Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension
|
|
- Mervyn Griffith
- 6 years ago
- Views:
Transcription
1 Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate 81, exit 300, southbound acceleration lane onto I-81 from westbound Interstate 66. $3,437,423 Interstate 81 - Exit 307 Study (Stephens City area) UPC $1,300,000 This is a study to examine possible relocation of the Interstate 81 exit 307 interchange south of its current location. Proposed locations and traffic projections will be examined as part of the study. Estimated Study Completion: Early 2017 This project is supported by and the Town of Stephens City through resolutions passed by each of these bodies. Scott Alexander,
2 Interstate 81 - Exit 310 at Route 37 (Kernstown Interchange) Contract Value: $24,967,843 Estimated Completion: Early summer 2017 UPC This project will reconstruct the interchange ramps on Interstate 81, exit 310, at Route 37 (south) in. The interchange configuration will feature a spread diamond interchange, which will widen and spread the ramps outward from their current intersections with Route 37. This design provides additional turn storage and adds dual left- and right-turn movements to move traffic more efficiently. Robert Good, P.E., The interchange is being designed with future scalability, which can accommodate changes in traffic patterns and traffic volumes. The design can accommodate conversion of the interchange to a partial cloverleaf, a full cloverleaf with collector-distributor lanes, or a multi-level semi-directional interchange. As part of the design contract, the consultant will produce preliminary designs for the final interchange configuration, ensuring that the spread diamond design accommodates and facilitates future phases, as neighboring development and traffic patterns demand more of the interchange. The final build-out of the interchange will be done in several future phases. In association with the interchange improvements, the Crosspointe developer will continue the extension of Route 37 east of I-81 and build it as part of their construction site. The Federal Highway Administration approved the Interchange Modification Request (IMR), on April 18, The IMR consists of a three-phase approach to improving the interchange. Phase one includes the design for the spread diamond configuration, right of way acquisition, utility relocations and construction of the spread diamond interchange. Future phase two may include a partial cloverleaf loop and/or widening of the Route 37 bridge over I-81. All phase two work depends on future traffic demand and available transportation funding. Future phase three may be the completion of cloverleaf or flyover ramps. The cloverleaf option may also include collector distributor lanes. Collector distributor lanes run parallel to the interstate roadway, taking traffic of the mainline a mile to half-mile prior to the interchange ramps. All phase three work depends on future traffic demand and available transportation funding. A $24,967,843 contract was awarded to General Excavation Inc. (GEI) of Warrenton, Virginia, on February 18, 2015 with completion in early summer 2017.
3 Interstate 81 - Exit 313 at Routes 17/50/522 (Winchester Interchange) Study Estimated Interchange Study Cost: $2 million Study Complete Early 2017 Bridge/Interchange Estimated Ad Date: 2021 Study Scott Alexander, Bridge Eulogio A. Javier II, P.E., This is an Interchange Modification Report (IMR) study to review the configuration and function of the Interstate 81 interchange at Routes 17/50/522 in the Winchester area. This study is scheduled for completion by early 2017, pending outcome of related SMART SCALE application. Following the this study, the Route 17/50/522 (Millwood Pike) deteriorated bridge over I-81, along with necessary interchange improvements, will be redesigned and replaced to provide added capacity. Based on the preliminary study results and magnitude of corridor improvements identified, an alternative phased approach has been evaluated for SMART SCALE application. The SMART SCALE application was submitted in fall UPC 88820, UPC Interstate 81 - Exit 313 at Routes 17/50/522 Interchange Improvement WinFred MPO This project replaces the structurally deficient Route 17/50/522 bridge over Interstate 81 at exit 313. The new bridge will have added capacity. Application ID 1625 $37,343,039 $37,343,039 Structurally deficient means a bridge is one with some maintenance concerns that do not pose a safety risk. A deficient bridge typically requires maintenance and repair and eventual rehabilitation or replacement to address deficiencies. To remain open to traffic, structurally deficient bridges are often posted with reduced weight limits that restrict the gross weight of vehicles using the bridges.
4 Interstate 81 - Exit 315 at Route 7 Northbound Deceleration Lane Extension WinFred MPO $643,139 This project extends the Interstate 81, exit 315, northbound deceleration lane. Application ID 1610 $643,134 Interstate 81 - Exit 323 Near West Virginia Line Acceleration and Deceleration Lanes Application 2015 UPC Winchester- MPO SMART SCALE Funding: $3,450,904 This project consists of the lengthening of the Interstate 81, exit 323 southbound on-ramp acceleration lane and taper and the northbound on-ramp deceleration lane and taper to improve weave movements and safety. $3,450,904 Estimated Ad Date: Fall 2019 Al Scott,
5 Interstate 81 Exit 317 and Redbud Road - I-81 Northbound Deceleration Ramp and Red Bud Road Realignment Application ID 1473 UPC $11,239,131 This project realigns the Interstate 81, exit 317, northbound deceleration ramp to Route 11. The realignment brings the ramp to the current intersection location with Redbud Road and Route 11. The project also realigns Redbud Road to intersect with Snowden Bridge Boulevard. $11,239,131 Route 11 at Apple Valley Road Application 2015 This project consists of extending the existing right-turn lane and taper from the southbound approach on US 11 onto westbound Apple Valley Road. UPC SMART SCALE Funding: $514,704 The project also includes access management improvements with the elimination of an existing commercial entrance in proximity to the intersection. $514,704 Estimated Ad Date: Spring 2020 Al Scott,
6 Route 11 North Widening - Snowden Bridge Boulevard to Route 761 (Old Charles Town Road) Application ID 1471 This project widens Route 11 north from Snowden Bridge Boulevard to Route 761 (Old Charlestown Road). $28,346,132 Work includes removing the intersection of Redbud Road and Route 11 and realigning Redbud Road to intersect with Snowden Bridge Boulevard. $28,346,132 Route 11 (Valley Pike)/Shawnee Drive Intersection Improvements Application ID 1409 WinFred MPO $4,227,102 $4,141,793 This project provides more efficient traffic management along Valley Pike (Route 11) in the area of Shawnee Drive. This location has two closely spaced intersections, one at Shawnee Drive with a traffic signal and one at Opequon Church Lane, which is unsignalized. Improvements include widening Valley Pike at both intersections, adding a traffic signal at Opequon Church Lane plus adding crosswalks and pedestrian signal phases at both intersections. Upon completion of this work, safety will be enhanced with improved pedestrian mobility and reduced areas of congestion.
7 Route 11 (Martinsburg Pike) Application 2015 UPC Route 661 (Welltown Road) UPC adds capacity on Route 11 with a third southbound lane between Interstate 81 and Route 37. UPC SMART SCALE Funding: $1,078,947 (UPC 94847) $2,500,755 (UPC 94847) $1,159,583 (UPC ) Ad Date: Advertised in Fall project not awareded yet UPC adds a turn-lane on Route 661 at the Route 11 intersection. The projects are being done concurrently for economies of scale and coordination efficiency. This SMART SCALE proposal increases capacity on US 11 with the addition of a third southbound through lane between Highway 37 and Interstate 81, exit 317. The additional lane will also improve the operation and safety of the existing intersection with Welltown Road. Charles Gardner,
8 Route 37 Bypass Study Estimated Cost for Preliminary Engineering Study Only UPC 85972: $2,463,376 Study Completion Date: Early 2017 UPC 85972, UPC This study is to define the Route 37 Eastern Bypass alignment. The project is 15.5-miles long and extends from the Route 37 southern end at Interstate 81 south to Route 37 east of I-81 north. The purpose of this study is to provide with the preliminary alignment necessary to allow the County to plan industrial, commercial and residential developments in the area of the proposed Route 37 Eastern Bypass corridor. Estimated Cost for Preliminary Engineering Phase 2 UPC : Will be part of SMART SCALE prioritization process. $4,236,624 Thomas Marando, P.E., The alignment will include future interchanges at Warrior Drive (Future), Route 522 (Front Royal Pike), Route 50 (Millwood Pike), Route 657 (Senseny Road), Route 7 (Berryville Pike), Snowden Boulevard (Future), Interstate 81 and Route 37 (west of US 11). The County has prioritized three segments for further engineering development: Segment 1: Route 37 - Interstate 81 to Route 522 Segment 2: Route 37 - Route 37 (Northern Termini) to Route 7 Segment 3: Route 37 - Route 522 to Route 7 Currently VDOT is performing a traffic analysis on Segment 1: Route 37 - Interstate 81 to Route 522; including evaluating interchange alternatives at Warrior Drive (Future), and Route 522 (Front Royal Pike). The traffic analysis is scheduled to be complete in This project consists of the extension of Highway 37 as a four-lane, divided facility for approximately 1.8 miles from the future intersection of Tasker Road to Front Royal Pike (Route 522). The project includes a full diamond interchange at the future alignment of Warrior Drive and a half diamond interchange at Route 522.
9 Route 37 East to Warrior Drive South Application ID 1476 UPC This project extends Route 37 from the Tasker Road interchange to the future location of Warrior Drive. Warrior Drive will be extended from its existing terminus to Route 37. $49,510,785 $49,510,785 Route 37 Extension - Interstate 81 Exit 310 to Route 522 Application ID 1438 UPC This project extends Route 37 from its current termini as constructed with the Interstate 81, exit 310 project (UPC 75881). Route 37 will be extended to Route 522. $102,187,419 $102,187,414 Thomas Marando,
10 Route 277 (Fairfax Pike) Widening Application 2015 UPC SMART SCALE Funding: $29,134,878 $35,934,878 This project consists of the reconstruction of Fairfax Pike (Route 277) to provide a four-lane, divided roadway with access management improvements from the Interstate 81, exit 307 northbound ramps to Double Church Road. Intersection improvements along the project include the addition of turn lanes and relocation of Aylor Road. The project will also include pedestrian and bicycle facilities. Estimated Ad Date: Late 2019 Thomas Marando, P.E., Route 277 Widening and Access Management Route 277 Phase II Application ID 1478 This project completes the Route 277 Phase II work. The project extends from Double Church Road (Route 641) to Warrior Drive. $25,428,540 $25,428,540
11 Route Warrior Drive Intersection Application ID 1480 This project provides an extension of the existing right-turn lane from eastbound Route 277 to southbound Warrior Drive, which provides access to Sherando High School. $476,644 Work includes installation of a pedestrian pedestal on the northwest corner and installation of a bike/ pedestrian facility along Warrior Drive from Route 277 to the high school. $476,644 Route 644 (Papermill Road) at Route 522 (Front Royal Pike) Turn Lane This project provides the installation of a full right-turn lane from eastbound Paper Mill Road to southbound Route 522. Application ID 1444 $507,262 $507,262
12 Route 655 (Sulphur Spring Road) UPC The project reconstructs a portion of Route 655 (Sulphur Spring Road) located in, east $8,502,836 of the City of Winchester, between Route 50 (Millwood Pike) and Clarke County. This area serves several residential communities and provides access to the landfill. The improvements will Estimated Ad Date: provide better road alignment and turning movements. Spring 2018 Right of way: Underway The improvements to the road include two 12-foot travel lanes and 6-foot paved shoulders. The road Construction advertisement: Construction not alignment will be slightly adjusted to straighten out a gradual curve. Right and left-turn lanes will be funded constructed on Route 655 at Routes 50 and Route 656. Also the box culvert on Route 655 at Sulphur Spring Run will be extended to accommodate the new turn lane onto Route 50. Jennifer Housman, P.E., This project is funded for preliminary engineering and right of way. Construction is unfunded at this time. During construction the road will remain open, serving the county landfill. Route 655 (Sulphur Springs Road) Reconstruction Application ID 1503 UPC This project reconstructs Route 655 (Sulphur Springs Road) from Route 50/17 (Millwood Pike) to Route 656. $3,443,253 $2,812,608
13 Route 657 (Senseny Road) at Crestleigh Drive Intersection Improvements Application ID 1474 $2,548,582 This project improves the intersection of Route 657 (Senseny Road) at Crestleigh Drive. Proposed work includes turn lanes and potential signalization. $2,548,582 Route 659 (Valley Mill Road) UPC $7,200,000 Estimated Ad Date: Spring 2017 This project Improves the alignment of Route 659 (Valley Mill Road) with Route 7 in. The projecte extends from Route 7 to 0.5-mile east of Channing Drive. This is a potential revenue sharing project. Steven Damron,
14 Route 767 (Fox Drive) at Route 522 (North Frederick Pike) Application 2015 UPC This project consists of a new right turn lane and taper from the northbound approach on Fox Drive onto eastbound North Frederick Pike (Route 522). SMART SCALE Funding: $650,996 $650,996 Estimated Ad Date: Fall 2020 Al Scott, Tevis Street Extension - Extension of New Hope Drive $8,000,000 Estimated Ad Date: Fall 2018 UPC This project is a component of the Tevis Street connector road between Route 522 and Pleasant Valley Road. This is a locally administered Revenue Sharing Project for the extension of Hope Drive and the realignment of Papermill Road and Tevis Street in the City of Winchester. Steven Damron,
15 Tevis Street Extension UPC $1,600,000 Estimated Ad Date: Fall 2017 This project is a component of the Tevis Street connector road between Route 522 and Pleasant Valley Road. This is a locally administered Revenue Sharing Project to extend Tevis Street in the City of Winchester from Legge Blvd to Interstate 81 right of way limits to connect with Revenue Sharing Tevis Street projects, UPC 94846, Steven Damron, Tevis Street UPC 87616, Estimated Cost Tevis Street Extension: $9,591,404 (UPC 87616) $1,400,000 (UPC 94846) Estimated Total Cost Tevis Street Completion: $10,991,404 This is the Tevis Street connector road between Route 522 and Pleasant Valley Road. The project includes a flyover bridge across Interstate 81 and will be coordinated with a project in the City of Winchester to complete Tevis Street from I-81 flyover bridge to Pleasant Valley Road. This is a Revenue Sharing project and is and being locally administered. Estimated Ad Date: Summer 2018 Steven Damron,
16 Meadow Branch Avenue Extension - City of Winchester $4,000,000 Estimated Completion: Fall 2017 Steve Damron, UPC This project will construct a new section of Meadow Branch Avenue that will connect the road from the intersection of Meadow Branch/Merrimans Lane near Amherst Street to the intersection of Meadow Branch/Buckner Avenue. The length of this new roadway will be approximately 0.6 miles and will be constructed on undeveloped property. Project advertised in February Green Circle Trail Final Phases - City of Winchester Application ID 1434 City of Winchester $5,759,500 $3,092,000 This project completes Green Circle within the City of Winchester. The Green Circle Trail is a multi-use, bike/pedestrian path that connects multiple key activity centers within the City of Winchester. This project will include a one-mile section of a 10-foot wide shared use path. The Winchester Green Circle project, when completed, will provide safe facilities and accommodations for both bicyclists and pedestrians, to access major destinations in the city. The circle connects areas of historic, recreational, educational and natural interest. Some of those attractions include Glen Burnie Historic House & Gardens/Museum of the Shenandoah Valley, Jim Barnett Park, Shenandoah University, Old Town Winchester, and the Abrams Creek Wetlands Preserve. Where possible the routes follow local streams emphasizing the restoration, protection and interpretation of natural resources and urban green spaces.
17 Middle Road Improvements Project Application ID 1455 City of Winchester This project constructs bike lanes, sidewalks, curb and gutter, and provided drainage improvements on Middle Road, from Valley Avenue (Route 11) to the Winchester City limits. $3,526,670 $2,026,670 Traffic Signal Replacement at North Loudoun/Brooke Road/ Brick Kiln Road Application ID 1456 City of Winchester $535,000 $335,000 This project replaces an aging traffic signal at the intersection of North Loudoun Street (Route 11) and Brooke Road. This intersection is complex, including a CSX Railroad crossing along with the convergence of three roadways including North Loudoun Street, Brooke Road and Brick Kiln Road. Project was screened out for SMART SCALE funding since it was replacing an existing signal, for which maintenance funds can be used.
18 Museum of the Shenandoah Valley Trails Application ID 1454 City of Winchester This project constructs approximately three miles of bike/pedestrian trails on the 90-plus acres of property where the Museum of the Shenandoah Valley is located in the City of Winchester. $3,167,774 $1,495,274 This work is located along the museum frontage on Route 50 and connects to the Green Circle Trail. These trails will be open to the public, year-round, at no cost.
Transportation Committee Project Priority List
Transportation Committee Project Priority List Funded Priorities PRIORITY 1 - Interstate 81, Exit 310 Improvements Description: Construct improvements to Exit 310 interchange. Capital Cost: $54,200,000
More informationRoute 7 Corridor Study
Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi
More informationRoute 29 Solutions Projects
Route 29 Solutions Route 29 Solutions Projects www.route29solutions.org October 10, 2014 Route 29 Widening to Six Lanes Albemarle County This project will widen a 1.8-mile segment of Route 29 from four
More informationAPPENDIX D COST SUMMARY TABLES
APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to
More informationAppendix D: Concept Screening
Concept Description Concept #1 Route 288 Roadway Widening This concept consists of constructing a third lane on northbound and southbound Route 288 between Powhite Parkway and US 360. This improvement
More informationRoute 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.
28 VIRGINIA DEPARTMENT OF TRANSPORTATION \\ CULPEPER DISTRICT Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. PROJECT
More informationAPPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD
APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR
More informationBasalt Creek Transportation Refinement Plan Recommendations
Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for
More informationHighway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County
Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County
More informationDescription: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.
I-64 KIPDA ID # 350 Project Type: ROADWAY CAPACITY Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. Purpose: Project will improve capacity and address safety concerns.
More informationStaunton. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation
2020 Transportation Plan Developed for the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration
More informationLos Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation
Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto
More informationBluffdale/ UDOT South High-T Intersection Project Type Operations
Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South
More informationChapter 5 Future Transportation
Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,
More informationLegislative Update Williamsburg Residency
Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:
More informationEXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative
EXHIBIT B-1 PROJECT DESCRIPTION Phase 1 of the Preferred Alternative The Transform 66 Public-Private Partnership (P3) Project (the Project ) means the Phase 1 of the Preferred Alternative components of
More informationWelcome to the Sellwood Bridge Project Open House!
Welcome to the Sellwood Bridge Project Open House! 5:30 7:30 pm Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting: Learn how the Preferred
More informationNORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association
NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 20, 2012 Garrett Moore VDOT District Administrator, Northern Virginia Paving Program 2012 This season's paving program will
More informationCity Avenue Projects
City Avenue Projects City Avenue Special Services District Conceived in the early 1990 s Lita Cohen, Jim Ettelson, Joe Manko, and Michael Nutter Saint Joseph s provided key start-up support. True Public/Private
More informationAttached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.
SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i July 25, 2016 6. HIGHWAY MATTERS A. PLAN PROJECT UPDATES Attached for your reference please find project updates on ongoing VDOT construction projects
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.
More informationThe Year Ahead: Virginia Department of Transportation Northern Virginia District
The Year Ahead: Virginia Department of Transportation Northern Virginia District Nicholas J. Roper, P.E. District Project Development Engineer Phone: (703)259-1953 Email: nicholas.roper@vdot.virginia.gov
More informationApplication to AASHTO to recognize six suggested relocations of U.S. Bicycle Route 1 in the Northern Virginia District.
September 7 th, 2007 Application to AASHTO to recognize six suggested relocations of U.S. Bicycle Route 1 in the Northern Virginia District. Acting District Administrator Mr. Morteza Salehi has endorsed
More informationProject Description Form 8EE
Project Description Form 8EE Basic Project Information Submitting Jurisdiction/Agency: Town of Dumfries Project Title: Route 1 (Fraley Blvd) Widening: Brady's Hill Road to Dumfries Road Project Location:
More informationI-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer
I-264 CORRIDOR EVALUATION STUDY September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer Study Overview Interchange Locations Study Context Follow-up
More informationI-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT
I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT March I-215 / NEWPORT ROAD INTERCHANGE PROJECT Fact Sheet Project Overview This project will reconstruct the existing interchange located on Interstate
More informationFY 2006 TRANSPORTATION CAPITAL PROGRAM
Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported
More informationDesign Criteria. Design Criteria
F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road
More informationWelcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study
Welcome Thank you for your interest in the Lewis & Clark Viaduct Concept Study Please use the arrows in the upper left hand corner to navigate through the presentation. Use the envelope icon to ask a question
More informationMulti-Modal Traffic Analysis. Parisi and Associates
Mill Valley to Corte Madera Bicycle and Pedestrian Corridor Study Appendix D: Multi-Modal Traffic Analysis Prepared by Parisi and Associates August 2009 Appendix D - Multi-Modal Traffic Analysis Table
More information3.0 PROJECT DESCRIPTION
The following section of the Draft EIR contains a description of the proposed Elk Grove Boulevard/SR 99 Interchange Modification project, consistent with the requirements of CEQA Guidelines Section 15124.
More informationGiles Run Connector Road
Giles Run Connector Road Laurel Hill Adaptive Reuse Area to Laurel Crest Drive South County Federation Meeting June 14, 2016 History Connector road included in the Laurel Hill Comprehensive Plan amendment
More informationCounty of Fairfax, Virginia. Department of Transportation
Fairfax County Parkway History 2 Planning began 50 years ago 1960s Washington s Regional Transportation Plan Recommends improved north/south travel Construct Capital Beltway and outer beltway Outer beltway
More information5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION
5. MODIFICATIONS AT JEANNE D ARC BOULEVARD/REGIONAL ROAD 174 INTERCHANGE INTERSECTION - PUBLIC HEARING COMMITTEE RECOMMENDATION Having held a public hearing, that Council approve the preliminary designs
More informationTerwillegar Drive Expressway Draft Concept Plan
Terwillegar Drive Expressway Draft Concept Plan Anthony Henday Drive to Whitemud Drive November 28 5:00-8:00 p.m. December 1 10:00 a.m. - 3:00 p.m. Let s Talk Today you can: Learn about the new direction
More informationTRASBURG RANSPORTATION
TRASBURG RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION
More informationDESIGN MEMORANDUM WITH DESIGN EXCEPTIONS SP SP
DRAFT NOT FINAL (Note: document was not finalized due to an eastbound stopping site distance design issue that requires more detailed bridge and roadway design considerations. This discussion starts on
More informationAGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive
AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell
More informationBrooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017
Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn
More informationPRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT
PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT Prepared by: In Association with: November 2013 EXECUTIVE SUMMARY Patton Township, in partnership
More informationCity of Gainesville Transportation/Roadway Needs PROJECT SUMMARY
A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St
More informationINDEX. Geometric Design Guide for Canadian Roads INDEX
Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines
More informationLynchburg District Update
Lynchburg District Update Virginia Statewide Bicycle and Pedestrian Advisory Committee Spring Meeting May 16 th, 2017 David Cook Transportation Planner, VDOT Lynchburg District Table of Contents Active
More informationSTREET AND HIGHWAY PLAN
STREET AND HIGHWAY PLAN Introduction The street and highway system in the Winston-Salem Urban Area consists of thousands of miles of traffic carrying facilities, ranging from short local residential streets
More informationFY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects
Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE
More informationAPPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES
1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237
More informationPublic Meeting #1 Comment Summary
Public Meeting #1 Comment Summary This summary includes comments received on comment forms and during conversations between attendees and project team staff at the February 18, 2016 public open house.
More informationTRANSPORTATION & MOBILITY
TRANSPORTATION & MOBILITY ROADWAY SYSTEM There are approximately 40 miles of roadways in Manitou Springs. For planning purposes, roadways are typically assigned a functional classification which defines
More informationCulpeper District. Albemarle County Monthly Report October, 2011
Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications
More informationDuwamish Way-finding and CTR Report
V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail
More informationSECTION 2 ALTERNATIVES INCLUDING PROPOSED ACTION 2.0 ALTERNATIVES INCLUDING PROPOSED ACTION 2.1 INTRODUCTION 2.2 ALTERNATIVES CONSIDERED BUT REJECTED
2.0 ALTERNATIVES INCLUDING PROPOSED ACTION 2.1 INTRODUCTION The City of Starke is currently a bottleneck for traffic traveling along U.S. 301 in Bradford County. Local urban traffic combined with increasing
More informationAccess Routes from US 101 to the Richmond San Rafael Bridge
Access Routes from US 101 to the Richmond San Rafael Bridge TAM Board Meeting January 28, 2016 RSRB Project Elements Eastbound Third Lane: Sir Francis Drake Blvd. to Marine Street 10 ft Barrier Separated
More informationFinal Project Prioritization Plan
Final Project Prioritization Plan For the NM 599 Corridor Executive Summary I. EXECUTIVE SUMMARY NM 599 serves as a North/South by-pass for vehicles traveling through Santa Fe and a WIPP route for low
More informationAPPENDIX E Evaluation of Improvement Alternatives
APPENDIX E Evaluation of Improvement Alternatives Table E-1 Preliminary Comparison of Design Alternatives, Concord Table E-2 Preliminary Comparison of Route 2 Improvement Packages, Acton and Concord TABLE
More informationMCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017
MCA Member Meeting: Tysons Update Fairfax County Department of Transportation November 13, 2017 Presentation Overview Balancing Land Use and Transportation How Are We Doing? Studies and Projects Neighborhood
More informationARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY
ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,
More informationAppendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station
Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,
More informationFDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017
April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related
More informationCHAPTER 5 TRANSPORTATION GOAL
CHAPTER 5 TRANSPORTATION GOAL Create and sustain a transportation system that meets the demands for existing and future traffic; skillfully integrates existing and planned development; and provides a safe
More informationIowa Highway 58 Corridor Improvement Study
1 Iowa Highway 58 Corridor Improvement Study Public Informational Meeting May 6, 2014 2 Welcome and Introductions Randy Lorenzen, City of Cedar Falls Engineer 3 Outline of Presentation Review of Project
More informationCHAPTER 3 STUDY AREA OPERATIONAL OVERVIEW
HPTER 3 STUY RE OPERTIONL OVERVIEW This chapter describes the overall traffic operations within the study area under existing and future conditions and focuses on individual intersections not directly
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17
More informationInstitute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017
Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Northern Virginia
More informationTransportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners
Transportation Investment Act Gwinnett County Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners April 25, 2012 Transportation Investment Act Gwinnett County Gwinnett County Transportation
More informationProject Overview. Rolling Road Widening Fairfax County. Get Involved. Design Public Hearing. Contact Information
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More informationMeadow Woods Elementary School
Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete
More informationUPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase
Presentation for County Board, February 27, 2018 Regular Hearing N. Lynn Street Esplanade and Custis Trail Improvements Funding Request for VDOT Construction Bid Award UPC Design 70762 / CN 109813 Locally
More informationEXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %
Fee Program Project List - 2004 General Plan Cost Estimate 2004 Alternative Route Study West Valley Condition 27 Alternative connection between, Feasibility study. Included in /White Rock Connector. south
More informationClackamas County Comprehensive Plan
ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They
More informationBikeway Elements. Study Area A: Needwood Road and Vicinity (Figures 3 and 4)
B R I G G S C H A N E Y R O A D I N T E R C H A N G E The ROD includes a partial interchange at Briggs Chaney Road, which is not included in the Fairland Master Plan. This interchange includes ramps to
More informationRM 620/RM 2222 CONNECTOR (BYPASS) STATUS REPORT RM 620/2222 STATUS
RM 620/RM 2222 CONNECTOR (BYPASS) STATUS REPORT January 25, 2017 RM 620/2222 BYPASS - INTRODUCTION Because of the enormous traffic demand at the RM 620/2222 intersection, TxDOT searched for a way to relieve
More informationMandan Commission Meeting August 2, 2016 Mandan City Hall
Mandan-Bismarck Corridor Improvement Study Mandan Commission Meeting August 2, 2016 Mandan City Hall 2014 HDR, Inc., all rights reserved. Mandan Corridors Study Schedule 2015 2016 Study Kick Off August
More informationTRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS
ITEM #9: TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by
More informationSummary: Mercer County Princeton Avenue & Spruce Street Study January 2009
Summary: Several recent studies have assessed potential development and redevelopment opportunities in the Mercer Crossing area of Trenton, Ewing, and Lawrence. This Princeton Avenue and Spruce Street
More informationARRENTON RANSPORTATION
ARRENTON RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION
More informationBay to Bay Boulevard Complete Streets Project
Bay to Bay Boulevard Complete Streets Project Dale Mabry Highway to Bayshore Boulevard February 08, 2018 Photo Source: Tampa Bay Times Alessandra Da Pra Meeting Format Introduction Resurfacing Information
More information4.0 Recommended Transportation Plan
4.0 Recommended Transportation Plan The Town wants to provide a multi modal transportation system for its residents in order to provide them with options when making trips. The automobile has always been
More informationFairfax County Parkway Widening Fairfax County
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More information3.0 Future Conditions
3.0 Future Conditions In order to be able to recommend appropriate improvements to the transportation system of the Town, it is important to first understand the nature and volume of traffic that is expected
More informationI-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016
I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016 Mike Snare, PE, Project Manager Virginia Department of Transportation GEC Michelle Holland, Megaprojects
More informationFY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects
Camden County Bus Purchase Project ID Numbers: D0601 / 068082 In the DVRPC region, a combination of fixed route, subscription, and demand responsive transit services are provided in Camden County by Senior
More informationFDOT Treasure Coast Traffic Report
July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationMIAMI & ERIE CANAL SHARED USE TRAIL
New Bremen, Ohio Survey Transportation Engineering Grant Writing Project Cost Engineers Estimate: $509,358 Bid Amount $480,892 Size 1.12 miles $597,696 ODOT TEP $249,815 ODNR Completion Projected 11/15/14
More informationTHE VDOT STARS PROGRAM AN OVERVIEW FOR DESIGNERS. Integrating Transportation Planning, Project Development, and Project Programming
THE VDOT STARS PROGRAM AN OVERVIEW FOR DESIGNERS Integrating Transportation Planning, Project Development, and Project Programming March 21, 2017 AGENDA Program Overview Project Development Project Types
More informationWelcome to the first issue of Nuts and Bolts, a monthly overview of VDOT activities for elected officials in Northern Virginia.
December 2002 Welcome to the first issue of Nuts and Bolts, a monthly overview of VDOT activities for elected officials in Northern Virginia. Each month, you will receive the latest information on projects
More informationProposed Action, Purpose and Need Technical Memorandum
Proposed Action, Purpose and Need Technical Memorandum MoPac (State Loop 1) Intersections, Austin District From North of Slaughter Lane to South of La Crosse Avenue CSJ: 3136-01-015 Travis County, Texas
More informationFDOT Treasure Coast Traffic Impact Report
January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance
More informationCity of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County
City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton
More informationRoute 7 (East Market Street) Interchange at Battlefield Parkway Town of Leesburg Project No: UPC Presentation to Town Council
Route 7 (East Market Street) Interchange at Battlefield Parkway Town of Leesburg Project No: 0007-253-109 UPC 106573 Presentation to Town Council June 26, 2017 Council Decisions East Market Street / Battlefield
More informationRegional Transportation Needs Within Southeastern Wisconsin
Regional Transportation Needs Within Southeastern Wisconsin #118274 May 24, 2006 1 Introduction The Southeastern Wisconsin Regional Planning Commission (SEWRPC) is the official areawide planning agency
More informationINTERSTATE 540 IMPROVEMENT STUDY
INTERSTATE 540 IMPROVEMENT STUDY WASHINGTON COUNTY AND BENTON COUNTY APRIL, 2006 INTERSTATE 540 IMPROVEMENT STUDY WASHINGTON COUNTY AND BENTON COUNTY April, 2006 Prepared by Parsons Transportation Group
More informationTransportation Corridor Studies: Summary of Recommendations
Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field
More informationCity Avenue Projects
City Avenue Projects City Avenue Special Services District Conceived in the early 1990 s Lita Cohen, Jim Ettelson, Joe Manko, and Michael Nutter Saint Joseph s provided key start-up support. True Public/Private
More informationPine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session
Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session February 20, 2018 Meeting Agenda Study Overview Existing Conditions Access Management Potential Gateway Features
More informationRoadway Design Manual
Roadway Design Manual Manual Notice Archive by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2009-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective
More informationFY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION
AGENDA ITEM #8: FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by the state
More informationPROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia
PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia PRELIMINARY ENGINEERING REPORT Prepared for: Prepared by: July 2017 Table of Contents 1
More informationFDOT Treasure Coast Traffic Impact Report
September 29, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report September 29 through October 6, 2017 TREASURE COAST Construction and maintenance
More information4.0 Recommended Transportation Plan
4.0 Recommended Transportation Plan The Town wants to provide a multi modal transportation system for its residents in order to provide them with options when making trips. The automobile has always been
More informationINGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI
INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:
More information