Greater Cambridge City Deal Executive Board & Joint Assembly

Size: px
Start display at page:

Download "Greater Cambridge City Deal Executive Board & Joint Assembly"

Transcription

1 Greater Cambridge City Deal Executive Board & Joint Assembly Welcome to the Call for Evidence on tackling congestion in Cambridge Launch Event 11 th November 2015

2 Bob Menzies Service Director: Strategy & Development Economy, Transport & Environment Cambridgeshire County Council

3 Presentation overview Background and context Travel and trip making Network Performance The future transport network with planned growth How can we achieve an efficient network?

4 BACKGROUND AND CONTEXT

5 In 2014 There were 3.6 million journeys on the Busway There were 3.5 million Park & Ride journeys There were almost 10 million rail passenger arrivals or departures from Cambridge station

6 In % of Cambridge residents cycled at least once a week (highest level in England) 23% in South Cambs (5 th highest in England) Around 11,000 people walked or cycled into or out of Cambridge every day (including around 2,800 on the Busway maintenance track)

7 In 2014 Over 200,000 motor vehicles per day entered and exited Cambridge

8 Growth in Cambridge and South Cambs.

9 The draw of Cambridge as a place to work

10 Number of People Where people live and work 90,000 80,000 70, % 60,000 50,000 40,000 30,000 20,000 10, % 16.6% 67.7% 27.5% 39.7% - Workplace of People Living in Cambridge Homeplace of People Working in Cambridge Rest of UK 7,790 27,873 South Cambridgeshire 8,272 23,367 Cambridge 33,704 33,704

11 TRAVEL AND TRIP MAKING

12 Traffic into and around Cambridge Traffic coming into Cambridge has been fairly stable since However, congestion occurs in many areas of the city with unreliable journey times, particularly in the peak periods.

13 Mode share of travel to work trips starting in Cambridge

14 Mode share of travel to work trips with destination in Cambridge

15 NETWORK PERFORMANCE

16 KEY 5,000-5,999 6,000-6,999 7,000-7,999 8,000-8,999 9,000-9,999 10,000-10,999 11,000+ Peak spreading Cambridge radial cordon, two way flows by half hour time period Half hour YEAR starting :00 07:00 07:30 07:30 08:00 08:00 08:30 08:30 09:00 09:00 09:30 09:30 10:00 10:00 10:30 10:30 11:00 11:00 11:30 11:30 12:00 12:00 12:30 12:30 13:00 13:00 13:30 13:30 14:00 14:00 14:30 14:30 15:00 15:00 15:30 15:30 16:00 16:00 16:30 16:30 17:00 17:00 17:30 17:30 18:00 18:00 18:30 18:

17 Air Quality and health Vehicular traffic is the dominant contributor to Air Quality problems in Cambridge Stationary traffic most problematic Particular problems in city centre and on more congested radial routes 1 hour mean target Annual mean target

18 THE FUTURE TRANSPORT NETWORK WITH PLANNED GROWTH

19 Future traffic growth By 2031, if we carry on as we are, with growth: 32% increase in traffic in Cambridge in morning peak 38% increase in traffic in South Cambs. in morning peak Time spent in congested conditions could more than double

20 What would this mean for everyday Journey by car car journeys? Increase in journey time (%) Trumpington to Cambridge Science Park +28% Madingley to Cambridge Station +31% Milton to Cambridge City Centre +29% Milton to Addenbrooke s Hospital +39% Histon to Cambridge City Centre +22% Ely to Cambridge Science Park +31% Waterbeach to Cambridge University Library +54% Fen Ditton to Cambridge City Centre +11%

21 To keep traffic levels in Cambridge at 2011 levels in 2031, with growth ~20% 38% 30% 25% 24%

22 But to reduce congestion we will need less people to drive. 38% 30% ~20%

23 But to reduce congestion we will need less people to drive. ~20% 38% 30% 25% 24%

24 We need to make the most of the finite capacity we have Doing nothing is not an option

25 HOW CAN WE ACHIEVE AN EFFICIENT NETWORK?

26 Tools for addressing congestion Managing demand (typically seen as a stick) For example restrictions on movement, expansion of parking controls, fiscal measures Enhancing capacity (typically seen as a carrot) For example bus lanes / priority, cycle lanes, pedestrian crossings, new roads, new public transport services Changing behaviour For example travel planning, promotions, incentives

27 Carrots and sticks City Deal programme currently contains lots of carrots and no sticks Carrots alone have not reduced congestion, in Cambridge or elsewhere

28 Intended / unintended consequences Transport network needs to be considered as a whole interventions in one area will have knock-on effects elsewhere

29 Now seeking your views How should we tackle congestion in Cambridge??

30 City Deal Overview Up to 500m for transport infrastructure, payable in 3 tranches Tranche 1: 100m Tranche 2: Up to 200m Tranche 3: Up to 200m Tranches 2 and 3 depend on the achievement of triggers Aligns with other local capital investment plans to support growth

31 City Deal: An exciting opportunity Unleash the next wave of the Cambridge Phenomenon Ensure that Greater Cambridge is able to keep competing on an international stage Ease transport constraints Ease housing affordability issues Improve the links between skills and jobs Bring the different Councils and other partners together as never before

32 Purpose of the Call for Evidence Residents, businesses and organisations are being invited to put forward their ideas to tackle the problem of growing traffic congestion in Cambridge An opportunity for anyone or any organisation to put forward their thoughts on how they believe the congestion issues in Cambridge can be solved. All realistic ideas to help resolve congestion will be considered

33 Engagement programme Written evidence to be received by Monday 30 th November to Three public hearings Monday 16 th November Wednesday 18 th November Monday 30 th November Report to Joint Assembly and Executive Board 17 th December 2015 /15th January 2016 Presentations from this evening will be available at

Transport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age.

Transport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age. Transport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age 30 th March 2015 1 Presentation Overview Roles and responsibilities Snapshot of Key Challenges

More information

Bristol City Council has produced a draft Bristol Transport Strategy document.

Bristol City Council has produced a draft Bristol Transport Strategy document. Bristol Transport Strategy Summary Document Introduction Bristol City Council has produced a draft Bristol Transport Strategy document. The Strategy fills a gap in transport policy for Bristol. We have

More information

A1307 Haverhill to Cambridge: Approval to consult on transport improvement concepts

A1307 Haverhill to Cambridge: Approval to consult on transport improvement concepts Report To: Greater Cambridge City Deal Executive Board 3 March 2016 Lead Officer: Graham Hughes, Executive Director of Economy, Transport and Environment, Cambridgeshire County Council A1307 Haverhill

More information

City Deal: Call for Evidence

City Deal: Call for Evidence CambridgePPF Approach: Opportunity for everyone in Greater Cambridge area to benefit from a better transport system Provision of choice how to travel, whether to own a car, how children get to school etc

More information

Cambridge Access and Capacity Study

Cambridge Access and Capacity Study Report To: Greater Cambridge City Deal Executive Board 9 June 2016 Lead Officer: Graham Hughes, Executive Director, Economy and Environment, Cambridgeshire County Council Cambridge Access and Capacity

More information

Map 1 shows the two roads, and how they fit into the public transport network in and around Cambridge.

Map 1 shows the two roads, and how they fit into the public transport network in and around Cambridge. Milton Road and Histon Road corridors bus priority infrastructure 1. Purpose The County Council would like to understand in more detail, the options to deliver the most effective corridor-based public

More information

Report to: Greater Cambridge Partnership Executive Board 4 July Transport Strategy - Future Public Transport Requirements

Report to: Greater Cambridge Partnership Executive Board 4 July Transport Strategy - Future Public Transport Requirements Report to: Greater Cambridge Partnership Executive Board 4 July 2018 Lead officer: Peter Blake GCP Transport Director Transport Strategy - Future Public Transport Requirements 1. Purpose 1.1. This paper

More information

Tackling Peak-time Congestion in Cambridge

Tackling Peak-time Congestion in Cambridge HAVE YOUR SAY Tackling Peak-time Congestion in Cambridge Inside this information leaflet you will find out ways in which the Greater Cambridge City Deal is proposing to tackle congestion in Cambridge this

More information

ENFIELD TOWN THE REVISED DESIGN

ENFIELD TOWN THE REVISED DESIGN TOWN THE REVISED DESIGN We re turning Enfield into a borough that encourages walking and cycling, a place that s easy for all of us to get around however we choose to travel. A greener place, with safer

More information

North West Non-Technical Summary of the Transport Assessment September 2011

North West Non-Technical Summary of the Transport Assessment September 2011 North West Non-Technical Summary of the Transport Assessment September 2011 Introduction This is a Non-Technical Summary of the findings of the Transport assessment work undertaken for the proposed North

More information

9. Parking Supporting Statement

9. Parking Supporting Statement 9. Parking Supporting Statement Content 1. Setting the Scene 2. Vision 3. Parking and the Shared Priorities 4. Issues 5. Delivery Programme in the first Plan Period 2001/02 2005/06 6. Good Practice 7.

More information

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016 Context. Author: Parish Clerk 2 The Draft Integrated Transport Policy (DITS) sets out a vision and objectives, and identifies a detailed programme of interventions to support the Maidstone Borough Local

More information

2. Context. Existing framework. The context. The challenge. Transport Strategy

2. Context. Existing framework. The context. The challenge. Transport Strategy Transport Strategy Providing quality connections Contents 1. Introduction 2. Context 3. Long-term direction 4. Three-year priorities 5. Strategy tree Wellington City Council July 2006 1. Introduction Wellington

More information

Greater Cambridge City Deal. Initial consultation on better bus, cycling and walking trips. Milton Road

Greater Cambridge City Deal. Initial consultation on better bus, cycling and walking trips. Milton Road Greater Cambridge City Deal Initial consultation on better bus, cycling and walking trips Milton Road Response by Kings Hedges, East and West Chesterton Labour Parties The Greater Cambridge City Deal has

More information

Appendix N(b): Portishead Station Outline Travel Plan

Appendix N(b): Portishead Station Outline Travel Plan Portishead Branch Lane (MetroWest Phase 1): Environment Impact Assessment Appendix N(b): Portishead Station Outline Travel Plan Prepared for West of England Councils September 2017 1 The Square Temple

More information

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT Update June 2018 Hi, Let s Get Wellington Moving (LGWM) is developing a Recommended Programme of Investment (RPI) that meets our programme objectives and supports the city s and region s growth. As part

More information

Initial ideas for bus and cycle links

Initial ideas for bus and cycle links Initial ideas for bus and cycle links HAVE YOUR SAY The Greater Cambridge City Deal working in partnership: Please complete the survey inside this leaflet or online at: www.gccitydeal.co.uk/a1307 by 1

More information

National Transport Awards Cambridge Park & Ride

National Transport Awards Cambridge Park & Ride National Transport Awards Cambridge Park & Ride What Cambridgeshire has achieved q An award winning scheme focussed on quality. q Four sites, with a fifth site due to be built later this year. q 950,000

More information

MILTON ROAD LLF PROJECT UPDATE

MILTON ROAD LLF PROJECT UPDATE Greater Cambridge City Deal MILTON ROAD LLF PROJECT UPDATE 9 th May 2017 Project objectives Comprehensive priority for buses in both directions wherever practicable; Additional capacity for sustainable

More information

ABERDEEN: CITY OF THE FUTURE

ABERDEEN: CITY OF THE FUTURE ABERDEEN: CITY OF THE FUTURE A contribution towards discussions on a future transport strategy for Aberdeen and its Region Prepared by the Centre for Transport Research University of Aberdeen June 2010

More information

1.2. South Cambridgeshire Local Plan Proposed Submission, July 2013

1.2. South Cambridgeshire Local Plan Proposed Submission, July 2013 Project: A428 Corridor Study To: Subject: Planning Policy Context From: Date: 2 May 2014 cc: 1. Introduction The aim of this note is to provide a brief overview of the national and local policy relating

More information

Cycle network linking Wolverhampton city centre and Bilston town centre with employment sites and residential areas:

Cycle network linking Wolverhampton city centre and Bilston town centre with employment sites and residential areas: Context and Problems Corridor length 12.3 km; Population within 800m 59,922; Jobs within 800m 59,100; Unemployment 11%; Average Index of Multiple Deprivation 46; Households with no car 45%; Proportion

More information

Developing a Birmingham Transport Space Allocation policy. David Harris Transport Policy Manager Economy Directorate Birmingham City Council

Developing a Birmingham Transport Space Allocation policy. David Harris Transport Policy Manager Economy Directorate Birmingham City Council Developing a Birmingham Transport Space Allocation policy David Harris Transport Policy Manager Economy Directorate Birmingham City Council Birmingham s Sustainable Urban Mobility Plan Birmingham Connected

More information

Greater Cambridge City Deal. Initial summary of responses to the Tackling Congestion: Call for Evidence

Greater Cambridge City Deal. Initial summary of responses to the Tackling Congestion: Call for Evidence Greater Cambridge City Deal Initial summary of responses to the Tackling Congestion: Call for Evidence 9 th December 2015 Contents 1. Introduction and overview...2 2. Purpose and limitations of report...3

More information

Technical note. 1. Introduction

Technical note. 1. Introduction Project: A428 study - Phase 2 To: Adrian Shepherd Subject: Park & Ride site locations From: Atkins Date: Jun 3, 2016 cc: Ashley Heller 1. Introduction 1.1. Purpose of Technical Note The purpose of this

More information

Birmingham Connected. Edmund Salt. Transportation Policy Birmingham City Council

Birmingham Connected. Edmund Salt.   Transportation Policy Birmingham City Council Birmingham Connected Edmund Salt Transportation Policy Birmingham City Council www.birmingham.gov.uk/connected Birmingham Connected the story so far Broadly following EU Guidance We ve done all of this

More information

CSRM Modelling Summary Report for Cambridge and South Cambridgeshire Local Plans July 2013

CSRM Modelling Summary Report for Cambridge and South Cambridgeshire Local Plans July 2013 CSRM Modelling Summary Report for Cambridge and South Cambridgeshire Local Plans July 2013 Prepared by WSP Group and Atkins EXECUTIVE SUMMARY This Summary Report outlines the work undertaken by WSP Group

More information

Cambridgeshire Local Transport Plan Policies and Strategy

Cambridgeshire Local Transport Plan Policies and Strategy Cambridgeshire Local Transport Plan 2011 2026 Policies and Strategy John Onslow Acting Executive Director of Environment Services Cambridgeshire County Council Shire Hall Castle Hill Cambridge CB3 0AP

More information

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM. City of Cambridge Transportation Master Plan Public Consultation Centre March 7, 2018 5:00 8:00 PM Region of Waterloo City of Cambridge Transportation Master Plan Public Consultation Centre March 7, 2018

More information

Cambridge South East Transport Study LLF 6 June 2018

Cambridge South East Transport Study LLF 6 June 2018 Cambridge South East Transport Study LLF 6 June 2018 Project Update Public Consultation Completed Assembly 14 June 2018 Executive Board 4 July 2018 Public Consultation Feedback 9 February to 9 April 2018

More information

Transportation Master Plan Advisory Task Force

Transportation Master Plan Advisory Task Force Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved

More information

Part 3: Active travel and public transport planning in new housing developments

Part 3: Active travel and public transport planning in new housing developments 1 Linking active travel and public transport to housing growth and planning Part 3: Active travel and public transport planning in new housing developments Active Travel Toolkit Slide Pack July 2017 Linking

More information

University of Leeds Travel Plan

University of Leeds Travel Plan University of Leeds Travel Plan 2015-2018 Contents 1: Introduction 1.1 What is a Travel Plan? 1.2 Why do we need one? 1.3 Sustainability Strategy 2: Overview 2.1 The bigger picture 2.2 The City scale 2.3

More information

CAMBRIDGE SOUTH WEST PARK & RIDE

CAMBRIDGE SOUTH WEST PARK & RIDE CAMBRIDGE SOUTH WEST PARK & RIDE Have your say on: Extra Park & Ride spaces to the south west of Cambridge Bus priority measures into the city centre CREATING MORE PARK & RIDE SPACES The existing Park

More information

A Strategy for Increasing Walking and Cycling

A Strategy for Increasing Walking and Cycling 37 5 A Strategy for Increasing Walking and Cycling 5. Increasing Walking and Cycling through Developing Greenways 38 5 Increasing Walking and Cycling through Developing Greenways If our society decided

More information

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

CITY OF BLOOMINGTON COMPLETE STREETS POLICY CITY OF BLOOMINGTON COMPLETE STREETS POLICY POLICY OBJECTIVE: The City of Bloomington will enhance safety, mobility, accessibility and convenience for transportation network users of all ages and abilities,

More information

Cambridge Past, Present & Future Wandlebury Ring, Gog Magog Hills Babraham, Cambridge CB22 3AE Phone

Cambridge Past, Present & Future Wandlebury Ring, Gog Magog Hills Babraham, Cambridge CB22 3AE  Phone Cambridge Past, Present & Future Wandlebury Ring, Gog Magog Hills Babraham, Cambridge CB22 3AE www.cambridgeppf.org Phone 01223 243830 CambridgePPF 2015 Statement on Transport This document sets out the

More information

Transportation Assessment

Transportation Assessment Transportation Assessment Midtown Open House February 10, 2018 Overview Midtown in Focus Overview & Purpose of Today Transportation Assessment overview Summary of Transportation work to date Review & Analysis

More information

CAMBRIDGE ACCESS STUDY: TACKLING CONGESTION WORKSHOP

CAMBRIDGE ACCESS STUDY: TACKLING CONGESTION WORKSHOP WEDNESDAY, 18 TH NOVEMBER, 2014 Carl Beet Paul Parkhouse Sarah Tuohy CAMBRIDGE ACCESS STUDY: TACKLING CONGESTION WORKSHOP A REMINDER OF THE CHALLENGE 30,000 EXTRA PEOPLE OF WORKING AGE 44,000 new jobs

More information

Cambridgeshire s Local Sustainable Transport Fund (LSTF) bid

Cambridgeshire s Local Sustainable Transport Fund (LSTF) bid From:- Please reply to: Councillor Ian Bates Box No RES1108 Shire Hall, Castle Hill, Cambridge CB3 0AP Telephone:- Cambridge (01223) 699173 E-Mail: ian.bates@cambridgeshire.gov.uk Dear Sir/Madam, Cambridgeshire

More information

Cambridge Metro: High quality transport infrastructure for the Cambridge City Deal

Cambridge Metro: High quality transport infrastructure for the Cambridge City Deal Cambridge Metro: High quality transport infrastructure for the Cambridge City Deal City Deal Cambridge is currently assessing how to invest the initial City Deal funding of 100m which is available for

More information

London Cycle Network Annual Report 2000

London Cycle Network Annual Report 2000 London Cycle Network Annual Report 2000 A cycle network for London by 2005 A cycle network for London by 2005 The London Cycle Network will: provide local links between residential neighbourhoods, railway

More information

Nottingham Cycle City Frequently Asked Questions

Nottingham Cycle City Frequently Asked Questions Nottingham Cycle City Frequently Asked Questions About the scheme How much money is to be spent on cycling? And where is the money from? We have 6.1 million in Growth Fund which we will be investing directly

More information

CAMBRIDGE EAST SUSTAINABLE TRANSPORT STUDY

CAMBRIDGE EAST SUSTAINABLE TRANSPORT STUDY CAMBRIDGE EAST SUSTAINABLE TRANSPORT STUDY Study Report Final November 2006 Prepared for: Cambridge East Transport Topic Group c/o Cambridgeshire County Council Castle Court Cambridge CB3 0AP Prepared

More information

Active Transportation Infrastructure Investment A Business Case

Active Transportation Infrastructure Investment A Business Case Active Transportation Infrastructure Investment A Business Case In 2016, the Real Estate Foundation awarded the Capital Regional District a $50,000 grant for Shifting Gears: Land Use Change through Active

More information

APPENDIX B: CAMBRIDGE NORTH WEST TRANSPORT STUDY

APPENDIX B: CAMBRIDGE NORTH WEST TRANSPORT STUDY APPENDIX B: CAMBRIDGE NORTH WEST TRANSPORT STUDY Appendices not included due to size Whole report including appendices can be found here: http://www.cambridgeshire.gov.uk/transport/strategies/longterm/developmenta

More information

Evaluating a Cycling Strategy

Evaluating a Cycling Strategy Evaluating a Cycling Strategy Developing a pragmatic methodology in Newcastle Tom King (Newcastle Cycling Forum) Rob Snowball (Newcastle City Council) Context - Newcastle Cycling Strategy Ten year plan

More information

North Coast Corridor:

North Coast Corridor: North Coast Corridor: Connecting People, Transportation & Environment Legislative Hearing: 11.8.10 1 North Coast Corridor Region s Lifeline A Regional Strategy Mobility, Economy & Environment North Coast

More information

Thursday 18 th January Cambridgeshire Travel Survey Presentation to the Greater Cambridge Partnership Joint Assembly

Thursday 18 th January Cambridgeshire Travel Survey Presentation to the Greater Cambridge Partnership Joint Assembly Thursday 18 th January 2018 Cambridgeshire Travel Survey Presentation to the Greater Cambridge Partnership Joint Assembly Contents 1. Study Background 2. Methodology 3. Key Findings An opportunity for

More information

Sustainable Urban Mobility Plan for Aberdeen, Scotland. Louise Napier Senior Planner Aberdeen City Council

Sustainable Urban Mobility Plan for Aberdeen, Scotland. Louise Napier Senior Planner Aberdeen City Council Sustainable Urban Mobility Plan for Aberdeen, Scotland Louise Napier Senior Planner Aberdeen City Council A bit about me.. Louise Napier Senior Planner (Transport Strategy & Programmes) Aberdeen City Council

More information

A1307 HAVERHILL TO CAMBRIDGE CORRIDOR

A1307 HAVERHILL TO CAMBRIDGE CORRIDOR REPORT N O 70012014-003 A1307 HAVERHILL TO CAMBRIDGE CORRIDOR DRAFT CONCEPTS REPORT PUBLIC JANUARY 2016 A1307 HAVERHILL TO CAMBRIDGE CORRIDOR DRAFT CONCEPTS REPORT Cambridgeshire County Council Public

More information

Report to Cabinet. 18 May 2016

Report to Cabinet. 18 May 2016 Agenda Item 8 Report to Cabinet 18 May 2016 Subject: Presenting Cabinet Member: Proposed CCTV Enforcement of Traffic Contraventions in a Bus Lane (Key Decision Ref. No. HE030) Highways and Environment

More information

Madingley Road / A428 Corridor Study Options Appraisal Report Cambridgeshire County Council. 20 June 2014

Madingley Road / A428 Corridor Study Options Appraisal Report Cambridgeshire County Council. 20 June 2014 Cambridgeshire County Council 20 June 2014 Notice This document and its contents have been prepared and are intended solely for Cambridgeshire County Council s information and use in relation to the Madingley

More information

Local Sustainable Transport Fund

Local Sustainable Transport Fund I II III Sustainable travel in Greater Manchester: The journey to a low carbon economy Greater Manchester has a vision of sustainable commuting at the heart of its blueprint for a low carbon economy, as

More information

GETTING WHERE WE WANT TO BE

GETTING WHERE WE WANT TO BE CAMBRIDGESHIRE & peterborough GETTING WHERE WE WANT TO BE A GREEN PARTY TRANSPORT POLICY CONTENTS Our Campaign Priorities 4 Bus Franchising 6 Supporting Active Transport 8 Workplace Parking Levy 9 Tackling

More information

4. Guided Bus Explained

4. Guided Bus Explained 4. Guided Bus Explained Contents 1 INTRODUCTION... 2 Structure of this report... 2 2 KERB GUIDED BUS... 3 Overview... 3 Kerb guidance... 3 Figures Figure 2.1 Figure 2.2 Figure 2.3 Figure 2.4 Figure 2.5

More information

EUROPEAN MOBILITY WEEK September 2015

EUROPEAN MOBILITY WEEK September 2015 EUROPEAN MOBILITY WEEK 16-22 September 2015 Description and objective The European Mobility Week is an annual campaign on sustainable urban mobility, organised with the support of the Directorates General

More information

Integrated Regional Traffic Management. Michael Aherne Technical Director POLIS Conference 2009

Integrated Regional Traffic Management. Michael Aherne Technical Director POLIS Conference 2009 Integrated Regional Traffic Management Michael Aherne Technical Director POLIS Conference 2009 M50 finish Public Transport and Pedestrians College Green The Spatial Perspective What Could has

More information

Design Workshops Summary of all Feedback January 2017

Design Workshops Summary of all Feedback January 2017 Histon Road Corridor Design Workshops Summary of all Feedback January 2017 CITY DEAL AND GROWTH Commitment to Growth: Government, County, City and District Emerging Local Plans: 33,000 new homes 45,000

More information

Progress with the Road Investment Strategy

Progress with the Road Investment Strategy Report by the Comptroller and Auditor General Department for Transport and Highways England Progress with the Road Investment Strategy HC 1056 SESSION 2016-17 22 MARCH 2017 4 Key facts Progress with the

More information

Living Streets response to the Draft London Plan

Living Streets response to the Draft London Plan Living Streets response to the Draft London Plan Contents Living Streets response to the Draft London Plan... 1 About Living Streets... 2 Summary... 2 Consultation response... 3 Chapter 1: Planning London

More information

Arterial Transitway Corridors Study. Ave

Arterial Transitway Corridors Study. Ave Arterial Transitway Corridors Study Ave January 2012 Arterial Transitway Corridors Study Overview Corridor Features and Demographics 11 study corridors, 95 route miles 86,000 daily rides and half of existing

More information

WELCOME. City of Greater Sudbury. Transportation Demand Management Plan

WELCOME. City of Greater Sudbury. Transportation Demand Management Plan WELCOME City of Greater Sudbury Transportation Demand Management Plan Public Consultation Session St. Andrew s Place, Activity Hall 111 Larch Street Wednesday September 13, 2017 6:00 to 8:00 pm Welcome

More information

Welcome. Background. Goals. Vision

Welcome. Background. Goals. Vision Welcome The formal Public Information Centre (PIC) for the Transportation Master Plan How We GO will be held in early 2017. At that time we will present the recommended transportation system for Niagara

More information

Richard Gillingham South Gloucestershire Council

Richard Gillingham South Gloucestershire Council Richard Gillingham South Gloucestershire Council The West of England Area Transport Vision Insert JTS Map Metrobus. why we needed it. Prosperous region 25.5bn/year economy contributes 10bn/year treasury

More information

Nomination. Halton Region in Context

Nomination. Halton Region in Context Transportation Association of Canada Sustainable Urban Transportation Award Nomination of: Region of Halton Regional Transportation Master Plan Study March 2005 Nominated by: Nomination The TAC Sustainable

More information

NOTES FROM JUNIOR COUNCIL ORIENTATION SESSION HELD ON MONDAY, JANUARY 22, 2018, AT 3:30 PM IN COUNCIL CHAMBERS, CITY HALL

NOTES FROM JUNIOR COUNCIL ORIENTATION SESSION HELD ON MONDAY, JANUARY 22, 2018, AT 3:30 PM IN COUNCIL CHAMBERS, CITY HALL CITY OF KAMLOOPS Junior Council Meeting Agenda March 12, 2018, at 3:30 pm in Council Chambers, 7 Victoria Street West, Kamloops, BC Page 1. APPROVAL OF THE AGENDA 2. MINUTES Attachment Recommendation:

More information

Extracting Maximum Benefit from Parking Policy - 10 Years Experience in Perth, Australia. By Emmerson Richardson Sinclair Knight Merz

Extracting Maximum Benefit from Parking Policy - 10 Years Experience in Perth, Australia. By Emmerson Richardson Sinclair Knight Merz Extracting Maximum Benefit from Parking Policy - 10 Years Experience in Perth, Australia By Emmerson Richardson Sinclair Knight Merz Snapshot of Perth > Metropolitan Area Population 1.7 million > 3.5 million

More information

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign E4 Cycle Route Exeter University to Redhayes Bridge - Recommendations from Exeter Cycling Campaign 1.0 Introduction Exeter Cycling Campaign has prepared this report to provide recommendations for Devon

More information

Regional Bus Priority

Regional Bus Priority Regional Bus Priority Recommendation(s) That the Board: i) Notes the systematic review for bus priority measures on the proposed Frequent Transit Network (FTN). Executive summary The New Network public

More information

Land at Chesterton, Cirencester

Land at Chesterton, Cirencester Land at Chesterton, Cirencester Transport Update 22 October 2014 By Mark Gimingham BA (Hons) BTP CMILT MCIHT, Partner, i-transport LLP Purpose To provide an update on progress with the development of the

More information

Westminster s Joint Health and Wellbeing Strategy

Westminster s Joint Health and Wellbeing Strategy Westminster s Joint Health and Wellbeing Strategy 2013 2016 Response from Sustrans General comments From a strategic perspective, Sustrans welcomes the Health and Wellbeing Strategy s focus on encouraging

More information

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street CITY OF MINNEAPOLIS Hennepin Avenue Reconstruction Washington Avenue to 12 th Street April 2016 1 Upcoming Opportunities Public Meeting #2 April 25, 2016 Minneapolis Central Library Doty Board Room Repeat

More information

Cambridge Parking Strategy Review

Cambridge Parking Strategy Review Cambridge Parking Strategy Review Cambridgeshire County Council Report May 2017 Our ref: 23132601 Client ref: SH Cambridge Parking Strategy Review Cambridgeshire County Council Report May 2017 Our ref:

More information

HISTON ROAD Have your say on better public transport, cycling and walking journeys

HISTON ROAD Have your say on better public transport, cycling and walking journeys HISTON ROAD Have your say on better public transport, cycling and walking journeys Have your say: Please complete the survey inside this leaflet or online at www.greatercambridge.org.uk/histonconsultation

More information

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document TELL US Bakers Arms to Leyton Green Road (Section D, E, F) Leyton Green Road to Whipps Cross Roundabout (Section G) YOUR VIEWS www.enjoywalthamforest.co.uk

More information

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006 Corporate NO: C012 Report COUNCIL DATE: June 26, 2006 COUNCIL-IN-COMMITTEE TO: Mayor & Council DATE: June 22, 2006 FROM: General Manager, Engineering FILE: 0410-20(MoT/Gate) SUBJECT: Surrey Response on

More information

What s the issue for transport in Cardiff?

What s the issue for transport in Cardiff? Demand for travel The number of commuters travelling to work in Cardiff has increased from 190,000 in 2001 to 198,000 in 2010, with some 124,000 Cardiff residents travelling across the city daily to their

More information

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10 Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel

More information

Travel Planning WC & NWCD Cycling Group. Thursday 2 nd July Amanda Holden

Travel Planning WC & NWCD Cycling Group. Thursday 2 nd July Amanda Holden Travel Planning WC & NWCD Cycling Group Thursday 2 nd July Amanda Holden 1 Today s workshop What is Travel Planning? University Travel Plan NWCD Travel Plan Targets Cycling Initiatives Other Travel Plan

More information

Canada s Capital Region Delegation to the Velo-City Global 2010 Conference

Canada s Capital Region Delegation to the Velo-City Global 2010 Conference Canada s Capital Region Delegation to the Velo-City Global 2010 Conference Report of Findings from Visits, Meetings & Presentations In Amsterdam-Den Haag, Utrecht, Berlin & Copenhagen The Itinerary Copenhagen

More information

WEST YORKSHIRE LTP CYCLE PROSPECTUS

WEST YORKSHIRE LTP CYCLE PROSPECTUS WEST YORKSHIRE LTP CYCLE PROSPECTUS The West Yorkshire Ambition: To be recognised as a great place for safe cycling, inspiring more people to cycle more often. INTRODUCTION Cycling is low cost, environmentally

More information

Final Plan 20 December 2016

Final Plan 20 December 2016 Final Plan 20 December 2016 Introduction Aims of the Travel Plan How do we travel? Understanding travel behaviours? The University Master Plan and its implications Galway City sustainable transport policies

More information

COMMONWEALTH GAMES TRANSPORT Background Information

COMMONWEALTH GAMES TRANSPORT Background Information COMMONWEALTH GAMES TRANSPORT Background Information Agenda The numbers Roles & Responsibilities G2014 Overview Bus Fleet Venue Transport Spectator & Workforce Transport GCC Transport Infrastructure Games

More information

BUILDING THE CASE FOR TRAVEL OPTIONS IN WASHING TON COUNTY. Image: Steve Morgan. Image: Steve Morgan

BUILDING THE CASE FOR TRAVEL OPTIONS IN WASHING TON COUNTY. Image: Steve Morgan. Image: Steve Morgan BUILDING THE CASE FOR TRAVEL OPTIONS IN WASHING TON COUNTY Image: Steve Morgan Image: Steve Morgan Image: TriMet Image: TriMet WHAT ARE TRAVEL OPTIONS PROGRAMS? Travel options programs encourage residents,

More information

City Deal Public Consultation Response - Cambourne to Cambridge Better Bus Journeys A428/A1303 Improvements

City Deal Public Consultation Response - Cambourne to Cambridge Better Bus Journeys A428/A1303 Improvements Cambridge Past, Present & Future Wandlebury Ring, Gog Magog Hills Babraham, Cambridge CB22 3AE www.cambridgeppf.org Phone 01223 243830 City Deal Public Consultation Response - Cambourne to Cambridge Better

More information

THE PLANNING AND. Transport and the law Integrated transport planning Strategies Responsibilities of local government and road controlling authorities

THE PLANNING AND. Transport and the law Integrated transport planning Strategies Responsibilities of local government and road controlling authorities The planning and policy context Transport and the law Integrated transport planning Strategies Responsibilities of local government and road controlling authorities THE PLANNING AND POLICY CONTEXT Providing

More information

The Greater Cambridge City Deal

The Greater Cambridge City Deal The Greater Cambridge City Deal Submission concerning the Histon Road initial consultation on better bus, cycling and walking trips. From: Carina O Reilly, Charlotte Perry and Mike Todd-Jones, City Councillors,

More information

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm IAN WHITE ASSOCIATES Crawley Station Gateway Public Realm contents 1. objectives & client brief 2. site appraisal 3. best practice guidance 4. design concept 1. objectives & client brief Crawley Train

More information

Cambridge Past, Present & Future Wandlebury Ring, Gog Magog Hills Babraham, Cambridge CB22 3AE Phone

Cambridge Past, Present & Future Wandlebury Ring, Gog Magog Hills Babraham, Cambridge CB22 3AE  Phone Cambridge Past, Present & Future Wandlebury Ring, Gog Magog Hills Babraham, Cambridge CB22 3AE www.cambridgeppf.org Phone 01223 243830 12 November 2015 City Deal Public Consultation Response - Cambourne

More information

Cycle City Ambition Grants

Cycle City Ambition Grants Cycle City Ambition Grants Guidance on the Application Process is published alongside this application form on the Department s website. Please include all relevant information with your completed application

More information

smartertravel >>> The New Policy Framework for Transport in Ireland Aoife O Grady

smartertravel >>> The New Policy Framework for Transport in Ireland Aoife O Grady The New Policy Framework for Transport in Ireland Aoife O Grady National Sustainable Transport Office Why Smarter Travel? The new national policy Smarter Travel Areas What does this mean for What does

More information

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013 Douglas Land Use and Transportation Strategy (DLUTS) Summary August 2013 Background Douglas is a large and popular residential suburb of approximately 30,000 persons on the periphery of Cork City along

More information

KIGALI CITY, RWANDA MODERNIZATION OF TRANSPORT INFRASTRUCTURE AND SERVICES. Presentation to ITC, UTwente Enschede 13 June 2018

KIGALI CITY, RWANDA MODERNIZATION OF TRANSPORT INFRASTRUCTURE AND SERVICES. Presentation to ITC, UTwente Enschede 13 June 2018 KIGALI CITY, RWANDA MODERNIZATION OF TRANSPORT INFRASTRUCTURE AND SERVICES Presentation to ITC, UTwente Enschede 13 June 2018 Dr. Eng. Alphonse NKURUNZIZA City Engineer, City of Kigali Kigali City Projected

More information

Active Travel Strategy Dumfries and Galloway

Active Travel Strategy Dumfries and Galloway Active Travel Strategy Dumfries and Galloway Our Active Travel Strategy The agreed Interventions for Dumfries and Galloway Council s Local Transport Strategy includes an action to Develop an Active Travel

More information

TRANSPORTATION TOMORROW SURVEY

TRANSPORTATION TOMORROW SURVEY Clause No. 15 in Report No. 7 of was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on April 17, 2014. 15 2011 TRANSPORTATION TOMORROW SURVEY recommends

More information

Western Orbital Study Options Report Cambridge City Deal Partnership. September 2015

Western Orbital Study Options Report Cambridge City Deal Partnership. September 2015 Cambridge City Deal Partnership September 2015 Notice This document and its contents have been prepared and are intended solely for Cambridge City Deal Partnership s information and use in relation to

More information

Active travel and economic performance: A What Works review of evidence from cycling and walking schemes

Active travel and economic performance: A What Works review of evidence from cycling and walking schemes 1 Making the economic case for active travel Active travel and economic performance: A What Works review of evidence from cycling and walking schemes Active Travel Toolkit Slide Pack July 2017 Active travel

More information

Auckland Council: Electric bicycle CBD trial

Auckland Council: Electric bicycle CBD trial Auckland Council: Electric bicycle CBD trial This business case has been written to support the purchase of electric bicycles (ebikes) as a trial for business travel by staff at Auckland Council s CBD

More information

Wayfinding and Walking in London. Lilli Matson Transport for London May 2013

Wayfinding and Walking in London. Lilli Matson Transport for London May 2013 Wayfinding and Walking in London Lilli Matson Transport for London May 2013 I want to make walking in London as attractive and enjoyable as possible by making walking count Mayor of London Boris Johnson

More information