DRAFT. Jesmond Vale Lane. Meldon Terrace. Heaton Road. King John Street. Newcastle City Council
|
|
- Ashlie Watts
- 6 years ago
- Views:
Transcription
1 Remove footway build-out and reposition crossing equipment & tactile paving uild-out kerb to reduce turning speeds Jesmond Vale Lane Provide gap in parking for right turning cycles Light segregation set-back 5m from junction Realign kerb and remove refuge island but provide crossing south of junction Meldon Terrace 2.0m northbound cycle lane protected by light segregation placed within lane leaving a clear 1.7m space for cycling (spacing increased between light segregation to enable right turning movement) Realign kerb and maintain tight junction geometry & raised table Realign kerb and footway (footway space maintained above 2m) To tie into planned cycle route Scheme to tie into CC design for southern section of King John Street Existing / Proposed ollard Rev Description Drawn File: C:\Users\JohnMcQueen\Documents\03 s\14 ewcastle S4P\02 Heaton and Ouseburn\01 Design\02 Concept\02 Working\S4P-HO-C.dwg / Meldon Terrace Sheet 01 of 05 o. Tel: C-S4P-HO-C :0 JMQ xxx 09/05/17 Ordnance Survey (c) 16. All rights reserved. Licence number
2 6.00 Stage Sequence Diagram Maintain access to property Provide bus stop boarder strip to help cyclists avoid having to dangerously over-taking stationary buses Provide right turning space for cycles US SHELTER urlington Gardens Simonside Terrace uild-out kerb to reduce turning speeds Maintain access to off street parking uild-out kerb to reduce turning speeds 2.0m northbound cycle lane protected by light segregation placed within lane Introduce new crossing & refuge island Maintain access to off street parking Provide early start green for cycles 5.00 Rothbury Terrace Provide new ASL Existing / Proposed ollard Remove footway build-out and reposition crossing equipment & tactile paving Rev Description Drawn File: C:\Users\JohnMcQueen\Documents\03 s\14 ewcastle S4P\02 Heaton and Ouseburn\01 Design\02 Concept\02 Working\S4P-HO-C.dwg / Rothbury Terrace Sheet 02 of 05 o. Tel: C-S4P-HO-C :0 JMQ xxx 09/05/17 Ordnance Survey (c) 16. All rights reserved. Licence number
3 274 Maintain access to property 272 Maintain access to property 2.1m southbound cycle lane protected a clear 1.8m space for cycling Maintain access to property 254 Maintain access to property Existing / Proposed ollard Rev Description Drawn File: C:\Users\JohnMcQueen\Documents\03 s\14 ewcastle S4P\02 Heaton and Ouseburn\01 Design\02 Concept\02 Working\S4P-HO-C.dwg (between no. 246 & 274) Sheet 03 of 05 o. Tel: C-S4P-HO-C :0 JMQ xxx 09/05/17 Ordnance Survey (c) 16. All rights reserved. Licence number
4 Lesbury Road Car parking provided on side with housing Layout 5 Existing / Proposed ollard Provide bus stop boarder strip to help cyclists avoid having to dangerously over-taking stationary buses Enough space provided to allow two cars to pass with buses are alighting SHELTER US Proposed modal filter in Cartington Terrace to stop through traffic and reduce need for traffic signals in Provide controlled crossing set back 5m from side road TS TS 5.16 Cartington Terrace Gabriel's Avenue Remove traffic signals and provide priority junction (subject to introduction of filtered traffic on Cartington Terrace). Light segregation set-back 5m from junction 274 Rev Description Drawn File: C:\Users\JohnMcQueen\Documents\03 s\14 ewcastle S4P\02 Heaton and Ouseburn\01 Design\02 Concept\02 Working\S4P-HO-C.dwg / Cartington Terrace Sheet 04 of 05 o. Tel: C-S4P-HO-C :0 JMQ xxx 09/05/17 Ordnance Survey (c) 16. All rights reserved. Licence number
5 Provide 6.4m two-way carriageway for motor vehicles (no centre line to reduce traffic speed) Maintain access to property Maintain access to property King Edward Road Light segregation set-back 5m from junction Proposed modal filter in Alexandra Road to stop through traffic and reduce need for right turn filter lane in (design & location of filter subject to traffic data analysis & public consultation) Maintain tight junction geometry & raised table Provide gap in parking for right turning cycles Alexandra Road Relocate car club bay into Alexandra Road Car parking provided on side with housing Layout 5 Existing / Proposed ollard Rev Description Drawn File: C:\Users\JohnMcQueen\Documents\03 s\14 ewcastle S4P\02 Heaton and Ouseburn\01 Design\02 Concept\02 Working\S4P-HO-C.dwg / Alexandra Road Sheet 05 of 05 o. Tel: C-S4P-HO-C :0 JMQ xxx 09/05/17 Ordnance Survey (c) 16. All rights reserved. Licence number
Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation
Frascati Road and Temple Hill Route Improvements Outline Design Report to Accompany Public consultation September 2013 Background: Dún Laoghaire-Rathdown is committed to providing high quality pedestrian
More informationTS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1
TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL Page 1 Table of Contents 1.0 Introduction... 3 2.0 Project Overview... 3 3.0 Project Proposals... 4 3.1 Enfield Road / Durham Road Junction... 3 5 3.2 Summerfield
More informationBroom Hill/Blackberry Hill Walking and Cycling Improvements
Broom Hill/Blackberry Hill Walking and Cycling Improvements Introduction Bristol has been awarded additional funding from the UK government to upgrade and extend walking and cycling routes across the city.
More informationRhebogue Neighbourhood Greenway. Road Safety Audit Stage 2
Rhebogue Neighbourhood Greenway Road Safety Audit Stage 2 Report Number: 12/007/00/00057 July 2014 Mid West National Road Design Office Lissanalta House, Dooradoyle County Limerick Tel: 061 496 800 Fax:
More informationMilton Road Bus Stop and Crossings Workshop WSP. 19th September 2017
Bus Stop and Crossings Workshop WSP 19th September 2017 Workshop Aims Task 1: Identify preferences for bus stop designs relative to: (a) Ranking preference between 4 possible bus stop designs on the narrower
More informationParking. Signing. Appendix C Typical detail drawings. London Cycling Design Standards
Appendix C Typical detail drawings London Cycling Design Standards All drawings are prefixed CCE/ General A1 Cycle Symbol Diagram 1057 165 A3 Raised entry treatment on side roads 166 A4 Raised table at
More informationMAGNA PARK Lutterworth. DHL SUPPLY CHAIN: Design and Access Statement. June
DHL SUPPLY CHAIN: Design and Access Statement June 2015 CONTENTS SECTION - The Access Proposals 9.1. Site Access 140 9.2. Mere Lane 140 9.3. A5 140 9.4. Footpaths, cycle ways and bridleways 142 SECTION
More informationHow do we design for pedestrians? Case study: transforming the Walworth Road
How do we design for pedestrians? Case study: transforming the Walworth Road David Moores, Director of Public Realm Institution of Highways and Transportation, November 2009 Presentation overview Design
More informationMarcus Jones, TRL. Presented by Name Here Job Title - Date
Segregation Insert the title and of priority your at presentation junctions: a here discussion Marcus Jones, TRL Presented by Name Here Job Title - Date Background: TfL cycle facility trials Infrastructure
More informationCabinet Member for Highways & Streetscene. Highway Infrastructure Manager
LONDON BOROUGH OF RICHMOND UPON THAMES DATE: AUGUST 2015 DECISION MAKER: LEAD OFFICER: SUBJECT: WARDS: Cabinet Member for Highways & Streetscene Highway Infrastructure Manager PROPOSED CYCLING IMPROVEMENTS
More informationChelmsford City Growth Package
Chelmsford City Growth Package Public Consultation Document Volume 2 West Chelmsford July - August 2017 Chelmsford City Growth Package Public Consultation Document - Volume 2 - West Chelmsford Contents
More informationA105 Oaktree Avenue to Carpenters Gardens
Cycle Enfield - Section 6 A105 Oaktree Avenue to Carpenters Gardens Stage 2 Road Safety Audit Ref: 2759.03.06/032/A105/BOR/2016 Prepared for: London Borough of Enfield By: Road Safety Audit, TfL Asset
More informationPerne Rd / Radegund Rd Roundabout Cambridge
Perne Rd / Radegund Rd Roundabout Cambridge The conversion of an conventional urban roundabout to continental geometry A little bit of history The first traffic roundabout was built in Sollershott, Letchworth
More informationDesign and Installation of Low Level Cycle Signals
Transport for London Surface Transport Management System Document Guidance Note Design and Installation of Low Level Cycle Signals Document reference: SQA-0651 - Issue: Draft out of date information. 1
More informationA105 Green Lanes junction with Bourne Hill / Hedge Lane
Cycle Enfield - Section 5 A105 Green Lanes junction with Bourne Hill / Hedge Lane Stage 2 Road Safety Audit Ref: 2759.03.05/032/A105/BOR/2016 Prepared for: London Borough of Enfield By: Road Safety Audit,
More informationSLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane
SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane Exception Report Client Officer Rudo Beremauro Date 20 January 2015 RSA /Project Sponsor s Contents Section 3 Project Sponsor's
More informationReport from Embassy Visit to Copenhagen May David Arditti
Report from Embassy Visit to Copenhagen May 2013 David Arditti Standard CPH cycle track, one-way 1.5 2m wide, 5cm above carriageway, 5cm below footway Basic one-way cycle track protected by car parking
More informationAppendix F CAPITA Technical Audit
Appendix F CAPITA Technical Audit West Hendon - Major Review of Technical Audit Responses 14 June 2016 Quality Management Quality Management Job No Project Location Title CS/086106 West Hendon - Major
More informationDún Laoghaire Rathdown County Council. Luas to Dart via UCD Cycle and Pedestrian Route
Dún Laoghaire Rathdown County Council Luas to Dart via UCD Cycle and Pedestrian Route October 2012 Luas to Dart via UCD Cycle and Pedestrian Route DOCUMENT CONTROL SHEET Client: Project Title: Document
More informationMILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING
MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING NOVEMBER 216 MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING Cambridgeshire County Council Type of document (version)
More informationIAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm
IAN WHITE ASSOCIATES Crawley Station Gateway Public Realm contents 1. objectives & client brief 2. site appraisal 3. best practice guidance 4. design concept 1. objectives & client brief Crawley Train
More informationA6 Manchester Airport Relief Road
A6 Manchester Airport Relief Road Status Date Author Approved for Issue (AECOM) Approved for Issue (Grontmij) P0 18 July 2014 Adam Richardson Martin Houghton Martin Williamson P1 06 August 2014 Tony Hickman
More informationA105 South of Ecclesbourne Gardens to Oakthorpe Road
Cycle Enfield - Section 1 A105 South of Ecclesbourne Gardens to Oakthorpe Road Stage 2 Road Safety Audit Ref: 2759.03.01/032/A105/BOR/2016 Prepared for: London Borough of Enfield By: Road Safety Audit,
More informationDesign Workshops Summary of all Feedback January 2017
Histon Road Corridor Design Workshops Summary of all Feedback January 2017 CITY DEAL AND GROWTH Commitment to Growth: Government, County, City and District Emerging Local Plans: 33,000 new homes 45,000
More informationIMPROVEMENT OPTIONS REPORT - WONERSH VILLAGE. for WONERSH PARISH COUNCIL. March V3.0 stilwell-ltd.co.uk
IMPROVEMENT OPTIONS REPORT - WONERSH VILLAGE for WONERSH PARISH COUNCIL March 2016 V3.0 stilwell-ltd.co.uk Improvement Options Report Wonersh Village, Wonersh Date of Prepared Checked Revision Comments
More informationLEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document
LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document TELL US Bakers Arms to Leyton Green Road (Section D, E, F) Leyton Green Road to Whipps Cross Roundabout (Section G) YOUR VIEWS www.enjoywalthamforest.co.uk
More informationHISTON ROAD Have your say on better public transport, cycling and walking journeys
HISTON ROAD Have your say on better public transport, cycling and walking journeys Have your say: Please complete the survey inside this leaflet or online at www.greatercambridge.org.uk/histonconsultation
More informationGuide to the Cycle Enfield Public Consultation on Enfield Town. Produced by the Save Our Enfield Town Campaign Group
Guide to the Cycle Enfield Public Consultation on Enfield Town Produced by the Save Our Enfield Town Campaign Group What s in this guide? Introduction Page 3 What Enfield Council says about Option 1 Page
More informationMARKHOUSE ROAD IMPROVEMENTS
MARKHOUSE ROAD IMPROVEMENTS www.enjoywalthamforest.co.uk Waltham Forest is changing and we want you to be part of it. Thanks to a funding pot of 27million from Transport for London, we re delivering the
More informationCollege Green traffic management changes
College Green traffic management changes No through east-west traffic movements in the College Green area except for pedestrians and cyclists. Two-way bus and tram movements on Lower Grafton Street and
More informationDerby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN. Date: 20 th November, 2018.
Your Ref: Derby City Council Air Quality - Preferred Option Nov 2018 Derby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN Date: 20 th November, 2018. 1. Introduction: 1.1. Derby Cycling
More informationChapter 4 - Links Within the Highway. Suitability of Routes
Chapter 4 - Links Within the Highway Suitability of Routes Most cycling takes place on existing urban roads; this will also be the case with the National Cycle Network. As well as following lightly trafficked
More informationM9/A90/M90 Edinburgh to Fraserburgh Trunk Road. A90 Tealing. Moving Cursor Programme Junction Study
A90 Tealing Moving Cursor Programme Junction Study This is an unpublished report prepared for the Transport Scotland, Trunk Road and Bus Operations Division (TRBO) and must not be referred to in any publication
More informationTraffic Calming Regulations
Traffic Advisory Leaflet 7/93 August 1993 Traffic Calming Regulations Introduction Traffic calming can help drivers to make their speeds appropriate to local conditions, through measures which are self-enforcing.
More informationIssues at T junctions:
TheSlade_PublicConsulationPlans_March2017.pdf These comments relate to junction designs in this phase of the project on The Slade. Comments begin with the northernmost junction: Girdlestone Rd and continue
More informationThe Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport
LONDON BOROUGH OF RICHMOND UPON THAMES Cabinet Member Decision DATE: January 2012 REPORT OF: LEAD OFFICER: SUBJECT: WARDS: The Cabinet Member for Highways & Streetscene Aurang Zeb - Head of Highways &
More informationOLDER PEOPLE INDEPENDENT MOBILITY FOR LIVEABLE COMMUNITIES. Christopher G B (Kit) Mitchell
OLDER PEOPLE INDEPENDENT MOBILITY FOR LIVEABLE COMMUNITIES by Christopher G B (Kit) Mitchell Independent mobility is necessary for a high quality of adult life In developed countries, the automobile has
More informationUnion Street roundabout Turbo-style roundabouts the future? Patrick Lingwood Walking and Cycling Officer Bedford Borough Council
Union Street roundabout Turbo-style roundabouts the future? Patrick Lingwood Walking and Cycling Officer Bedford Borough Council Presentation outline Local importance and problems we faced The evolution
More informationDESIGN CODE. Enterprise West Harlow London Road North Design Code 21
DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.
More informationCITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY
RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study
More informationAppendix A Type of Traffic Calming Measures Engineering Solutions
Appendix A Type of Traffic Calming Measures Engineering Solutions PHYSICAL MEASURES Central Hatching The major consideration of this feature is that, these markings can only be laid down the centre of
More informationCURRENT ORIGINAL REFERENCE SECTIONS. (Typical Section) (Typical Section) The Parade Island Bay : Concept Option Summary Sheets.
ORIGINAL (Typical Section) CURRENT (Typical Section) 3,900 3,000 2,000 1,500 3,100 1,600 3,100 1,500 2,000 2,500 3,900 3,000 1,800 600 2,000 3,000 3,000 2,000 600 1,800 2,500 Existing Planting Traffic
More informationMilton Road Project Update. Paul van de Bulk 30 January 2018
Milton Road Project Update Paul van de Bulk 30 January 2018 Milton Road Project Objectives Comprehensive priority for buses in both directions wherever practicable; Safer and more convenient routes for
More informationAppendix C Detailed Analysis of Off-Route Alternatives. Documentation of Site Visits on 25 th and 26 th March 2009
Appendix C Detailed Analysis of Off-Route Alternatives Documentation of Site Visits on 25 th and 26 th March 2009 Route Name: Southern end of Roseburn Path, (NCN Route 1), east to Eglinton Crescent and
More informationThe existing site constraints which may be encountered for the A428 scheme proposals are divided into sections as follows.
Project: A428 Study To: Cambridgeshire County Council Subject: Tidal Bus lane Review From: Atkins Date: 24 May 2016 cc: Introduction As part of the A428 Corridor Study to improve the bus journey time between
More information2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE
About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation
More informationThe Consultation has now ended.
The Consultation has now ended. We have received Cabinet Member approval to undertake implementation of the Baker Street Two Way scheme. You are not viewing the most recent documentation. Please visit
More informationAppendix 11 Barton Greenway Review
Appendix 11 Barton Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown
More informationConsultation Report & Results August 2016
Queen Edith s Way Consultation Report & Results August 216 Summary The consultation on walking and cycling improvements along Queen Edith s Way took place from 2 June to 1 August 216. A total of 64 survey
More informationTraffic calming regulations (Scotland)
Traffic Advisory Leaflet 11/94 December 1994 Traffic calming regulations (Scotland) Introduction Traffic calming can help drivers to make their speeds appropriate to local conditions, through measures
More informationScheme Category. Traffic Management. Traffic Management. Implementation LBAS ,000. Traffic Management. Traffic Management. Traffic Management
90,000 Ref Location Description Requested by Scheme Category Scheme stage Cost Code Estimated cost Comments RA London Road, Wickford close to no 63 2 Twinstead, Wickford 3 4 5 6 7 B48 Westmayne / Ford
More informationWelcome. If you have any questions or comments on the project, please contact:
Welcome This drop-in public open house is intended to provide information about the Bay Street bike lanes project. This project proposes a dedicated cycling facility along Bay Street between Aberdeen Avenue
More informationStrand Aldwych Project
Strand Aldwych Project TN07 Scheme Design Summary Produced for Westminster City Council 31st July 2018 57 Webber Street London SE1 0RF Tel +44 (0)207 654 7280 13-14 Orchard Street Bristol BS1 5EH Tel:
More informationTIP Scheme List Huntingdonshire
Scheme List 2018 - Huntingdonshire C = cycling, W = walking, P = public transport, T = traffic and highway, S = safety 265 T A1096 junction capacity enhancements Highway Capacity Improvements LTTS around
More informationNRA New Divided Road Types: Type 2 and Type 3 Dual-carriageways
NRA New Divided Road Types: Type 2 and Type 3 Dual-carriageways BENEFITS of the TYPE 2 and TYPE 3 DUAL CARRIAGEWAY ROAD TYPE There are significant safety and economic benefits associated with the Type
More informationRoad Safety Factsheet
Road Safety Factsheet Overtaking July 2017 Overtaking is one of the highest risk manoeuvres for both drivers and riders because it can put the overtaking vehicle into the path of oncoming traffic, often
More informationSandyford Cycle Route (Kilgobbin / Drummartin Link Road)
Sandyford Cycle Route (Kilgobbin / Drummartin Link Road) Public Consultation Report on Submissions Client: Dun Laoghaire-Rathdown County Council Date: May 2018 Job Number: 15_116B Clifton Scannell Emerson
More information4. Guided Bus Explained
4. Guided Bus Explained Contents 1 INTRODUCTION... 2 Structure of this report... 2 2 KERB GUIDED BUS... 3 Overview... 3 Kerb guidance... 3 Figures Figure 2.1 Figure 2.2 Figure 2.3 Figure 2.4 Figure 2.5
More informationSevenways Roundabout, and the need for a Road Safety Scheme:
Sevenways Roundabout, and the need for a Road Safety Scheme: The way the current roundabout has evolved has obviously created an environment that is dangerous for all road users, motorists, cyclists and
More informationPublic Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY
Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR SAY Consultation open from 24 September to 5 November 2018 Contents Introduction 3 Background 4 Springwood Drive Roundabout
More informationActive Travel Towns Funding Scheme Project Proposal. Sligo. Sligo Local Authorities
Active Travel Towns Funding Scheme 2014-2016 Project Proposal for Sligo by Sligo Local Authorities Introduction Over the last two years, Sligo Local Authorities have implemented years 1 & 2 of their 5
More informationWelcome to the Quebec Alternatives Analysis Public Meeting
Welcome to the Public Meeting Please sign in. Public Comment Please fill out a comment card and tell us what you think. Check back or comment any time at: www.quebecalternatives.com Project Area Technical
More informationsessions. The opinions of local people will help decide which of these two options is taken forward to be built.
A4018 FAQs Why are no bus lanes proposed north of Crow Lane? Inbound and outbound bus lanes were considered north of the Crow Lane junction, but they took away capacity from other traffic on the approach
More informationAgenda Item 34. N11 - Brewery Road Improvement Scheme
Agenda Item 34 N11 - Brewery Road Improvement Scheme Public Consultation Report on Submissions Client: Dún Laoghaire-Rathdown County Council Date: November 2017 Job Number: 13_066A Document Pack Page 11
More informationMILTON ROAD LLF PROJECT UPDATE
Greater Cambridge City Deal MILTON ROAD LLF PROJECT UPDATE 9 th May 2017 Project objectives Comprehensive priority for buses in both directions wherever practicable; Additional capacity for sustainable
More informationALTERNATIVE A ONLY. Right Turn Only. BOTH ALTERNATIVES on southbound Mission from 23rd St to 25th St and on northbound Mission from 20th St to 23rd St
Proposal Detail: 22nd on southbound Mission from on both sides of Mission from to 23rd from at northbound Mission and 22nd St and at at northbound Mission and 23rd St Reconfigure Lanes ONLY No Parking
More informationLondon Cycling Design Standards. Chapter 4 Links Cycle lanes, cycle tracks and other cycle facilities
London Cycling Design Standards 4 Chapter 4 Links Cycle lanes, cycle tracks and other cycle facilities Contents 4.1 Introduction and general issues 4.2 Cycle lanes (on-carriageway) 4.3 Bus lanes and other
More informationDMURS - Practical Implications
Comhairle Contae Fhine Gall DMURS - Practical Implications Sean McGrath. 13 November 2013 Planning and Strategic Infrastructure Department DMURS Practical Implications What DMURS means for: Street Layouts
More informationNRA New Divided Road Types: Type 2 and Type 3 Dual - Carriageways
NRA New Divided Road Types: Type 2 and Type 3 Dual - Carriageways DN-GEO-03059 December 2007 DN Design Technical TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland
More informationBEST PRACTICES FOR ACCESSIBLE TRANSPORT. C G B (Kit) Mitchell
BEST PRACTICES FOR ACCESSIBLE TRANSPORT by C G B (Kit) Mitchell Independent mobility is necessary for independent living Many people with disabilities use cars, either as driver or passenger Those who
More informationCambridge Cycling Campaign
February 15, 2016 Our Ref: RH 160215 Milton Road Consultation Response City Deal Team, SH1311, Shire Hall, Cambridge CB3 0AP Cambridge Cycling Campaign Llandaff Cambers, 2 Regent Street, Cambridge CB2
More informationTraffic Safety Plan Second Avenue
Traffic Safety Plan Second Avenue April 2017 City of Greater Sudbury Roads & Transportation Services Division Overview Overview... 2 1.0 Project Overview... 4 2.0 Pedestrian Safety... 4 2.1 Current Infrastructure...
More informationChicane Schemes. Traffic Advisory Leaflet 12/97 December Introduction
Traffic Advisory Leaflet 12/97 December 1997 Chicane Schemes Introduction Traffic Advisory Leaflet 9/94 "Horizontal Deflections" reported on the results of track trials carried out by the Transport Research
More informationMaynooth Cycling Submission on North South Corridor
Maynooth Cycling Submission on North South Corridor Maynooth Cycling welcomes the intention to improve facilities and quality of service for pedestrians and cyclists in Maynooth. In particular, we strongly
More informationAPPENDIX D. PERS Assessment
APPENDIX D PERS Assessment Oval Gas Works Oval and Kennington Development Area (OAKDA), Lambeth Street Audit: Pedestrian Environment Review System (PERS) Audit Contents 1 INTRODUCTION... 1 2 OVERVIEW OF
More informationAT403.1 Ancient monument Note 3 amended P500 Basic triangle New size 1800mm added
AT403.1 P666 P874 P1028.4 P2509.1 P5001.2 P500 P672 P875 P1032 P2511.1 P5010 P530A P673 P876 P1033 P2512.1 P5011 P530.1 P784.1 P877 P1050 P2601.1 P7005 P543 P786 P878 P2010.1 P2601.1A P7009.1 P563.1 P787
More informationEntry Treatments. Traffic Advisory Leaflet 2/94 August Introduction. Design. Vertical Deflections. Locations
Traffic Advisory Leaflet 2/94 August 1994 Entry Treatments Introduction Entry treatments have been developed for use at side roads so that drivers leaving a major road are in no doubt that they are entering
More informationGreen Streets and Urban Greenways
127 11 Green Streets and Urban Greenways 11. Green Streets and Urban Greenways 128 11 Green Streets and Urban Greenways Once the traffic-free section of a route has come to an end, then comes the remaining
More information1. Provide a dedicated westbound approach bus lane at the intersection;
3. MODIFICATIONS AT HIGHWAY 417 WESTBOUND OFF-RAMP/PINCREST ROAD - PUBLIC HEARING COMMITTEE RECOMMENDATIONS Having held a public hearing, that Council approve the preliminary design for the proposed modifications
More informationAudit No. RSA Stage 1 Road Safety Audit Bermuda Park, Nuneaton Getting West Nuneaton Moving: Bermuda Connection
Audit No. RSA 2199 Stage 1 Road Safety Audit Bermuda Park, Nuneaton Getting West Nuneaton Moving: Bermuda Connection 1 1.0 INTRODUCTION 1.1 This report results from a Stage 1 Road Safety Audit for a highways
More informationPublic Works and Infrastructure Committee. General Manager, Transportation Services
STAFF REPORT ACTION REQUIRED Extending the Bay Street Bicycle Lanes Date: May 16, 2013 To: From: Public Works and Infrastructure Committee General Manager, Transportation Services Wards: Toronto Centre
More informationUrban Street Design and Development
Urban Street Design and Development Ashok Bhattacharjee, Advisor, Clean Air and Sustainable Mobility, Centre for Science and Environment CSE Workshop on Safe Access and Parking - Lytton Hotel, Kolkata
More informationSt. Ives Transport Strategy
St. Ives Transport Strategy Introduction This is the St. Ives Transport Strategy. It forms part of the County Council s Local Transport Plan (LTP). It has been drawn up following consultation with stakeholders,
More informationAppendix 12 Parking on footways and verges
Appendix 12 Parking on footways and verges Legal position Parking on footways and verges whether wholly or partly is banned throughout London, unless signs are placed to allow parking. The ban requires
More informationCHURCH ROAD. Public consultation document TELL US YOUR VIEWS.
CHURCH ROAD Public consultation document YOUR TELL US VIEWS www.enjoywalthamforest.co.uk CHURCH ROAD Introduction Waltham Forest Council was one of three boroughs to be awarded 27million of funding from
More informationRaised Rib Markings. Traffic Advisory Leaflet 2/95 March Introduction
Traffic Advisory Leaflet 2/95 March 1995 Raised Rib Markings Introduction Raised rib markings consist of a continuous line marking with ribs across the line at regular intervals. They were first specially
More informationComments on the Hailsham to Eastbourne Sustainable Transport Corridor
Comments on the Hailsham to Eastbourne Sustainable Transport Corridor Version 1.1 25/01/2015 Paul Humphreys 1 Table of Contents Version Control... 2 Summary... 2 Rationale provided by ESCC... 3 The ESCC
More information2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE
About the Project The City of Edmonton is planning a major bike route on the southside of Edmonton. The Strathcona Bike Route will connect the communities of Strathcona, Garneau and the University area,
More informationCity of Seattle Edward B. Murray, Mayor
City of Seattle Edward B. Murray, Mayor Department of Transportation Scott Kubly, Director Eastlake Community Council 117 E Louisa St. #1 Seattle, WA 98102-3278 January 28, 2016 RE: Roosevelt to Downtown
More informationTraffic Sensitive Streets. Guidance Notes. GeoPlace Streets Team. Traffic Sensitive Streets. Guidance Note Page 1 of 7.
Guidance Notes GeoPlace Streets Team Guidance Note Page 1 of 7 Introduction The guidance note provides information on the definition, role and value of. It will also focus on how and why Traffic Sensitive
More informationThe Greater Cambridge City Deal
The Greater Cambridge City Deal Submission concerning the Histon Road initial consultation on better bus, cycling and walking trips. From: Carina O Reilly, Charlotte Perry and Mike Todd-Jones, City Councillors,
More informationCyclists at road narrowings
Traffic Advisory Leaflet 1/97 February 1997 Cyclists at road narrowings Introduction Traffic calmed streets can offer a more attractive environment for cycling, by reducing motor vehicles speeds to a level
More informationReducing Speed: The C-Roundabout
Reducing Speed: The C-Roundabout Ivan Jurisich (PRESENTER) NZCE (Civil) BSc(Maths) MPhil (Civil Eng) Member of ITE Traffic Engineering Solutions Ltd Phone: +649 366 7532 Email: ivan.jurisich@tes.net.nz
More informationHave your say on the transformation of Oxford Street West
Have your say on the transformation of Oxford Street West About Living Streets We are Living Streets, the UK charity for everyday walking. We want to create a walking nation, free from congested roads
More informationHennepin Avenue Reconstruction Washington Avenue to 12 th Street
CITY OF MINNEAPOLIS Hennepin Avenue Reconstruction Washington Avenue to 12 th Street April 2016 1 Upcoming Opportunities Public Meeting #2 April 25, 2016 Minneapolis Central Library Doty Board Room Repeat
More informationCUERDEN TRANSPORT PROPOSALS
1 CUERDEN TRANSPORT PROPOSALS The transport assessment, submitted with the Cuerden development planning application, looks at access to the site and the impact on the local road network in detail. This
More informationON ROAD CYCLE TRAINING
ON ROAD CYCLE TRAINING A guide to safer cycling On road cycle training A guide to safer cycling 4 5 6 7 8 9 0 4 5 Starting and finishing a journey Road positioning Passing parked and slower vehicles Passing
More informationTransport Research Laboratory Creating the future of transport
Transport Research Laboratory Creating the future of transport PUBLISHED PROJECT REPORT PPR730 Off-street trials of a Bus Stop Bypass An assessment of user perceptions, safety, capacity and accessibility
More informationWISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING. March 28, 2017
WISCONSIN AVENUE EXTENSION SECOND PUBLIC INFORMATION MEETING March 28, 2017 STUDY AREA N MEETING AGENDA Introductions Study Background Alternatives Studied Recommended Alternative Discussion STUDY BACKGROUND
More informationReport on trends in mode share of vehicles and people crossing the Canal Cordon to 2013
Report on trends in mode share of vehicles and people crossing the Canal Cordon 2006 to 2013 Dublin City Council, National Transport Authority, Civic Offices, Dun Scèine, Wood Quay, Harcourt Lane, Dublin
More information