1 Managed Lanes 2017: What They Are and How They Work Robert W. Poole, Jr. Director of Transportation Policy Reason Foundation

2 What are Managed Lanes? Lanes restricted by price or vehicle type. HOV lane: only qualified HOVs HOT Lane: HOVs and paying vehicles Express Toll Lane: all (or nearly all) pay Today, over 1,500 lane-miles in operation. Priced MLs in use or planned in 17 metro areas.

3 Priced ML Projects, 2017

4 Speed (mph) Pricing enables uncongested traffic flow HCM Curve SR 91 Curve (WSA ) Unstable Flow Vehicles (PCE) Per Hour Per Lane 4

5 Problems with non-paying vehicles Maintaining uncongested flow depends on effective pricing. Large majority must be priced. Still no proven way to enforce HOV occupancy. High person throughput via vanpools, buses as alternative to HOVs going free. Recent trend of no HOVs free: MoPac, I-595, I-95 MD, I-4 Orlando, SF-Oakland Bay Bridge

6 National trend is ML networks Metro Area Under Way Planned Atlanta Dallas/Ft. Worth Denver Houston Jacksonville Los Angeles Miami Minneapolis/St. Paul Orlando San Diego San Francisco Seattle Tampa Washington, DC

7 What do ML networks need? Consistent user experience (access, occupancy, pricing, signage) Seamless connectors Revenue maximization (to build out the network, including connectors) MLs also on toll roads, if congested

8 Synergy of Managed Lanes and express bus service Market-priced lane is virtual equivalent of an exclusive fixed guideway. Pricing limits vehicle flow to what s compatible with LOS C conditions. Reliable high speed is sustainable long-term, thanks to pricing. Lanes should include bus-friendly features.

9 Main Lanes Managed Lanes Direct Access Road to Arterial Direct Transit Access Ramps BRT Station

10 Typical ML concerns Less throughput than general lanes Lexus Lanes Unaffordable tolls No room to add lanes

11 I-95 Miami throughput comparison Southbound AM Peak Northbound PM Peak EL GP Total With Express Lanes Without Exp. Lanes EL GP Total With Express Lanes Without Exp. Lanes Source: FDOT / Kimley-Horn; Cambridge Systematics 11

12 Speed (mph) Pricing enables uncongested traffic flow HCM Curve SR 91 Curve (WSA ) Unstable Flow Vehicles (PCE) Per Hour Per Lane 12

13 These are not Lexus Lanes

14 Unaffordable tolls Opponents use highest peak toll, full length of facility, twice a day, 5 days a week. The 90/10 rule: 90% of ML customers use it about 10% of the time. Better measure is average toll for all customers (SR , $2.93) Better to have a fast, reliable alternative to congestion than NO alternative. Express bus on MLs is a new alternative.

15 What if there is little or no room to widen the corridor? Innovations in use today: Elevated express toll lanes--tampa Depressed express toll lanes-- Dallas

16 Tampa Express Toll Lanes Reversible, cashless toll lanes Elevated: 6 lanes on 6 feet Uncongested guideway for express bus service, also

17

18 Are P3s a good fit for ML projects? Project costs & competition Risk transfer Traffic & revenue risk Constraints on state DOT funding Upsides for state DOTs Best of both worlds

19 Risk transfer, a major benefit Construction cost overruns Late completion O & M Traffic & revenue uniquely risky in ML projects

20 Fitch Ratings on T&R risk in MLs Ramp-up may be faster than traditional toll roads. Volatility is much higher: -10% in traffic may mean -30% in revenue. Debt service reserves must be higher, for same bond rating (e.g., BBB). Long-term revenue growth likely greater than traditional toll roads.

21 Other financing considerations State bonds may be subject to volume cap or constitutional debt limits. Opportunity cost of using state funds for this, versus other unmet needs.

22 Upsides for in-house procurement Capturing 100% of long-term revenue growth Possibly avoiding non-compete or compensation clauses Ability to do system financing of ML network

23 Potential best of both worlds P3 with significant revenue-sharing: Ensures all P3 risk-transfer benefits for state. Preserves state bonding for other needs Avoids the risks of early years volatility Likely longer-term revenue stream from revenue sharing.

24 Conclusions Priced MLs are a national trend. Pricing works well, if nearly all vehicles are priced. Networks offer benefits, but need consistent policies. ML network offers free guideway for region-wide express bus service. P3s offer advantages for ML projects.

25 Questions? Contact information:

Managed Lanes: A Popular and Effective Urban Solution. Ed Regan Presented by Susan Buse

Managed Lanes: A Popular and Effective Urban Solution. Ed Regan Presented by Susan Buse Managed Lanes: A Popular and Effective Urban Solution Ed Regan Presented by Susan Buse Overview of Managed Lanes First ML: SR 91 Orange County, CA 1996 Today About 23 Operating Projects in 9 States Basic

More information

A Federal Perspective on Congestion Pricing. Wayne Berman Federal Highway Administration July 8, 2010

A Federal Perspective on Congestion Pricing. Wayne Berman Federal Highway Administration July 8, 2010 A Federal Perspective on Congestion Pricing Wayne Berman Federal Highway Administration July 8, 2010 Overview Background on Congestion Pricing Benefits and Experiences of Pricing Case Study Miami I-95

More information

Toll Express Lanes for the Research Triangle region Including discussion of possible applications on I-40

Toll Express Lanes for the Research Triangle region Including discussion of possible applications on I-40 Toll Express Lanes for the Research Triangle region Including discussion of possible applications on I-40 Presentation for discussion at Durham-Chapel Hill-Carrboro MPO TAC meeting Wednesday, December

More information

Priced Managed Lanes in America. October 2013

Priced Managed Lanes in America. October 2013 Priced Managed Lanes in America October 2013 1 Priced Managed Lanes What are they? Where are they? Why do them? When to do them? Common issues Lessons learned What are Priced Managed Lanes? The subset

More information

Managed Lanes: A National Perspective Managed Lane Strategies

Managed Lanes: A National Perspective Managed Lane Strategies Managed Lanes: A National Perspective Managed Lane Strategies Use the following control strategies to manage a lane(s) to provide a reliable transportation option: Eligibility/occupancy Access control

More information

Overview of 64 Express Lanes. Secretary of Transportation Aubrey Layne April 12, 2017

Overview of 64 Express Lanes. Secretary of Transportation Aubrey Layne April 12, 2017 Overview of 64 Express Lanes Secretary of Transportation Aubrey Layne April 12, 2017 2 More Choices for Motorists Coming December 2017 Purpose and Use Our purpose is two-fold: Reduce congestion by making

More information

What are Managed Lanes?

What are Managed Lanes? Express Lanes What are Managed Lanes? Highway facilities or a set of lanes where operational strategies are proactively implemented and managed in response to changing conditions. http://ops.fhwa.dot.gov/freewaymgmt/managedlanesvideo/index.htm

More information

Transit Operations in the I-95 Express Lanes

Transit Operations in the I-95 Express Lanes Transit Operations in the I-95 Express Lanes TRB 15 th International Conference on Managed Lanes Miami, Florida Presented by Diane Quigley FDOT Transit Planning Administrator May 5, 2016 FDOT Governance

More information

It s Been 15 Years Already?!

It s Been 15 Years Already?! It s Been 15 Years Already?! What We ve Learned from 12 Operational Facilities 14 Parsons Brinckerhoff, 2012. THEY WORK! May 24, 2012 Parsons Brinckerhoff, 2012. 2 David Ungemah ungemah@pbworld.com May

More information

Managed Lanes: The Fitch Approach. Saavan Gatfield, Senior Director

Managed Lanes: The Fitch Approach. Saavan Gatfield, Senior Director Managed Lanes: The Fitch Approach Saavan Gatfield, Senior Director HOT Lanes Getting Hotter Priced Managed Lanes Across the United States As of 4/27/14 Sources: HNTB Corporation; GAO analysis of USDOT,

More information

Managed Lanes Fundamentals and Opportunities. September 12, 2013

Managed Lanes Fundamentals and Opportunities. September 12, 2013 Managed Lanes Fundamentals and Opportunities September 12, 2013 What are managed lanes? What are managed lanes? Specialized lanes rather than general purpose Synonym for high occupancy toll (HOT) lanes

More information

1. Operate along freeways, either in regular traffic lanes, in high-occupancy vehicle (HOV) lanes, or along the shoulders.

1. Operate along freeways, either in regular traffic lanes, in high-occupancy vehicle (HOV) lanes, or along the shoulders. Most decisions about whether or not to use transit involve time and cost, and most transit services are slower than travel by private vehicle. However, when transit is faster or nearly as fast as travel

More information

395 Express Lanes Extension

395 Express Lanes Extension 395 Express Lanes Extension January 2016 Building a network of Express Lanes Project overview Add capacity on I-395 with addition of a third HOV lane and active traffic management Generate guaranteed transit

More information

Public Hearing October 21, 2014 University of North Florida Adam W. Herbert University Center Alumni Drive Jacksonville, FL 32224

Public Hearing October 21, 2014 University of North Florida Adam W. Herbert University Center Alumni Drive Jacksonville, FL 32224 - Project Development & Environment Study from SR 9B to SR 202 (JTB Blvd.) Duval County, Florida Financial Project ID: 209301-3-22-01 Public Hearing October 21, 2014 University of North Florida Adam W.

More information

Managed Lanes in California:

Managed Lanes in California: Managed Lanes in California: Where We ve Been Where We re Going Joe Rouse Managed Lanes Manager California Department of Transportation Managed Lanes Defined Lanes that are proactively managed in response

More information

MOVEABLE BARRIER. Congestion Management Solutions

MOVEABLE BARRIER. Congestion Management Solutions MOVEABLE BARRIER Congestion Management Solutions 1 Portland area morning congestion (AM) 2 Portland area afternoon congestion (PM) 3 30 year planning - Portland Area 100% Growth over 30 years 4 Movable

More information

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway State Road 54/56 Tampa Bay s Northern Loop The Managed Lane Solution Linking I-75 to the Suncoast Parkway SUNCOAST PARKWAY Both I 75 and the Suncoast Parkway are planning, or in the process of constructing,

More information

Northern Virginia Express Lanes Design Challenges and Solutions. IBTTA Maintenance and Roadway Operations Workshop June 25, 2018

Northern Virginia Express Lanes Design Challenges and Solutions. IBTTA Maintenance and Roadway Operations Workshop June 25, 2018 Northern Virginia Express Lanes Design Challenges and Solutions IBTTA Maintenance and Roadway Operations Workshop June 25, 2018 Virginia Express Lanes Overview 60 miles of managed lanes (4 projects) Long

More information

TAMPA BAY EXPRESS (TBX)

TAMPA BAY EXPRESS (TBX) TAMPA BAY EXPRESS (TBX) Hank Schneider, P.E. FDOT- District 7 Consultant Project Manager Florida Department of TRANSPORTATION TAMPA BAY EXPRESS AGENDA What is TBX? What does TBX do? Why is TBX Important?

More information

DEVELOPING A POLICY TO PLAN AND OPERATE MANAGED LANES IN NORTH CENTRAL TEXAS: LBJ IN DALLAS COUNTY AND AIRPORT FREEWAY IN TARRANT COUNTY

DEVELOPING A POLICY TO PLAN AND OPERATE MANAGED LANES IN NORTH CENTRAL TEXAS: LBJ IN DALLAS COUNTY AND AIRPORT FREEWAY IN TARRANT COUNTY DEVELOPING A POLICY TO PLAN AND OPERATE MANAGED LANES IN NORTH CENTRAL TEXAS: LBJ IN DALLAS COUNTY AND AIRPORT FREEWAY IN TARRANT COUNTY Regional Transportation Council May 11, 2006 Transportation Department

More information

Technology and the Changing Face of Tollways

Technology and the Changing Face of Tollways Technology and the Changing Face of Tollways Harris County Toll Road Authority Lisa Castañeda, PE, Assistant Director ITS Texas 2009 November 12, 2009 Topics Growth and Evolution of Tollways in Houston

More information

Tolling Study. July 23, 2009

Tolling Study. July 23, 2009 Eastside Corridor Tolling Study Interagency Working Group July 23, 2009 1 Welcome Craig Stone Director of WSDOT Toll Division 2 Agenda Introductions/Roles & Responsibilities Meeting Goals Express Toll

More information

Managed Lanes. Steve Schilke, P.E. Major Projects Unit Head District 1. Illinois Traffic Engineering and Safety Conference October 2016

Managed Lanes. Steve Schilke, P.E. Major Projects Unit Head District 1. Illinois Traffic Engineering and Safety Conference October 2016 Managed Lanes Steve Schilke, P.E. Major Projects Unit Head District 1 Illinois Traffic Engineering and Safety Conference October 2016 Agenda Managed Lanes Projects I-55 (Stevenson Expressway) Express Toll

More information

Preview. Tables in your paper Mass Transit as alternative to auto California s problems in urban transportation

Preview. Tables in your paper Mass Transit as alternative to auto California s problems in urban transportation Preview Tables in your paper Mass Transit as alternative to auto California s problems in urban transportation Integrating tables in your writing Commuting in Urban Areas Last time auto and congestion

More information

North Coast Corridor:

North Coast Corridor: North Coast Corridor: Connecting People, Transportation & Environment Legislative Hearing: 11.8.10 1 North Coast Corridor Region s Lifeline A Regional Strategy Mobility, Economy & Environment North Coast

More information

4 Level of Service Results: HOV and Express Lanes

4 Level of Service Results: HOV and Express Lanes 4 Level of Service Results: HOV and Express Lanes Considering the importance of managed lanes (such as HOV and express lanes) in improving the overall performance of a corridor, Alameda CTC started monitoring

More information

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016

I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016 I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016 Mike Snare, PE, Project Manager Virginia Department of Transportation GEC Michelle Holland, Megaprojects

More information

Major Mobility Improvement Program (MMIP)

Major Mobility Improvement Program (MMIP) Major Mobility Improvement Program (MMIP) Tim Matthews, PE MMIP Program Manager October 9, 2017 1 Agenda Introductions/Roles Meeting Objective Major Mobility Investment Program (MMIP) MMIP and the Georgia

More information

Sustainable Transportation Planning in the Portland Region

Sustainable Transportation Planning in the Portland Region Sustainable Transportation Planning in the Portland Region Jennifer Dill, Ph.D. Associate Professor School of Urban Studies & Planning jdill@pdx.edu http://web.pdx.edu/~jdill/ Outline Elements of a sustainable

More information

IH 85 EXPRESS LANES ATLANTA, GA USDOT Congestion Reduction Demonstration Program Grant ($110M)

IH 85 EXPRESS LANES ATLANTA, GA USDOT Congestion Reduction Demonstration Program Grant ($110M) IH 85 EXPRESS LANES ATLANTA, GA USDOT Congestion Reduction Demonstration Program Grant ($110M) HOV to HOT: 15 miles Convert from 2+ HOV to managed (3+ free) Project includes Express Lane component, new

More information

IMPACTS TO TRANSIT FROM LOS ANGELES CONGESTION REDUCTION DEMONSTRATION. Word Count: 3,386 (body) + 2,000 (8 tables) + 1,500 (6 figures) = 6,886 words

IMPACTS TO TRANSIT FROM LOS ANGELES CONGESTION REDUCTION DEMONSTRATION. Word Count: 3,386 (body) + 2,000 (8 tables) + 1,500 (6 figures) = 6,886 words IMPACTS TO TRANSIT FROM LOS ANGELES CONGESTION REDUCTION DEMONSTRATION TRB PAPER -0 Brian Pessaro, AICP Senior Research Associate Center for Urban Transportation Research (CUTR) University of South Florida

More information

I-395 Express Lanes Northern Extension Project Public Hearings

I-395 Express Lanes Northern Extension Project Public Hearings I-395 Express Lanes Northern Extension Project Public Hearings Susan Shaw, PE, Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Manager Virginia Department of

More information

Express Transit Lanes for Toll Roads

Express Transit Lanes for Toll Roads Reason Foundation Policy Brief No. 146 September 2017 Express Transit Lanes for Toll Roads by Robert W. Poole, Jr. Reason Foundation Reason Foundation s mission is to advance a free society by developing,

More information

95 Express Annual Operations Report: Fiscal Year

95 Express Annual Operations Report: Fiscal Year 95 Express Annual Operations Report: Fiscal Year 2014-2015 General The 95 Express Program completed its sixth full Fiscal Year of operations in June 2015. For the FDOT, its Fiscal Year (FY) is from July

More information

The Future of All Electronic Tolling Brian Patno Raytheon ITS Texas October 26, 2012

The Future of All Electronic Tolling Brian Patno Raytheon ITS Texas October 26, 2012 The Future of All Electronic Tolling Brian Patno Raytheon ITS Texas October 26, 2012 Copyright 2012 Raytheon Company. All rights reserved. Customer Success Is Our Mission is a registered trademark of Raytheon

More information

The I-680 Southbound Express Lane

The I-680 Southbound Express Lane The I-680 Southbound Express Lane ALAMEDA County Transportation Commission FY2014-15 Annual Report SUNOL SMART CARPOOL LANE JOINT POWERS AUTHORITY Table of Contents Message from the Chair...3 I-680 Southbound

More information

Preview. Second midterm Tables in your paper Mass Transit as alternative to auto California s problems in urban transportation

Preview. Second midterm Tables in your paper Mass Transit as alternative to auto California s problems in urban transportation Preview Second midterm Tables in your paper Mass Transit as alternative to auto California s problems in urban transportation Score Distribution 1 st Midterm 2 nd Midterm 3.5-4.0 8% 21% 3.0-3.5 23% 34%

More information

Improving Mobility Without Building More Lanes

Improving Mobility Without Building More Lanes Improving Mobility Without Building More Lanes By Mike Salisbury and Will Toor July 2017 Copyright 2017 by Southwest Energy Efficiency Project. All rights reserved. Photo: Courtesy of the Denver Post Anyone

More information

Washington DC Section of ITE Project Briefing

Washington DC Section of ITE Project Briefing Washington DC Section of ITE Project Briefing November 5, 2015 Renée Hamilton, VDOT, Deputy District Administrator I-66 Outside the Beltway Improvement Area Project Location Virginia 2 Purpose and Need

More information

I-80 Corridor Overhaul

I-80 Corridor Overhaul I-80 Corridor Overhaul MTC Horizon Transformative Projects 15 November, 2018 Megan Gee Arup Vision A rightsized freeway network future-proofs the region for population growth, new mobility innovations,

More information

Arnold Hinojosa

Arnold Hinojosa Policy Analysis of the Mass Transit Challenges Facing Rapidly Growing Southern and Western Cities and How These Challenges Can Be Addressed Using the Model Set by Chicago Arnold Hinojosa ahinojosa@kentlaw.edu

More information

TRB Managed Lanes Conference May 22 24, 2012, Oakland, CA

TRB Managed Lanes Conference May 22 24, 2012, Oakland, CA HOT LLanes and d TTransit i P f Performance TRB Managed Lanes Conference May 22 24, 2012, Oakland, CA Miami UPA Transit Results (2008 2010 Data) Miami UPA Transit Improvements 2 new routes Dade-Broward

More information

Turnpike Projects in Palm Beach County. Palm Beach TPA Update September 20, 2018

Turnpike Projects in Palm Beach County. Palm Beach TPA Update September 20, 2018 Turnpike Projects in Palm Beach County Palm Beach TPA Update September 20, 2018 Agenda Background Funded Projects Future Project Status Widenings Interchanges Express Lanes Phasing 2 Background 45 Miles

More information

FREQUENTLY ASKED QUESTIONS: MANAGED LANES

FREQUENTLY ASKED QUESTIONS: MANAGED LANES FREQUENTLY ASKED QUESTIONS: MANAGED LANES by Baruch Feigenbaum and Austill Stuart January 2019 Reason Foundation s mission is to advance a free society by developing, applying and promoting libertarian

More information

405 Express Lanes General Information & Frequently Asked Questions

405 Express Lanes General Information & Frequently Asked Questions The questions and answers below provide current information on the project to improve Interstate 405 (I-405) in Orange County from State Route 73 to Interstate 605. Why are improvements needed on I-405?

More information

Contemporary Approaches in Congestion Pricing:

Contemporary Approaches in Congestion Pricing: Contemporary Approaches in Congestion Pricing: Lessons Learned from the National Evaluation of Congestion Pricing Strategies at Six Sites August 2015 FHWA-JPO-2015-217 Office of the Assistant Secretary

More information

Transit Signal Priority (TSP) Application to Miami-Dade Transit

Transit Signal Priority (TSP) Application to Miami-Dade Transit Transit Signal Priority (TSP) Application to Miami-Dade Transit Amar Sarvepalli Parsons Brinckerhoff Southeast Florida FSUTMS Users Group August 15, 2008 Overview PART A WHAT IS TSP INTRODUCTION PURPOSE

More information

Fundamental Certainty

Fundamental Certainty Fundamental Certainty.or No? a presentation at: R. Mark Woodworth PKF Hospitality Research, LLC May 7, 2013 mark.woodworth@pkfc.com Hotel Horizons Forecasting Model Smith Travel Research Historical rooms

More information

Regional Transportation Needs Within Southeastern Wisconsin

Regional Transportation Needs Within Southeastern Wisconsin Regional Transportation Needs Within Southeastern Wisconsin #118274 May 24, 2006 1 Introduction The Southeastern Wisconsin Regional Planning Commission (SEWRPC) is the official areawide planning agency

More information

I-405/SR 167 Corridor Executive Advisory Group

I-405/SR 167 Corridor Executive Advisory Group I-405/SR 167 Corridor Executive Advisory Group Meeting #2 Bellevue City Hall July 18, 2016 Introductions Roger Millar, P.E., AICP Acting Secretary of Transportation 2 Agenda Introductions I-405 Partner

More information

State Road & Tollway Authority Georgia 400 Demolition Project Frequently Asked Questions

State Road & Tollway Authority Georgia 400 Demolition Project Frequently Asked Questions State Road & Tollway Authority Georgia 400 Demolition Project Frequently Asked Questions 1. When will toll collection end? Toll collection is scheduled to end on Friday, November 22, weather permitting.

More information

RTA 2013 Leadership Briefing and Tour Report

RTA 2013 Leadership Briefing and Tour Report RTA 2013 Leadership Briefing and Tour Report Suburban MD, Northern VA, Baltimore, Washington, DC Mike Fendrick, PE, Parsons Brinckerhoff Bill Jenkins, PE, AECOM Mike Surasky, PE, A. Morton Thomas & Associates,

More information

July 10, :00-11:30 a.m.

July 10, :00-11:30 a.m. July 10, 2012 10:00-11:30 a.m. 1. Welcome and Self Introductions 2. Briefing on 10 & 110 Metro ExpressLanes Stephanie Wiggins, Executive Officer, ExpressLanes Demo Project, Metro Metro ExpressLanes is

More information

Fiscal Year Budget Overview

Fiscal Year Budget Overview Fiscal Year 2015-2016 Budget Overview Investing in Transportation for Today and Tomorrow Ed Reiskin Director of Transportation APRIL 1, 2014 San Francisco: great city, excellent transportation choices

More information

Complete Streets Policies in Charlotte

Complete Streets Policies in Charlotte Complete Streets Policies in Charlotte Complete Streets Peer Exchange Baton Rouge, LA January 19, 2016 Norm Steinman, AICP Charlotte DOT Changing what we do to change what will happen 1. Inventory of Conditions

More information

Capital Beltway HOT Lanes - Frequently Asked Questions

Capital Beltway HOT Lanes - Frequently Asked Questions Capital Beltway HOT Lanes - Frequently Asked Questions December 20, 2007 1. What is the cost of the project? The fixed-price design-build cost is approximately $1.4 billion. 2. Why have the project costs

More information

6/14/2013. Welcome. to the US 75 Corridor Study. Public Meeting. US 75 Corridor Study Area

6/14/2013. Welcome. to the US 75 Corridor Study. Public Meeting. US 75 Corridor Study Area Welcome to the US 75 Corridor Study Public Meeting US 75 Corridor Study Area 1 Existing and Future Congestion Levels 2012 2035 A do-nothing approach does not address the severe congestion in the region

More information

Tolling Trends in North America. Susan Buse

Tolling Trends in North America. Susan Buse Tolling Trends in North America Susan Buse Background United States: over 100 operational toll facilities, mostly roads with bridges primarily along the borders and in major ports such as New York and

More information

I-635 LBJ EAST PROJECT

I-635 LBJ EAST PROJECT 635 I-635 LBJ EAST PROJECT Transportation and Trinity River Project Committee 9 June 2014 TxDOT Dallas District Dallas County, Texas CSJ: 2374-01-137, 2374-02-053 Agenda I-635 LBJ East Project Overview

More information

Fast Affordable Sustainable Transportation

Fast Affordable Sustainable Transportation Fast Affordable Sustainable Transportation Bay Area October 2017 PC: Dllu Waking up from our traffic nightmare Transportation in the Bay Area has reached a crisis point. There is grinding congestion on

More information

November 14, Dulles To DC Loop Public-Private Partnership Proposal. Executive Summary

November 14, Dulles To DC Loop Public-Private Partnership Proposal. Executive Summary November 14, 2005 Dulles To DC Loop Public-Private Partnership Proposal Executive Summary Virginia Mobility Associates LLC, a newly established single purpose entity, proposes to privately finance the

More information

METRO RTA TRANSIT MASTER PLAN. May 25-26, 2011

METRO RTA TRANSIT MASTER PLAN. May 25-26, 2011 METRO RTA TRANSIT MASTER PLAN May 25-26, 2011 WHAT IS THE TRANSIT MASTER PLAN? A twenty-year plan for METRO RTA What will METRO look like in 2031? 1 TRANSIT TECHNOLOGIES 2 TRANSIT TECHNOLOGIES Transit

More information

Hot lane policies and their implications

Hot lane policies and their implications Transportation (2012) 39:1019 1033 DOI 10.1007/s11116-011-9382-5 Hot lane policies and their implications Rahul Goel Mark W. Burris Published online: 13 November 2011 Ó Springer Science+Business Media,

More information

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Introduction The Georgia Department of Transportation (GDOT) prepared a

More information

Public Information and Participation Comments

Public Information and Participation Comments Two public meetings were held in December. The first meeting was December 6, 2011 at Mary Ellen Henderson Middle School and had 36 public attendees. The second meeting was on December 14, 2011 at the Arlington

More information

Multimodal Approach to Planning & Implementation of Transit Signal Priority within Montgomery County Maryland

Multimodal Approach to Planning & Implementation of Transit Signal Priority within Montgomery County Maryland Multimodal Approach to Planning & Implementation of Transit Signal Priority within Montgomery County Maryland A Path to Successful Implementation James Allday Bunch - Sabra, Wang & Associates, Inc. ITS

More information

Congestion Management/ Crash Mitigation Process A Feasibility Study on Implementing HOV, Reversible Lanes and Time-of-Day Parking Strategies

Congestion Management/ Crash Mitigation Process A Feasibility Study on Implementing HOV, Reversible Lanes and Time-of-Day Parking Strategies Congestion Management/ Crash Mitigation Process A Feasibility Study on Implementing HOV, Reversible Lanes and Time-of-Day Parking Strategies Arterial Roadway HOV Lanes Arterial Roadway Reversible Lanes

More information

Measuring the Distribution and Costs of Congestion. Tim Lomax Texas Transportation Institute

Measuring the Distribution and Costs of Congestion. Tim Lomax Texas Transportation Institute Measuring the Distribution and Costs of Congestion Tim Lomax Texas Transportation Institute http://mobility.tamu.edu The Congestion Measurement Story Travel time, variations, compare to goals WHAT? WHY?

More information

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

MoPac South: Impact on Cesar Chavez Street and the Downtown Network MoPac South: Impact on Cesar Chavez Street and the Downtown Network Prepared by: The University of Texas at Austin Center for Transportation Research Prepared for: Central Texas Regional Mobility Authority

More information

WHAT IFS: Over the course of

WHAT IFS: Over the course of WHAT IFS: Over the course of the 422plus Project certain questions have arisen multiple times at meetings, briefings and on-line at the website. Most of these questions start with WHAT IF. WHAT IF vehicle

More information

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies

Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies Transform 66 Project February 4, 2016 Partnering Conference Michigan Department of Transportation American Council of Engineering Companies Susan Shaw, PE, CCM, DBIA Megaprojects Director Northern Virginia

More information

Public Hearing Tarrant County. October 11 th, 2012

Public Hearing Tarrant County. October 11 th, 2012 Public Hearing Tarrant County October 11 th, 2012 Public Hearing Agenda Welcome and Project Overview Ms. Maribel P. Chavez, P.E. District Engineer Texas Department of Transportation Fort Worth District

More information

Aurora Corridor to E Line

Aurora Corridor to E Line Aurora Corridor to E Line Jack Whisner Transit Planner, Service Development King County Metro Transit Seattle, Washington jack.whisner@kingcounty.gov 206-477-5847 King County Metro Transit Part of general

More information

Today s Agenda. Welcome & Introductions. I-526 Lowcountry Corridor Update. Table Discussions. Next Steps / Conclusion

Today s Agenda. Welcome & Introductions. I-526 Lowcountry Corridor Update. Table Discussions. Next Steps / Conclusion SCDOT Turns 100! SCDOT Turns 100! Today s Agenda Welcome & Introductions I-526 Lowcountry Corridor Update Table Discussions Next Steps / Conclusion Project Limits I-526 Lowcountry Corridor Project Description

More information

U.S. Economic and Apartment Market Overview and Outlook. July 15, 2014

U.S. Economic and Apartment Market Overview and Outlook. July 15, 2014 2014 U.S. Economic and Apartment Market Overview and Outlook July 15, 2014 U.S. Economic Overview U.S. GDP Growth Persistent Despite 1Q Polar Vortex Annualized Quarterly Percent Change 10% 5% 0% -5% -10%

More information

Capital Beltway HOT Lanes Project

Capital Beltway HOT Lanes Project Some things can t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead Some things can t wait for traffic Overview Two new lanes in each direction Carpool/HOV-3 lanes on the Beltway

More information

Roadways. Roadways III.

Roadways. Roadways III. Introduction 97 Roadway Design Principles 98 Safe Speeds 99 Optimizing of Street Space 00 Minimum Lane Widths in the City of Boston 02 Design Features that Reduce Operating Speeds 05 Travel Lanes Transit

More information

The Bay Bridge Corridor Congestion Study

The Bay Bridge Corridor Congestion Study Bay Bridge Corridor Congestion Study Tony Bruzzone, Arup TJPA Board Nov 1, 2010 Funded by AC Transit/Federal Transit Administration (FTA) Contracted with the Transbay Joint Powers Authority (TJPA) Stakeholders:

More information

I-395 Express Lanes Northern Extension Project Arlington County Board October 18, 2016

I-395 Express Lanes Northern Extension Project Arlington County Board October 18, 2016 I-395 Express Lanes Northern Extension Project Arlington County Board October 18, 2016 Susan Shaw, PE, Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Manager

More information

Alternatives Public Workshop

Alternatives Public Workshop US 1 Express Lanes Project Development & Environment (PD&E) Study Alternatives Public Workshop August 2013 1 Today s Agenda Project Background and Overview Tier 1 Alternatives Development Tier 2 Decision-Making

More information

Lodging Market Update. Valley Hotel and Resort Association April 13, 2016 Presented by: Robert Hayward

Lodging Market Update. Valley Hotel and Resort Association April 13, 2016 Presented by: Robert Hayward Lodging Market Update Valley Hotel and Resort Association April 13, 2016 Presented by: Robert Hayward United States Lodging Market 63.7% 59.8% 58.9% 59.2% 61.3% 63.1% 63.3% 63.1% 60.3% 55.1% 57.5% 59.9%

More information

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011 Corridor Advisory Group and Task Force Meeting #10 July 27, 2011 1 Agenda Recap CAG/TF #9 Public Meeting #2 Summary Single Mode Alternatives Evaluation Results Next Steps 2 3 CAG/TF #9 Recap CAG /TF #9

More information

Enhancing Return on Investment for MnPASS Express Lanes

Enhancing Return on Investment for MnPASS Express Lanes Enhancing Return on Investment for MnPASS Express Lanes Minnesota s Transportation Conference February 28, 2018 mnpass.org Agenda MnPASS Express Lane Background MnPASS System Update Enhancing Return on

More information

TRANSPORTATION RESEARCH BOARD. Continuous Access Priced Managed Lanes: What Have We Learned So Far? Thursday, September 20, :00-3:30 PM ET

TRANSPORTATION RESEARCH BOARD. Continuous Access Priced Managed Lanes: What Have We Learned So Far? Thursday, September 20, :00-3:30 PM ET TRANSPORTATION RESEARCH BOARD Continuous Access Priced Managed Lanes: What Have We Learned So Far? Thursday, September 20, 2018 2:00-3:30 PM ET The Transportation Research Board has met the standards and

More information

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc.

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc. CITY OF OAKLAND 27th Street Bikeway Feasibility and Design Final Report (v3) March 23, 2007 PREPARED BY: Kimley-Horn and Associates, Inc. Table of Contents 1. Introduction 3 2. 27 th Street/Bay Place Corridor

More information

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives Contents EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW... 1-1 1.1 Study Scope... 1-1 1.2 Study Area... 1-1 1.3 Study Objectives... 1-3 2 EXISTING CONDITIONS... 2-1 2.1 Existing Freeway Conditions... 2-4 2.1.1

More information

Sketch Level Assessment. of Traffic Issues. for the Fluor Daniel I-495 HOT Lane Proposal. Ronald F. Kirby

Sketch Level Assessment. of Traffic Issues. for the Fluor Daniel I-495 HOT Lane Proposal. Ronald F. Kirby Sketch Level Assessment of Traffic Issues for the Fluor Daniel I-495 HOT Lane Proposal Ronald F. Kirby Director of Transportation Planning National Capital Region Transportation Planning Board (TPB) Metropolitan

More information

Freeway Improvement Project

Freeway Improvement Project CapCity Corridor History and Milestones CapCity Partners CapCity Origin and Destination analysis Origins and Destinations Destinations based on Origins North of I-80 8% O & D data prepared by SACOG Origins

More information

Dumbarton Transportation Corridor Study. San Francisco Bay ITE November 2016

Dumbarton Transportation Corridor Study. San Francisco Bay ITE November 2016 Dumbarton Transportation Corridor Study San Francisco Bay ITE November 2016 Dumbarton Corridor Source: Wikipedia 2 Dumbarton Corridor 3 Growth Imbalance Jobs-housing imbalance Major employers driving growth

More information

National Capital Region Congestion Report

National Capital Region Congestion Report NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD National Capital Region Congestion Report 4th Quarter 2015 Metropolitan Washington Council of Governments 777 North Capitol Street, N.E., Suite 300,

More information

Capital Beltway HOT Lanes Project

Capital Beltway HOT Lanes Project New Travel Choices Ahead Capital Beltway HOT Lanes Project Update January 2011 Major Milestones Reached in 2010 Project is 55% complete New bridge spans completed at every interchange; Second phase well

More information

GIVING GEORGIANS A CHOICE TO KEEP MOVING

GIVING GEORGIANS A CHOICE TO KEEP MOVING GIVING GEORGIANS A CHOICE TO KEEP MOVING I-85 Express Lanes Annual Performance Report FISCAL YEAR 2014 (JULY 1, 2013 JUNE 30, 2014) EEP OVING VISION AND MISSION Enhancing mobility in Georgia by providing

More information

I 595 Express Corridor Improvements Project. February 2014 Update

I 595 Express Corridor Improvements Project. February 2014 Update I 595 Express Corridor Improvements Project February 2014 Update PROJECT COMPONENTS Reversible Express Lanes Direct Connect to Florida s Turnpike Open Road Tolling SR 84 Continuous Connection Florida s

More information

RapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion

RapidRide Roosevelt Seat Sea t t le t le Depa De r pa t r men men t of Sept T an r sp an or sp t or a t t a ion RapidRide Roosevelt Seattle Bicycle Advisory Board 1 Our mission, vision, and core values Mission: deliver a high-quality transportation system for Seattle Vision: connected people, places, and products

More information

Reversible Elevated Express Lanes. A Solution for Urban Traffic Congestion

Reversible Elevated Express Lanes. A Solution for Urban Traffic Congestion Lee Roy Selmon Crosstown Expressway Reversible Elevated Express Lanes A Solution for Urban Traffic Congestion Martin Stone, Ph.D., AICP Director of Planning Tampa-Hillsborough Expressway Authority Pensacola

More information

National Housing Trends

National Housing Trends National Housing Trends 34% America s Choice of Best Long Term Investment 26% 17% 15% 6% Real Estate Stocks / Mutual Funds Gold Savings Accounts / CDs Bonds Gallup 2018 Housing Affordability 197 Index

More information

101 Corridor Managed Lanes

101 Corridor Managed Lanes 101 Corridor Managed Lanes TA BOD Meeting May 5, 2016 Agenda Item 11a Presentation Outline 101 Corridor Profile System Deficiencies Background Managed Lanes Proposed Purpose and Need Alternatives Under

More information

South King County High-Capacity Transit Corridor Study

South King County High-Capacity Transit Corridor Study HIGH-CAPACITY TRANSIT CORRIDOR STUDY South King County Corridor South King County High-Capacity Transit Corridor Study Corridor Report August 2014 South King County High Capacity Transit Corridor Report

More information

VISION Long Range Plan Update Board Workshop. February 10, 2016

VISION Long Range Plan Update Board Workshop. February 10, 2016 VISION 2040 Long Range Plan Update Board Workshop February 10, 2016 Vision 2040 Key Milestones UNDERSTAND THE NEED IDENTIFY A RANGE OF OPTIONS EVALUATE COMMUNITY OPTIONS DEFINE PROJECTS & PLANS Vision

More information

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016

I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016 I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016 Susan Shaw, PE, Megaprojects Director, Virginia Department of Transportation Amanda Baxter, Special Projects

More information