1 AECOM Morrison Drive tel Ottawa, ON, Canada K2H 8S fax Minutes of Meeting Date of Meeting April 4, 2013 Start Time 6:30 p.m. Project Number Project Name Location Regarding Attendees Distribution Minutes Prepared By Bank Street Widening Class EA Study Leitrim Road to Rideau Road Gloucester South Seniors Centre, 4550 Bank Street Public Consultation Meeting Recommended Plan Daryl Robinson, Resident Jim Butcher, ELCA Brad Nixon, Findlay Creek Community Association Robert Cameron, GSSC Mike Fitch, Resident Peter Sloan, CFSC Andy Silis, Resident Kennedy Johnston, Peter Knippel Nursery City Project Manager: Angela Taylor, Planning and Infrastructure Consultant Team: Valerie McGirr, Vanessa Skelton Attendees, other Project Team members Vanessa Skelton PLEASE NOTE: If this report does not agree with your records of the meeting, or if there are any omissions, please advise, otherwise we will assume the contents to be correct. 1. Introductions Angela Taylor welcomed PCG attendees who then introduced themselves. V. McGirr presented the study work completed to date. A copy of this presentation is attached. 2. Summary of Comments When will the roundabout be built? This is expected in the longer term, before 2031 but will depend on the timing of growth in the area. Need bicycle paths on Bank Street through the Greenbelt. They could connect to nature trails within the Greenbelt. The multi-use trail on the east side of Bank Street will lead to other Greenbelt trails and could continue north while the multi-use trail on the west side of Bank Street will serve Kempark. The multi-use paths start at Leitrim. Don t believe that roundabouts are good for arterial roads, especially where there are unfamiliar drivers. It is inappropriate to slow down traffic on Bank Street. Roundabouts have been shown to work well. It will be necessary to slow down traffic from the rural environment to an urban environment. More information will be available during detailed design. Action MIN PCG # Docx

2 Page 2 Minutes of Meeting April 4, 2013 How do cyclists use a roundabout? Cyclists can either navigate the roundabout with the vehicles in the circular lanes or they can follow the cycle track to a ramp which will lead to a cycle path behind the sidewalk. The cyclist then follows the path to a marked crossing adjacent to the pedestrian crossing. The cyclist crosses the roadway lanes at this location and then connects back to a cycle path behind the sidewalk. The cycle path connects back to the cycle track with a ramp. How will drivers access businesses where there is a raised median? U-turns will be permitted at intersections. Would it be possible to have the third southbound lane at Leitrim become the left turn lane at Rotary Way? It is not preferred to have a through lane become a left turn lane as it can take drivers by surprise to find themselves in a left turn lane, resulting in unsafe lane changes. On Leitrim Road the second eastbound lane will be forced off as a right turn lane into the area parking access road. Where there is a rural cross-section (paved shoulders and ditches), the light poles are placed in the median so that they are not a roadside hazard. When is the work to be done? The City s Transportation Master Plan guides the planning for where and when infrastructure is required. The study is recommending a 5 year timeframe for four laning from south of Leitrim to south of Findlay Creek Drive. This will be subject to budget approval. The four-laning within the remainder of the urban area and the six-laning through the Bank and Leitrim intersection are further in the future (before 2031). The four-laning in the rural area is likely beyond The longer time frame from Findlay Creek Drive to the urban boundary is based on current assumptions and will need to be re-assessed as growth occurs. Existing signal timing is poor from Findlay Creek Drive to Leitrim Road as vehicles from Findlay Creek Drive fill in Bank Street from Analdea/White Alder to Findlay Creek Drive leaving no room for Bank Street traffic when the light is green. Are there plans to expand Albion Road in the TMP? No expansion is proposed. Resurfacing and paved shoulders are planned within 1-2 years. The multi-use pathways shown in the interim stage between Leitrim and Rotary Way are within existing right-of-way What will happen to the church parking? St. James Anglican Church is surrounded by City property, providing an opportunity to negotiate a location for parking. The front lawn of the senior s centre is the septic system location and therefore would not be suitable for parking Will the presentation be available? It will be sent with the minutes of this meeting. What are the other infrastructure projects is the widening of Bank Street competing with? The City usually undertakes one-two road widening projects per year. This year Greenbank Road and Trim Road are under construction. The Strandherd- Armstrong Bridge and the Hunt Club extension and new interchange both have provincial-federal funding and were accounted for previously. Action MIN PCG # Docx

3 Page 3 Minutes of Meeting April 4, 2013 Why is this study only looking as far as Rideau Road: The Transportation Master Plan identified Bank Street in the urban area as the first step. It identified the widening of Bank Street to Parkway Road as a later step. Four lanes beyond Rideau Road is expected to be considered after Every five years, population and employment projections are updated in the Official Plan and then the Transportation Master Plan. This allows the City to re-assess infrastructure needs. The sidewalks constructed by the developer in front of the Findlay Creek Shopping Centre are expected to be in the ultimate location. Action MIN PCG # Docx

4 Bank Street from Leitrim Road to Rideau Road Class Environmental Assessment Valerie McGirr

5 Business and Public Consultation Meeting #3 BANK STREET from Leitrim Road to Rideau Road CLASS ENVIRONMENTAL ASSESSMENT STUDY April 4, 2013

6 Agenda Introduction and recap Project schedule Purpose of Consultation #3 Input received and actions taken Recommended plan Potential implementation staging Impacts and mitigation measures Next steps April 2, 2013

7 Recap Study Area

8 Introduction and Recap At the last meeting we reviewed: Alternative Designs and Technically Preferred Design Potential Impacts and Mitigation Measures Raised median needed in urban area for safety reasons Two-way, left-turn lane preferred in southerly rural area Roundabouts not feasible at Bank &Leitrim and at Bank & Findlay Creek Drive Both signals and roundabouts are feasible at Remer Access #2 and the future Earl Armstrong Road extension. Protect ROW for roundabout. Final decision in detail design Intersection ti of the Earl Armstrong Road and Bank Street t will be the subject of a future Class EA Study

9 Schedule Milestone: Timeframe: Project Initiation February 2012 Project Need/Alternative Solutions Winter-Spring 2012 Existing Conditions Spring-Summer 2012 OH #1 June 2012 Alternative Designs Summer-Fall 2012 OH #2 November 2012 Functional Design for Recommended d Plan Winter Environmental Study Report Fall 2012-Winter 2013 OH #3 Spring 2013 Presentation ti to Council June 2013 ESR Public Review Summer 2013

10 Purpose of Consultation #3 Present the Recommended Plan for Bank Street widening and obtain feedback Provide possible construction implementation staging for review and comment Consider proposed mitigation measures Discuss next steps

11 Input Received Comments were received from the pubic, business/property owners and property managers regarding: loss of parking at police station and arena loss of property due to widening restricted access to businesses due to raised median change to the location of subdivision access road 10-year timeframe for improvements

12 Input Received Comments provided to the Study Team in writing and verbally were reviewed to assess the potential for mitigation of potential impacts Where feasible, changes were incorporated into the Recommended Plan to address concerns During detail design, the City will review conditions in the local area at that time to assess whether further changes are appropriate to address any remaining issues

13 Summary of Recommended Plan Generally two lanes in each direction with a third through lane on Bank St at Leitrim Road New intersections for planned development Left and right turn lanes at major intersections Urban cross-section within urban area and rural cross-section within rural area Bike lane design to be confirmed in detail design Roundabouts at Remer Access #2 and Earl Armstrong to be considered in detail design TWLTL from south of Remer Access #2 / Earl Armstrong Road to north of Rideau Road

14 Recommended Plan

15 Recommended Plan

16 Recommended Plan

17 Recommended Plan

18 Recommended Plan

19 Recommended Plan

20 Recommended Plan

21 Recommended Plan

22 Recommended Plan

23 Recommended Plan

24 Recommended Plan

25 Recommended Plan Arena Place

26 Recommended Plan

27 Recommended Plan

28 Typical Cross-sections for Raised Median and Two Way Left Turn Lane Handout of drawing of TWLTL versus Raised Median PRELIMINARY

29 Typical Cross-Sections

30 Typical Cross-Sections

31 Typical Cross-Sections

32 Typical Cross-Sections

33 Implementation Staging Plan Four-laning of Bank Street from south of Leitrim Road to south of Findlay Creek Drive Includes ultimate plan (4 lanes) from north of Rotary Way to south of Findlay Creek Drive Serves most of current urbanized area Includes pedestrian and cyclist accommodation on both sides of Bank Street northerly to Leitrim intersection and east to Arena

34 Implementation Staging Plan RENA PL. AR

35 Implementation Staging Plan

36 Implementation Staging Plan

37 Implementation Staging Plan

38 Implementation Staging Plan

39 Mitigating Impacts Minimize property acquisition across developed parcels beyond 40 m right-of-way (44 m in 6-lane section) Negotiate property acquisition with land owners Seek NCC approvals for Greenbelt land in detail design when required level of detail is available. Provide land exchange Design driveways accordance with City of Ottawa and MTO standards Permit U-turns at signalized intersections to facilitate access to properties where raised median has restricted access Provide two-way, left turn lane to facilitate access where Bank St volumes are lower Replace Findlay Creek culvert during widening. Design replacement to incorporate wildlife passage, if feasible Work with developers to create public recreation pathway connection to Findlay Creek Storm Water Management pond Provide landscaping on Hydro Ottawa lands during realignment of Arena Place Accommodate pedestrian and cyclist movements

40 Next Steps Complete lifecycle costs Hold Open House #3 on April 8, 2013 Consider and document comments received Finalize Recommended d Plan Complete Environmental Study Report Present the study to Transportation ti Committee June 5, 2013 Publish Notice of Study Completion and provide ESR to the public for 30 day review period

41 Thank You

Building a Liveable Ottawa 2031 Backgrounder 5: Barrhaven/Riverside South/Leitrim

Building a Liveable Ottawa 2031 Backgrounder 5: Barrhaven/Riverside South/Leitrim Building a Liveable Ottawa 2031 Backgrounder 5: Barrhaven/Riverside South/Leitrim Wards 3 and 22 Official Plan Transportation Master Plan Cycling Plan Pedestrian Plan October 2013 ottawa.ca/liveableottawa

More information

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto

More information

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Background Agenda Traffic Study Update Class EA Alternatives Bridge

More information

APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS

APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS MEMO : Peter Steacy, P.Eng. Date: December 3, 2014 : Ian Borsuk, P.Eng. Job No.: 3414015-000 Subject: City of Ottawa O-Train Extension Planning & EA Study

More information

TRANSPORTATION NEEDS ASSESSMENT

TRANSPORTATION NEEDS ASSESSMENT TRANSPORTATION NEEDS ASSESSMENT A travel demand analysis was carried out to determine the operational issues and the potential benefit that adding traffic capacity would have on the road network. All the

More information

Highway 56 Traffic Study Rymal Road to Cemetery Road

Highway 56 Traffic Study Rymal Road to Cemetery Road January 31, 2018 6:00 pm 8:00 pm Highway 56 Traffic Study Rymal Road to Cemetery Road City of Hamilton Public Meeting 2 2 Purpose of Public Meeting To review and obtain public input and comments on the

More information

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN 8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN The Transportation Services Committee recommends the adoption of the recommendation contained in the following report

More information

Welcome to the Open House

Welcome to the Open House Leslie Street Between 19 th Avenue and Stouffville Road Addendum to Class Environmental Assessment Study Welcome to the Open House Please sign in at the front desk. March 28, 2017 Richmond Green Sports

More information

APPENDIX L. Design Criteria

APPENDIX L. Design Criteria APPENDIX L Design Criteria DRAFT PRELIMINARY DESIGN CRITERIA Page 1 of 18 APPROVALS MANAGER, ENGINEERING CITY OF HAMILTON MANAGER, ENGINEERING REGION OF HALTON DATE This Design Criteria for the New East-West

More information

Downey Road. Transportation Improvement Study

Downey Road. Transportation Improvement Study Downey Road Transportation Improvement Study Workshop 2 Participant Handbook Workshop 1 May 18 and 19, 2016 Workshop 2 June 23 and 28, 2016 Prepared By: City of Guelph Paradigm Transportation Solutions

More information

Southcote Road Improvements Class Environmental Assessment Study

Southcote Road Improvements Class Environmental Assessment Study 1 Southcote Road Improvements Class Environmental Assessment Study Public Information Centre #1 May 24, 2018 Study Area 2 3 Welcome The Ancaster Transportation Master Plan (2011) outlined a long range

More information

COMMITTEE RECOMMENDATIONS. That Council approve:

COMMITTEE RECOMMENDATIONS. That Council approve: 4. MODIFICATIONS TO INNES ROAD (REGIONAL ROAD 30) AND TENTH LINE ROAD (REGIONAL ROAD 47) TO ACCOMMODATE THE DEVELOPMENT OF THE TRINITY COMMONS SHOPPING CENTRE COMMITTEE RECOMMENDATIONS That Council approve:

More information

Preliminary Engineering Study

Preliminary Engineering Study Preliminary Engineering Study Open House # 2 June 6, 2018 PREPARED FOR: PREPARED BY: Agenda Background and status of preliminary engineering study County Road 26 design summary County Road 63 design summary

More information

Building a Liveable Ottawa 2031 Backgrounder 4: Kanata/Stittsville

Building a Liveable Ottawa 2031 Backgrounder 4: Kanata/Stittsville Building a Liveable Ottawa 2031 Backgrounder 4: Kanata/Stittsville Wards 4, 6 and 23 Official Plan Transportation Master Plan Cycling Plan Pedestrian Plan October 2013 ottawa.ca/liveableottawa Building

More information

APPENDIX L: COST ESTIMATING TOOLS

APPENDIX L: COST ESTIMATING TOOLS APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders

More information

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE Welcome Welcome to the third community meeting for the Issaquah-Fall City Road Improvements Project. AGENDA 6:00 p.m. Welcome and sign-in 6:10 p.m. Presentation 6:50 p.m. Open house Learn about the roadway

More information

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell

More information

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan Application of a Complete Street initiative and how it might function operationally 8 8 Southbend to Prima Vista October 30, 2017 Presentation Agenda 2 Perspective and History Traffic projections, Levels

More information

List of Display Boards

List of Display Boards List of Display Boards Welcome Introduction Municipal Class Environmental Assessment (EA) Process Need and Justification for an Interchange Alternatives for Evaluation Vertical and Horizontal Alignments

More information

Application of a Complete Street

Application of a Complete Street Application of a Complete Street Southbend to Prima Vista Update May 14, 2018 Meeting Agenda Perspective and History Public input received Typical sections being considered Presentation of the 2-lane master

More information

Glebe Neighbourhood Cycling Plan

Glebe Neighbourhood Cycling Plan Glebe Neighbourhood Cycling Plan Summary of Public Comments received after June 5 th Public Information Session Comment STUDY NETWORK CS9, CS8, E, E0 CS4, E CS4 CS8 E Suggestions for alternate cycling

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening We are here today to present the draft plan for the Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening project

More information

Public Information Centre

Public Information Centre WELCOME Public Information Centre Father Tobin Road Lougheed Middle School - Library Wednesday November 7, 2012 7:00 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background The City

More information

WELCOME Public Information Centre

WELCOME Public Information Centre WELCOME Public Information Centre Fernforest Drive Brampton Soccer Centre Community Room #2 Tuesday January 19, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background

More information

Functional, Preliminary Design and Detailed Design

Functional, Preliminary Design and Detailed Design Functional, Preliminary Design and Detailed Design Main Street (Echo Drive to the Rideau River), Lees Avenue (Main Street to Chestnut Street), and Rideau River Drive (Main Street to 130m south of Main

More information

East Burke Transportation, Safety and Capacity Improvements

East Burke Transportation, Safety and Capacity Improvements East Burke Transportation, Safety and Capacity Improvements The purpose of this project is to increase mobility and improve safety for pedestrians, cyclists, and motor vehicles along VT Route 114 in the

More information

CTH M Reconstruction

CTH M Reconstruction CTH M Reconstruction ID 5992 09 81 City of Madison, South Pleasant View Road (Cross Country Road Prairie Hill Road) CTH M Dane County Public Information Meeting Thursday, May 24, 2012 6 p.m. to 8 p.m.

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project The City of Edmonton is planning a major bike route on the southside of Edmonton. The Strathcona Bike Route will connect the communities of Strathcona, Garneau and the University area,

More information

Fields of St. Croix HOA Meeting. October 27, 2016

Fields of St. Croix HOA Meeting. October 27, 2016 Fields of St. Croix HOA Meeting October 27, 2016 Welcome! Why are we here? Update on Manning Avenue Phase 2 Project: Project Design Schedule Project Background Importance of Manning Avenue: Primary north-south

More information

Environmental Assessment Airport Road from King Street to Huntsmill Drive Community Working Group (CWG) Orientation November 30, 2017

Environmental Assessment Airport Road from King Street to Huntsmill Drive Community Working Group (CWG) Orientation November 30, 2017 Environmental Assessment Airport Road from King Street to Huntsmill Drive Community Working Group (CWG) Orientation November 30, 2017 Agenda 1. Welcome and Introductions 2. Opening Remarks 3. Project Overview

More information

Sixth Line Development - Transit Facilities Plan

Sixth Line Development - Transit Facilities Plan Memorandum Date: November 13, 2012 To: From: c.c. Subject: Rob Freeman (Freeman Planning) Kevin Phillips Sixth Line Development - Transit Facilities Plan 33016631 This memo was prepared to review the transit

More information

Welcome to the Public Meeting. Red Hill Business Park South Transportation Master Plan Addendum. December 4, :00 p.m. to 8:00 p.m.

Welcome to the Public Meeting. Red Hill Business Park South Transportation Master Plan Addendum. December 4, :00 p.m. to 8:00 p.m. Welcome Welcome to the Transportation Master Plan Addendum December 4, 2012 6:00 p.m. to 8:00 p.m. Please sign-in Background PIC#1 Public Information Centre #1 (PIC#1) was held on June 25, 2012. Feedback

More information

The Bike Buzz in Richland. November 2017 Carl Berkowitz

The Bike Buzz in Richland. November 2017 Carl Berkowitz The Bike Buzz in Richland November 2017 Carl Berkowitz Richland has been growing by leaps and bounds with lots of new homes and roads throughout the community. Recognizing all the growth in the Queensgate

More information

Spring/Summer Traffic and Construction Technical Briefing

Spring/Summer Traffic and Construction Technical Briefing Spring/Summer Traffic and Construction Technical Briefing 1 1. Introduction 2. Infrastructure Investments 3. Impacts to Mobility 4. Transit Operations 5. Mitigation Measures 6. Wrap-Up Overview 2 Infrastructure

More information

Document 2 Safety and Operations of Renaud Road and the Prescott Russell Cycling Trail

Document 2 Safety and Operations of Renaud Road and the Prescott Russell Cycling Trail Document 2 Safety and Operations of Renaud Road and the Prescott Russell Cycling Trail Safety Review of Renaud Road (October 2013) The BECA expressed concerns about the two 90 degree bends in the road

More information

COUNTY ROAD 22 HORSESHOE VALLEY ROAD. Municipal Class Environmental Assessment. simcoe.ca

COUNTY ROAD 22 HORSESHOE VALLEY ROAD. Municipal Class Environmental Assessment. simcoe.ca OCTOBER 2014 Municipal Class Environmental Assessment COUNTY ROAD 22 HORSESHOE VALLEY ROAD Project A Truck Climbing Lanes Project B Intersection Improvements simcoe.ca CORPORATE COMMUNICATIONS DEPARTMENT

More information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction: Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency

More information

LeBreton Flats. National Capital Commission. Pedestrian and Cyclist Plan. Prepared for: By:

LeBreton Flats. National Capital Commission. Pedestrian and Cyclist Plan. Prepared for: By: LeBreton Flats Pedestrian and Cyclist Plan Prepared for: National Capital Commission By: July 2002 TABLE OF CONTENTS 1.0 INTRODUCTION...1 1.1 Background...1 1.2 Study Objectives...2 2.0 POLICY REVIEW...2

More information

CITY OF KINGSTON REPORT TO COUNCIL. Report No.:

CITY OF KINGSTON REPORT TO COUNCIL. Report No.: CITY OF KINGSTON REPORT TO COUNCIL Report No.: 13-072 TO: FROM: RESOURCE STAFF: Mayor and Members of Council Jim Keech, President and CEO, Utilities Kingston Mark Van Buren, Director of Engineering DATE

More information

Casablanca Boulevard & GO Station Access

Casablanca Boulevard & GO Station Access Casablanca Boulevard & GO Station Access Class Environmental Assessment STAKEHOLDER WORKSHOP Thursday September 27th, 2018 5:30PM 8:00PM 1 WORKSHOP PURPOSE Provide an overview of the Design Alternatives

More information

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

Trans-Canada Highway 1 RW Bruhn Bridge Replacement Trans-Canada Highway 1 RW Bruhn Bridge Replacement May 2016 RW Bruhn Bridge Project Objectives Improve safety, traffic flow and movement of goods Improve safety for pedestrians and cyclists Replace the

More information

Cycling Study. Lanark County

Cycling Study. Lanark County Lanark County Cycling Study Prepared by: AECOM Canada Ltd. 302 1150 Morrison Drive, Ottawa, ON, Canada K2H 8S9 T 613.820.8282 F 613.820.8338 www.aecom.com Project Number: 108515 Date: May, 2009 Table of

More information

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017

Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017 WELCOME Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017 Purpose of the Open House The purpose of this Open House is to gain public input on the bicycle lanes proposed

More information

Columbia Pike Implementation Team (CPIT) Meeting

Columbia Pike Implementation Team (CPIT) Meeting Columbia Pike Implementation Team (CPIT) Meeting November 30, 2010 Agenda Introductions / Purpose of Meeting Review of project goals Multimodal project: 10% street design between the curbs Discussion Multimodal

More information

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Solana Beach Comprehensive Active Transportation Strategy (CATS) Solana Beach Comprehensive Active Transportation Strategy (CATS) 3.0 Goals & Policies The Solana Beach CATS goals and objectives outlined below were largely drawn from the Solana Beach Circulation Element

More information

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Atwood Avenue Fair Oaks Avenue Cottage Grove Road Atwood Avenue Fair Oaks Avenue Cottage Grove Road Agenda Purpose Review project scope & goals Present design alternatives Gather feedback Answer Questions Format Open House Presentation Q&A Open House

More information

AGENDA ITEM SUMMARY SPECIAL AGENDA ITEM NO. _1A_

AGENDA ITEM SUMMARY SPECIAL AGENDA ITEM NO. _1A_ AGENDA ITEM SUMMARY AGENCY: City Council MEETING DATE: June 25, 2012 DEPARTMENT: Community Dev PREPARED BY: T Spade DEPT. DIR. APPROVAL: MJ CITY MGR. APPROVAL: LR PRESENTED BY: T Spade TITLE: RECEIVE REPORT

More information

Hospital Link Project Project Update September 2017

Hospital Link Project Project Update September 2017 Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

Tonight is an opportunity to learn about the Study and ask questions of the Study Team members.

Tonight is an opportunity to learn about the Study and ask questions of the Study Team members. Exhibit 1 Welcome Second Open House Tonight is an opportunity to learn about the Study and ask questions of the Study Team members. A first Public Open House was held on September 18th, 2013 which presented

More information

WELCOME! To the Centennial Neighbourhoods Secondary Plan and Transportation Management Plan Information Centre. City of Hamilton

WELCOME! To the Centennial Neighbourhoods Secondary Plan and Transportation Management Plan Information Centre. City of Hamilton WELCOME! To the Centennial Neighbourhoods Secondary Plan and Transportation Management Plan Information Centre City of Hamilton Public Information Centre #2 Dec 1, 2015 CENTENNIAL NEIGHBOURHOODS SECONDARY

More information

Johnwoods Street Closure Summary Response

Johnwoods Street Closure Summary Response Johnwoods Street Closure Summary Response The following provides a summary of the major questions asked at the Public Information Meeting on May 4 th, 2016 and the responses. 1. What was the Approval Process

More information

Appendix O. Assessment of Bicycle Facility Alternatives

Appendix O. Assessment of Bicycle Facility Alternatives Appendix O Assessment of Bicycle Facility Alternatives FINAL ASSESSMENT OF CROSS-SECTION ELEMENTS Lakeshore Road, from Mississaga Street to Dorval Drive Town of Oakville Submitted to: Town of Oakville

More information

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015 City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015 McPhail Transportation Planning Services Ltd. AGENDA 6:00 7:00 pm Viewing Boards / Q & A with the Team 7:00 7:50

More information

We support several of Regional Municipality of Durham Transportation Master Plan Directions such as

We support several of Regional Municipality of Durham Transportation Master Plan Directions such as OATAC-17-26 Relates to Item 1 of the O.A.T.A.C. Report (DS-17-164) We support several of Regional Municipality of Durham Transportation Master Plan Directions such as Direction 3: Make walking and cycling

More information

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS SUMMARY REPORT: COMMUNITY UPDATE MEETING February 6, 2014 6 8:30 p.m. Roosevelt Middle School Library 3366 Park Blvd, San Diego

More information

5 CIRCULATION AND STREET DESIGN

5 CIRCULATION AND STREET DESIGN 5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing

More information

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners DRAFT Corridor study Honeysuckle Road October 2017 Prepared for the City of Dothan, AL Prepared by TABLE OF CONTENTS SECTION I... 1 STUDY SUMMARY... 1 INTRODUCTION... 1 CONCLUSIONS... 5 SECTION II... 7

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

Terwillegar Drive Expressway Draft Concept Plan

Terwillegar Drive Expressway Draft Concept Plan Terwillegar Drive Expressway Draft Concept Plan Anthony Henday Drive to Whitemud Drive November 28 5:00-8:00 p.m. December 1 10:00 a.m. - 3:00 p.m. Let s Talk Today you can: Learn about the new direction

More information

City of Wilsonville 5 th Street to Kinsman Road Extension Project

City of Wilsonville 5 th Street to Kinsman Road Extension Project City of Wilsonville 5 th Street to Kinsman Road Walking Tour & Neighborhood Workshop Summary Report Public Outreach Overview On July 18 th, 2017, the City of Wilsonville hosted a neighborhood walking tour

More information

Planning Guidance in the 2012 AASHTO Bike Guide

Planning Guidance in the 2012 AASHTO Bike Guide Planning Guidance in the 2012 AASHTO Bike Guide Presentation by: RJ Eldridge Peter Lagerwey August 22, 2012 WEBINAR 2: PLANNING GUIDANCE IN THE 2012 AASHTO BIKE GUIDE Today s Webinar Significant Updates

More information

Woodward Hill Elementary School School Safety and Operation Review

Woodward Hill Elementary School School Safety and Operation Review Address: 6082-142 nd Street Surrey, BC, V3X 1C1 Site Visit: March 7, 2011 Principal Anne Mackie Report Date: November 25, 2011 Phone: (604) 594-2408 Email: Mackie_A@sd36.bc.ca The following report is one

More information

State Street and Pierce Park Lane Intersection Concept Report

State Street and Pierce Park Lane Intersection Concept Report State Street and Pierce Park Lane Intersection Prepared for September 2017 Prepared by CITATION Parametrix. 2017. State Street & Pierce Park Lane Intersection. Prepared by Parametrix, Boise, ID. September

More information

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS Page 1 of 9 EXECUTIVE SUMMARY Alberta Transportation ( AT ) is preparing to construct the final sections of the Calgary Ring Road. This includes the South West Ring Road ( SWRR ) (from Lott Creek Blvd

More information

Display Boards Including Five Refined Design Concepts

Display Boards Including Five Refined Design Concepts APPENDIX D Workshop Session 3 Sign-in sheets Agenda Booklet Display Boards Including Five Refined Design Concepts PowerPoint Presentation Questions Recorded Discussion of Preference Exercise AGENDA

More information

Reams Road RCA Study. Board of County Commissioners Public Hearing

Reams Road RCA Study. Board of County Commissioners Public Hearing Reams Road RCA Study Board of County Commissioners Public Hearing April 24, 2018 Presentation Overview Study Overview Existing Conditions Development of Alternatives Preferred Alternative Public Involvement

More information

City of Waterloo Complete Streets Policy

City of Waterloo Complete Streets Policy City of Waterloo Complete Streets Policy Chris Hodgson P. Eng City of Waterloo Complete Streets Forum 2011 April 28-29 Toronto Waterloo context: Current population Major employers Universities and student

More information

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails Chapter 7 Transportation Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails 7.1 TRANSPORTATION BACKGROUND The District of Maple Ridge faces a number of unique

More information

SNCC Demographic Trends

SNCC Demographic Trends Employment Population SNCC Demographic Trends In 1970 the SNCC population was 10,040, accounting for roughly 3% of the County population In 2015, SNCC grew to 60,567 people, roughly 11% of the County population

More information

Edenbrook Hill Drive Traffic Calming Study

Edenbrook Hill Drive Traffic Calming Study WELCOME Public Information Centre Edenbrook Hill Drive Traffic Calming Study Fletchers Meadow Secondary School Wednesday January 20, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming

More information

Bikeable/Walkable Community Plan. Oct. 11, 2012 City Council Workshop

Bikeable/Walkable Community Plan. Oct. 11, 2012 City Council Workshop Bikeable/Walkable Community Plan Oct. 11, 2012 City Council Workshop Background 2006 - O Fallon s population was 72,477. Citizen Survey showed a strong interest in additional bike & pedestrian opportunities.

More information

Welcome to the Sellwood Bridge Project Open House!

Welcome to the Sellwood Bridge Project Open House! Welcome to the Sellwood Bridge Project Open House! 5:30 7:30 pm Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting: Learn how the Preferred

More information

NOTES OF MEETING AIRPORT ROAD (KING STREET TO HUNTSMILL DRIVE) ENVIRONMENTAL ASSESSMENT (EA) COMMUNITY WORKING GROUP (CWG) ORIENTATION SESSION

NOTES OF MEETING AIRPORT ROAD (KING STREET TO HUNTSMILL DRIVE) ENVIRONMENTAL ASSESSMENT (EA) COMMUNITY WORKING GROUP (CWG) ORIENTATION SESSION NOTES OF MEETING AIRPORT ROAD (KING STREET TO HUNTSMILL DRIVE) ENVIRONMENTAL ASSESSMENT (EA) COMMUNITY WORKING GROUP (CWG) ORIENTATION SESSION Thursday, November 30, 2017 6:00 p.m. 8:00 p.m. Caledon Community

More information

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists

Cyclists and Bikeways: What s your match? A guide to bikeway options for a variety of cyclists Cyclists and Bikeways: What s your match? guide to bikeway options for a variety of cyclists The workshop and this resource were made possible by funding from the Province of Ontario via the Ministry of

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

Water Street Promenade Engineering and Design Services

Water Street Promenade Engineering and Design Services Preliminary Design Presentation Parking & Traffic Safety Committee Water Street Promenade Engineering and Design Services July 16,2014 November 3, 2016 Education / Infrastructure / Innovation 1 Project

More information

CHIEF PEGUIS TRAIL EXTENSION WEST

CHIEF PEGUIS TRAIL EXTENSION WEST 1 PRELIMINARY DESIGN OF THE CHIEF PEGUIS TRAIL EXTENSION WEST Public Information Session June 6, 2017 Welcome 1 Thank you for attending today s public information session. The following boards provide

More information

WalkShop. Highland Creek Village

WalkShop. Highland Creek Village On June 5, 2014, 15 people participated in a for the Transportation Master Plan. The purpose of the was to receive feedback from a diverse range of local stakeholders and document existing transportation

More information

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study

More information

Complete Streets: Planning, Policy & Performance

Complete Streets: Planning, Policy & Performance Complete Streets: Planning, Policy & Performance Tell Us About Your CS Experiences Successes Hardships Funding Politics Safety Not every street needs to be complete, but every mode needs a complete network.

More information

5.0 Roadway System Plan

5.0 Roadway System Plan Southwest Boise Transportation Study Page 16 5.0 Roadway System Plan The Roadway System Plan outlines roadway improvements in the Initial Study Area. It forecasts future deficiencies on the arterial system,

More information

Chapter 3 DESIGN SPECIFICATIONS

Chapter 3 DESIGN SPECIFICATIONS Brampton PathWays Planning and Design Guidelines 27 Chapter 3 DESIGN SPECIFICATIONS 3.1 CLASS 1 MULTI-USE PATH Off-road multi-use trails are the backbone of the Brampton PathWays Network. They are typically

More information

Comments The Plan for Port Whitby

Comments The Plan for Port Whitby Comments The Plan for Port Whitby April 24th, 2013 Community Meeting #2 Summary Report Prepared by GLPi April 29th, 2013 1 Introduction The purpose of the Port Whitby Secondary Plan Update, Community Improvement

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY The Caledon Transportation Needs Study has been undertaken as a joint project by the Town of Caledon and the Region of Peel to determine the existing

More information

Transportation Master Plan Advisory Task Force

Transportation Master Plan Advisory Task Force Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved

More information

WELCOME TO OPEN HOUSE # 1 June 14, 2017

WELCOME TO OPEN HOUSE # 1 June 14, 2017 Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE # 1 June 14, 2017 Please sign in and join our mailing list Purpose of Open House #1 & Study Area York

More information

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015 HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE 1 MAY 14, 2015 ACCESSIBILITY Under the Accessibility Standards 2015 for Customer

More information

DATE: October 20, Planning Commission. Beth McKibben, Planner Community Development Department FILE NO.: CSP

DATE: October 20, Planning Commission. Beth McKibben, Planner Community Development Department FILE NO.: CSP DATE: October 20, 2014 TO: FROM: Planning Commission Beth McKibben, Planner Community Development Department FILE NO.: CSP2014 0017 PROPOSAL: Local consistency review of DOT&PF project to remove and replace

More information

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road West Dimond Blvd Jodhpur St to Sand Lake CSS Transportation Project Summary Municipality of Anchorage Project # 05 005 Project Manager: John Smith, P.E. (MOA PM&E) Project Administrator: Julie Makela,

More information

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY DRAFT PLAN City Council Meeting August 14, 2017 STUDY AREA Sedgwick Corridor State Route 160, principal arterial with Class 3 access management designation, commuter and freight route, connection to SR

More information

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION CITY OF TORONTO TRANSPORTATION SERVICES DIVISION 2016 TRAFFIC CALMING GUIDE FOR TORONTO TABLE OF CONTENTS Introduction

More information

Bicycle Traffic Control Signal - St. Clair Avenue West and Poplar Plains Road

Bicycle Traffic Control Signal - St. Clair Avenue West and Poplar Plains Road PW17.11 REPORT FOR ACTION Bicycle Traffic Control Signal - St. Clair Avenue West and Poplar Plains Road Date: November 4, 2016 To: Public Works and Infrastructure Committee From: Acting General Manager,

More information

Project Update May 2018

Project Update May 2018 Project Update May 2018 Dakota County, in cooperation with the City of Lakeville, is planning to reconstruct 202 nd Street West (County Road 50) from Holyoke Avenue to Cedar Avenue (County Road 23). 202

More information

Zlatko Krstulich, P.Eng. City of O9awa

Zlatko Krstulich, P.Eng. City of O9awa Zlatko Krstulich, P.Eng. City of O9awa 1. Introduction to the Ontario Traffic Manual Series 2. What is OTM Book 18: Bicycle Facilities? 3. Study / Committee Team Members 4. Brief overview of the content

More information