1 A7 Transportation and Access: Application 2 - LBHF Addendum to the Environmental Statement Volume I January 2012

2 Introduction A7.1 This Chapter of the Addendum to the June 2011 Environmental Statement (ES) (Volume I), hereafter referred to as the ES Addendum, considers the amendments that have been made to the Earls Court Development Proposals in the context of transport and access. Consideration is given to the changes that have been made to the outline elements of the Earls Court Development Proposals in addition to the details submitted on development plots WV01, WV02 and WV05 and their subsequent potential affect on the impacts to transport and access as defined within the June 2011 ES. A7.2 In addition, as appropriate, additional environmental information and clarifications are provided within this ES Addendum Chapter as a result of consultation responses received to date on this technical aspect of the ES. A7.3 This Chapter of the Addendum has been prepared by WSP who, have used revised traffic modelling and professional judgment to determine whether the alternations to the Earls Court Development Proposals will result in any changes to the potential residual impacts of the Proposals on the transport networks. Summary of the Conclusions of the June 2011 Environmental Statement A7.4 Chapter 7: Transportation & Access of the June 2011 ES (Volume I) includes a full assessment of the impact of the June 2011 Earls Court Development Proposals on the surrounding road network, the local bus network, underground and rail networks and walk and cycle networks. The assessment has included traffic surveys, the use of Transport for London s (TfL s) transport models for forecasting future traffic on the highway network (in 2031, the anticipated year of completion of the Development Proposals), analysis of cycle, bus and pedestrian routes and station capacity assessments. Consideration has been given to the potential impacts to the surrounding road network, the local bus network, underground and rail networks and walk and cycle networks during both the demolition and construction phases and on completion and occupation of the Earls Court Development Proposals. A7.5 Demolition and construction will generate short-term increases in vehicle movements and passenger trips on the highway and the public transport network in vicinity of the Earls Court Site, however, these increases are not expected to cause any impact on highway, bus, underground or rail services. The residual impacts to these modes of transport are considered to be of negligible significance. A7.6 Minor impacts will be experienced on the walk and cycle networks as a result of Heavy Goods Vehicle (HGVs) entering and exiting the Earls Court Site. Temporary accesses and crossings of pedestrian and cycle routes will result in some localised reduced pedestrian and cyclist amenity. In order to mitigate impacts, the phase specific Construction Environmental Management Plans (CEMP) will set out details of the management of vehicle movements and the routes to be used by construction traffic and the site access/egress arrangement will be agreed with the London Borough of Hammersmith & Fulham (LBHF), the Royal Borough of Kensington & Chelsea (RBKC) and TfL. The residual impacts to the local walk and cycle network in relation to the change in level of accessibility for pedestrians and cyclists and the change in pedestrian and cyclist amenity are assessed as being of minor adverse significance. A7.7 A review of the road traffic associated with the Earls Court Development Proposals has been undertaken. In addition, the future forecast growth in road traffic across the Earls Court area in the absence of the Earls Court Development Proposals has been considered in consultation with TfL. When considering the future forecast growth in road traffic, the increased road traffic associated with the Earls Court Development Proposals is insignificant. The analysis indicates that the road traffic associated with the Earls Court Development Proposals can be accommodated on the highway A7.8 A number of mitigation measures are proposed to improve the coordination and performance of the local highway network and to smooth traffic flows. Measures include the optimisation of road signal timings and proposals for the North End Road / Lillie Road junction to be converted from its double mini-roundabout layout into a four-arm signal controlled junction with direct pedestrian crossings and improved cyclist facilities. As a result of these measures in addition to the main of making the Earls Court Site a highly accessible place where people move around freely and efficiently and supporting transport strategies will help to ensure that residents and employees can undertake journeys in a sustainable yet viable way, the residual impact to the highway network is assessed as being of negligible significance. A7.9 In terms of public transport, the assessment has considered anticipated bus demand, plus changes in underground and overground line loadings, and station capacities. A7.10 With regard bus demand, the results for the morning peak period show that overall bus demand is forecast to fall from existing levels due to TfL s committed District Line, Piccadilly Line and West London Line service frequency improvements. The addition of the Earls Court Development Proposals see some increases in demand above the future (2031) baseline (without the Development Proposals), but overall passenger numbers are still less than the current situation. The residual impact on the bus network is therefore considered to be of negligible significance. A7.11 In terms of the number of people using the underground network (specifically in terms of the number of available seats or the number of people standing per m2), the level of crowding during the morning peak hour would be similar to the current situation despite a projected increase in demand of 26% (without the Earls court Development Proposals). This is due to the increases in capacity provided by the District and Piccadilly Line upgrades. In the afternoon rush hour, the level of crowding is lower than in the morning peak hour. Overall the residual impact of the Earls Court Development Proposals on the underground network is considered to be of negligible significance. A7.12 In relation to the West London Line (overground services), taking into consideration the planned capacity improvements, the Earls Court Development Proposals will lead to a small change in the number of people using the West London Line overground rail services in the morning peak hour, equivalent to 6 additional passengers per carriage. In the afternoon rush hour, standing densities are higher, however, when the demand associated with the Earls Court Development Proposals is compared against the 2031 baseline position, the largest increase equates to 0.15 passengers /m2. Overall the residual impact of the Earls Court Development Proposals on the West London Line / overground network is considered to be of negligible significance. A7.13 With regards to walking and cycling, the Earls Court Development Proposals will also provide pedestrian routes across the Earls Court Site resulting in a highly accessible place where people move around freely and efficiently, and its scale, diversity and quality will enable it to be a self-contained highly walkable neighbourhood where daily needs are easily met via a short walk on a safe and attractive street and therefore with regard to these modes of transport, the Earls Court Development Proposals are considered to deliver major beneficial impacts. A7.14 Additional links through the Earls Court Site allow for significantly improved pedestrian and cyclist accessibility within area whilst improved crossings allow for enhanced access to stations. The overall residual impact in terms of the level of accessibility for pedestrians and cyclists is assessed as being of major beneficial significance. Mitigation Measures A7.15 The mitigation measures applicable to the highway network have been briefly discussed in the preceding section. In addition, a number of other transportation and access mitigation measures are proposed. The full mitigation measures package can be found within Chapter 7: Transportation & Access of the June 2011 ES (Volume I). A selection of these mitigation measures are outlined below: Residential car parking at a ratio of 0.6 spaces per residential dwelling; A hierarchy of transport strategies and street typologies to ensure the needs of pedestrians, cyclists and public transport users have priority over the needs of private motor vehicles; Provision of a comprehensive pedestrian and cycle network with high quality cycle lanes and pavements to create a wide choice of routes within the development and integrate with existing walking and cycling routes (including connections to the proposed cycle superhighway), providing attractive and easy connections to and from the area; Off site improvements such as widening and resurfacing of existing cycle lanes, improved road junction and pedestrian crossing points and opportunities to improve pedestrian and cycle access to public transport; Electric car charging points (20% active with further 20% passive) will be provided throughout the Earls Court Development Proposals with the car club being largely made up of electric vehicles when feasible; A7-1

3 Widening of footways, financial contributions to improve pedestrian and cyclist facilities, delivery of a pedestrian crossing in conjunction with new highway access to / from the A4 / West Cromwell Road; A financial contribution towards the implementation of a wayfinding strategy by TfL, LBHF, and RBKC with enhanced signage and information provision in accordance with the Legible London guidelines; Financial contribution to the improvement of existing bus stops along North End Road, Old Brompton Road, Warwick Road and Earls Court Road. Provision of a financial contribution to London Buses to support the delivery of new or extended services; On-site bus standing areas to replace and enhance existing facilities; Improvements to West Kensington and Brompton Stations and a new entrance to Earls Court Station; and A range of hard and soft measures such as the provision of space for London Cycle Hire Hubs and the presence of on site management to operate concierge and delivery management strategy. Transportation & Access Residual Impacts A7.16 The residual impacts of the demolition and construction transportation and access impact assessment are assessed as follows: Negligible in terms of the change in traffic flows on the highway network; Negligible in terms of the change in passenger densities on the underground and overground rail networks; Minor adverse in terms of the change in level of accessibility for pedestrians and cyclists across the walk and cycle network; and Minor adverse in terms of the change in level of amenity for pedestrians and cyclists across the walk and cycle A7.17 The assessments of the potential transportation and access effects of the Earls Court Development Proposals have not raised any significant issues regarding the capacity of the transport network to cater for the Development s travel demand. A7.18 The residual transportation and access impacts of the completed and occupied Earls Court Development Proposals are assessed as follows: Negligible in terms of the change in traffic flows on the highway network; Negligible in terms of the change in passenger densities on the underground and overground rail networks; Major beneficial in terms of the change in level of accessibility for pedestrians and cyclists across the walk and cycle network; and Major beneficial in terms of the change in level of amenity for pedestrians and cyclists across the walk and cycle Review of the June 2011 Cumulative Impact Assessment A7.19 The Cumulative Impact Assessment presented within Chapter 7: Transportation & Access of the June 2011 ES (Volume I) considers the cumulative impacts associated with the Earls Court Development Proposals and the emerging Seagrave Road Development Proposals. The Seagrave Road Site is a key site for redevelopment within the Earls Court and West Kensington Opportunity Area (ECWKOA). In terms of other development schemes in the area, otherwise known as cumulative schemes, the travel demands across the different modes of transport have been included within the forecast future year of As such, they have inherently been taken into consideration within the Cumulative Impact Assessment. A7.20 The cumulative transportation and access residual impacts of the completed and occupied Earls Court and Seagrave Road Development Proposals (plus other cumulative schemes ) are assessed as follows: Minor adverse in terms of the change in traffic flows on the highway network; Negligible in terms of the change in passenger densities on the underground and overground rail networks; Major beneficial in terms of the change in level of accessibility for pedestrians and cyclists across the walk and cycle network; and Major beneficial in terms of the change in level of amenity for pedestrians and cyclists across the walk and cycle Further Information and Clarifications as a Result of Consultation A7.21 The following sections of this Chapter of the ES Addendum either provide further environmental information or present clarifications on the information presented within Chapter 7: Transportation & Access of the June 2011 ES (Volume I) as a result of consultation on the ES. All the consultation comments made on the ES and the Applicant s responses can be found within the Addendum to ES Volume III: Appendix B. The distinction between the provision of further environmental information or clarifications is made in the following sections of this Chapter. Clarification on Testing of the Maximum and Minimum Parameters A7.22 As described in Chapter A2: EIA Addendum Methodology of this ES Addendum, the likely significant effects of the Earls Court Development Proposals on transportation and access have been assessed, in both the June 2011 EIA and further, in relation to the revised Earls Court Development Proposals addressed in this ES Addendum, using the maximum areas proposed for each use class. This is the maximum amount of development by use class as described in the Development Specification. A7.23 As a greater amount of development leads to a higher trip generation which equates to a greater amount of road traffic, passenger numbers and pedestrians attributable to the Earls Court Development Proposals, this is considered to provide a robust assessment of the likely significant impacts. This scenario generates a greater likely impact on transportation and access aspects when considered in relation to a reduced amount of development. A7.24 In terms of deconstruction, demolition and construction impacts on transportation and access aspects, the principal consideration is the impacts of heavy good vehicle (HGV) movements on the road The number of HGV movements has been defined from the timeslices and the estimates of demolition and construction waste arisings and construction materials. The timeslices are based on the Illustrative Masterplan and present a realistic sequence of deconstruction / demolition and construction activities. The estimates of demolition and construction waste arisings and construction materials are also based on the Illustrative Masterplan and so generate a reasonable assessment of the number of HGV movements. The sequence of deconstruction / demolition and construction activities is not dependent on the scale of the development. Whist the estimates of demolition and construction waste arisings and construction materials are dependent on the scale of development, the likely effects of the Earls Court Development Proposals on the road network arising during the deconstruction, demolition and construction stages are unlikely to alter as a result of variations within the outline parameters for scale or quantum of development. A7.25 The scale of development presented by the Illustrative Masterplan sits within the maximum and minimum scale parameters. As noted in Chapter A2: EIA Addendum Methodology of this ES Addendum, the variation between the maximum and minimum parameters is minimal which together with the restrictions in the Design Guidelines and the requirements of the Development Specification (in terms of the amount of development) gives rise to very limited flexibility in the amount or scale of proposed development. As such, it is considered that HGV movements based on a masterplan built out to either the minimum or maximum scale parameter will not give rise to a material change in the significance of impacts on the road network during the deconstruction, demolition and construction stages of the Earls Court Development Proposals. A7.26 There is on-going consideration and consultation on the potential to bring demolition and construction waste and materials by rail. If this is concluded as being viable there will be a reduction in the forecast impacts associated with the short term demolition and construction phases of development. Review of Planning Policy Context A7.27 Chapter 7: Transport & Access of the June 2011 ES summarises the relevant planning policy context (as of June 2011). Consideration is given to national and regional planning policy; and local planning policy of relevance to the A7-2

4 LBHF. In addition, the Chapter considers the local policy context of the RBKC with respect to transportation and access. Whilst Planning Application 2 is for LBHF determination, the Earls Court Site straddles the borough boundary of the LBHF and the RBKC. National Planning Policy A7.28 The review of the national planning policy context (as presented in the June 2011 ES) remains valid and so applicable to the revised Planning Applications for the Earls Court Development Proposals. A7.29 In July 2011, a draft of the National Planning Policy Framework (NPPF) (Ref. A7-1) was issued for consultation. The key recurring themes include the importance of complimentary land uses being accessible by public transport, walking and cycling, and for car parking levels to promote sustainable transport policies. Regional Planning Policy A7.30 Since June 2011, the Draft Replacement London Plan has been adopted (Ref. A7-2). The overall strategic approach is summarised in Policy 6.1 as being the closer integration of transport and development. Paragraph 6.1 explains that the transport policies are primarily intended to support delivery of the Mayor s sixth objective - that London should be a city where it is easy, safe and convenient for everyone to access jobs, opportunities and facilities with an efficient and effective transport system which actively encourages more walking and cycling and makes better use of the Thames. A7.31 Policy 6.1 encourages closer integration of transport and development by: Encouraging patterns of development that reduce the need to travel, especially by car; Improving the capacity and accessibility of public transport, walking and cycling, particularly in areas of greatest demand; Supporting development that generates high levels of trips at locations with high levels of public transport accessibility; Improving interchange between different forms of transport, particularly around major rail and Underground stations; Facilitating the efficient distribution of freight whilst minimising its impacts on the transport network; Supporting measures that encourage shifts to more sustainable modes and appropriate demand management; Promoting greater use of low carbon technology so that CO2 and other contributors to global warming are reduced; and Promoting walking by ensuring an improved urban realm. Local Planning Policy A7.32 The LBHF Core Strategy (Ref A7-3) which was adopted on 19 October The Core Strategy is the overarching LDF document, and sets out strategic objectives for transport to ensure there is high quality transport infrastructure to support development, to improve transport accessibility, reduce congestion and the need to travel, reduce and mitigate local causes of climate change, and promote healthier lifestyles. A7.33 The Borough-Wide Strategic Policy T1 aims to improve transport provision and accessibility, especially on north-south routes and by seeking better connections to rail services. The development-related aspects of this policy seek: Access improvements for all, particularly people with disabilities, as part of planning permissions for new developments; To ensure appropriate parking is provided to meet the essential needs of development without impacting on the quality of the urban environment; and To relate the intensity of development to public transport accessibility and highway capacity. A7.34 The first draft ECWKOA SPD was published in March 2011 and a revised draft for consultation was published in November 2011 (Ref A7-4). The revised draft SPD provides supplementary detail to policies contained within LBHF s adopted Core Strategy (October 2011) and RBKC s adopted Core Strategy (December 2010) (Ref A7-5). It also provides supplementary detail to the adopted London Plan. A7.35 There are 26 transport Key Principles set out in the initial consultation draft: TRN1: Any development proposals should demonstrate by way of robust Transport Assessments that the impact of development on the transport networks is acceptable. TRN2: Development should be supported by robust Transport Assessments that set out phase by phase what the cumulative impact of development will be and how it will be mitigated at each phase. TRN3: All streets within the Opportunity Area (OA) should be built to adoptable standards and offered to the Highway Authority for adoption. TRN4: All streets within the OA should be accessible to all with appropriate gradients where changes in level are experienced, generous footway widths and accessible crossing facilities. The streets should provide safe and direct north-south and east-west movement for pedestrians and cyclists and integrate well with the surrounding streets. TRN5: Development should provide a coherent pedestrian wayfinding strategy in and around the OA. TRN6: New development should fund environmental improvements and deliver wider, clearer and higher quality footways on the existing streets surrounding the OA and contribute towards the A4 improvement scheme. TRN7: New development should deliver new pedestrian crossings and improve existing crossings in order to meet the increase demand from development and significantly improve the pedestrian environment and access into and out of the OA. TRN8: New development should deliver improved onward connections for cyclists into the streets surrounding the OA. TRN9: New development should deliver increased levels of cycle parking to London Plan and Local Development Plan standards, particularly at key public transport interchanges, and the Mayor s Cycle Hire Scheme should be extended into the OA. TRN10: New development should deliver physical improvements to all three stations to accommodate the forecast increase in passenger numbers. TRN11: Development in the OA should not result in excessive crowding or delay on the London Underground or National Rail and Overground networks, compared to predicted levels in TRN12: New development should provide capacity and environmental improvements to Earl s Court Station, including the reopening of the existing pedestrian tunnel beneath Warwick Road, as part of ensuring the station can accommodate the forecast increase in passenger numbers. TRN13: New development should deliver extra capacity at the gate lines, ticket halls and circulation space at West Brompton and West Kensington stations in order to accommodate the development related trips. TRN14: Step-free access should be provided at West Brompton and West Kensington stations and any new entrance at Earl s Court Station. TRN15: New development should deliver platform lengthening to accommodate eight car trains on the West London Line platforms at West Brompton. TRN16: New development should deliver significantly enhanced interchange facilities at all three stations. TRN17: Additional bus services, routes and stops funded by development will be necessary within and around the OA to accommodate new development trips. TRN18: Development should include taxi rank and coach parking facilities within the OA. TRN19: Development traffic cannot be accommodated on the existing road network without significant capacity improvements, which should be clearly identified in development proposals along with appropriate funding mechanisms to ensure improvements are delivered before development demand is introduced. TRN20: Development proposals should include deliverable and funded road network improvements that reduce delays on the A4 to 2009 levels. TRN21: Development should not worsen traffic conditions to unacceptable levels on existing streets and a review of local traffic management arrangements should be undertaken to address this and provide funded mitigations where necessary. TRN22: New development should investigate improvements to the Earl s Court One Way System, including to the pedestrian environment, and should fund a package of measures as identified in the investigation. A7-3

5 TRN23: All junctions from the OA on to the existing road network and road links across the OA should be assessed to ensure they have no unacceptable impacts on the existing road network in terms of vehicle capacity, road safety and urban design. TRN24: Car parking levels should be minimised in order to restrain car trips, except for parking for car club vehicles, which are encouraged in order to provide an alternative to private car ownership and use. TRN25: Development proposals should be supported by an on-street parking strategy. TRN26: Development proposals should be supported by substantial measures to minimise the impact of freight, including during the construction period. A7.36 The LBHF Core Strategy was adopted on the 19th October As referred to above, within the Regional Planning Policy section of this ES Addendum Chapter, the revised draft ECWKOA SPD provides supplementary detail to policies contained within the LBHF s adopted Core Strategy. Review of the Baseline Conditions A7.37 The transportation and access baseline as presented within the June 2011 ES remains valid and so applicable to the revised Earls Court Development Proposals. There have been no changes to the surrounding highway network for known changes to the transport networks considered within the assessment of the Earls Court Development Proposals. Review of the Impact of the Design Changes A7.38 The design changes and amendments to the Planning Applications form and content are described in full in Chapter 4: The Design Changes. A7.39 The demolition and construction related road vehicle movements per hour per construction sequence are estimated based on the estimates of key deconstruction, demolition and construction waste and material quantities (Chapter 5: Deconstruction, of the June 2011 ES (Volume I)). With the exception of the additional HGV trips associated with the slight increase (+2.5% or 5,000m 3 ) in the amount of excavation proposed (additional 610 trips each way (120 trips each way in Year 2 and 490 trips each way in Year 3 split 50:50 across Gates 1 and 2)) no alterations have been made to the estimates of key deconstruction, demolition and construction waste and material quantities, and so with the exception of the above, there are no other amendments to the anticipated number of demolition and construction related road vehicle movements. A7.40 In transportation and access impact terms the changes can be seen as beneficial as the amount of development (floorspace) has been reduced and therefore the associated transport demands reduced also. A7.41 The change in floorspace proposed by the revised Earls Court Development Proposals results in a reduction of peak hour transport demands across all modes by 10% in both the morning (AM) peak and in afternoon (PM) peaks when compared to the June 2011 Earls Court Development Proposals. January 2012 Potential Impacts & Mitigation Measures A7.42 The slight increase in HGV movements has been considered and it can be concluded that these additional trips have no additional impact on the surrounding road As such, the impacts on the highway network remain being of negligible significance. The impacts on the level of accessibility and amenity for pedestrians and cyclists across the walk and cycle network remain as minor adverse in significance. Generally, the flow of construction traffic would be spread evenly over the working day, with occasional peaks resulting from operational requirements for materials and stock-piling at the Earls Court Site. In practice, it is likely that the contractor will choose to limit traffic flows during the background peak hours. A7.43 In light of the changes made to the outline elements of the Planning Applications in addition to the details submitted in relation to development plots WV01, WV02 and WV05, the impacts to the transport networks remain largely unchanged or reduced slightly in scale and therefore the proposed mitigation strategy and so the resultant residual impacts remain as reported within Chapter 7: Transportation & Access of the June 2011 ES (Volume I) (see below for a summary). A7.44 The only significant change to the mitigation being promoted as part of the revised Earls Court Development Proposals is the improvements being made to each of the stations in the study area which include Earls Court, West Brompton and West Kensington. Although only minor works would be required to mitigate the impact of the revised Earls Court Development Proposals, significant further work is being proposed to ensure that each station has a level of operational performance better than is experienced today despite the increase in passenger numbers. The proposed works would also see all stations becoming full step free accessible. The details of the proposals can be found in the addendum to the TA prepared for and submitted in support of Planning Application 2 (Ref. A7-6). January 2012 Residual Impact Assessment A7.45 The residual impacts of the demolition and construction traffic remain as being assessed as follows: Negligible in terms of the change in traffic flows on the highway network; Negligible in terms of the change in passenger densities on the LUL and Network Rail modes; Minor Adverse in terms of the change in level of accessibility for pedestrians and cyclists across the walk and cycle network; Minor Adverse in terms of the change in level of amenity for pedestrians and cyclists across he walk and cycle A7.46 The assessments of the potential transportation and access effects of the June 2011 Earls Court Development Proposals have not raised any significant issues regarding the capacity of the transport network to cater for the Development s related travel demand. This is still valid particularly given the reduced Development demand of the revised Earls Court Development Proposals. A7.47 The revised Earls Court Development Proposal s demand has been found to be accommodated on the highway, public transport, pedestrian and cyclist networks with appropriate new junction and access arrangements, subject to the mitigation of local impacts as outlined in the section above. A7.48 Together with the Framework Travel Plan, the transportation and access impact on the highway network, bus network and LUL and Network Rail modes of transport remain as being assessed as impacts of negligible significance. A7.49 The Earls Court Development Proposals will also provide pedestrian and cycle linkages across the site and deliver an open and highly accessible place where people move around freely and efficiently, and its scale, diversity and quality will enable it to be a self-contained highly walkable neighbourhood where daily needs are easily met via a short walk on a safe and attractive street and therefore with regard to these modes, the development can be considered to be delivering beneficial impacts. It can therefore be considered that the Earls Court Development Proposals will have a major beneficial effect for pedestrians and cyclists in the local area, whereby both improved accessibility and amenity will be delivered. These benefits remain as part of the revised Earls Court Development Proposals. Review of the Cumulative Impact Assessment Combined Effects of Individual Impacts (Type 1) A7.50 A review of the combined effects of individual impacts on identified sensitive receptors has been undertaken. A7-4

6 A7.51 An exercise which tabulates the residual impacts stated in the June 2011 ES (Volume I) and this ES Addendum against relevant receptors has been completed, and the potential for impact interactions and so cumulative effects has been identified. This is presented within Chapter A18: Cumulative Impact Assessment of this ES Addendum. Cumulative Impacts with Other Schemes (Type 2) A7.52 In addition to the assessment of the revised Earls Court Development Proposals alone, this ES Addendum Chapter considers the potential for cumulative impacts. The Cumulative Impact Assessment Scenario considered within the transportation and access impact assessment differs slightly to those Scenarios considered throughout the remainder of the ES. This is because the assessment of transportation and access impacts takes account of a future background transport demand (i.e. a future baseline scenario which account for natural growth, rather than growth attributed to the revised Earls Court Development Proposals). This future background transport demand takes account of the other cumulative schemes, as detailed within Chapter A2: EIA Addendum Methodology. A7.53 A review of the Cumulative Schemes that were considered within the June 2011 Cumulative Impact Assessment has been undertaken. The following amendment (change in planning status from pending consideration to resolution to grant planning consent ) and two additional schemes are acknowledged: Amendment: Hammersmith Embankment residential led scheme 2011/00407/COMB, resolution to grant 23 September 2011; Additional cumulative scheme: Fulham Wharf, 51 Townmead Road, SW6 2SY 2010/02481/FUL resolution to grant 5 July 2011; and Additional cumulative scheme: Westfield mixed use retail and residential led extension to the existing Westfield London shopping centre 2011/02940/OUT submitted for planning. A7.54 It is important that the cumulative schemes are taken into account without double-counting their traffic into the forecasts of background traffic growth. Therefore the TA for each of the cumulative schemes has been reviewed against TfL s London Transportation Study (LTS) growth forecasts, confirming that the additional travel demand associated with all of the cumulative schemes are already counted into the background growth forecasts for the 2021 and 2031 Future Baseline scenarios. The detail of this review is set out in Appendix F of the TA which was submitted in support of the June 2011 Planning Applications. A7.55 In addition to the cumulative schemes, the TA takes account of travel demand generated by other developments further afield. This has been achieved by using LTS forecasts, with LTS Version being provided by TfL for use as part of the Planning Applications. Discussions with TfL have confirmed that further cumulative assessments are being progressed by their consultants to clarify any strategic implications of the Western Arc developments. A7.56 As such, with regards to transportation and access impacts, the following Cumulative Impact Scenario has been considered: SCENARIO 2: The revised Earls Court Development Proposals PLUS the revised Seagrave Road Development Proposals (assessment year of 2031). A7.57 The conclusions of this assessment were that the potential transport effects of the revised Earls Court Development Proposals in combination with the revised Seagrave Road Development Proposals will not raise any significant issues regarding the capacity of the transport network to cater for the Development s related travel demand. This is still valid given the reduced development demand of the revised Earls Court Development Proposals and the negligible demand associated with the revised Seagrave Road Development Proposals. References Ref A7-1 Communities and Local Government, July 2011; Draft National Planning Policy Framework, July Ref A7-2 GLA, 2011; The London plan Spatial Development Strategy for Greater London, July Ref A7-3 London Borough of Hammersmith & Fulham, 2011; Core Strategy. Ref A7-4 Greater London Authority / LBHF / RBKC, November 2011; Revised Draft Earls Court and West Kensington Opportunity Area Supplementary Planning Document. Ref A7-5 Royal Borough of Kensington and Chelsea, 2010; Core Strategy. Ref A7-6 WSP, on behalf of Earls Court Properties Limited, (January 2012); Earls Court Application 2 Addendum to the Transport Assessment. Conclusions A7.58 The key design changes made to the outline elements of the Planning Applications in addition to the submission of details on layout, scale and appearance of development plots WV01, WV02 and WV05 have no material impact on the significance of the impacts to transport networks in the area. The reduced floorspace would result in a reduced travel demand and therefore the June 2011 assessment of transportation and access impacts therefore remains applicable to the revised Earls Court Development Proposals. A7-5

Living Streets response to the Draft London Plan

Living Streets response to the Draft London Plan Living Streets response to the Draft London Plan Contents Living Streets response to the Draft London Plan... 1 About Living Streets... 2 Summary... 2 Consultation response... 3 Chapter 1: Planning London

More information

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016 Context. Author: Parish Clerk 2 The Draft Integrated Transport Policy (DITS) sets out a vision and objectives, and identifies a detailed programme of interventions to support the Maidstone Borough Local

More information

RIVER CROSSINGS: EAST OF SILVERTOWN CROSSINGS

RIVER CROSSINGS: EAST OF SILVERTOWN CROSSINGS TRANSPORT FOR LONDON RIVER CROSSINGS: EAST OF SILVERTOWN CROSSINGS SUPPORTING TECHNICAL DOCUMENTATION TRAFFIC IMPACT REPORT Neil Georgeson July 2014 This report examines the traffic impacts that potential

More information

North West Non-Technical Summary of the Transport Assessment September 2011

North West Non-Technical Summary of the Transport Assessment September 2011 North West Non-Technical Summary of the Transport Assessment September 2011 Introduction This is a Non-Technical Summary of the findings of the Transport assessment work undertaken for the proposed North

More information

Report to Cabinet. 18 May 2016

Report to Cabinet. 18 May 2016 Agenda Item 8 Report to Cabinet 18 May 2016 Subject: Presenting Cabinet Member: Proposed CCTV Enforcement of Traffic Contraventions in a Bus Lane (Key Decision Ref. No. HE030) Highways and Environment

More information

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria,

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria, 1.0 Introduction 1.1 The Transport Assessment has been prepared on behalf of Eon and Roger Bullivant Ltd in respect of the proposed mixed use sustainable urban extension of Drakelow Park. 1.2 The methodology

More information

Appendix N(b): Portishead Station Outline Travel Plan

Appendix N(b): Portishead Station Outline Travel Plan Portishead Branch Lane (MetroWest Phase 1): Environment Impact Assessment Appendix N(b): Portishead Station Outline Travel Plan Prepared for West of England Councils September 2017 1 The Square Temple

More information

DRAFT for a State Policy for Healthy Spaces and Places

DRAFT for a State Policy for Healthy Spaces and Places DRAFT for a State Policy for Healthy Spaces and Places 1 DRAFT State Policy for Healthy spaces and Places 1. Purpose To encourage the use and development of land that builds healthy communities through

More information

2. Context. Existing framework. The context. The challenge. Transport Strategy

2. Context. Existing framework. The context. The challenge. Transport Strategy Transport Strategy Providing quality connections Contents 1. Introduction 2. Context 3. Long-term direction 4. Three-year priorities 5. Strategy tree Wellington City Council July 2006 1. Introduction Wellington

More information

TRANSPORT AND MOVEMENT

TRANSPORT AND MOVEMENT TRANSPORT AND MOVEMENT Movement Strategy Public Transport Cycling and Walking Road Network Parking Standards Transport Impact Assessments Traffic Management Policies DRAFT POOLBEG PLANNING SCHEME Movement

More information

GD 0043/18 ACTIVE TRAVEL STRATEGY

GD 0043/18 ACTIVE TRAVEL STRATEGY GD 0043/18 ACTIVE TRAVEL STRATEGY 2018-2021 May 2018 Minister s Introduction There is strong evidence that regular physical activity reduces the risk of a range of health conditions. The best way to increase

More information

A1307 Haverhill to Cambridge: Approval to consult on transport improvement concepts

A1307 Haverhill to Cambridge: Approval to consult on transport improvement concepts Report To: Greater Cambridge City Deal Executive Board 3 March 2016 Lead Officer: Graham Hughes, Executive Director of Economy, Transport and Environment, Cambridgeshire County Council A1307 Haverhill

More information

Loughborough University Travel Planning

Loughborough University Travel Planning Document Ti tle Client Name Loughborough University Travel Planning Loughborough University Travel Plan Executive Summary 2015-2020 23 December 2015 Loughborough University Travel Planning Project no:

More information

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport LONDON BOROUGH OF RICHMOND UPON THAMES Cabinet Member Decision DATE: January 2012 REPORT OF: LEAD OFFICER: SUBJECT: WARDS: The Cabinet Member for Highways & Streetscene Aurang Zeb - Head of Highways &

More information

Joint Response to the Department for Transport Consultation on the Station Champions Report on Better Rail Stations. February 2010

Joint Response to the Department for Transport Consultation on the Station Champions Report on Better Rail Stations. February 2010 Joint Response to the Department for Transport Consultation on the Station Champions Report on Better Rail Stations Joint Response to the Better Rail Stations Consultation This response has been prepared

More information

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE 21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE 21.07-1 Connectivity and Choice Transport connectivity and mode choice are critical to achieving productive, sustainable and socially just cities. Travel

More information

Phone: Ref No: 06/2018/0884

Phone: Ref No: 06/2018/0884 Development Directorate Preston City Council Town Hall Lancaster Road Preston PR1 2RL FAO Ben Sandover Phone: 01772 533855 Email: david.allen@lancashire.gov.uk Ref No: 06/2018/0884 Date: 20 September 2018

More information

MILTON ROAD LLF PROJECT UPDATE

MILTON ROAD LLF PROJECT UPDATE Greater Cambridge City Deal MILTON ROAD LLF PROJECT UPDATE 9 th May 2017 Project objectives Comprehensive priority for buses in both directions wherever practicable; Additional capacity for sustainable

More information

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description University of Victoria Campus Cycling Plan Terms of Reference 1.0 Project Description The Campus Cycling Plan, a first for the University, will provide a comprehensive and coordinated approach to support

More information

MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING

MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING NOVEMBER 216 MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING Cambridgeshire County Council Type of document (version)

More information

High frequency bus services operating to Little Island; Creation of a new Park and Ride site and train station at North Esk;

High frequency bus services operating to Little Island; Creation of a new Park and Ride site and train station at North Esk; Cork County Council 7 th December 2018 Dear Adrian O Neill (aoneill@jbbarry.ie) The Transport and Mobility Forum, Cork (TMF) is a representative group of organisations who have a common interest in sustainable

More information

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Exhibit 1 PLANNING COMMISSION AGENDA ITEM Exhibit 1 PLANNING COMMISSION AGENDA ITEM Project Name: Grand Junction Circulation Plan Grand Junction Complete Streets Policy Applicant: City of Grand Junction Representative: David Thornton Address:

More information

9. Parking Supporting Statement

9. Parking Supporting Statement 9. Parking Supporting Statement Content 1. Setting the Scene 2. Vision 3. Parking and the Shared Priorities 4. Issues 5. Delivery Programme in the first Plan Period 2001/02 2005/06 6. Good Practice 7.

More information

4 & 4A Oaklands Road, Bromley, BR1 3SL TRANSPORT ASSESSMENT

4 & 4A Oaklands Road, Bromley, BR1 3SL TRANSPORT ASSESSMENT 4 & 4A Oaklands Road, Bromley, BR1 3SL TRANSPORT ASSESSMENT Oaklands January 2015 4 & 4A Oaklands Road, Bromley, BR1 3SL TRANSPORT ASSESSMENT Oaklands January 2015 Registered Company Address: Mansion House

More information

5 Highways and Transport Assessment

5 Highways and Transport Assessment 5 Highways and Transport Assessment INTRODUCTION 5.1 This chapter identifies and assesses the potential effects that the development, as described in Chapter 3 may have on the traffic, transport and access

More information

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013 Douglas Land Use and Transportation Strategy (DLUTS) Summary August 2013 Background Douglas is a large and popular residential suburb of approximately 30,000 persons on the periphery of Cork City along

More information

ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT

ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT One Size Doesn t Fit All S Corbett, C Chenery Page 1 ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT Authors/Presenters: Sam Corbett, Principal Transport

More information

Contents Location Map Welcome and Introduction Travel Plan Management Science Park Accessibility Walking Cycling Bus Rail Car Sharing Contact Details

Contents Location Map Welcome and Introduction Travel Plan Management Science Park Accessibility Walking Cycling Bus Rail Car Sharing Contact Details Contents Contents Location Map Welcome and Introduction Travel Plan Management Science Park Accessibility Walking Cycling Bus Rail Car Sharing Contact Details 1 2 3 5 7 9 11 13 15 17 19 Thames Valley Science

More information

Transport Assessment Haine Road Ramsgate CT12 5ET

Transport Assessment Haine Road Ramsgate CT12 5ET Haine Road Ramsgate CT12 5ET September 2016 39 Cossington Road Canterbury Kent CT1 3HU Tel 01227 472128 www.rmbconsultants.co.uk This report has been prepared by in accordance with the instructions of

More information

Section 2 Strategic Alignment. Contents

Section 2 Strategic Alignment. Contents Section 2 Strategic Alignment Contents 2 Strategic Alignment... 2 2.1 General... 2 2.2 SmartGrowth Strategy and Implementation Plan... 2 2.3 Walking and Cycling Strategy... 3 2.4 Built Environment Strategy...

More information

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development BELFAST RAPID TRANSIT Ciarán de Búrca Director, Transport Projects Division Department for Regional Development Objectives of Belfast Rapid Transit To provide a modern, safe, efficient and high quality

More information

APPELLANT S STATEMENT OF CASE

APPELLANT S STATEMENT OF CASE TOWN & COUNTRY PLANNING ACT 1990 (AS AMENDED) APPEAL BY FOCUS INTERNATIONAL CHRISTIAN CENTRE (FICC) AGAINST REFUSAL OF PLANNING PERMISSION BY THE LONDON BOROUGH OF HILLINGDON PLANNING PERMISSION IS SOUGHT

More information

Technical note. 1. Introduction

Technical note. 1. Introduction Project: A428 study - Phase 2 To: Adrian Shepherd Subject: Park & Ride site locations From: Atkins Date: Jun 3, 2016 cc: Ashley Heller 1. Introduction 1.1. Purpose of Technical Note The purpose of this

More information

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm IAN WHITE ASSOCIATES Crawley Station Gateway Public Realm contents 1. objectives & client brief 2. site appraisal 3. best practice guidance 4. design concept 1. objectives & client brief Crawley Train

More information

Ormond & McKinnon Walks Response to Draft Glen Eira Community Plan

Ormond & McKinnon Walks Response to Draft Glen Eira Community Plan Response to Draft Glen Eira Community Plan We would like to take this opportunity to thank Glen Eira City Council for the opportunity to comment on the Glen Eira Draft Community Plan. Below is an outline

More information

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document TELL US Bakers Arms to Leyton Green Road (Section D, E, F) Leyton Green Road to Whipps Cross Roundabout (Section G) YOUR VIEWS www.enjoywalthamforest.co.uk

More information

Part 3: Active travel and public transport planning in new housing developments

Part 3: Active travel and public transport planning in new housing developments 1 Linking active travel and public transport to housing growth and planning Part 3: Active travel and public transport planning in new housing developments Active Travel Toolkit Slide Pack July 2017 Linking

More information

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21 DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.

More information

Design Workshops Summary of all Feedback January 2017

Design Workshops Summary of all Feedback January 2017 Histon Road Corridor Design Workshops Summary of all Feedback January 2017 CITY DEAL AND GROWTH Commitment to Growth: Government, County, City and District Emerging Local Plans: 33,000 new homes 45,000

More information

Appendix 12 Parking on footways and verges

Appendix 12 Parking on footways and verges Appendix 12 Parking on footways and verges Legal position Parking on footways and verges whether wholly or partly is banned throughout London, unless signs are placed to allow parking. The ban requires

More information

Chapter 12 TRAFFIC AND TRANSPORT

Chapter 12 TRAFFIC AND TRANSPORT Chapter 12 TRAFFIC AND TRANSPORT 12 12 Traffic and transport Introduction 12.1 Alan Baxter Ltd undertook the traffic and transport assessment. The findings of the assessment are summarised in this chapter

More information

Bus and Transit Lane Review Update

Bus and Transit Lane Review Update Board Meeting / 25 February 2013 Agenda Item no.8(i) Bus and Transit Lane Review Update Glossary Auckland Transport New Zealand Transport Agency Transit Two Transit Three (AT) (NZTA) (T2) (T3) Executive

More information

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager LONDON BOROUGH OF RICHMOND UPON THAMES DATE: AUGUST 2015 DECISION MAKER: LEAD OFFICER: SUBJECT: WARDS: Cabinet Member for Highways & Streetscene Highway Infrastructure Manager PROPOSED CYCLING IMPROVEMENTS

More information

ABERDEEN: CITY OF THE FUTURE

ABERDEEN: CITY OF THE FUTURE ABERDEEN: CITY OF THE FUTURE A contribution towards discussions on a future transport strategy for Aberdeen and its Region Prepared by the Centre for Transport Research University of Aberdeen June 2010

More information

Roads and public rights of way

Roads and public rights of way Roads and public rights of way This factsheet outlines how the effects of the Proposed Scheme on roads and public rights of way (PRoW) along the line of route would be managed. Version 1.0 Last updated:

More information

Warfield Neighbourhood Plan: 4.4 Infrastructure

Warfield Neighbourhood Plan: 4.4 Infrastructure Warfield Neighbourhood Plan: 4.4 Infrastructure Previously decided Policy headings: Policy WNP16 Transport Impact of Development Policy WNP17 Transport Proposals Policy WNP18 New School Buildings Policy

More information

ENFIELD TOWN THE REVISED DESIGN

ENFIELD TOWN THE REVISED DESIGN TOWN THE REVISED DESIGN We re turning Enfield into a borough that encourages walking and cycling, a place that s easy for all of us to get around however we choose to travel. A greener place, with safer

More information

Determining bicycle infrastructure preferences A case study of Dublin

Determining bicycle infrastructure preferences A case study of Dublin *Manuscript Click here to view linked References 1 Determining bicycle infrastructure preferences A case study of Dublin Brian Caulfield 1, Elaine Brick 2, Orla Thérèse McCarthy 1 1 Department of Civil,

More information

WEST HATCH HIGH SCHOOL THE BEST THAT I CAN BE. School Travel Plan

WEST HATCH HIGH SCHOOL THE BEST THAT I CAN BE. School Travel Plan WEST HATCH HIGH SCHOOL THE BEST THAT I CAN BE School Travel Plan Policy reviewed June 2017 TABLE OF CONTENTS Context... 3 Purpose... 3 Scope... 3 1.0 Introduction... 4 2.0 Existing Conditions... 4 3.0

More information

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10 Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel

More information

Building a sustainable world city: the role of transport and land use in London. London s relationship with transport

Building a sustainable world city: the role of transport and land use in London. London s relationship with transport Building a sustainable world city: the role of transport and land use in London Peter Wright Policy Manager, TfL Overview London s relationship with transport Past Current Future Questions? 1 London s

More information

GETTING WHERE WE WANT TO BE

GETTING WHERE WE WANT TO BE CAMBRIDGESHIRE & peterborough GETTING WHERE WE WANT TO BE A GREEN PARTY TRANSPORT POLICY CONTENTS Our Campaign Priorities 4 Bus Franchising 6 Supporting Active Transport 8 Workplace Parking Levy 9 Tackling

More information

Developing a Birmingham Transport Space Allocation policy. David Harris Transport Policy Manager Economy Directorate Birmingham City Council

Developing a Birmingham Transport Space Allocation policy. David Harris Transport Policy Manager Economy Directorate Birmingham City Council Developing a Birmingham Transport Space Allocation policy David Harris Transport Policy Manager Economy Directorate Birmingham City Council Birmingham s Sustainable Urban Mobility Plan Birmingham Connected

More information

Speed Limit Policy Isle of Wight Council

Speed Limit Policy Isle of Wight Council APPENDIX B Speed Limit Policy Isle of Wight Council 2009 Contents Section 1 Introduction 1.1 Links with the Local Transport Plan Section 2 Speed Limits on Urban Roads and Residential Areas 2.1 20mph Limits

More information

WELCOME TO OPEN HOUSE # 1 June 14, 2017

WELCOME TO OPEN HOUSE # 1 June 14, 2017 Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE # 1 June 14, 2017 Please sign in and join our mailing list Purpose of Open House #1 & Study Area York

More information

CUERDEN TRANSPORT PROPOSALS

CUERDEN TRANSPORT PROPOSALS 1 CUERDEN TRANSPORT PROPOSALS The transport assessment, submitted with the Cuerden development planning application, looks at access to the site and the impact on the local road network in detail. This

More information

Ministry of Education Flat Bush School Notice of Requirement. Integrated Transportation Assessment Report. February 2016

Ministry of Education Flat Bush School Notice of Requirement. Integrated Transportation Assessment Report. February 2016 Ministry of Education Flat Bush School Notice of Requirement Integrated Transportation Assessment Report February 2016 TDG Ref: 12988-2 151105 ita flat bush.docx Ministry of Education Flat Bush School

More information

ATTACHMENT 4 - TDM Checklist. TDM Checklist Overview

ATTACHMENT 4 - TDM Checklist. TDM Checklist Overview ATTACHMENT 4 - TDM Checklist TDM Checklist Overview The proposed checklist rates developments on the degree to which they are TDM and transit supportive. Points are assigned based on the level of transit

More information

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017 A127/A130 Fairglen Interchange Improvement Schemes Information Leaflet February 2017 1 2 Foreword By Councillor Kevin Bentley Essex is continuing to grow as a vibrant economic hub and as a fantastic place

More information

Progress update on the Sustainable Movement Corridor scheme Guildford Borough Council, June 2016

Progress update on the Sustainable Movement Corridor scheme Guildford Borough Council, June 2016 Progress update on the Sustainable Movement Corridor scheme Guildford Borough Council, June 2016 1. Introduction The concept of the Sustainable Movement Corridor (hereafter the SMC ) was first developed

More information

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR SAY Consultation open from 24 September to 5 November 2018 Contents Introduction 3 Background 4 Springwood Drive Roundabout

More information

EAST HERTFORDSHIRE DISTRICT PLAN CONSULTATION

EAST HERTFORDSHIRE DISTRICT PLAN CONSULTATION EAST HERTFORDSHIRE DISTRICT PLAN CONSULTATION Stevenage Borough Council representations December 2016 Summary The East Hertfordshire District Plan [EHDP] is the equivalent of the Stevenage Borough District

More information

Map 1 shows the two roads, and how they fit into the public transport network in and around Cambridge.

Map 1 shows the two roads, and how they fit into the public transport network in and around Cambridge. Milton Road and Histon Road corridors bus priority infrastructure 1. Purpose The County Council would like to understand in more detail, the options to deliver the most effective corridor-based public

More information

Integrated Regional Traffic Management. Michael Aherne Technical Director POLIS Conference 2009

Integrated Regional Traffic Management. Michael Aherne Technical Director POLIS Conference 2009 Integrated Regional Traffic Management Michael Aherne Technical Director POLIS Conference 2009 M50 finish Public Transport and Pedestrians College Green The Spatial Perspective What Could has

More information

MANNERS/DIXON/VICTORIA/WlLLlS STREETS TRAFFIC AND STREETSCAPE IMPROVEMENTS

MANNERS/DIXON/VICTORIA/WlLLlS STREETS TRAFFIC AND STREETSCAPE IMPROVEMENTS I! ATTACHMENT 3 TO REPORT 03.481 PAGE 1 OF 13 CITY INFRASTRUCTURE COMMllTEE 6 AUGUST 2003 MANNERS/DIXON/VICTORIA/WlLLlS STREETS TRAFFIC AND STREETSCAPE IMPROVEMENTS REPORT 4 (I 215/48/IM) 1. Purpose of

More information

10 SHERFORD Town Code

10 SHERFORD Town Code Key Fixes (Ref: Masterplan Book, section 4a. Land Use Budget and Key Fixes ) The Town Plan designs and allocates buildings, streets and spaces as accurately as possible in the understandable absence of

More information

CSRM Modelling Summary Report for Cambridge and South Cambridgeshire Local Plans July 2013

CSRM Modelling Summary Report for Cambridge and South Cambridgeshire Local Plans July 2013 CSRM Modelling Summary Report for Cambridge and South Cambridgeshire Local Plans July 2013 Prepared by WSP Group and Atkins EXECUTIVE SUMMARY This Summary Report outlines the work undertaken by WSP Group

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

Response to further information request Ministry of Education Notice of Requirement (200 & 252 Park Estate Road)

Response to further information request Ministry of Education Notice of Requirement (200 & 252 Park Estate Road) 21 Pitt Street PO Box 6345, Auckland 1141, New Zealand T: +64 9 300 9000 // F: +64 9 300 9300 E: info@beca.com // www.beca.com Auckland Council Private Bag 92300 Victoria Street West Auckland 1142 15 August

More information

FAQ s Walsh Road / Ferguson Road Pilot Scheme

FAQ s Walsh Road / Ferguson Road Pilot Scheme FAQ s Walsh Road / Ferguson Road Pilot Scheme What is happening? Traffic calming measures are being installed as a pilot. Temporary Bollards will be installed to the east of 1 Ferguson Road and a Temporary

More information

Environment Policy & Scrutiny Committee

Environment Policy & Scrutiny Committee Environment Policy & Scrutiny Committee Date: 2 nd March 2015 Classification: Title: Report of: Cabinet Member Portfolios Wards Involved: Policy Context: Financial Summary: Report Authors and Contact Details:

More information

Tel: Karime Hassan Chief Executive Exeter City Council Civic Centre Paris Street Exeter EX1 1JN

Tel: Karime Hassan Chief Executive Exeter City Council Civic Centre Paris Street Exeter EX1 1JN Page 1 of 6 Karime Hassan Chief Executive Exeter City Council Civic Centre Paris Street Exeter EX1 1JN Dear Mr Hassan 14th September 2015 Re: Development of Bus & Coach Station Site Following the submission

More information

Transportation Master Plan Advisory Task Force

Transportation Master Plan Advisory Task Force Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved

More information

Launceston's Transport Futures. Greater travel options for the people of Launceston

Launceston's Transport Futures. Greater travel options for the people of Launceston Launceston's Transport Futures Greater travel options for the people of Launceston Final Draft 13 Jan 2014 1 Page Number Executive summary 3 What is Transport Futures? 4 Vision 6 Economy, access and liveability

More information

Oxford Street West. 21 December https://consultations.tfl.gov.uk/roads/oxford-street/?cid=oxford-street

Oxford Street West. 21 December https://consultations.tfl.gov.uk/roads/oxford-street/?cid=oxford-street Oxford Street West 21 December 2017 https://consultations.tfl.gov.uk/roads/oxford-street/?cid=oxford-street This consultation response is on behalf of the London Cycling Campaign (LCC), the capital s leading

More information

Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008

Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008 Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008 The following amendments to the wording of the maintenance strategy apply following the revised maintenance

More information

Guide to the Cycle Enfield Public Consultation on Enfield Town. Produced by the Save Our Enfield Town Campaign Group

Guide to the Cycle Enfield Public Consultation on Enfield Town. Produced by the Save Our Enfield Town Campaign Group Guide to the Cycle Enfield Public Consultation on Enfield Town Produced by the Save Our Enfield Town Campaign Group What s in this guide? Introduction Page 3 What Enfield Council says about Option 1 Page

More information

APPENDIX B. TDM Existing Conditions

APPENDIX B. TDM Existing Conditions APPENDIX B TDM Existing Conditions SCARBOROUGH CENTRE TMP TRANSPORTATION DEMAND MANAGEMENT INTRODUCTION Scarborough Centre has grown into a mixed-use hub for population, transportation, and employment

More information

Chelmsford City Growth Package

Chelmsford City Growth Package Chelmsford City Growth Package Public Consultation Document Volume 2 West Chelmsford July - August 2017 Chelmsford City Growth Package Public Consultation Document - Volume 2 - West Chelmsford Contents

More information

London Cycle Network Annual Report 2000

London Cycle Network Annual Report 2000 London Cycle Network Annual Report 2000 A cycle network for London by 2005 A cycle network for London by 2005 The London Cycle Network will: provide local links between residential neighbourhoods, railway

More information

Have your say on the transformation of Oxford Street West

Have your say on the transformation of Oxford Street West Have your say on the transformation of Oxford Street West About Living Streets We are Living Streets, the UK charity for everyday walking. We want to create a walking nation, free from congested roads

More information

Welcome! Public Open House on UBC s Transportation Plan

Welcome! Public Open House on UBC s Transportation Plan 1 Welcome! Public Open House on UBC s Transportation Plan Public open house hours: to When it comes to on-campus transportation, what do you think is working well and what are some opportunities for improvement?

More information

SCHEME DESIGN AND ENGINEERING

SCHEME DESIGN AND ENGINEERING THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL LINK CLASSIFIED ROAD) SIDE ROADS ORDER 2013 THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL LINK) COMPULSORY PURCHASE ORDER 2013 THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL

More information

CAMBRIDGE SOUTH WEST PARK & RIDE

CAMBRIDGE SOUTH WEST PARK & RIDE CAMBRIDGE SOUTH WEST PARK & RIDE Have your say on: Extra Park & Ride spaces to the south west of Cambridge Bus priority measures into the city centre CREATING MORE PARK & RIDE SPACES The existing Park

More information

72 Crossrail Amendment of Provisions

72 Crossrail Amendment of Provisions 72 Crossrail Amendment of Provisions Manhattan Shaft Worksite 5.4.36 This new worksite is adjacent to the Tumbling Bay worksite and will occupy an area of land between the Manhattan Building and the Great

More information

Active Travel Strategy Dumfries and Galloway

Active Travel Strategy Dumfries and Galloway Active Travel Strategy Dumfries and Galloway Our Active Travel Strategy The agreed Interventions for Dumfries and Galloway Council s Local Transport Strategy includes an action to Develop an Active Travel

More information

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design Cycle traffic and the Strategic Road Network Sandra Brown, Team Leader, Safer Roads- Design Highways England A Government owned Strategic Highways Company Department for Transport Road Investment Strategy

More information

Regional Bus Priority

Regional Bus Priority Regional Bus Priority Recommendation(s) That the Board: i) Notes the systematic review for bus priority measures on the proposed Frequent Transit Network (FTN). Executive summary The New Network public

More information

1 Road and HGV danger in London. Hannah White, Freight & Fleet Programme Manager November 2017

1 Road and HGV danger in London. Hannah White, Freight & Fleet Programme Manager November 2017 1 Road and HGV danger in London Hannah White, Freight & Fleet Programme Manager November 2017 2 London and its transport networks London: 8.6m residents + 30m visitors 30m journeys per day 6.3m by bus

More information

Planning Daily Work Trip under Congested Abuja Keffi Road Corridor

Planning Daily Work Trip under Congested Abuja Keffi Road Corridor ISBN 978-93-84468-19-4 Proceedings of International Conference on Transportation and Civil Engineering (ICTCE'15) London, March 21-22, 2015, pp. 43-47 Planning Daily Work Trip under Congested Abuja Keffi

More information

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations. The Last Mile Planning for Pedestrians Planning around stations will put pedestrians first. Making walking to stations safe and easy is important; walking will be a part of every rapid transit Accessible

More information

Your views are important. Please fill in a form before you leave. Or alternatively

Your views are important. Please fill in a form before you leave. Or alternatively Drum Property Group is delighted to welcome you to this exhibition which sets out our initial proposals for a mixed-use development at Stead s Place, Edinburgh. We are keen to hear the views of local people

More information

Central London Bus Services Review

Central London Bus Services Review Central London Bus Services Review Sustrans response to Transport for London November 2018 About Sustrans Sustrans is the charity making it easier for people to walk and cycle. We are engineers and educators,

More information

Active Transportation Infrastructure Investment A Business Case

Active Transportation Infrastructure Investment A Business Case Active Transportation Infrastructure Investment A Business Case In 2016, the Real Estate Foundation awarded the Capital Regional District a $50,000 grant for Shifting Gears: Land Use Change through Active

More information

Missed Opportunity Areas:

Missed Opportunity Areas: Missed Opportunity Areas: Traffic and transport implications of the Brent Cross and Battersea Power Station developments Despite awareness of the need to meet higher standards of urban design and promote

More information

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project. TRAVEL PLAN Central European University Campus Redevelopment Project Page 1 Table of Contents Introduction... 3 Background... 7 Building Users... 7 Transportation in Community Consultation... 7 Summary

More information

May Canal Cordon Report 2017

May Canal Cordon Report 2017 May 2018 Canal Cordon Report 2017 Report on trends in mode share of vehicles and people crossing the Canal Cordon to 2017 2 Analysis of trends in mode share of people crossing the canal cordon - 2017 Contents

More information

Strategy for Walking & Cycling Action Plan

Strategy for Walking & Cycling Action Plan Strategy for Walking & Cycling Action Plan To achieve higher levels of walking and cycling activity, the destinations which people access have to be available within suitable distances and designed to

More information

Statement of Evidence of Judith Makinson

Statement of Evidence of Judith Makinson In the Matter of: The Resource Management Act 1991 and In the Matter of: Podium Sports Lodge, 18 20 Peake Road Application By: Brian Perry Charitable Trust Statement of Evidence of Judith Makinson TDG

More information

PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK

PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK Elaine Brick Principal Transport Planner AECOM Abstract Smarter Travel funding was awarded to the Chartered Institute of Highways and Transportation

More information