1 Bus Stop and Crossings Workshop WSP 19th September 2017

2 Workshop Aims Task 1: Identify preferences for bus stop designs relative to: (a) Ranking preference between 4 possible bus stop designs on the narrower sections of Milton (3.5m to 4.5m width) (b) Ranking preference between 6 possible bus stop designs on the wider sections of Milton (4.5m to 6m width) Task 2: Based on location plans of the Final Design Concept for Milton : Identify preferred locations for bus stops and crossings along Milton Provide reasons to facilitators for decisions on locations (for example closeness to local school etc)

3 Task 1: Bus Stop Design

4 Key Considerations of Bus Stop Designs Pedestrians Cyclists Bus Users Buses General Traffic Most Vulnerable Users Want to be in free flow and not interrupted Want to have free movement and no interruptions Need to not be in conflict with bus uses and pedestrians Least vulnerable of users when not on highway Need a safe place to wait Potential to conflict with cyclists both when waiting and loading/ unloading from buses Disability considerations for loading and unloading Need a clear marked bus stop Minimise dwelltime Need to Easily be able to re-join traffic if not in bus lane Need to ensure no conflict with cyclists Wish for free flow traffic Wish to not be obstructed by Bus However.likely to be impacted. Least important user of Milton scheme

5 Bus Stop Options: Shared Use Arrangement Design Option Considerations: Shared surface for cycle, ped and bus users. No one user type has priority Coloured and textured surfaces to make users aware they are entering a shared space Most common design and therefore people have experience of being in this situation elsewhere in Cambridge Simplest design and can be accommodated on both narrow and wider sections of Milton road

6 Bus Stop Options: Segregated Use Design Option Considerations: Segregated space for ped, cycle and bus users for cycle, Each has their own dedicated space Coloured and textured surfaces to make users aware that bus users have priority over cycle lane when alighting/boarding bus Only possible to deliver in wider sections of Milton Cambridge example can be found on Huntingdon

7 Bus Stop Options: Floating Bus Stop Design Option Considerations: Segregated space for ped, cycle and bus users for cycle, Each has their own dedicated space Cycle users have priority in cycle lane so bus users need to check and give way when alighting bus and crossing to pavement Not felt to be so user friendly for those with disabilities Only possible to deliver in wider sections of Milton Cambridge example can be found on Hills

8 Bus Stop Options: Partial Layby Design Option Considerations: Shared surface for cycle, ped and bus users. No one user type has priority Coloured and textured surfaces to make users aware they are entering a shared space Partial Layby enable express buses and cars to pass the bus while it is stopped while also enabling the bus to easily re-join the traffic Can be accommodated both narrow and wider sections of Milton road Main additional benefit is for general traffic and other buses passing

9 Bus Stop Options: Cyclists Give Way to Pedestrians Design Option Considerations: Segregated space for ped, cycle and bus users for cycle, Each has their own dedicated space. However potential conflict point at cross over. Pedestrians have priority over cyclist at cross over point Need to be mindful of potential safety issues of moving cycle lane to back of highway boundary if driveways are present Can be accommodated both narrow and wider sections of Milton road

10 Bus Stop Options: Pedestrians Give Way to Cyclists Design Option Considerations: Segregated space for ped, cycle and bus users for cycle, Each has their own dedicated space. However potential conflict point at cross over. Cyclists have priority over pedestrians at cross over point Need to be mindful of potential safety issues of moving cycle lane to back of highway boundary if driveways are present Can be accommodated both narrow and wider sections of Milton road

11 Indicative Bus Stop Shelter designs in Cambridge

12 Task 2: Bus Stop & Crossing Locations

13 Bus Stop Locations Identify preferred locations for bus stops and crossings along Milton Provide reasons to facilitators for decisions on locations (for example closeness to local school etc) To assist group discussions the current locations and Do Optimum suggested locations of crossings and bus stops will already be shown on the plan. Are the locations suggested in the Do Optimum still the preferred in the context of the Final Concept Design?

14 Bus Stop Locations: Table Location Plans Explained BUS STOP LOCATION PROPOSED IN THE DO OPTIMUM DESIGN

15 Crossing Location Considerations: If the suggestion is for a new crossing rather then the shifting of location of an existing crossing, what is the need for this crossing? Where is the demand for this crossing coming from? Can a new crossing be justified? Crossings should be a maximum of 50m away from a bus stop Crossings should never be placed directly in-front of a bus stop Consider existing driveways that are marked on the plan. Given peak traffic flow all crossings will be signal Toucan Crossings Consider how having a signal crossing can give benefits to traffic leaving busy side streets when they are red, giving a gap in main flow traffic on Milton

16 TOUCAN Crossings Explained

17 Thank you wsp.com

Milton Road Project Update. Paul van de Bulk 30 January 2018

Milton Road Project Update. Paul van de Bulk 30 January 2018 Milton Road Project Update Paul van de Bulk 30 January 2018 Milton Road Project Objectives Comprehensive priority for buses in both directions wherever practicable; Safer and more convenient routes for

More information

HISTON ROAD Have your say on better public transport, cycling and walking journeys

HISTON ROAD Have your say on better public transport, cycling and walking journeys HISTON ROAD Have your say on better public transport, cycling and walking journeys Have your say: Please complete the survey inside this leaflet or online at www.greatercambridge.org.uk/histonconsultation

More information

Design Workshops Summary of all Feedback January 2017

Design Workshops Summary of all Feedback January 2017 Histon Road Corridor Design Workshops Summary of all Feedback January 2017 CITY DEAL AND GROWTH Commitment to Growth: Government, County, City and District Emerging Local Plans: 33,000 new homes 45,000

More information

MILTON ROAD LLF PROJECT UPDATE

MILTON ROAD LLF PROJECT UPDATE Greater Cambridge City Deal MILTON ROAD LLF PROJECT UPDATE 9 th May 2017 Project objectives Comprehensive priority for buses in both directions wherever practicable; Additional capacity for sustainable

More information

Cycle Track Design Best Practices Cycle Track Sections

Cycle Track Design Best Practices Cycle Track Sections Design Best Practices Sections It is along street segments where the separation and protection methods of cycle tracks offer more comfort than conventional bicycle lanes, and are more attractive to a wide

More information

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation Frascati Road and Temple Hill Route Improvements Outline Design Report to Accompany Public consultation September 2013 Background: Dún Laoghaire-Rathdown is committed to providing high quality pedestrian

More information

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport LONDON BOROUGH OF RICHMOND UPON THAMES Cabinet Member Decision DATE: January 2012 REPORT OF: LEAD OFFICER: SUBJECT: WARDS: The Cabinet Member for Highways & Streetscene Aurang Zeb - Head of Highways &

More information

Welcome. If you have any questions or comments on the project, please contact:

Welcome. If you have any questions or comments on the project, please contact: Welcome This drop-in public open house is intended to provide information about the Bay Street bike lanes project. This project proposes a dedicated cycling facility along Bay Street between Aberdeen Avenue

More information

2.0 LANE WIDTHS GUIDELINE

2.0 LANE WIDTHS GUIDELINE 2.0 LANE WIDTHS GUIDELINE Road Engineering Design Guidelines Version 2.0.1 May 2018 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services initiated

More information

MARKHOUSE ROAD IMPROVEMENTS

MARKHOUSE ROAD IMPROVEMENTS MARKHOUSE ROAD IMPROVEMENTS www.enjoywalthamforest.co.uk Waltham Forest is changing and we want you to be part of it. Thanks to a funding pot of 27million from Transport for London, we re delivering the

More information

CURBSIDE ACTIVITY DESIGN

CURBSIDE ACTIVITY DESIGN 5 CURBSIDE ACTIVITY DESIGN This chapter provides design guidance for separated bike lanes adjacent to curbside activities including parking, loading and bus stops. Typical configurations are presented

More information

Southside Pilot Proposal

Southside Pilot Proposal To improve bicycle access and mobility to UC Berkeley, Downtown Berkeley, and the Southside area, a pilot project could include a two-way parking-protected cycle track. Turn pockets and island bus stops

More information

ACCESSIBLE LOADING ZONES AND PROTECTED BIKE LANES: A UNIVERSAL DESIGN APPROACH. Accessibility Coalition Dec. 2016

ACCESSIBLE LOADING ZONES AND PROTECTED BIKE LANES: A UNIVERSAL DESIGN APPROACH. Accessibility Coalition Dec. 2016 ACCESSIBLE LOADING ZONES AND PROTECTED BIKE LANES: A UNIVERSAL DESIGN APPROACH Accessibility Coalition Dec. 2016 A myth exists that only able-bodied individuals can ride bicycles. In reality, people with

More information

10.0 CURB EXTENSIONS GUIDELINE

10.0 CURB EXTENSIONS GUIDELINE 10.0 CURB EXTENSIONS GUIDELINE Road Engineering Design Guidelines Version 1.0 March 2017 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services

More information

Maynooth Cycling Submission on North South Corridor

Maynooth Cycling Submission on North South Corridor Maynooth Cycling Submission on North South Corridor Maynooth Cycling welcomes the intention to improve facilities and quality of service for pedestrians and cyclists in Maynooth. In particular, we strongly

More information

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document TELL US Bakers Arms to Leyton Green Road (Section D, E, F) Leyton Green Road to Whipps Cross Roundabout (Section G) YOUR VIEWS www.enjoywalthamforest.co.uk

More information

Columbia Pike Implementation Team (CPIT) Meeting

Columbia Pike Implementation Team (CPIT) Meeting Columbia Pike Implementation Team (CPIT) Meeting November 30, 2010 Agenda Introductions / Purpose of Meeting Review of project goals Multimodal project: 10% street design between the curbs Discussion Multimodal

More information

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR SAY Consultation open from 24 September to 5 November 2018 Contents Introduction 3 Background 4 Springwood Drive Roundabout

More information

How do we design for pedestrians? Case study: transforming the Walworth Road

How do we design for pedestrians? Case study: transforming the Walworth Road How do we design for pedestrians? Case study: transforming the Walworth Road David Moores, Director of Public Realm Institution of Highways and Transportation, November 2009 Presentation overview Design

More information

ENFIELD TOWN THE REVISED DESIGN

ENFIELD TOWN THE REVISED DESIGN TOWN THE REVISED DESIGN We re turning Enfield into a borough that encourages walking and cycling, a place that s easy for all of us to get around however we choose to travel. A greener place, with safer

More information

Bicycle Network Submission

Bicycle Network Submission Bicycle Network Submission Complete Streets: Cycleway and Streetscapes Submission to Waverley Council 20 November 2014 Bicycle Network Submission, Complete Streets: Cycleway and Streetscapes 1 Bicycle

More information

Marcus Jones, TRL. Presented by Name Here Job Title - Date

Marcus Jones, TRL. Presented by Name Here Job Title - Date Segregation Insert the title and of priority your at presentation junctions: a here discussion Marcus Jones, TRL Presented by Name Here Job Title - Date Background: TfL cycle facility trials Infrastructure

More information

College Green traffic management changes

College Green traffic management changes College Green traffic management changes No through east-west traffic movements in the College Green area except for pedestrians and cyclists. Two-way bus and tram movements on Lower Grafton Street and

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving

More information

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager LONDON BOROUGH OF RICHMOND UPON THAMES DATE: AUGUST 2015 DECISION MAKER: LEAD OFFICER: SUBJECT: WARDS: Cabinet Member for Highways & Streetscene Highway Infrastructure Manager PROPOSED CYCLING IMPROVEMENTS

More information

Dún Laoghaire Rathdown County Council. Luas to Dart via UCD Cycle and Pedestrian Route

Dún Laoghaire Rathdown County Council. Luas to Dart via UCD Cycle and Pedestrian Route Dún Laoghaire Rathdown County Council Luas to Dart via UCD Cycle and Pedestrian Route October 2012 Luas to Dart via UCD Cycle and Pedestrian Route DOCUMENT CONTROL SHEET Client: Project Title: Document

More information

Joe Routt Boulevard. Access Design Options

Joe Routt Boulevard. Access Design Options Access Design Options Impacted area highlighted in yellow. Access Design Option 1 This option would involve closing Joe Routt between Gene Stallings Blvd. and Houston St. to car and bus traffic, creating

More information

DRAFT. Jesmond Vale Lane. Meldon Terrace. Heaton Road. King John Street. Newcastle City Council

DRAFT. Jesmond Vale Lane. Meldon Terrace. Heaton Road. King John Street. Newcastle City Council Remove footway build-out and reposition crossing equipment & tactile paving uild-out kerb to reduce turning speeds Jesmond Vale Lane Provide gap in parking for right turning cycles Light segregation set-back

More information

4. Guided Bus Explained

4. Guided Bus Explained 4. Guided Bus Explained Contents 1 INTRODUCTION... 2 Structure of this report... 2 2 KERB GUIDED BUS... 3 Overview... 3 Kerb guidance... 3 Figures Figure 2.1 Figure 2.2 Figure 2.3 Figure 2.4 Figure 2.5

More information

MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING

MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING NOVEMBER 216 MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING Cambridgeshire County Council Type of document (version)

More information

The minutes of the meeting held on Tuesday 13th June 2017 were agreed as a correct record. There were no matters arising.

The minutes of the meeting held on Tuesday 13th June 2017 were agreed as a correct record. There were no matters arising. MILTON ROAD LOCAL LIAISON FORUM: MINUTES Date: Tuesday 12th September 2017 Time: 18.00-20:00 Place: Present: Apologies: Chesterton Community College, Rex Freeman Hall LLF Members County Councillor Jocelynne

More information

Bicycle/Bus Conflict Area Study

Bicycle/Bus Conflict Area Study Bicycle/Bus Conflict Area Study Gregory R. Krykewycz, PP, AICP Sr. Transportation Planner Office of Transit, Bicycle, & Pedestrian Planning DVRPC and the regional context Philadelphia s MPO, created in

More information

MAGNA PARK Lutterworth. DHL SUPPLY CHAIN: Design and Access Statement. June

MAGNA PARK Lutterworth. DHL SUPPLY CHAIN: Design and Access Statement. June DHL SUPPLY CHAIN: Design and Access Statement June 2015 CONTENTS SECTION - The Access Proposals 9.1. Site Access 140 9.2. Mere Lane 140 9.3. A5 140 9.4. Footpaths, cycle ways and bridleways 142 SECTION

More information

2. Context. Existing framework. The context. The challenge. Transport Strategy

2. Context. Existing framework. The context. The challenge. Transport Strategy Transport Strategy Providing quality connections Contents 1. Introduction 2. Context 3. Long-term direction 4. Three-year priorities 5. Strategy tree Wellington City Council July 2006 1. Introduction Wellington

More information

Chelmsford City Growth Package

Chelmsford City Growth Package Chelmsford City Growth Package Public Consultation Document Volume 2 West Chelmsford July - August 2017 Chelmsford City Growth Package Public Consultation Document - Volume 2 - West Chelmsford Contents

More information

Road Improvement Consultations Huntingdon Road

Road Improvement Consultations Huntingdon Road Road Improvement Consultations Huntingdon Road General Summary: About You In total, 828 people responded to this consultation. 33.1% indicated they were a resident of Girton. 18.6% stated they were a resident

More information

Background. Caversham a vision for the future. Joint public meeting arranged by:

Background. Caversham a vision for the future. Joint public meeting arranged by: Joint public meeting arranged by: Sharing our Streets Caversham a vision for the future and Caversham Traders Association This presentation followed a presentation by Simon Beasley, Network Manager for

More information

Submission on Clontarf to City Centre Cycle Route with signatures of 1,493 people

Submission on Clontarf to City Centre Cycle Route with signatures of 1,493 people Submission on Clontarf to City Centre Cycle Route with signatures of 1,493 people Route should use a fully segregated two-way cycle path Contact details Cian Ginty - editor, IrishCycle.com - cian.ginty@gmail.com

More information

Urban Street Design and Development

Urban Street Design and Development Urban Street Design and Development Ashok Bhattacharjee, Advisor, Clean Air and Sustainable Mobility, Centre for Science and Environment CSE Workshop on Safe Access and Parking - Lytton Hotel, Kolkata

More information

TRANSPORT AND MOVEMENT

TRANSPORT AND MOVEMENT TRANSPORT AND MOVEMENT Movement Strategy Public Transport Cycling and Walking Road Network Parking Standards Transport Impact Assessments Traffic Management Policies DRAFT POOLBEG PLANNING SCHEME Movement

More information

guide to a phased approach TRIPP

guide to a phased approach TRIPP complete street development guide to a phased approach TRIPP development phases Existing 00 months 00 crores/km Phase 0 months 0 crores/km Phase 09 months 0 to 08 crores/km Phase months 07 to crores/km

More information

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Governance and Priorities Committee Report For the July 2, 2015 Meeting CITY OF VICTORIA For the July 2, 2015 Meeting To: Governance and Priorities Committee Date: From: Subject: Brad Dellebuur, A/Assistant Director, Transportation and Parking Services Executive Summary The

More information

Lawrence Avenue Streetscape Concepts August 30, 2011

Lawrence Avenue Streetscape Concepts August 30, 2011 Lawrence Avenue Streetscape Concepts August 30, 2011 Neighborhood Context Phase II: River to Western Ave. Phase I: Western Ave. to Clark St. Key Map Lawrence Ave. Existing Streetscape Conditions East of

More information

Derby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN. Date: 20 th November, 2018.

Derby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN. Date: 20 th November, 2018. Your Ref: Derby City Council Air Quality - Preferred Option Nov 2018 Derby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN Date: 20 th November, 2018. 1. Introduction: 1.1. Derby Cycling

More information

The Greater Cambridge City Deal

The Greater Cambridge City Deal The Greater Cambridge City Deal Submission concerning the Histon Road initial consultation on better bus, cycling and walking trips. From: Carina O Reilly, Charlotte Perry and Mike Todd-Jones, City Councillors,

More information

ECONOMY PEOPLE ENVIRONMENT

ECONOMY PEOPLE ENVIRONMENT Report Back on Local Transit Improvements May 29, 2013 ECONOMY PEOPLE ENVIRONMENT Intro Council Requested Report Back Topics Progress on Planning for Broadway Subway False Creek Bridges Local Transit Improvements

More information

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design Cycle traffic and the Strategic Road Network Sandra Brown, Team Leader, Safer Roads- Design Highways England A Government owned Strategic Highways Company Department for Transport Road Investment Strategy

More information

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Eliminate on-street parking where it will allow for a dedicated bus only lane % Traffic Dashboard Priorities Survey Responses Introduction 1) Are you familiar with bus rapid transit (BRT)? a. No, BRT is new to me. 597 23.5% b. I ve heard of BRT, but I don t know much about it. 1,136

More information

Maynooth Cycling. Presentation to Maynooth Community Council 14 December 2015

Maynooth Cycling. Presentation to Maynooth Community Council 14 December 2015 Maynooth Cycling Presentation to Maynooth Community Council 14 December 2015 Maynooth Cycling our aims To encourage walking and cycling as an alternative to motorised transportation in Maynooth To encourage

More information

Nottingham Cycle City Frequently Asked Questions

Nottingham Cycle City Frequently Asked Questions Nottingham Cycle City Frequently Asked Questions About the scheme How much money is to be spent on cycling? And where is the money from? We have 6.1 million in Growth Fund which we will be investing directly

More information

BYRES ROAD: PUBLIC REALM Public Consultation

BYRES ROAD: PUBLIC REALM Public Consultation Public Consultation Introduction As a vibrant commercial, shopping and residential location within the heart of the West End Byres Road is an important destination. Its proximity to the University of Glasgow

More information

Chapter 4 - Links Within the Highway. Suitability of Routes

Chapter 4 - Links Within the Highway. Suitability of Routes Chapter 4 - Links Within the Highway Suitability of Routes Most cycling takes place on existing urban roads; this will also be the case with the National Cycle Network. As well as following lightly trafficked

More information

Easton Safer Streets - Final Project Report BRISTOL

Easton Safer Streets - Final Project Report BRISTOL - Final Project Report BRISTOL A Sustrans Community Street Design Project in partnership with Bristol City Council February 07 About Sustrans Sustrans makes smarter travel choices possible, desirable and

More information

Byron Avenue. Public Meeting. Thursday June 16, Traffic Calming Design Sherbourne Road to Island Park Drive

Byron Avenue. Public Meeting. Thursday June 16, Traffic Calming Design Sherbourne Road to Island Park Drive Byron Avenue Traffic Calming Design Sherbourne Road to Island Park Drive Public Meeting Thursday June 16, 2016 Our Lady of Fatima Parish 153 Woodroffe Avenue 6 9pm 1 Project Summary Area Projects Background

More information

Tel: Karime Hassan Chief Executive Exeter City Council Civic Centre Paris Street Exeter EX1 1JN

Tel: Karime Hassan Chief Executive Exeter City Council Civic Centre Paris Street Exeter EX1 1JN Page 1 of 6 Karime Hassan Chief Executive Exeter City Council Civic Centre Paris Street Exeter EX1 1JN Dear Mr Hassan 14th September 2015 Re: Development of Bus & Coach Station Site Following the submission

More information

Guide to the Cycle Enfield Public Consultation on Enfield Town. Produced by the Save Our Enfield Town Campaign Group

Guide to the Cycle Enfield Public Consultation on Enfield Town. Produced by the Save Our Enfield Town Campaign Group Guide to the Cycle Enfield Public Consultation on Enfield Town Produced by the Save Our Enfield Town Campaign Group What s in this guide? Introduction Page 3 What Enfield Council says about Option 1 Page

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

Road Diets FDOT Process

Road Diets FDOT Process Florida Department of TRANSPORTATION Road Diets FDOT Process Humberto Castillero, PE, PTOE Roadway Design Office Purpose of Guide Develop a statewide lane elimination review process Balance state & local

More information

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM. City of Cambridge Transportation Master Plan Public Consultation Centre March 7, 2018 5:00 8:00 PM Region of Waterloo City of Cambridge Transportation Master Plan Public Consultation Centre March 7, 2018

More information

Dodder Greenway Emerging Preferred Route Consultation - October 2018

Dodder Greenway Emerging Preferred Route Consultation - October 2018 Dodder Greenway Emerging Preferred Route Consultation - October 2018 1.0 Introduction Dublin Cycling Campaign is the advocacy group for cycling in Dublin. Dublin Cycling Campaign is the leading member

More information

AUTOMATED AND ZERO EMISSION VEHICLES HOW THEY MIGHT RESHAPE OUR STREETS

AUTOMATED AND ZERO EMISSION VEHICLES HOW THEY MIGHT RESHAPE OUR STREETS AUTOMATED AND ZERO EMISSION VEHICLES HOW THEY MIGHT RESHAPE OUR STREETS BACKGROUND: This study is a collaboration between Urban Circus (Visualisation) and Ethos Urban (Urban Design) Ideas were workshopped

More information

Perne Rd / Radegund Rd Roundabout Cambridge

Perne Rd / Radegund Rd Roundabout Cambridge Perne Rd / Radegund Rd Roundabout Cambridge The conversion of an conventional urban roundabout to continental geometry A little bit of history The first traffic roundabout was built in Sollershott, Letchworth

More information

TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1

TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1 TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL Page 1 Table of Contents 1.0 Introduction... 3 2.0 Project Overview... 3 3.0 Project Proposals... 4 3.1 Enfield Road / Durham Road Junction... 3 5 3.2 Summerfield

More information

European Student Competition VOICE Vulnerable Road Users Organizations in Cooperation Across Europe

European Student Competition VOICE Vulnerable Road Users Organizations in Cooperation Across Europe European Student Competition VOICE Vulnerable Road Users Organizations in Cooperation Across Europe Name of task: Modernization of Grochowska street in Warsaw Area of Grochowska and Minska crossroad Full

More information

CAMBRIDGE SOUTH WEST PARK & RIDE

CAMBRIDGE SOUTH WEST PARK & RIDE CAMBRIDGE SOUTH WEST PARK & RIDE Have your say on: Extra Park & Ride spaces to the south west of Cambridge Bus priority measures into the city centre CREATING MORE PARK & RIDE SPACES The existing Park

More information

The Consultation has now ended.

The Consultation has now ended. The Consultation has now ended. We have received Cabinet Member approval to undertake implementation of the Baker Street Two Way scheme. You are not viewing the most recent documentation. Please visit

More information

Oxford Street West. 21 December https://consultations.tfl.gov.uk/roads/oxford-street/?cid=oxford-street

Oxford Street West. 21 December https://consultations.tfl.gov.uk/roads/oxford-street/?cid=oxford-street Oxford Street West 21 December 2017 https://consultations.tfl.gov.uk/roads/oxford-street/?cid=oxford-street This consultation response is on behalf of the London Cycling Campaign (LCC), the capital s leading

More information

CHECKLIST 5: ROADWORK TRAFFIC SCHEME AUDIT

CHECKLIST 5: ROADWORK TRAFFIC SCHEME AUDIT CHECKLIST 5: ROADWORK TRAFFIC SCHEME AUDIT 5.1 General items 5.1.1 Alignment Are the roadworks located safely with respect to horizontal and vertical alignment? If not, does works signing cater for this?

More information

CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT

CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT 2.1 General topics 2.1.1 Changes since previous audit Do the conditions for which the scheme was originally designed still apply? (for example, no changes to

More information

Report on MEPS Přerov TH MIDDLE EUROPEAN PROJECT SEMINAR LAURA ENJUANES NOGUERO E

Report on MEPS Přerov TH MIDDLE EUROPEAN PROJECT SEMINAR LAURA ENJUANES NOGUERO E 2017 Report on MEPS Přerov 2017 28TH MIDDLE EUROPEAN PROJECT SEMINAR LAURA ENJUANES NOGUERO E01650478 Table of Content 1. Introduction... 1 2. Problem definition... 1 3. Proposed solution in the presentation...

More information

West Midlands Cycle Design Guidance Cycling and the Midland Metro

West Midlands Cycle Design Guidance Cycling and the Midland Metro Transport for the West Midlands Cycling and the Midland Metro September 2017 Project Code: 02821 Phil Jones Associates Ltd Seven House High Street Longbridge Birmingham B31 2UQ philjonesassociates.co.uk

More information

TYPES OF CYCLING. Figure 1: Types of Cycling by Gender (Actual) Figure 2: Types of Cycling by Gender (%) 65% Chi-squared significance test results 65%

TYPES OF CYCLING. Figure 1: Types of Cycling by Gender (Actual) Figure 2: Types of Cycling by Gender (%) 65% Chi-squared significance test results 65% TYPES OF CYCLING 1,980 responses were received to this question (multiple answers were allowed), 727 female (41%) and 1,242 (71%) from male respondents. The most common responses for both genders were

More information

1 This technical note considers the issues associated with the use of tidal flow bus lanes on key public transport corridors in Cambridge.

1 This technical note considers the issues associated with the use of tidal flow bus lanes on key public transport corridors in Cambridge. TECHNICAL NOTE: TIDAL FLOW BUS LANE OPTION ASSESSMENT Purpose 1 This technical note considers the issues associated with the use of tidal flow bus lanes on key public transport corridors in Cambridge.

More information

Report from Embassy Visit to Copenhagen May David Arditti

Report from Embassy Visit to Copenhagen May David Arditti Report from Embassy Visit to Copenhagen May 2013 David Arditti Standard CPH cycle track, one-way 1.5 2m wide, 5cm above carriageway, 5cm below footway Basic one-way cycle track protected by car parking

More information

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study

More information

CAMBRIDGE EAST SUSTAINABLE TRANSPORT STUDY

CAMBRIDGE EAST SUSTAINABLE TRANSPORT STUDY CAMBRIDGE EAST SUSTAINABLE TRANSPORT STUDY Study Report Final November 2006 Prepared for: Cambridge East Transport Topic Group c/o Cambridgeshire County Council Castle Court Cambridge CB3 0AP Prepared

More information

What Is a Complete Street?

What Is a Complete Street? Session 5 Charleen Zimmer, AICP, Zan Associates May 5-7, 2010 What Is a Complete Street? May 2010 5-1 Not a Complete Street More of a Complete Street May 2010 5-2 Benefits of Complete Streets Safety for

More information

Traffic Safety Plan Second Avenue

Traffic Safety Plan Second Avenue Traffic Safety Plan Second Avenue April 2017 City of Greater Sudbury Roads & Transportation Services Division Overview Overview... 2 1.0 Project Overview... 4 2.0 Pedestrian Safety... 4 2.1 Current Infrastructure...

More information

EUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK

EUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK EUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK CITY OF SYRACUSE DEPARTMENT OF PUBLIC WORKS 1200 CANAL STREET EXTENSION SYRACUSE, NEW YORK 13210 DRAFT REPORT DATE: November 13,

More information

Cycling and risk. Cycle facilities and risk management

Cycling and risk. Cycle facilities and risk management Cycling and risk Cycle facilities and risk management Failure to recognize possibilities is the most dangerous and common mistake one can make. Mae Jemison, astronaut 6/11/2010 York Regional Council Cycling

More information

El Centro Mobility Hub

El Centro Mobility Hub The El Centro drive shed comprises a major portion of the El Centro downtown area, which is well served by bus routes. The proposals intend to promote use of public transit through improvements and enhancements

More information

A1307 Haverhill to Cambridge: Approval to consult on transport improvement concepts

A1307 Haverhill to Cambridge: Approval to consult on transport improvement concepts Report To: Greater Cambridge City Deal Executive Board 3 March 2016 Lead Officer: Graham Hughes, Executive Director of Economy, Transport and Environment, Cambridgeshire County Council A1307 Haverhill

More information

A65 TRANSPORT ASSESSMENT. 13 th May 2005

A65 TRANSPORT ASSESSMENT. 13 th May 2005 A65 TRANSPORT ASSESSMENT 13 th May 2005 1 CONTENTS 1.0 Introduction 2.0 Overview 3.0 Detailed Assessment of the A65 Corridor 4.0 Future Proposals 5.0 Conclusions List of Figures Figure 1: AM Average Traffic

More information

Side Roads and Other Non-Signalised Junctions

Side Roads and Other Non-Signalised Junctions Green Surfacing Sections of the Cycle Superhighway are marked with green paint these highlight sections where people cycling the Superhighway are likely to come into contact with walkers, drivers, or other

More information

Topic No January 2000 Manual on Uniform Traffic Studies Revised July Chapter 8 GAP STUDY

Topic No January 2000 Manual on Uniform Traffic Studies Revised July Chapter 8 GAP STUDY Chapter 8 8.1 PURPOSE GAP STUDY (1) The Gap Study is used to determine the size and the number of gaps in the vehicular traffic stream for unsignalized intersections and access points, pedestrian studies,

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation

More information

The existing site constraints which may be encountered for the A428 scheme proposals are divided into sections as follows.

The existing site constraints which may be encountered for the A428 scheme proposals are divided into sections as follows. Project: A428 Study To: Cambridgeshire County Council Subject: Tidal Bus lane Review From: Atkins Date: 24 May 2016 cc: Introduction As part of the A428 Corridor Study to improve the bus journey time between

More information

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21 DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.

More information

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County. Transportation PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN NON-MOTORIZED PLAN CONTENTS Goals, Policies, and Action Strategies Table 4 (Bike Facility Classifications and Descriptions) Table 5 (Bike Facility

More information

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm IAN WHITE ASSOCIATES Crawley Station Gateway Public Realm contents 1. objectives & client brief 2. site appraisal 3. best practice guidance 4. design concept 1. objectives & client brief Crawley Train

More information

Cambridge Cycling Campaign

Cambridge Cycling Campaign February 15, 2016 Our Ref: RH 160215 Milton Road Consultation Response City Deal Team, SH1311, Shire Hall, Cambridge CB3 0AP Cambridge Cycling Campaign Llandaff Cambers, 2 Regent Street, Cambridge CB2

More information

MCARTHUR AVENUE AS WE HEARD IT REPORT CYCLING LANES. City of Ottawa Transportation Services. Photo: istock

MCARTHUR AVENUE AS WE HEARD IT REPORT CYCLING LANES. City of Ottawa Transportation Services. Photo: istock MCARTHUR AVENUE CYCLING LANES Photo: istock AS WE HEARD IT REPORT City of Ottawa Transportation Services CONTENTS Background...1 Consultation Activities Summary...1 Public Commentary Questionnaire Results...2

More information

Monroe Street Reconstruction

Monroe Street Reconstruction Total participants: 45+ Monroe Street Reconstruction Cross Section Workshop Notes September 29, 2016, Wingra School Workshop Orientation, Technical and Functional Considerations: The workshop began with

More information

(HIGHWAY GEOMETRIC DESIGN -1)

(HIGHWAY GEOMETRIC DESIGN -1) LECTURE HOUR-19 TE-1(10CV56) UNIT-3 (HIGHWAY GEOMETRIC DESIGN -1) Width of carriage way: Width of the carriage way or the width of the pavement depends on the width of the traffic lane and number of lanes.

More information

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015 Implementing Complete Streets in Ottawa October 1, 2015 The Essentials Complete Streets Implementation Framework will become part of the routine delivery of City transportation projects Approach uses every

More information

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street

Hennepin Avenue Reconstruction Washington Avenue to 12 th Street CITY OF MINNEAPOLIS Hennepin Avenue Reconstruction Washington Avenue to 12 th Street April 2016 1 Upcoming Opportunities Public Meeting #2 April 25, 2016 Minneapolis Central Library Doty Board Room Repeat

More information

Bus Lane Laws. What happens if you have to go into a bus lane? Bus lanes. Penalties of using bus lanes. When can you use them? Who can use them?

Bus Lane Laws. What happens if you have to go into a bus lane? Bus lanes. Penalties of using bus lanes. When can you use them? Who can use them? CITY DRIVING GUIDE Introduction There are major differences for drivers driving in cities as opposed to driving on roads elsewhere. The set of challenges the driver will face driving in a city can be daunting

More information

Cyclists at road narrowings

Cyclists at road narrowings Traffic Advisory Leaflet 1/97 February 1997 Cyclists at road narrowings Introduction Traffic calmed streets can offer a more attractive environment for cycling, by reducing motor vehicles speeds to a level

More information

Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008

Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008 Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008 The following amendments to the wording of the maintenance strategy apply following the revised maintenance