Concern regarding the conflicts between the frequently used Minto Place Taxi Stands and Cyclists. One suggestion to paint the pavement here to reinforce cyclist priority. Para Transpo 3 Relocating a Para Transpo zone to Bay Street will interfere with the bicycle lane on Bay Street Consider using the traffic circle at Laurier West for Para Transpo Won t a physical barrier interfere with the ability to access Para Transpo vehicles. Loading Zones Concern regarding the N-S pedestrians crossings times at Bank Street being adequate for couriers making deliveries. Tour bus unloading and loading at the Residence Inn By Marriott and Hotel Indigo is done on the North side of Laurier during off-peak hours. Maintenance 9 The bicycle lanes should be well plowed in the winter 5 Consider where the snow-melt water will accumulate and drain What will be the impact of the new lanes on City operating expenses? Whose taxes will pay for this? Increase the snow clearing priority on Gloucester to compensate for lost parking Aesthetics 7 Add trees and more potted plants More street food vendors will make the street more attractive We need more pedestrian friendly streets in downtown Making downtown accessible to cyclists will make it more attractive and interesting Planter boxes must be visible with reflective material Planter boxes will increase congestion and create a lack of visibility Bicycle Parking 4 In long term, work with buildings along Laurier to provide additional underground bicycle parking to improve security and deterrence to theft There are hundreds of bicycles parked in underground garage at Queen Elizabeth Towers (condominium buildings on Laurier Avenue) McCormick Rankin Corporation 6 November 00

9 Segregated Bicycle Lane Pilot Project November 5 th, 00 TABLE : SUMMARY OF COMMENTS ISSUES/CONCERNS/COMMENTS FREQUENCY OF RESPONSE More bicycle parking is required. Install a bike share program along the corridor Impacts of Segregated Bicycle Lanes Impact on Property Value 5 The loss of on-street parking on Laurier Avenue will decrease the property value of the condominiums. 3 There is no evidence to show whether property values will increase or decrease following the implementation of the segregated bicycle lanes. Impacts on Vehicle Parking 5 There is significant concern from residents of the condominiums on Laurier Avenue between Lyon Street and Bronson Avenue regarding the reduction in on-street parking along Laurier Avenue directly in front of the buildings. The concern is about visitor parking for friends and relatives as well as for services such as caregivers, tradespeople and deliveries. Some citizens felt the impact to on-street parking was not a concern. 3 It was suggested that the City charge more for parking to remove more cars from the road The reduction to on-street parking all along Laurier Avenue is a concern The reduction to on-street parking near businesses is a concern Concerned about empty parking bays bordered by planter boxes being used to pass vehicles on the right and vehicles colliding with the planter boxes Impacts on Vehicle Traffic 35 Some people expressed concern about the expected increase in traffic congestion along the corridor as shown in the MRC report. 9 The removal of turn lanes might cause accidents Increasing traffic congestion will encourage drivers to divert to smaller residential streets Giving priority to bikes over cars or parking is absurd Many people currently illegally park or stop along the curb, where will they go? Banning the EBL movement at Metcalfe Street will cause frustration for drivers Banning the EBL movement at Metcalfe Street will mean there is nowhere to turn left between Kent Street and Cumberland Street. This will frustrate drivers. Banning Right-turn-on-red movements along Laurier Avenue will needlessly increase driver frustration. 3 Communication and education for drivers and cyclists about the rules of the road will be very important. 3 The roads are safer if more bicycles and vehicles share the road. Concerned about fast cyclists but bixi tourists in Montreal slow people down. The lights should be timed to prevent bicycles from stopping at each light Suggest providing an advanced green phase for left-turning cyclists Support the advanced green phase for cyclists and pedestrians 3 Bikes should yield to right-turning vehicles Suggest using a five second advanced green phase for cyclists The advanced green phase for cyclists is expensive, unnecessary, increases congestion and driver frustration Impacts on Pedestrians 5 There should not be any requirement for sharing of space by bicycles and pedestrians. A lot of people cross Laurier Avenue between intersections. Adding bicycle lanes make an added peril for these people. A problem with the Maisonneuve Boulevard bike lanes was that pedestrians used them as an extension of the sidewalk, blocking bike access. I see no reason why this would not also happen in Ottawa. I am concerned that the bike lane will be too near the location where pedestrians wait for the crosswalk between City Hall and Confederation Park. I can see many conflicts between cyclists and pedestrians here. Between cars driving into the cross walks and bikes ignoring red lights it is very unsafe for pedestrians. McCormick Rankin Corporation 7 November 00 43

10 Segregated Bicycle Lane Pilot Project November 5 th, 00 TABLE : SUMMARY OF COMMENTS ISSUES/CONCERNS/COMMENTS FREQUENCY OF RESPONSE Impacts on Business The installation of segregated cycling lanes will have a major impact on the operation of businesses between Bank Street and Queen Elizabeth Driveway Business people, office visitors, construction, contractors and truck deliveries all need parking on Laurier. We need to know their views. Monitoring Plan 3 Any survey must include people who work and live on Laurier How many bikes per hour will be a minimum to justify maintaining this use of valuable transit space after the trial period is up? Cycling Network and Connections Alternative Route Choice Would prefer Somerset because: Preferences from cyclists at the first public open house Provides better connectivity and connects Preston to Elgin Better connection on west side Results of the second stage evaluation Would prefer Sparks Street because: It would revitalize the area It is currently empty Better west end connection Safer without traffic Would prefer Gladstone because: Connects Elgin to Preston and there was no significant opposition from business owners Would prefer Gloucester because: There is less traffic There is less opposition Lower-density residential Quieter, safer, less residential property, fewer pedestrians and more underground parking It is safer Would prefer Queen because: Less residential properties and less traffic Less impact on Laurier Avenue condominium owners Would prefer Wellington because: There is no on-street parking City-wide Cycling Network 7 Create a grid of North-South and East-West segregated bike lanes Work with the NCC to have designated bike lanes on Queen Elizabeth Parkway or Colonnel By Drive that is separate from multi-use pathway. Extend the bike lanes from Rideau River with a pedestrian/cycling bridge across the River then a route through Hemlock and join the NCC path to the aviation museum and Ottawa River. Phase II should include Bronson to Churchill on Scott Street More lanes should have been added for the first stage of a city-wide network Provide connections to New Edinburgh East and West End Connections 56 The proposed route does not provide and East-West cycling corridor from Preston Street to Elgin Street as originally proposed. A better connection to the market would be good The east and west end connections need to be improved to encourage cyclists to use the facility 8 The bike pocket at the east end of project (between Elgin and Canal) is dangerous. The westbound bike lane should be beside the sidewalk. The raised bicycle lane next to the sidewalk in front of City Hall could cause confusion between cyclists and pedestrians McCormick Rankin Corporation 8 November 00

11 Segregated Bicycle Lane Pilot Project November 5 th, 00 TABLE : SUMMARY OF COMMENTS ISSUES/CONCERNS/COMMENTS FREQUENCY OF RESPONSE Would like a better east-end connection from the Queen Elizabeth pathway and Colonnel By Drive The bike lanes should be continued east of Nicholas 4 The segregated bicycle lanes should continue to Nicholas 3 There is currently no good west end connection Should connect Laurier at Bronson to Scott 4 Could end west end at Percy. 3 Percy is a valuable west end connection A connection to the River Path on the west end is important 7 Need a signed route on Somerset and Cambridge to Laurier 3 The connection through the Technical High School site to Slater/Albert at Bronson is essential 4.3 Summary of Question and Answer Sessions Each open house included a presentation and a question and answer session. Mr. Colin Simpson, Senior Project Manager, Transportation Planning, gave a brief presentation explaining the segregated bicycle lane pilot project. The presentation included a brief overview of the background for the pilot project, a description of the advantages of segregated bicycle lanes, an explanation of the study process, an overview of the Laurier Avenue design, and an explanation of the next steps in the process. Open house attendees were given the opportunity to ask questions at the end of the presentation. The questions and discussion that followed pertained primarily to the cycling connections at the east and west ends as well as the loss of vehicle parking on Laurier Avenue between Lyon Street and Bronson Avenue. A summary of the discussion from the open house sessions is included in Appendix D. 5 Conclusions The feedback received from the consultation session showed a considerable amount of support for the project from the community but also a lot of concern from the residents of Laurier Avenue particularly regarding the loss of on-street parking spaces on Laurier Avenue. The main themes that surfaced through the public consultation process are described below. Right-Turn Design Alternatives were presented to the public for their comments on the best solution of four possible options. The preferred treatment was Option A, while Option D received some support. The other options received no support. The preferences provided by the members of the public are shown in Figure and reflect a total of 39 opinions. Option A reflects the proposed design for the segregated bicycle lane pilot project and is shown in Figure. Figure Preferred Right-Turn Alternatives Option D 5% 3 Option A 95% McCormick Rankin Corporation 9 November 00

12 Segregated Bicycle Lane Pilot Project November 5 th, 00 Figure Right-Turn Alternative Option A Safety is an important consideration in the design and implementation of the bicycle lanes along Laurier Avenue. Members of the public pointed out the importance of selecting appropriate pavement markings and signage to reduce conflicts between road users at intersections, driveways and access points. There were also comments received regarding the importance of proper snow clearance for the bicycle lanes and the need to carefully consider the drainage along the facility. Pedestrians represent the highest modal share travelling through the intersections along Laurier Avenue. It was pointed out by members of the public the importance of ensuring the safety of pedestrians along the corridor and improving the pedestrian environment. Impact on Residents was a main concern for people who live on Laurier Avenue. The main concern of residents was the decrease in on-street parking on Laurier Avenue as well as concern regarding the increased traffic congestion that will result. The condominium buildings on Laurier Avenue (Lyon St. to Bronson Ave.) have very limited underground parking for visitors and rely heavily on the existing onstreet parking on Laurier Ave. Some residents of Laurier Avenue expressed concern that the property value of the condominium units could decrease as a result of the pilot project. Impact on Business was raised as a concern from some businesses along Laurier Avenue. Some business representatives expressed concern regarding the decrease in on-street parking along Laurier Avenue and the potential impact this could have on them. The importance of making loading and unloading of delivery trucks and tour buses as safe and simple as possible to minimize the impact on these operations was highlighted. Similarly, it was pointed out that ensuring Para Transpo is able to continue to operate similar to existing conditions is very important. Traffic Congestion was a significant concern for many people and there was some concern that increased congestion will cause drivers to divert onto smaller residential streets. In addition to the reduction of vehicle travel lanes from four to two as required for the implementation of segregated bicycle lanes, there were a few design features which raised concern or opposition from some members of the public. Banning the eastbound-left (EBL) movement at Metcalfe Street was a concern particularly due to the existing ban on EBL movements between Kent Street and Cumberland Street. With limited locations where EBL movements are permitted, there is concern from the public that this may increase driver frustration and confusion along the corridor. There was also a concern that banning the right-turn-on-red movements will contribute to traffic congestion. There was also a mix of support and opposition regarding the advanced cycling and pedestrian phase along Laurier Avenue. Cycling Connections were a primary concern of many who provided feedback on the proposed segregated bicycle lane design. There was significant concern with the east and west end cycling McCormick Rankin Corporation 0 November 00

13 Segregated Bicycle Lane Pilot Project November 5 th, 00 connections. There were suggestions that the east end should be extended to east of Nicholas St. or King Edward Ave. There were numerous responses that the west end connection needed wore work and the most important connections presented were to Scott Street, the Ottawa River Pathway and Somerset Street. There were also some suggestions that the facility be terminated at Percy Street rather than Bronson Avenue. In addition to suggested connections or extensions of the segregated bicycle lanes along Laurier Avenue, there were suggestions that a network of segregated bicycle lanes should be provided including a grid of east-west and north-south streets. McCormick Rankin Corporation November 00

Glebe Neighbourhood Cycling Plan

Glebe Neighbourhood Cycling Plan Glebe Neighbourhood Cycling Plan Summary of Public Comments received after June 5 th Public Information Session Comment STUDY NETWORK CS9, CS8, E, E0 CS4, E CS4 CS8 E Suggestions for alternate cycling

More information

General Manager Planning and Growth Management Department

General Manager Planning and Growth Management Department M E M O / N O T E D E S E R V I C E Information previously distributed / Information distribué auparavant TO : Chair and Members of Transportation Committee DESTINATAIRE : Président et membre du Comité

More information

South Park Street Bicycle Lane Improvements. Public Engagement. November 2017

South Park Street Bicycle Lane Improvements. Public Engagement. November 2017 South Park Street Bicycle Lane Improvements Public Engagement November 2017 South Park Street Bicycle Lane Improvements WHAT WE HEARD REPORT Introduction To improve safety and bicycle route continuity

More information

Complete Streets: Policy Framework Complete Streets: Implementation Plans A more Complete Street: Laurier Bike Lane Pilot Project

Complete Streets: Policy Framework Complete Streets: Implementation Plans A more Complete Street: Laurier Bike Lane Pilot Project Complete Streets Initiatives City of Ottawa Complete Streets: Policy Framework Complete Streets: Implementation Plans A more Complete Street: Laurier Bike Lane Pilot Project Zlatko.Krstulic@Ottawa.ca May

More information

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Governance and Priorities Committee Report For the July 2, 2015 Meeting CITY OF VICTORIA For the July 2, 2015 Meeting To: Governance and Priorities Committee Date: From: Subject: Brad Dellebuur, A/Assistant Director, Transportation and Parking Services Executive Summary The

More information

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study

More information

Laurier Segregated Bike Lane Pilot Project July 2013 update

Laurier Segregated Bike Lane Pilot Project July 2013 update Laurier Segregated Bike Lane Pilot Project July 2013 update Presentation Overview Background Pilot Monitoring Results Mitigation Recommendations Next Steps Laurier 2 Background Laurier Avenue Segregated

More information

122 Avenue: 107 Street to Fort Road

122 Avenue: 107 Street to Fort Road : 107 Street to Fort Road November 24, 2015 4:30 8:00 p.m. Meeting Purpose Summarize project work completed to date Share results of public input from Phase 1 Share the draft concept plan and proposed

More information

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades

Harbord Street and Hoskin Avenue Bicycle Lane Upgrades STAFF REPORT ACTION REQUIRED and Bicycle Lane Upgrades Date: April 22, 2014 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Transportation Services 19 and

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017

Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017 Public Works Committee Meeting Richard E. Mastrangelo Council Chamber November 20, 2017 Purpose of Meeting Why are we here? Project Recap/Updates Project Limits/Segments Road Diet Concept Lessons Learned

More information

MCARTHUR AVENUE AS WE HEARD IT REPORT CYCLING LANES. City of Ottawa Transportation Services. Photo: istock

MCARTHUR AVENUE AS WE HEARD IT REPORT CYCLING LANES. City of Ottawa Transportation Services. Photo: istock MCARTHUR AVENUE CYCLING LANES Photo: istock AS WE HEARD IT REPORT City of Ottawa Transportation Services CONTENTS Background...1 Consultation Activities Summary...1 Public Commentary Questionnaire Results...2

More information

Chair and Members of Transportation Standing Committee. Bruce Zvaniga, P.Eng., Director, Transportation and Public Works

Chair and Members of Transportation Standing Committee. Bruce Zvaniga, P.Eng., Director, Transportation and Public Works P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. 12.1.1 Transportation Standing Committee December 7, 2017 TO: Chair and Members of Transportation Standing Committee SUBMITTED BY: ORIGINAL SIGNED

More information

Richmond-Adelaide Cycle Track Study Including Peter Street & Simcoe Street

Richmond-Adelaide Cycle Track Study Including Peter Street & Simcoe Street Richmond-Adelaide Cycle Track Study Including Peter Street & Simcoe Street Information Booklet #2 DRAFT November 5, 2013 Richmond St. west of University Ave. Table of Contents BACKGROUND... 3 WHAT S NEW

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation

More information

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX PHASE I...2 Do Not Enter Sign...3 One-Way Sign...4 Turn Prohibition...5 Pavement Markings...6 Speed Monitoring Trailer...7 Neighborhood Speed Watch...8 Police

More information

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY DRAFT PLAN City Council Meeting August 14, 2017 STUDY AREA Sedgwick Corridor State Route 160, principal arterial with Class 3 access management designation, commuter and freight route, connection to SR

More information

Dowling/Beaty Cycling Route

Dowling/Beaty Cycling Route Public Meeting #2 Dowling/Beaty Cycling Route May 17, 2017 6:00 p.m. 8:00 p.m. Parkdale Public Library - Auditorium 1303 Queen Street West How to Participate Share your questions, ideas and concerns We

More information

CPC Parking Lot Riverside Drive. Transportation Rationale

CPC Parking Lot Riverside Drive. Transportation Rationale CPC Parking Lot Transportation Rationale Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 September 2015 Novatech File: 114093 Ref: R-2015-153 Table of Contents 1.0 INTRODUCTION...

More information

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening We are here today to present the draft plan for the Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening project

More information

Item No Halifax Regional Council January 16, 2018 January 30, 2018

Item No Halifax Regional Council January 16, 2018 January 30, 2018 P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. 9.2.1 Halifax Regional Council January 16, 2018 January 30, 2018 TO: Mayor Savage and Members of Halifax Regional Council Original Signed SUBMITTED

More information

Richmond-Adelaide Cycle Tracks

Richmond-Adelaide Cycle Tracks Public Drop-In Event Richmond-Adelaide Cycle Tracks June 25, 2018 12:00 p.m. 3:00 p.m. 4:30 p.m. 7:30 p.m. Metro Hall, Rotunda 55 John Street 1 Purpose of Event In Scope Communicate an update about the

More information

Richmond, Adelaide and Simcoe Street Pilot Cycle Tracks. Special Report: Opinions of Property Representatives & Drivers

Richmond, Adelaide and Simcoe Street Pilot Cycle Tracks. Special Report: Opinions of Property Representatives & Drivers Richmond, Adelaide and Simcoe Street Pilot Cycle Tracks Public Consultation Summary Special Report: Opinions of Property Representatives & Drivers Prepared by: Jason Diceman, Sr. Public Consultation Coordinator

More information

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

Public Information Centre

Public Information Centre WELCOME Public Information Centre Father Tobin Road Lougheed Middle School - Library Wednesday November 7, 2012 7:00 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background The City

More information

BYRON AVENUE TRAFFIC CALMING DESIGN

BYRON AVENUE TRAFFIC CALMING DESIGN BYRON AVENUE TRAFFIC CALMING DESIGN Photo: istock AS WE HEARD IT REPORT City of Ottawa Transportation Services ottawa.ca 3.1.1 TTY 613-580-2401 CONTENTS Background...1 Consultation Activities Summary...1

More information

Zlatko Krstulich, P.Eng. City of O9awa

Zlatko Krstulich, P.Eng. City of O9awa Zlatko Krstulich, P.Eng. City of O9awa 1. Introduction to the Ontario Traffic Manual Series 2. What is OTM Book 18: Bicycle Facilities? 3. Study / Committee Team Members 4. Brief overview of the content

More information

Corydon-Osborne Neighbourhood Plan Recommendations

Corydon-Osborne Neighbourhood Plan Recommendations Corydon-Osborne Neighbourhood Plan Recommendations November 12, 2013 Plan Boundaries The current boundaries of Stafford Street to the west and Donald Street to the east ignore two key cycling routes; Harrow

More information

WELCOME Public Information Centre

WELCOME Public Information Centre WELCOME Public Information Centre Fernforest Drive Brampton Soccer Centre Community Room #2 Tuesday January 19, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background

More information

Bicycle Facilities Planning

Bicycle Facilities Planning Bicycle Facilities Planning Overview Types of Cyclists Purpose for Riding Types of Facilities Bike Lanes Bicycle Boulevards Cycle Tracks Intersections Signals Signing and Marking Discussion Types of Bicyclists

More information

Complete Streets. Designing Streets for Everyone. Sarnia

Complete Streets. Designing Streets for Everyone. Sarnia Complete Streets Designing Streets for Everyone Sarnia Complete Streets ~ Sarnia ~ 2018 Introduction Our City is made up of a network of streets that we use to go for a walk, cycle to work, drive to the

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project The City of Edmonton is planning a major bike route on the southside of Edmonton. The Strathcona Bike Route will connect the communities of Strathcona, Garneau and the University area,

More information

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY Appendix 2 City of Mississauga Lakeshore Road FINAL REPORT Transportation Review Study December 2010 EXECUTIVE SUMMARY Study Purpose

More information

PEDESTRIAN ACTION PLAN

PEDESTRIAN ACTION PLAN ATTACHMENT 2 CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN This page intentionally left blank EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY Setting the Stage

More information

ECONOMY PEOPLE ENVIRONMENT

ECONOMY PEOPLE ENVIRONMENT Report Back on Local Transit Improvements May 29, 2013 ECONOMY PEOPLE ENVIRONMENT Intro Council Requested Report Back Topics Progress on Planning for Broadway Subway False Creek Bridges Local Transit Improvements

More information

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015 HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE 1 MAY 14, 2015 ACCESSIBILITY Under the Accessibility Standards 2015 for Customer

More information

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) New benches Plant evergreen trees Widen existing sidewalk from 1.5m to 1.8m Marked crosswalk 1.8m wide sidewalk Add pedestrian oriented lights

More information

Sherwood Drive Traffic Circle

Sherwood Drive Traffic Circle Strathcona County Sherwood Drive Traffic Circle Online Survey Results April 7, 215 I. Executive Summary The Sherwood Drive Traffic Circle Survey was administered in March 215. In total, 2,263 residents

More information

to the Public Information Centre for the Downtown Traffic Study

to the Public Information Centre for the Downtown Traffic Study to the Public Information Centre for the Downtown Traffic Study City of Sault Ste. Marie July 25, 2018 Purpose of Study Determine if changes to one-way corridors can enhance downtown s character and spaces

More information

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists Cyclists and Bikeways: What s your match? guide to bikeway options for a variety of cyclists The workshop and this resource were made possible by funding from the Province of Ontario via the Ministry of

More information

Active Transportation Facility Glossary

Active Transportation Facility Glossary Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike

More information

Chapter 3 DESIGN SPECIFICATIONS

Chapter 3 DESIGN SPECIFICATIONS Brampton PathWays Planning and Design Guidelines 27 Chapter 3 DESIGN SPECIFICATIONS 3.1 CLASS 1 MULTI-USE PATH Off-road multi-use trails are the backbone of the Brampton PathWays Network. They are typically

More information

Tunnel Reconstruction South 5 th Street Association October 16, 2018

Tunnel Reconstruction South 5 th Street Association October 16, 2018 Tunnel Reconstruction South 5 th Street Association October 16, 2018 Reconstructing the Tunnel 2 Service During Tunnel Reconstruction April 2019 through July 2020 3 Projected Cross River Travel Paths of

More information

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division TO: Chair and Members Public Works Committee COMMITTEE DATE: June 18, 2018 SUBJECT/REPORT NO:

More information

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION CITY OF TORONTO TRANSPORTATION SERVICES DIVISION 2016 TRAFFIC CALMING GUIDE FOR TORONTO TABLE OF CONTENTS Introduction

More information

Major Bike Routes 102 Avenue Workshop April 21, 2015

Major Bike Routes 102 Avenue Workshop April 21, 2015 Major Bike Routes 102 Avenue Workshop April 21, 2015 Our Purpose Today Provide context on how Major Bike Routes fit into Edmonton s future Share information on what we heard in our last phase, and how

More information

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON JANUARY 10, 2017

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON JANUARY 10, 2017 TO: FROM: SUBJECT: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON JANUARY 10, 2017 KELLY SCHERR, P.ENG., MBA, FEC MANAGING DIRECTOR ENVIRONMENTAL & ENGINEERING SERVICES AND CITY ENGINEER QUEENS AVENUE

More information

City of Davis East Covell Corridor Plan

City of Davis East Covell Corridor Plan Community Open House #2 January 22, 2014 6:00 8:00 p.m. Veterans Memorial Center, Club Room City of Davis Introduction The (ECCP) is a taking a comprehensive look at the existing transportation systems

More information

CITY OF VANCOUVER ADMINISTRATIVE REPORT

CITY OF VANCOUVER ADMINISTRATIVE REPORT CITY OF VANCOUVER ADMINISTRATIVE REPORT Report Date: May 31, 2007 Author: Paul Storer Phone No.: 604.873.7693 RTS No.: 06348 VanRIMS No.: 13-5000-20 Meeting Date: June 12, 2007 TO: FROM: SUBJECT: Standing

More information

EXECUTIVE SUMMARY. Vision

EXECUTIVE SUMMARY. Vision Vision Walking and bicycling in Salt Lake City will be safe, convenient, comfortable, and viable transportation options that connect people to places, foster recreational and economic development opportunities,

More information

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM. City of Cambridge Transportation Master Plan Public Consultation Centre March 7, 2018 5:00 8:00 PM Region of Waterloo City of Cambridge Transportation Master Plan Public Consultation Centre March 7, 2018

More information

Byron Avenue. Public Meeting. Thursday June 16, Traffic Calming Design Sherbourne Road to Island Park Drive

Byron Avenue. Public Meeting. Thursday June 16, Traffic Calming Design Sherbourne Road to Island Park Drive Byron Avenue Traffic Calming Design Sherbourne Road to Island Park Drive Public Meeting Thursday June 16, 2016 Our Lady of Fatima Parish 153 Woodroffe Avenue 6 9pm 1 Project Summary Area Projects Background

More information

Nanaimo Transportation Master Plan. Phase 1 Consultation Summary

Nanaimo Transportation Master Plan. Phase 1 Consultation Summary Nanaimo Transportation Master Plan Phase 1 Consultation Summary Transportation Advisory Committee Meeting Wednesday December 12, 2012 Agenda Study Update Phase 1 Consultation Process Phase 1 Consultation

More information

Broad Street Bicycle Boulevard Design Guidelines

Broad Street Bicycle Boulevard Design Guidelines Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified

More information

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2. Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW

More information

Winnipeg Walk Bike Projects Downtown Tire Talk - Summary

Winnipeg Walk Bike Projects Downtown Tire Talk - Summary Winnipeg Walk Bike Projects Downtown Tire Talk - Summary Downtown Projected Bike Lane System Connecting The Forks to the Exchange District (Fort Street, Garry Street & The Forks to Assiniboine Connection)

More information

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project

West Capitol Avenue Road Rehabilitation and Safety Enhancement Project West Capitol Avenue Road Rehabilitation and Safety Enhancement Project Stakeholder Focus Group Meeting #2 Tuesday, August 28, 2018 7:00 8:00 a.m. West Sacramento City Hall 1110 West Capitol Avenue, West

More information

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input WELCOME Purpose of the Open House The Town of Smiths Falls has initiated the Beckwith Street Redevelopment Plan that includes the preparation of a streetscape functional design for the renewal of Beckwith

More information

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc

More information

Austin Avenue Bridges Project. Public Meeting Summary

Austin Avenue Bridges Project. Public Meeting Summary Austin Avenue Bridges Project Public Meeting Summary June 29, 2016 Red Table Safety and Connectivity Notes: 1. Would like to see forensic report evaluations 2. What is the lifespan? 3. Extend safety considerations

More information

Bloor Street Design Feasibility Study and Bike Lane Pilot Project. Public Works and Infrastructure Committee

Bloor Street Design Feasibility Study and Bike Lane Pilot Project. Public Works and Infrastructure Committee PW12.1 STAFF REPORT ACTION REQUIRED Design Feasibility Study and Bike Lane Pilot Project Date: March 30, 2016 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager,

More information

Edenbrook Hill Drive Traffic Calming Study

Edenbrook Hill Drive Traffic Calming Study WELCOME Public Information Centre Edenbrook Hill Drive Traffic Calming Study Fletchers Meadow Secondary School Wednesday January 20, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 11 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving traffic modifications on Twin Peaks Boulevard between Christmas

More information

Toronto Complete Streets Guidelines

Toronto Complete Streets Guidelines 88 90 5.1 Cycling Design Principles 92 5.2 Context-sensitive Cycling Facilities 96 5.3 Key Cycling Elements Cycling infrastructure provides choice in how people are able to move around the city. Cyclists

More information

Centennial Neighbourhoods Transportation Management Plan Summary of Phase 1 Consultation. Overview of Issues

Centennial Neighbourhoods Transportation Management Plan Summary of Phase 1 Consultation. Overview of Issues 1 Centennial Neighbourhoods Transportation Management Plan Summary of Phase 1 Consultation The Centennial Neighbourhoods Transportation Management Plan (CNTMP) is being undertaken to support the Secondary

More information

50 Avenue S.W. Corridor Study Glenmore Aquatic Centre Drop-In Event

50 Avenue S.W. Corridor Study Glenmore Aquatic Centre Drop-In Event Project overview The City of Calgary is conducting a transportation corridor study of 5 Avenue S.W., between Crowchild Trail and 4A Street S.W. In 29, it was reclassified as a Parkway under the Calgary

More information

Bike Flemingdon Park and Thorncliffe Park Public Consultation Report

Bike Flemingdon Park and Thorncliffe Park Public Consultation Report Bike Flemingdon Park and Thorncliffe Park Public Consultation Report January 2018 Prepared by: Robyn Shyllit Senior Public Consultation Coordinator Public Consultation Unit, City of Toronto Contents Executive

More information

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St.

Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St. Clybourn Ave. Protected Bike Lane Study Halsted St. to Division St. Nathan Roseberry, Senior Engineer Pam Broviak, Project Manager July 24, 2014 Agenda Project Goals Existing Roadway Conditions Traffic

More information

The Wiggle Route in Context

The Wiggle Route in Context The Wiggle Route in Context In a city of hills, the Wiggle is an important route because it winds its way along the flattest streets from Market to the Panhandle, bringing residents to local parks and

More information

Cycle Track Design Best Practices Cycle Track Sections

Cycle Track Design Best Practices Cycle Track Sections Design Best Practices Sections It is along street segments where the separation and protection methods of cycle tracks offer more comfort than conventional bicycle lanes, and are more attractive to a wide

More information

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City. A CHANGING CITY By the year 2040, Edmonton will be home to more than 1 million people. To accommodate growth and support a healthy and compact city, we need a new approach to development/redevelopment

More information

Summary of Comments Public Meeting: Marietta Street Resurfacing Project Atlanta Contemporary August 29, 2017 / 6:00 pm to 8:00 pm

Summary of Comments Public Meeting: Marietta Street Resurfacing Project Atlanta Contemporary August 29, 2017 / 6:00 pm to 8:00 pm Renew Atlanta hosted a public meeting to discuss the Marietta Street Resurfacing project at. Councilmember Cleta Winslow attended the public meeting, where over seventy (70) citizens to include representatives

More information

EUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK

EUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK EUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK CITY OF SYRACUSE DEPARTMENT OF PUBLIC WORKS 1200 CANAL STREET EXTENSION SYRACUSE, NEW YORK 13210 DRAFT REPORT DATE: November 13,

More information

Terwillegar Drive Expressway Draft Concept Plan

Terwillegar Drive Expressway Draft Concept Plan Terwillegar Drive Expressway Draft Concept Plan Anthony Henday Drive to Whitemud Drive November 28 5:00-8:00 p.m. December 1 10:00 a.m. - 3:00 p.m. Let s Talk Today you can: Learn about the new direction

More information

Chapter 5. Complete Streets and Walkable Communities.

Chapter 5. Complete Streets and Walkable Communities. Chapter 5. Complete Streets and Walkable Communities. 5.1 Description of Complete Streets. Cities throughout the world, and specifically the United States, are coming to embrace a new transportation and

More information

Memorandum. Sunday, July 13, Saturday, July 19, 2014

Memorandum. Sunday, July 13, Saturday, July 19, 2014 Memorandum To: David Lowin, Brooklyn Bridge Park Corporation From: Daniel Schack, AICP, PTP Date: Re: Brooklyn Bridge Park Pier 5/6 Loop Road Traffic Study Project No: 14-01-2407 At the request of Brooklyn

More information

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information

City of Seattle Edward B. Murray, Mayor

City of Seattle Edward B. Murray, Mayor City of Seattle Edward B. Murray, Mayor Department of Transportation Scott Kubly, Director Eastlake Community Council 117 E Louisa St. #1 Seattle, WA 98102-3278 January 28, 2016 RE: Roosevelt to Downtown

More information

Rideau Canal Corridor Pedestrian Crossing Study. Queen Elizabeth Dr.: Preston St. to Laurier Ave. & Colonel By Drive: Hog s Back to Daly Ave.

Rideau Canal Corridor Pedestrian Crossing Study. Queen Elizabeth Dr.: Preston St. to Laurier Ave. & Colonel By Drive: Hog s Back to Daly Ave. Rideau Canal Corridor Pedestrian Crossing Study Queen Elizabeth Dr.: Preston St. to Laurier Ave. & Colonel By Drive: Hog s Back to Daly Ave. Background: Canal parkways evolved over past 100 years Today

More information

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines I. Purpose: The City of Elizabeth City is committed to ensure the overall safety and livability of residential neighborhoods. One

More information

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment Sarah Rocchi, Vice-President, Projects, Opus International Consultants (Main Presenter) Catherine Mohoruk,

More information

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015 Implementing Complete Streets in Ottawa October 1, 2015 The Essentials Complete Streets Implementation Framework will become part of the routine delivery of City transportation projects Approach uses every

More information

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District No Turn on Red Regulations STAFF REPORT ACTION REQUIRED Date: June 1, 2010 To: From: Toronto and East York Community Council Director, Transportation Services, Toronto and East York District Wards: Trinity

More information

Pennsylvania Avenue (CR 484) Design Alternatives Study

Pennsylvania Avenue (CR 484) Design Alternatives Study MEMORANDUM Pennsylvania Avenue (CR 484) Design Alternatives Study Prepared for: APRIL 2016 Prepared By TABLE OF CONTENTS Project Background... 2 Previous Concept... 2 Existing Conditions... 4 New Alternatives...

More information

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm Southview Blvd & 3 rd Avenue Improvement Project Public Open House December 4, 2014 5 to 7pm Southview Blvd & 3 rd Avenue Public Information Meeting Agenda Presentation 5:30 to 6:15 pm Purpose of Project

More information

December 15, City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor Ottawa, ON K1P 1J1

December 15, City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor Ottawa, ON K1P 1J1 December 15, 2017 City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor Ottawa, ON K1P 1J1 Attention: Mr. Wally Dubyk, C.E.T. Project Manager, Infrastructure Approvals Dear

More information

Transportation Master Plan Advisory Task Force

Transportation Master Plan Advisory Task Force Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved

More information

Welcome! Public Open House on UBC s Transportation Plan

Welcome! Public Open House on UBC s Transportation Plan 1 Welcome! Public Open House on UBC s Transportation Plan Public open house hours: to When it comes to on-campus transportation, what do you think is working well and what are some opportunities for improvement?

More information

5 Transit & Traffic. Overview

5 Transit & Traffic. Overview 5 Transit & Traffic Overview Montgomery Place s roadways and overall traffic circulation are unique in the city due to the narrow streets and avenues with boulevards; however, no sidewalks or curbs in

More information

TRAFFIC CALMING TOOLBOX. For the residents of the City of Decatur, Georgia

TRAFFIC CALMING TOOLBOX. For the residents of the City of Decatur, Georgia TRAFFIC CALMING TOOLBOX For the residents of the City of Decatur, Georgia 2 City of Decatur Traffic Calming Toolbox Public Works Department 2635 Talley Street Decatur, GA 30030 404.377.5571 3 Welcome to

More information

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION

5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION 5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION Having held a public hearing, that Council approve the preliminary designs

More information

City of Wilsonville 5 th Street to Kinsman Road Extension Project

City of Wilsonville 5 th Street to Kinsman Road Extension Project City of Wilsonville 5 th Street to Kinsman Road Walking Tour & Neighborhood Workshop Summary Report Public Outreach Overview On July 18 th, 2017, the City of Wilsonville hosted a neighborhood walking tour

More information

CONNECTING PEOPLE TO PLACES

CONNECTING PEOPLE TO PLACES CONNECTING PEOPLE TO PLACES 82 EAST BENCH MASTER PLAN 07 Introduction The East Bench transportation system is a collection of slow moving, treelined residential streets and major arteries that are the

More information

Frequently Asked Questions (FAQ)

Frequently Asked Questions (FAQ) Frequently Asked s (FAQ) Study Process... 2 Rapid Transit Service and Operations... 5 Public Consultation... 8 Business Impacts... 8 Design and Property Impacts... 9 Construction Impacts...12 Traffic,

More information

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN 8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN The Transportation Services Committee recommends the adoption of the recommendation contained in the following report

More information

Fairview and Main Local Streets Improvement Plan

Fairview and Main Local Streets Improvement Plan PIM#2 Summary Report Meeting Format Date & Time: Location: Address: Prepared By: Community Open House August 11, 2016 5:30 p.m. 7:30 p.m. Red Lion Hotel 1800 W. Fairview Avenue, Boise Stephanie Borders,

More information

LANSDOWNE TRANSPORTATION DEMAND MANAGEMENT REPORT March 1, 2017 Final Report. Ottawa Sports & Entertainment Group (OSEG)

LANSDOWNE TRANSPORTATION DEMAND MANAGEMENT REPORT March 1, 2017 Final Report. Ottawa Sports & Entertainment Group (OSEG) LANSDOWNE TRANSPORTATION DEMAND MANAGEMENT REPORT 2016 March 1, 2017 Final Report Ottawa Sports & Entertainment Group (OSEG) TABLE OF CONTENTS SECTION 1 BACKGROUND... 1 1.1 Introduction... 1 1.2 Lansdowne

More information

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017 WELCOME Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017 Purpose of the Open House The purpose of this Open House is to gain public input on the bicycle lanes proposed

More information

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session Intersection Improvement: 1 Welcome WHY IS AN INTERSECTION IMPROVEMENT NEEDED? 2 Traffic volumes for Sturgeon Road, Silver Avenue and Murray Park Road exceed the capacity of the existing 4-way stop controlled

More information

Safe Routes to School Action Plan Aberdeen, Idaho

Safe Routes to School Action Plan Aberdeen, Idaho Background Aberdeen, Idaho is a largely agricultural community of nearly 2,000 people and is located in the southeast portion of the state on the western edge of American Falls Reservoir. The community

More information