1 Why is this roadway needed? Can't SR 50, University Boulevard and Aloma Avenue be widened instead of building this road? The need for this roadway was identified and determined through the East Orange County Transportation Needs Study (EOCTNS) completed in This study identified the need for a new east-west roadway between University Boulevard and SR 50, primarily to improve mobility for the residents living in the area and secondarily, to provide some traffic congestion relief to University Boulevard and SR 50. In addition to the new east-west road, this study also identified the need to improve Aloma Avenue and SR 50 from 4 to 6 lanes. The Florida Department of Transportation (FDOT) is presently preparing plans to improve SR 50 from 4 to 6 lanes. University Boulevard already has 6 lanes which is the maximum number of through lanes allowed on a County road. Orange County is currently evaluating Transportation Systems Management (TSM) alternatives on University Boulevard in order to provide some operational improvements since it cannot be widened beyond its existing 6 lanes. Even with improvements to Aloma Avenue and SR 50, the new east-west road is still needed. If my home is located within the pink area shown on the first RCA newsletter, does it mean my home will be acquired or impacted and when will I know if my home is going to be impacted? The newsletters that were mailed out included a pink shaded area that identified the study area that is being considered for this new roadway. In actuality, only a small portion of the pink shaded area will be directly impacted as a result of the final location (alignment) of the roadway. Will this be a toll road and will it be an expressway? This road will not be part of the expressway system, it will not be elevated and it will not be a toll road. This road will provide a connection between the neighborhoods in eastern Orange County and SR 436 to the west and Dean Road to the east. The proposed roadway improvements include sidewalks, bicycle lanes, landscaping and lighting. What is the process if the new road impacts my house? Once the County has identified the final right-of-way requirements, the County right-of-way agents will begin the preparation of right-of-way appraisals for impacted properties. During this process, impacted property owners will be contacted directly by the County right-of-way agents. Once the appraisal is completed, the County will offer to purchase their property for the appraised value. Property owners have certain rights guaranteed to them by the State of Florida. 1 Page
2 Will the zoning and land use change along this new roadway? The new roadway will not change the zoning. If any property owner wishes to change the zoning of his/her property, the property owner must make a zoning change request to the County's Zoning Department. The Zoning Board and the Board of County Commissioners must approve the request. Why didn't I receive a notice for public meetings during the RCA Study? The first newsletter for the RCA project was mailed notifying over 4,300 property owners in the area that the study was underway and that the first Public Meeting would be held on December 2, The mailing list was obtained from the Orange County Property Appraisers office and was the most current information available to us at that time. In addition, a display advertisement was published in the Orlando Sentinel on Sunday, November 28, 1999 notifying the public of the meeting. If you improve other roads such as Colonial Drive and Econlockhatchee Trail, this new roadway will not be needed. The East Orange County Transportation Needs Study, (completed in 1998), identified the need for numerous roadway improvements in the area bounded by SR 50, SR 436, the Seminole County Line and Chuluota Road. All of these roadway improvements, including the east-west roadway, will be needed to serve traffic in east Orange County over the next 20 years. The following is a list of these recommended roadway improvements that was approved as part of the Study: Widen SR 50 to six lanes from SR 436 to Old Cheney Highway (This project is currently being designed by the Florida Department of Transportation). Widen Rouse Road to four lanes from Lake Underhill Road to Corporate Boulevard (The design of this project is in its final stages). Conduct a study to determine the location for a new east-west road from SR 436 to North Tanner Road in the area north of SR 50 and south of University Boulevard. This project, from SR 436 to Dean Road, being conducted by the County, is the first phase of this project. Study a new road near the Orange/Seminole County line from Dean Road to SR 434 (This study was completed, determining that a new road in the area was not feasible). Widen SR 434 to six lanes from Corporate Boulevard to McCulloch Road. Provide additional improvements to Forsyth Road from SR 50 to University Boulevard (These improvements are under construction). 2 Page
3 Widen Hall Road to four lanes from University Boulevard to Aloma Avenue. Provide a new two lane roadway (Woodbury Road extension) from SR 50 to Challenger Parkway. Widen Aloma Avenue to six lanes from SR 436 to the Central Florida Greeneway. Widen Econlockhatchee Trail to four lanes from SR 50 to University Boulevard. Widen Dean Road from University Boulevard to Aloma Avenue. Use 12-foot lanes, not 11-foot lanes. Through input from the Project Advisory Team members, specifically neighborhood representatives, 11-foot lanes are proposed for the roadway east of Forsyth Road. The narrower lanes will help "calm" traffic through the residential areas. Twelve-foot lanes are proposed for the industrial/commercial area between SR 436 and Forsyth Road. A new road through these neighborhoods will not be safe for our children. Currently, some motorists are using the residential streets as a cut-through so that they do not have to use University Boulevard or SR 50. This new roadway will provide a safer route for these people and should relieve traffic on the residential streets. This road will also have on-road bicycle lanes, sidewalks and street lighting. Also, a representative of Orange County Public Schools is on the Project Advisory Team to ensure that the issue of school children safety is addressed. Take the tolls off of the East-West Expressway and the GreeneWay and this road will not be needed. The East West Expressway and other toll roads in the Orlando area are under the jurisdiction of the Orlando Orange County Expressway Authority (OOCEA) and not Orange County. In order to construct these toll roads, approximately 1.2 billion dollars in bonds were issued. The debt service, or payment, that must be made to repay these bonds is approximately 63 million dollars per year. The OOCEA uses the tolls collected on the expressway system to make this payment and to maintain these roadways. This is the only source of funding available to repay these bonds. Look at improving Lake Underhill Road. Lake Underhill Road will be widened in the future to four lanes between Goldenrod Road and Alafaya Trail. 3 Page
4 The wetlands along the Econlockhatchee River need to be protected. The wetlands along the north side of the Econlockhatchee River, just west of Dean Road are several hundred feet wide. This road will impact a maximum of 120 feet of this wetland area, and still leave a buffer adjacent to the river that will vary between 100 and 500 feet in width. The potential impacts to this wetland area were reviewed with the St. John's River Water Management District who made it clear that Orange County will have to purchase wetlands for preservation in another area that will compensate for the loss of the impacted wetlands. In addition to the impacts to the wetlands, concerns have been raised in regards to the stormwater runoff from the new road. All stormwater runoff from the road will be collected and treated in stormwater retention ponds and will not discharge directly into the Econlockhatchee River. I like the bicycle lanes, sidewalks and low speed limits that are proposed. Orange County provides on-road bicycle lanes and sidewalks on new roadways when feasible. In addition, street lighting will also be provided on new roadways because of the concerns for the safety of children walking to school during the early morning hours. This road is intended to provide an alternative to University Boulevard and SR 50 for people living in this residentially developed area. Neighborhood representatives on the Project Advisory Team indicated the desire for this road to have more of a "neighborhood feel" mainly consisting of a slower speed limit. The typical speed limit for this type of road is 45 mph, but the proposed speed limit will be 30 to 35 mph. Do not allow u-turns at intersections because they are dangerous. This road is proposed to have a raised grass median that will have only have breaks at certain intervals. Limiting the number of median breaks provides for a safer road by reducing the number of "conflict points" for vehicles traveling in different directions. Because median breaks will not be provided at every road along the alignment, some vehicles will have to make u-turns to get to their destinations. This road is being designed so that u-turns can be made safely. If the County builds a wall along my neighborhood, will they also maintain it? The Board of County Commissioners has approved the construction of eight-foot high screen walls of specific locations along the roadway. These walls will be maintained by Orange County. 4 Page
5 I think that the same effort spent to beautify Orange Blossom Trail should be spent on this road. Orange County provides a low-maintenance landscaping package on new roadways. This consists of grass in the median and along the road and shrub and tree plantings in the median. This is what is planned for this roadway. Increase the buffer area between Pinewood Village and the new road. The buffer area, or the area between the back property line of the houses in Pinewood Village and the right of way for the new road, that was shown at the Public Workshop was between 50 and 65 feet. This buffer area has now been increased to 100 feet. Will this road decrease the value of my property? It is difficult to determine whether specific property values will increase or decrease when a new road is built. Increased noise levels and loss of trees may be perceived to cause the value of a piece of residential property to decrease, but a new road provides additional access and convenience which may increase the property's value. Look at another alternative between Goldenrod Road and Harrell Road that starts at Bates Road and swings down and runs along the river. An alignment that began at Bates Road, swung south to the river and then headed east along the river was evaluated. This alignment had significant environmental impacts and much higher construction costs than other alternatives that had the same residential impacts. This alternative was eliminated from further consideration. This road will increase noise and air pollution. Noise levels may increase through some parts of the study area because of this new road. The slower speed limit proposed for this road will help keep noise levels low. Vehicular speeds have the greatest effect on the amount of noise produced on a road. Air pollution throughout the project area should decrease overall because of improved traffic flow on the roadway network and less stop and go traffic. Vehicles that have to sit in traffic create more pollution and use more gas than vehicles that can get to their destinations in a shorter time. Limit 18 wheel trucks to the left lane on SR 50. SR 50 (Colonial Drive) is a State of Florida Department of Transportation roadway and is not controlled by Orange County. This comment was forwarded to the Florida Department of Transportation. 5 Page
6 Don't allow school buses to stop on SR 50 or University Boulevard. School buses are required to stop on major roadways because many of the side streets that they would have to drive on are not wide enough for them to turn around on. This comment was forwarded to a member of the Project Advisory Team who represents the Orange County Public Schools transportation services. LYNX buses need to have stops off of the road on SR 50 and University Boulevard. LYNX buses would have the same problems with not being able to turn around on residential streets as school buses. Construction of bus pull-outs on constrained roadways such as University Boulevard are cost prohibitive. The outside lane on six-lane roads acts like an auxiliary lane for making turns and for buses to stop. What is planned for the next phase of this roadway east of Dean Road? The East Orange County Transportation Needs Study (EOCTNS) identified the need for a new east-west roadway from SR 436 to North Tanner Road. Traffic projections showed that the segment of this new road between SR 436 and Dean Road would be needed sooner than the segment east of Dean Road. Therefore, Orange County began the East West Road RCA Study for the segment between SR 436 and Dean Road in 1999 and will conduct a similar RCA Study for the portion between Dean Road and North Tanner Road in the next several years. The second phase of this east west road east of Dean Road may potentially use portions of existing roads such as Buck Road or Research Parkway. However, all feasible alternatives will be considered when this RCA Study is conducted. This road will increase crime and violence because of accessibility. It is not possible to determine that crime and violence will increase because of a new roadway. Crime may decrease because vehicles that are currently cuttingthrough neighborhoods will have a new road and will not have to cut through neighborhoods anymore. This road should line-up with the road planned by the City of Orlando for the redevelopment of the Naval Training Center. The beginning point of this new road was influenced by the location of the proposed access road from the Naval Training Center redevelopment project. Currently, this access road is planned to intersect SR 436 near the entrance to the Auvers Village Apartments. The new East-West Road will begin opposite the planned connection point of the proposed access road. Representatives from the Florida Department of Transportation were on the Project Advisory Team and indicated that they support the East West Road beginning at this location. 6 Page
7 How will this road ease traffic with all the curves and intersections? This road will help traffic conditions in the area by providing an alternative to other roads that are over capacity. The alternatives that were presented at the second Public Workshop will be evaluated over the next several months to determine how they will work operationally. The convenience of having a straight road must be balanced with trying to minimize impacts to neighborhoods throughout the corridor. If my house is impacted by this road, the County will not pay me enough money for my house to be able to buy a similar house. If your house will be impacted by the proposed roadway improvement, you will be contacted by a representative of the County's Real Estate Management Division to let you know. An independent Real Estate Appraiser will be hired to appraise your house as if you were going to try to sell it prior to this project. By law, you will be offered the "fair market value" for your house. Fair market value is defined as "the amount of money which a purchaser willing, but not obligated, to buy the property would pay to an owner willing, but not obligated, to sell it, taking into consideration all uses for which the land is suited." If you do not accept this offer, you can hire an appraiser of your own, paid for by the County (with limitations on the reimbursement), who will determine the fair market value of your house. Please note that this appraiser will only be paid for by the County after the County has begun the process to acquire your home. The County will continue to negotiate with you to buy your house throughout this process. If no agreement can be made, your case will go to trial and a jury will determine the price that you will be paid for your house. How do I get more information? If you would like more information regarding this project, please contact one of the Orange County staff members listed on the Contact Page. 7 Page
APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD
APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR
More informationFONTAINE AVENUE STUDY Final Report
FONTAINE AVENUE STUDY Final Report March 28, 2005 FONTAINE AVENUE STUDY City of Charlottesville March 28, 2005 Renaissance Planning Group Kenneth Schwartz, FAIA, AICP Director of Design Leigh Wilkerson,
More informationTransportation Planning Division
Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving
More informationCOMMUNITY MEETING #1 Summary
COMMUNITY MEETING #1 Summary October 26, 2016 LOCATION: TIME: ATTENDEES: Dr. Phillips High School Cafeteria 6500 Turkey Lake Road, Orlando, FL 32819 6:00 pm to 8:00 pm 79 citizens Commissioner Scott Boyd,
More informationReams Road RCA Study. Board of County Commissioners Public Hearing
Reams Road RCA Study Board of County Commissioners Public Hearing April 24, 2018 Presentation Overview Study Overview Existing Conditions Development of Alternatives Preferred Alternative Public Involvement
More information6.4 RECOMMENDED IMPROVEMENTS
6.4 RECOMMENDED IMPROVEMENTS 6.4.1 Williston Road Recommendations While all alternatives would be an improvement over existing conditions, Alternative 3B is recommended over the others because it provides
More informationLee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses
Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Introduction At the Lee s Summit Road Improvement Study Public Open House held Thursday, June 7, 2007
More informationTRANSPORTATION STANDARDS
INTRODUCTION LOCAL STREETS ON-STREET PARKING SIDEWALKS STREET LIGHTING STREET FURNISHINGS TRAFFIC CALMING STREET TREES MEDIAN PLANTING BOULEVARD LOCATIONS VILLAGE CENTER STREET LOCATIONS RESIDENTIAL STREET
More informationTRANSPORTATION COMMISSION Agenda Staff Report
TRANSPORTATION COMMISSION Agenda Staff Report Agenda Item No. 5.a DATE: JULY 31, 2014 TO: FROM: SUBJECT: TRANSPORTATION COMMISSION COMMUNITY DEVELOPMENT DEPARTMENT - PLANNING DRAFT OLYMPIC CORRIDOR PREFERRED
More informationTonight is for you. Learn everything you can. Share all your ideas.
Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.
More informationActive Transportation Facility Glossary
Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike
More informationDRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections
Roadway Cross-Sections Medford s roadway cross-section standards apply to new and reconstructed roads. The crosssections take into consideration roadway function and operational characteristics, including
More informationChapter 5 Future Transportation
Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,
More informationFleur Drive Reconstruction
Fleur Drive Reconstruction October 29, 2018 1 Agenda: Fleur Drive Reconstruction Project Scope & Cost Overview Fleur Drive Cross Section Elements - Travel Lane Widths - Sidewalk Widths - Parkway Widths
More informationState Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway
State Road 54/56 Tampa Bay s Northern Loop The Managed Lane Solution Linking I-75 to the Suncoast Parkway SUNCOAST PARKWAY Both I 75 and the Suncoast Parkway are planning, or in the process of constructing,
More informationEl Paso County 2040 Major Transportation Corridors Plan
El Paso County 2040 Major Transportation Corridors Plan Connect-our-County Online Transportation User Survey Preliminary Results June 24, 2010 Years of Residence 2. How many years have you LIVED HERE?
More informationPRESENTATION OUTLINE
November 8, 2017 PRESENTATION OUTLINE Regional Express Lanes Network Purpose/Benefits of Express Lanes 95 Express Phase 3C Project Video and Overview 95 Express Phase 3C Schedule 2 SOUTH FLORIDA REGIONAL
More informationCity of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE
Welcome Welcome to the third community meeting for the Issaquah-Fall City Road Improvements Project. AGENDA 6:00 p.m. Welcome and sign-in 6:10 p.m. Presentation 6:50 p.m. Open house Learn about the roadway
More informationChapter 5. Complete Streets and Walkable Communities.
Chapter 5. Complete Streets and Walkable Communities. 5.1 Description of Complete Streets. Cities throughout the world, and specifically the United States, are coming to embrace a new transportation and
More informationComplete Streets. Designing Streets for Everyone. Sarnia
Complete Streets Designing Streets for Everyone Sarnia Complete Streets ~ Sarnia ~ 2018 Introduction Our City is made up of a network of streets that we use to go for a walk, cycle to work, drive to the
More information5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)
5/7/2013 VIA EMAIL David Hung, Associate Planner Community Development Department, Current Planning Division City of Sacramento 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: University Village
More informationPUBLIC HEARING. for State Road (S.R.) 5/U.S. 1 Roundabout at Old Dixie Highway Flagler County, Florida. Financial Project ID No.
for State Road (S.R.) 5/U.S. 1 Roundabout at Old Dixie Highway Flagler County, Florida Financial Project ID No.: 441210-1-32-0 1 Welcome to the Public Hearing for State Road (S.R.) 5/U.S. 1 Roundabout
More informationBETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY
DRAFT PLAN City Council Meeting August 14, 2017 STUDY AREA Sedgwick Corridor State Route 160, principal arterial with Class 3 access management designation, commuter and freight route, connection to SR
More informationCURBSIDE ACTIVITY DESIGN
5 CURBSIDE ACTIVITY DESIGN This chapter provides design guidance for separated bike lanes adjacent to curbside activities including parking, loading and bus stops. Typical configurations are presented
More informationWELCOME Public Information Centre
WELCOME Public Information Centre Fernforest Drive Brampton Soccer Centre Community Room #2 Tuesday January 19, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background
More informationTHE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010
CONCEPT DESIGN COMMUNITY MEETING 3 JANUARY 28, 2010 AGENDA INTRODUCTION COMMUNITY INPUT ROADWAY STUDIES STREETSCAPE DESIGN STATIONS DISCUSSION SUMMARY AND DISCUSSION NEXT STEPS CLOSE INTRODUCTION SCHEDULE
More informationChapter 3.3 Horizon Elementary School. Volusia County MPO. June 2009
Chapter 3.3 Horizon Elementary School Port Orange, FL Volusia County MPO June 2009 Volusia County MPO School Bicycle and Pedestrian Review Study, Phase 3C School Summary Horizon Elementary School is located
More informationMonroe Street Reconstruction
Total participants: 45+ Monroe Street Reconstruction Cross Section Workshop Notes September 29, 2016, Wingra School Workshop Orientation, Technical and Functional Considerations: The workshop began with
More informationItem to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines
Passaic County Complete Streets Checklist - Concept Development Project Name Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Existing Plans Have
More informationWaterford Lakes Small Area Study Report
Waterford Lakes Small Area Study Report Orange County District 4 Prepared for: Orange County Public Works Department Traffic Engineering Division 4200 S. John Young Parkway Orlando, FL 32839-9205 Prepared
More informationCaltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns
Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Revised: May 10, 2016 The California Department of Transportation (Caltrans) is planning various
More informationChapter 4.3 Enterprise Elementary. Volusia County MPO. March Page 7.0
Chapter 4.3 Enterprise Elementary Enterprise, FL Volusia County MPO March 2008 Page 7.0 Volusia County MPO Bicycle and Pedestrian School Safety Review Study Introduction Enterprise Elementary School is
More informationUS 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue
41 US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue EXECUTIVE SUMMARY DRAFT FEBRUARY 2019 Project Overview The US 41 Complete Streets Corridor Planning Study,
More informationCity of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines
City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines I. Purpose: The City of Elizabeth City is committed to ensure the overall safety and livability of residential neighborhoods. One
More informationSafe Routes to School Action Plan Aberdeen, Idaho
Background Aberdeen, Idaho is a largely agricultural community of nearly 2,000 people and is located in the southeast portion of the state on the western edge of American Falls Reservoir. The community
More informationAPPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY
APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY Appendix 2 City of Mississauga Lakeshore Road FINAL REPORT Transportation Review Study December 2010 EXECUTIVE SUMMARY Study Purpose
More informationSaskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening
Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening We are here today to present the draft plan for the Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening project
More informationBicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)
Appendix B Neighborhood Connections Summaries This Appendix is a supplement to the information presented in Chapter 3 Connect People. The Appendix includes a summary or profile for each of the proposed
More informationTransportation Planning Division
Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meeting Stakeholder Interviews Data Collection Design Principles Tool Box Recommendations Schedule Moving Forward North
More informationCommunity Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007
Community Meeting Tonight s Agenda 6:00 Introductions South Boston/Dot Ave Improvement Study Background 6:15 Consultant Introductions Review of Scope and Schedule Review of Proposed Corridor Wide Guidelines
More informationChapter 3 BUS IMPROVEMENT CONCEPTS
Chapter 3 BUS IMPROVEMENT CONCEPTS The purpose of this chapter is to describe potential bus improvement strategies and potential impacts or implications associated with BRT implementation within the existing
More informationBroad Street Bicycle Boulevard Design Guidelines
Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified
More informationSouthbend to Prima Vista. October 30, Floresta Corridor Master Plan
Application of a Complete Street initiative and how it might function operationally 8 8 Southbend to Prima Vista October 30, 2017 Presentation Agenda 2 Perspective and History Traffic projections, Levels
More informationPROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia
PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia PRELIMINARY ENGINEERING REPORT Prepared for: Prepared by: July 2017 Table of Contents 1
More information2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE
About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation
More information7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811
7/23/2017 VIA EMAIL Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: 65 th Street Apartments (DR17-220) Dear Mr. Hanebutt:
More information2015 Florida Main Street Annual Conference. Complete Streets Equal Stronger Main Streets
WHAT ARE COMPLETE STREETS? CASE STUDIES COMPLETING YOUR MAIN STREET 2015 Florida Main Street Annual Conference St. Petersburg, Florida August 19, 2015 WHAT ARE COMPLETE STREETS? CASE STUDIES COMPLETING
More informationWater Street Promenade Engineering and Design Services
Preliminary Design Presentation Parking & Traffic Safety Committee Water Street Promenade Engineering and Design Services July 16,2014 November 3, 2016 Education / Infrastructure / Innovation 1 Project
More informationFigure 4-10: Pedestrian Improvements Types of Potential Station Area Improvements - Place-Making Improvements
INCORPORATE FEATURE PAVIN IN CROSSWALK AND INTERSECTION FIELDS Identifies high-priority pedestrian areas and create a station identity through colorful and interesting patterns ADD CURB EXTENSIONS Extending
More informationOcean Park Boulevard Green Street Project Alternatives & Trade Offs
Planning Commission March 4, 2009 Ocean Park Boulevard Green Street Project Alternatives & Trade Offs Purpose of Tonight s Meeting Review concept plans and options Provide input on alternatives and trade-offs
More informationNORTH HIGHLAND LAKE ROAD PROJECT
NORTH HIGHLAND LAKE ROAD PROJECT The purpose of this special newsletter is to inform the residents of Flat Rock about the facts concerning the proposed N. Highland Lake Road Project and clarify some misconceptions.
More informationCity of Cape Coral Traffic Calming. City Council May 16,
City of Cape Coral Traffic Calming City Council May 16, 2016 1 In This Presentation Why Traffic Calming? What is Traffic Calming? Examples Traffic Calming in the City of Cape Coral How to develop a Traffic
More informationHidden Oaks Elementary School
Hidden Oaks Elementary School SCHOOL ROUTE PLAN For HIDDEN OAKS ELEMENTARY SCHOOL LOCATION 13 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering
More informationRESIDENTIAL TRAFFIC CALMING PROGRAM
RESIDENTIAL TRAFFIC CALMING PROGRAM CITY OF ALEXANDRIA, KENTUCKY Prepared For: Safety & Public Works Departments 1 Table of Contents CITY OF ALEXANDRIA... 3 RESIDENTIAL TRAFFIC CALMING PROGRAM... 3 INTRODUCTION...
More informationCirculation in Elk Grove includes: Motor vehicles, including cars and trucks
Circulation, as it is used in this General Plan, refers to the many ways people and goods move from place to place in Elk Grove and the region. Circulation in Elk Grove includes: Motor vehicles, including
More informationDurrance Elementary School
Durrance Elementary School SCHOOL ROUTE PLAN For DURRANCE ELEMENTARY SCHOOL LOCATION 9 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering
More informationINTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS
INTRODUCTION The thoroughfare plan will assist public officials in the development of a specialized system for efficient and safe movement of vehicular traffic while minimizing potential conflicts with
More informationWaterford Lakes Small Area Study
Waterford Lakes Small Area Study Existing Traffic Conditions PREPARED FOR: ORANGE COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION ORLANDO, FLORIDA PREPARED WITH: INWOOD CONSULTING ENGINEERS
More informationFlorida Redevelopment Association 2015 Annual Conference
Florida Redevelopment Association 2015 Annual Conference Reimagining State Arterials Jeff Costello, Delray Beach CRA Executive Director I-95 Fed. Hwy Pairs Two blocks west of Intracoastal Waterway One-way
More informationCity of Margate, Florida. Neighborhood Traffic Management Manual
City of Margate, Florida Neighborhood Traffic Management Manual Table of Contents Page No. I. INTRODUCTION... 1 II. TRAFFIC CALMING REQUEST AND PROCESSING PROCEDURES... 2 1. COMPLETE AND SUBMIT PROJECT
More informationDOWNTOWN MIAMI PEDESTRIAN PRIORITY ZONE
DOWNTOWN MIAMI PEDESTRIAN PRIORITY ZONE AUGUST 6, 2013 DOWNTOWN MIAMI BY THE NUMBERS more than 200,000 people live, work, and play here every day is home to more than 1,000 events each year hosts more
More informationChapter 3.5 Osteen Elementary School. Volusia County MPO. November 2008
Chapter 3.5 Osteen Elementary School Osteen, FL Volusia County MPO November 2008 Volusia County MPO School Bicycle and Pedestrian Review Study, Phase 3B School Summary Osteen Elementary School is located
More informationVision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods
N D. Focus Area II Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods Transit Road Focus Area II is located in the Hamlet
More informationModal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd.
DRAFT PROJECT PAGE July 12, 2007 Main St / Broadway Rd (SR 1579) Project Statement Project Recommendation: From Avent Ferry Rd (NC 42) to the Harnett County line, Broadway Rd/Main St is recommended to
More informationRE: Natomas Landing (P99-091)
August 2, 2008 David Hung, Associate Planner Current Planning Division Development Services Department 300 Richards Boulevard, 3rd Floor Sacramento, CA 95811 RE: Natomas Landing (P99-091) Dear Mr. Hung:
More informationCONNECTING PEOPLE TO PLACES
CONNECTING PEOPLE TO PLACES 82 EAST BENCH MASTER PLAN 07 Introduction The East Bench transportation system is a collection of slow moving, treelined residential streets and major arteries that are the
More informationPublic Information Centre
WELCOME Public Information Centre Father Tobin Road Lougheed Middle School - Library Wednesday November 7, 2012 7:00 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background The City
More informationCOWETA HIGH SCHOOL AND EAST HIGHWAY 51
COWETA HIGH SCHOOL AND EAST HIGHWAY 51 Lack of sidewalks along Ben Lumpkin Rd. Lack of crosswalks and ramps at intersection. Hwy 51 is wide to cross as a pedestrian. No ADA compliance or connection to
More informationBridges and Arizona Crossings
Circulation and Transportation 5-11 Discovery Street/Barham Drive. Discovery Street is planned 5.4.3 Specific Plan Circulation Improvements to be extended eastward from its terminus at Craven Road Circulation
More informationTown of Bethlehem. Planning Assessment. Bethlehem Town Board
Town of Bethlehem US 9W Corridor Transportation Planning Assessment Presented e to: Bethlehem Town Board June 2009 Overview Study Background Route 9W Corridor Conditions and Improvements Selkirk Bypass
More informationAPPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016
APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of
More informationSwamp Road Residents Study
Swamp Road Residents Study SRRG Meeting with PennDot and Elected Officials Newtown and Wrightstown, PA April 25, 2008 Newtown Township Section of Swamp Road Limited Public Funds No reconstruction of a
More informationCITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study
CITY OF WEST LAKE HILLS 901 South Mopac Expressway Building V, Suite 220 Austin, Texas 78746 Texas P.E. Firm Registration No. F-929 Klotz Associates Final Report Submittal: March 20, 2015 Revised Final
More informationTerwillegar Drive Expressway Draft Concept Plan
Terwillegar Drive Expressway Draft Concept Plan Anthony Henday Drive to Whitemud Drive November 28 5:00-8:00 p.m. December 1 10:00 a.m. - 3:00 p.m. Let s Talk Today you can: Learn about the new direction
More informationINNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES
INNER LOOP EAST TRANSFORMATION PROJECT AIA Rochester Annual Meeting November 13, 2013 Bret Garwood, NBD Erik Frisch, DES Why? We are building a city that encourages walking, biking and enjoying the outdoor
More informationTown of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy
Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy Adopted January 6, 2014 Town of Mooresville Development Services Department TOWN OF MOORESVILLE NEIGHBORHOOD TRAFFIC
More information4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL
4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL The Transportation Services Committee recommends the adoption of
More informationComplete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA
Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Aaron Elias, Bill Cisco Abstract As part of evaluating the feasibility of a road diet on Orange Grove Boulevard in Pasadena,
More information5 CIRCULATION AND STREET DESIGN
5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing
More informationWELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018
WELCOME Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018 MEETING AGENDA 1. Welcome and Introductions 2. Study Progress Update 3. Problem Statement 4. Technical Analysis
More informationTonight is an opportunity to learn about the Study and ask questions of the Study Team members.
Exhibit 1 Welcome Second Open House Tonight is an opportunity to learn about the Study and ask questions of the Study Team members. A first Public Open House was held on September 18th, 2013 which presented
More informationProject Advisory Group (PAG) Meeting #2 January 31, SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street
Project Advisory Group (PAG) Meeting #2 January 31, 2018 Welcome & Introductions AGENDA 1. Where are we at? 2. Project Survey / Virtual Comment Tool / PAG Meeting #1 / Visioning Workshop Corridor Map Exercise
More informationCity of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A
A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table
More informationCluster 5/Module 2 (C5/M2): Pedestrians and Transit Oriented Development (TOD)
1 Cluster 5/Module 2 (C5/M2): Pedestrians and Transit Oriented Development (TOD) This presentation is one of the support materials prepared for the capacity building program Building Leaders in Urban Transport
More informationThis chapter describes the proposed circulation system and transportation alternatives associated with
5.0 Circulation 5.1 OVERVIEW This chapter describes the proposed circulation system and transportation alternatives associated with West Landing, and summarize the information contained in the Existing
More information2.0 LANE WIDTHS GUIDELINE
2.0 LANE WIDTHS GUIDELINE Road Engineering Design Guidelines Version 2.0.1 May 2018 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services initiated
More informationOrange Center Elementary School
Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete
More informationAppendix C. TRAFFIC CALMING PROGRAM TOOLBOX
Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX PHASE I...2 Do Not Enter Sign...3 One-Way Sign...4 Turn Prohibition...5 Pavement Markings...6 Speed Monitoring Trailer...7 Neighborhood Speed Watch...8 Police
More informationTRANSPORTATION ELEMENT. (Section 9J-5.019) GOALS, OBJECTIVES POLICIES
TRANSPORTATION ELEMENT (Section 9J-5.019) GOALS, OBJECTIVES GOAL 1 To facilitate a balanced multi-modal transportation system that encourages increased mobility options, and provides for energy efficient
More informationMineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st
Mineral Avenue Corridor Assessment ITE 2017 Western District Annual Meeting San Diego, CA June 21 st Biography - Aaron Heumann, PE, PTOE Currently City of Littleton Transportation Engineering Manager 24
More informationMain-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation
Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation APRIL 2016 A collaborative study between: For Additional Information or to Comment If you would like additional
More informationREGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES
REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES November 16, 2011 Deb Humphreys North Central Texas Council of Governments Bicycle and Pedestrian Advisory Committee Snapshot of the Guide 1. Introduction
More informationRESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY
RESOLUTION NO. 2018-?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY WHEREAS, safe, convenient, and accessible transportation for all users is a priority of the City of Neptune
More informationGiles Run Connector Road
Giles Run Connector Road Laurel Hill Adaptive Reuse Area to Laurel Crest Drive South County Federation Meeting June 14, 2016 History Connector road included in the Laurel Hill Comprehensive Plan amendment
More informationBasalt Creek Transportation Refinement Plan Recommendations
Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for
More informationFitting Light Rail through Well-established Communities
Fitting Light Rail through Well-established Communities San Francisco 2008 Michael D. Madden Chief, Project Development, Maryland Transit Administration Project Setting Located inside the Capital Beltway
More informationTransportation Corridor Studies: Summary of Recommendations
Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field
More informationOcean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs
City Council Study Session January 27, 2009 Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs Scope of Work Purpose of Tonight s Meeting Review work to date and direct staff
More informationProject Update May 2018
Project Update May 2018 Dakota County, in cooperation with the City of Lakeville, is planning to reconstruct 202 nd Street West (County Road 50) from Holyoke Avenue to Cedar Avenue (County Road 23). 202
More informationProposed. City of Grand Junction Complete Streets Policy. Exhibit 10
Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel