Harron Homes Ltd. October Proposed Residential Development Goole Road, Snaith Transport Assessment. traffic engineering and transport planning

Size: px
Start display at page:

Download "Harron Homes Ltd. October Proposed Residential Development Goole Road, Snaith Transport Assessment. traffic engineering and transport planning"

Transcription

1 traffic engineering and transport planning Harron Homes Ltd Proposed Residential Development October Trinity Lane, Beverley, East Riding of Yorkshire, HU17 0DY Registered No

2 Harron Homes Ltd Proposed Residential Development October 2015 Client Commission Client: Harron Homes Ltd Date Commissioned: 27/08/2015 Commissioned By: Mark Beevers LTP Quality Control Job No: LTP/15/2225 File Ref: Goole Road Snaith TA Draft ISSUE 1 Issue Revision Description Originated Checked Date 1 - Final for planning submission JH SW 27/10/2015 Authorised for Issue: TK LTP PROJECT TEAM As part of our commitment to quality the following team of transport professionals was assembled specifically for the delivery of this project. Relevant qualifications are shown and CV s are available upon request to demonstrate our experience and credentials. Team Member LTP Designation Qualifications Tony Kirby Director (Project Manager) IEng MSc MCIHT FIHE Steven Windass Principal Transport Planner BSc(Hons) MSc(Eng) MCIHT MIHE Jack Hearnshaw Transport Planner BA (Hons) AMIHE The contents of this document must not be copied or reproduced, in whole or in part, without the written consent of Local Transport Projects Ltd. Document Control

3 PROPOSED RESIDENTIAL DEVELOPMENT GOOLE ROAD, SNAITH TRANSPORT ASSESSMENT CONTENTS EXECUTIVE SUMMARY INTRODUCTION Background Scope... 4 Site Location, Existing Use & Allocation Status Development Proposals & Access Arrangements... 7 Proposed Vehicle Parking Arrangements Committed Development & Highway Works SITE ASSESSMENT Local Highway Network Pedestrian Access Cycling Travel by Public Transport Air Quality Management Area ROAD CASUALTY APPRAISAL Collision Record Casualties Collision Conditions Collision Times Collision Locations Road Safety Impact TRAFFIC IMPACT Proposed Traffic Generation Modal Split & Person Trip Generation Impact on the Highway Network CONCLUSIONS REFERENCES APPENDICES Appendix 1 Proposed Site Layout Appendix 2 Collision Plot Appendix 3 Trip Generation Data traffic engineering and transport planning Page 1 of 27

4 TABLES Table 1 Key Trip Attractors by Foot Table 2 Local Bus Services Table 3 - Collision History Table 4 - Casualty Road User Groups Table 5 - Collision Conditions Table 6 - Collisions by Time of Year Table 7 - Collisions by Day and Time Table 8 - Projected Vehicle Trip Generation Table 9 - Projected Person Trip Generation Table 10 - Projected Modal Trip Generation FIGURES Figure 1 Site Location Plan... 6 Figure 2 Proposed SNA-B Allocation... 7 Figure 3 PRoW Network Figure 4 - PIC Study Area PHOTOS Photo 1 A1041/A645 Mini-Roundabout in Snaith Photo 2 Butt Lane Photo 3 Zebra Crossing on Shearburn Terrace Photo 4 Shared Use Foot/Cycleway on A Photo 5 Butt Lane Southbound Bus Stop Page 2 of 27

5 EXECUTIVE SUMMARY This (TA) provides an appraisal of the transport impact associated with full proposals for a residential development of up to 92 dwellings at land located to the south of Goole Road (A1041), on the eastern edge of Snaith in the East Riding of Yorkshire. The proposed scheme is to be primarily accessed via a new simple priority T-junction connecting with Goole Road (A1041), with some dwellings accessed via a separate shared driveway. The scope of this report has been agreed with the Local Highway Authority as part of preapplication discussions and has been produced in accordance with the relevant local and national guidance. A Travel Plan that provides a strategy for encouraging sustainable travel at the proposed development site has been produced in conjunction with this TA as a separate document. The application site is well placed to generate trips by sustainable modes of transport with walking and cycling realistic travel modes for local journeys given that the entire built-up area of Snaith, East Cowick and West Cowick lie within 3km of the site, with a number of retail, education and health facilities. Bus services offer a realistic alternative to the private car for trips to and from Selby and Goole, with hourly services available within a short walk of the site on Butt Lane. Snaith Rail Station is located approximately 850m north-west of the Goole Road site access point, with trains at commuter times serving Knottingley, Pontefract, Castleford and Leeds. A road casualty study has not revealed any identifiable existing collision issues associated with the expected movements of the proposed development, therefore it is considered that there are no existing road safety issues pertinent to the development of the site. If the proposed access junction and internal roads of the proposed development are designed with due consideration to road safety, then the proposals should not have a detrimental road safety impact on the local transport network and should not adversely affect the safety of pedestrians and cyclists. The vehicle and person trip generation of the proposed development has been projected using the nationally recognised TRICS database. The traffic generation of the proposals would be split across the different routes, with an expected even split of traffic travelling to/from the east (Goole, Howden, Hull, the A614/M18 and the M62 east) and the west (Selby, Knottingley, Leeds, the A19/A1(M) and the M62 west) at the A1041 site access junction. Based on these traffic generation projections, it is considered that the proposed development should not generate a significant amount of movement at local junctions. The relevant test is that development should only be prevented or refused on transport grounds where the residual cumulative impacts of development are severe (DCLG, 2012). The projections of this TA indicate that the proposed scheme will not have a severe transport impact, therefore the proposed development is in accordance with the National Planning Policy Framework (DCLG, 2012). The assessments of this TA demonstrate that the proposed development would not be expected to have a detrimental impact in road safety, traffic and highway terms. traffic engineering and transport planning Page 3 of 27

6 1.0 INTRODUCTION 1.1 Background Local Transport Projects Ltd (LTP) has been commissioned by Harron Homes Ltd to prepare a (TA) in support of a full planning application which seeks to provide a residential development consisting of up to 92 dwellings at land located to the south of Goole Road (A1041), on the eastern edge of Snaith in the East Riding of Yorkshire LTP have also been commissioned to prepare a Travel Plan (TP) for the proposed development (LTP, 2015) which outlines the approach to encouraging travel by sustainable modes at the site. Although the TP has been prepared as a standalone document, both the TA and TP are linked and should be read in conjunction with each other. 1.2 Scope The scope of this TA is based upon the Government s Planning Practice Guidance (DCLG, 2014) and the Department for Transport s (DfT) Guidance on Transport Assessment (DfT, 2007a). The scope has also been agreed with East Riding of Yorkshire Council (ERYC) Highways Development Management (Ref: Will Park), as summarised below: Executive Summary: A non-technical summary of the report outlining the key outcomes of the assessment. Introduction & Description of Proposals: o Description of the development site, including location and existing access arrangements; o Summary of relevant planning and allocation history for the site; o Description of the proposed development including site layout, pedestrian/cycle facilities and proposed access arrangements. Site Assessment: o Site assessments to determine existing traffic conditions, such as posted speed limits, road restrictions, highway geometry, on-street parking restrictions and any other relevant features of the local area; o Assessment of the sustainable transport infrastructure (pedestrian, cycle and public transport) local to the site; Road Casualty Appraisal: Examination of road collision records (5 year study period) and assessment of the road safety impact of the proposed development on the local highway network. Page 4 of 27

7 Traffic Impact: o Calculation of the projected trip generation for the proposed development, utilising data from comparable sites within the latest TRICS database. These projections will include consideration of the trip generation potential of the site for all modes of travel, not just vehicular traffic; o Consideration of any relevant consented developments within the local area and any committed changes to the surrounding highway network, as advised by ERYC Highways; o Predicted distribution of the vehicle trips generated by the site onto the local highway network; o Assessment of the likely traffic impact of the proposed development on the operation of the local highway network. This will involve assessing the traffic generation of the proposals against the existing traffic flows on the local highway network and/or the typical threshold for assessment (30 two-way traffic flows). Access, Parking & Internal Layout: Description on the proposed access arrangements and internal layout of the site, including consideration of the proposed parking provision, access/servicing arrangements and suitability of proposed access junctions. Conclusions: Conclusions summarising the outcomes of the TA, including a commentary on the suitability of the proposals in terms of traffic impact and road safety The TA has been prepared in accordance with the agreed scope and reference has been made to the following documents wherever appropriate: ERYC Local Transport Plan ( ) (ERYC, 2015a); ERYC Local Plan: Proposed Submission Allocations Document & Policies Map Schedule of Modifications, March 2015 (ERYC, 2015b); Planning Practice Guidance (DCLG, 2014); ERYC Draft Sustainable Transport SPD (Supplementary Planning Document) (ERYC, 2014a) National Planning Policy Framework (DCLG, 2012); Guidance on (DfT, 2007a); and Manual for Streets (DfT, 2007b). traffic engineering and transport planning Page 5 of 27

8 1.3 Site Location, Existing Use & Allocation Status The application site is located on the southern side of the A1041 on the eastern edge of the town of Snaith, which lies approximately 10km west of Goole in the East Riding of Yorkshire. The site is currently used as agricultural land and is bound by the A1041 to the north, Mill Lane to the east, agricultural land to the south, and by Butt Lane and residential dwellings (served from Brierley Close) to the west. The approximate extents of the site are shown within Figure 1: Figure 1 Site Location Plan Mapping Source: Google Earth Pro; License Key JCPMR5M58LXF2GE The proposed site forms the SNA-B site, which has been identified for residential development by ERYC. Within the Proposed Submission Allocations Document (ERYC, 2014) of the emerging East Riding Local Plan, the site had a development area of 2.70 hectares with an indicative capacity of 57 dwellings. However, following a review of the residential development land allocated within the plan in March 2015, ERYC increased the size of the development land to 3.85 hectares with an indicative capacity of 98 dwellings. The boundary of the SNA-B site as it appears on the Proposed Modifications Policies Map (ERYC, 2015b) is shown in Figure 2, with a separate residential allocation (SNA-C) on the western side of Butt Lane: Page 6 of 27

9 Figure 2 Proposed SNA-B Allocation Source: ERYC Local Plan Proposed Modifications Policy Map (March 2015) Snaith (ERYC, 2015b) 1.4 Development Proposals & Access Arrangements The current proposals involve the development of the site to accommodate 92 residential dwellings, based on the following schedule: 9 two bedroom properties; 14 three bedroom properties; and 69 four bedroom properties The proposed site layout plan is attached as Appendix 1. It is expected that approximately 20% of dwellings at the site will be affordable housing with the remaining 80% open market dwellings. traffic engineering and transport planning Page 7 of 27

10 1.4.3 As discussed with ERYC Highways during pre-application scoping, the proposed development site is to be primarily served via a single vehicular access point, connecting with the A1041 (Goole Road) to the north of the site in the form of a simple priority T-junction. A loop road arrangement will be provided internal to the site, which will serve a number of dwellings directly, with additional connecting culs-de-sac and driveways providing access to other properties. It is understood that a separate access point is also to be provided to the north-west of the primary site access, serving a limited number of dwellings via a shared driveway arrangement. An emergency access is also to be provided from Butt Lane to the west of the site It is understood that the internal highway network of the site has been designed to ensure that refuse vehicles can utilise the highway alignment to enter and exit the site in a forward gear It is understood that the proposed site access junction has been designed to provide visibility splays in accordance with the relevant Manual for Streets (MfS) guidance (DfT, 2007b). Based on the posted speed limit within the vicinity of the site access junction (30mph), MfS requires visibility splays of 2.4m x 43m, which appear to be achievable in both directions at the proposed site access, with no horizontal or vertical alignment constraints Footways of 2.0m width will be provided alongside the main site access road, connecting with the existing provision on the southern side of the A1041 and allowing for good pedestrian permeability within Snaith. Shared surfaces are to be provided on connecting culs-de-sac within the site, where road layouts are to be designed with the intention of controlling vehicle speeds to around 20mph, helping to encourage pedestrian and cycle activity MfS advises that cyclists should generally be accommodated on the carriageway. In areas with low traffic volumes and speeds, there should not be any need for dedicated cycle lanes on the street (DfT, 2007b). Cyclists are therefore to be accommodated onstreet within the site and will benefit from a site layout that has been designed to control vehicle speeds to around 20mph. Cyclists will also benefit from a direct connection between the site and the shared-use foot/cycleway, which is provided on the southern side of the A Proposed Vehicle Parking Arrangements In March 2014, ERYC published a draft version of the Sustainable Transport Supplementary Planning Document which was subject to a period of public consultation. The draft document included advice and guidance to developers on providing for car parking within new developments... which are to be used as a starting point for considering the provision of vehicle parking for new development (ERYC, 2014a). It is understood that a number of consultation comments were received to the draft and the Council are in the process of considering these comments. It is understood that once the draft document is finalised, the Supplementary Planning Document (SPD) will form a material consideration in determining relevant planning applications. Page 8 of 27

11 1.5.2 The proposed site layout plan attached as Appendix 1 demonstrates that each two bedroom dwelling at the site is to be provided with at least 1 off-street car parking space, with an additional visitor space to be provided per every 2 dwellings. Each three and four bedroom dwelling is to be provided with at least 2 off-street car parking spaces, with garages also provided at the four bedroom dwellings. It is therefore considered that the proposed parking provision at the application site is generally consistent with the guidance provided within the draft SPD. 1.6 Committed Development & Highway Works There are not understood to be any relevant committed developments or changes to the local highway network in the vicinity of the application site which should be taken into account within this TA. traffic engineering and transport planning Page 9 of 27

12 2.0 SITE ASSESSMENT 2.1 Local Highway Network The proposed residential development site is to be accessed by all modes via a junction with the A1041 (Goole Road) on the northern boundary of the site. The A1041 is a two-way single carriageway that is subject to a 30mph speed limit and measures approximately 7.7m wide within the site frontage. The speed limit changes to a derestricted speed limit (60mph) approximately 60m east of the eastern boundary of the site The A1041 extends towards East Cowick forming Snaith Road and meets the A614 at a mini-roundabout approximately 2.5km west of the site. The A614 continues east, providing access to Rawcliffe, Goole and the M62. The A1041 continues in to Snaith to the west of the site forming Goole Road, Cowick Road and Beast Fair, where it meets the A645 at a mini-roundabout (see Photo 1) before continuing north through the villages of Carlton and Camblesforth towards Selby. Photo 1 A1041/A645 Mini-Roundabout in Snaith It was noted on-site that the A1041/A645 mini-roundabout is currently controlled on a part-time basis by traffic signals, understood to be provided in order to mitigate against higher traffic flows through the junction as a result of a temporary diversion associated with a road closure on Newland Bridge from 20 July to 20 December Butt Lane is a two-way single carriageway that connects with the A1041 (Cowick Road) to the north and forms High Street to the south-east (serving the village of West Cowick). Butt Lane is subject to a 30mph speed limit and is approximately 5.5m wide within the vicinity of the site. Page 10 of 27

13 Photo 2 Butt Lane There are not any waiting or stopping restrictions in place on the A1041 or Butt Lane within the vicinity of the site. 2.2 Pedestrian Access The Department for Transport (DfT) advise that the mean average length for walking journeys is approximately 1km (0.6miles), but acknowledge that journeys of up to three times these distances are not uncommon for regular commuters (DfT, 2004). There are a number of factors determining the distance that people are prepared to walk, such as their fitness and physical ability, journey purpose, settlement size and walking conditions (DfT, 2004). Guidance from Chartered Institution of Highways & Transportation (CIHT) suggests a preferred maximum walking distance of 2km for a number of journeys, including commuting and school trips (IHT, 2000) The application site is located within a 3km walking distance of the whole built-up area of Snaith along with the villages of East Cowick and West Cowick. This includes a number of key local trip attractors within a 2km walk, as outlined within Table 1: traffic engineering and transport planning Page 11 of 27

14 Trip Attractor Table 1 Key Trip Attractors by Foot Walking Route Approximate Walking Distance* Snaith & Rawcliffe Medical Group Butt Lane 280m Snaith Market Place (inc. local supermarket, post office, bank, public house, takeaways etc.) Goole Road Beast Fair Selby Road Market Place m Snaith Rail Station Goole Road Buttle Lane George Street 850m Snaith Library Goole Road Beast Fair Selby Road Market Place 900m Snaith Primary School The Snaith School Cowick Church of England Primary School Goole Road Beast Fair Shearburn Terrace Pontefract Road Bourn Mill Balk Road Goole Road Beast Fair Shearburn Terrace Pontefract Road Goole Road Snaith Road 1.1km 1.3km 1.6km *Walking distances are approximate (measured along footways, rather than as the crow flies) and have been measured from the centre of the site As demonstrated within Table 1, the application site is located within a suitable walking distance of a range of local amenities, including retail, education and health facilities. The proximity of these facilities are likely to have a positive impact on the number of regular journeys which can be made on foot from the site There is a shared-use foot/cycleway provided on the southern side of the A1041 within the site frontage that provides a key pedestrian route between the site and Snaith town centre. A footway is also provided on the eastern side of Butt Lane to the west of the site which provides an additional connection to the town centre There are a number of both formal and informal crossing facilities provided within the vicinity of the site, including a zebra crossing on Shearburn Terrace within Snaith town and a pedestrian refuge island to the west of the Saffron Drive junction. In addition, there are dropped kerbs and tactile paving at most pedestrian crossing points within the local area. Page 12 of 27

15 Photo 3 Zebra Crossing on Shearburn Terrace In addition, there is a good network of Public Rights of Way (PRoW) routes within Snaith and the surrounding area, including a number of footpaths to the south-west of the site. The PRoW network is shown in red on the plan within Figure 3: Figure 3 PRoW Network Mapping Source: Google Earth Pro; License Key JCPMR5M58LXF2GE traffic engineering and transport planning Page 13 of 27

16 2.3 Cycling Cycling is a low cost and healthy alternative to car use, which can substitute for short car trips, or can form part of a longer journey by public transport. The DfT state that the average cycle journey is 4km (2.4 miles), with much longer distances cycled by regular commuters (DfT, 2004) The proposed development site is located within a reasonable cycle ride, up to 5km (approximately 15 minutes at the average cycling speed of 12mph), of the villages of Snaith, West Cowick, East Cowick, Carlton, Gowdall, Camblesforth and Rawcliffe. As demonstrated within Table 1, there are also a number of local amenities within a short cycle ride of the application site A shared-use foot/cycleway (see Photo 4) runs along the southern side of the A1041 within the frontage of the proposed development site. It runs between the junction with Brierley Close on the western boundary of the site and the junction with Lidgate in East Cowick. Photo 4 Shared Use Foot/Cycleway on A National Cycle Network (NCN) Route 62, which also forms part of the Trans-Pennine Trail (TPT), can be accessed from Selby Road/Gowdall Lane approximately 800m northwest of the proposed development site. Both NCN Route 62 and the TPT are long distance cycle routes which connect a number of local settlements including Carlton, Gowdall and Selby along with larger settlements including Hull and Doncaster Given the availability of a shared-use foot/cycleway, the proximity of the site to signed NCN routes and that most roads within Snaith are subject to a 30mph speed limit, it is considered that the local environment within the vicinity of the site is generally conducive to encouraging cycling trips. Page 14 of 27

17 2.4 Travel by Public Transport Advice within Guidelines for Public Transport in Development (IHT, 1999) states that the generally acceptable maximum distance that a bus stop should be located from a development site is 400m. There are bus stops located on Butt Lane in Snaith (see Photo 5) and on High Street in West Cowick within a 300m walk of the western boundary of the site. Although it is recognised that these stops will not be within 400m of all parts of the site, it is felt that residents would still have good access to bus services. Photo 5 Butt Lane Southbound Bus Stop Table 2 provides details of the services that operate from the stops on Butt Lane and High Street: Table 2 Local Bus Services Service 400/401 Route Selby Camblesforth Snaith West Cowick Rawcliffe Goole Mon-Fri Daytime Frequency^ Every 60 Minutes ^ Refers to the general daytime service between 9am and 5pm Weekend/Evening Frequency Eve: No Service Sat: Every 60 Minutes Sun: No Service The nearest point of access to rail services is via Snaith Rail Station, approximately 850m north-west of the Goole Road site access point. On Monday to Saturdays, the station provides two services per day towards Leeds at 07:16 and 19:01, with one service per day towards Goole at 18:10. It is considered that travel by train may represent a suitable mode of travel for commuters travelling to and from Knottingley, Pontefract, Castleford and Leeds. traffic engineering and transport planning Page 15 of 27

18 2.5 Air Quality Management Area The proposed development site is not within, or near, a region declared by ERYC as an Air Quality Management Area (AQMA). Page 16 of 27

19 3.0 ROAD CASUALTY APPRAISAL 3.1 Collision Record Personal Injury Collision (PIC) data for the highway network local to the proposed development site for the most recent available 5 year study period (01/07/2010 to 30/06/2015) was obtained from ERYC for analysis. A total of 6 collisions occurred within the study area, which includes the A1041 between the junction with Lodge Lane to the east and the mini-roundabout junction with Selby Road (A645) to the west. The study area is shown in Figure 4 and the location of the collisions are indicated on the plan attached as Appendix 2. Figure 4 - PIC Study Area Source Imagery: Copyright Google Earth Pro (License Key-JCPMR5M58LXF2GE) A total of 10 casualties resulted from the 6 recorded injury collisions during the study period. Table 3 below outlines the collision history of the study area: traffic engineering and transport planning Page 17 of 27

20 Table 3 - Collision History Year From 01/07/ /07/ /07/ /07/ /07/2014 To 30/06/ /06/ /06/ /06/ /06/2015 Fatal Serious Slight Total The collision records show that 4 of the recorded collisions occurred during the most recent 2 years of the study period. There have been 2 KSI collisions (Killed or Seriously Injured) recorded during the study period, giving a severity ratio of 33%. 3.2 Casualties Table 4 below provides a breakdown of the casualties according to the mode of travel and age group: Table 4 - Casualty Road User Groups Age (years) Road User Group 0 to to to to Total % Total Car Driver % LGV Driver % P2W Rider % Total % 0% 0% 10% 80% 10% Table 4 shows that the majority of casualties were vehicle drivers (80%), with the remaining 2 casualties P2W riders. Most of the recorded casualties were aged between 30 and 59 and it is noted that there have been no recorded pedestrian or cycle casualties, or casualties involving children. Page 18 of 27

21 3.3 Collision Conditions Table 5 below summarises the collisions by road surface, weather and lighting conditions: Table 5 - Collision Conditions Road Surface Collisions % Dry % Wet % Weather Collisions % Fine % Wind % Rain 0 0% Lighting Condition Collisions % Daylight % Dark (Lit) % As illustrated in Table 5, the majority of collisions did not occur with adverse road surface, weather or lighting conditions. 3.4 Collision Times Table 6 below summarises the collisions by time of year: Table 6 - Collisions by Time of Year Time of Year Collisions % Winter (Dec-Feb) % Spring (Mar-May) % Summer (Jun-Aug) % Autumn (Sep-Nov) 0 0% Table 6 shows that no collisions were recorded during the autumn months, with an even spread of collisions recorded during other seasons. traffic engineering and transport planning Page 19 of 27

22 3.4.3 Table 7 below summarises the collisions by day of week and also the time of day: Day Morning (06:00-11:00) Table 7 - Collisions by Day and Time Lunch (11:00-14:00) Afternoon (14:00-19:00) Evening (19:00-01:00) Night (01:00-06:00) Total % Monday 0 0% Tuesday 0 0% Wednesday % Thursday % Friday 0 0% Saturday % Sunday % Total % 33.3% 16.7% 33.3% 16.7% 0% Table 7 highlights that half of collisions occurred on a weekend, with the other half occurring midweek (Wednesday or Thursday). Most recorded collisions occurred during the daytime period, with one collision occurring during the evening, and none occurring during the night (01:00-06:00). 3.5 Collision Locations The locations of the 6 study collisions (shown on the plot attached as Appendix 2) can be summarised as follows: 2 occurred on the A1041 at the junction with Lodge Lane; 1 occurred on the A1041 at the junction with The Goddards Care Home; 1 occurred on the A1041 at the junction with The Arches (near to Saffron Drive); 1 occurred on the A1041 at the junction with Buttle Lane; and 1 occurred at the A1041/A645 mini-roundabout No collisions have been recorded within the immediate vicinity of the proposed site access location on the A Road Safety Impact A total of 6 collisions, resulting in 10 casualties, have occurred within the study area during the 5-year study period. Analysis of the study collisions has not revealed any identifiable existing collision issues associated with the expected movements of the proposed development, therefore it is considered that there are no existing road safety issues pertinent to the development of the site. Page 20 of 27

23 3.6.2 If the proposed access junction and internal roads of the proposed development are designed with due consideration to road safety, with appropriate highway design features incorporated into the detailed design of any schemes affecting the highway, then the proposals should not have a detrimental road safety impact on the local transport network and should not adversely affect the safety of pedestrians and cyclists. traffic engineering and transport planning Page 21 of 27

24 4.0 TRAFFIC IMPACT 4.1 Proposed Traffic Generation The TRICS database is a nationally recognised collection of traffic counts and trip generation statistics for calculating trip rates at development sites. The latest TRICS database (v7.2.2) has been interrogated to find suitable data to assist in projecting the trip generation of the proposed residential development In order to derive reflective trip rates, vehicle trip generation statistics within the Houses Privately Owned category (03-A) of the TRICS database have been interrogated. To ensure that only trip generation statistics for comparable sites were used in calculations, the TRICS sites were filtered to the following criteria: Survey type: Multi-modal sites; Size: 50 to 150 dwellings; Location type: Edge of Town and Suburban Area; Regions: England only, excluding Greater London sites; Weekday survey data only (exclusion of Saturday and Sunday surveys); and Recent survey data only (exclusion of surveys undertaken prior to 01/01/07) As there were less than 20 comparable sites in the database after filtering (14 survey sites), mean trip rates (as weighted and calculated by the TRICS software) have been used to project the vehicle trip generation of the proposed development, in accordance with good practice guidelines (JMP, 2013). Details of the site selection and trip rates taken from the TRICS database are attached in full within Appendix 3, with the projected vehicle trip rates and generation shown in Table 8: Table 8 - Projected Vehicle Trip Generation AM Peak PM Peak Residential Development Arrivals Departures Arrivals Departures Vehicle Trip Rates (per dwelling) Vehicle Trips (92 dwellings) The trip generation projections indicate that the proposed development could generate 50 two-way vehicle trip movements during the AM peak hour, with 47 during the PM peak hour. Page 22 of 27

25 4.2 Modal Split & Person Trip Generation The TRICS sites utilised to predict the traffic generation of the proposed development (see Section 4.1) contain multi-modal information, therefore the person trip generation of the site has been predicted based on the person trip rates derived from the comparable TRICS sites, summarised in Table 9 and shown in full as Appendix 3: Table 9 - Projected Person Trip Generation AM Peak PM Peak Residential Development Arrivals Departures Arrivals Departures Person Trip Rates (per dwelling) Person Trips (92 dwellings) The modal split of the proposed development has been predicted based on travel pattern information from the comparable residential development sites in the TRICS database, with the number of trips generated by each mode projected utilising the total person trip generation for the site, as summarised Table 10: Person Trips Table 10 - Projected Modal Trip Generation Modal Split Daily (07:00-19:00) Two-Way Trips Vehicle Drivers 60.6% 437 Vehicle Passengers 19.7% 141 Vehicle Occupants Sub-Total 80.3% 578 Pedestrians 15.3% 110 Cyclists 2.8% 20 Public Transport Users 1.6% 12 TOTAL 100% 717 * The total may not represent the sum of its parts due to rounding These modal split predictions indicate that over a third of person trips (39.4%) generated by the development would be expected to be made by sustainable modes (pedestrian, cycle, public transport and car passenger) It is noted that journey to work data from the 2011 National Census could be utilised to predict the modal split of trips generated by the site, however this dataset only represents commuting trips and does not account for journey purposes associated with other trips generated by residential sites, with varying modal splits across different journey purposes and time periods. It is therefore considered to be more representative to base the modal split projections for the proposed residential development on recorded trip generation data from comparable sites within the TRICS database. traffic engineering and transport planning Page 23 of 27

26 4.3 Impact on the Highway Network The DfT has previously issued guidance that transport assessment of development impacts could be based on a threshold of 30 two-way peak hour vehicle trips (DfT, 2007a). This guidance acknowledged that this threshold was not to be applied rigidly, but rather that it provided a useful point of reference from which to commence discussions This national DfT guidance has now been superseded (although not officially cancelled) and replaced with the National Planning Policy Framework (NPPF) (DCLG, 2012) and its accompanying Planning Practice Guidance (PPG) (DCLG, 2014). NPPF and PPG require that transport assessment is undertaken for developments that generate significant amounts of movement, although this is not defined. It is therefore acknowledged that there is no set threshold for assessment within the current national planning policy. In determining whether the proposed development is expected to have a material impact on the local highway network, the traffic projections for the proposed development (see Section 4.1) have been compared against the current and previous Government guidance As discussed with ERYC Highways (Ref: Will Park) during pre-application scoping discussions, the traffic generation of the proposals would be split across the different routes, with an expected split of traffic travelling to/from the east (Goole, Howden, Hull, the A614/M18 and the M62 east) and the west (Selby, Knottingley, Leeds, the A19/A1(M) and the M62 west) at the A1041 site access junction. With an even 50/50 split of traffic, the maximum hourly traffic increase at any local junctions associated with the proposals would be 25 two-way vehicle trips (AM peak hour), which does not represent a significant amount of movement. It is therefore considered that the proposals should not have a material impact on the operation of the local highway network Based on the assessments detailed in this TA, it is considered that the proposed development should not have a detrimental impact on the operation of the local highway network. Therefore, as the impact of the proposals is not expected to be severe, the proposals are considered to be in accordance with the NPPF, which states that development should only be prevented or refused on transport grounds where the residual cumulative impacts of development are severe (DCLG, 2012) Furthermore, it is worth reiterating that the potential vehicle trip reducing benefits of a Travel Plan have not been taken into account within the trip generation projections, therefore the traffic impact conclusions above reflect a worst-case scenario. Page 24 of 27

27 5.0 CONCLUSIONS This TA provides an appraisal of the transport impact associated with full proposals for a residential development of up to 92 dwellings at land located to the south of Goole Road (A1041), on the eastern edge of Snaith in the East Riding of Yorkshire. The proposed scheme is to be primarily accessed via a new simple priority T-junction connecting with Goole Road (A1041), with some dwellings accessed via a separate shared driveway The scope of this report has been agreed with ERYC Highways as part of preapplication scoping and has been produced in accordance with the relevant local and national guidance. A Travel Plan that provides a strategy for encouraging sustainable travel at the proposed development site has been produced in conjunction with this TA as a separate document The application site is well placed to generate trips by sustainable modes of transport with walking and cycling realistic travel modes for local journeys given that the entire built-up area of Snaith, East Cowick and West Cowick lie within 3km of the site, with a number of retail, education and health facilities. Bus services offer a realistic alternative to the private car for trips to and from Selby and Goole, with hourly services available within a short walk of the site on Butt Lane. Snaith Rail Station is located approximately 850m north-west of the Goole Road site access point, with trains at commuter times serving Knottingley, Pontefract, Castleford and Leeds A road casualty study showed that 6 PICs occurred within the study area around the proposed development site during the 5-year study period. Analysis of the study collisions has not revealed any identifiable existing collision issues associated with the expected movements generated by the proposed development, therefore it is considered that there are no existing road safety issues pertinent to the development of the site. If the proposed access junction and internal roads of the proposed development are designed with due consideration to road safety, then the proposals should not have a detrimental road safety impact on the local transport network and should not adversely affect the safety of pedestrians and cyclists The vehicle and person trip generation of the proposed development has been projected using the nationally recognised TRICS database. These vehicle trip generation projection exercises have identified that when fully-built, the proposed residential development is expected to generate 50 two-way vehicle trips during the AM peak hour and 47 two-way vehicle trips during the PM peak hour The traffic generation of the proposals would be split across the different routes, with an expected split of traffic travelling to/from the east (Goole, Howden, Hull, the A614/M18 and the M62 east) and the west (Selby, Knottingley, Leeds, the A19/A1(M) and the M62 west) at the A1041 site access junction. With an even 50/50 split of traffic, the maximum hourly traffic increase at any local junctions associated with the proposals would be 25 two-way vehicle trips (AM peak hour). Based on these traffic generation projections, it is considered that the proposed development should not generate a significant amount of movement at local junctions. traffic engineering and transport planning Page 25 of 27

28 5.1.7 The relevant test is that development should only be prevented or refused on transport grounds where the residual cumulative impacts of development are severe (DCLG, 2012). The projections of this TA indicate that the proposed scheme will not have a severe transport impact, therefore the proposed development is in accordance with the National Planning Policy Framework (DCLG, 2012) It is concluded from the assessments of this TA that the proposed development would not be expected to have a detrimental impact in road safety, traffic and highway terms. Page 26 of 27

29 6.0 REFERENCES CIHT (Chartered Institution of Highways and Transportation), Manual for Streets 2: Wider Application of the Principles. DCLG (Department for Communities and Local Government), Planning Practice Guidance Travel Plans, s and Statements in Decision-Taking (ID: 42-06/03/2014) [online: DCLG, National Planning Policy Framework. DfT (Department for Transport), Road Safety Data [online: (released 25/06/2015). DfT, 2007a. Guidance on. DfT, 2007b. Manual for Streets. DfT, LTN 01/04 Policy, Planning and Design for Walking and Cycling. DfT, Inclusive Mobility. ERYC (East Riding of Yorkshire Council), 2015a. ERYC Local Transport Plan ERYC, 2015b. East Riding Proposed Submission Local Plan Allocations Document & Policies Map. Schedule of Modifications, March ERYC, 2014a. Sustainable Transport Supplementary Planning Document DRAFT. ERYC, 2014b. ERYC Local Plan: Proposed Submission Allocations Document & Policies Map (January 2014). IHT (Institution of Highways and Transportation), Guidelines for Providing for Journeys on Foot. IHT, Guidelines for Public Transport in Development. JMP, TRICS Good Practice Guide LTP (Local Transport Projects Ltd), Proposed Residential Development, Travel Plan. traffic engineering and transport planning Page 27 of 27

30 Appendix 1 Proposed Site Layout traffic engineering and transport planning Appendix 1

31

32 Appendix 2 Collision Plot Appendix 2

33

34 Appendix 3 Trip Generation Data traffic engineering and transport planning Appendix 3

35 Projected Traffic Generation 92 dwellings Vehicle Trip Rates (per dwelling) Vehicle Trips Time IN OUT TOTAL IN OUT TOTAL 07:00-08: :00-09: AM Peak 09:00-10: :00-11: :00-12: :00-13: :00-14: :00-15: :00-16: :00-17: :00-18: PM Peak 18:00-19: TOTAL MM, Mean 03-A, 50 to 150 dwells, England only (exc. GL), Edge of Town, Suburban Area, exc. Sat/Sun, 07+ TRICS v7.2.2 Projected Person Trip Generation Person Trip Rates (per dwelling) Person Trips Time IN OUT TOTAL IN OUT TOTAL 07:00-08: :00-09: :00-10: :00-11: :00-12: :00-13: :00-14: :00-15: :00-16: :00-17: :00-18: :00-19: TOTAL MM, Mean 03-A, 50 to 150 dwells, England only (exc. GL), Edge of Town, Suburban Area, exc. Sat/Sun, 07+ Projected Modal Split Proportion of Vehicle Trips Time IN OUT TOTAL 07:00-08: % 62.8% 63.1% 08:00-09: % 50.9% 55.6% 09:00-10: % 61.3% 64.0% 10:00-11: % 64.2% 64.2% 11:00-12: % 67.1% 66.4% 12:00-13: % 65.9% 66.2% 13:00-14: % 62.7% 64.7% 14:00-15: % 62.9% 63.9% 15:00-16: % 58.3% 52.3% 16:00-17: % 58.3% 56.0% 17:00-18: % 65.5% 60.9% 18:00-19: % 61.0% 60.9% TOTAL 60.8% 60.4% 60.6% Projected Modal Trip Generation Mode Vehicle Drivers Vehicle Passengers Vehicle Occupants Sub-Total Pedestrian Pedal-cycle Public Transport Total Person Trips 12-Hour (07:00-19:00) Split IN OUT TOTAL 60.6% % % % % % % % Local Transport Projects Ltd

36 TRICS B17.20 (C) 2015 TRICS Consortium Ltd Wednesday 09/09/15 Proposed Residential Development, Page 1 Local Transport Projects Beverley East Yorkshire Licence No: TRIP RATE CALCULATION SELECTION PARAMETERS: Calculation Reference: AUDIT Land Use : 03 - RESIDENTIAL Category : A - HOUSES PRIVATELY OWNED MULTI-MODAL VEHICLES Selected regions and areas: 02 SOUTH EAST SC SURREY 1 days 03 SOUTH WEST CW CORNWALL 1 days 04 EAST ANGLIA NF NORFOLK 1 days SF SUFFOLK 1 days 05 EAST MIDLANDS LN LINCOLNSHIRE 1 days 06 WEST MIDLANDS SH SHROPSHIRE 2 days WM WEST MIDLANDS 1 days 07 YORKSHIRE & NORTH LINCOLNSHIRE NY NORTH YORKSHIRE 3 days SY SOUTH YORKSHIRE 1 days 08 NORTH WEST CH CHESHIRE 1 days 09 NORTH CB CUMBRIA 1 days This section displays the number of survey days per TRICS sub-region in the selected set Filtering Stage 2 selection: This data displays the chosen trip rate parameter and its selected range. Only sites that fall within the parameter range are included in the trip rate calculation. Parameter: Number of dwellings Actual Range: 52 to 150 (units: ) Range Selected by User: 50 to 150 (units: ) Public Transport Provision: Selection by: Include all surveys Date Range: 01/01/07 to 23/01/14 This data displays the range of survey dates selected. Only surveys that were conducted within this date range are included in the trip rate calculation. Selected survey days: Monday Tuesday Wednesday Thursday Friday 3 days 4 days 2 days 3 days 2 days This data displays the number of selected surveys by day of the week. Selected survey types: Manual count Directional ATC Count 14 days 0 days This data displays the number of manual classified surveys and the number of unclassified ATC surveys, the total adding up to the overall number of surveys in the selected set. Manual surveys are undertaken using staff, whilst ATC surveys are undertaking using machines. Selected Locations: Suburban Area (PPS6 Out of Centre) 8 Edge of Town 6 This data displays the number of surveys per main location category within the selected set. The main location categories consist of Free Standing, Edge of Town, Suburban Area, Neighbourhood Centre, Edge of Town Centre, Town Centre and

37 TRICS B17.20 (C) 2015 TRICS Consortium Ltd Wednesday 09/09/15 Proposed Residential Development, Page 2 Local Transport Projects Beverley East Yorkshire Licence No: This data displays the number of surveys per location sub-category within the selected set. The location sub-categories consist of Commercial Zone, Industrial Zone, Development Zone, Residential Zone, Retail Zone, Built-Up Zone, Village, Out of Town, High Street and No Sub Category. Filtering Stage 3 selection: Use Class: C3 14 days This data displays the number of surveys per Use Class classification within the selected set. The Use Classes Order 2005 has been used for this purpose, which can be found within the Library module of TRICS. Population within 1 mile: 1,001 to 5,000 2 days 5,001 to 10,000 5 days 10,001 to 15,000 1 days 15,001 to 20,000 4 days 20,001 to 25,000 2 days This data displays the number of selected surveys within stated 1-mile radii of population. Population within 5 miles: 5,001 to 25,000 1 days 25,001 to 50,000 3 days 75,001 to 100,000 3 days 100,001 to 125,000 3 days 125,001 to 250,000 2 days 250,001 to 500,000 2 days This data displays the number of selected surveys within stated 5-mile radii of population. Car ownership within 5 miles: 0.6 to days 1.1 to days This data displays the number of selected surveys within stated ranges of average cars owned per residential dwelling, within a radius of 5-miles of selected survey sites. Travel Plan: No 14 days This data displays the number of surveys within the selected set that were undertaken at sites with Travel Plans in place, and the number of surveys that were undertaken at sites without Travel Plans.

38 TRICS B17.20 (C) 2015 TRICS Consortium Ltd Wednesday 09/09/15 Proposed Residential Development, Page 3 Local Transport Projects Beverley East Yorkshire Licence No: LIST OF SITES relevant to selection parameters 1 CB-03-A-04 SEMI DETACHED CUMBRIA MOORCLOSE ROAD SALTERBACK WORKINGTON Edge of Town No Sub Category Total Number of dwellings: 82 Survey date: FRIDAY 24/04/09 Survey Type: MANUAL 2 CH-03-A-06 SEMI-DET./BUNGALOWS CHESHIRE CREWE ROAD CREWE Suburban Area (PPS6 Out of Centre) No Sub Category Total Number of dwellings: 129 Survey date: TUESDAY 14/10/08 Survey Type: MANUAL 3 CW-03-A-02 SEMI D./DETATCHED CORNWALL BOSVEAN GARDENS TRURO Suburban Area (PPS6 Out of Centre) Residential Zone Total Number of dwellings: 73 Survey date: TUESDAY 18/09/07 Survey Type: MANUAL 4 LN-03-A-01 MIXED HOUSES LINCOLNSHIRE BRANT ROAD BRACEBRIDGE LINCOLN Edge of Town Residential Zone Total Number of dwellings: 150 Survey date: TUESDAY 15/05/07 Survey Type: MANUAL 5 NF-03-A-02 HOUSES & FLATS NORFOLK DEREHAM ROAD NORWICH Suburban Area (PPS6 Out of Centre) Residential Zone Total Number of dwellings: 98 Survey date: MONDAY 22/10/12 Survey Type: MANUAL 6 NY-03-A-06 BUNGALOWS & SEMI DET. NORTH YORKSHIRE HORSEFAIR BOROUGHBRIDGE Suburban Area (PPS6 Out of Centre) Residential Zone Total Number of dwellings: 115 Survey date: FRIDAY 14/10/11 Survey Type: MANUAL 7 NY-03-A-09 MIXED HOUSING NORTH YORKSHIRE GRAMMAR SCHOOL LANE NORTHALLERTON Suburban Area (PPS6 Out of Centre) Residential Zone Total Number of dwellings: 52 Survey date: MONDAY 16/09/13 Survey Type: MANUAL

39 TRICS B17.20 (C) 2015 TRICS Consortium Ltd Wednesday 09/09/15 Proposed Residential Development, Page 4 Local Transport Projects Beverley East Yorkshire Licence No: LIST OF SITES relevant to selection parameters (Cont.) 8 NY-03-A-10 HOUSES AND FLATS NORTH YORKSHIRE BOROUGHBRIDGE ROAD RIPON Edge of Town No Sub Category Total Number of dwellings: 71 Survey date: TUESDAY 17/09/13 Survey Type: MANUAL 9 SC-03-A-04 DETACHED & TERRACED SURREY HIGH ROAD BYFLEET Edge of Town Residential Zone Total Number of dwellings: 71 Survey date: THURSDAY 23/01/14 Survey Type: MANUAL 10 SF-03-A-01 SEMI DETACHED SUFFOLK A1156 FELIXSTOWE ROAD RACECOURSE IPSWICH Suburban Area (PPS6 Out of Centre) Residential Zone Total Number of dwellings: 77 Survey date: WEDNESDAY 23/05/07 Survey Type: MANUAL 11 SH-03-A-04 TERRACED SHROPSHIRE ST MICHAEL'S STREET SHREWSBURY Suburban Area (PPS6 Out of Centre) No Sub Category Total Number of dwellings: 108 Survey date: THURSDAY 11/06/09 Survey Type: MANUAL 12 SH-03-A-05 SEMI-DETACHED/TERRACED SHROPSHIRE SANDCROFT SUTTON HILL TELFORD Edge of Town Residential Zone Total Number of dwellings: 54 Survey date: THURSDAY 24/10/13 Survey Type: MANUAL 13 SY-03-A-01 SEMI DETACHED HOUSES SOUTH YORKSHIRE A19 BENTLEY ROAD BENTLEY RISE DONCASTER Suburban Area (PPS6 Out of Centre) Residential Zone Total Number of dwellings: 54 Survey date: WEDNESDAY 18/09/13 Survey Type: MANUAL 14 WM-03-A-03 MIXED HOUSING WEST MIDLANDS BASELEY WAY ROWLEYS GREEN COVENTRY Edge of Town Residential Zone Total Number of dwellings: 84 Survey date: MONDAY 24/09/07 Survey Type: MANUAL This section provides a list of all survey sites and days in the selected set. For each individual survey site, it displays a unique site reference code and site address, the selected trip rate calculation parameter and its value, the day of the week and date of each survey, and whether the survey was a manual classified count or an ATC count.

40 TRICS B17.20 (C) 2015 TRICS Consortium Ltd Wednesday 09/09/15 Proposed Residential Development, Page 5 Local Transport Projects Beverley East Yorkshire Licence No: TRIP RATE for Land Use 03 - RESIDENTIAL/A - HOUSES PRIVATELY OWNED MULTI-MODAL VEHICLES Calculation factor: 1 DWELLS BOLD print indicates peak (busiest) period ARRIVALS DEPARTURES TOTALS No. Ave. Trip No. Ave. Trip No. Ave. Trip Time Range Days DWELLS Rate Days DWELLS Rate Days DWELLS Rate 00:00-01:00 01:00-02:00 02:00-03:00 03:00-04:00 04:00-05:00 05:00-06:00 06:00-07:00 07:00-08: :00-09: :00-10: :00-11: :00-12: :00-13: :00-14: :00-15: :00-16: :00-17: :00-18: :00-19:00 19:00-20:00 20:00-21:00 21:00-22:00 22:00-23:00 23:00-24:00 Total Rates: This section displays the trip rate results based on the selected set of surveys and the selected count type (shown just above the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivals plus departures). Within each of these main columns are three sub-columns. These display the number of survey days where count data is included (per time period), the average value of the selected trip rate calculation parameter (per time period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at the foot of the table. To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey days that have count data available for the stated time period. The average (mean) number of arrivals, departures or totals (whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the stated time period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the stated calculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Trip rates are then rounded to 3 decimal places. Parameter summary Trip rate parameter range selected: (units: ) Survey date date range: 01/01/07-23/01/14 Number of weekdays (Monday-Friday): 14 Number of Saturdays: 0 Number of Sundays: 0 Surveys manually removed from selection: 2 This section displays a quick summary of some of the data filtering selections made by the TRICS user. The trip rate calculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximum survey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set of surveys are show. Finally, the number of survey days that have been manually removed from the selected set outside of the standard filtering procedure are displayed.

41 TRICS B17.20 (C) 2015 TRICS Consortium Ltd Wednesday 09/09/15 Proposed Residential Development, Page 6 Local Transport Projects Beverley East Yorkshire Licence No: TRIP RATE for Land Use 03 - RESIDENTIAL/A - HOUSES PRIVATELY OWNED MULTI-MODAL TOTAL PEOPLE Calculation factor: 1 DWELLS BOLD print indicates peak (busiest) period ARRIVALS DEPARTURES TOTALS No. Ave. Trip No. Ave. Trip No. Ave. Trip Time Range Days DWELLS Rate Days DWELLS Rate Days DWELLS Rate 00:00-01:00 01:00-02:00 02:00-03:00 03:00-04:00 04:00-05:00 05:00-06:00 06:00-07:00 07:00-08: :00-09: :00-10: :00-11: :00-12: :00-13: :00-14: :00-15: :00-16: :00-17: :00-18: :00-19:00 19:00-20:00 20:00-21:00 21:00-22:00 22:00-23:00 23:00-24:00 Total Rates: This section displays the trip rate results based on the selected set of surveys and the selected count type (shown just above the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivals plus departures). Within each of these main columns are three sub-columns. These display the number of survey days where count data is included (per time period), the average value of the selected trip rate calculation parameter (per time period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at the foot of the table. To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey days that have count data available for the stated time period. The average (mean) number of arrivals, departures or totals (whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the stated time period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the stated calculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Trip rates are then rounded to 3 decimal places. Parameter summary Trip rate parameter range selected: (units: ) Survey date date range: 01/01/07-23/01/14 Number of weekdays (Monday-Friday): 14 Number of Saturdays: 0 Number of Sundays: 0 Surveys manually removed from selection: 2 This section displays a quick summary of some of the data filtering selections made by the TRICS user. The trip rate calculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximum survey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set of surveys are show. Finally, the number of survey days that have been manually removed from the selected set outside of the standard filtering procedure are displayed.

42 TRICS B17.20 (C) 2015 TRICS Consortium Ltd Wednesday 09/09/15 Page 1 Local Transport Projects Beverley East Yorkshire Licence No: Time Range/Peak Period Selection Direction: Totals / Use All Times

Transport Assessment Haine Road Ramsgate CT12 5ET

Transport Assessment Haine Road Ramsgate CT12 5ET Haine Road Ramsgate CT12 5ET September 2016 39 Cossington Road Canterbury Kent CT1 3HU Tel 01227 472128 www.rmbconsultants.co.uk This report has been prepared by in accordance with the instructions of

More information

Phone: Ref No: 06/2018/0884

Phone: Ref No: 06/2018/0884 Development Directorate Preston City Council Town Hall Lancaster Road Preston PR1 2RL FAO Ben Sandover Phone: 01772 533855 Email: david.allen@lancashire.gov.uk Ref No: 06/2018/0884 Date: 20 September 2018

More information

The Hurlstone Partnership

The Hurlstone Partnership The Hurlstone Partnership PROPOSED HOLIDAY LODGES AT MID WALES GOLF CENTRE, MOAT LANE, CAERSWS, SY17 5SB Access Review October 2018 JPH/180802/D1 Seven Oaks Farm, Crew Green, Shrewsbury SY5 9AS Tel: 01743

More information

4 & 4A Oaklands Road, Bromley, BR1 3SL TRANSPORT ASSESSMENT

4 & 4A Oaklands Road, Bromley, BR1 3SL TRANSPORT ASSESSMENT 4 & 4A Oaklands Road, Bromley, BR1 3SL TRANSPORT ASSESSMENT Oaklands January 2015 4 & 4A Oaklands Road, Bromley, BR1 3SL TRANSPORT ASSESSMENT Oaklands January 2015 Registered Company Address: Mansion House

More information

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria,

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria, 1.0 Introduction 1.1 The Transport Assessment has been prepared on behalf of Eon and Roger Bullivant Ltd in respect of the proposed mixed use sustainable urban extension of Drakelow Park. 1.2 The methodology

More information

Speed Limit Policy Isle of Wight Council

Speed Limit Policy Isle of Wight Council APPENDIX B Speed Limit Policy Isle of Wight Council 2009 Contents Section 1 Introduction 1.1 Links with the Local Transport Plan Section 2 Speed Limits on Urban Roads and Residential Areas 2.1 20mph Limits

More information

10 SHERFORD Town Code

10 SHERFORD Town Code Key Fixes (Ref: Masterplan Book, section 4a. Land Use Budget and Key Fixes ) The Town Plan designs and allocates buildings, streets and spaces as accurately as possible in the understandable absence of

More information

Appendix N(b): Portishead Station Outline Travel Plan

Appendix N(b): Portishead Station Outline Travel Plan Portishead Branch Lane (MetroWest Phase 1): Environment Impact Assessment Appendix N(b): Portishead Station Outline Travel Plan Prepared for West of England Councils September 2017 1 The Square Temple

More information

BLYTHEWOOD PARK, BROMLEY

BLYTHEWOOD PARK, BROMLEY BLYTHEWOOD PARK, BROMLEY Proposed Access Junction to Serve a Single Residential Dwelling On behalf of Robert Pooke CONTENTS Introduction...1 Appeal Site and Planning History...2 Relevant Transport Policy...4

More information

Design and Installation of Low Level Cycle Signals

Design and Installation of Low Level Cycle Signals Transport for London Surface Transport Management System Document Guidance Note Design and Installation of Low Level Cycle Signals Document reference: SQA-0651 - Issue: Draft out of date information. 1

More information

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016 Context. Author: Parish Clerk 2 The Draft Integrated Transport Policy (DITS) sets out a vision and objectives, and identifies a detailed programme of interventions to support the Maidstone Borough Local

More information

Proposed Strategic Housing Development at the Former Doyle s Nursery and Garden Centre and Benoni, Brennanstown Road, Cabinteely, Dublin 18

Proposed Strategic Housing Development at the Former Doyle s Nursery and Garden Centre and Benoni, Brennanstown Road, Cabinteely, Dublin 18 Proposed Strategic Housing Development at the Former Doyle s Nursery and Garden Centre and Benoni, Brennanstown Road, Cabinteely, Mobility Management Plan Quality information Prepared by Checked by Approved

More information

Loughborough University Travel Planning

Loughborough University Travel Planning Document Ti tle Client Name Loughborough University Travel Planning Loughborough University Travel Plan Executive Summary 2015-2020 23 December 2015 Loughborough University Travel Planning Project no:

More information

PROPOSED RESIDENTIAL SUBDIVISION

PROPOSED RESIDENTIAL SUBDIVISION PROPOSED RESIDENTIAL SUBDIVISION PART OF TARNEIT ROAD & 1121 DOHERTYS ROAD, TARNEIT Prepared For: TCG (RM) Developments Pty Ltd MARCH 2014 OUR REF: 16740R#1 PROPOSED RESIDENTIAL SUBDIVISION PART OF TARNEIT

More information

North West Non-Technical Summary of the Transport Assessment September 2011

North West Non-Technical Summary of the Transport Assessment September 2011 North West Non-Technical Summary of the Transport Assessment September 2011 Introduction This is a Non-Technical Summary of the findings of the Transport assessment work undertaken for the proposed North

More information

APPELLANT S STATEMENT OF CASE

APPELLANT S STATEMENT OF CASE TOWN & COUNTRY PLANNING ACT 1990 (AS AMENDED) APPEAL BY FOCUS INTERNATIONAL CHRISTIAN CENTRE (FICC) AGAINST REFUSAL OF PLANNING PERMISSION BY THE LONDON BOROUGH OF HILLINGDON PLANNING PERMISSION IS SOUGHT

More information

Roads and public rights of way

Roads and public rights of way Roads and public rights of way This factsheet outlines how the effects of the Proposed Scheme on roads and public rights of way (PRoW) along the line of route would be managed. Version 1.0 Last updated:

More information

21/02/2018. How Far is it Acceptable to Walk? Introduction. How Far is it Acceptable to Walk?

21/02/2018. How Far is it Acceptable to Walk? Introduction. How Far is it Acceptable to Walk? 21/2/218 Introduction Walking is an important mode of travel. How far people walk is factor in: Accessibility/ Sustainability. Allocating land in Local Plans. Determining planning applications. Previous

More information

MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING

MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING NOVEMBER 216 MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING Cambridgeshire County Council Type of document (version)

More information

PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK

PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK Elaine Brick Principal Transport Planner AECOM Abstract Smarter Travel funding was awarded to the Chartered Institute of Highways and Transportation

More information

SCHEME DESIGN AND ENGINEERING

SCHEME DESIGN AND ENGINEERING THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL LINK CLASSIFIED ROAD) SIDE ROADS ORDER 2013 THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL LINK) COMPULSORY PURCHASE ORDER 2013 THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL

More information

Chapter 4 Route Window C3 Hyde Park and Park Lane shafts. Transport for London

Chapter 4 Route Window C3 Hyde Park and Park Lane shafts. Transport for London Chapter 4 Route Window C3 Hyde Park and Park Lane shafts Transport for London HYDE PARK AND PARK LANE SHAFTS 4 Route Window C3 Hyde Park and Park Lane shafts Introduction 4.1 In this route window, which

More information

Arcadis LLP Proposed Secondary School (Bolder Academy) Macfarlane Lane, Isleworth Transport Assessment. March 2017

Arcadis LLP Proposed Secondary School (Bolder Academy) Macfarlane Lane, Isleworth Transport Assessment. March 2017 traffic engineering and transport planning Arcadis LLP Proposed Secondary School (Bolder Academy) March 2017 Armstrong House, The Flemingate Centre, Beverley, HU17 0NZ 01482 679 911 info@local-transport-projects.co.uk

More information

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport LONDON BOROUGH OF RICHMOND UPON THAMES Cabinet Member Decision DATE: January 2012 REPORT OF: LEAD OFFICER: SUBJECT: WARDS: The Cabinet Member for Highways & Streetscene Aurang Zeb - Head of Highways &

More information

M9/A90/M90 Edinburgh to Fraserburgh Trunk Road. A90 Tealing. Moving Cursor Programme Junction Study

M9/A90/M90 Edinburgh to Fraserburgh Trunk Road. A90 Tealing. Moving Cursor Programme Junction Study A90 Tealing Moving Cursor Programme Junction Study This is an unpublished report prepared for the Transport Scotland, Trunk Road and Bus Operations Division (TRBO) and must not be referred to in any publication

More information

APPENDIX F: TECHNICAL NOTE 22 (VICARAGE ROAD JUNCTION)

APPENDIX F: TECHNICAL NOTE 22 (VICARAGE ROAD JUNCTION) APPENDIX F: TECHNICAL NOTE 22 (VICARAGE ROAD JUNCTION) West Midlands Interchange Transport Assessment DCO Submission WEST MIDLANDS INTERCHANGE SUBJECT: Technical Note 22 Review of Vicarage Road Junction

More information

Technical note. 1. Introduction

Technical note. 1. Introduction Project: A428 study - Phase 2 To: Adrian Shepherd Subject: Park & Ride site locations From: Atkins Date: Jun 3, 2016 cc: Ashley Heller 1. Introduction 1.1. Purpose of Technical Note The purpose of this

More information

Mill Hill Broadway Capacity Improvement

Mill Hill Broadway Capacity Improvement 1 16 MARCH 2016 Mill Hill Broadway Capacity Improvement Presentation to Barnet Members and Mill Hill Residents Association 2 Background A1 is one of 23 Transport for London Road Network (TLRN) Strategic

More information

Thornhill Cemetery Northern Extension, Cardiff. Transport Assessment April 2018

Thornhill Cemetery Northern Extension, Cardiff. Transport Assessment April 2018 Thornhill Cemetery Northern Extension, Cardiff Design Contract Delivery, City Operations, Cardiff County Council, County Hall CF10 4UW Transport Assessment April 2018 Print name Signed Prepared by: Checked

More information

Land at Chesterton, Cirencester

Land at Chesterton, Cirencester Land at Chesterton, Cirencester Transport Update 22 October 2014 By Mark Gimingham BA (Hons) BTP CMILT MCIHT, Partner, i-transport LLP Purpose To provide an update on progress with the development of the

More information

Chapter 12 TRAFFIC AND TRANSPORT

Chapter 12 TRAFFIC AND TRANSPORT Chapter 12 TRAFFIC AND TRANSPORT 12 12 Traffic and transport Introduction 12.1 Alan Baxter Ltd undertook the traffic and transport assessment. The findings of the assessment are summarised in this chapter

More information

MILTON ROAD LLF PROJECT UPDATE

MILTON ROAD LLF PROJECT UPDATE Greater Cambridge City Deal MILTON ROAD LLF PROJECT UPDATE 9 th May 2017 Project objectives Comprehensive priority for buses in both directions wherever practicable; Additional capacity for sustainable

More information

TERM CONTRACT FOR THE MANAGEMENT AND MAINTENANCE OF THE SCOTTISH TRUNK ROAD NETWORK NORTH EAST UNIT

TERM CONTRACT FOR THE MANAGEMENT AND MAINTENANCE OF THE SCOTTISH TRUNK ROAD NETWORK NORTH EAST UNIT TERM CONTRACT FOR THE MANAGEMENT AND MAINTENANCE OF THE SCOTTISH TRUNK ROAD NETWORK NORTH EAST UNIT A90 LAURENCEKIRK ROAD SAFETY SCHEME MONITORING STUDY Client: Transport Scotland Trunk Road and Bus Operations

More information

CUERDEN TRANSPORT PROPOSALS

CUERDEN TRANSPORT PROPOSALS 1 CUERDEN TRANSPORT PROPOSALS The transport assessment, submitted with the Cuerden development planning application, looks at access to the site and the impact on the local road network in detail. This

More information

DARLAND FARM, MEDWAY. Transport Statement

DARLAND FARM, MEDWAY. Transport Statement DARLAND FARM, MEDWAY Transport Statement Project No. 16-007 June 2016 DAARLAND FARM, MEDWAY Transport Statement C&A Consulting Engineers Office 17 Wealden Place Bradbourne Vale Road Sevenoaks Kent TN13

More information

20mph Speed Limit Trial Warrington Borough Council. Mark Tune Traffic Management & Road Safety Manager

20mph Speed Limit Trial Warrington Borough Council. Mark Tune Traffic Management & Road Safety Manager 20mph Speed Limit Trial Warrington Borough Council Mark Tune Traffic Management & Road Safety Manager Benefits of reduced speed Reduced number and severity of accidents More cycle friendly environment

More information

Kings Road, Herne Bay: Proposed Crash Remedial Measure

Kings Road, Herne Bay: Proposed Crash Remedial Measure Kings Road, Herne Bay: Proposed Crash Remedial Measure To: Canterbury Joint Transportation Board 17 February 2015 By: Classification: Ward: Tim Read - Head of Transportation Unrestricted Herne Bay Summary:

More information

Tel: Karime Hassan Chief Executive Exeter City Council Civic Centre Paris Street Exeter EX1 1JN

Tel: Karime Hassan Chief Executive Exeter City Council Civic Centre Paris Street Exeter EX1 1JN Page 1 of 6 Karime Hassan Chief Executive Exeter City Council Civic Centre Paris Street Exeter EX1 1JN Dear Mr Hassan 14th September 2015 Re: Development of Bus & Coach Station Site Following the submission

More information

Transport Assessment. Curtis Street Plan Change

Transport Assessment. Curtis Street Plan Change Transport Assessment Curtis Street Plan Change Transport Assessment for Curtis Street Plan Change i Contents 1. Introduction... 1 2. Existing Conditions... 2 2.1 Location... 2 2.2 Study Area... 3 2.3

More information

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign E4 Cycle Route Exeter University to Redhayes Bridge - Recommendations from Exeter Cycling Campaign 1.0 Introduction Exeter Cycling Campaign has prepared this report to provide recommendations for Devon

More information

1.0 Introduction. Long standing options identified in the 2006 South Marston Village Report.

1.0 Introduction. Long standing options identified in the 2006 South Marston Village Report. 1.0 Introduction 1.1 Part One of this study has assessed options to mitigate the impacts of existing issues on the road network in and around South Marston Village. Issues have been identified from site

More information

Transport Assessment & Traffic Modelling Report

Transport Assessment & Traffic Modelling Report Transport Assessment & Traffic Modelling Report Additional Traffic Modelling for Glanmire / Dunkettle to facilitate a signalised junction with Dunkettle Road from Ballinglanna Lands. MHL & Associates Ltd,,

More information

Travel Plan Monitoring Report. Bourton View, Wellingborough - Residential

Travel Plan Monitoring Report. Bourton View, Wellingborough - Residential Travel Plan Monitoring Report Bourton View, Wellingborough - Residential Prepared by: Developer Eyes Property and Estate Management, Broughton Grange Business Centre, Headlands, Kettering, Northants, NN15

More information

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation Frascati Road and Temple Hill Route Improvements Outline Design Report to Accompany Public consultation September 2013 Background: Dún Laoghaire-Rathdown is committed to providing high quality pedestrian

More information

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design Cycle traffic and the Strategic Road Network Sandra Brown, Team Leader, Safer Roads- Design Highways England A Government owned Strategic Highways Company Department for Transport Road Investment Strategy

More information

Response to further information request Ministry of Education Notice of Requirement (200 & 252 Park Estate Road)

Response to further information request Ministry of Education Notice of Requirement (200 & 252 Park Estate Road) 21 Pitt Street PO Box 6345, Auckland 1141, New Zealand T: +64 9 300 9000 // F: +64 9 300 9300 E: info@beca.com // www.beca.com Auckland Council Private Bag 92300 Victoria Street West Auckland 1142 15 August

More information

TRANSPORT AND MOVEMENT

TRANSPORT AND MOVEMENT TRANSPORT AND MOVEMENT Movement Strategy Public Transport Cycling and Walking Road Network Parking Standards Transport Impact Assessments Traffic Management Policies DRAFT POOLBEG PLANNING SCHEME Movement

More information

Collision Site Investigation - Bodenham By-Pass Background

Collision Site Investigation - Bodenham By-Pass Background Collision Site Investigation - Bodenham By-Pass Background The junction of the C12 and A338 was the subject of a Local Safety Scheme (LSS) in 2011. Analysation of the collisions at the time revealed the

More information

Traffic Sensitive Streets. Guidance Notes. GeoPlace Streets Team. Traffic Sensitive Streets. Guidance Note Page 1 of 7.

Traffic Sensitive Streets. Guidance Notes. GeoPlace Streets Team. Traffic Sensitive Streets. Guidance Note Page 1 of 7. Guidance Notes GeoPlace Streets Team Guidance Note Page 1 of 7 Introduction The guidance note provides information on the definition, role and value of. It will also focus on how and why Traffic Sensitive

More information

SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane

SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane Exception Report Client Officer Rudo Beremauro Date 20 January 2015 RSA /Project Sponsor s Contents Section 3 Project Sponsor's

More information

Harriet Fraser Traffic Engineering & Transportation Planning

Harriet Fraser Traffic Engineering & Transportation Planning Appendix 5: Traffic Assessment 71 26 February 2015 Mr James Beban Senior Resource Consents Planner Cuttriss Consultants Ltd PO Box 30429 Lower Hutt PO Box 40170 Upper Hutt 5140 P 04 526 2979 M 027 668

More information

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail.

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail. TRANSPORT AND ACCESS EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail. Whilst there are some walking facilities within

More information

Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008

Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008 Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008 The following amendments to the wording of the maintenance strategy apply following the revised maintenance

More information

For Information Only. Pedestrian Collisions (2011 to 2015) Resolution. Presented: Monday, Apr 18, Report Date Tuesday, Apr 05, 2016

For Information Only. Pedestrian Collisions (2011 to 2015) Resolution. Presented: Monday, Apr 18, Report Date Tuesday, Apr 05, 2016 Presented To: Operations Committee For Information Only Pedestrian Collisions (0 to 0) Presented: Monday, Apr 8, 06 Report Date Tuesday, Apr 0, 06 Type: Correspondence for Information Only Resolution For

More information

Determining bicycle infrastructure preferences A case study of Dublin

Determining bicycle infrastructure preferences A case study of Dublin *Manuscript Click here to view linked References 1 Determining bicycle infrastructure preferences A case study of Dublin Brian Caulfield 1, Elaine Brick 2, Orla Thérèse McCarthy 1 1 Department of Civil,

More information

Access Management Guidelines February 2013 THE CITY OF

Access Management Guidelines February 2013 THE CITY OF Access Management Guidelines February 2013 THE CITY OF Table of Contents Introduction 2 Review and Approval Process 5 Technical Guidelines 9... 10... 12 3. Separation Distance: Non-Signalized All-Turns

More information

Part 3: Active travel and public transport planning in new housing developments

Part 3: Active travel and public transport planning in new housing developments 1 Linking active travel and public transport to housing growth and planning Part 3: Active travel and public transport planning in new housing developments Active Travel Toolkit Slide Pack July 2017 Linking

More information

How far do people walk?

How far do people walk? How far do people walk? Gareth Wakenshaw BSc (Hons), PGDip, MCIHT WYG Group Dr Nick Bunn BSc (Hons), MSc, PhD, MCIHT, CMILT WYG Group Presented at the PTRC Transport Practitioners Meeting London, July

More information

Shotover Country. Proposed Private Plan Change. Transportation Assessment Report. February 2010

Shotover Country. Proposed Private Plan Change. Transportation Assessment Report. February 2010 Shotover Country Proposed Private Plan Change February 2010 PO Box 13 835, Armagh Christchurch 8141 P: +64 3 379 2404 www.tdg.co.nz New Zealand Shotover Country Proposed Private Plan Change Quality Assurance

More information

AD L T r a f f i c a n d H i g h w a y s E n g i n e e r i n g L t d BRIEFING NOTE B4219 COWLEIGH ROAD, STORRIDGE (ADL REF: 3409/09 NOVEMBER 2017)

AD L T r a f f i c a n d H i g h w a y s E n g i n e e r i n g L t d BRIEFING NOTE B4219 COWLEIGH ROAD, STORRIDGE (ADL REF: 3409/09 NOVEMBER 2017) AD L T r a f f i c a n d H i g h w a y s E n g i n e e r i n g L t d ADL House, Oaklands Business Park, Armstrong Way, Yate, Bristol, BS37 5NA Tel: 01454 332 100 Fax: 01454 327 983 Email: cad@adltraffic.co.uk

More information

PROPOSED GARDEN CENTRE AND RETAIL OUTLET CENTRE AT ASHCHURCH, GLOUCESTERSHIRE TRANSPORT ASSESSMENT Page 1 of 48

PROPOSED GARDEN CENTRE AND RETAIL OUTLET CENTRE AT ASHCHURCH, GLOUCESTERSHIRE TRANSPORT ASSESSMENT Page 1 of 48 TRANSPORT ASSESSMENT Page 1 of 48 1. INTRODUCTION 1.1. This Transport Assessment (TA) has been prepared by PFA Consulting on behalf of Robert Hitchins Limited (RHL) and its successors in title to the land,

More information

Appendix BGH 1. Location Plan of Traffic Survey Sites

Appendix BGH 1. Location Plan of Traffic Survey Sites Appendix BGH 1 Location Plan of Traffic Survey Sites PLAN OF SURVEY SITES Caldy Valley Road/A5115 Whitchurch Road/A41 Ring Road/A41 Whitchurch Road/A55 Slip Roads KEY: SAIGHTON CAMP AREA A NTS Appendix

More information

LAND NORTH OF STOKE ROAD, HOO ST WERBURGH, MEDWAY CLIENT: DEAN LEWIS ESTATES

LAND NORTH OF STOKE ROAD, HOO ST WERBURGH, MEDWAY CLIENT: DEAN LEWIS ESTATES LAND NORTH OF STOKE ROAD, HOO ST WERBURGH, MEDWAY CLIENT: DEAN LEWIS ESTATES P17052 Land North of Stoke Road, Hoo St. Werburgh, Medway Document Control Job Number P17052 Document Version Final File Reference

More information

Chelmsford City Growth Package

Chelmsford City Growth Package Chelmsford City Growth Package Public Consultation Document Volume 2 West Chelmsford July - August 2017 Chelmsford City Growth Package Public Consultation Document - Volume 2 - West Chelmsford Contents

More information

The Wincheap Society

The Wincheap Society The Wincheap Society s on sections of: Thanington 4th Arm Slip Road, Walking, Cycling & Horse-Riding Assessment & Review Report, by Peter Brett Associates, October 2017, on behalf of Pentland Properties

More information

DRAFT for a State Policy for Healthy Spaces and Places

DRAFT for a State Policy for Healthy Spaces and Places DRAFT for a State Policy for Healthy Spaces and Places 1 DRAFT State Policy for Healthy spaces and Places 1. Purpose To encourage the use and development of land that builds healthy communities through

More information

Maynooth Traffic Management Plan & Traffic Model

Maynooth Traffic Management Plan & Traffic Model Maynooth Traffic Management Plan & Traffic Model Traffic Survey Report Draft September 6 Designer AECOM Adelphi Plaza George's Street Upper Dún Laoghaire Co.Dublin Client Kildare County Council Aras Cill

More information

A65 TRANSPORT ASSESSMENT. 13 th May 2005

A65 TRANSPORT ASSESSMENT. 13 th May 2005 A65 TRANSPORT ASSESSMENT 13 th May 2005 1 CONTENTS 1.0 Introduction 2.0 Overview 3.0 Detailed Assessment of the A65 Corridor 4.0 Future Proposals 5.0 Conclusions List of Figures Figure 1: AM Average Traffic

More information

Strategic Director for Environment. Enclosures Appendix A - Option drawings. Jamie Blake- Strategic Director for Environment

Strategic Director for Environment. Enclosures Appendix A - Option drawings. Jamie Blake- Strategic Director for Environment Chipping Barnet Area Committee 9 July 2018 Title Report of Wards Status Urgent Key Cromer Road Request for 20mph Zone Strategic Director for Environment High Barnet Public No No Enclosures Appendix A -

More information

Appendix A Type of Traffic Calming Measures Engineering Solutions

Appendix A Type of Traffic Calming Measures Engineering Solutions Appendix A Type of Traffic Calming Measures Engineering Solutions PHYSICAL MEASURES Central Hatching The major consideration of this feature is that, these markings can only be laid down the centre of

More information

Sandwell General Hospital Travel Plan 2014

Sandwell General Hospital Travel Plan 2014 Sandwell General Hospital Travel Plan 2014 Travel Plan Survey Dated 24 th June 2013 Travel plan finalised March 2014 Prepared by Michael Raynor, JMP Consultants Ltd Site Address Lyndon, West Bromwich,

More information

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document TELL US Bakers Arms to Leyton Green Road (Section D, E, F) Leyton Green Road to Whipps Cross Roundabout (Section G) YOUR VIEWS www.enjoywalthamforest.co.uk

More information

Design Workshops Summary of all Feedback January 2017

Design Workshops Summary of all Feedback January 2017 Histon Road Corridor Design Workshops Summary of all Feedback January 2017 CITY DEAL AND GROWTH Commitment to Growth: Government, County, City and District Emerging Local Plans: 33,000 new homes 45,000

More information

GD 0043/18 ACTIVE TRAVEL STRATEGY

GD 0043/18 ACTIVE TRAVEL STRATEGY GD 0043/18 ACTIVE TRAVEL STRATEGY 2018-2021 May 2018 Minister s Introduction There is strong evidence that regular physical activity reduces the risk of a range of health conditions. The best way to increase

More information

Statement of Evidence of Judith Makinson

Statement of Evidence of Judith Makinson In the Matter of: The Resource Management Act 1991 and In the Matter of: Podium Sports Lodge, 18 20 Peake Road Application By: Brian Perry Charitable Trust Statement of Evidence of Judith Makinson TDG

More information

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc. Magnolia Place Traffic Impact Analysis Prepared for: City of San Mateo Prepared by: Hexagon Transportation Consultants, Inc. Updated January 4, 2010 Table of Contents 1. Introduction...1 2. Existing Conditions...6

More information

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21 DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.

More information

TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1

TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1 TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL Page 1 Table of Contents 1.0 Introduction... 3 2.0 Project Overview... 3 3.0 Project Proposals... 4 3.1 Enfield Road / Durham Road Junction... 3 5 3.2 Summerfield

More information

World Leading Traffic Analysis

World Leading Traffic Analysis World Leading Traffic Analysis Over the past 25 years, has worked closely with road authorities and traffic managers around the world to deliver leading traffic monitoring equipment. With products now

More information

Arcadis LLP. Travel Plan. June Proposed Secondary School (Bolder Academy) Macfarlane Lane, Isleworth. traffic engineering and transport planning

Arcadis LLP. Travel Plan. June Proposed Secondary School (Bolder Academy) Macfarlane Lane, Isleworth. traffic engineering and transport planning traffic engineering and transport planning Arcadis LLP Proposed Secondary School (Bolder Academy) June 2017 Armstrong House, The Flemingate Centre, Beverley, HU17 0NW 01482 679 911 info@local-transport-projects.co.uk

More information

A105 Green Lanes junction with Bourne Hill / Hedge Lane

A105 Green Lanes junction with Bourne Hill / Hedge Lane Cycle Enfield - Section 5 A105 Green Lanes junction with Bourne Hill / Hedge Lane Stage 2 Road Safety Audit Ref: 2759.03.05/032/A105/BOR/2016 Prepared for: London Borough of Enfield By: Road Safety Audit,

More information

Appendix F CAPITA Technical Audit

Appendix F CAPITA Technical Audit Appendix F CAPITA Technical Audit West Hendon - Major Review of Technical Audit Responses 14 June 2016 Quality Management Quality Management Job No Project Location Title CS/086106 West Hendon - Major

More information

A future cycle route network for North Staffordshire mb/08/16 Need for a strategy. Existing cycle route network

A future cycle route network for North Staffordshire mb/08/16 Need for a strategy. Existing cycle route network Need for a strategy 1. The government s aim is to double cycling levels nationally by 2025 [note 1]. This would bring significant health, environmental, economic and traffic benefits [note 2]. It is widely

More information

High frequency bus services operating to Little Island; Creation of a new Park and Ride site and train station at North Esk;

High frequency bus services operating to Little Island; Creation of a new Park and Ride site and train station at North Esk; Cork County Council 7 th December 2018 Dear Adrian O Neill (aoneill@jbbarry.ie) The Transport and Mobility Forum, Cork (TMF) is a representative group of organisations who have a common interest in sustainable

More information

Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9.

Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9. Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9 Prepared By: URS Canada Inc. 4 th Floor, 30 Leek Crescent Richmond Hill, Ontario L4B

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING

IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING BBAG BRIEFING NOTE EMAIL: BERMUDABRIDGEAGP@BTINTERNET.COM WWW.FACEBOOK.COM/GROUPS/BERMUDABRIDGEAG TWITTER @BERMUDABRIDGEAG CYCLING BBAG BRIEFING NOTE

More information

Child Road Safety in Great Britain,

Child Road Safety in Great Britain, Child Road Safety in Great Britain, 21-214 Bhavin Makwana March 216 Summary This short report looks at child road casualties in Great Britain between 21 and 214. It looks at how children travel, the geographical

More information

To: The results of these surveys have been analysed and are summarised within this Technical Note.

To: The results of these surveys have been analysed and are summarised within this Technical Note. Technical Note Project: Histon Road / Milton Road, Cambridge Parking Surveys To: Andy Harrison Subject: Survey Report v1.6 From: Jonathan Barlow Date: 18 th February 2016 cc: Richard Jones / Dave Boddy

More information

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02 1 VicRoads Access Management Policies May 2006 Ver 1.02 VicRoads Access Management Policies May 2006 Version 1.02 2 VicRoads Access Management Policies May 2006 Ver 1.02 FOREWORD FOR ACCESS MANAGEMENT

More information

Joint Response to the Department for Transport Consultation on the Station Champions Report on Better Rail Stations. February 2010

Joint Response to the Department for Transport Consultation on the Station Champions Report on Better Rail Stations. February 2010 Joint Response to the Department for Transport Consultation on the Station Champions Report on Better Rail Stations Joint Response to the Better Rail Stations Consultation This response has been prepared

More information

REPORT ON TRANSPORT AND PARKING, 2017

REPORT ON TRANSPORT AND PARKING, 2017 NEIGHBOURHOOD DEVELOPMENT PLAN 2017 REPORT ON TRANSPORT AND PARKING, 2017 COMPILED BY: NEIGHBOURHOOD DEVELOPMENT PLAN STEERING COMMITTEE AND ROLVENDEN PARISH COUNCIL CONSULTANTS: TONY FULLWOOD ASSOCIATES,

More information

C.A.R.S. Project Design Report.

C.A.R.S. Project Design Report. C.A.R.S. Project Design Report. PRODUCED BY: Browne, A. Kennedy, M. Dolan, N. Selman, C. STUDENT NO: DATE DUE: COURSE: LECTURER: C09365788-C09686908-D11125480-C08868352 20-April-2012 Dt004/3 Civil Engineering

More information

Land at Harrogate College Interim Travel Plan

Land at Harrogate College Interim Travel Plan Imperial West Land at Harrogate College Curtins Ref: TPLE 1275/ITP Revision: Final Issue Date: 14 April 2016 Sophos International Client Name: Harrogate College Curtins Rose Wharf, 78-80 East Street, Leeds,

More information

BROMPTON LODGE, CRANBOURNE PRECINCT STRUCTURE PLAN TRAFFIC ENGINEERING ASSESSMENT WOLFDENE PTY LTD PREPARED FOR

BROMPTON LODGE, CRANBOURNE PRECINCT STRUCTURE PLAN TRAFFIC ENGINEERING ASSESSMENT WOLFDENE PTY LTD PREPARED FOR BROMPTON LODGE, CRANBOURNE PRECINCT STRUCTURE PLAN TRAFFIC ENGINEERING ASSESSMENT PREPARED FOR WOLFDENE PTY LTD TRAFFIC ENGINEERING ASSESSMENT PRECINCT STRUCTURE PLAN AT BROMPTON LODGE, CRANBOURNE Document

More information

Report to Cabinet. 18 May 2016

Report to Cabinet. 18 May 2016 Agenda Item 8 Report to Cabinet 18 May 2016 Subject: Presenting Cabinet Member: Proposed CCTV Enforcement of Traffic Contraventions in a Bus Lane (Key Decision Ref. No. HE030) Highways and Environment

More information

Appendix 5 Traffic Assessment

Appendix 5 Traffic Assessment Appendix 5 Traffic Assessment 44 Harrison Transportation Best Start Educare Shelly Bay Road Beachlands Transportation Assessment Report September 2017 PO Box 11 557 Palm Beach Papamoa 3151 Reference: 187

More information

Wicklow County Council Chomairle Chontae Chill Mhantáin. Traffic Calming Policy

Wicklow County Council Chomairle Chontae Chill Mhantáin. Traffic Calming Policy Chomairle Chontae Chill Mhantáin Adopted by Wicklow County Council on the 11th of June, 2012 Contents Section Page 1. Introduction 3 2. Legislation 3 3. Guidance Documentation 3 4. Policy Objectives &

More information

IMPLEMENTATION. PEDESTRIAN USERS (Continued /) Building Frontages: A: Stair Applications. Geometry (Accessed from the Sidewalk) Refer to A:

IMPLEMENTATION. PEDESTRIAN USERS (Continued /) Building Frontages: A: Stair Applications. Geometry (Accessed from the Sidewalk) Refer to A: A: Stair Applications Building Frontages: Geometry (Accessed from the Sidewalk) Refer to A: Ramps should be provided for disabled users at 1:12 (8.3%) gradient. Ramp rises should be stepped at 400mm intervals.

More information

TRAFFIC STUDY GUIDELINES Clarksville Street Department

TRAFFIC STUDY GUIDELINES Clarksville Street Department TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two

More information