1 Finl Drft s Approved by Technicl Subcommittee SEWRPC Plnning Report No. 7 A REGIONAL FREEWAY RECONSTRUCTION SYSTEM PLAN FOR SOUTHEASTERN WISCONSIN Chpter V FREEWAY SYSTEM PROBLEMS AND DEFICIENCIES: PHYSICAL DESIGN, TRAFFIC SAFETY, AND TRAFFIC CONGESTION INTRODUCTION This chpter will describe for ech freewy segment nd for the freewy system s whole, its existing nd potentil future trffic problems nd deficiencies. The physicl design deficiencies of ech segment of the freewy system will be determined by identifying those elements of the freewy system which do not currently meet ccepted modern freewy design stndrds. Also, trffic sfety problems on ech segment of the freewy system will be identified by reviewing the number nd rte of trffic ccidents over the pst three yers. The existing nd potentil future trffic congestion problems on the freewy system will be identified, including tht trffic congestion which my be expected to remin even upon implementtion of other trnsporttion system improvement nd expnsion s clled for in the dopted regionl trnsporttion pln. Some of the deficiencies of the current freewy system which will be identified in this chpter exist due to the dvncement in knowledge bout freewy opertions nd design which hs been chieved since the time of originl freewy construction, nd the evolution of modern freewy design criteri. Others my exist becuse the originl plnned freewy system, s shown on Mp 5-1, ws never completed. FREEWAY SYSTEM PHYSICAL DESIGN DEFICIENCIES Freewy Design Stndrds The extent to which the physicl chrcteristics of ech segment of the freewy system meets modern freewy design stndrds ws determined by compring the physicl design chrcteristics of ech freewy segment to

2 E ZOO STADIUM Mp 5-1 ORIGINAL PLANNED REGIONAL FREEWAY SYSTEM AND EXISTING FREEWAY SYSTEM FREEWAY U S H 1 8 PLANNED FREEWAY DESIGNYEAR 1990 EXISTING FREEWAYS YEAR 2001 NUMBER OF LANES 5 FOND DU LAC U S H WEST BEND FREEWAY FREEWAY STADIUM NORTH- SOUTH FREEWAY EAST- WEST BAY FR FREEWAY E E WAY U S H 1 IH 9 BELT WAY E FR BAY FREEWAY U S H 5 FREEWAY 8 FREEWAY PARK FREEWAY AIRPORT FREEWAY WAY AIRPORT SPUR FREEWAY GRAPHIC SCALE MILES BELT FREEWAY FREE U S H 12 FREEWAY FREEWAY LAKE RACINE LOOP FREEWAY ROCK U S H 12 I H 9 NORTH- SOUTH The originl plnned freewy system is the recommended freewy system in the Southestern Wisconsin Regionl Plnning Commission s design yer 1990 lnd use nd trnsporttion plns which were completed in 19. Source: SEWRPC. 1

3 modern freewy design stndrds. The primry sources for these design stndrds were the Americn Assocition of Stte Highwy nd Trnsporttion Officil s (AASHTO) report entitled A Policy on Geometric Design Stndrds of Highwys nd Streets nd the Wisconsin Deprtment of Trnsporttion s (WisDOT) Fcilities Development Mnul. The design stndrds re defined in Tble 5-1 nd include: Verticl Curvture Stopping Sight Distnce Horizontl Curvture Verticl Alignment Lne Width Shoulder Width Lne Blnce nd Route Continuity Entrnce/Exit Rmp Spcing Verticl Clernce, nd Weving The design stndrds of verticl curvture stopping sight distnce, horizontl curvture, shoulder width, lne blnce nd route continuity, nd weving include both desirble stndrds nd minimum stndrds. The design stndrds of verticl lignment, lne width, entrnce/exit rmp spcing, nd verticl clernce include only one stndrd which is both the desirble nd minimum stndrd. Design stndrds re provided for both 70 miles per hour freewy design speed nd 0 miles per hour freewy design speed. The existing freewy system in Milwukee County ws principlly designed nd constructed with 0 miles per hour design speed; therefore, the design stndrds for 0 miles per hour design speed were pplied in Milwukee County for the identifiction of freewy design deficiencies. The existing freewy system in the other six counties of the southestern Wisconsin Region ws principlly designed nd constructed with 70 miles per hour design speed; therefore, the design stndrds for 70 miles per hour design speed were pplied in these six counties. However, design stndrds relted to lne width, shoulder width, lne blnce nd route continuity, verticl clernce, entrnce/exit rmp spcing nd weving do not vry with design speed. Only the design stndrds of verticl curvture stopping sight distnce, horizontl curvture, nd verticl lignment vry with design speed. In ddition to these physicl design stndrds, design guideline for interchnge spcing ws defined. The design stndrds were pplied to ech freewy segment to determine design deficiencies. The interchnge spcing design guideline ws pplied to ech freewy segment to identify those segments of freewy with less thn desirble or minimum interchnge spcing which my be expected to ffect freewy opertions. 2

4 Tble 5-1 FREEWAY DESIGN STANDARDS AND GUIDELINES FOR THE SOUTHEASTERN WISCONSIN REGIONAL FREEWAY SYSTEM Stndrd Level Design Speed of 70 Miles Per Hour Design Speed of 0 Miles per Hour b Verticl Curvture Stopping Sight Distnce Provide dequte sight distnce to observe n obstcle locted on the freewy in crest or sg curve nd rect nd stop your vehicle in sfe nd comfortble mnner prior to reching the Desirble Crest-rte of verticl curvture of 50 or more. Sg-rte of verticl curvture of 220 or more. obstcle. Minimum Crest-rte of verticl curvture of 290 or more. Sg-rte of verticl curvture of 150 or more. Crest-rte of verticl curvture of 310 or more. Sg-rte of verticl curvture of 10 or more. Crest-rte of verticl curvture of 190 or more. Sg-rte of verticl curvture of 120 or more. Horizontl Curvture Desirble No more thn 2 00 of curvture No more thn 3 00 of curvture Avoid shrp curves so trvel cn be mde sfely t design speeds. Minimum No more thn 2 5 of curvture No more thn 15 of curvture Verticl Alignment (Grde) Avoid steep grdes to mximize sight distnce, permit design speeds to be chieved by ll types of vehicles, nd minimize vritions in vehicle speeds. Provide some grde to fcilitte dringe. Lne Width Provide dequte width of trvel lne to llow for sfe nd comfortble driving. Desirble/Minimum No more thn 2.5% nd no less thn 0.5% No more thn 3.0% nd no less thn 0.5% Desirble/Minimum 12 feet 12 feet Shoulder Width Desirble 12 feet 12 feet Provide dequte width to shelter stopped vehicle Minimum 10 feet 10 feet Lne Blnce nd Route Continuity Lne blnce would mintin the number of lnes provided over freewy, nd prticulrly the number of lnes provided through interchnges would be consistent with the number of lnes pproching the interchnge. Route continuity would provide directionl pth through n interchnge which delinetes the mjor route nd minimizes the need for lne chnges to follow the mjor route. Entrnce/Exit Rmp Spcing Provide dequte distnce between freewy rmps mesured from rmp nose to rmp nose to llow trffic to merge with, nd diverge from, the freewy minline without impeding djcent freewy rmp trffic or freewy minline trffic. Desirble Minimum Route continuity nd lne blnce chieved Route continuity not chieved, but lne blnce chieved Route continuity nd lne blnce chieved Desirble/Minimum 200 feet or more 200 feet or more Route continuity not chieved, but lne blnce chieved 2

5 Tble 5-1 (continued) Stndrd Level Design Speed of 70 Miles Per Hour Design Speed of 0 Miles per Hour b Verticl Clernce Minimum height of bridges over the freewy mesured from the pvement to the bottom of freewy overpsses. Weve Segments Stretches of freewy where two or more trffic strems must cross ech other or chnge lnes between djcent merge nd diverge points. Desirble/Minimum 1 feet c 1 feet c Desirble Minimum No left hnd rmps or left lne drops, nd desirble spcing of freewy system nd service interchnge rmp noses of 2800 feet nd freewy service interchnge rmp noses of 200 feet. No left hnd rmps or left lne drops, nd minimum spcing of freewy system nd service interchnge rmp noses of 2000 feet nd freewy service interchnge rmp noses of 100 feet. No left hnd rmps or left lne drops, nd desirble spcing of freewy system nd service interchnge rmp noses of 2800 feet nd freewy service interchnge rmp noses of 200 feet. No left hnd rmps or left lne drops, nd minimum spcing of freewy system nd service interchnge rmp noses of 2000 feet nd freewy service interchnge rmp noses of 100 feet. Guideline Level Design Speed of 70 Miles Per Hour Design Speed of 0 Miles per Hour b Interchnge Spcing Provide dequte distnce between djcent interchnges to minimize the impct on freewy minline opertions of merging, diverging, nd weving movements ttendnt to freewy interchnges. Desirble Minimum 5 miles d 2 miles d 2 miles d 1.0 mile d Applied to freewy segments in ll counties in the Region except Milwukee County. b Applied to ll freewy segments in Milwukee County. c The minimum verticl clernce for signs nd pedestrin bridges over freewy is 17 feet. d Interchnge spcing cn be reduced if uxiliry lnes re provided. Source: Americn Assocition of Stte Highwy nd Trnsporttion Officils nd Wisconsin Deprtment of Trnsporttion. 2b

6 The identifiction of design deficiencies ddresses the physicl design problems on the freewy minline including the connections of freewy interchnge rmps with the minline freewy. The design problems of individul freewy interchnges, including their connections with the surfce rteril street system, hve not been identified in this nlysis. These design problems include the briding of freewy on-nd off-rmps with freewy frontge rods in Kenosh nd Rcine Counties. This prticulr design problem ws ddressed in preliminry engineering study completed by the Wisconsin Deprtment of Trnsporttion in the lte 1990 s. Freewy System Physicl Design Deficiencies Physicl design deficiencies were identified for ech segment of the freewy system by compring the design chrcteristics of ech freewy segment to the modern freewy design stndrds. Mps for ech segment nd system interchnge of the freewy system depicting the extent to which ech freewy segment nd system interchnge meets ech design stndrd re provided in Appendix A. Figure 5-1 summrizes the extent to which ech freewy segment nd system interchnge meet or do not meet ech design stndrd, nd the ttendnt physicl design deficiencies of ech freewy segment with respect to ech stndrd. The findings of this nlysis of the physicl existing design deficiencies of the freewy system, s further summrized on Mp 5-2, indictes tht: Mny of the oldest freewy segments, predominntly in Milwukee County, do not meet number of modern design stndrds for much of their length. Mny older freewy segments, in outlying counties, generlly meet the modern design stndrds with the exception of one or two stndrds t isolted loctions. A number of freewy segments t the fr outlying portions of the Region fully meet ll design stndrds. TRAFFIC SAFETY PROBLEMS The trffic sfety problems of the existing freewy system were ssessed by nlyzing the trffic crsh, or ccident, history of the freewy system over recent three yer period of 199, 1997, nd The trffic crsh rte for ech one-tenth mile segment of the 272 mile regionl freewy system ws estimted for the three yer period. The estimted trffic crsh rte, expressed s the number of crshes per 100 million vehicle-miles for ech freewy segment, ws compred to both the regionl freewy system verge crsh rtes nd the verge crsh rte for freewys within the county within which the freewy segment ws locted. Those freewy segments with crsh rtes which exceeded the regionl verge crsh rte, nd/or which exceeded their county 3

7 Figure 5-1 SUMMARY OF PHYSICAL DESIGN DEFICIENCIES OF THE FREEWAY SYSTEM OF SOUTHEASTERN WISCONSIN KEY: The portion of cell colored specific color represents the pproximte proportion of the segment s length clssified s meeting or not meeting desirble nd minimum stndrds. Meets Desirble Stndrd Meets Minimum Stndrd Does Not Meet Either Stndrd Dt Not Avilble t this Time Not Applicble to System Interchnges Freewy Segment Reference Number (See Mp Fcility/ A-1) Fcilities Description 1 IH 9 Illinois Stte Line to STH 158 Verticl Curvture Approximte Extent of Freewy Segment Meeting or Not Meeting Desirble nd Minimum Stndrds Lne Verticl Blnce Entrnce/ Horizontl Alignment Shoulder nd Route Verticl Exit Rmp Curvture (Grde) Width Continuity Clernce b Spcing Lne Width Weve Segments 2 IH 9 STH 20 to STH IH 9 Rcine/ Milwukee Co. Line to STH 20 IH 9 Mitchell Interchnge to Rcine Co. Line 5 IH 3/9 Mrquette Interchnge to Mitchell Interchnge IH 89 Hle Interchnge to Mitchell Interchnge 7 IH 89 Zoo Interchnge to Hle Interchnge 8 IH 9 Zoo Interchnge to Mrquette Interchnge 3

8 Freewy Segment Reference Number (See Mp Fcility/ A-1) Fcilities Description 9 USH 1/ Ntionl Avenue STH 31 to Lisbon Avenue Verticl Curvture Figure 5-1 (continued) Approximte Extent of Freewy Segment Meeting or Not Meeting Desirble nd Minimum Stndrds Lne Verticl Blnce Entrnce/ Horizontl Alignment Shoulder nd Route Verticl Exit Rmp Curvture (Grde) Width Continuity Clernce b Spcing Lne Width Weve Segments 10 IH 3 Silver Spring Drive to the Mrquette Interchnge 11 IH 3 STH 17/57 to Silver Spring Drive 12 IH 3 STH 0/ Ozukee CTH Q to STH 17/ STH IH 3 Ozukee CTH P to STH 0 1 IH 3 Ozukee CTH P to Ozukee/ Sheboygn Co. Line 15 IH 3 Wukesh CTH Y to the Hle Interchnge 1 IH 3 STH 83 to Wukesh CTH Y 17 IH 3 STH 120 to STH IH 3 USH 12 to STH IH 3 STH 50 to USH 12 3b

9 Freewy Segment Reference Number (See Mp Fcility/ A-1) Fcilities Description 20 IH 3 Wlworth/ Rock Co. Line to STH 50 Verticl Curvture Figure 5-1 (continued) Approximte Extent of Freewy Segment Meeting or Not Meeting Desirble nd Minimum Stndrds Lne Verticl Blnce Entrnce/ Horizontl Alignment Shoulder nd Route Verticl Exit Rmp Curvture (Grde) Width Continuity Clernce b Spcing Lne Width Weve Segments 21 USH 12 IH 3 to STH USH 12 STH 120 to Illinois Stte Line 23 IH 9 Wukesh CTH Y to the Zoo Interchnge 2 IH 9 STH 1 to Wukesh CTH Y 2 IH 9 STH 83 to Wukesh STH 1 25 IH 9 Jefferson/ Wukesh Co. Line to STH 83 2 STH 1 Wukesh CTH KE to IH 9 27 STH 1 Wukesh CTH KE to Wukesh CTH R 28 USH 5 Zoo Interchnge to STH USH 5 STH 100 to North Interchnge 3c

10 Freewy Segment Reference Number (See Mp Fcility/ A-1) Fcilities Description 30 STH 15 North Interchnge to 8th Street Verticl Curvture Figure 5-1 (continued) Approximte Extent of Freewy Segment Meeting or Not Meeting Desirble nd Minimum Stndrds Lne Verticl Blnce Entrnce/ Horizontl Alignment Shoulder nd Route Verticl Exit Rmp Curvture (Grde) Width Continuity Clernce b Spcing Lne Width Weve Segments 31 USH North 1/5 Interchnge to USH 1/5 Interchnge 32 USH 5 USH 1/ 5 Interchnge to Wshington CTH D 33 USH 1 Wshington CTH K to USH 5 3 USH 1 Wshington CTH K to Wshington/ Dodge Co. Line 35 STH 119 IH 9 to Estern Terminus 3 IH 79 Mrquette Interchnge to Crferry Drive 50 IH 9/ Zoo IH 89/ Interchnge USH 5 51 IH 3/ Mrquette IH 9/ Interchnge c IH IH 3/ Hle IH 89/ Interchnge USH 5 53 IH 3/ Mitchell IH 9/ Interchnge IH 89 3d

11 Freewy Segment Reference Number (See Mp Fcility/ A-1) Fcilities Description 5 USH 1/ North USH 5/ Interchnge STH 15 Verticl Curvture Figure 5-1 (continued) Approximte Extent of Freewy Segment Meeting or Not Meeting Desirble nd Minimum Stndrds Lne Verticl Blnce Entrnce/ Horizontl Alignment Shoulder nd Route Verticl Exit Rmp Curvture (Grde) Width Continuity Clernce b Spcing Lne Width Weve Segments 55 USH 1/ USH 1/ USH 5 USH 5 Interchnge 5 IH 9/ IH 9/ STH 1 STH 1 Interchnge 57 IH 3/ IH 3/ USH 12 USH 12 Interchnge 58 IH 9/ IH 8/ STH 119 STH 119 Airport Interchnge 59 IH 9/ Stdium USH 1/ Interchnge STH 31 Identifiction of design deficiencies bsed on criteri included in Tble 5-1. The extent of ech of the freewy segment meeting or not meeting the minimum or desirble stndrds is displyed on the mps included in Appendix A. b The extent of ech segment meeting or not meeting the minimum stndrd for verticl clernce pplies only to the extent of structures present within ech segment. c Dt for the Mrquette Interchnge is not presented here becuse tht system interchnge is being considered by seprte study. Source: SEWRPC. 3e

12 Mp 5-2 EXISTING FREEWAY SYSTEM PHYSICAL DESIGN DEFICIENCIES: 2000 FREEWAY SEGMENTS SEGMENT WITH A NUMBER OF DESIGN DEFICIENCIES OVER MUCH OF ITS LENGTH SEGMENT WITH DESIGN DEFICIENCIES AT ISOLATED LOCATIONS SEGMENT WHICH FULLY OR NEARLY FULLY MEETS THE DESIGN STANDARDS DATA NOT AVAILABLE AT THIS TIME SYSTEM INTERCHANGES INTERCHANGE WITH A NUMBER OF DESIGN DEFICIENCIES INTERCHANGE WITH ONE DESIGN DEFICIENCY DATA NOT AVAILABLE AT THIS TIME INTERCHANGE BEING ADDRESSED BY SEPARATE STUDY GRAPHIC SCALE MILES A system interchnge is n interchnge between segments of the regionl freewy system. Source: SEWRPC. 3f

13 freewy verge crsh rte were considered to experience trffic sfety problems which my wrrnt considertion during the review of freewy redesign lterntives. The verge freewy crsh rtes within southestern Wisconsin nd within ech of the seven counties of southestern Wisconsin re shown on Figure 5-2. Only the Milwukee County freewy crsh rte, 10 crshes per 100 million vehicle-miles, is greter thn the Region verge freewy crsh rte of 77 crshes per 100 million vehicle-miles. Mp 5-3 displys those freewy segments within southestern Wisconsin with verge trffic crsh rtes which exceed the regionl verge freewy crsh rte. Within ech county there re freewy segments which exceed the regionl verge crsh rte. Mps 5- through 5-10 disply for ech of the seven counties those freewy segments which exceed the verge crsh rte for freewys within ech county. Freewy segments with trffic crsh problems my be considered to be those which exceed the regionl freewy system verge crsh rte nd/or their county freewy system verge crsh rte. The trffic crsh rtes for the southestern Wisconsin freewy system my be compred to sttewide highwy crsh rtes. The trffic crsh rtes for federl interstte freewys locted in urbn res in Wisconsin is n estimted 10 crshes per 100 million vehicle-miles, nd for ll other interstte freewys is 7 crshes per 100 million vehicle-miles. TRAFFIC CONGESTION PROBLEMS This section will document the existing trffic congestion on the freewy system of southestern Wisconsin. Historic levels of trffic congestion on the freewy system will lso be presented for comprison to the existing level nd to document the historic trend in the growth of freewy trffic congestion in southestern Wisconsin. Also, the estimted current nd historic levels of freewy system trffic congestion will be compred to forecst future yer 2020 levels of freewy trffic congestion. Freewy trffic congestion cn be clssified into three levels s follows: Extreme Trffic Congestion Freewy speeds of 20 to 30 miles per hour or less. Brekdown of freewy trffic flow with stop-nd-go, bumper-to-bumper trffic. No bility to mneuver or chnge lnes. Defined s level of service F.

14 Figure 5-2 FREEWAY CRASH RATES WITHIN THE SOUTHEASTERN WISCONSIN REGION: CRASH RATE (CRASHES PER 100 MILLION VEHICLE MILES) REGION KENOSHA COUNTY MILWAUKEE COUNTY OZAUKEE COUNTY RACINE COUNTY WALWORTH COUNTY WASHINGTON COUNTY WAUKESHA COUNTY The verge freewy crsh rte for the six counties of the Southestern Wisconsin Region except Milwukee County is 51 crshes per 100 million vehicle miles. Source: Wisconsin Deprtment of Trnsporttion.

15 Mp 5-3 CRASH RATES ON THE FREEWAY SYSTEM WITHIN THE SOUTHEASTERN WISCONSIN REGION: CRASH RATES PER 100 MILLION VEHICLE MILES 7.9 OR LESS OR GREATER GRAPHIC SCALE MILES The verge crsh rte on the freewy system in southestern Wisconsin from 199 through 1998 ws 7.9 crshes per 100 million vehicle miles. Source: Wisconsin Deprtment of Trnsporttion. b

16 Mp 5- CRASH RATES ON THE FREEWAY SYSTEM IN KENOSHA COUNTY: COUNTYWIDE FREEWAY AVERAGE 1% TO 50% ABOVE COUNTYWIDE FREEWAY AVERAGE 51% TO 100% ABOVE COUNTYWIDE FREEWAY AVERAGE MORE THAN 100% ABOVE COUNTYWIDE FREEWAY AVERAGE GRAPHIC SCALE MILES The verge crsh rte on the freewy system in Kenosh County from 199 through 1998 ws 70. crshes per 100 million vehicle miles. Source: Wisconsin Deprtment of Trnsporttion. c

17 Mp 5-5 CRASH RATES ON THE FREEWAY SYSTEM IN MILWAUKEE COUNTY: COUNTYWIDE FREEWAY AVERAGE 1% TO 50% ABOVE COUNTYWIDE FREEWAY AVERAGE 51% TO 100% ABOVE COUNTYWIDE FREEWAY AVERAGE MORE THAN 100% ABOVE COUNTYWIDE FREEWAY AVERAGE GRAPHIC SCALE MILES The verge crsh rte on the freewy system in Milwukee County from 199 through 1998 ws 10.1 crshes per 100 million vehicle miles. Source: Wisconsin Deprtment of Trnsporttion. d

18 Mp 5- CRASH RATES ON THE FREEWAY SYSTEM IN OZAUKEE COUNTY: COUNTYWIDE FREEWAY AVERAGE 1% TO 50% ABOVE COUNTYWIDE FREEWAY AVERAGE 51% TO 100% ABOVE COUNTYWIDE FREEWAY AVERAGE MORE THAN 100% ABOVE COUNTYWIDE FREEWAY AVERAGE GRAPHIC SCALE MILES The verge crsh rte on the freewy system in Ozukee County from 199 through 1998 ws 53.5 crshes per 100 million vehicle miles. Source: Wisconsin Deprtment of Trnsporttion. e

19 Mp 5-7 CRASH RATES ON THE FREEWAY SYSTEM IN RACINE COUNTY: COUNTYWIDE FREEWAY AVERAGE 1% TO 50% ABOVE COUNTYWIDE FREEWAY AVERAGE 51% TO 100% ABOVE COUNTYWIDE FREEWAY AVERAGE MORE THAN 100% ABOVE COUNTYWIDE FREEWAY AVERAGE GRAPHIC SCALE MILES The verge crsh rte on the freewy system in Rcine County from 199 through 1998 ws 1.3 crshes per 100 million vehicle miles. Source: Wisconsin Deprtment of Trnsporttion. f

20 Mp 5-8 CRASH RATES ON THE FREEWAY SYSTEM IN WALWORTH COUNTY: COUNTYWIDE FREEWAY AVERAGE 1% TO 50% ABOVE COUNTYWIDE FREEWAY AVERAGE 51% TO 100% ABOVE COUNTYWIDE FREEWAY AVERAGE MORE THAN 100% ABOVE COUNTYWIDE FREEWAY AVERAGE The verge crsh rte on the freewy system in Wlworth County from 199 through 1998 ws 0.3 crshes per 100 million vehicle miles. Source: Wisconsin Deprtment of Trnsporttion. GRAPHIC SCALE MILES g

21 Mp 5-9 CRASH RATES ON THE FREEWAY SYSTEM IN WASHINGTON COUNTY: COUNTYWIDE FREEWAY AVERAGE 1% TO 50% ABOVE COUNTYWIDE FREEWAY AVERAGE 51% TO 100% ABOVE COUNTYWIDE FREEWAY AVERAGE GRAPHIC SCALE MILES MORE THAN 100% ABOVE COUNTYWIDE FREEWAY AVERAGE The verge crsh rte on the freewy system in Wshington County from 199 through 1998 ws 52.8 crshes per 100 million vehicle miles. Source: Wisconsin Deprtment of Trnsporttion. h

22 Mp 5-10 CRASH RATES ON THE FREEWAY SYSTEM IN WAUKESHA COUNTY: COUNTYWIDE FREEWAY AVERAGE 1% TO 50% ABOVE COUNTYWIDE FREEWAY AVERAGE 51% TO 100% ABOVE COUNTYWIDE FREEWAY AVERAGE MORE THAN 100% ABOVE COUNTYWIDE FREEWAY AVERAGE The verge crsh rte on the freewy system in Wukesh County from 199 through 1998 ws 3.7 crshes per 100 million vehicle miles. Source: Wisconsin Deprtment of Trnsporttion. GRAPHIC SCALE MILES i

23 Severe Trffic Congestion Freewy speeds reduced bout 5 to 15 mph below typicl freewy free-flow speed. Extremely limited mneuverbility. No gps in trffic strem to ccommodte lne chnging or vehicles entering the freewy. Minor disruptions such s multiple vehicles entering the freewy or vehicles prked on the side of the freewy will result in brekdown of freewy trffic flow with stop-nd-go trffic. Trffic volumes t 81 to 100 percent of mximum trffic crrying cpcity. Defined s level of service E. Moderte Trffic Congestion Minor reduction in speeds of up to 5 mph. Freedom to mneuver or chnge lnes is substntilly limited. Minor disruptions, such s multiple vehicles entering the freewy or vehicles prked on the side of the freewy, will result in brekdown of freewy trffic flow nd stop-nd-go trffic. Trffic volumes t to 80 percent of mximum trffic crrying cpcity. Defined s level of service D. Tble 5-2 further describes these three levels of trffic congestion. The estimted existing yer 1999 level of freewy trffic congestion in southestern Wisconsin is displyed on Mp 5-11 nd summrized in Tble-5-3. This existing level of freewy system trffic congestion ws estimted by reviewing freewy hourly verge trffic speeds, verge trffic densities, nd trffic volumes by segment of the freewy system for ech hour of n verge weekdy in Approximtely 27 miles of freewy, or 10 percent of the freewy system, experience extreme trffic congestion for pproximtely one hour in ech direction on n verge weekdy, nd n dditionl three hours of severe trffic congestion in ech direction on n verge weekdy. These 27 miles of freewy lso experience n dditionl four hours of moderte trffic congestion on n verge weekdy, representing for these 27 miles totl of pproximtely eight hours of trffic congestion on n verge weekdy. Another 2 miles of freewy, or bout nine percent of the system, experience pproximtely one hour in ech direction of severe trffic congestion ech weekdy, nd n dditionl two hours of moderte trffic congestion in ech direction on n verge weekdy for totl of bout three hours of trffic congestion on n verge weekdy. Another 12 miles of freewy, or bout four percent of the totl system, experience totl of pproximtely two hours of trffic congestion on n verge weekdy in ech direction, ll of which re moderte congestion. All of these currently congested freewys re locted in Milwukee nd Wukesh Counties. 5

24 Tble 5-2 DESCRIPTION OF LEVELS OF FREEWAY TRAFFIC OPERATION AND CONGESTION Averge Hourly Freewy Trffic Conditions Level of Trffic Congestion Level of Service Rtio of Hourly Trffic Volume to Mximum Hourly Trffic Averge Freewy Speed None A nd B Freewy free flow speed None C to 2 mph below freewy free flow speed Moderte D Up to 5 mph below freewy free flow speed Severe E to 15 mph below freewy free flow speed Extreme F 1.00 or less 20 to 30 mph or less Operting Conditions No restrictions on bility to mneuver nd chnge lnes. Some restrictions on bility to mneuver nd chnge lnes. Substntil restrictions on bility to mneuver nd chnge lnes. Extreme restrictions on bility to mneuver nd chnge lnes. Opertion t mximum cpcity. No gps in trffic strem to ccommodte lne chnging. No bility to mneuver or chnge lnes. Stopnd-go, bumper-tobumper trffic. Impcts of Freewy Incidents Minor disruptions such s multiple vehicles entering the freewy or vehicles on the side of the freewy do not disrupt trffic flow. Mjor disruptions such s n ccident blocking lne my not result in severe or extreme trffic congestion. Minor disruptions my result in severe trffic congestion. Minor disruptions will result in extreme trffic congestion. The most minor of disruptions will result in extreme trffic congestion. Durtion nd extent of extreme trffic congestion will be extended. Source: SEWRPC nd Trnsporttion Reserch Bord, Ntionl Acdemy of Sciences, nd Ntionl Acdemy of Engineering. 5

25 GRAPHIC SCALE Mp 5-11 ESTIMATED TRAFFIC CONGESTION ON FREEWAYS WITHIN THE SOUTHEASTERN WISCONSIN REGION: 1999 ESTIMATED HOURS OF CONGESTION ON AN AVERAGE WEEKDAY NO CONGESTION MOST SEVERE LEVEL OF HOURLY CONGESTION EXPERIENCED -- MODERATE MODERATE SEVERE SEVERE SEVERE MILES Source: SEWRPC. 5b

26 Tble 5-3 ESTIMATED EXISTING SOUTHEASTERN WISCONSIN FREEWAY SYSTEM TRAFFIC CONGESTION ON AN AVERAGE WEEKDAY: 1999 Miles of Congested Freewys Averge Hours of Congestion on n Averge Weekdy Highest Level of Hourly Congestion Experienced Miles Percent of Freewy System Extreme Congestion (Hours) Severe Congestion (Hours) Moderte Congestion (Hours) Totl Congestion (Hours) Extreme Severe Moderte Totl Miles of Congested Freewy nd Percent of Regionl Freewy System All Levels of Congestion Source: SEWRPC. 5c

27 Figures 5-3 nd 5- nd Tble 5- compre the current level nd loction of freewy system trffic congestion within southestern Wisconsin to estimted historic trffic congestion in the yers 1991, 1980, nd Trffic congestion hs significntly incresed over the pst 10 yers s well s over the pst 20 nd 30 yers. The increse in freewy trffic congestion ech decde hs prticulrly been substntil with respect to the milege of freewys experiencing extreme nd severe trffic congestion. The totl milege of freewys experiencing trffic congestion on n verge weekdy hs incresed from bout nine miles in 1972, to 18 miles in 1980, to miles in 1991, nd to 5 miles in The totl milege of freewys experiencing extreme trffic congestion hs incresed from bout 11 miles in 1991 to 27 miles in No freewy segments experienced extreme trffic congestion in 1972 or The totl milege of freewys experiencing severe trffic congestion incresed from bout two miles in 1972, to 1 miles in 1980, to 18 miles in 1991, nd to 2 miles in The verge number of hours on n verge weekdy tht congested freewy segment experienced trffic congestion in ech direction ws n estimted 2.8 hours in 1972, 3.5 hours in 1980, 3.5 hours in 1991, nd 5.5 hours in The forecst future yer 2020 level of freewy system trffic congestion within Southestern Wisconsin is presented on Mp-5-12 nd in Figure 5-5 nd Tble 5-5. The forecst increse in freewy system trffic congestion my be expected to be substntil in terms of extent, severity, nd durtion of freewy congestion: The totl milege of freewys experiencing congestion my be expected to increse from 5 miles of freewy, or 2 percent of the freewy system, in 1999 to 122 miles, or percent of the freewy system, in By the yer 2020, freewys in Kenosh, Rcine, Ozukee, nd Wshington counties my be expected to begin to experience trffic congestion on n verge weekdy. The totl milege of freewys experiencing extreme trffic congestion my be expected to increse from 27 miles, or ten percent of the freewy system, in 1999 to 8 miles, or 18 percent of the freewy system, in The totl milege of freewys experiencing severe trffic congestion my be expected to increse from 2 miles in 1999 to 28 miles in the yer 2020.

28 Figure 5-3 COMPARISON OF ESTIMATED FREEWAY SYSTEM AVERAGE WEEKDAY TRAFFIC CONGESTION WITHIN SOUTHEASTERN WISCONSIN: 1972, 1980, 1991, AND ESTIMATED HOURS OF CONGESTION ON AN AVERAGE WEEKDAY MOST SEVERE LEVEL OF HOURLY CONGESTION EXPERIENCED NOT CONSTRUCTED -- NO CONGESTION -- 1 MODERATE 3 MODERATE GRAPHIC SCALE MILES 3 SEVERE SEVERE SEVERE Source: SEWRPC. 1

29 Figure 5- COMPARISON OF ESTIMATED FREEWAY SYSTEM AVERAGE WEEKDAY TRAFFIC CONGESTION WITHIN SOUTHEASTERN WISCONSIN: 1972, 1980, 1991, AND MODERATE CONGESTION 0 SEVERE CONGESTION CONGESTION 50 FREEWAY MILES YEAR Source: SEWRPC. b

30 Tble 5- ESTIMATED HISTORIC AND EXISTING FREEWAY SYSTEM TRAFFIC CONGESTION ON AN AVERAGE WEEKDAY: HISTORIC 1972, 1980, AND 1991, AND EXISTING 1999 Yer Miles of Congested Freewy Highest Level of Hourly Congestion Experienced Miles Percent of Freewy System Averge Hours of Congestion on n Averge Weekdy Extreme Congestion (Hours) Severe Congestion (Hours) Moderte Congestion (Hours) Totl Congestion (Hours) Extreme Severe Moderte Totl Extreme Severe Moderte Totl Extreme Severe Moderte Totl Extreme Severe Moderte Totl Source: SEWRPC. c

31 GRAPHIC SCALE Mp 5-12 FORECAST FUTURE YEAR 2020 TRAFFIC CONGESTION ON FREEWAYS WITHIN THE SOUTHEASTERN WISCONSIN REGION ESTIMATED HOURS OF CONGESTION ON AN AVERAGE WEEKDAY NO CONGESTION MOST SEVERE LEVEL OF HOURLY CONGESTION EXPERIENCED -- MODERATE MODERATE SEVERE SEVERE SEVERE MILES Source: SEWRPC. d

32 Figure 5-5 COMPARISON OF ESTIMATED EXISTING YEAR 1999 FREEWAY SYSTEM TRAFFIC CONGESTION WITHIN SOUTHEASTERN WISCONSIN TO FORECAST FUTURE YEAR 2020 FREEWAY SYSTEM TRAFFIC CONGESTION MODERATE CONGESTION SEVERE CONGESTION CONGESTION FREEWAY MILES YEAR Source: SEWRPC. e

33 Tble 5-5 COMPARISON OF ESTIMATED EXISTING YEAR 1999 FREEWAY SYSTEM TRAFFIC CONGESTION WITHIN SOUTHEASTERN WISCONSIN TO FORECAST FUTURE YEAR 2020 FREEWAY SYSTEM TRAFFIC CONGESTION Yer Miles of Congested Freewy Highest Level of Hourly Congestion Experienced Miles Percent of Freewy System Averge Hours of Congestion on n Averge Weekdy Extreme Congestion (Hours) Severe Congestion (Hours) Moderte Congestion (Hours) Totl Congestion (Hours) Extreme Severe Moderte Totl Extreme Severe Moderte Totl Source: SEWRPC. f

34 The totl milege of freewys experiencing moderte trffic congestion my be expected to increse from 12 miles, or four percent of the freewy system, in 1999 to miles, or 1 percent of the system, in the yer The verge number of hours tht congested freewy segment my be expected to experience trffic congestion my be expected to increse from 5.5 hours in 1999 to.1 hours in the yer The forecst yer 2020 trffic congestion is bsed upon forecst yer 2020 trffic volumes nd trnsporttion fcilities nd services which ssume implementtion of the yer 2020 regionl lnd use pln nd regionl trnsporttion system pln, excepting only certin freewy widening improvements (the widening of IH 3 from four to six lnes between Bender Rod nd Highlnd Rod). SUMMARY AND CONCLUSIONS This chpter defines the problems nd deficiencies of the existing freewy system with respect to physicl design, trffic sfety, nd trffic congestion. A summry of the most importnt findings of this chpter is s follows: Physicl Design Deficiencies Mny of the oldest freewy segments, predominntly in Milwukee County, do not meet number of modern design stndrds for much of their length, including with respect to shoulder width, entrnce/exit rmp spcing, lne blnce, verticl curvture, nd verticl clernce. Mny older freewy segments in outlying counties generlly meet the modern design stndrds with the exception of one or two stndrds t isolted loctions, including with respect to verticl lignment, verticl curvture, verticl clernce, or shoulder width. A number of freewy segments t the fr outlying portions of the Region fully meet ll design stndrds. Trffic Sfety Within ech county, there re segments of freewy which should be considered to hve trffic sfety problems. These freewy segments hve trffic crsh rtes which exceed the regionl verge crsh rte, or exceed the crsh rte for freewys within the county within which they re locted. 7

35 Trffic Congestion Existing trffic congestion on the freewy system is substntil, with totl of 5 miles, or 2 percent, of the 272 mile freewy system experiencing congestion on n verge weekdy. An estimted 53 miles, or 19 percent of the freewy system, experiences extreme or severe trffic congestion for t lest one hour ech weekdy. Freewy trffic congestion hs incresed prticulrly over the pst 20 yers, in extent, severity, nd durtion of congestion. The extent of the freewy system experiencing congestion hs incresed from 18 miles, or eight percent of the totl freewy system in 1980, to 5 miles nd 18 percent in 1991, nd to 5 miles nd 2 percent in The miles of freewy experiencing extreme or severe congestion hs incresed from 1 miles nd 7 percent of the freewy system in 1980, to 29 miles nd 11 percent in 1991, nd to 53 miles nd 19 percent in The verge number of hours of congestion on n verge weekdy occurring on congested freewy segment hs incresed from 3.5 hours in 1980 to 5.5 hours in Freewy trffic congestion is forecst to increse substntilly by the yer 2020 even if regionl lnd use nd trnsporttion plns re implemented. The extent of the regionl freewy system experiencing congestion my be expected to increse from 5 miles nd 2 percent of the freewy system to 122 miles nd percent of the freewy system. The miles of freewy experiencing extreme or severe congestion my be expected to increse from 53 miles nd 19 percent of the freewy system to 77 miles nd 28 percent of the freewy system. * * * 8

ERRATA for Guide for the Development of Bicycle Facilities, 4th Edition (GBF-4)

ERRATA for Guide for the Development of Bicycle Facilities, 4th Edition (GBF-4) Dvid Bernhrdt, P.E., President Commissioner, Mine Deprtment of Trnsporttion Bud Wright, Executive Director 444 North Cpitol Street NW, Suite 249, Wshington, DC 20001 (202) 624-5800 Fx: (202) 624-5806 www.trnsporttion.org

More information

* LANDING ROLLED CURB SIDEWALK RAMP TYPE R (ROLLED SIDES) * LANDING ** RAMP FULL CURB HEIGHT MAY BE REDUCED TO ACCOMMODATE MAXIMUM SIDE FLARE SLOPE

* LANDING ROLLED CURB SIDEWALK RAMP TYPE R (ROLLED SIDES) * LANDING ** RAMP FULL CURB HEIGHT MAY BE REDUCED TO ACCOMMODATE MAXIMUM SIDE FLARE SLOPE * MXIMUM LNDING IS 2.0% IN ECH DIRECTION OF TRVEL. LNDING MINIMUM DIMENSIONS 5' x 5'. ** MXIMUM RMP CROSS IS 2.0%, RUNNING 5% - 7% (8.3% MXIMUM). "NON-WLKING" RE * LNDING 24" CROSS FULL WIDTH PERMNENT

More information

# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan

# Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan #70421 Southeastern Wisconsin Regional Freeway System Reconstruction Study and Preliminary Recommended Plan Public Information Meetings and Hearings May June 2002 1 Reason for Freeway System Study 270-mile

More information

Minnesota Manual on Uniform Traffic Control Devices

Minnesota Manual on Uniform Traffic Control Devices Minnesot Mnul on Uniform Trffic Control Devices MN MUTCD Jnury 2014 MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES MN MUTCD Jnury 2014 Minnesot Deprtment of Trnsporttion Office of Trffic, Sfety,

More information

Wonderland Road South from Southdale Road to Highway 402 DRAFT Assessment and Evaluation of Road Cross-Section Concepts

Wonderland Road South from Southdale Road to Highway 402 DRAFT Assessment and Evaluation of Road Cross-Section Concepts APPENDIX F 1 Socio-Economic 1.1 Property nd Access Impcts to properties Potentil impcts to ccess to existing residences/usinesses Totl numer of properties impcted Impcts to residences (e.g., displcement)

More information

APPENDIX C SANITARY SEWER PEAK DESIGN FACTOR

APPENDIX C SANITARY SEWER PEAK DESIGN FACTOR PPENDIX C SNITRY SEWER PEK DESIGN FCTOR ll gravity sewers will be designed to accommodate the peak flow from the contributing drainage area. The peak flow will be computed using the appropriate peaking

More information

Exploring Impacts of Countdown Timers on Queue Discharge Characteristics of Through Movement at Signalized Intersections

Exploring Impacts of Countdown Timers on Queue Discharge Characteristics of Through Movement at Signalized Intersections Avilble online t www.sciencedirect.com ScienceDirect Procedi - Socil nd Behviorl Scienc es 96 ( 2013 ) 255 264 13th COTA Interntionl Conference of Trnsporttion Professionls (CICTP 2013) Exploring Impcts

More information

d r a f t The City of Vaughan is undertaking a The following review was prepared by 6.0 Transportation 6.1 Background North Kleinburg-Nashville

d r a f t The City of Vaughan is undertaking a The following review was prepared by 6.0 Transportation 6.1 Background North Kleinburg-Nashville North Kleinburg-Nshville Secondry Pln 6.0 Trnsporttion 6.1 Bckground The City of Vughn is undertking Trnsporttion Mster Pln (TMP) Study s prt of the Officil Pln Updte. The TMP is being prepred to identify

More information

#83875 v1 Southeastern Wisconsin Regional Freeway System Reconstruction Study and Recommended Plan. Overview and Summary June

#83875 v1 Southeastern Wisconsin Regional Freeway System Reconstruction Study and Recommended Plan. Overview and Summary June #83875 v1 Southeastern Wisconsin Regional Freeway System Reconstruction Study and Recommended Plan Overview and Summary June 2003 1 Reason for Freeway System Study The freeway system is nearing the end

More information

Regional Transportation Needs Within Southeastern Wisconsin

Regional Transportation Needs Within Southeastern Wisconsin Regional Transportation Needs Within Southeastern Wisconsin #118274 May 24, 2006 1 Introduction The Southeastern Wisconsin Regional Planning Commission (SEWRPC) is the official areawide planning agency

More information

Garden City Community Park - Bike Terrain Park Consultation Process

Garden City Community Park - Bike Terrain Park Consultation Process To: From: City of Richmond Prks, Recretion nd Culturl Services Committee Mike Redpth, Senior Mnger, Prks Report to Committee To V~-- \Wht A 20 x>r3. \ Dte: My 13, 2013 File: 06-2345-20- MNOR1NoI01 Re:

More information

Open Access Regression Analysis-based Chinese Olympic Games Competitive Sports Strength Evaluation Model Research

Open Access Regression Analysis-based Chinese Olympic Games Competitive Sports Strength Evaluation Model Research Send Orders for Reprints to reprints@benthmscience.e The Open Cybernetics & Systemics Journl, 05, 9, 79-735 79 Open Access Regression Anlysis-bsed Chinese Olympic Gmes Competitive Sports Strength Evlution

More information

2014 WHEAT PROTEIN RESPONSE TO NITROGEN

2014 WHEAT PROTEIN RESPONSE TO NITROGEN 2014 WHEAT PROTEIN RESPONSE TO NITROGEN Aron Wlters, Coopertor Ryford Schulze, Coopertor Dniel Hthcot, Extension Progrm Specilist Dr. Clrk Neely, Extension Stte Smll Grins Specilist Ryn Collett, Extension

More information

Minnesota s Wild Turkey Harvest Fall 2016, Spring 2017

Minnesota s Wild Turkey Harvest Fall 2016, Spring 2017 Minnesot s Wild Turkey Hrvest Fll 2016, Spring 2017 Lindsey Messinger Frmlnd Wildlife Popultions nd Reserch Group Minnesot Deprtment of Nturl Resources Mdeli, Minnesot 15 August 2017 Summry of Seson Structure

More information

NORTH POLE ELEMENTARY SCHOOL

NORTH POLE ELEMENTARY SCHOOL RTH PLE ELEMETARY SCHL Firbnks Are Sfe Routes to School Februry 2012 Wlk Zone Inventory Report & Engineering Recommendtions orth Pole Elementry School orth Pole Elementry School (PES) is locted within

More information

TOWNSHIP OF LOWER MERION. PUBLIC WORKS COMMITTEE Wednesday, April 3, :00 PM ( Approximately)

TOWNSHIP OF LOWER MERION. PUBLIC WORKS COMMITTEE Wednesday, April 3, :00 PM ( Approximately) TOWNSHIP OF LOWER MERION PUBLIC WORKS COMMITTEE Wednesdy, April 3, 2019 6:00 PM ( Approximtely) Chirpersons: Vice Chirperson: Michel F. McKeon Rick Churchill, Anthony C. Stevenson AGENDA 1. AUTHORIZATION

More information

Daytime Habitat Selection by Resident Golden Eagles in Southern Idaho, USA

Daytime Habitat Selection by Resident Golden Eagles in Southern Idaho, USA Dytime Hbitt Selection by Resident Golden Egles in Southern Idho, USA Environmentl & Sttisticl Consultnts Chd LeBeu 1-04-14 Ryn Nielson, Eric Hllingstd, nd Dve Young cwlebeu@west-inc.com Introduction Risk

More information

TECHNICAL BULLETINApril 2016

TECHNICAL BULLETINApril 2016 SYN-86 TECHNICAL BULLETINApril 216 Synovex One-Feedlot Implnts in Feedlot Steers: Phse IIIB Studies in Nersk nd Texs Zoetis Florhm Prk, NJ 7932 Summry Two Phse IIIB studies 1,2 were conducted in feedlot

More information

Meeting Notes [Part B]

Meeting Notes [Part B] Portlnd Stte University PXScholr Joint Policy Advisory Committee on Trnsporttion Oregon Sustinble Community igitl Librry 5-8-1997 Meeting Notes 1997-05-08 [Prt B] Joint Policy Advisory Committee on Trnsporttion

More information

2014 Victorian Shooting Championship

2014 Victorian Shooting Championship 2014 Victorin Shooting Chmpionship VPCI, in conjunction with the Stte Coches nd the Stte Umpires invite ll PFA licensed petnque plyers in the Stte of Victori to tke prt in the 2014 Victorin Shooting Chmpionship.

More information

INVESTIGATION 2. What s the Angle?

INVESTIGATION 2. What s the Angle? INVESTIGATION 2 Wht s the Angle? In the previous investigtion, you lerned tht when the rigidity property of tringles is comined with the ility to djust the length of side, the opportunities for useful

More information

#82820 v1 Southeastern Wisconsin Regional Freeway System Reconstruction Study and Recommended Plan. Myths and Facts. May Myths to be Addressed

#82820 v1 Southeastern Wisconsin Regional Freeway System Reconstruction Study and Recommended Plan. Myths and Facts. May Myths to be Addressed #82820 v1 Southeastern Wisconsin Regional Freeway System Reconstruction Study and Recommended Plan Myths and Facts May 2003 Myths to be Addressed The Regional Planning Commission is only concerned with

More information

UNIFORM STANDARD DRAWINGS CLARK COUNTY AREA, NEVADA YEAR 2016 REVISIONS

UNIFORM STANDARD DRAWINGS CLARK COUNTY AREA, NEVADA YEAR 2016 REVISIONS , NEVD YER 2016 REVISIONS DWG NO. TITLE ND REVISIONS SUMMRY EFFECTIVE DTE 223.1 Residential Driveway without djacent Sidewalk 7/1/2016 New Drawing to allow flexibility in Roadway Design. 234.1 Typical

More information

SOUTHEASTERN WISCONSIN REGIONAL FREEWAY SYSTEM RECONSTRUCTION STUDY

SOUTHEASTERN WISCONSIN REGIONAL FREEWAY SYSTEM RECONSTRUCTION STUDY SOUTHEASTERN WISCONSIN REGIONAL FREEWAY SYSTEM RECONSTRUCTION STUDY STUDY NEWSLETTER 5 APRIL 2002 Introduction This study is a systemwide evaluation of the network of 270 miles of freeways in the seven

More information

Design and Calibration of Submerged Open Channel Flow Measurement Structures: Part 3 - Cutthroat Flumes

Design and Calibration of Submerged Open Channel Flow Measurement Structures: Part 3 - Cutthroat Flumes Uth Stte University DigitlCommons@USU Reports Uth Wter Reserch Lbortory Jnury 1967 Design nd Clibrtion of Submerged Open Chnnel Flow Mesurement Structures: Prt 3 - Cutthrot Flumes Gylord V. Skogerboe M.

More information

United States Patent (19)

United States Patent (19) United Sttes Ptent (19) Mobley (11) 45) Ptent Number: Dte of Ptent: Nov. 19, 1991 (54) BICYCLE RACK FORMOUNTING ON A VAN 76 Inventor: Mrk H. Mobley, P.O. Box 636, Norris, Tenn. 37828 21 Appl. No.: 436,492

More information

Contents TRIGONOMETRIC METHODS PROBABILITY DISTRIBUTIONS

Contents TRIGONOMETRIC METHODS PROBABILITY DISTRIBUTIONS ontents UNIT 7 TRIGONOMETRI METHODS Lesson 1 Trigonometric Functions................... 462 1 onnecting ngle Mesures nd Liner Mesures.............. 463 2 Mesuring Without Mesuring.........................

More information

Chapter 4 Group of Volunteers

Chapter 4 Group of Volunteers CHAPTER 4 SAFETY CLEARANCE, FREEBOARD AND DRAUGHT MARKS 4-1 GENERAL 4-1.1 This chpter specifies the minimum freebord for inlnd wterwy vessels. It lso contins requirements concerning the indiction of the

More information

An Analysis of the Visual Demands Associated with Aviation Maintenance Inspectors. The Ohio State University College of Optometry, Columbus, OH 2

An Analysis of the Visual Demands Associated with Aviation Maintenance Inspectors. The Ohio State University College of Optometry, Columbus, OH 2 An Anlysis of the Visul Demnds Associted with Avition Mintennce Inspectors Gregory W. Good 1, Json J. Nichols 1, Mnoj V. Subbrm 1, Vn B. Nkgwr 2, Ronld W. Montgomery 2 1 The Ohio Stte University College

More information

THERMOFLO FLUID PUMPS& SYSTEMS THERMOFLO FOR HEATING, COOLING AND WATER SUPPLY APPLICATIONS TO BS7074 SEALED SYSTEMS EXPANSION VESSELS PRESSURIZERS

THERMOFLO FLUID PUMPS& SYSTEMS THERMOFLO FOR HEATING, COOLING AND WATER SUPPLY APPLICATIONS TO BS7074 SEALED SYSTEMS EXPANSION VESSELS PRESSURIZERS THERMOFLO S E A L E D S Y S T E M S THERMOFLO SEALED SYSTEMS FOR HEATING, COOLING AND WATER SUPPLY APPLICATIONS TO BS7074 EXPANSION VESSELS PRESSURIZERS PUMPS& SYSTEMS WALL OR BASE MOUNTING PRESSURIZERS

More information

Report. Honolulu City Council. The Proposed Sale of City Housing Properties

Report. Honolulu City Council. The Proposed Sale of City Housing Properties Report t o m ~ t 4 rfl +r~ +kn L~J LI IC V 0 Honolulu City Council ~2c - C rn on The Proposed Sle of City Housing Properties Prepred By The Council Tsk Force to Review Utiliztion of All City Property (Tsk

More information

PRELIMINARY DRAFT FIRST AMENDMENT TO VISION 2050: A REGIONAL LAND USE AND TRANSPORTATION PLAN FOR SOUTHEASTERN WISCONSIN

PRELIMINARY DRAFT FIRST AMENDMENT TO VISION 2050: A REGIONAL LAND USE AND TRANSPORTATION PLAN FOR SOUTHEASTERN WISCONSIN PRELIMINARY DRAFT FIRST AMENDMENT TO VISION 2050: A REGIONAL LAND USE AND TRANSPORTATION PLAN FOR SOUTHEASTERN WISCONSIN ESTABLISHING TARGETS FOR FEDERAL PERFORMANCE MEASURES: HIGHWAY SAFETY SOUTHEASTERN

More information

NORTH POLE MIDDLE SCHOOL

NORTH POLE MIDDLE SCHOOL RTH PLE MILE SCHL Firbnks Are Sfe Routes to School Februry 2012 Wlk Zone Inventory Report & Engineering Recommendtions orth Pole Middle School orth Pole Middle School (PMS) is locted within the City of

More information

AHP-based tennis service technical evaluation consistency test

AHP-based tennis service technical evaluation consistency test Avilble online.jocpr.com Journl of Chemicl nd Phrmceuticl Reserch, 0, ():7-79 Reserch Article ISSN : 097-78 CODEN(USA) : JCPRC AHP-bsed tennis service technicl evlution consistency test Mio Zhng Deprtment

More information

Firearm Safety. Links to Topics below XAVIER BECERRA THE SIX BASIC GUN SAFETY RULES. Attorney Genera] The. Six Basic Gun Safety Rules

Firearm Safety. Links to Topics below XAVIER BECERRA THE SIX BASIC GUN SAFETY RULES. Attorney Genera] The. Six Basic Gun Safety Rules firerm Sfety Stte of Cliforni - Deprtment of Justice - Office of the Attorney Generl Pge 1 of 14 Stte of Cliforni Deprtment of]ustice XAVIER BECERRA Attorney Gener] Serch Trnslte Website Trducir Sitio

More information

A Step, Stride and Heading Determination for the Pedestrian Navigation System

A Step, Stride and Heading Determination for the Pedestrian Navigation System Journl of Globl Positioning Systems (2004) Vol. 3,. 1-2: 273-279 A Step, Stride nd Heding Determintion for the Pedestrin Nvigtion System Jeong Won Kim GNSS Technology Reserch Center, Chungnm Ntionl University,

More information

A Measurement Framework for National Key Performance Measures

A Measurement Framework for National Key Performance Measures MINISTERIAL COUNCIL ON EDUCATION, EMPLOYMENT, TRAINING AND YOUTH AFFAIRS Performnce Mesurement nd Reporting Tskforce Working for qulity eduction outcomes A Mesurement Frmework for Ntionl Key Performnce

More information

VB-7253 Series. Application. Features. Applicable Literature

VB-7253 Series. Application. Features. Applicable Literature VB-7253 Series 1/2 to 2 Screwed NPT Stinless Steel Trim with Teflon Disc Stem Up Open, Two-Wy Vlves Generl Instructions Appliction VB-7253 series single set, stem down to close, two wy vlves control wter

More information

APPENDIX M FOR THE JEFFERSON COUNTY PORTION OF THE VISION 2050 PLAN RECOMMENDATIONS MILWAUKEE URBANIZED AREA INTRODUCTION

APPENDIX M FOR THE JEFFERSON COUNTY PORTION OF THE VISION 2050 PLAN RECOMMENDATIONS MILWAUKEE URBANIZED AREA INTRODUCTION INTRODUCTION Following the 2010 U.S. Census, 70 the Milwaukee urbanized area boundary extends beyond the Southeastern Wisconsin Region across the boundary line between Waukesha and Jefferson Counties,

More information

Why? DF = 1_ EF = _ AC

Why? DF = 1_ EF = _ AC Similr Tringles Then You solved proportions. (Lesson 2-) Now 1Determine whether two tringles re similr. 2Find the unknown mesures of sides of two similr tringles. Why? Simon needs to mesure the height

More information

An Indian Journal FULL PAPER ABSTRACT KEYWORDS. Trade Science Inc. The tennis serve technology based on the AHP evaluation of consistency check

An Indian Journal FULL PAPER ABSTRACT KEYWORDS. Trade Science Inc. The tennis serve technology based on the AHP evaluation of consistency check [Type text] [Type text] [Type text] ISSN : 097-7 Volume 0 Issue 0 BioTechnology 0 An Indin Journl FULL PAPER BTAIJ, 0(0), 0 [-7] The tennis serve technology bsed on the AHP evlution of consistency check

More information

The development of a truck concept to allow improved direct vision of vulnerable road users by drivers

The development of a truck concept to allow improved direct vision of vulnerable road users by drivers Loughorough University Institutionl Repository The development of truck concept to llow improved direct vision of vulnerle rod users y drivers This item ws sumitted to Loughorough University's Institutionl

More information

Characteristics, Expenditures, and Economic Impact of Resident and Nonresident Hunters and Anglers in North Dakota, , Season and Trends

Characteristics, Expenditures, and Economic Impact of Resident and Nonresident Hunters and Anglers in North Dakota, , Season and Trends Agriculturl Economics Report No. 389 June 1998 Chrcteristics, Expenditures, nd Economic Impct of Resident nd Nonresident Hunters nd Anglers in North Dkot, 1996-97, Seson nd Trends Tin D. Lewis Jy A. Leitch

More information

Chapter 5. Triangles and Vectors

Chapter 5. Triangles and Vectors www.ck12.org Chpter 5. Tringles nd Vectors 5.3 The Lw of Sines Lerning Objectives Understnd how both forms of the Lw of Sines re obtined. Apply the Lw of Sines when you know two ngles nd non-included side

More information

MDM. Key findings of the traffic assessment are as follows:

MDM. Key findings of the traffic assessment are as follows: Key findings of the traffic assessment are as follows: Baseline Traffic Volumes. Townhouse Road to the east of Route 25 carries approximately 3, vehicles per day (vpd) during the summer. The peak hour

More information

Involuntary Resettlement Due Diligence Report. SRI: Integrated Road Investment Program Project 1

Involuntary Resettlement Due Diligence Report. SRI: Integrated Road Investment Program Project 1 Involuntry Resettlement Due Diligence Report My 2014 SRI: Integrted Rod Investment Progrm Project 1 Volume 1: Southern Province Rurl Rods Prepred by Rod Development Authority, Ministry of Highwys, Ports

More information

IGF Research Project N Safer High Heels

IGF Research Project N Safer High Heels IGF Reserch Project 17868 N Sfer High Heels Survivl of compnies in the fshion nd sesonlly dependent sectors such s the footwer industry depends upon their ility to implement the ltest trends. Shoe ottoms

More information

PRESSURE LOSSES DUE TO THE LEAKAGE IN THE AIR DUCTS - A SAFETY PROBLEM FOR TUNNEL USERS?

PRESSURE LOSSES DUE TO THE LEAKAGE IN THE AIR DUCTS - A SAFETY PROBLEM FOR TUNNEL USERS? - 7 - PRESSURE LOSSES DUE TO THE LEAKAGE IN THE AIR DUCTS - A SAFETY PROBLEM FOR TUNNEL USERS? Pucher Krl, Grz Uniersity of Technology, Austri E-Mil: pucherk.drtech@gmx.t Pucher Robert, Uniersity of Applied

More information

Lesson 8: Application Technology

Lesson 8: Application Technology The type of ppliction equipment used must suit the type of ppliction. In this module, you ll lern the prts of the most common types of ppliction equipment used by ssistnt pplictors, s well s how to properly

More information

The Discussion of this exercise covers the following points: The open-loop Ziegler-Nichols method. The open-loop Ziegler-Nichols method

The Discussion of this exercise covers the following points: The open-loop Ziegler-Nichols method. The open-loop Ziegler-Nichols method Exercise 6-3 Level Process Control EXERCISE OBJECTIVE In this exercise, you will perform PID control of level process. You will use the open-loop step response method to tune the controller. DISCUSSION

More information

Dorridge & District Residents Association A Walk From Dorridge to Blythe Valley Nature Reserve

Dorridge & District Residents Association A Walk From Dorridge to Blythe Valley Nature Reserve Dorridge & District Residents Assocition A Wlk From Dorridge to Bly Vlley Nture Reserve This is circulr wlk. It is wlk of round 5 miles from centre of Dorridge, though obviously, those nerer Four Ashes

More information

A fisheries management strategy robust to ignorance: rotational harvest in the presence of indirect fishing mortality

A fisheries management strategy robust to ignorance: rotational harvest in the presence of indirect fishing mortality 2357 RAPID COMMUNICATIONS / COMMUNICATIONS RAPIDES A fisheries mngement strtegy robust to ignornce: rottionl hrvest in the presence of indirect fishing mortlity Rnsom A. Myers, Susnn D. Fuller, nd Dniel

More information

REVISED DRAFT APPENDIX I IH 43 BETWEEN HOWARD AVENUE AND SILVER SPRING DRIVE RECONSTRUCTING WITH WIDENING AND NOT WIDENING

REVISED DRAFT APPENDIX I IH 43 BETWEEN HOWARD AVENUE AND SILVER SPRING DRIVE RECONSTRUCTING WITH WIDENING AND NOT WIDENING INTRODUCTION The Advisory Committee on Regional Transportation System Planning requested an evaluation comparing the potential benefits and impacts associated with widening and not widening IH 43 upon

More information

Bypass Compensator Cartridge, Size 16

Bypass Compensator Cartridge, Size 16 Bypss Compenstor Crtridge, Size 6 Q mx = 5 l/min, p mx = 42 br Direct cting, djustble compenstor spring Description These direct-cting bypss pressure-compenstor (hydrostt) crtridges, series DWDP-2B -6,

More information

UNIVERSITY PARK ELEMENTARY SCHOOL

UNIVERSITY PARK ELEMENTARY SCHOOL UNIVSITY PAK LMNTAY SCHL Firbnks Are Sfe outes to School Februry 2012 Wlk Zone Inventory eport & ngineering ecommendtions University Prk lementry School University Prk lementry School is locted off Loftus

More information

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams. Technical Memorandum TRFFIC IMPCT STUDY RIDLEY ROD CONVENIENCE STORE Southampton County, V Prepared for: Mr. David Williams By: Charles Smith, P.E., PTOE EPR Charlottesville, V July 2014 1 TBLE OF CONTENTS

More information

Regards, David C. Grossman, M.D., M.P.H. Chair, U.S. Preventive Services Task Force

Regards, David C. Grossman, M.D., M.P.H. Chair, U.S. Preventive Services Task Force Thnk you for your interest in the U.S. Preventive Services Tsk Force (USPSTF or Tsk Force), n independent, volunteer group of ntionl experts in prevention nd evidence-sed medicine. Our mission is to improve

More information

FOR OWNERS OF HORSE BUSINESSES

FOR OWNERS OF HORSE BUSINESSES W 371-B MANAGEMENT AND COST CONSIDERATIONS FOR OWNERS OF HORSE BUSINESSES Andrew P. Griffith, Assistnt Professor nd UT Extension Specilist Deprtment of Agriculturl nd Resource Economics BACKYARD VEGETABLES

More information

WIND ENERGY POTENTIAL OF COASTAL ERITREA: AN ANALYSIS OF SPARSE WIND DATA

WIND ENERGY POTENTIAL OF COASTAL ERITREA: AN ANALYSIS OF SPARSE WIND DATA Solr Energy Vol. 66, No. 3, pp. 201 3, 1999 Pergmon P II: S0038 092X(99)00026 2 1999 Elsevier Science Ltd All rights reserved. Printed in Gret Britin 0038-092X/99/$ - see front mtter www.elsevier.com/

More information

Tubbs 06. Soft White Winter Wheat. Variety description

Tubbs 06. Soft White Winter Wheat. Variety description New Whet Vrieties Tubbs 06 Soft White Winter Whet EM 8993-E December 2009 Michel Flowers, C. Jmes Peterson, Andrew Hulting, John Burns, Stephen Guy, nd John Kuehner Vriety description Tubbs 06 is common

More information

Department of Animal and Aquacultural Sciences, Norwegian University of life Science, PO-Box N-1432 Ås, Norway.

Department of Animal and Aquacultural Sciences, Norwegian University of life Science, PO-Box N-1432 Ås, Norway. Presenttion in session H11.5 * The ehviour of horses in different pddock sizes, with nd without exercise G.H.M. Jørgensen * & K.E. Bøe. Deprtment of Animl nd Aquculturl Sciences, Norwegin University of

More information

Fitness, obesity and risk of heat illness among army trainees

Fitness, obesity and risk of heat illness among army trainees Occuptionl Medicine Advnce Access published July 14, 2014 Occuptionl Medicine doi:10.1093/occmed/kqu062 Fitness, obesity nd risk of het illness mong rmy trinees S. A. Bedno 1, N. Urbn 2,3, M. R. Boivin

More information

FISCALLY CONSTRAINED TRANSPORTATION PLAN

FISCALLY CONSTRAINED TRANSPORTATION PLAN FISCALLY CONSTRAINED TRANSPORTATION PLAN 2 Credit: Hugh J. Fuller, WSP/Parsons Brinckerhoff 2.1 THE FISCALLY CONSTRAINED TRANSPORTATION PLAN Federal regulations require the Region s transportation plan

More information

Lateral Earth Pressure on Lagging in Soldier Pile Wall Systems

Lateral Earth Pressure on Lagging in Soldier Pile Wall Systems Lterl Erth Pressure on Lgging in Soldier Pile Wll Systems Howrd A. Perko, Ph.D, P.E., CTL Thompson, Fort Collins, CO, USA hperko@ctlthompson.com John J Boulden, SGM, Inc., Grnd Junction, CO johnb@sgm-inc.com

More information

Integration of modelling and monitoring to optimize network control: two case studies from Lisbon

Integration of modelling and monitoring to optimize network control: two case studies from Lisbon Aville online t www.sciencedirect.com ScienceDirect Procedi Engineering 70 ( 2014 ) 555 562 12th Interntionl Conference on Computing nd Control for the Wter Industry, CCWI2013 Integrtion of modelling nd

More information

CHAPTER 4. Surface Root-zone Water Content and Bentgrass Water Stress. During Drydown for Selected Putting Green Construction.

CHAPTER 4. Surface Root-zone Water Content and Bentgrass Water Stress. During Drydown for Selected Putting Green Construction. CHAPTER 4 Surfce Root-zone Wter Content nd Bentgrss Wter Stress During Drydown for Selected Putting Green Construction Systems ABSTRACT Creeping entgrss, cool-seson grss used extensively in golf courses

More information

Bicycle Commuter Corridor Study

Bicycle Commuter Corridor Study June 12, 2013 yrcuse Metropolitn rnsporttion Council Finl ocument June 12, 2013 his document ws prepred with finncil ssistnce from the Federl Highwy dministrtion nd the Federl rnsit dministrtion of the

More information

Small Game Hunter Lead Shot Communication Study. Executive Summary. A cooperative study conducted by:

Small Game Hunter Lead Shot Communication Study. Executive Summary. A cooperative study conducted by: 8 Smll Gme Hunter Led Shot Communiction Study Executive Summry A coopertive study conducted y: Minnesot Coopertive Fish nd Wildlife Reserch Unit Minnesot Deprtment of Nturl Resources 9 Smll Gme Hunter

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

Copyright 1983 by ASME NEGATIVE INCIDENCE FLOW OVER A TURBINE ROTOR BLADE

Copyright 1983 by ASME NEGATIVE INCIDENCE FLOW OVER A TURBINE ROTOR BLADE THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS 345 E. 47 St., New York, N.Y. 7 83-GT-23 ^+ The Society shll not be responsible for sttements or opinions dvnced in ppers or in G discussion t meetings of the

More information

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION 7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION 7.1 INTRODUCTION & METHODOLOGY FEASIBILITY REPORT Congestion hot spot problem locations have been assessed using the

More information

and that excessive pronation is one major cause of foot and leg problems of runners. The treatment modahties used on these runners are shown

and that excessive pronation is one major cause of foot and leg problems of runners. The treatment modahties used on these runners are shown Foot orthotic devices to modify selected spects of lower extremity mechnics* B. T. BATES,&dgger; Ph.D., L. R. OSTERNIG, Ph.D., B. MASON, M.S., AND L. S. JAMES, M.D., Eugene, Oregon From the Biomechnics-Sports

More information

TRAFFIC IMPACT ANALYSIS For Bradfield Elementary School In Highland Park, Texas

TRAFFIC IMPACT ANALYSIS For Bradfield Elementary School In Highland Park, Texas TRFFIC IMPCT NLYSIS For Bradfield Elementary School In Highland Park, Texas EXECUTIVE SUMMRY The purpose of conducting this Traffic Impact nalysis (TI) was to evaluate the existing vehicular conditions

More information

Chapter 7 TRANSPORTATION FACILITIES ELEMENT INTRODUCTION

Chapter 7 TRANSPORTATION FACILITIES ELEMENT INTRODUCTION Chapter 7 TRANSPORTATION FACILITIES ELEMENT INTRODUCTION The transportation system of the Town of Genesee benefits all Town residents by providing for the movement of goods and people into, out of, through,

More information

Sensitivity Analysis of Factors Affecting Road Widening Thresholds

Sensitivity Analysis of Factors Affecting Road Widening Thresholds Sensitivity Analysis of Factors Affecting Road Widening Thresholds Abstract: Carlos Alba and Edward Beimborn The decision to widen a highway is often a complex matter involving considerations of traffic

More information

Defining Purpose and Need

Defining Purpose and Need Advanced Design Flexibility Pilot Workshop Session 4 Jack Broz, PE, HR Green May 5-6, 2010 Defining Purpose and Need In your agency s project development process, when do design engineers typically get

More information

Workfit -SR, Dual Monitor Short Surface

Workfit -SR, Dual Monitor Short Surface User's Guide Workfit -SR, Dul Monitor Short Surfce Do not throw wy! Crdord locks needed for instlltion. Visit http://www.ergotron.com/workfi t-sr-instll for instlltion instructionl video. NOTE: 10 feet

More information

Nick Willis Discipline: Middle distance running Specialist events: 800m and 1500m

Nick Willis Discipline: Middle distance running Specialist events: 800m and 1500m Olympic Eduction Discipline: Middle distnce running Specilist events: 800m nd 1500m ws born in Lower Hutt (ner Wellington) in 1983.Running tlent obviously runs in the Willis fmily, s Nick nd his brother

More information

APPENDIX G TRAFFIC FORECASTING, TRAFFIC ANALYSIS, AND TRAFFIC SIGNAL GUIDELINES REGINA BYPASS

APPENDIX G TRAFFIC FORECASTING, TRAFFIC ANALYSIS, AND TRAFFIC SIGNAL GUIDELINES REGINA BYPASS PPENDI G TRFFIC FORECSTING, TRFFIC NLYSIS, ND TRFFIC SIGNL GUIDELINES REGIN YPSS DisplayText cannot span more than DisplayText cannot span more than January 2015 PPENDI G TRFFIC FORECSTING, TRFFIC NLYSIS,

More information

1970 BRITISH COHORT STUDY: SURVEY

1970 BRITISH COHORT STUDY: SURVEY 1970 BRITISH COHORT STUDY: 2016-18 SURVEY Self-completion Questionnire HOW TO FILL IN THE QUESTIONNAIRE Plese complete the questionnire using blck or blue ink. The questionnire will be red by scnner, so

More information

Intended Hydration Strategies and Knowledge of Exercise-Associated Hyponatraemia in Marathon Runners: A Questionnaire-Based Study

Intended Hydration Strategies and Knowledge of Exercise-Associated Hyponatraemia in Marathon Runners: A Questionnaire-Based Study Journl of Athletic Trining 2018;53(7):696 702 doi: 10.4085/1062-6050-125-17 Ó by the Ntionl Athletic Triners Assocition, Inc www.ntjournls.org Exertionl Het Illness Intended Hydrtion Strtegies nd Knowledge

More information

Working Paper: Reversal Patterns

Working Paper: Reversal Patterns Remember to welcome ll ides in trding. AND remember to reserve your opinion until you hve independently vlidted the ide! Working Pper: Reversl Ptterns Working Pper In this pper I wnt to review nd (hopefully)

More information

SELECTED ROADWAY CAPACITY ANALYSIS

SELECTED ROADWAY CAPACITY ANALYSIS CHAPTERFOUR SELECTED ROADWAY CAPACITY ANALYSIS 4.1 SELECTED ROADWAY CAPACITY ANALYSIS Introduction Capacity analysis was performed on six selected roadways within the Dearborn County study area using the

More information

Ferskvannsavlusing small-scale tests: Short-term exposure tests to elucidate handling effects.

Ferskvannsavlusing small-scale tests: Short-term exposure tests to elucidate handling effects. Ferskvnnsvlusing smll-scle tests: Short-term exposure tests to elucidte hndling effects. The use of freshwter to control infesttions of the se louse Lepeophtheirus slmonis K on Atlntic slmon Slmo slr L.

More information

SEWRPC MEMORANDUM REVIEW, UPDATE, AND REAFFIRMATION OF THE YEAR 2035 REGIONAL TRANSPORTATION PLAN. Chapter 6

SEWRPC MEMORANDUM REVIEW, UPDATE, AND REAFFIRMATION OF THE YEAR 2035 REGIONAL TRANSPORTATION PLAN. Chapter 6 PDF 151065 KRY/CTH/SD/EDL/dad/mlh/edl 4/16/10 150281 v2 Preliminary Draft (REVISED) INTRODUCTION SEWRPC MEMORANDUM REVIEW, UPDATE, AND REAFFIRMATION OF THE YEAR 2035 REGIONAL TRANSPORTATION PLAN Chapter

More information

Owner s Manual. For TH330MR1 Hydraulic Winches Dedicated for Personnel Lifting

Owner s Manual. For TH330MR1 Hydraulic Winches Dedicated for Personnel Lifting Red this Owner s Mnul thoroughly before operting the equipment. Keep it with the equipment t ll times. Replcements re vilble from Thern, Inc., PO Box 347, Winon, MN 55987, 507-454-2996. www.thern.com IMPORTANT:

More information

EFFICACY OF A NOVEL AREA-REPELLENT AEROSOL FORMULATION AGAINST MOSQUITOES AND FLIES (DIPTERA: CULICIDAE, MUSCIDAE)

EFFICACY OF A NOVEL AREA-REPELLENT AEROSOL FORMULATION AGAINST MOSQUITOES AND FLIES (DIPTERA: CULICIDAE, MUSCIDAE) Proceedings of the Eighth Interntionl Conference on Urbn Pests Gbi Müller, Reiner Pospischil nd Willim H Robinson (editors) 2014 Printed by OOK-Press Kft., H-8200 Veszprém, Ppái ut 37/, Hungry EFFICACY

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Route 29 Solutions Route 29 Solutions Projects www.route29solutions.org October 10, 2014 Route 29 Widening to Six Lanes Albemarle County This project will widen a 1.8-mile segment of Route 29 from four

More information

Intersection Traffic Control Feasibility Study

Intersection Traffic Control Feasibility Study Intersection Traffic Control Feasibility Study CSAH 9 at CSAH 60 (185th Avenue) Prepared For: Dakota County Transportation Department Western Service Center 14955 Galaxie Avenue, 3rd Floor Apple Valley,

More information

Grade 6. Mathematics. Student Booklet SPRING 2011 RELEASED ASSESSMENT QUESTIONS. Record your answers on the Multiple-Choice Answer Sheet.

Grade 6. Mathematics. Student Booklet SPRING 2011 RELEASED ASSESSMENT QUESTIONS. Record your answers on the Multiple-Choice Answer Sheet. Grde 6 Assessment of Reding, Writing nd Mthemtics, Junior Division Student Booklet Mthemtics SPRING 211 RELEASED ASSESSMENT QUESTIONS Record your nswers on the Multiple-Choice Answer Sheet. Plese note:

More information

PILOT PROGRAM FOR THE EVALUATION OF NANOFILTRATION MEMBRANES PREPARED BY: WILMINGTON, MA ON UF PERMEATE

PILOT PROGRAM FOR THE EVALUATION OF NANOFILTRATION MEMBRANES PREPARED BY: WILMINGTON, MA ON UF PERMEATE PILOT PROGRAM FOR THE EVALUATION OF NANOFILTRATION MEMBRANES ON UF PERMEATE PREPARED BY: KOCH MEMBRANE SYSTEMS, INC. 850 MAIN STREET WILMINGTON, MA 01887 NANOPILT. D157 INTRODUCTION This progrm will outline

More information

First Aid in School Policy

First Aid in School Policy First Aid in School Policy Approved y the Governing Body of West Monkton Church of Englnd Primry School: Reviewed y Governors nd Agreed: Septemer 2017 At West Monkton we im to e n inspirtionl community,

More information

DIE DESIGN AND CONSTRUCTION SPECIFICATIONS STAMPING - EUROPE MINIMUM CORE HOLE SIZE TO PULL PUNCHES WITH WINDOWS

DIE DESIGN AND CONSTRUCTION SPECIFICATIONS STAMPING - EUROPE MINIMUM CORE HOLE SIZE TO PULL PUNCHES WITH WINDOWS MINIMUM CORE HOLE SIZE TO PULL PUNCHES WITH WINDOWS THE MINIMUM DIMENSIONS FOR THE HOLE IN THE PD REQUIRED TO INSERT THE PUNCH-PULLER ND THE BLL-LIFTER RE GIVEN IN THE TBLE BELOW. C CORE HOLE ØB MIN. SECTION

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

REQUEST FOR COMMENTS

REQUEST FOR COMMENTS REQUEST FOR COMMENTS NEW UNIFORM STNDRD DRWING NUMER 217.S2, "RESIDENTIL CUR ND GUTTER R-TYPE"; MODIFICTIONS TO STNDRD DRWING NUMERS 223, 224, 226.S1, ND 227.S1 The Specifications Subcommittee of the Regional

More information

ABSTRACT VARIATION AMONG FISH SPECIES IN THE STOICHIOMETRY OF NUTRIENT EXCRETION. by Lisette Esmeralda Torres

ABSTRACT VARIATION AMONG FISH SPECIES IN THE STOICHIOMETRY OF NUTRIENT EXCRETION. by Lisette Esmeralda Torres ABSTRACT VARIATION AMONG FISH SPECIES IN THE STOICHIOMETRY OF NUTRIENT EXCRETION by Lisette Esmerld Torres This study investigtes how nutrient cycling rtes nd rtios vry mong fish species nd with body size,

More information

Response by anglers to a differential harvest regulation on three black bass species at Skiatook Lake, Oklahoma

Response by anglers to a differential harvest regulation on three black bass species at Skiatook Lake, Oklahoma 9 Response y nglers to differentil hrvest regultion on three lck ss species t Skitook Lke, Oklhom Jmes M. Long U.S. Geologicl Survey, Oklhom Coopertive Fish nd Wildlife Reserch Unit, Nturl Resource Ecology

More information

Graphic Standards Guide

Graphic Standards Guide Grphic Stndrds Guide YOGA LOVE RUN PEACE 2 ABOUT This Grphic Stndrds Guide covers the bsic guidelines for the Lululemon Athletic s new grphic identity. The Guide provides summry of the primry fetures nd

More information

Reproduction. Not for. Mower - Roller Bar WARNING. Installation and Leveling Instructions. Attention Setup Personnel: Model: ,

Reproduction. Not for. Mower - Roller Bar WARNING. Installation and Leveling Instructions. Attention Setup Personnel: Model: , Mower - Roller Br Instlltion nd Leveling Instructions 4 Model: 9555, 9594 Attention Setup Personnel: 5 4 5 Model: 958, 9595 Model: 9559 Model: 959 The sfety wrnings provided in this guide nd in the trctor's

More information

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table

More information