1 M4 Corridor around Newport PUBLIC INQUIRY QUESTION REFERENCE NO. : PIQ/156 RAISED BY: The Inspector DATE: 31/01/18 RESPONDED BY: Matthew Jones DATE: 02/03/18 SUBJECT: The Welsh Government s response to Mr Waller s suggested alternative (Objectors Suggested Alternative 28) Question: During Inquiry session on 31/01/2018, Mr Wadrup queried whether the Welsh Government s consideration of Mr Waller s suggested alternative had included consideration of all the components he had mentioned. Welsh Government agreed to meet with Mr Waller to confirm his suggested components and then provide a further written response if required. Response: Matt Jones of Welsh Government and Paul Snook of Costain Vinci Joint Venture met with Mr Waller on 31/01/18 to discuss the list of components of his suggested alternative. Mr Waller agreed to check his records for his position regarding J28. Mr Waller s of the same day is attached to this PIQ. This confirmed Mr Waller wished his suggested alternative to include: A) significant improvements to public transport, e.g. through further development of the Metro to assist east west transport in south east Wales, building a light rail/tram route along line of A48 maybe with more park and ride, better provision for buses in Newport; B) better promotion of public transport including working with individuals on their travel options; C) works to the existing M4, including closure of J27, online widening where this is feasible, making it a truly SMART motorway, widening/additional tunnel at Brynglas if this proves necessary; D) non motorway improvements to roads in Newport to relieve congestion, e.g. increasing capacity of some of the junctions on the SDR, and improvements to other roads where this can be done without unacceptable environmental impact. Again, the purpose of this would be to take some journeys off the motorway. The Welsh Government s letter to Mr Waller dated 19/10/17 (WG Ref: qa /alt054) considered each of these measures individually and concluded that individually, or in combination, they would not sufficiently address the problems or achieve the objectives of the Scheme. A summary is included within this PIQ, as well as further information on the appraisal of the measures in combination.

2 A) and B) Public Transport Upgrades: i) Metro ii) Light rail along A48 iii) More park & ride; Improved bus provision iv) Promotion i), iii) & iv) The 2013 Public Transport Overview report (Document ) considered a range of possible public transport and Metro measures that had potential to relieve M4 motorway traffic. The appraisal showed around 3% of motorway traffic would transfer, and that even a doubling of public transport usage in the Newport area would only achieve up to a 5% reduction in motorway traffic. In light of recent progress with the Metro, the 2016 Updated Public Transport Overview Report (Document ) reiterated that public transport measures, including those of the Metro, could not sufficiently address the problems on the M4 around Newport, only reducing traffic flows by less than 4%. ID 73 summarises all the evidence in relation to modal shift as a result of further public transport provision. Even with ambitious assumptions in favour of public transport and including improved bus provision the amount of traffic taken from the M4 is less than 6%. In their own right, interventions to enhance rail servces, provide park and ride faciltiies and to enhance bus services may offer value for money although it is not possible to draw any specific conclusions in this case due to the general nature of the proposals. It should also be borne in mind that, given the findings of the Public Transport Overview Report, such measures are likely to have an insignificant impact on travel behaviour and would not therefore overcome the problems on the M4. Therefore, whilst individual public transport interventions may have a positive BCR in their own right, they will fail to deliver benefits in the same order of magnitude as the Published Scheme. ii) No viable light rail route along the A48 corridor in Newport has been identified through previous public transport studies, and as such is not deemed a feasible component to include within this appraisal. As a general point, it should be noted that the construction of new light rail lines are very high capital cost interventions. Given that there is an existing heavy rail network providing connectivity between Cardiff and Newport (as well as competing bus services), the economic efficiency of a new light rail route is subject to doubt. Summary: Reduction in motorway traffic of less than 6% in the design year of 2037 C) Works to Existing M4: i) Closure of J27 ii) Online widening (including at Brynglas if required) iii) SMART motorway i) The Objectors Suggested Alternatives Report (Document 4.7.2) appraised a combination of junction closures: J25 closure of east facing slip roads, J26 closure of east facing slip roads and J27 full closure. It demonstrated that this would result in only a minor reduction in peak hour M4 traffic, generally less than 5%. However, a direct consequence of of re routing of traffic to the local road network throughout Newport, alternative M4 junctions would experience significantly increased local congestion at these points, resulting in a negative Benefit to Cost Ratio (BCR). A negative BCR means that the option would actually have a negative overall impact on users and would fail to deliver benefts. Whist the closure of Junction 27 in isolation has not undergone an economic appraisal, it would have the most significant impact on local road traffic conditions, because this junction provides the most direct alternative to the heavily congested Junction 28, particularly for traffic approaching along the A467 Forge Lane. As well as adding to congestion on Forge Lane, a ripple effect could arise could arise with the added consequence of increased

3 traffic using the local network through north Newport to access the M4 at Junction 26. The fact the package of junction closures performs poorly suggests that the economic case for closing Junction 27 is poor. Increased congestion on the local road network would also impede public transport. Whilst closure of only J27 would have less of a negative impact on the local road network, it would also have a negligible impact on mainline traffic flows. Summary: Minor impact on motorway traffic of generally less than 5% ii) The Objectors Suggested Alternatives report appraised Alternative 19: Online Widening of Existing M4 including Brynglas Tunnels. This Alternative considered dual 4 lane motorway between J29 and J26, and a dual 3 lane motorway between J26 and J25. This Alternative would increase capacity along the existing motorway between J29 and J25, including at the existing bottleneck at the Brynglas Tunnels between J25A and J26. This would alleviate congestion problems along this section of motorway. However, this would attract more traffic, causing the section between J24 and J25 (where there would be no increase in capacity) to replace the Brynglas Tunnels as the most congested section. The Alternative would not provide sufficient long term capacity and congestion would remain, so that the benefits achieved would be significantly less than with Published Scheme. The form of online widening exhibits a very poor BCR of 0.15 (PIQ 152) and benefits of less than 100m in Present Value terms. Putting aside the issue of cost, this suggests that online widening on any section of the existing M4 will deliver very modest benefits as compared with the Published Scheme. The extent of widening considered in Alternative 19 was deemed the most feasible in terms of buildability and land impacts. It is therefore assumed that Mr Waller s proposal of online widening where this is feasible including widening/additional tunnel at Brynglas if this proves necessary is broadly the same as the layout appraised in Alternative 19. It would therefore also cause congestion to shift to an un widened section, resulting in a low BCR. Summary: BCR of significantly less than 1. iii) A Smart Motorway is one that uses active traffic management (ATM) to increase capacity by use of variable speed limits (VSL) and hard shoulder running at periods of peak traffic. The existing M4 already contains a VSL system. Full Smart Motorways, however, are designed to meet a minimum criteria in terms of horizontal and vertical geometry and visibility. The existing M4 around Newport falls short of these standards, particularly in terms of visibility, and does not have a continuous hard shoulder. This would require considerable online widening over a length similar to that proposed in Objectors Suggested Alternative 19 and described in the preceding section of this PIQ. The result of the online widening described in the preceding section would be the shifting of congestion from the current bottleneck at the Brynglas Tunnels to the section between J24 and J25 (where there would be no increase in capacity). Parts of the J24 to J25 section fall short of visibility requirements and do not have a continuous hardshoulder. Therefore, in order to install a Smart Motorway along this section,a to address the shifted congestion associated with the online widening measure, further widening would be required. This additional J24 J25 widening would be largely adjacent to residential areas, significantly increasing the cost of the online widening measure as well as its impact on property and land take.

4 The alternative would be to consider expansion of the existing VSL system (as opposed to Smart Motorway) across the length of the M4 around Newport without requirement for on line widening. VSL is already in place between Junction 24 and Junction 28, and clearly the benefits of VSL on the most significant bottleneck (the Brynglas Tunnels) are being realised. An expansion of VSL would only cover the eastern section (Junction 23 to Junction 24) and the western section (Junction 28 to Junction 29). These sections are well aligned and relatively free flowing, so that while there may be some additional benefits derived from regulating traffic speeds on these sections, the overall impact of this is likely to be limited. Summary: Requires widening which has been demonstrated to perform poorly. Extending VSL is feasible but with limited potential for additional benefits beyond that already achieved at the Brynglas Tunnels. D) Improvements to Local Roads Mr Waller s proposal of improvements to roads in Newport to relieve congestion, e.g. increasing capacity of some of the junctions on the SDR, and improvements to other roads does not make clear which other local roads he has in mind, making it difficult to assess precisely. In the absence of more details of the proposal, it has been assumed that it is broadly the same as the layout previously appraised in Alternative 1: Blue Route of the Objectors Suggested Alternatives Report (Document 4.7.2). The Blue Route considered improvements to the A48 Southern Distributor Road (SDR) and A4810 (known locally as the Steelworks Access Road). The Blue Route was also appraised in more detail in the Appraisal of Objectors Alternative Blue Route Proposals Report (Document ). The appraisals demonstrated that the Blue Route would relieve less than 10% of traffic on nearly all sections of the existing M4 and would marginally increase the traffic levels on the heaviest trafficked section between J28 and J29. Overall in the design year of 2037 the Blue Route would reduce traffic volumes on the existing M4 by between 3 and 4% (see Bryan Whittaker s rebuttal evidence WG/REB/OBJ Prof Cole at ). While these percentages are based on a half toll the proportion of traffic volume extracted would be similar or more likely less under a no toll scenario since the Blue Route would not have the capacity to attract any further transfer fron the M4. The proposals would result under a no toll scenario in a BCR of 1 (PIQ 152). Based on the assumption that Mr Waller s proposal consists of local road improvements similar to those proposed as part of the Blue Route, and in lieu of any detail of the precise nature of the proposal, it can therefore be inferred that the proposal would also relieve in the region of 3 to 4% at best of motorway traffic and result in a BCR of around 1. Summary: A minor reduction in motorway traffic of some 3 to 4%; BCR of approximately 1.

5 Conclusion: Measures in Combination Each of the measures considered individually above would broadly result in either or both of two outcomes achieving only a small reduction in motorway traffic, or resulting in a high cost/low benefit (and therefore a low BCR). The measures have not been appraised in combination and it should be considered that the inteventions, when delivered as a package, some of the measures will have complemantary impacts, whilst some of the measures may be acting in competition. For example, improving the local road network and improving public transport will make it more feasible to close junctions thereby being complimentary, whilst it is also possible that there would be a competition between some of the measures. For instance, the closure of junctions on the existing M4 would put more pressure on local roads which might undermine the efficacy and thus attractiveness of road based public transport. If, however, it is assumed that the reduction in traffic on the existing M4 would be cumulative then the closure of M4 junctions, the construction of the Blue Route and a comprehensive measure of public transport measures would extract less than 15% of the traffic in the design year of 2037 (6% for PT, 5% for junction closures and 4% for the Blue Route). This figure of 15% is extremely optimistic because it assumes the upper bound amount of traffic reduction for each component and that they are additive. Between 2011 and 2016 the volume of traffic on the M4 increased by an average of 12% (see Bryan Whittaker s revised proof (1.2.6) pages 5 6, tables 3.1 and 3.2. Given that there was already a widely acknowledged problem to be solved even in 2011 and 2012 (that certainly was the position of the original proponents of the Blue Route when it was first advanced) it is apparent that even in combination these measures would not be sufficient to extract the amount of traffic required to alleviate serious congestion on the existing M4. Online widening at Brynglas tunnels would increase the capacity of the existing road at that point but the traffic benefit to be derived would be relatively slight in comparison to the costs and the pinch point on the M4 would be moved to the east. Much of the detailed quantitative analysis which underpins this assessment was conducted on the basis of a half toll scenario. That quantitative analysis suggests that even in combination these alternative measures would not solve the problem. The removal of the tolls increases the volume of traffic along the corridor and further undermines the adequacy of the alternative measures. It should also be noted that this assessment of the merit of a combination of measures ignores in favour of those measures certain practical impediments pertaining to their implementation. For example, online widening of the Brynglass Tunnels and the construction of Blue Route could not be achieved as quickly as the construction of the Published Scheme. Similarly, the congestion caused during construction should the Blue Route and online widening be undertaken would be a significant detriment. It can therefore be concluded qualitatively that even in combination, the measures would not provide sufficient long term capacity and serious congestion would remain on the M4. To the extent that some level of relief would be provided by online widening and the Blue Route the costs would outweigh the benefits. Appraising some of the various sub options is challenging because of a lack of specificity. Individual public transport improvements or smaller scale local road improvements may be good value for money in their own right but will fail to deliver benefits of the scale of that of the Published Scheme. From an economic perspective, it is acknowledged that the BCR for the various options when delivered as a package may be higher than when considered in isolation. Notwithstanding this, similar interventions which have undergone economic appraisal (online widening, junction closures and the Blue Route) exhibit low BCRs and in the case of online

6 widening and junction closures perform very poorly. Therefore, the additional benefits derived from delivering these interventons are highly unlikely to result in the package delivering value for money. Copy of Mr Waller s dated 31/1/18:

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016 Context. Author: Parish Clerk 2 The Draft Integrated Transport Policy (DITS) sets out a vision and objectives, and identifies a detailed programme of interventions to support the Maidstone Borough Local

More information

PUBLIC INQUIRY QUESTION

PUBLIC INQUIRY QUESTION M4 Corridor around Newport PUBLIC INQUIRY QUESTION REFERENCE NO. : PIQ/091 RAISED BY: Tim Gent of St Modwens DATE: 09/05/2017 RESPONDED BY: Bryan Whittaker and Stephen Bussell DATE: 15/05/2017 SUBJECT:

More information

Package 3. M4 Corridor Enhancement Measures SUPPORTING TECHNICAL DOCUMENT - November 2011

Package 3. M4 Corridor Enhancement Measures SUPPORTING TECHNICAL DOCUMENT - November 2011 M4 Corridor Enhancement Measures SUPPORTING TECHNICAL DOCUMENT - November 2011 Package 3 A package of measures focusing on upgrading the M4 between Junctions 24 and 29 to dual 4 lane standard, including

More information

Technical note. 1. Introduction

Technical note. 1. Introduction Project: A428 study - Phase 2 To: Adrian Shepherd Subject: Park & Ride site locations From: Atkins Date: Jun 3, 2016 cc: Ashley Heller 1. Introduction 1.1. Purpose of Technical Note The purpose of this

More information

Mill Hill Broadway Capacity Improvement

Mill Hill Broadway Capacity Improvement 1 16 MARCH 2016 Mill Hill Broadway Capacity Improvement Presentation to Barnet Members and Mill Hill Residents Association 2 Background A1 is one of 23 Transport for London Road Network (TLRN) Strategic

More information

Appendices. Atkins SBL Forecasting Report 54

Appendices. Atkins SBL Forecasting Report 54 Appendices Atkins 5103087 SBL 54 Atkins 5103087 SBL 55 Appendix A. Local Trip End Generation Rates A.1. A.1.1. Trip Rates The trip rates calculated from TRICS v6.8.1 are presented below for each of the

More information

PROOF OF EVIDENCE. Gerald Kells Transport Policy and Campaigns Advisor

PROOF OF EVIDENCE. Gerald Kells Transport Policy and Campaigns Advisor Highways Inquiry Procedure Rules 1994 Doc Ref: OBJ/0125 1 For a local inquiry into: PROOF OF EVIDENCE Gerald Kells Transport Policy and Campaigns Advisor For Friends of the Earth Cymru / Cyfeillion y Ddaear

More information

RIVER CROSSINGS: EAST OF SILVERTOWN CROSSINGS

RIVER CROSSINGS: EAST OF SILVERTOWN CROSSINGS TRANSPORT FOR LONDON RIVER CROSSINGS: EAST OF SILVERTOWN CROSSINGS SUPPORTING TECHNICAL DOCUMENTATION TRAFFIC IMPACT REPORT Neil Georgeson July 2014 This report examines the traffic impacts that potential

More information

York Scarborough Bridge Economic Appraisal Update Technical Note

York Scarborough Bridge Economic Appraisal Update Technical Note York Scarborough Bridge Economic Appraisal Update Technical Note Specification No. 1 Client name West Yorkshire Combined Authority Client reference M088 Discipline Transportation Project name CCAG2 Economics

More information

Bristol City Council has produced a draft Bristol Transport Strategy document.

Bristol City Council has produced a draft Bristol Transport Strategy document. Bristol Transport Strategy Summary Document Introduction Bristol City Council has produced a draft Bristol Transport Strategy document. The Strategy fills a gap in transport policy for Bristol. We have

More information

Northern Beaches Bus Rapid Transit (BRT) Pre-Feasibility Study. Summary Report

Northern Beaches Bus Rapid Transit (BRT) Pre-Feasibility Study. Summary Report Northern Beaches Bus Rapid Transit (BRT) Pre-Feasibility Study Summary Report Contents 1. Introduction 1 2. Development of options 3 2.1 Shortlist of options 4 2.2 Travel time improvements 6 3. North-South

More information

GD 0043/18 ACTIVE TRAVEL STRATEGY

GD 0043/18 ACTIVE TRAVEL STRATEGY GD 0043/18 ACTIVE TRAVEL STRATEGY 2018-2021 May 2018 Minister s Introduction There is strong evidence that regular physical activity reduces the risk of a range of health conditions. The best way to increase

More information

Solution to the problem of traffic congestion around Newport

Solution to the problem of traffic congestion around Newport OBJ6917 I object to the proposed construction of a motorway to the south of Newport and provide an alternative solution for the inspectors' consideration in the attached document. Benjamin Potts-Johnson

More information

North West Non-Technical Summary of the Transport Assessment September 2011

North West Non-Technical Summary of the Transport Assessment September 2011 North West Non-Technical Summary of the Transport Assessment September 2011 Introduction This is a Non-Technical Summary of the findings of the Transport assessment work undertaken for the proposed North

More information

LET US KNOW WHAT YOU THINK

LET US KNOW WHAT YOU THINK A164 and Jock s Lodge Junction Improvement Scheme Funding Bid PUBLIC CONSULTATION November 2017 Public Exhibition to be held at Beverley Racecourse on Wednesday 8 th November 2017 between 9.30 am and 6.45

More information

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT Update June 2018 Hi, Let s Get Wellington Moving (LGWM) is developing a Recommended Programme of Investment (RPI) that meets our programme objectives and supports the city s and region s growth. As part

More information

Determining bicycle infrastructure preferences A case study of Dublin

Determining bicycle infrastructure preferences A case study of Dublin *Manuscript Click here to view linked References 1 Determining bicycle infrastructure preferences A case study of Dublin Brian Caulfield 1, Elaine Brick 2, Orla Thérèse McCarthy 1 1 Department of Civil,

More information

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025 ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025 May 2016 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable.

More information

Active travel and economic performance: A What Works review of evidence from cycling and walking schemes

Active travel and economic performance: A What Works review of evidence from cycling and walking schemes 1 Making the economic case for active travel Active travel and economic performance: A What Works review of evidence from cycling and walking schemes Active Travel Toolkit Slide Pack July 2017 Active travel

More information

Active Traffic Management and Part-Time Shoulder Use in Montgomery County, PA

Active Traffic Management and Part-Time Shoulder Use in Montgomery County, PA Active Traffic Management and Part-Time Shoulder Use in Montgomery County, PA PENN STATE TESC SESSION 8B MOVING PENNDOT AND PTC FORWARD DECEMBER 8, 2017 Agenda Define Active Traffic Management and describe

More information

Wellington Public Transport Spine Study

Wellington Public Transport Spine Study Wellington Public Transport Spine Study Study purpose Feasibility study Options for a high quality, high frequency PT system Key action from Ngauranga to Airport Corridor Plan (2008) Long-term outlook

More information

Package 2. M4 Corridor Enhancement Measures SUPPORTING TECHNICAL DOCUMENT - NOVEMBER 2011

Package 2. M4 Corridor Enhancement Measures SUPPORTING TECHNICAL DOCUMENT - NOVEMBER 2011 M4 Corridor Enhancement Measures SUPPORTING TECHNICAL DOCUMENT - NOVEMBER 2011 Package 2 A package of measures focusing on improving the existing highway infrastructure, primarily through enhancements

More information

The London to Fishguard Trunk Road (East of Magor to Castleton) Order 201-

The London to Fishguard Trunk Road (East of Magor to Castleton) Order 201- Proof of Evidence -Traffic Adran yr Economi a r Seilwaith Department for Economy and Infrastructure The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads)

More information

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 Prepared by Planning and Research Division Arkansas State

More information

ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT

ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT One Size Doesn t Fit All S Corbett, C Chenery Page 1 ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT Authors/Presenters: Sam Corbett, Principal Transport

More information

ADDITIONAL EVIDENCE: OTTERS. Evidence of Eurasian Otter (Lutra lutra) population connectivity across the M4 Corridor around Newport Proposed Motorway

ADDITIONAL EVIDENCE: OTTERS. Evidence of Eurasian Otter (Lutra lutra) population connectivity across the M4 Corridor around Newport Proposed Motorway ADDITIONAL EVIDENCE: OTTERS Evidence of Eurasian Otter (Lutra lutra) population connectivity across the M4 Corridor around Newport Proposed Motorway Cardiff University Presented to the Inquiry with a supplementary

More information

Watford Health Campus LLP. Watford Fields Residents Association. Re: Wiggenhall Road Junction

Watford Health Campus LLP. Watford Fields Residents Association. Re: Wiggenhall Road Junction Watford Health Campus Partnership LLP Watford Health Campus LLP Watford Fields Residents Association C/o Jags Shah Tempsford Hall Sandy Beds SG19 2BD 27 th January 2016 Re: Wiggenhall Road Junction Dear

More information

RACQ SUBMISSION ON DRAFT BRISBANE CITY COUNCIL TRANSPORT PLAN FOR BRISBANE The Royal Automobile Club of Queensland Limited

RACQ SUBMISSION ON DRAFT BRISBANE CITY COUNCIL TRANSPORT PLAN FOR BRISBANE The Royal Automobile Club of Queensland Limited RACQ SUBMISSION ON DRAFT BRISBANE CITY COUNCIL TRANSPORT PLAN FOR BRISBANE 2006-2026 The Royal Automobile Club of Queensland Limited 18 April 2008 Introduction The Royal Automobile Club of Queensland (RACQ)

More information

Building a sustainable world city: the role of transport and land use in London. London s relationship with transport

Building a sustainable world city: the role of transport and land use in London. London s relationship with transport Building a sustainable world city: the role of transport and land use in London Peter Wright Policy Manager, TfL Overview London s relationship with transport Past Current Future Questions? 1 London s

More information

Report to Cabinet. 18 May 2016

Report to Cabinet. 18 May 2016 Agenda Item 8 Report to Cabinet 18 May 2016 Subject: Presenting Cabinet Member: Proposed CCTV Enforcement of Traffic Contraventions in a Bus Lane (Key Decision Ref. No. HE030) Highways and Environment

More information

Phone: Ref No: 06/2018/0884

Phone: Ref No: 06/2018/0884 Development Directorate Preston City Council Town Hall Lancaster Road Preston PR1 2RL FAO Ben Sandover Phone: 01772 533855 Email: david.allen@lancashire.gov.uk Ref No: 06/2018/0884 Date: 20 September 2018

More information

Motorway-to-motorway: a potential technological solution to motorway congestion

Motorway-to-motorway: a potential technological solution to motorway congestion 108 Roger Higginson Principal Engineer Intelligent Transport Systems Atkins Jill Hayden Principal Engineer Intelligent Transport Systems Atkins Sukhvinder Ubhi Project Sponsor Highways Agency Motorway-to-motorway:

More information

APPELLANT S STATEMENT OF CASE

APPELLANT S STATEMENT OF CASE TOWN & COUNTRY PLANNING ACT 1990 (AS AMENDED) APPEAL BY FOCUS INTERNATIONAL CHRISTIAN CENTRE (FICC) AGAINST REFUSAL OF PLANNING PERMISSION BY THE LONDON BOROUGH OF HILLINGDON PLANNING PERMISSION IS SOUGHT

More information

Bus Lanes Improving Travel Time or Reliability

Bus Lanes Improving Travel Time or Reliability November 2008 Bus Lanes Improving Travel Time or Reliability Christopher Wilson Simon Kinnear CAITR Perth, December 2008 AIM OF PRESENTATION Understanding the importance of travel time reliability as an

More information

Living Streets response to the Draft London Plan

Living Streets response to the Draft London Plan Living Streets response to the Draft London Plan Contents Living Streets response to the Draft London Plan... 1 About Living Streets... 2 Summary... 2 Consultation response... 3 Chapter 1: Planning London

More information

A65 TRANSPORT ASSESSMENT. 13 th May 2005

A65 TRANSPORT ASSESSMENT. 13 th May 2005 A65 TRANSPORT ASSESSMENT 13 th May 2005 1 CONTENTS 1.0 Introduction 2.0 Overview 3.0 Detailed Assessment of the A65 Corridor 4.0 Future Proposals 5.0 Conclusions List of Figures Figure 1: AM Average Traffic

More information

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development

BELFAST RAPID TRANSIT. Ciarán de Búrca Director, Transport Projects Division Department for Regional Development BELFAST RAPID TRANSIT Ciarán de Búrca Director, Transport Projects Division Department for Regional Development Objectives of Belfast Rapid Transit To provide a modern, safe, efficient and high quality

More information

9. Parking Supporting Statement

9. Parking Supporting Statement 9. Parking Supporting Statement Content 1. Setting the Scene 2. Vision 3. Parking and the Shared Priorities 4. Issues 5. Delivery Programme in the first Plan Period 2001/02 2005/06 6. Good Practice 7.

More information

Chelmsford City Growth Package

Chelmsford City Growth Package Chelmsford City Growth Package Public Consultation Document Volume 2 West Chelmsford July - August 2017 Chelmsford City Growth Package Public Consultation Document - Volume 2 - West Chelmsford Contents

More information

Operational Comparison of Transit Signal Priority Strategies

Operational Comparison of Transit Signal Priority Strategies Operational Comparison of Transit Signal Priority Strategies Revision Submitted on: November, 0 Author: Adriana Rodriguez, E.I Assistant Engineer Parsons Brinckerhoff 0 South Orange Avenue, Suite 00 Orlando,

More information

Bus and Transit Lane Review Update

Bus and Transit Lane Review Update Board Meeting / 25 February 2013 Agenda Item no.8(i) Bus and Transit Lane Review Update Glossary Auckland Transport New Zealand Transport Agency Transit Two Transit Three (AT) (NZTA) (T2) (T3) Executive

More information

Standing Committee on Policy and Strategic Priorities

Standing Committee on Policy and Strategic Priorities POLICY REPORT Report Date: January 15, 2019 Contact: Steve Brown Contact No.: 604.873.9733 RTS No.: 12955 VanRIMS No.: 08-2000-20 Meeting Date: January 30, 2019 TO: FROM: SUBJECT: Standing Committee on

More information

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS Page 1 of 9 EXECUTIVE SUMMARY Alberta Transportation ( AT ) is preparing to construct the final sections of the Calgary Ring Road. This includes the South West Ring Road ( SWRR ) (from Lott Creek Blvd

More information

A1307 Haverhill to Cambridge: Approval to consult on transport improvement concepts

A1307 Haverhill to Cambridge: Approval to consult on transport improvement concepts Report To: Greater Cambridge City Deal Executive Board 3 March 2016 Lead Officer: Graham Hughes, Executive Director of Economy, Transport and Environment, Cambridgeshire County Council A1307 Haverhill

More information

CAMBRIDGE SOUTH WEST PARK & RIDE

CAMBRIDGE SOUTH WEST PARK & RIDE CAMBRIDGE SOUTH WEST PARK & RIDE Have your say on: Extra Park & Ride spaces to the south west of Cambridge Bus priority measures into the city centre CREATING MORE PARK & RIDE SPACES The existing Park

More information

M4 Corridor Enhancement Measures Alternatives Considered

M4 Corridor Enhancement Measures Alternatives Considered M4 Corridor Enhancement Measures Alternatives Considered Measures discarded falling outside from of the the M4 M4 CEM CEM Programme Contents Page Workbook User Guide 2 Key information and Glossary 3 Key

More information

From: The following comments and proposals have been raised as a result of the public consultation:

From: The following comments and proposals have been raised as a result of the public consultation: Project: A428 Study - Phase 2 To: Adrian Shepherd Subject: Analysis of Consultation Proposals From: Atkins Date: 1 Feb 2016 cc: Ashley Heller 1. Aim The aim of this technical note is to provide an initial

More information

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table

More information

Improving the A1 in Northumberland Public consultation. November December North of Ellingham

Improving the A1 in Northumberland Public consultation. November December North of Ellingham A1 Improving the A1 in Northumberland Public consultation November December 2016 North of Ellingham Improving the A1 in Northumberland In autumn 2014, the government announced the first Road Investment

More information

CUERDEN TRANSPORT PROPOSALS

CUERDEN TRANSPORT PROPOSALS 1 CUERDEN TRANSPORT PROPOSALS The transport assessment, submitted with the Cuerden development planning application, looks at access to the site and the impact on the local road network in detail. This

More information

NRA New Divided Road Types: Type 2 and Type 3 Dual - Carriageways

NRA New Divided Road Types: Type 2 and Type 3 Dual - Carriageways NRA New Divided Road Types: Type 2 and Type 3 Dual - Carriageways DN-GEO-03059 December 2007 DN Design Technical TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland

More information

Transportation Master Plan Advisory Task Force

Transportation Master Plan Advisory Task Force Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved

More information

ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology decision. That the Mayors Council on Regional Transportation receive this report.

ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology decision. That the Mayors Council on Regional Transportation receive this report. TO: FROM: Mayors Council on Regional Transportation Geoff Cross, Vice President of Planning and Policy DATE: September 27, 2017 SUBJECT: ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology

More information

High frequency bus services operating to Little Island; Creation of a new Park and Ride site and train station at North Esk;

High frequency bus services operating to Little Island; Creation of a new Park and Ride site and train station at North Esk; Cork County Council 7 th December 2018 Dear Adrian O Neill (aoneill@jbbarry.ie) The Transport and Mobility Forum, Cork (TMF) is a representative group of organisations who have a common interest in sustainable

More information

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Aaron Elias, Bill Cisco Abstract As part of evaluating the feasibility of a road diet on Orange Grove Boulevard in Pasadena,

More information

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

MoPac South: Impact on Cesar Chavez Street and the Downtown Network MoPac South: Impact on Cesar Chavez Street and the Downtown Network Prepared by: The University of Texas at Austin Center for Transportation Research Prepared for: Central Texas Regional Mobility Authority

More information

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager LONDON BOROUGH OF RICHMOND UPON THAMES DATE: AUGUST 2015 DECISION MAKER: LEAD OFFICER: SUBJECT: WARDS: Cabinet Member for Highways & Streetscene Highway Infrastructure Manager PROPOSED CYCLING IMPROVEMENTS

More information

ABERDEEN: CITY OF THE FUTURE

ABERDEEN: CITY OF THE FUTURE ABERDEEN: CITY OF THE FUTURE A contribution towards discussions on a future transport strategy for Aberdeen and its Region Prepared by the Centre for Transport Research University of Aberdeen June 2010

More information

M4 Corridor Enhancement Measures Magor to Castleton (M4 CEM) Easing the Flow

M4 Corridor Enhancement Measures Magor to Castleton (M4 CEM) Easing the Flow Number: WG14775 Welsh Government Consultation Document Corridor Enhancement Measures Magor to Castleton ( CEM) Easing the Flow Date of issue: 6th March 2012 Responses by: 6th June 2012 Revision A . Overview

More information

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006 Corporate NO: C012 Report COUNCIL DATE: June 26, 2006 COUNCIL-IN-COMMITTEE TO: Mayor & Council DATE: June 22, 2006 FROM: General Manager, Engineering FILE: 0410-20(MoT/Gate) SUBJECT: Surrey Response on

More information

ENFIELD TOWN THE REVISED DESIGN

ENFIELD TOWN THE REVISED DESIGN TOWN THE REVISED DESIGN We re turning Enfield into a borough that encourages walking and cycling, a place that s easy for all of us to get around however we choose to travel. A greener place, with safer

More information

MEMORANDUM. Our project study area included the following locations:

MEMORANDUM. Our project study area included the following locations: MEMORANDUM Date: To: From: Subject: Najib O. Habesch Nick M. Fomenko, PE, PTOE Bushnell Park North Traffic Assessment BETA Project #: 4461 As part of our contract to undertake the design of the Bushnell

More information

Loughborough University Travel Planning

Loughborough University Travel Planning Document Ti tle Client Name Loughborough University Travel Planning Loughborough University Travel Plan Executive Summary 2015-2020 23 December 2015 Loughborough University Travel Planning Project no:

More information

A new sustainable transport option for Hereford

A new sustainable transport option for Hereford A new sustainable transport option for Hereford MTRU September 2010 September 2011 Introduction by Paige Mitchell Ten Minute Travel Radius for Trips on Foot and Bicycle from or to the City Centre Source:

More information

DYNAMIC LANES FOR AUCKLAND

DYNAMIC LANES FOR AUCKLAND Dynamic Lanes for Auckland MENEZES M. and INMAN R. Page 1 DYNAMIC LANES FOR AUCKLAND Authors: INMAN, Robert BA (Hons) Previously Auckland Transport Senior Traffic Engineer Now Aurecon Robert.Inman@aurecongroup.com

More information

Appendix N(b): Portishead Station Outline Travel Plan

Appendix N(b): Portishead Station Outline Travel Plan Portishead Branch Lane (MetroWest Phase 1): Environment Impact Assessment Appendix N(b): Portishead Station Outline Travel Plan Prepared for West of England Councils September 2017 1 The Square Temple

More information

The Central-Wanchai Bypass

The Central-Wanchai Bypass The Central-Wanchai Bypass By Geoffrey Rogers and John Patient February 2004 Civic Exchange Limited Room 701, Hoseinee House, 69 Wyndham Street, Central. Tel: (852) 2893 0213 Fax: (852) 3105 9713 www.civic-exchange.org

More information

SCHEME DESIGN AND ENGINEERING

SCHEME DESIGN AND ENGINEERING THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL LINK CLASSIFIED ROAD) SIDE ROADS ORDER 2013 THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL LINK) COMPULSORY PURCHASE ORDER 2013 THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL

More information

Welcome. Smart motorway M1 junctions 13 to 16 public information exhibition. Highways England Creative [XXXXX_XXXX_XXX]

Welcome. Smart motorway M1 junctions 13 to 16 public information exhibition. Highways England Creative [XXXXX_XXXX_XXX] Welcome Smart motorway junctions 13 to 16 public information exhibition Smart motorways Smart motorways are a technology driven approach to the use of our motorways, increasing capacity and relieving congestion

More information

Map 1 shows the two roads, and how they fit into the public transport network in and around Cambridge.

Map 1 shows the two roads, and how they fit into the public transport network in and around Cambridge. Milton Road and Histon Road corridors bus priority infrastructure 1. Purpose The County Council would like to understand in more detail, the options to deliver the most effective corridor-based public

More information

RIGHT TURNS AT INTERSECTIONS: ARE THERE ALTERNATIVES?

RIGHT TURNS AT INTERSECTIONS: ARE THERE ALTERNATIVES? RIGHT TURNS AT INTERSECTIONS: ARE THERE ALTERNATIVES? R.C. Pyke, J.D. Sampson and K.G. Schmid Stewart Scott International, P O Box 784506, Sandton, 2146 TTT Africa, P.O.Box 109, Sunninghill, G.D.P.T.R.W,

More information

INTERIM ADVICE NOTE 150/12. Guidance for Alternative Temporary Traffic Management Techniques for Relaxation Schemes on Dual Carriageways.

INTERIM ADVICE NOTE 150/12. Guidance for Alternative Temporary Traffic Management Techniques for Relaxation Schemes on Dual Carriageways. INTERIM ADVICE NOTE 150/12 Guidance for Alternative Temporary Traffic Management Techniques for Relaxation Schemes on Dual Carriageways Summary Guidance for temporary traffic management (TTM), on the approach

More information

Cork to Limerick Route Pre-Feasibility Study Update

Cork to Limerick Route Pre-Feasibility Study Update Cork to Limerick Route Pre-Feasibility Study Update November 2008 Document Title: Cork to Limerick Route Pre-Feasibility Study Update Document Ref(s). : Date Rev Status Originator Checked Approved 01/12/08

More information

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY Appendix 2 City of Mississauga Lakeshore Road FINAL REPORT Transportation Review Study December 2010 EXECUTIVE SUMMARY Study Purpose

More information

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017 A127/A130 Fairglen Interchange Improvement Schemes Information Leaflet February 2017 1 2 Foreword By Councillor Kevin Bentley Essex is continuing to grow as a vibrant economic hub and as a fantastic place

More information

Integrated Regional Traffic Management. Michael Aherne Technical Director POLIS Conference 2009

Integrated Regional Traffic Management. Michael Aherne Technical Director POLIS Conference 2009 Integrated Regional Traffic Management Michael Aherne Technical Director POLIS Conference 2009 M50 finish Public Transport and Pedestrians College Green The Spatial Perspective What Could has

More information

Managed Motorways Experience from the UK

Managed Motorways Experience from the UK Managed Motorways Experience from the UK Author David Kamnitzer (dkamnitzer@ibigroup.com) Director, IBI Group Project Manager of IBI Group s technical advisor commission for the Highways Agency s Managed

More information

Alternatives to the Use of Heritage Squares for Bus Layover in Dublin City Centre

Alternatives to the Use of Heritage Squares for Bus Layover in Dublin City Centre Presentation to DCC Public Transport Sub-committee Dublin City Hall, 11 th March 2016 Alternatives to the Use of Heritage Squares for Bus Layover in Dublin City Centre A DIT Community Links Project on

More information

A7 Transportation and Access: Application 2 - LBHF

A7 Transportation and Access: Application 2 - LBHF A7 Transportation and Access: Application 2 - LBHF Addendum to the Environmental Statement Volume I January 2012 Introduction A7.1 This Chapter of the Addendum to the June 2011 Environmental Statement

More information

Auckland Transport s responses to feedback on proposed upgrades to the intersection of Mercari way and Don Mckinnon Drive

Auckland Transport s responses to feedback on proposed upgrades to the intersection of Mercari way and Don Mckinnon Drive s to feedback on proposed upgrades to the intersection of way and Don Mckinnon Drive Points raised through feedback process 1 Congestion The proposal will improve traffic flow through the intersection

More information

Develop a Multi-Modal Transportation Strategy (Theme 6)

Develop a Multi-Modal Transportation Strategy (Theme 6) DEVELOP A MULTI-MODAL TRANSPORTATION STRATEGY (THEME 6) WHY IS THIS THEME ADDRESSED? Develop a Multi-Modal Transportation Strategy (Theme 6) Statement of Ideal Reduce resident and visitor reliance on single

More information

Evan Johnson, Tindale Oliver & Associates. Alan Danaher, P.E., PTOE, AICP, PTP

Evan Johnson, Tindale Oliver & Associates. Alan Danaher, P.E., PTOE, AICP, PTP To: Copies: From: Evan Johnson, Tindale Oliver & Associates Matt Muller, RTS Jesus Gomez, RTS Alan Danaher, P.E., PTOE, AICP, PTP Date: January 14, 2014 Subject: Ridership Projections Gainesville Streetcar

More information

Cambridge Access and Capacity Study

Cambridge Access and Capacity Study Report To: Greater Cambridge City Deal Executive Board 9 June 2016 Lead Officer: Graham Hughes, Executive Director, Economy and Environment, Cambridgeshire County Council Cambridge Access and Capacity

More information

To: The results of these surveys have been analysed and are summarised within this Technical Note.

To: The results of these surveys have been analysed and are summarised within this Technical Note. Technical Note Project: Histon Road / Milton Road, Cambridge Parking Surveys To: Andy Harrison Subject: Survey Report v1.6 From: Jonathan Barlow Date: 18 th February 2016 cc: Richard Jones / Dave Boddy

More information

Integrated Corridor Approach to Urban Transport. O.P. Agarwal World Bank Presentation at CODATU XV Addis Ababa, 25 th October 2012

Integrated Corridor Approach to Urban Transport. O.P. Agarwal World Bank Presentation at CODATU XV Addis Ababa, 25 th October 2012 Integrated Corridor Approach to Urban Transport O.P. Agarwal World Bank Presentation at CODATU XV Addis Ababa, 25 th October 2012 What is the Integrated Corridor Approach for Urban Transport Public? Why

More information

IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING

IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING BBAG BRIEFING NOTE EMAIL: BERMUDABRIDGEAGP@BTINTERNET.COM WWW.FACEBOOK.COM/GROUPS/BERMUDABRIDGEAG TWITTER @BERMUDABRIDGEAG CYCLING BBAG BRIEFING NOTE

More information

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR SAY Consultation open from 24 September to 5 November 2018 Contents Introduction 3 Background 4 Springwood Drive Roundabout

More information

MILTON ROAD LLF PROJECT UPDATE

MILTON ROAD LLF PROJECT UPDATE Greater Cambridge City Deal MILTON ROAD LLF PROJECT UPDATE 9 th May 2017 Project objectives Comprehensive priority for buses in both directions wherever practicable; Additional capacity for sustainable

More information

University of Leeds Travel Plan

University of Leeds Travel Plan University of Leeds Travel Plan 2015-2018 Contents 1: Introduction 1.1 What is a Travel Plan? 1.2 Why do we need one? 1.3 Sustainability Strategy 2: Overview 2.1 The bigger picture 2.2 The City scale 2.3

More information

Managed Motorways All Lanes Running

Managed Motorways All Lanes Running Managed Motorways All Lanes Running All-Purpose Trunk Roads (APTR)/Dual 3- lane Motorway (D3M) Analysis and Hazard Assessment 1039092-ATA-035 Date: 8 May 2012 Version: 1.0 MMFD-ATA-035 - Issue 1 0 08-05-12.doc

More information

REPORT. Engineering and Construction Department

REPORT. Engineering and Construction Department REPORT COMMUNITY SERVICES COMMITTEE MEETING DATE: JUNE 11, 2013 FROM: Engineering and Construction Department DATE: May 24, 2013 SUBJECT: Great Lakes Boulevard Mini Roundabout LOCATION: Great Lakes Boulevard

More information

Chapter 4 Route Window C3 Hyde Park and Park Lane shafts. Transport for London

Chapter 4 Route Window C3 Hyde Park and Park Lane shafts. Transport for London Chapter 4 Route Window C3 Hyde Park and Park Lane shafts Transport for London HYDE PARK AND PARK LANE SHAFTS 4 Route Window C3 Hyde Park and Park Lane shafts Introduction 4.1 In this route window, which

More information

MnPASS System Today and the Future

MnPASS System Today and the Future MnPASS System Today and the Future April 2010 By Nick Thompson Minnesota Department of Transportation Topics Minnesota s Current and Future MnPASS High Occupancy Toll Systems Overview of the MnPASS System

More information

SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane

SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane Exception Report Client Officer Rudo Beremauro Date 20 January 2015 RSA /Project Sponsor s Contents Section 3 Project Sponsor's

More information

Kings Road, Herne Bay: Proposed Crash Remedial Measure

Kings Road, Herne Bay: Proposed Crash Remedial Measure Kings Road, Herne Bay: Proposed Crash Remedial Measure To: Canterbury Joint Transportation Board 17 February 2015 By: Classification: Ward: Tim Read - Head of Transportation Unrestricted Herne Bay Summary:

More information

WHAT IFS: Over the course of

WHAT IFS: Over the course of WHAT IFS: Over the course of the 422plus Project certain questions have arisen multiple times at meetings, briefings and on-line at the website. Most of these questions start with WHAT IF. WHAT IF vehicle

More information

Regional Transportation Needs Within Southeastern Wisconsin

Regional Transportation Needs Within Southeastern Wisconsin Regional Transportation Needs Within Southeastern Wisconsin #118274 May 24, 2006 1 Introduction The Southeastern Wisconsin Regional Planning Commission (SEWRPC) is the official areawide planning agency

More information

POLICY: TRAFFIC CALMING

POLICY: TRAFFIC CALMING 2006 MAY REFERENCE: COUNCIL APPROVED BY COUNCIL MAY 23, 2006 CITY OPERATIONS - NO. 608 POLICY: TRAFFIC CALMING A. All requests for traffic calming within the City shall be considered in accordance with

More information

Cycle network linking Wolverhampton city centre and Bilston town centre with employment sites and residential areas:

Cycle network linking Wolverhampton city centre and Bilston town centre with employment sites and residential areas: Context and Problems Corridor length 12.3 km; Population within 800m 59,922; Jobs within 800m 59,100; Unemployment 11%; Average Index of Multiple Deprivation 46; Households with no car 45%; Proportion

More information

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign E4 Cycle Route Exeter University to Redhayes Bridge - Recommendations from Exeter Cycling Campaign 1.0 Introduction Exeter Cycling Campaign has prepared this report to provide recommendations for Devon

More information