1 Final Report East 12 th Street Bikeway Feasibility Study Prepared for: City of Oakland Public Works Agency Submitted by: 180 Grand Avenue, Suite 250 Oakland, CA Phone: (510) ; Fax: (510) Contact: Alice Chen x101 November 19, 2008

2

3 Table of Contents Introduction... 1 Background... 1 Setting... 2 Data Collection... 5 Traffic Volumes... 5 Lane Configuration... 6 On-street Parking... 7 Bicycle and Pedestrian Volumes... 7 Collision Data... 8 Intersection Operations Proposed Bike Lanes Proposed Project Intersection Operations Cumulative Conditions Summary of Recommendations Appendices... 25

4 List of Tables Table 1 Average Daily Traffic Volumes on East 12 th Street... 5 Table 2 Width Measurements at Study Intersections... 6 Table 3 Bicycle and Pedestrian Counts at East 12 th Street Intersections... 8 Table 4 Additional Bicycle Counts... 8 Table 5 Highest Number of Reported Collisions... 9 Table 6 Existing Intersection Level of Service Summary Table 7 Existing with Project Intersection Level of Service Summary Table 8 Existing Intersection Level of Service with Recommendations Table 9 Future (2025) Intersection Level of Service Summary Table 10 Future Intersection Level of Service with Recommendations... 18

5 Introduction The City of Oakland Community and Economic Development Agency is considering the feasibility of bike lanes on East 12 th Street from 2 nd Avenue to Fruitvale Avenue and has retained Dowling Associates to lead this study. This report summarizes the data collection efforts, presents the findings of the feasibility analysis, and provides specific recommendations for implementing the bike lanes along this corridor. Background This study was prepared to assess the feasibility of providing Class II bike lanes on East 12 th Street from 2 nd Avenue to Fruitvale Avenue. For a Class II bike lane, Caltrans Design Standards require a five-foot width for each direction of travel, which would require reconfiguration of East 12 th Street to accommodate the bike lanes. The Alameda Countywide Bicycle Plan shows this section of East 12 th Street as segment BC of the cross county Oakland I-880 corridor (#25). The recent update of the Oakland Bicycle Master Plan identifies several bicycle facilities that link with East 12 th Street providing access to the Estuary and the City of Alameda to the south and to the Oakland hills to the north. Existing and proposed bicycle facilities that cross East 12 th Street include: 4 th /5 th Avenues Class III Bike Route: Proposed from Embarcadero to East 18 th Street. 16 th Avenue Class III Bike Route: Existing/proposed from Embarcadero to Foothill Boulevard Fruitvale Avenue Class II/III Bike Lane/Route: Existing/proposed from Alameda Avenue to Foothill Boulevard. 38 th Avenue Class III Bike Lane: Proposed from East 12 th Street to MacArthur Boulevard. The East 12 th Street Bikeway would connect with the proposed Class II bike lanes on East 12 th /12 th Street to downtown Oakland and the proposed Class III bike route that continues from Fruitvale Avenue to 38 th Avenue. East 12 th Street Bikeway Feasibility Study 1

6 Setting Adjacent Land Uses East 12 th Street runs from downtown Oakland through several East Oakland neighborhoods, including San Antonio and Fruitvale districts. This feasibility study is focused on the segment from 2 nd Avenue at the edge of Lake Merritt to Fruitvale Avenue in East Oakland near the Fruitvale BART station. This corridor is 2.25 miles long. East 12 th Street is an important route for bicycles and automobiles traveling from these neighborhoods to downtown. The general character of East 12 th Street changes from residential and commercial mix to primarily industrial. Several schools are located in close proximity to East 12 th Street, including three elementary schools (La Escuelita, Franklin, and Lazear), two middle schools (Urban Promise and Oakland Charter Academies), one high school (LIFE Academy), two adult schools (Neighborhood Centers and Oakland Evening), and one community college (Laney). Additionally, there is a park (Clinton Square) and a recreational center (Franklin) near East 12 th Street. From 2 nd to 5 th Avenues, East 12 th Street is predominantly residential with some neighborhood serving retail on the ground floor. Photo 1 East 12 th Street at 4 th Avenue From 5 th to 8 th Avenues, it contains offices, a park, a theater, some restaurants and bars, Photo 2 East 12 th Street at 7 th Avenue with residential uses on top of businesses or on side streets. Pedestrian bulb-outs and landscaping have been installed in this segment. East 12 th Street Bikeway Feasibility Study 2

7 From 8 th to 14 th Avenues, the street includes light industrial businesses, smaller warehouses, markets, some offices and residences, and automotive shops. From 14 th to 16 th Avenues westbound, the uses are mostly commercial fronting East 12 th Street, with a fastfood restaurant, a sitdown restaurant, office, and light industrial uses. Residences are located on the side streets. There are no land uses on East 12 th Street eastbound between 14 th and 20 th Avenues. From 16 th to 23 rd Avenues, the street transitions to a more industrial orientation and includes warehouses (retail and industrial), light industrial businesses, and automotive shops. Activities associated with these businesses result in trucks parked along this section of East 12 th Street. BART s elevated train tracks enter East 12 th Street s median near 19 th Avenue. From 23 rd to 26 th Avenues, several automotive shops, coin operated laundry facilities, discount retail warehouses, and fastfood restaurants have frontages along East 12 th Street. Residences are Photo 3 East 12 th Street at 10 th Avenue Photo 4 East 12 th Street at 14 th Avenue (WB) Photo 5 East 12 th Street at Miller Avenue (EB) Photo 6 East 12 th Street between 26 th and 29 th Avenues (WB) East 12 th Street Bikeway Feasibility Study 3

8 generally located on the side streets. From 26 th to 29 th Avenues, there is a middle school and a selfstorage facility. From 29 th to Fruitvale Avenues, there are industrial warehouses, some empty lots or abandoned buildings, and some residences on both East 12 th Street and on the side streets. Photo 7 East 12 th Street at 31 st Avenue (WB) At Fruitvale Avenue, the neighborhood transitions again as it proceeds east towards the BART station. Restaurants, other retail, and civic services become the predominant land uses. Future Conditions Photo 8 East 12 th Street at Fruitvale (EB) Several on-going and proposed projects along the corridor may potentially change the character of East 12 th Street. In addition to the recently completed streetscape improvements from 5 th Avenue to 8 th Avenue, a streetscape study is underway for 14 th Avenue, which includes the two intersections with East 12 th Street. The Fruitvale Alive study identified several improvements along the Fruitvale Avenue corridor, particularly at the intersection with East 12 th Street. The reconstruction and reconfiguration of the 12 th Street Dam project lies directly west of the project towards downtown Oakland. The future development of the Fruitvale Transit Village Phase II and the Fruitvale Gateway would also potentially affect travel patterns along East 12 th Street. The recently approved Oak-to-Ninth development along the estuary may affect the traffic on the cross streets, such as 5 th Avenue and 22 nd Avenue. East 12 th Street Bikeway Feasibility Study 4

9 Data Collection Traffic Volumes Average Daily Traffic Twenty-four hour vehicle traffic counts were conducted at four locations along East 12 th Street on Wednesday, October 11, The weather that day was clear and warm. Morning traffic peaks occurred in the westbound direction (towards downtown Oakland) between 8:00 and 9:00 AM, and evening traffic peaks occurred in the eastbound direction between 4:00 and 6:00 PM. The average daily traffic (ADT) is summarized in Table 1. Table 1 Average Daily Traffic Volumes on East 12 th Street AM PM Location ADT Time Volume Time Volume Between 5 th and 8 th Aves 12,301 8:00-9:00 1,181 5:00-6:00 1,296 Between 19 th and 22 nd Aves 21,921 8:00-9:00 1,892 4:30-5:30 2,334 Between 23 rd and 29 th Aves 16,482 7:45-8:45 1,551 4:30-5:30 1,881 Between 29 th and Fruitvale Aves 15,138 7:45-8:45 1,483 4:30-5:30 1,714 Source: Counts conducted by Wiltec on October 11, Peak Hour Intersection Volumes Peak hour intersection counts were collected for the ten signalized intersections along the corridor. Since recent counts were available for four (4) intersections, peak hour turning movement counts were conducted on October 11, 2006 at the six (6) remaining intersections during the AM and PM peak periods. The AM and PM peak hour volumes for all signalized intersections along the corridor are provide in the technical appendix. East 12 th Street Bikeway Feasibility Study 5

10 Lane Configuration Lane configurations along East 12 th Street in the study area can be summarized by breaking down the segment into 3 parts. From 2 nd Avenue to 13 th Avenue, East 12 th Street has four undivided traffic lanes (two in each direction) with parallel parking. From 13 th Avenue and 19 th Avenue, East 12 th Street becomes a one-way couplet with two or three traffic lanes in each direction. From 19 th Avenue to Fruitvale Avenue, East 12 th Street becomes a divided roadway with two or three traffic lanes in each direction. The roadway cross-section generally provides 2 to 3 travel lanes in each direction. Typical lane widths range from 9.5 to 12 feet and parking is allowed at certain segments of the roadway. Table 2 provides details of curb-to-curb measurements and travel lane widths at the study intersections. Table 2 Width Measurements at Study Intersections Eastbound Approach Westbound Approach Intersection Curb-to-curb Travel Lane Curb-to-curb Travel Lane 5 th Avenue 43 feet (at bulbout) 58 feet (midblock) feet 43 feet (at bulbout) 58 feet (midblock) feet 10 th Avenue 58 feet feet 58 feet feet 14 th Avenue 39 feet feet 52 feet 12 feet 16 th Avenue N/A N/A 58 feet feet 22 nd Avenue 42 feet (including channelized right turn lane) feet 54 feet feet 23 rd Avenue 44 feet feet 43 feet feet 29 th Avenue 49 feet (including channelized right turn lane) feet 43 feet feet Fruitvale 14 feet (at bulbout, through lane only) 22 feet (midblock, through lane only) 14 feet 36 feet feet East 12 th Street Bikeway Feasibility Study 6

11 On-street Parking Between 2nd and 13th Avenues, there are 4 travel lanes (2 lanes in each direction) with parallel parking on both sides of the roadway and left turns are unrestricted. Between 5th and 8th Avenues, pedestrian bulb-outs are located at each intersection, which reduces curb-to-curb widths. From 13 th Avenue to Photo 9 -Pedestrian bulb-out at 8 th Avenue Fruitvale, the roadway is divided. There are generally two to three travel lanes in each direction, and left turns are prohibited at some intersections, including eastbound left turns at 22 nd Avenue and westbound left turns at 23 rd Avenue. On-street parking is provided along most of the corridor. If on-street parking is provided, most is parallel parking. In the eastbound direction, parking is prohibited between 13 th and 18 th Avenues, 22 nd and 23 rd Avenues, and 26 th to 29 th Avenues. In the westbound direction, parking is prohibited between 22 nd and 23 rd Avenues, and between 26 th and 29 th Avenues. Between 13 th and 18 th Avenues, parking is permitted on the north side and south side. Between 18 th and 16 th Avenues on the south side, vehicles park at a 45-degree angle even though the parking spaces are unmarked. Bicycle and Pedestrian Volumes Peak period bicycle and pedestrian counts were conducted on Wednesday, October 11 at nine (9) locations on East 12 th Street. A summary of bicycle and pedestrian counts is provided in Table 3. East 12 th Street Bikeway Feasibility Study 7

12 Table 3 Bicycle and Pedestrian Counts at East 12 th Street Intersections AM Peak Period PM Peak Period (7:00 to 9:00) (4:00 to 6:00) Intersection Pedestrians Bicyclists Pedestrians Bicyclists East 12 th Street at 5 th Avenue East 12 th Street at10 th Avenue East 12 th Street at14 th Avenue (north) East 12 th Street at14 th Avenue (south) East 12 th Street at16 th Avenue nd Avenue rd Avenue th Avenue Fruitvale Avenue Source: Data collected by Wiltec, October In addition to counts at the intersections, bicycles mounted on bus racks, bicyclists riding on the wrong side of the roadway, and bicyclists riding on the sidewalk were counted separately at 5 th Avenue, 29 th Avenue, and Fruitvale Avenue. A summary of bicycles mounted on buses, bicyclists on sidewalk, and wrong-way riding bicyclists is provided in Table 4. Table 4 Additional Bicycle Counts Bikes Mounted on Bus Racks Bicyclist on Sidewalk Wrong-way Riding Intersection AM PM AM PM AM PM 5 th Avenue th Avenue Fruitvale Avenue Source: Data collected by Wiltec, October Collision Data Collision data for East 12 th Street from the Statewide Integrated Traffic Reporting System (SWITRS) was provided by the City for the period of April 1, 2002 to March 31, During this four-year period, a total of 242 collisions were reported along East 12 th Street 1 Data provided was missing collisions from January 1, 2005 to March 31, East 12 th Street Bikeway Feasibility Study 8

13 from 2 nd Avenue to Fruitvale Avenue. Total reported collisions averaged about 60 collisions per year. Of these reported collisions, only one collision involved a bicycle (at Fruitvale Avenue) and 11 involved pedestrians. The primary collision factors most often cited were improper turning (46), auto right-of-way violation (42), traffic signals and signs (41, and unsafe speed (37). Most of the collisions (63%) occurred between the 9:00 am and 6:00 pm during daylight hours. The ten intersections with the highest numbers of collisions are listed in Table 5. The location with the highest number of collisions is the intersection of East 12 th Street and 22 nd Avenue with 30 reported collisions. With 22 nd Avenue providing access across I-880 and then over to Alameda, the intersection is designed to facilitate those movements to and from 22 nd Avenue south of East 12 th Street. The intersection of 14 th Avenue was the second highest with 16 reported collisions. Based on the available average daily traffic (ADT) volumes for East 12 th Street, a collision rate per 1,000 ADT was calculated. When the exposure is considered, the collision rate at 22 nd Avenue continues to be the highest at 1.37 collisions per 1000 ADT, but the intersection of East 12 th Street and 2 nd Avenue is a close second with 1.33 collisions per 1000 ADT. Table 5 Highest Number of Reported Collisions Intersection of East 12 th Street Reported Collisions Average Daily Traffic Collision Rate (per 1,000 ADT) 22nd Avenue 30 21, th Avenue 20 22, nd Avenue 16 12, th Avenue 14 16, rd Avenue 13 16, th Avenue 11 12, th Avenue 10 12, th Avenue 8 12, th Avenue 8 16, th Avenue 7 12, Source: SWITRS 4/1/2002 to 3/31/2006 (missing data from January 1, 2005 to March 31, 2005). East 12 th Street Bikeway Feasibility Study 9

14 Intersection Operations For the intersection operations, the level of service (LOS) was calculated using the Synchro software program. For this analysis, current signal timing sheets were provided by the City. Other inputs, such as lane configurations, lane widths, and turn pocket lengths, were based of measurements in the field and observations of the operations of the intersection. The LOS was calculated using the Highway Capacity Manual (HCM) operations method. The results are summarized in Table 6. All signalized intersection operate at LOS C or better in both the AM and PM peak hours, which meet the City s LOS D standard for signalized intersections in this area. Most of the signalized intersections operate with little delay during the peak hour, particularly on East 12 th Street in the eastbound and westbound directions. The exception would be the intersection of East 12 th Street at Fruitvale Avenue. The average intersection delay is 32.7 seconds during the PM peak hour, but the delay for the eastbound left-turn movement on East 12 th Street is 69.8 seconds, which is LOS E. Table 6 Existing Intersection Level of Service Summary AM Peak Hour PM Peak Hour Intersection LOS Delay LOS Delay E. 12 th Street at 2 nd Avenue B 14.8 C 28.6 E. 12 th Street at 5 th Avenue B 15.5 B 18.9 E. 12 th Street at 10 th Avenue A 3.8 A 4.2 E. 12 th Street at 14 th Avenue (north) B 11.8 A 8.7 E. 12 th Street at 14 th Ave (south)/8 th St A 7.5 B 17.1 E. 12 th Street at 16 th Avenue A 9.8 B 11.1 E. 12 th Street at 22 nd Avenue C 23.8 C 30.9 E. 12 th Street at 23 rd Avenue B 10.3 A 8.6 E. 12 th Street at 29 th Avenue B 12.8 C 23.7 E. 12 th Street at Fruitvale Avenue C 30.2 C 32.7 Source:, East 12 th Street Bikeway Feasibility Study 10

15 Proposed Bike Lanes The proposed project is the installation of Class II bike lanes on both sides of East 12 th Street roadway between 2 nd Avenue and Fruitvale Avenue. To accommodate bike lanes in each direction, curb-to-curb cross-sections were compared to the following minimum and preferred cross-sections for bike lanes to determine if vehicle travel lanes will need to be removed to accommodate the bike lane: Preferred widths: 11-foot travel lanes, 8-foot parallel parking lanes, 18.5-foot 45-degree angle parking lanes, and 6-foot bike lane in each travel direction. Minimum widths: 11-foot outside travel lanes, 10-foot inside travel lanes, 7-foot parallel parking lanes, 18.5-foot 45-degree angle parking lanes, and 5-foot bike lane in each travel direction. Proposed Project Between 2 nd Avenue and 13 th Avenue, the roadway is currently four lanes (two lanes westbound and two lanes eastbound) with parallel parking on both sides. The bike lanes would reduce this roadway to three travel lanes (one westbound lane and one eastbound lane with a median two-way left turn lane) and maintain the parallel parking on both sides. This configuration would be similar to the T3 Cross Section described in the Bicycle Master Plan Update. Between 13 th Avenue and 19 th Avenue, the one-way couplet would be wide enough to provide two travel lanes with parallel parking on both sides, where parking currently exists on the eastbound roadway. A minimum of 40 feet would be required, as identified for W2 Cross Section described in the Bicycle Master Plan Update. From 19 th Avenue to Fruitvale, where the roadway is divided by the wide median containing the BART overhead structure, the bike lane would require a minimum of 33 feet in each direction to provide two travel lanes one 10 and one 11 adjacent to the bike lane - with a minimum 7 parking lane. East 12 th Street Bikeway Feasibility Study 11

16 Intersection Operations With the addition of bike lanes on East 12 th Street, the intersection analysis was conducted assuming that one travel lane would be removed to accommodate the bike lane, unless sufficient curb-to-curb was available to maintain existing intersection geometries with the bike lane. The effects on the traffic operations at these key intersections along the corridor are summarized in Table 7. Table 7 Existing with Project Intersection Level of Service Summary Existing With Bike Lanes Time Intersection Period LOS Delay LOS Delay E. 12 th Street at 2 nd Avenue E. 12 th Street at 5 th Avenue E. 12 th Street at 10 th Avenue E. 12 th Street at 14 th Avenue (north) E. 12 th Street at 14 th Ave (south) and 8 th St E. 12 th Street at 16 th Avenue E. 12 th Street at 22 nd Avenue E. 12 th Street at 23 rd Avenue E. 12 th Street at 29 th Avenue E. 12 th Street at Fruitvale Avenue Source:, AM B 14.8 B 15.9 PM C 28.6 C 33.3 AM B 15.5 C 20.5 PM B 18.9 B 24.2 AM A 3.8 A 8.6 PM A 4.2 A 7.5 AM B 11.8 B 11.3 PM A 8.7 A 8.4 AM A 7.5 A 9.0 PM B 17.1 C 26.5 AM A 9.8 B 11.8 PM B 11.1 B 11.7 AM C 23.8 C 24.1 PM C 30.9 E 59.6 AM B 10.3 B 10.5 PM A 8.6 A 9.0 AM B 12.8 B 13.0 PM C 23.7 C 25.3 AM C 30.2 C 30.4 PM C 32.7 C 34.2 East 12 th Street Bikeway Feasibility Study 12

17 With the bike lanes on East 12 th Street, most of the signalized intersections would continue to operate at LOS D or better, which meets the City standard, except as noted below. A summary of Existing LOS results with recommendations are shown in Error! Reference source not found.. Table 8 Existing Intersection Level of Service with Recommendations Existing With Bike Lanes With Recommendation Time Intersection Period LOS Delay LOS Delay LOS Delay AE. 12 th Street at 2 nd AM B 14.8 B 15.9 B 17.9 Avenue PM C 28.6 C 33.3 D 42.9 E. 12 th Street at 5 th Avenue AM B 15.5 C 20.5 B 14.5 PM B 18.9 B 24.2 B 18.6 E. 12 th Street at 10 th AM A 3.8 A 8.6 A 5.9 Avenue PM A 4.2 A 7.5 A 7.2 E. 12 th Street at 14 th AM B 11.8 B 11.3 B 11 Avenue (north) PM A 8.7 A 8.4 A 8.4 E. 12 th Street at 14 th Ave AM A 7.5 A 9 B 10.7 (south) and 8 th St PM B 17.1 C 26.5 C 20.9 E. 12 th Street at E. 8 th St AM C 30.9 A 6.1 merge PM F B 14.9 E. 12 th Street at 16 th AM A 9.8 B 11.8 B 11.8 Avenue PM B 11.1 B 11.7 B 11.7 E. 12 th Street at 22 nd AM C 23.8 C 24.1 C 23.8 Avenue PM C 30.9 E 59.6 C 30 E. 12 th Street at 23 rd AM B 10.3 B 10.5 B 10.5 Avenue PM A 8.6 A 9 A 9 E. 12 th Street at 29 th AM B 12.8 B 13 B 13 Avenue PM C 23.7 C 25.3 C 25.3 E. 12 th Street at Fruitvale AM C 30.2 C 30.4 C 30.4 Avenue PM C 32.7 C 34.2 C 34.2 Source:, East 12 th Street Bikeway Feasibility Study 13

18 East 12 th Street at 22 nd Avenue The intersection of East 12 th Street at 22 nd Avenue would operate below the City standard at LOS E during the PM peak hour. With the bike lane, the eastbound approach, which is the critical movement at 22 nd Avenue, would experience excessive delays due to the loss of one eastbound through lane. Recommendation: Because of the limited right-of-way and intensive land uses of this section of the corridor, roadway widening is not possible to accommodate bicycle lanes while maintaining existing travel and parking lanes. Excessive delays can be reduced by removing the bike lane and replacing it with Sharrows (pavement markings indicating a travel lane for shared use by bicyclists and motorists) in the eastbound direction from 21 st Avenue to 22 nd Avenue in order to maintain existing travel lanes. Maintaining travel lanes at preferred widths would return the intersection operations to LOS C in the PM peak-hour. East 12 th Street at 14 th Avenue (south) and East 8 th Street In addition, the LOS for the intersection of East 12 th Street at 14 th Avenue (south) and 8 th Street assumes the existing channelized freeright turn from 8 th Street would remain. However, to address potential conflicts with bicyclists at the merge on East 12 th Street, the additional analysis considered options to control the high speed free right-turn from 8 th Street. If the free right-turns are controlled at the existing signal at this location, LOS F conditions would result due to the delays to the northbound right turns combined with the delays for the southbound left turn movement. Recommendation: At the East 8th Street merge onto East 12th Street, a bicycle refuge and actuated traffic signal are recommended at the existing island to control eastbound vehicle movement that currently enters freely onto East 12th Street from East 8th Street. (See Appendices for discussion of Caltrans signal warrants.) Because of the limited widths, challenging geometrics, and high vehicle volumes and speeds, the bike lane will be suspended from the bicycle refuge island until the threeto-two travel lane merge, which is a total distance of 545 feet. As such, the signal phase for bicyclists will provide 30 seconds of all-red time in order to provide enough time for bicyclists to get into the resumed bike lane before vehicles from East 8th Street will be given a green phase. Assuming twenty-five bicycle calls per hour, the new traffic signal to control the free right-turns from East 8 th Street to East 12 th Street would cause excessive delay to eastbound through vehicles entering East 12 th Street from East 8 th Street during the PM peak hour. The East 12 th Street Bikeway Feasibility Study 14

19 delay is primarily due to the 30 seconds of all red signal time bicyclists would need to get from the refuge island to where the bike lane restarts 545 feet east. Additionally, there is a risk that excessive delays, all red time, and long cycle lengths would lead to noncompliance problems by both bicyclists and vehicles. The existing travel lanes can be maintained with bike lanes from 14 th Avenue to the 16th Avenue ramp. In order to maintain existing travel lanes and provide bike lanes from the 16th Avenue ramp to the three-lane to two-lane merge, the roadway will need to be widened for a length of 245 feet by a width of 4 feet. Making these changes to the roadway, the traffic signal cycle length can be shortened due to the bike lane being located in close proximity to the bicycle refuge island and would result in LOS B in the PM peak-hour. East 12 th Street Bikeway Feasibility Study 15

20 Cumulative Conditions To assess the cumulative conditions with and without the proposed bike lanes, forecasts of future turning movement volumes were developed based on the latest Oakland Cumulative Growth Scenario and available forecasts from previous studies, including the 12 th Street Reconstruction project, the Oak-to-Ninth EIR, and other on-going studies for developments along the corridor, which include the preliminary analyses for the Fruitvale Transit Village Phase II and the Fruitvale Gateway developments. For locations where cumulative forecasts were not available from previous studies, the model growth between 2005 and 2025 was used to estimate the future link volumes, which were then proportioned based on the existing turning movement volumes and compared to the forecasts for adjacent intersections and adjusted for consistency. However, it should be noted that these cumulative forecasts assumed the existing lane configurations on East 12 th Street. With the lane reductions as part of the proposed bike lanes, the current forecasts may overstate future growth along East 12th Street. These forecasts do not account for modal, temporal or spatial changes due to the bike lanes. With an improved bicycle facility, some trips may shift from auto to bicycle. Some traffic may shift to earlier or later time periods to avoid congestion or from East 12th Street to parallel routes, such as 8th Street, International Boulevard, 15th Street, and Foothill Boulevard due to the reduce capacity on East 12th Street with the implementation of the bike lanes. Without further detailed analysis, the vehicular traffic volume assumptions under cumulative conditions are considered as a worst-case condition. The future intersection LOS analysis assumed existing signal timings and maintenance of the existing left-turn pockets along East 12 th Street. As summarized in Table 9, several intersections would operate below the City standard. The following five intersections would operate at LOS E or F without the bike lanes: East 12 th Street at 5 th Avenue East 12 th Street at 14 th Avenue (South) - East 8 th Street East 12 th Street at 22 nd Avenue East 12 th Street at 29 th Avenue East 12 th Street at Fruitvale Avenue East 12 th Street Bikeway Feasibility Study 16

21 Table 9 Future (2025) Intersection Level of Service Summary Future With Bike Lanes Time Intersection Period LOS Delay LOS Delay E. 12 th Street at 2 nd Avenue E. 12 th Street at 5 th Avenue E. 12 th Street at 10 th Avenue E. 12 th Street at 14 th Avenue (north) E. 12 th Street at 14 th Ave (south) and 8 th St E. 12 th Street at 16 th Avenue E. 12 th Street at 22 nd Avenue E. 12 th Street at 23 rd Avenue E. 12 th Street at 29 th Avenue E. 12 th Street at Fruitvale Avenue Source:, AM D 46.0 D 46.0 PM C 34.9 C 28.2 AM C 29.3 F PM E 69.2 F AM A 6.2 F PM A 4.1 E 77.4 AM B 17.6 B 19.7 PM B 12.4 B 13.8 AM C 23.0 C 27.9 PM E 76.5 F AM B 12.5 C 22.6 PM C 27.1 C 29.0 AM C 27.7 C 28.9 PM E 66.1 F AM B 15.3 B 15.9 PM B 13.9 B 14.9 AM B 18.0 B 19.1 PM F F AM D 39.3 D 39.6 PM E 67.2 E 76.4 With the addition of bike lanes on East 12 th Street, operations at study intersections would deteriorate significantly at 5 th Avenue during the AM peak hour and 10 th Avenue during the AM and PM peak hours. The bike lane would further degrade substandard conditions at 5 th Avenue during the AM peak hour and 14 th Avenue (South)-East 8 th Street, 22 nd Avenue, 29 th Avenue, and Fruitvale Avenue during the PM peak hour. A summary of 2025 LOS results with recommendations is shown in Table 10. East 12 th Street Bikeway Feasibility Study 17

22 Table 10 Future Intersection Level of Service with Recommendations Intersection E. 12 th Street at 2 nd Avenue E. 12 th Street at 5 th Avenue Future (2025) With Bike Lanes With Recommendation Time Period LOS Delay LOS Delay LOS Delay AM D 46.0 D 46.0 D 43.4 PM C 34.9 C 28.2 D 35.2 AM C 29.3 F C 33.6 PM E 69.2 F E 68.9 E. 12 th Street at 10 th AM A 6.2 F C 27.6 Avenue PM A 4.1 E 77.4 C 29.1 E. 12 th Street at 14 th AM B 17.6 B 19.7 B 19.9 Avenue (north) PM B 12.4 B 13.8 B 13.9 E. 12 th Street at 14 th Ave AM C 23.0 C 27.9 C 21.5 (south) and 8 th St PM E 76.5 F D 43.0 E. 12 th Street at E. 8 th St AM C 23.4 A 5.4 merge PM F B 16.5 E. 12 th Street at 16 th AM B 12.5 C 22.6 C 22.6 Avenue PM C 27.1 C 29.0 C 29.0 E. 12 th Street at 22 nd AM C 27.7 C 28.9 C 27.6 Avenue PM E 66.1 F E 65.6 E. 12 th Street at 23 rd AM B 15.3 B 15.9 B 15.9 Avenue PM B 13.9 B 14.9 B 14.9 E. 12 th Street at 29 th AM B 18.0 B 19.1 B 19.1 Avenue PM F F F E. 12 th Street at Fruitvale AM D 39.3 D 39.6 D 39.6 Avenue PM E 67.2 E 76.4 E 67.0 Source:, East 12 th Street at 5 th Avenue During the AM peak hour, the delay increases resulting in a change from LOS C to LOS F with the bike lanes. The LOS further deteriorates in the PM peak hour due to lane reduction and upstream changes to the roadway from the installation of bike lanes. East 12 th Street Bikeway Feasibility Study 18

23 Recommendation: Maintain the existing bulb-outs and two travel lanes in each direction at 5 th Avenue. Sharrows would be installed on the outside travel lanes. With this recommendation, the intersection delay would be similar to that experienced under No Project conditions. The difference in delay can be attributed to the recommended changes to the signal at 10 th Avenue. East 12 th Street at 10 th Avenue The intersection of East 12 th Street and 10 th Avenue drops to LOS F during the AM peak hour and LOS E during the PM peak hour with the bike lane due to the reduced capacity on East 12 th Street. Recommendation: Bike lanes would need to be removed in order to provide for greater through-lane capacity for eastbound and westbound vehicles. However, because of low northbound and southbound vehicle volumes and low pedestrian volumes, bike lanes could be maintained at this intersection if a semi-actuated traffic signal were installed to prioritize eastbound and westbound traffic movements. Installing an actuated, uncoordinated signal at this intersection, with minimum pedestrian crossing times, would result in LOS C with 27.6 seconds of delay during the AM peak hour and 29.1 seconds of delay during the PM peak hour. East 12 th Street at 14 th Avenue (south) East 8 th Street At 14 th Avenue (South) East 8 th Street in the PM peak-hour, deterioration of LOS results primarily from separating the free rightturns from East 8 th Street to a new signal where East 8 th Street merges with East 12 th Street. With this shift, the intersection average delay increases. The excessive delays experienced by the northbound through movements are no longer averaged with the high volumes of free northbound right turns, which experience minimal delays. Recommendation: Curb-to-curb widths of 44 feet along this roadway allow for the restriping eastbound East 8 th Street from 12 th Avenue to 14 th Avenue to increase vehicle travel lanes from the existing three lanes to four lanes, which will result in three lanes feeding onto northbound 14 th Avenue and one lane feeding onto eastbound East 12 th Street. Doing so would reduce the delays at 14 th Avenue (south) and result in LOS D in the PM peak-hour. Assuming twenty-five bicycle calls per hour, the new traffic signal at the East 8 th Street East 12 th Street merge does not operate at acceptable LOS in the PM peak hour. The same recommendation discussed under Existing conditions would reduce the delays. There is East 12 th Street Bikeway Feasibility Study 19

24 enough width to maintain existing travel lanes with bike lanes from 14 th Avenue to the 16th Avenue ramp. In order to maintain existing travel lanes and provide bike lanes from the 16th Avenue ramp to the three-lane to two-lane merge, the roadway will need to be widened for a length of 245 feet by a width of 4 feet. Making these changes to the roadway, the traffic signal cycle length can be shortened due to the bike lane being located in close proximity to the bicycle refuge island and would result in LOS B in the PM peak-hour. East 12 th Street at 22 nd Avenue At 22 nd Avenue, the reduction in travel lanes with bike lanes in the eastbound direction would result in excessive delays during the PM peak hour. Specifically, the eastbound through traffic and the westbound left turns would operate at LOS F with the bike lanes. Modifications to the traffic signal phasing and cycle length could not mitigate this intersection to an acceptable level of service due to the heavy westbound left turn volumes. The other option explored of parking removal to accommodate the bike lane would create design and safety issues, as bicyclists would be shifted to the far right for a few hundred feet only to be forced to transition to the left of the dedicated right-turn lane as they approach the intersection. Recommendation: At 22 nd Avenue, the recommendation is to remove the bike lane and replace it with Sharrows in the eastbound direction from 21 st Avenue to 22 nd Avenue in order to maintain existing travel lanes. Maintaining travel lanes at preferred widths would return the intersection operations to LOS E in the PM peak-hour. East 12 th Street at 29 th Avenue The intersection delay increases slightly at 29 th Avenue in the PM peak hour due to lane width reductions from 12-foot to 11-foot lanes on the eastbound approach with the bike lanes. Recommendation: Optimizing signal splits at 29 th Avenue decreases delay to better than it was under No Project conditions, although it still operates at LOS F in the PM peak-hour. The existing signal cycle length would be maintained. East 12 th Street at Fruitvale Avenue The intersection delay increases slightly at Fruitvale Avenue in the PM peak hour due to lane width reduction from a 14-foot to 11-foot lane for the eastbound through traffic with the bike lanes. East 12 th Street Bikeway Feasibility Study 20

25 Recommendation: Optimizing signal splits at Fruitvale Avenue returns the project to a similar delay experienced under No Project conditions, although it still operates at LOS E in the PM peak-hour, primarily due to northbound left, eastbound through and eastbound left operational issues. The existing signal cycle length would be maintained. Summary of Recommendations Based on the analysis of intersection operations under Existing and 2025 conditions, the following general lane configurations are recommended for the proposed bikeways on East 12 th Street with specific modifications at intersections to improve safety and operations with the bike lane as well as address substandard intersection operations. Existing parking lanes are maintained unless otherwise specified. 2 nd Avenue to 5 th Avenue Maintain existing travel lanes using minimum widths. Install Sharrows in both directions on the outer travel lanes. East 12th Street at 5th Avenue Maintain existing lane configurations with minimum lane widths on East 12 th Street. 5 th Avenue to 13 th Avenue East of 5 th Avenue, transition from 2 travel lanes in each direction to 1 travel lane in each direction and one two-way left turn median using minimum widths to provide for installation of the bike lane. Continue this configuration to 13 th Avenue. East 12th Street at 10 th Avenue Reduce existing travel lanes from two to one in each direction with dedicated left-turn pockets to install bike lanes on East 12 th Street. Replace existing pre-timed traffic signal with an actuated, uncoordinated signal with minimum crossing times for pedestrians and pedestrian countdown signals. East 12 th Street Bikeway Feasibility Study 21

26 13th Avenue to 21st Avenue From 13 th Avenue to 16th Avenue ramp eastbound, transition at 13 th Avenue and maintain three lanes eastbound using preferred widths with bike lane and existing no parking lane. East 12 th Street at 14 th Avenue (south) and 8 th Street Use preferred widths to install bike lane and maintain existing lane configurations on East 12 th Street. Increase the number of northbound through lanes from East 8 th Street onto 14 th Avenue from 2 to 3 lanes from re-striping East 8 th Street between 12 th and 14 th Avenues using preferred lane widths. On East 8 th Street, this would result in three lanes for vehicles heading through to 14 th Avenue and one for vehicles merging onto East 12 th Street. At the East 8th Street East 12th Street merge, there are currently raised bars located for 300 feet east of the merge to prevent vehicles from East 8th Street from weaving into traffic coming from East 12th Street and onto the 16th Avenue ramp. However, these raised bars also trap bicyclists coming eastbound on East 12th Street between two lanes of fastmoving traffic. As a result, it is proposed to install an actuated uncoordinated bicycle signal and create a bicycle refuge at the existing island at the East 8 th Street East 12 th Street merge eastbound. From 16 th Avenue ramp to 21 th Avenue eastbound, widen roadway by 4 feet for a length of 245 feet and begin merge from three lanes to two lanes after the 16th Avenue ramp to accommodate bike lane using preferred widths. Bike lane after the merge can fit within the given roadway widths using preferred widths. A handful of parking spaces at the 19 th Avenue intersection may need to be removed. However, there are no land uses in close proximity to these parking spaces. From 21 st Avenue to 16 th Avenue westbound, reduce travel lanes from three to two lanes and install bike lane using preferred widths. East 12 th Street at 16 th Avenue (westbound only) Reduce number of travel lanes from three to two and use preferred widths to install bike lanes on East 12 th Street. From 16 th Avenue to 13 th Avenue westbound, maintain existing travel lanes and parking configuration using minimum widths up to 14 th Avenue. Preferred widths can be used for the transition from two to one lane approaching 13 th Avenue. A handful of parking East 12 th Street Bikeway Feasibility Study 22

27 spaces may need to be removed on the north side to accommodate the merge and bike lanes. East 12 th Street at 14 th Avenue (north) Use minimum widths and maintain existing lane configurations to install bike lanes on East 12 th Street. 21st Avenue to 29th Avenue From 21 st Avenue to 22 nd Avenue eastbound, maintain existing travel lanes using preferred widths and install Sharrows on the outside lane, suspending the bike lane. From 22 nd Avenue to 29 th Avenue eastbound, reduce travel lanes from three to two lanes using preferred widths and install bike lanes. From 23 rd Avenue to 21 st Avenue westbound, maintain existing travel lanes and install bike lanes using minimum widths. East 12th Street at 22nd Avenue In the eastbound direction, maintain existing travel lanes using preferred widths and suspend bike lane In the westbound direction, maintain existing travel lanes using minimum widths to install bike lane. East 12th Street at 23rd Avenue In the eastbound direction, reduce number of travel lanes using preferred widths to install bike lane. In the westbound direction, maintain existing travel lanes using minimum widths to install bike lane. From 29 th Avenue to 23 rd Avenue westbound, generally maintain existing travel lanes (with a reduction from 3 to 2 travel lanes west of 29 th Avenue for the length needed to get the bike lane past the raised island for southbound right turning vehicles) and install bike lanes using preferred widths. 29th Avenue to Fruitvale Avenue From 29 th Avenue to 30 th Avenue eastbound, maintain existing travel lanes and install bike lanes using preferred widths. From 30 th Avenue to the Fruitvale Avenue split eastbound, reduce travel lanes from three to two lanes and install bike lanes using East 12 th Street Bikeway Feasibility Study 23

28 preferred widths. Bike lanes are to be continued to Fruitvale Avenue next to the eastbound through lane. From Fruitvale Avenue to 29 th Avenue westbound, maintain existing travel lanes and install bike lanes using preferred widths. East 12th Street at 29th Avenue Maintain existing lane configurations using preferred widths to install bike lanes in both directions on East 12 th Street. East 12th Street at Fruitvale Avenue Maintain existing lane configurations in the eastbound through direction using preferred widths. End bike lane in the eastbound direction approaching the bulb-out or modify the bulb-out to allow a continuous bike lane. Begin westbound bike lanes west of Fruitvale Avenue. East 12 th Street Bikeway Feasibility Study 24

29 Appendices Caltrans Bicycle Signal Warrants A bicycle signal is proposed at the East 8 th Street East 12 th Street merge in order to facilitate bicycle movements across the existing uncontrolled movement by vehicles onto East 12 th Street from East 8 th Street (essentially, these movements are a free right turn at the 14 th Avenue intersection). Raised bars located for 300 feet east of the merge prevent vehicles from East 8 th Street from weaving across East 12 th Street onto the 16th Avenue ramp, but also trap bicyclists coming eastbound on East 12 th Street between two lanes of fast-moving traffic. For this reason, a bicycle refuge and actuated bicycle signal is proposed at the East 8 th Street East 12 th Street merge. Bicycle signals are used to direct bicyclists to take specific actions and may be used to address an identified safety or operational problem involving bicyclists. In order to install a bicycle signal on a facility under the State of California s jurisdiction, the bicycle signal must meet the following criteria according to the California Manual on Uniform Traffic Control Devices (MUTCD): 1. Bicycle signal must be used in combination with an existing traffic signal 2. Volumes: Bicycle intersection volumes must be greater than 50 and bicycle volumes times vehicle volumes at the intersection must be greater than 50,000 in the same peak-hour. 3. Collision: When 2 or more bicycle/vehicle collisions of types susceptible to correction by a bicycle signal have occurred over a 12-month period and the responsible public works official determines that a bicycle signal will reduce the number of collisions. 4. Geometric: (a) Where a separate bicycle/multi use path intersects a roadway. (b) At other locations to facilitate a bicycle movement that is not permitted for a motor vehicle. 2 For this Proposed Project, Criterion 1 is met as the vehicle movements are originating from the signalized intersection of 14 th Avenue and the bicycle signal would be installed to control the existing free right movements. Criterion 2 is not met under existing conditions, primarily because conditions in the eastbound direction at this intersection discourage bicyclists (there are 5 bicyclists in the AM and 2 MUTCD 2003 California Supplement (September 26, 2006), Sections 4C.102(CA) and 4D.104(CA), East 12 th Street Bikeway Feasibility Study 25

30 1 bicyclist in the PM peak-hours). However, it is assumed that 50 bicyclists per hour are reasonable in the peak-hours once bike lanes are installed and improvements are implemented at this intersection. If 50 bicyclists are anticipated, the bicycle volumes multiplied by vehicle volumes will be far greater than 50,000 under both peak-hours under Existing and 2025 conditions. Criterion 3 is not met, as there has been only one bicycle-involved collision reported over a five-year period and it wasn t at this intersection. However, as stated before, the configuration at this intersection actively discourages bicyclists. Criterion 4 is met for condition (b). In the interest of safety and promoting bicycle use along East 12 th Street, it is assumed that the City of Oakland will consider installing a bicycle signal at the East 8 th Street East 12 th Street merge. East 12 th Street Bikeway Feasibility Study 26

31 Level of Service Calculations Intersection levels of service were calculated using the 2000 Highway Capacity Manual methodologies, which were implemented by Synchro software, version 7, build 763. The detailed calculations for each intersection follow and are ordered: Existing AM Peak-Hour No Project Existing PM Peak-Hour No Project Existing AM Peak-Hour with Bike Lanes Existing PM Peak-Hour with Bike Lanes Cumulative 2025 AM Peak-Hour No Project Cumulative 2025 PM Peak-Hour No Project Cumulative 2025 AM Peak-Hour with Bike Lanes Cumulative 2025 PM Peak-Hour with Bike Lanes Existing AM Peak-Hour with Bike Lanes - Mitigated Existing PM Peak-Hour with Bike Lanes - Mitigated Cumulative 2025 AM Peak-Hour with Bike Lanes - Mitigated Cumulative 2025 PM Peak-Hour with Bike Lanes - Mitigated East 12 th Street Bikeway Feasibility Study 27

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc.

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc. CITY OF OAKLAND 27th Street Bikeway Feasibility and Design Final Report (v3) March 23, 2007 PREPARED BY: Kimley-Horn and Associates, Inc. Table of Contents 1. Introduction 3 2. 27 th Street/Bay Place Corridor

More information

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN HARRISON STREET/OAKLAND AVENUE Community Workshop #4: Draft Plan Review December 3, 2009 D E S I G N, C O M M U N I T Y & E N V I R O N M E N T INTRODUCTIONS Key Project Staff: Alisa Shen, Project Manager,

More information

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Aaron Elias, Bill Cisco Abstract As part of evaluating the feasibility of a road diet on Orange Grove Boulevard in Pasadena,

More information

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677 Transportation Impact Analysis Sierra College Boulevard Commercial Project City of Rocklin Prepared for: David Mohlenbrok City of Rocklin 081 Alvis Court Rocklin, CA 95677 Prepared by: 1875 Olympic Boulevard,

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: April 1, 219 To: Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee From:

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project Project Overview Fed by a two-lane Interstate-280 (I-280) off-ramp, high vehicular volumes and speeds are longstanding issues along San Jose Avenue. Residents in the surrounding neighborhoods have expressed

More information

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015 Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

David DiPierro, John Amberson. Steering Committee Meeting #4 Overview

David DiPierro, John Amberson. Steering Committee Meeting #4 Overview IBI GROUP 18401 Von Karman Avenue Suite 110 Irvine CA 92612 USA tel 949 833 5588 fax 949 833 5511 ibigroup.com Memorandum To/Attention Steering Committee Members Date February 17, 2016 From IBI Group Project

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212

More information

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS...

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... IX 1 INTRODUCTION... 1 1.1 Project Overview... 1 1.2 Analysis Scenarios...

More information

Station 1: Street & Sidewalk Upgrades

Station 1: Street & Sidewalk Upgrades Station 1: Street & Sidewalk Upgrades Existing no left turn; Potential left turn arrow, see Circulation Study boards for more information Thru-lane guidance Improved lead-in green bike lane 17TH ST CASTRO

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

San Jose Transportation Policy

San Jose Transportation Policy San Jose Transportation Policy Protected Intersections in LOS Policies to Support Smart Growth Presented by: Manuel Pineda City of San Jose Department of Transportation Bay Area Map San Francisco Oakland

More information

TRAFFIC STUDY GUIDELINES Clarksville Street Department

TRAFFIC STUDY GUIDELINES Clarksville Street Department TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

Intersection Traffic Control Feasibility Study

Intersection Traffic Control Feasibility Study Intersection Traffic Control Feasibility Study CSAH 9 at CSAH 60 (185th Avenue) Prepared For: Dakota County Transportation Department Western Service Center 14955 Galaxie Avenue, 3rd Floor Apple Valley,

More information

City of El Cerrito San Pablo Avenue Specific Plan. Capital Improvement Program

City of El Cerrito San Pablo Avenue Specific Plan. Capital Improvement Program City of El Cerrito San Pablo Avenue Specific Plan Capital Improvement Program May 2015 San Pablo Avenue Intersection Improvements San Pablo Avenue and Hill Street/Eastshore Boulevard Background Existing

More information

NJDOT Complete Streets Checklist

NJDOT Complete Streets Checklist Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip

More information

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

More information

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Revised: May 10, 2016 The California Department of Transportation (Caltrans) is planning various

More information

4.12 TRANSPORTATION Executive Summary. Setting

4.12 TRANSPORTATION Executive Summary. Setting 4.12 TRANSPORTATION 4.12.1 Executive Summary This section is based on the Multimodal Transportation Impact Study (TIS; 2016) prepared by Omni-Means, Ltd. to evaluate projected transportation impact conditions

More information

Gateway Transportation Study

Gateway Transportation Study Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213 Back of

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

Simulation Analysis of Intersection Treatments for Cycle Tracks

Simulation Analysis of Intersection Treatments for Cycle Tracks Abstract Simulation Analysis of Intersection Treatments for Cycle Tracks The increased use of cycle tracks also known as protected bike lanes has led to investigations of how to accommodate them at intersections.

More information

4.0 TRANSPORTATION SYSTEMS

4.0 TRANSPORTATION SYSTEMS Transportation Systems 4.0 TRANSPORTATION SYSTEMS This chapter examines the impacts of the Central Corridor Extension on existing roadways and traffic operations and discusses the transit service, operations,

More information

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing

More information

Grant Avenue Streetscape

Grant Avenue Streetscape REPORT TYPE GOES HERE Grant Avenue Streetscape PREPARED FOR City of Manassas 9027 Center Street Manassas, VA 20110 PREPARED BY 8300 Boone Boulevard Suite 700 Vienna, Virginia 22182 571.389.8121 July 31,

More information

Bay to Bay Boulevard Complete Streets Project

Bay to Bay Boulevard Complete Streets Project Bay to Bay Boulevard Complete Streets Project Dale Mabry Highway to Bayshore Boulevard February 08, 2018 Photo Source: Tampa Bay Times Alessandra Da Pra Meeting Format Introduction Resurfacing Information

More information

Welcome! San Jose Avenue Open House August 25, 2015

Welcome! San Jose Avenue Open House August 25, 2015 Welcome! San Jose Avenue Open House August 25, 2015 Vision Zero The City and County of San Francisco adopted Vision Zero San Francisco Vision Zero High Injury Network as a policy in 2014, committing an

More information

Dear Mr. Tweed: Sincerely, Min Zhou, P.E. Vice President

Dear Mr. Tweed: Sincerely, Min Zhou, P.E. Vice President December 17, 2012 Mr. Steve Tweed City of Long Beach, Department of Public Works Traffic & Transportation Bureau, 10 th Floor City Hall 333 West Ocean Boulevard Long Beach, CA 90802 Subject: Broadway and

More information

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto

More information

Bridge Street Corridor Study Report

Bridge Street Corridor Study Report Bridge Street Corridor Study Report Prepared for: Prepared by: BRIDGE STREET CORRIDOR STUDY REPORT PREPARED FOR: CITY OF ARROYO GRANDE COMMUNITY DEVELOPMENT DEPARTMENT 300 EAST BRANCH STREET ARROYO GRANDE,

More information

Active Transportation Facility Glossary

Active Transportation Facility Glossary Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

J Street and Folsom Boulevard Lane Conversion Project (T ) Before and After Traffic Evaluation

J Street and Folsom Boulevard Lane Conversion Project (T ) Before and After Traffic Evaluation J Street and Folsom Boulevard Lane Conversion Project (T15125400) Before and After Traffic Evaluation Prepared by Transportation Division June 2014 Executive Summary On February 12, 2013, the City of Sacramento

More information

SECTION 1 - TRAFFIC PLANNING

SECTION 1 - TRAFFIC PLANNING SECTION 1 - TRAFFIC PLANNING 1.1 TRAFFIC OPERATIONS 1.1.1 Roadway Functional Classification The Multnomah County Comprehensive Framework Plan s Policy 34: Trafficways and the Functional Classification

More information

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis To James Hinkamp and Tony Coe, City of Lafayette Date January 19, 2017 Copies Reference number 243381/VP From Michael Iswalt and Vanessa Peers File reference 4-05 Subject Lafayette Downtown Congestion

More information

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine Draft Study STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine SUBMITTED TO: BANGOR AREA COMPREHENSIVE TRANSPORTATION SYSTEM SUBMITTED BY: I MAY 23, 2017 DRAFT STILLWATER AVENUE STUDY FINAL REPORT Table

More information

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for: DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,

More information

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd. 9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major

More information

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015 HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE 1 MAY 14, 2015 ACCESSIBILITY Under the Accessibility Standards 2015 for Customer

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

4.10 TRAFFIC AND CIRCULATION

4.10 TRAFFIC AND CIRCULATION 4.10 TRAFFIC AND CIRCULATION The following section is based on a traffic and circulation study prepared by Fehr & Peers, Inc. (November 2003; refer to Appendix F for technical calculations). The effects

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project The City of Edmonton is planning a major bike route on the southside of Edmonton. The Strathcona Bike Route will connect the communities of Strathcona, Garneau and the University area,

More information

TRAFFIC OPERATIONS ANALYSIS REPORT. Pacheco Boulevard Alignment Study and Alternatives Analysis

TRAFFIC OPERATIONS ANALYSIS REPORT. Pacheco Boulevard Alignment Study and Alternatives Analysis TRAFFIC OPERATIONS ANALYSIS REPORT Pacheco Boulevard Alignment Study and Alternatives Analysis PREPARED FOR: CITY OF MARTINEZ AND CONTRA COSTA COUNTY OCTOBER 2016 FINAL REPORT Prepared By: under contract

More information

3.9 - Transportation and Traffic

3.9 - Transportation and Traffic Transportation and Traffic 3.9 - Transportation and Traffic This section describes the potential transportation and traffic effects of project implementation on the project site and its surrounding area.

More information

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY Appendix 2 City of Mississauga Lakeshore Road FINAL REPORT Transportation Review Study December 2010 EXECUTIVE SUMMARY Study Purpose

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District No Turn on Red Regulations STAFF REPORT ACTION REQUIRED Date: June 1, 2010 To: From: Toronto and East York Community Council Director, Transportation Services, Toronto and East York District Wards: Trinity

More information

Broad Street Bicycle Boulevard Design Guidelines

Broad Street Bicycle Boulevard Design Guidelines Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified

More information

CITY OF LOMITA CITY COUNCIL REPORT

CITY OF LOMITA CITY COUNCIL REPORT CITY OF LOMITA CITY COUNCIL REPORT TO: FROM: City Council Ryan Smoot, City Manager Item No. SCH 12 PREPARED BY: Mark A. McAvoy, P.E., Public Works Director/City Engineer MEETING DATE: August 1, 2017 SUBJECT:

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

Appendix A: Crosswalk Policy

Appendix A: Crosswalk Policy Appendix A: Crosswalk Policy Appendix A: Crosswalk Policy Introduction This citywide Crosswalk Policy is aimed at improving pedestrian safety and enhancing pedestrian mobility by providing a framework

More information

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006

Mission-Geneva Transportation Study Community Workshop 2 July 8, 2006 Community Workshop 2 July 8, 2006 Small Group Workbook 1 Basic Improvements on Mission Street Streetscape. Pedestrian-scale lighting; landscaping; community art on utility boxes; more (possibly unique)

More information

2.0 LANE WIDTHS GUIDELINE

2.0 LANE WIDTHS GUIDELINE 2.0 LANE WIDTHS GUIDELINE Road Engineering Design Guidelines Version 2.0.1 May 2018 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services initiated

More information

D.13 Transportation and Traffic

D.13 Transportation and Traffic This section addresses transportation and traffic issues and impacts related to the Proposed Project. Section D.13.1 provides a description of the affected environment for the Proposed Project. Applicable

More information

Clay Street Realignment Project Traffic Study

Clay Street Realignment Project Traffic Study Final Clay Street Realignment Project Traffic Study November 24, 2009 Prepared for: City of Placerville RS07-2466 2990 Lava Ridge Court, Suite 200 Roseville, CA 95661 (916) 773-1900 Fax (916) 773-2015

More information

TABLE TRAFFIC ANALYSIS SCENARIOS

TABLE TRAFFIC ANALYSIS SCENARIOS 4.11 TRANSPORTATION The potential traffic impacts of the proposed project are evaluated in the Buena Park Beach/Orangethorpe Mixed Use Project Traffic Analysis (Traffic Analysis) by Austin-Foust Associates

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

Addendum to Mitigated Negative Declaration

Addendum to Mitigated Negative Declaration Addendum Date: Case No.: 2014.1499E Project Title: (MDSP) - Mission Valencia Green Gateway Streetscape Project Original: 2008.1075, MDSP Mitigated Negative Declaration Project Sponsor: Charlie Ream, San

More information

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services

Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue Bus Rapid and Conventional Transit Planning and Design Services City of Saskatoon February 2018 Project Team HDR Corporation

More information

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners DRAFT Corridor study Honeysuckle Road October 2017 Prepared for the City of Dothan, AL Prepared by TABLE OF CONTENTS SECTION I... 1 STUDY SUMMARY... 1 INTRODUCTION... 1 CONCLUSIONS... 5 SECTION II... 7

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007 Technical Memorandum May 2007 Syracuse Metropolitan Transportation Council Edwards and Kelcey with Wallace Roberts and Todd Alta Planning and Design CONTENTS SECTION ONE- INTRODUCTION...1 SECTION TWO-

More information

City of Memphis On-Street Parking Modification Guidelines

City of Memphis On-Street Parking Modification Guidelines City of Memphis Effective Date: December 1, 2013 Bicycle/Pedestrian Program 125 N. Main Street Memphis, TN 38103 (901) 576-6710 www.bikepedmemphis.com City of Memphis Executive Summary It is current practice

More information

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,

More information

Figure 1: Vicinity Map of the Study Area

Figure 1: Vicinity Map of the Study Area ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove

More information

DOWNTOWN TUPELO MAIN STREET: ROAD DIET STUDY

DOWNTOWN TUPELO MAIN STREET: ROAD DIET STUDY DOWNTOWN TUPELO MAIN STREET: ROAD DIET STUDY Since mid-2009, RPM Transportation Consultants (RPM) has worked with the Downtown Tupelo Main Street Association to evaluate traffic conditions and potential

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation

More information

2016 Church Street Access Study. 100 Clinton Square 126 North Salina Street, Suite 100 Syracuse, NY

2016 Church Street Access Study. 100 Clinton Square 126 North Salina Street, Suite 100 Syracuse, NY 2016 Church Street Access Study 100 Clinton Square 126 North Salina Street, Suite 100 Syracuse, NY 13202 www.smtcmpo.org Syracuse Metropolitan Transportation Council Final Report February 23, 2016 This

More information

Focused Traffic Analysis for the 200 Nellen Avenue Project

Focused Traffic Analysis for the 200 Nellen Avenue Project March 13, 2017 Mr. Phil Boyle Town of Corte Madera 300 Tamalpais Drive Corte Madera, CA 94976-0159 Focused Traffic Analysis for the 200 Nellen Avenue Project Dear Mr. Boyle; W-Trans has completed a focused

More information

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009 Summary: Several recent studies have assessed potential development and redevelopment opportunities in the Mercer Crossing area of Trenton, Ewing, and Lawrence. This Princeton Avenue and Spruce Street

More information

Pedestrian & Bicycle Safety Innovations & Applications

Pedestrian & Bicycle Safety Innovations & Applications Pedestrian & Bicycle Safety Innovations & Applications County Engineers Association of Maryland Spring, 2017 Conference May 25, 2017 George Branyan Pedestrian Program Coordinator District Department of

More information

COMMITTEE RECOMMENDATIONS. That Council approve:

COMMITTEE RECOMMENDATIONS. That Council approve: 4. MODIFICATIONS TO INNES ROAD (REGIONAL ROAD 30) AND TENTH LINE ROAD (REGIONAL ROAD 47) TO ACCOMMODATE THE DEVELOPMENT OF THE TRINITY COMMONS SHOPPING CENTRE COMMITTEE RECOMMENDATIONS That Council approve:

More information

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD Appendix T CCMP 3.3.4 TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD 3.3.4 Trail Traffic and Transportation Design Multi-use trails have certain design standards, which vary depending on the agency that

More information

Chapter 3 BUS IMPROVEMENT CONCEPTS

Chapter 3 BUS IMPROVEMENT CONCEPTS Chapter 3 BUS IMPROVEMENT CONCEPTS The purpose of this chapter is to describe potential bus improvement strategies and potential impacts or implications associated with BRT implementation within the existing

More information

Traffic Impact Study for Rolling Ridge Redevelopment

Traffic Impact Study for Rolling Ridge Redevelopment Traffic Impact Study for Rolling Ridge Redevelopment Webster Groves, Missouri October 19, 2018 Prepared For: Gershman Commercial Real Estate 150 North Meramec Avenue Suite 500 St. Louis, Missouri 63105

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

Multi-Modal Traffic Analysis. Parisi and Associates

Multi-Modal Traffic Analysis. Parisi and Associates Mill Valley to Corte Madera Bicycle and Pedestrian Corridor Study Appendix D: Multi-Modal Traffic Analysis Prepared by Parisi and Associates August 2009 Appendix D - Multi-Modal Traffic Analysis Table

More information

Multimodal Analysis in the 2010 Highway Capacity Manual

Multimodal Analysis in the 2010 Highway Capacity Manual Multimodal Analysis in the 2010 Highway Capacity Manual It s not just cars anymore! Jamie Parks, AICP HCAT Conference May 9-10, 2011 Multimodal LOS in the 2010 HCM History and background Overview of methods

More information

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Date: April 16 th, 2015 To: From: Re: Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Darian Nagle-Gamm, Traffic Engineering Planner Highway 6 (2 nd Street) /

More information

San Pablo High Treatment applied incrementally at each N + ++

San Pablo High Treatment applied incrementally at each N + ++ Transit Improvements T1 Further study options for creation or designation of segregated transit lanes along San Pablo, including options for restrictions during a limited number of peak travel hours and

More information

3.16 TRANSPORTATION, CIRCULATION, AND PARKING Regulatory Setting Environmental Setting ROADWAY SYSTEM

3.16 TRANSPORTATION, CIRCULATION, AND PARKING Regulatory Setting Environmental Setting ROADWAY SYSTEM 3.16 TRANSPORTATION, CIRCULATION, AND PARKING This section assesses the potential for implementation of the Orchard Park Redevelopment component of the 2018 LRDP to result in impacts related to transportation,

More information

DRAFT MEMORANDUM. 1. Introduction

DRAFT MEMORANDUM. 1. Introduction Dowling Associates, Inc. 180 Grand Ave., Suite 250, Oakland, CA 94612 (510) 839-1742 FAX: (510) 839-0871 428 J Street, Suite 500, Sacramento, CA 95814 (916) 266-2190 FAX: (916) 266-2195 MEMORANDUM To:

More information

Low Level Road Improvements Traffic Analysis. Report

Low Level Road Improvements Traffic Analysis. Report Low Level Road Improvements Traffic Analysis Report June, 22 Table of Contents. INTRODUCTION.... LOW LEVEL ROAD PROJECT....2 STUDY AREA....2. West-End Corridor Improvements... 2.2.2 East-End Corridor Improvements...

More information

Marina Loft (DRC 51-R-12)

Marina Loft (DRC 51-R-12) Marina Loft (DRC 51-R-12) traffic study prepared for: Cymbal Development OCtober 2012 Traf Tech October 1, 2012 Mr. Asi Cymbal - President Cymbal Development 3470 North Miami Avenue Upper Suite Miami,

More information