1 Road Environment Safety Update 26 Issued February 2006 Road safety benefit-cost analysis: Materials for program submissions Introduction Improving safety on NSW roads is one of the primary objectives of the RTA. With limited budgets and resources, it is imperative that the RTA has a means of objectively assessing and prioritising road environment safety projects, which also ensure that funds used to improve road safety, provide optimum benefits for the community. In the mid 1990 s, a Benefit Cost Analysis model was developed for assessing the benefit cost ratio (BCR) and net present value (NPV) of road environment safety projects. This spreadsheet can be used to assess the road safety (crash saving) merits of projects at blackspots (point locations such as intersections or isolated curves) as well as homogenous sections of road where treatments are applied uniformly along that stretch (mass action treatments). The purpose of this Road environment safety update is to provide access to BCR documentation, spreadsheets and information on how to use them. Use of road safety benefit cost analysis in NSW Each year, the Road Safety Strategy Branch provides the Annual Regional Program Development Process Guidelines to assist the Operations and Services Directorate develop Road Environment Safety Programs. The Guidelines for Accident Blackspot and Mass Action treatments are provided under program positions and respectively of the Road Environment and Light Vehicle Standards (RELVS) Program. All projects funded under program positions and are funded by the State Government. The feature of this program is to objectively and systematically identify blackspot/mass action locations and to implement cost-effective measures designed to reduce the incidence and severity of road crashes. The Guidelines specify that funding proposals for Accident Blackspot and Mass Action treatments need to satisfy stringent criteria with regard to project and program benefit cost ratios (BCRs). Council Blackspot submissions for local roads as well as projects where there are multiple sources of funds may be accepted within this Program provided they satisfy all of the requirements specified within the Guidelines. Road safety benefit cost analysis: Materials for program submissions Approved by: Version: 1.0 Issued: February 2006 Effective date: February 2006 GM Road Safety Strategy UNCONTROLLED WHEN PRINTED Page 1 (4 pages)
2 Benefit-cost ratio overview and methodology All Blackspot and Mass Action projects must meet a set of criteria to be eligible for funding. One criterion is a benefit cost ratio (BCR) that meets or surpasses the required level. For a Blackspot, the BCR must be greater than or equal to 3.0. For a Mass Action project, the BCR must be greater than or equal to 2.0. For example, the BCR of reducing 24 right-through opposing direction crashes (DCA 202) at an intersection by installing traffic signals can be calculated as follow: Safety BCR = Economic Benefit of reducing 24 DCA202 crashes Costs of installing signal hardware and software adjustments + Costs of additional ongoing maintenance to the signals (over the life of the facility) The benefits can be determined by estimating the likely number of crashes prevented multiplied by the crash cost. (Comment: To be consistent with other RTA publications this definition was adopted from the Economic Analysis Manual). Costs include the initial cost of treatment and the cost of maintaining that treatment over a period in which the treatment will remain effective. BCRs can be determined using the State Blackspot Program- Safety BCR and NPV Calculation sheet (6 th Release), using either the State or Federal models depending upon the category into which the proposed project falls. The calculation sheet is a Microsoft Excel spreadsheet. It is regularly updated to reflect the most up to date crash costs and crash reduction rates for treatments. The calculation sheet is available from the RTA internet website or by contacting the Manager, Accident Investigation and Blackspot Program. There are two types of methodologies that can be used to determine remedial treatments for a crash site, with these being a crash by type methodology and a crash by outcome methodology. The RTA uses the crash by type methodology to determine the best remedial treatment to reduce crashes at any given site. Knowing the types of crashes that are predominant at a site or along a length of road makes it easier to determine the correct treatment or treatments that will reduce those crashes. An alternative crash by outcome methodology can be used to determine treatments. However due to the nature of crashes, these events can sometimes show an innocuous site to be very dangerous and another much more unsafe one to be deceptively benign. Crash by type methodology The crash by type methodology uses a crash reduction matrix 1 that looks at the generic influence a remedial treatment has in reducing certain types of crashes at a site. It has a high-speed list of reduction percentages for rural roads and a low-speed list for urban roads. A detailed methodology for economically assessing road safety projects can be found in the attached Notes on the use of the RTA s Road Safety Benefit Cost Spreadsheets. 1 Developed by Dr David Andreassen Page 2 (4 pages) Road Environment Safety Update / No 26 / February 2006
3 Where to find information on Road Safety Benefit Cost Analysis 1. Austroads (2004) Guide to Traffic Engineering Practice Series: Part 4 -Treatment of Crash Locations, Austroads, Canberra This document provides an overview of crash analysis, investigation and the treatment of crash locations in a cost-effective manner. It is the nationally accepted document endorsed by all road authorities in Australia and New Zealand. 2. Roads and Traffic Authority (2004) Accident Reduction Guide: Part 1 Accident Investigation and Prevention, Version 1 This document provides specific details on the RTA administered programs such as the Blackspot and Mass Action Programs as well as step-by-step guidance for crash analysis and investigation, development and economic evaluation of countermeasures, formulation of a ranked program of works and monitoring and evaluation of the countermeasures. This document also contains worked examples of the use of road safety benefit cost analysis in justifying projects. The document is available on the RTA s website and can be accessed using the following path: - road safety - road environment safety - technical directions /RS01: Accident Reduction Guide Part 1: Accident Investigation and Prevention. 3. Roads and Traffic Authority (2004) Road Safety Strategy Branch: Road Environment and Light Vehicle Standards (RELVS) Bidding Guidelines This document provides guidance on the criteria required in the annual funding for proposed Blackspot and mass action projects. They also advise the format in which the projects are to be submitted. These Guidelines are updated and issued to the Client Services Directorate (RTA Regional Offices) each year. A copy of these Guidelines can be obtained by contacting the RELVS section at the details found on page number 4 of this document. 4. Roads and Traffic Authority (1999). Economic Analysis Manual, Version 2 This document provides a set of practical guidelines to assist with the undertaking of economic and financial appraisal of investment proposals within the RTA. Cost-Benefit analysis is covered in more detail because it is the most common method used for the assessment of RTA road and bridge investment proposals. A copy of this document can be obtained through the RTA Corporate Finance Advisory Service. Ph: (02) Commonwealth Department of Transport and Regional Services (DOTARS), The National Black Spot Program, Notes on Administration This document provides guidance on how to submit proposals for road environment safety projects. It outlines minimum criteria that must be met before projects can be funded. Successful projects are funded under the National Blackspot Program, which is a Federal Government funding source Roads and Traffic Authority (2004) National Blackspot Program Safety BCR and NPV Calculation Sheet This is the spreadsheet model that enables users to determine the BCR and NPV of road environment safety projects using the parameters required by the National Blackspot Program, i.e. 5% p.a. discounting. Guidance for the use of this model can be found in References 2 and road safety - road environment safety - road environment safety updates Road Environment Safety Update / No 26 / February 2006 Page 3 (4 pages)
4 7. Roads and Traffic Authority (2004) State Blackspot Program Safety BCR and NPV Calculation Sheet This is the spreadsheet model that enables users to determine the BCR and NPV of road environment safety projects using the parameters required by the State Blackspot and Mass Action Programs, i.e. 7% p.a. discounting. Guidance for the use of this model can be found in Reference road safety - road environment safety - road environment safety updates. 8. Roads and Traffic Authority. Percentage Reduction in Accidents Tables This is a set of six tables that provide details on percentage reduction rates for standard treatments, project life, maintenance costs per treatment and costs of crashes by crash types. It is available on the RTA s website and can be accessed using the following path: - road safety - road environment safety - technical directions /RS01: Accident Reduction Guide Part 1: Accident Investigation and Prevention, Appendix C, page Roads and Traffic Authority. Pro forma for Strategic Estimate of Costs This pro forma acts as a checklist enabling a holistic estimation of costs associated with blackspot and mass action treatments. There are three pro forma sheets currently available for estimating construction costs associated with the installation of roundabouts, the installation of traffic signals and road realignment works. These pro forma sheets are available on the RTA s website and can be accessed using the following path: - road safety - road environment safety - technical directions /RS01: Accident Reduction Guide Part 1: Accident Investigation and Prevention. Attachments 1. Notes on the use of the RTA s Safety Benefit Cost Spreadsheet Model. 2. National Black Spot Program Nomination Checklist. 3. National Black Spot Program Nomination Forms. 4. Black Spot Consultative Panel. For further enquiries: Accident Investigation and Blackspot Program Manager ww.rta.nsw.gov.au Page 4 (4 pages) Road Environment Safety Update / No. 26 / February 2006 RTA/Pub Page 4 (4 pages) Road Environment Safety Update / No 26 / February 2006
5 Attachment 1 Notes on the use of the RTA s Safety Benefit Cost Spreadsheet 1.0 Introduction This model has been produced to assist practitioners in calculating the safety benefit cost ratios for treatments at a site. For the purposes of the model a site can either be a single location (intersection/isolated curve) or a homogeneous section of road where a treatment is being uniformly implemented (shoulder widening/street lighting). The model has been produced both to simplify the calculation of safety benefit cost ratios and to ensure that submissions for funding have been evaluated in a consistent and supportable manner. 2.0 Use of the model 2.1 Computer requirements The spreadsheet model is written in Microsoft Excel V5.0. Each copy of the spreadsheet requires approximately 330 kilobytes of hard disk storage. 2.2 Cell protection The Model has been write-protected for cells, which perform calculations, hold background data or contain labels. This has been done so that critical parts of the spreadsheet cannot be inadvertently changed. The print area of the spreadsheet has also been pre-set. 2.3 General inputs and outputs for the Benefit Cost Model General inputs The general inputs required by the benefit cost Model are described below. The reference letter, [A] gives the position of the cell on the worked example spreadsheet contained at the end of these notes. Local [A]. This cell should contain a brief location description of the site being evaluated. Speed limit of Main Road [B]. The speed limit determines the accident costs to be used. That is, if the speed limit is 70 km/h or less, then urban accident costs are used. If the speed limit is 80 km/h or greater then rural accident costs are used. If the site involves roads with differing speed limits intersecting, the greater speed limit should be selected. Expected annual traffic growth [C]. This is the estimated traffic growth at the site over the assumed project life. Where there is an increase in traffic volumes assumed that model assumes that accidents will also increase. That is, in the years following the implementation of treatments, reductions in accidents will increase in line with the increase in traffic volumes. Assumed project life [D]. This is the assumed project life that is the period for which the benefits of the project are assumed to occur. The RTA has compiled a list of assumed project life for the treatment types. (The model allows for project lives up to 30 years). Years of accident data [E]. Normally at least three years (in urban areas) and five years (in rural areas) of accident data should be used (check requirement with the Guidelines produced by the relevant Road Authority). However in special circumstances greater or lesser accident periods could be used. For example, the site being investigated could have been treated with a measure which has only been installed for two years, but which had already resulted in a demonstrated accident history. In these circumstances the two year figures could be used. Start [F]. This is the start of the period for which accident data is used. This parameter together with the number of years of accident data defines the years over which the accident data used in the benefit cost calculations have been taken. Total accidents [G1 - G5]. The total number of accidents reported at the site during the study period, grouped into 20 categories according to DCA code. These accident numbers are not directly used in any of the calculations, but are provided to give the total accident picture at the site. Attachment 1 / Road Environment Safety Update / No 26 / February 2006 Page 1 (8 page)
6 2.3.2 General outputs TOTAL [G6]. This cell sums the total numbers of accidents within each category and gives the total number of reported accidents at the site over the study period. 2.4 Evaluation of proposed treatments Standard treatments A standard list of site treatments has been produced. These standard treatments are listed in Tables A1 to A4 in the BCR spreadsheets. These treatments should cover most circumstances but not necessarily all possible treatments. They do not specifically account for combinations of treatments at a site. For each treatment assumed accident reductions have been estimated. These accident reductions are also shown tables A1 to A4 in the BCR spreadsheets. Where possible these accident reductions have been derived by consideration of before and after studies conducted both in Australia and overseas. Where this information was not available for a particular treatment, the assessment of benefits has been derived by an assessment of the likely impact of the treatment on risk at the site. The continued monitoring of treatments and their effectiveness (via the upkeep of RTA s Accident Blackspot Program Database) will lead to further refinements of these accident reduction factors Inputs for evaluation of a single treatment The model allows for up to three treatments to be evaluated on the same sheet. For each treatment the following information should be entered into the model: Treatment code [H]. This is a number, which can be read from the description of the treatment shown in the tables in Appendix A. When the treatment code is entered the description of the treatment will be automatically displayed, as will be the assumed accident reductions associated with this treatment. Initial cost of treatment [K]. This is the initial cost of the treatment, which is generally the cost incurred up to the completion of the treatment. Annual maintenance [L]. These are the annual maintenance or running costs of the treatment. If there are no ongoing costs, then a 0 (zero) should be inputted. Target accidents [M1 - M5]. This is the number of target accidents associated with each accident group. In some cases this will be the total accidents reported at the site. In others, this will be a lesser number of accidents, which result from the specific deficiency, which is to be addressed by the treatment. Appendix A provides a guide as to whether all accidents at the site should be used as the target accidents or only those which relate to specific deficiencies to be addressed by the treatment. For example, if the treatment involves a right turn lane, then only turning and rear-end accidents associated with the approach for which this lane is proposed will be entered as the target accidents. Custom reduction [N]. The model provides for a custom reduction of any of the accident types to be made for any treatment. Once a non-zero number is added into custom treatment, this value rather than the custom reduction is used in the model calculations. The use of a custom reduction should only occur after a systematic on-site investigation has been conducted. Full documentation of the reasons for the use of alternative reductions should be made available Outputs for each treatment evaluated Treatment A [I]. This cell automatically displays the description of the treatment, which corresponds to the treatment code entered in [H]. Assumed reduction. This cell automatically displays the percentage reductions in accidents expected from the nominated treatment. These reductions are shown in Tables A1 to A4 in Appendix A. A negative number indicates that the treatment is expected to result in an increase in accidents. TOTAL (Target accidents) [M7]. This cell gives the total of target accidents for the treatment selected. Page 2 (8 pages) Attachment 1 / Road Environment Safety Update / No 26 / February 2006
7 TOTAL (Discounted benefits) [O1]. This is the total discounted benefit at the appropriate discount rate over the assumed project life. A bracket around this figure (or any of the individual discounted benefits in the column above it) represents a negative benefit (disbenefit). Discounted costs [O2]. This is the total discounted cost of the Treatment. It is calculated by adding the estimated cost over the life of the project to the Annual Maintenance costs, extrapolated over the assumed life of the project. 7% or 5% [O3]. This is the total discounted benefit of the treatment minus the total discounted costs (note: the NPV value is calculated at 5% for National Blackspot Program nominations). NPV/Cap cost [O4]. This is the NPV divided by the Capital Cost, (Capital Cost is the Initial Cost of the Measure and does not include Annual Maintenance). BC 7% or 5% [O5]. This is the total discounted benefit divided by the total discounted costs. It should be noted that not all of the standard treatments apply for both low and high speed limit roads. Where a treatment type does not apply to the respective speed limit selected the model displays the words, "Check code/speed" in the cells in the Assumed Reduction column Evaluation of alternative treatments on the same sheet Where the treatment at the site can be described by one treatment code the model provides the safety benefit cost ratio and the NPV of the treatment. When this is the case two or three different treatments at a site can be examined on the same sheet and the more cost-effective or practical treatment recommended for implementation Evaluation of a combination of treatments Where more than one treatment is being examined at a site the model can be still be used, but caution must be taken when assessing the target accidents. That is, the target accidents of a second treatment should not include those accidents, which would have already been reduced as result of the first treatment. For example, if the two treatments proposed on the approach to an intersection involve both installing an additional priority sign on median islands and moving limit lines forward using line marking and kerb extensions on the main road, then if there were 10 right angle accidents on that approach, there would be 10 target accidents for the median island treatment, but only 8.5 target accidents for moving the limit lines forward (as the signs on median islands are expected to save 15% or 1.5 accidents). The overall safety benefit cost ratio of both treatments can be derived by adding the discounted benefits and discounted costs together and dividing the two totals to give the overall safety benefit cost ratio Use of custom reductions The use of a custom reduction should be utilised when the treatment proposed is not in the tables supplied or the user has validated research background after a systematic on-site investigation has been conducted. 2.5 Summary of parameters and formulas used in the model The various parameters and formulae used in the model are summarised at the foot of the main worksheet. A copy of this information is contained in Table C, within the spreadsheet. The parameters include the accident costs currently being used in the model. 3.0 Updates to model The safety benefit cost model is updated at yearly intervals. Updates include: Annual updates of accident costs. Additional standard treatments based on the identified need for additional categories. Changes in treatment effectiveness in response to monitoring the effects of implemented treatments. Attachment 1 / Road Environment Safety Update / No 26 / February 2006 Page 3 (8 pages)
8 4.0 Worked example A worked example has been prepared to illustrate the use of the model. The example involves the evaluation of traffic signals installed at a cross intersection. On the main road approach it is intended to install 100 metres of raised median either side of the new signals. There is also intended to be no right turn filters on the main road approaches to the intersection (right turns controlled by arrows), whereas filters will be used (common phasing) on the side-road approaches to the intersection. The cells of the spreadsheet model required to be filled in to undertake this evaluation are described in the following table: 4.1 Summary table Cell label Description of cell Entered in example Ref. Location Speed limit of main road Expected annual traffic growth Assumed project life Years of accident data Start Total accidents (DCA codes ) Total accidents (DCA codes 201;501) Total accidents (DCA codes ) Total accidents (DCA codes ) Total accidents (DCA codes ,901,902) TOTAL Treatment code TREATMENT A User enters the description of the site where the evaluation is taking place. The speed limit at the site (or on the main road if lower speed limit on side road). Expected traffic growth during the payback period. To give 2.2% traffic growth 2.2 should be entered into this cell. Enter the time period over which benefits from the treatment are assumed to accrue. The years of accident data used in the analysis. In the example assumed to start at the beginning of the second quarter of 1992 (April) and end after the second quarter of 1997, which is 5.25 years. The start of the time period when accidents commenced. To indicate the beginning of January 1997 enter 1/97. Enter the total accidents, which have occurred at the site during the study period classified into accident groupings. For this example there are 20 accidents in the category DCA Intersection of North Road and South Road, Westville A 60 B 2.2 C 15 D 5 E 1/97 F 20 G1 Enter 2 accidents in this category. 2 G2 Enter 8 accidents in this category. 8 G3 Enter 3 accidents in this category. 3 G4 Enter 3 accidents in this category. 3 G5 Automatically provides the total accidents at the site (36 in this example) Enter the number, which is in front of the Treatment. Lists of treatments and their codes are given in Tables A and B. For traffic signals with no filter turns the treatment code is 4. Automatically displayed when a treatment code is entered in H. G6 4 H I Page 4 (8 pages) Attachment 1 / Road Environment Safety Update / No 26 / February 2006
9 Cell label Description of cell Entered in example Ref. Assumed reduction Initial cost of treatment Annual maintenance Target accidents (DCA codes ) Target accidents (DCA codes 201;501) Automatically displays the percentage reductions in accidents expected from the nominated treatment. These reductions are shown in Table B. The [-40] displayed for rear-end accidents indicate an expected 40 increase in this category of accidents. Enter the initial cost of the treatment. This should the total costs estimated to be incurred on the implementation of the treatment up until the time the treatment is completed. Enter the estimated annual maintenance/running costs of the treatment. Enter the accidents, which are targeted by the proposed treatment. This should be based on application of the accident investigation process. Enter all 20 accidents in this category K 6000 L 20 M1 Enter 2 accidents for this category. 2 M2 J Target accidents (DCA codes ) Enter 4 accidents for this category. For this example target accidents of 4 have been selected since 4 of the accidents in this category have occurred on approaches to the intersection for which it is not proposed to install filter turns. 4 M3 Target accidents (DCA codes ) Enter 3 accidents for this category. 3 M4 Target accidents (DCA codes ,901,902) TOTAL Custom reduction Enter 2 accidents for this category. For this example target accidents of 2 have been selected since 1 of the accidents in this category has occurred on where the pedestrian movement would conflict with a filter turn movement. Calculates the total number of target accidents for this treatment. Enter the percentage reduction, which overrides the Assumed Reduction that is displayed by the model. A custom reduction should only be implemented where it is considered that exceptional circumstances exist. In this example the provision of an extended median in association with the signals would be expected to reduce the incidence of head-on accidents by 20% (see treatment 90 in Table B). 2 M5 M7 20 N [Economic parameters] Cells giving outputs of the model for TREATMENT A. O1- O5 Treatment code Enter Treatment code for traffic signals with right turn filters. For this example this treatment has been selected to account for those accidents, which have not been targeted by the portion of the traffic signals with right turn filters. This treatment code could also be used to account for an alternative treatment. 3 P Attachment 1 / Road Environment Safety Update / No 26 / February 2006 Page 5 (8 pages)
10 Cell label Description of cell Entered in example Ref. Target accidents (DCA codes ) Target accidents (DCA codes ,901,902) BCR combining treatments A & B BCR combining treatments A, B & C Enter those accidents, which were not targeted by the portion of the signals without right turn filters. Enter the accident, which was not targeted by the portion of the signals without right turn filters. Calculates a safety BCR by combining the discounted costs and benefits of Treatments A & B. In this example this is the final Safety BCR for the project. It also incorporates the additional benefits (which are negative) associated with the portion of the signals which have right turn filters as well as the negative impact on rear-end accidents. Calculates a safety BRC by combining the discounted costs and benefits of Treatments A, B & C. 4 Q1 1 Q2 R S Page 6 (8 pages) Attachment 1 / Road Environment Safety Update / No 26 / February 2006
11 4.2 Worked Example Cell References LOCATION: [A] TREATMENT A TREATMENT B [B] Speed Limit of Main Road [I] [C] [D] [E] Expected Annual Traffic Growth (%) Assumed Project Life Years of Accident Data/Start [F] Initial Cost of Treatment Annual Maintenance Treatment Code [K] [L] [H] Initial Cost of Treatment Annual Maintenance Treatment Code [P] DCA Codes Descriptions Total Accidents Target Accidents Assumed Reduction Custom Reduction Discounted Benefits (RTA 7%) Target Accidents Assumed Reduction Custom Reduction Discounted Benefits (RTA 7%) Intersection, adjacent [G1] [M1] [O1] approaches 201 Head-on [G2] [M2] [N] [O2] Opposing vehicles; turning [G3] [M3] [O3] [Q1] 207; 304 U-turn Rear-end [G4] [M4] [O4] [Q2] Lane change Parallel lanes; turning 406; 407 Vehicle leaving driveway Overtaking; same direction 601 Hit parked vehicle 903 Hit railway train Pedestrian crossing [G5] [M5] [O5] carriageway 605 Permanent obstruction on carriageway 609 Hit animal 701; 702 Off carriageway, on straight 703; 704 Off carriageway on straight, hit object 705; 502 Out of control on straight 801; 802 Off carriageway, on curve 803; 804 Off carriageway on curve, hit object 805 Out of control on curve TOTAL [G6] [M7] TOTAL TOTAL [R] BCR Combining Treatments A & B for RTA (7%) B/C 7 % NPV/Cap Cost 7% Discounted Costs B/C 7 % NPV/Cap Cost 7% Discounted Costs Attachment 1 / Road Environment Safety Update / No 26 / February 2006 Page 7 (8 pages)
12 (This page intentionally left blank) Page 8 (8 pages) Attachment 1 / Road Environment Safety Update / No 26 / February 2006
13 Attachment 2 The National Black Spot Program Nomination checklist Black spot sites A Black spot can be up to 3 km in length. However, crashes along a section can only be included in the BCR calculations if they occur along the length being treated. The minimum criterion for eligibility is at least 3 casualty crashes in the most recent 5 years of crash data. However all crashes, including towaways can be used when calculating the Safety BCR. It is also useful to include crash diagrams and trend analysis sheets to help explain the nomination. Black length sites A Black Length is any section of road being treated that is longer than 3 km. The minimum criterion for eligibility is an average of 0.2 casualty crashes per kilometre per annum over the last 5 years of crash data. Raw crash numbers should also be included as well as the crash rates per km over both 1 and 5 year periods. Maximum project size The Federal contribution for any crash conforming project will be no greater than $750,000. The minimum project cost that will be considered by the Consultative Panel is $10,000. Audit identified projects that cost more than $300,000 will not be considered. Councils will be allocated funding based on the Estimate of Cost submitted on the nomination form. Therefore Councils must be sure that all expected costs are identified and included, along with possible variations and contingencies. Road safety audits Projects can be nominated from sites identified in a Road Safety Audit; however, the audit has to have been undertaken by an independent audit team who are on the IPWEA s Auditors Accreditation list, not just a safety assessment by council engineers. Each audit nomination will be ranked by the RTA using a simplified risk assessment process. Ineligible roads Funding is not available for projects located on National Highways or on Roads of National Importance (RONI s) where federally funded work is currently taking place. Regional split The Federal Government has a requirement that at least 50% of each state s funding must be allocated to projects in regional areas. Economic evaluation of projects To be eligible for Federal funding all projects must have a safety Benefit Cost Ratio (BCR) of 2.0 or greater as the program is prioritised on BCR and cost. The discount rate for benefits and costs in the economic evaluation of all projects is 5%. There is a new spreadsheet called the National Black Spot Program Model for Calculating Road Safety BCR and NPV and it is available from me or from the local RTA Regional Office. It uses a crash by type methodology to calculate the BCR and is the only one accepted by the RTA for economic analysis. Different treatments can be compared or a number of treatments combined to determine the most economically efficient way to target and reduce crashes. Attachment 2 / Road Environment Safety Update / No 26 / February 2006 Page 1 (2 pages)
14 Contentious projects Any large projects nominated by Councils on State roads or ones that involve the construction of traffic signals on local roads will require a full investigation of the proposal to ensure they meet with RTA warrants and long term planning strategies. Construction requirements The design and construction of all projects must conform to RTA and/or Austroads design guidelines. They are also subject to the Environment Protection and Biodiversity Conservation Act 1999 and Section 30 of the Australian Heritage Commission Act Federal Black Spot signs must be erected at all sites during construction, and where the Federal allocation is greater than $100,000, they must be left in place for a period of two (2) years. These signs are usually available through the local RTA Regional Office. Payments to Council on completion of work will be based on the approved allocation, or the cost of work, whichever is the lesser. Enquiries for National Black Spot Program Manager, Black Spot Programs Phone: (02) Road Safety Strategy Fax: (02) Attachment 2 / Road Environment Safety Update / No 26 / February 2006 Page 2 (2 pages)
15 Attachment 3 National Black Spot Program Nomination form Nominee Details 1. Title: Dr/Mr/Mrs/ etc: Nominee Reference No: (DOTARS use only) 2. Surname: 3. First Name: 4. Organisation: 5. Position Title / Occupation: 6. Postal Address: 7. State: 8. Postcode: 9. Telephone Number: 10. Fax Number: 11. address 12. Date of Submission: 13. Is this your first nomination to the Black Spot Programme? (Y/N) Site Nomination 13. Shire or Council area in which site nomination is located Nominee Reference No: (DOTARS use only) 14. Suburb/Town etc. 15. Postcode (of site) 16. Site Description: (eg intersection, 5km road length, 20kms west of Smithsville) 17. Road Name(s): Primary Road Intersecting Road (if any) 18. Nature of Concern Please forward nomination form to local or state road authority for site assessment and treatment proposal Attachment 3 / Road Environment Safety Update / No 26 / February 2006 Page 1 (4 pages)
16 (This page intentionally left blank) Page 2 (4 pages) Attachment 3 / Road Environment Safety Update / No 26 / February 2006
17 Only to be completed by state or local government road authorities Site Assessment State Reference No: (STA use only) 1. National highway (Y/N) If yes, no further assessment is required as nomination is ineligible under this programme 2. Is this a state or local road? 3. Is this an urban or rural project? 4. Geographic location (Geocode) 5. Problem diagnosis (eg. right turn crashes, rear end crashes) 1: X: Y: 2: X: Y: 6. AADT at location 7. Primary crash-type code (DCA), if available 8. Crash history * 9. Crash history * To be completed for a SPOT and for a To be completed only for a LENGTH proposal LENGTH proposal Fatal crashes Fatal crashes per km Injury crashes Total casualty crashes Measurement period: from to No. of Years Injury crashes per km Total casualty crashes per km What is the calculated crash rate per kilometre per annum for this site? Has this road length been assessed among the top 10% of lengths identified within the State with a demonstrably higher crash rate than other roads in the State? (Y/N) If YES, what is the State calculated crash rate per kilometre per annum at the 10% level? * For all crash history based proposals 8. must be completed; for a proposal based on a road length 9. is also to be completed. ** Optional, liaison with the state road authority may be required. Road Safety Audit 10. Is the proposal supported by a Road Safety Audit? (Y/N) If no crash history has been specified above, the proposal must be supported by a Road Safety Audit. (For report format refer to AUSTROADS Publication No. AP-30/94 or AP-G30/02, Road Safety Audit ) Is a copy of the relevant report (or section of the report) attached? (Y/N) Attachment 3 / Road Environment Safety Update / No 26 / February 2006 Page 3 (4 pages)
18 Only to be completed by state or local government road authorities Treatment Proposal 11. Proposed Treatment: (eg install signs, modify signals, install roundabout) 12. Treatment Code: (If applicable) * See Appendix 1 of Notes on Administration 13. Estimated Cost to Black Spot Programme $ 14. Net Preset Value $ 15. Benefit Cost Ratio (BCR) Not required if nomination is a Road Safety Audit project 16. Other contributions to this project $ Source: 17. Environmental clearances: Are there any environmental or heritage concerns with this project: (Y/N) If YES, have clearances been obtained? (Y/N) (please attach) 18. Expected start date (physical construction) 19. Expected completion date (physical construction) Contact Details Contact Person Organisation Telephone Number Facsimile Number address Signature Page 4 (4 pages) Attachment 3 / Road Environment Safety Update / No 26 / February 2006
19 Attachment 4 Black Spot Consultative Panels All nominations are to be referred to the Black Spot Consultative Panel in your state: State Road And Transport Agency Addresses New South Wales South Wales Wales Victoria The Black Spot Consultative Panel c/- Roads and Traffic Authority PO Box K198 HAYMARKET NSW 2000 The Black Spot Consultative Panel c/- Road Safety Department VICROADS 60 Denmark Street KEW VIC 3101 Queensland The Black Spot Consultative Panel c/- Roads Programs Division Queensland Main Roads GPO Box 2595 BRISBANE QLD 4001 Western Australia The Black Spot Consultative Panel c/- Main Roads Western Australia PO Box 6202 EAST PERTH WA 6892 South Australia The Black Spot Consultative Panel c/- Transport SA PO Box 1 WALKERVILLE SA 5081 Tasmania The Black Spot Consultative Panel c/- Land Transport Safety Division Department of Infrastructure, Energy and Resources GPO Box 936 HOBART TAS 7001 Northern Territory The Black Spot Consultative Panel c/- Transport and Infrastructure Department of Infrastructure, Planning and Environment PO Box 2520 DARWIN NT 0801 Australian Capital Territory The Black Spot Consultative Panel c/- Roads ACT Department of Urban Services Locked Bag 2000 CIVIC SQUARE ACT 2608 Attachment 4 / Road Environment Safety Update / No 26 / February 2006 Page 1 (1 page)
Austroads National Risk Assessment Model (ANRAM) Chris Jurewicz, ARRB
Austroads National Risk Assessment Model (ANRAM) Chris Jurewicz, ARRB Overview Context What is ANRAM? How it is used? Severe crash risk estimation ANRAM Toolkit Next steps 2 Context Diminishing blackspots
More informationYork Scarborough Bridge Economic Appraisal Update Technical Note
York Scarborough Bridge Economic Appraisal Update Technical Note Specification No. 1 Client name West Yorkshire Combined Authority Client reference M088 Discipline Transportation Project name CCAG2 Economics
More informationCrash Patterns in Western Australia. Kidd B., Main Roads Western Australia Willett P., Traffic Research Services
Crash Patterns in Western Australia Kidd B., Main Roads Western Australia Willett P., Traffic Research Services Abstract Examination of crash patterns is one way of identifying key factors on which focus
More informationSpeed Limit Policy Isle of Wight Council
APPENDIX B Speed Limit Policy Isle of Wight Council 2009 Contents Section 1 Introduction 1.1 Links with the Local Transport Plan Section 2 Speed Limits on Urban Roads and Residential Areas 2.1 20mph Limits
More informationCommuniqué ABC Meeting #41 Cairns 2-3 August 2012
Communiqué ABC Meeting #41 Cairns 2-3 August 2012 Esplanade shared path, Cairns Queensland The Australian Bicycle Council met in Cairns on 2-3 August 2012. Cairns Cycling Update Hellius Visser, Director
More information1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02
1 VicRoads Access Management Policies May 2006 Ver 1.02 VicRoads Access Management Policies May 2006 Version 1.02 2 VicRoads Access Management Policies May 2006 Ver 1.02 FOREWORD FOR ACCESS MANAGEMENT
More informationSLSA Age Manager Course Participant Workbook. 2nd Edition
SLSA Age Manager Course Participant Workbook 2nd Edition Age Managers Participant Workbook Participant Details Name: Club: SLSC Contact telephone: Contact email: If I have any questions or problems with
More informationPost impact trajectory of vehicles at rural intersections
Post impact trajectory of vehicles at rural intersections Doecke SD., Woolley JE. and Mackenzie JR. Centre for Automotive Safety Research Abstract This report describes the path of vehicles after a collision
More informationPAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION PROGRESS REPORT
Chairperson and Committee Members ENVIRONMENT AND COMMUNITY DEVELOPMENT COMMITTEE 6 DECEMBER 2011 Meeting Status: Public Purpose of Report: For Decision PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION
More informationSafe Speed programme ATTACHMENT 1. Randhir Karma, Group Manager Network Management and Safety
Safe Speed programme ATTACHMENT 1 Randhir Karma, Group Manager Network Management and Safety 1 Why Safe Speeds? AT s strategic context National guidance AT has embraced Vision Zero principles and recognises
More informationSPEED CONTROL AT ROUNDABOUTS USE OF MAXIMUM ENTRY PATH RADII
23 rd ARRB Conference Research Partnering with Practitioners, Adelaide Australia, 2008 SPEED CONTROL AT ROUNDABOUTS USE OF MAXIMUM ENTRY PATH RADII Dr Owen Arndt, Queensland Department of Main Roads, Australia
More informationSeal Extension Guidelines. Asset Management and Systems
Seal Extension Guidelines 1. Guideline Definitions AADT - Annual Average Daily Traffic is measured at regular annual (or greater) intervals and adjusted for seasonal effects, using an approved traffic
More informationDepartment of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths
Road Asset Technical Accord - RATA The Centre of Excellence for Road Asset Planning in the Waikato Region Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths
More informationAustralasian Pedestrian Facility Selection Tool [V2.0] User Guide
Research Report AP-R472A-18 Australasian Pedestrian Facility Selection Tool [V2.0] User Guide Australasian Pedestrian Facility Selection Tool [V2.0]: User Guide Prepared by Steve Abley, Dave Smith and
More informationEffectiveness of combined treatments: shoulder sealing and guard fence
Abstract Australasian College of Road Safety Conference Effectiveness of combined treatments: shoulder sealing and guard fence Sapkota J., Anderson C., & Dua A. Safer Roads and Vehicles, Safety and Regulation
More informationAt each type of conflict location, the risk is affected by certain parameters:
TN001 April 2016 The separated cycleway options tool (SCOT) was developed to partially address some of the gaps identified in Stage 1 of the Cycling Network Guidance project relating to separated cycleways.
More informationChapter 5 DATA COLLECTION FOR TRANSPORTATION SAFETY STUDIES
Chapter 5 DATA COLLECTION FOR TRANSPORTATION SAFETY STUDIES 5.1 PURPOSE (1) The purpose of the Traffic Safety Studies chapter is to provide guidance on the data collection requirements for conducting a
More informationTRAFF IC CALMING POLICY
TRAFF IC CALMING POLICY Policy No: 45396 Approved by Council 28 May 2008 C11/05/08 Further amendment by Council 22 June 2011 vide c08/06/11 Contents 1 Problem Statement 1 2 Desired Outcomes 2 3 Strategic
More informationland transport road assets
land transport road assets land transport road assets Otago Region Information as at June 2007 land transport road assets 2 Purpose of this publication Land Transport New Zealand annually publishes comparative
More informationCOMPARING WEEKLY AND WEEKDAY AVERAGED TRAFFIC DATA WHEN MODELLING TRAFFIC NOISE. Peter Karantonis 1 and David Gonzaga 2
ICSV14 Cairns Australia 9-12 July, 2007 COMPARING WEEKLY AND WEEKDAY AVERAGED TRAFFIC DATA WHEN MODELLING TRAFFIC NOISE Peter Karantonis 1 and David Gonzaga 2 1 Renzo Tonin & Associates (Qld) Pty Ltd L20,
More informationTHE IRAP ROAD SAFETY TOOLKIT A WEBSITE-BASED APPROACH TO ADDRESSING ROAD SAFETY PROBLEMS
THE IRAP ROAD SAFETY TOOLKIT A WEBSITE-BASED APPROACH TO ADDRESSING ROAD SAFETY PROBLEMS Blair TURNER Principal Research Scientist, Safe Systems Division ARRB Group Ltd 500 Burwood Highway, Vermont South,
More informationFindings on the Effectiveness of Intersection Treatments included in the Victorian Statewide Accident Black Spot Program
Findings on the Effectiveness of Intersection Treatments included in the Victorian Statewide Accident Black Spot Program Nimmi Candappa, Jim Scully, Stuart Newstead and Bruce Corben, Monash University
More informationReview of Guidelines for Cycleway Safety Fencing
Review of Guidelines for Cycleway 1.0 PURPOSE 1.1 This document is meant to provide a review of available reference documents for determining appropriate fencing requirements for cycleway paths and shared
More informationBus and Transit Lane Review Update
Board Meeting / 25 February 2013 Agenda Item no.8(i) Bus and Transit Lane Review Update Glossary Auckland Transport New Zealand Transport Agency Transit Two Transit Three (AT) (NZTA) (T2) (T3) Executive
More informationCENTRE FOR POPULATION HEALTH RESEARCH
An Evaluation of the State Black Spot Program in Western Australia, 2003-2004 CENTRE FOR POPULATION HEALTH RESEARCH Curtin Health Innovation Research Institute Curtin University of Technology GPO Box U1987
More informationgaf traffic 2015 capability statement
gaf traffic 2015 capability statement www.gaftraffic.com.au INTRODUCING GAF TRAFFIC GAF Traffic is a people-centred traffic engineering consultancy serving new and existing projects in Western Australia.
More informationAmy Gillett Foundation Response to Towards Zero Road Safety Action Plan Discussion Paper
30 June 2017 Attention: Manager of the Road Safety Unit Level 1, Energy House 18-20 Cavenagh Street Darwin, NT 0801 Lodged via email: roadsafety@nt.gov.au Amy Gillett Foundation Response to Towards Zero
More informationGOVERNMENT OF SASKATCHEWAN SUBMISSION TO THE RAILWAY SAFETY ACT REVIEW PANEL
GOVERNMENT OF SASKATCHEWAN SUBMISSION TO THE RAILWAY SAFETY ACT REVIEW PANEL Saskatchewan Highways & Transportation May 29, 2007 I Introduction Government of Saskatchewan Submission To the Railway Safety
More information6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT
6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT General Manager responsible: Officer responsible: Author: Jane Parfitt General Manager City Environment DDI 941 8656 Michael Aitken
More informationAn Evaluation of the Effectiveness and Cost- Effectiveness of the State Black Spot Program in Western Australia:
An Evaluation of the Effectiveness and Cost- Effectiveness of the State Black Spot Program in Western Australia: 2007-2008 Curtin-Monash Accident Research Centre Faculty of Health Sciences Curtin University
More informationSpeed Limits in the Hoddle Grid
Speed Limits in the Hoddle Grid Recent History of speed limits March 2013 Docs # 7738485 1 Introduction Muncipalities have power to Erect speed limit signs BUT Municipalities DO NOT have the power to approve
More informationThe Yalgoo Experience. Ryan Gibson
The Yalgoo Experience Ryan Gibson Outline Yalgoo WALGA RoadWise Program Towards Zero Road Safety in the Mid West The OLA Process The Issue Outcomes What could have been done better Where is Yalgoo? Shire
More informationUpdate June 2018 OUR 2017 PUBLIC ENGAGEMENT
Update June 2018 Hi, Let s Get Wellington Moving (LGWM) is developing a Recommended Programme of Investment (RPI) that meets our programme objectives and supports the city s and region s growth. As part
More informationland transport road assets
land transport road assets land transport road assets Westland District West Coast Region Information as at June 2006 land transport road assets 2 Purpose of this publication Land Transport New Zealand
More informationFHWA Safety Performance for Intersection Control Evaluation (SPICE) Tool
FHWA Safety Performance for Intersection Control Evaluation (SPICE) Tool Virginia Section ITE Annual Meeting Virginia Beach June 217 Pete Jenior Kittelson & Associates, Inc. 1 Intersection Control Evaluation
More informationDRAFT INTERIM ADVICE NOTE 150/17
DRAFT INTERIM ADVICE NOTE 150/17 Guidance on Alternative Temporary Traffic Management Techniques for Relaxation Works on Dual Carriageways Summary Guidance for temporary traffic management (TTM), on the
More informationReduction of Speed Limit at Approaches to Railway Level Crossings in WA. Main Roads WA. Presenter - Brian Kidd
Australasian College of Road Safety Conference A Safe System: Making it Happen! Melbourne 1-2 September 2011 Reduction of Speed Limit at Approaches to Railway Level Crossings in WA Radalj T 1, Kidd B 1
More informationTRAFFIC IMPACT STUDY CRITERIA
Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat
More informationdraft Benefit Cost Analysis Agassiz Rosedale Highway 9/Yale Road East Intersection Improvement Apex Engineering Limited Prepared for:
draft Benefit Cost Analysis Agassiz Rosedale Highway 9/Yale Road East Intersection Improvement Prepared for: BC Ministry of Transportation South Coast Region Prepared by: Apex Engineering 4299 West 14
More informationRural Highway Overtaking Lanes
Rural Highway Overtaking Lanes Kah Wai Ng School of Civil and Resource Engineering, University of Western Australia Song Wang School of Mathematics and Statistics, University of Western Australia Doina
More informationSupplementary Appendix to ARTC Track & Civil Code of Practice. Establishing Minimum Protective Measures at Level Crossings ETF-16-01
Discipline Engineering Specification Category Supplementary Appendix to ARTC Code of Practice Establishing Minimum Protective Measures at Level Crossings Applicability ARTC Network wide New South Wales
More informationINTERIM ADVICE NOTE 188/16
INTERIM ADVICE NOTE 188/16 Guidance on Omission of Warning Lights (Road Danger Lamps) for Relaxation Works on Dual Carriageways Summary Guidance for omission of warning lights (road danger lamps) in temporary
More informationTo position power poles a safe distance from the road to minimise the likelihood of being accidentally hit by vehicles.
Policy Statement Subject Placement of Rigid Distribution Poles Along Roads With Speed Limits Exceeding 70KM/H Approved by Robert Rogerson Signature & Date Distribution Standards and Policy Manager Authorised
More informationSchool Bus Safety in Australia Newman, Shannon L., & Tziotis, Michael, (ARRB Transport Research Ltd).
School Bus Safety in Australia Newman, Shannon L., & Tziotis, Michael, (ARRB Transport Research Ltd). Abstract In 1999 ARRB Transport Research was commissioned by Austroads to undertake a review current
More informationRoad Safety. Inspections
Title of your presentation Road Safety Name and contact details Inspections Phil Allan Australiaame ROAD SAFETY SEMINAR Lome, Togo October 2006 Definition A Road Safety Inspection (RSI) is an on-site systematic
More informationResponse Road Safety Strategy for New South Wales
Response Road Safety Strategy for New South Wales 2012-2021 The Amy Gillett Foundation (AGF) welcomes the opportunity to contribute to the Road Safety Strategy for New South Wales 2012-2021 (the Strategy).
More informationDESIGN BULLETIN #66/2010
DESIGN BULLETIN #66/2010 Highway Geometric Design Guide Chapter B, Climbing Lane Warrants for Two Lane Undivided and Four Lane Divided Highways - Revised Summary This Design Bulletin is being issued as
More informationRoad Safety Trends, Targets and Safety Programs in New Zealand. by Dr Shane Turner
Road Safety Trends, Targets and Safety Programs in New Zealand by Dr Shane Turner New Zealand Kiwi s vs Aussies Outline Land transport organisations NZ & US crash/accident trends NZ safety targets & priorities
More informationCity of Perth Cycle Plan 2029
Bicycling Western Australia s response City of Perth Cycle Plan 2029 2012-2021 More People Cycling More Often ABOUT BICYCLING WESTERN AUSTRALIA Bicycling Western Australia is a community based, not-for-profit
More informationThe Corporation of the City of Sarnia. School Crossing Guard Warrant Policy
The Corporation of the City of Sarnia School Crossing Guard Warrant Policy Table of Contents Overview And Description... 2 Role of the School Crossing Guard... 2 Definition of a Designated School Crossing...
More informationM9/A90/M90 Edinburgh to Fraserburgh Trunk Road. A90 Tealing. Moving Cursor Programme Junction Study
A90 Tealing Moving Cursor Programme Junction Study This is an unpublished report prepared for the Transport Scotland, Trunk Road and Bus Operations Division (TRBO) and must not be referred to in any publication
More informationCONTROL AND COMMUNICATIONS PROVISION PART 1 TD 46/05 MOTORWAY SIGNALLING SUMMARY
DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 9 SECTION 1 NETWORK - TRAFFIC CONTROL AND COMMUNICATIONS STANDARDS OF PROVISION PART 1 TD 46/05 MOTORWAY SIGNALLING SUMMARY This issue of TD 46 incorporates Interim
More informationTRAFFIC STUDY GUIDELINES Clarksville Street Department
TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two
More informationDesigning for Pedestrians: An Engineering Symposium. Rutgers University March 21, 2013
Designing for Pedestrians: An Engineering Symposium Rutgers University March 21, 2013 The Problem 2 Pedestrian Fatalities Pedestrian Fatalities by Year in US (1994-2010) 6000 5000 4000 3000 2000 1000 0
More informationMeasuring Pedestrian Delay
Measuring Pedestrian Delay Final Report Prepared for: Auckland Design Office, Auckland Council Date: 20 September 2017 Version: Final Document Information Client Auckland Council Job Number NZ2165 Title
More informationAn evaluation of intersection characteristics associated with crashes at intersections in Melbourne CBD. Jim Scully, Brian Fildes 1
An evaluation of intersection characteristics associated with crashes at intersections in Melbourne CBD Jim Scully, Brian Fildes 1 ABSTRACT The contribution of crashes occurring at intersections to road
More information21. CHRISTCHURCH CYCLE LANES: PROPOSED COLOURED SURFACING CHANGE
21. CHRISTCHURCH CYCLE LANES: PROPOSED COLOURED SURFACING CHANGE General Manager responsible: General Manager City Environment, DDI 941-8608 Officer responsible: Transport and Greenspace Manager Author:
More informationSH1, Karo Drive Wellington Crash Reduction Study
SH1, Karo Drive Wellington Crash Reduction Study A REPORT PREPARED FOR New Zealand Transport Agency Reference: 12334 January 2013 Hawke s Bay office: PO Box 28 208, Havelock North 4157 Tel: (06) 877 8040
More informationPROPOSED RESIDENTIAL SUBDIVISION
PROPOSED RESIDENTIAL SUBDIVISION PART OF TARNEIT ROAD & 1121 DOHERTYS ROAD, TARNEIT Prepared For: TCG (RM) Developments Pty Ltd MARCH 2014 OUR REF: 16740R#1 PROPOSED RESIDENTIAL SUBDIVISION PART OF TARNEIT
More informationOperational Ranking of Intersections: A Novel Prioritization Methodology
Operational Ranking of Intersections: A Novel Prioritization Methodology Reza Omrani, Ph.D. Transportation Engineer CIMA+ 3027 Harvester Road, Suite 400 Burlington, ON L7N 3G7 Reza.Omrani@cima.ca Pedram
More informationA study on the relation between safety analysis process and system engineering process of train control system
A study on the relation between safety analysis process and system engineering process of train control system Abstract - In this paper, the relationship between system engineering lifecycle and safety
More informationFlorida s Intersection Safety Implementation Plan (ISIP)
Florida Department of TRANSPORTATION Florida s Intersection Safety Implementation Plan (ISIP) Alan El-Urfali, PE State Traffic Engineering and Operations Office March 28, 2017 Intersection Safety Implementation
More informationRegional Cycling Plan
Adopted December 2008 Quality for Life Adopted December 2008 For more information, contact: Greater Wellington 142 Wakefield Street PO Box 11646 Manners Street Wellington 6142 T 04 384 5708 F 04 385 6960
More informationDesign and Installation of Low Level Cycle Signals
Transport for London Surface Transport Management System Document Guidance Note Design and Installation of Low Level Cycle Signals Document reference: SQA-0651 - Issue: Draft out of date information. 1
More informationBUILDING CHINARAP. Zhang Tiejun Research Institute of Highway (RIOH) Beijing, China
BUILDING CHINARAP Zhang Tiejun Research Institute of Highway (RIOH) Beijing, China E-mail: tj.zhang@rioh.cn Greg Smith International Road Assessment Programme (irap) Beijing, China E-mail: greg.smith@irap.org
More informationPolicy Statement. Objective. Context. References and Supporting Documentation
Policy Statement Subject Placement of Distribution Poles Along Roads With Speed Limits Not Exceeding 70km/h Approved by Robert Rogerson Signature & Date Distribution Standards and Policy Manager Authorised
More informationENHANCED IDENTIFICATION OF HIGH-RISK INTERSECTIONS. P. DURDIN Abley Transportation Consultants, New Zealand
ENHANCED IDENTIFICATION OF HIGH-RISK INTERSECTIONS P. DURDIN Abley Transportation Consultants, New Zealand paul.durdin@abley.com 1. ABSTRACT The New Zealand Transport Agency s High-Risk Intersections Guide
More informationPerformance-Based Approaches for Geometric Design of Roads. Douglas W. Harwood MRIGlobal 3 November 2014
Performance-Based Approaches for Geometric Design of Roads Douglas W. Harwood MRIGlobal 3 November 2014 Traditional Approaches to Highway Geometric Design Based on established geometric design criteria
More informationINTERIM ADVICE NOTE 150/11. Temporary Traffic Management Signing: Simplification of lane change zone signing for relaxation schemes.
INTERIM ADVICE NOTE 150/11 Temporary Traffic Management Signing: Simplification of lane change zone signing for relaxation schemes Summary Guidance to those planning traffic management on omission of certain
More informationAn evaluation of pedestrian countdown timers in the Sydney CBD
An evaluation of pedestrian countdown timers in the Sydney CBD Cleaver, M. A., Hislop, J., de Roos, M. P., Fernandes, R., Prendergast, M. (NSW Centre for Road Safety) Brisbane, G., Levasseur, M., McTiernan,
More informationINTERIM ADVICE NOTE 150/12. Guidance for Alternative Temporary Traffic Management Techniques for Relaxation Schemes on Dual Carriageways.
INTERIM ADVICE NOTE 150/12 Guidance for Alternative Temporary Traffic Management Techniques for Relaxation Schemes on Dual Carriageways Summary Guidance for temporary traffic management (TTM), on the approach
More informationNRA New Divided Road Types: Type 2 and Type 3 Dual - Carriageways
NRA New Divided Road Types: Type 2 and Type 3 Dual - Carriageways DN-GEO-03059 December 2007 DN Design Technical TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland
More informationAppendix 5B Accessway standards and guidelines Appendix 5B Accessway standards and guidelines
Appendix 5B standards and guidelines Appendix 5B standards and guidelines 204 Appendix 5B standards and guidelines Introduction This Appendix sets out Transit s safety standards for accessways onto state
More informationMICROPHONE WIND SPEED LIMITS DURING WIND FARM NOISE MEASUREMENTS
MICROPHONE WIND SPEED LIMITS DURING WIND FARM NOISE MEASUREMENTS Abstract Jon Cooper 1 and Tom Evans 2 1 Resonate Acoustics, Level 1/23 Peel St, Adelaide SA 5000, Australia Email: jon.cooper@resonateacoustics.com
More informationOur Approach to Managing Level Crossing Safety Our Policy
Our Approach to Managing Level Crossing Safety Our Policy Our policy towards managing level crossing risk is: that we are committed to reducing the risk at level crossings where reasonably practicable
More informationURBAN KIWIRAP IDENTIFYING ROAD SAFETY RISK ON NEW ZEALAND S URBAN ROADS
URBAN KIWIRAP IDENTIFYING ROAD SAFETY RISK ON NEW ZEALAND S URBAN ROADS C. BRODIE & F. TATE & R. MINNEMA New Zealand Transport Agency, New Zealand colin.brodie@nzta.govt.nz, fergus.tate@nzta.govt.nz, ron.minnema@nzta.govt.nz
More informationGeometric Categories as Intersection Safety Evaluation Tools
Geometric Categories as Intersection Safety Evaluation Tools John R. Campbell Ayres Associates N19 W24075 Riverwood Drive, Suite 300 Waukesha, WI 53188 campbellj@ayresassociates.com Keith K. Knapp Engineering
More informationWarning and Directional- TGSIs. Prepared for the NSW Government - NSW Roads and Maritime Services. September 2013
Warning and Directional- TGSIs Prepared for the NSW Government - NSW Roads and Maritime Services September 2013 Prepared by the Physical Disability Council of NSW Jordana Goodman Policy Officer Physical
More informationThe Ins and Outs of Roundabouts
The Ins and Outs of Roundabouts Safety Auditors Perspective April 2000 TABLE OF CONTENTS PAGE Preface 3 Introduction 4 Road Safety Audits 5 List of Common Road Safety Problems at Roundabouts 6 Commonly
More informationRecommended Roadway Plan Section 2 - Land Development and Roadway Access
Recommended Roadway Plan Section 2 - Land Development and Roadway Access SECTION 2 Land Development and Roadway Access 2.1 Land Use and Access Management The Federal Highway Administration (FHWA) defines
More informationLand Transport Rule Setting of Speed Limits 2017
Land Transport Rule Setting of Speed Limits 2017 Frequently asked questions yellow draft consultation This document provides answers to questions relating to the proposed Land Transport Rule: Setting of
More informationCITY OF SAINT JOHN TRAFFIC CALMING POLICY
CITY OF SAINT JOHN TRAFFIC CALMING POLICY VERSION: 1.0 April 10, 2012 Pedestrians, Cyclists and Motorists Sharing Street Spaces CONTENTS INTRODUCTION... 3 POLICY GOAL... 3 POLICY OBJECTIVES... 3 GUIDING
More informationASSET MANAGEMENT & SCRIM: A TARGETED APPROACH TO THE MANAGEMENT OF SKIDDING RESISTANCE
ASSET MANAGEMENT & SCRIM: A TARGETED APPROACH TO THE MANAGEMENT OF SKIDDING RESISTANCE Andrew Stevenson - Cornwall Council, UK Anuradha Premathilaka W.D.M. Limited, UK John Donbavand - W.D.M. Limited,
More informationNMT SAFE STUDY APPROACH
24 May 2017 ADVOCATING THE NON MOTORISED TRANSPORT AGENDA CONTENT Content NMT road safety study approach NMT road safety study process NMT SAFE STUDY APPROACH THE NEED FOR NMT SAFETY STUDIES Is there is
More informationDOCKYARD PORT OF PLYMOUTH HARBOUR SAFETY PLAN. Issue 2 Jun 13
DOCKYARD PORT OF PLYMOUTH HARBOUR SAFETY PLAN 1 CONTENTS Para Page 1. Introduction 3 2. Safety Management System 3 3 Reduce Risks 4 4. Identification of the Hazards and Risks... 4 5. Conformance with the
More informationLocal road mountable roundabouts are there safety benefits?
Local road mountable roundabouts are there safety benefits? Nimmi Monash University Accident Research Centre Abstract Roundabouts are internationally accepted as being highly effective in improving safety
More informationCycle Routes. Traffic Advisory Leaflet 3/95 March Introduction. Implementation. Project aims. Design
Traffic Advisory Leaflet 3/95 March 1995 Cycle Routes Introduction The leaflet summarises the findings of the Cycle Routes Programme. This research was undertaken for the Department of Transport by the
More informationAppendix B Transportation Report
Project File Report Appendix B Transportation Report Town of Whitby HMM Project No. 327878 Final Report October 2014 Revision and Version Tracking CP Rail Crossing at New Coronation Road Class EA Study
More informationCity of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY
4.10 ALBERT LEA CROSSWALK POLICY PURPOSE: Pedestrian crosswalks are an integral part of our transportation infrastructure. To be effective and promote safety, marked crosswalks must be installed after
More informationTruck Climbing Lane Traffic Justification Report
ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:
More informationHastings District Council. Whakatu Arterial Link Transportation Assessment
Hastings District Council Whakatu Arterial Link Transportation Assessment June 2014 Executive summary This report is subject to, and must be read in conjunction with, the limitations set out in Section
More informationMACKA S SAND PTY LTD
MACKA S SAND PTY LTD ROAD SAFETY AUDIT STAGE 2 PRELIMINARY DESIGN OF CHANNELISED INTERSECTION OF ACCESS ROAD TO TO PROPOSED SAND MINING DEVELOPMENT AT LOT 218, D.P. 1044608, WILLIAMTOWN AND NELSON BAY
More informationTHE DEVELOPMENT OF MALAYSIAN HIGHWAY RAIL LEVEL CROSSING SAFETY SYSTEMS: A PROPOSED RESEARCH FRAMEWORK. Siti Zaharah Ishak
THE DEVELOPMENT OF MALAYSIAN HIGHWAY RAIL LEVEL CROSSING SAFETY SYSTEMS: A PROPOSED RESEARCH FRAMEWORK Siti Zaharah Ishak Transport System Centre, School of Natural & Built Environments, University Of
More informationGUIDE TO PROJECT EVALUATION. Part 8: Examples
GUIDE TO PROJECT EVALUATION Part 8: Examples Guide to Project Evaluation Part 8: Examples Summary Part 8 of the Guide to Project Evaluation (the Guide) presents worked examples demonstrating appropriate
More informationTraffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017
TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC
More informationAccess Location, Spacing, Turn Lanes, and Medians
Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-3 Access Location, Spacing, Turn Lanes, and Medians This section addresses access location, spacing, turn lane and median needs, including
More informationECONOMIC BENEFITS OF CYCLING INFRASTRUCTURE AT THE PROGRAM LEVEL
ROBYN DAVIES Program Manager (Cycling and Active Transport) Queensland Department of Transport and Main Roads robyn.c.davies@tmr.qld.gov.au ADAM ROGERS Director (Cycling) Queensland Department of Transport
More informationINFORMATION ON AND APPLICATION TO USE ACT RACE FIELD INFORMATION
INFORMATION ON AND APPLICATION TO USE ACT RACE FIELD INFORMATION CONTENTS Section 1. Instructions on completing the application form Section 2. Information for the applicant Section 3. Application Form
More informationEmerging Crash Trend Analysis. Mark Logan Department of Main Roads, Queensland. Patrick McShane Queensland Transport
Emerging Crash Trend Analysis Mark Logan Department of Main Roads, Queensland Patrick McShane Queensland Transport The authors would like to acknowledge the assistance of Queensland Transport's Data Analysis
More informationHSM PREDICTIVE METHODS IN PRELIMINARY ENGINEERING
HSM PREDICTIVE METHODS IN PRELIMINARY ENGINEERING 2017 ILLINOIS THE CONFERENCE Filiberto Sotelo & Steven Schilke, P.E. OUTLINE Safety & Transportation Management Process What is HSM? Illinois HSM Predictive
More information