IMPLEMENTATION. PEDESTRIAN USERS (Continued /) Building Frontages: A: Stair Applications. Geometry (Accessed from the Sidewalk) Refer to A:
|
|
- Kristina Elfrieda Lawson
- 6 years ago
- Views:
Transcription
1 A: Stair Applications Building Frontages: Geometry (Accessed from the Sidewalk) Refer to A: Ramps should be provided for disabled users at 1:12 (8.3%) gradient. Ramp rises should be stepped at 400mm intervals. Stairs to be implemented according to National Building Regulations (SABS 1900) Public stairs 1.5m width, minimum of 3 steps, non-slip materials with -2% gradients for drainage. B: Bicycle Ramps at Public Stairs Bicycle Ramps and Storage (Refer to B): Bicycle ramps to be provided adjacent to all stairs 1:2 (50%) gradient. Locate bicycle storage and parking adjacent to major destinations i.e. BRT stations, GRRL station, employment-, retail- and entertainment centres. Storage geometry: Length: 1.8m Width: 0.6m Height: 2.1m Aisle: 1.5m Application Areas: All building frontages leading out onto Class 3 roads. 120
2 PUBLIC TRANSPORT A: Feeder and Public Transport Routes Surfacing Bus Rapid Transit (BRT) and Supporting Public Transport: BRT Feeder and Other Public Transport Routes (Refer to A) BRT Feeder Routes, GRRL feeder/distribution system and other public transport modes generally travel on Class 3 routes. Feeder routes form part of the general traffic stream and are not separated as with trunk routes. Signage and special road surfacing should demarcate these feeder routes. BRT Feeder Stops and Other Public Transport Stops (Refer to B and C) Stops to be provided within the road reserve, but also separated from through traffic (i.e. Lay-by) Multi-modal stop sharing is encouraged. Multi-modal signage recommended at stops. Enforcement Dedicated public transport lanes must be enforced by CCTV cameras and electronic ticketing for private vehicle drivers entering restricted public transport roadspace. B: Feeder and Public Transport Stops Application Areas: BRT feeder routes according to City of Johannesburg BRT Scoping Study (Transportation Planning Department). SPTN routes according to the City of Johannesburg Integrated Transport Plan. Gauteng Rapid Rail Link feeder / distribution routes. C: Feeder Stops 121
3 PRIVATE TRANSPORT A: 90 On-street Parking Dimensions Parking: Geometry and Layout (Refer to A, B and C) Parking standards are to be applied in accordance with the National Department of Transport Parking Standards (2 nd Edition), Application Areas (Refer to D): On-street parking is acceptable on Class 3 routes, but not preferred. On-street parking should primarily be provided along Class 4 and 5 routes. B: 45 On-street Parking Dimensions C: Parallel Parking Dimensions D: Typical Layout Applications of On-street Parking 122
4 Class 4 and 5 Roads CLASS 4/5 ROAD SELECTED ROADWAY ELEMENT DESIGN CODES FOR MARLBORO PRECINCT Development Cell Circulation Description: Residential collector / access roads serving properties within the precinct. These roads are mainly utilised as access routes with little mobility. Street Classification: Road Hierarchy Fredman Maude Gwen Bute Norwich Close Protea Place Sandown Valley Alice Characteristics: Speed: 60 km/h Vehicle volumes: veh/hr Geometry: Primarily single carriageway roads but dual carriageway class 3 roads are not uncommon Turning Radii: > 4.2m < 10m Level of Access: LOA 7 LOA 8 Parking: On-street acceptable Surfacing: Road surfacing materials may vary from standard asphalt surfaces. Alternative surfacing should be standard at intersections and at midblock pedestrian crossings. Sight Distances Kerb Radii (Turning Vehicles) 123
5 PEDESTRIAN USERS A: Priority Mid-block Crossing Priority Mid-Block Pedestrian Crossings Yield Layout (Refer to A): Provide yield mid-block crossings along Class 4/5 routes. RTM 4 pedestrian crossing lines to be implemented (minimum width 2.4m/ desirable 5m width) No overtaking line RM1 fro 9m minimum / 16m preferred. RTM2 road signage with yield sign WM5 RTM2 to be placed 3m minimum 6m from block pedestrian crossing (RTM4). Option to provide raised block pedestrian crossing to serve as further speed reduction tool. Road Lighting (Refer to B): Street lighting to be provided as per NDoT Pedestrian Guideline Standard. Kerb Transitions (Refer to C): Kerb ramps must be implemented at all crossing points to accommodate for wheelchair users and sight impaired pedestrians. C: Kerb-Ramp Details B: Lighting of Mid-Block Crossings Application Areas: High volume pedestrian crossing points that occur mid-block between two land-use attractors or where intersection spacing is longer than 300m apart. 124
6 A: Roundabout Intersection Pedestrian Crossing Intersection Crossings: Roundabout Intersection Pedestrian Crossing (Refer to A): RTM 4 pedestrian crossings to be implemented (minimum width 1.5m / desirable width 3m) RTM 2 with WM5 yield road signage on both sides of the pedestrian crossing. Therefore vehicle will yield for pedestrians before entering the circle, then vehicles upon entering the circle, again yielding before exiting the desired road. Shared pedestrian and cycle lanes provided adjacent to road with signage R113 W201 Roundabout sign Provide barrier kerbing. Option to provide raised roundabout intersection to further reduce vehicular speed. Staged Intersection Crossing (Refer to B): RTM 3 pedestrian crossing lines to be implemented (minimum width 1.5m / desirable width 3m) Interlocking pavers or coloured asphalt is recommended at Class 4/5 junctions serving as gateways to a residential road. Staged crossings should be considered. Minimum median width for staged crossings 2m. Raised pedestrian crossing can be considered. Road Lighting (Refer to C): Staged Intersection Crossing Dimensions Street lighting to be provided as per NDoT Pedestrian Guideline Standard. C: Intersection Lighting D: Kerb Transitions Kerb Transitions (Refer to D): Kerb ramps must be implemented at all crossing points to accommodate for wheelchair users and sight impaired pedestrians. 125
7 Application Areas: Road intersections between Class 4 roads and Class 5 roads and Class 5 roads and Class 5 roads. 126
8 A: Class 4 and 5 Pedestrian / Cycle Ways Pedestrian and Cycle Ways: Layout and Geometry (Refer to A): Walkways to be provided adjacent to all Class 4/5 Roads with cycle ways provided within roadway separated by paint marking. Walkway and cycle way also separated because of speed differential of modes (Barrier Kerb 0.3m). All existing lateral obstructions should be removed from the walkway / cycle way area. Design Dimensions Walkway (Refer to B) Cycle way B: Geometry and Design Dimensions Gradient 5% Gradient 5% Minimum Width 1.5m Minimum Width 2.5m Desirable width 1.8m Desirable width 3m Lateral clearance 0.1m Height clearance 2.1m Lateral clearance 0.5m Height clearance 2.1m Buffer strip 0.6m Buffer strip 0.6m B: Geometry and Design Dimensions C: Lighting along walkways and cycle ways Surfacing: Surfacing should be conducive to movement of able bodied users and users with disabilities. Gratings and covers opening 12mm. Edges Edges should be defined visually and tactile. Handrails to be implemented where vertical drop of 0.8m with slope steeper than 1:2 (50%) occurs within 1.2m from edge. D: Walkways along Urban Links Lighting (Refer to C): Lighting should be provided along all walkways and cycle ways for safety and security as well as night-time operational reasons. 127
9 Application Areas (Refer to D and E): Adjacent to all Class 4/5 roads Facilities (walkways and cycle ways) to be aligned to crossing points at intersections and mid-block crossings. E: Walkways at Activity Centres 128
10 A: Stair Applications Building Frontages: Geometry (Accessed from the Sidewalk) Refer to A: Ramps should be provided for disabled users at 1:12 (8.3%) gradient. Ramp rises should be stepped at 400mm intervals. Stairs to be implemented according to National Building Regulations (SABS 1900) Public stairs 1.5m width, minimum of 3 steps, non-slip materials with -2% gradients for drainage. B: Bicycle Ramps at Public Stairs Bicycle Ramps and Storage (Refer to B): Bicycle ramps to be provided adjacent to all stairs 1:2 (50%) gradient. Locate bicycle storage and parking adjacent to major destinations i.e. BRT stations, GRRL station, employment-, retail- and entertainment centres. Storage geometry: Length: 1.8m Width: 0.6m Height: 2.1m Aisle: 1.5m Application Areas: All building frontages leading out onto Class 4/5 roads. 129
IMPLEMENTATION. PEDESTRIAN USERS (Continued /) A: Class 2 Pedestrian / Cycle Ways. Pedestrian and Cycle Ways:
A: Class 2 Pedestrian / Cycle Ways PLAN VIEW Pedestrian and Cycle Ways: Layout and Geometry (Refer to A): Walkways and cycle to be provided adjacent to all Class 2 Roads (these facilities should always
More informationDEVELOPMENT FRAMEWORK
DEVELOPMENT FRAMEWORK 2.3.3 Advantages and Disadvantages Whilst PTAL is a simple calculation (easily performed by a spreadsheet) that offers an obvious indication of the density of public transport provision
More informationClassification Criteria
SCHEDULE D TO RECOMMENDED OFFICIAL PLAN AMENDMENT NO. 40 SCHEDULE C-4 Road Criteria Criteria Traffic Service Objective Land Service/Access Typical Daily Traffic Volume Flow characteristics Travel Speed
More informationROUNDABOUTS/TRAFFIC CIRCLES
GENERAL 1. Description This standard identifies minimum requirements that shall be met for Roundabouts and Neighborhood Traffic Circles in the design and construction of elements for Arlington County Horizontal
More informationTGSI Tactile Ground Surface Indicators
TGSI Tactile Ground Surface Indicators Introduction: This Design Note, No 11, provides guidelines and requirements for the use and installation of Tactile Ground Surface Indicators (TGSI s). References
More informationCHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS
CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...
More informationCHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT
CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT 2.1 General topics 2.1.1 Changes since previous audit Do the conditions for which the scheme was originally designed still apply? (for example, no changes to
More informationAppendix C. TRAFFIC CALMING PROGRAM TOOLBOX
Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX PHASE I...2 Do Not Enter Sign...3 One-Way Sign...4 Turn Prohibition...5 Pavement Markings...6 Speed Monitoring Trailer...7 Neighborhood Speed Watch...8 Police
More information10.0 CURB EXTENSIONS GUIDELINE
10.0 CURB EXTENSIONS GUIDELINE Road Engineering Design Guidelines Version 1.0 March 2017 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services
More informationCURRENT ORIGINAL REFERENCE SECTIONS. (Typical Section) (Typical Section) The Parade Island Bay : Concept Option Summary Sheets.
ORIGINAL (Typical Section) CURRENT (Typical Section) 3,900 3,000 2,000 1,500 3,100 1,600 3,100 1,500 2,000 2,500 3,900 3,000 1,800 600 2,000 3,000 3,000 2,000 600 1,800 2,500 Existing Planting Traffic
More informationAgenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN
PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations
More informationOff-road Trails. Guidance
Off-road Trails Off-road trails are shared use paths located on an independent alignment that provide two-way travel for people walking, bicycling, and other non-motorized users. Trails specifically along
More informationINDEX. Geometric Design Guide for Canadian Roads INDEX
Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines
More informationRoadways. Roadways III.
Introduction 97 Roadway Design Principles 98 Safe Speeds 99 Optimizing of Street Space 00 Minimum Lane Widths in the City of Boston 02 Design Features that Reduce Operating Speeds 05 Travel Lanes Transit
More informationAnne Arundel County BICYCLE, PEDESTRIAN, TRANSIT ASSESSMENT GUIDELINES
Anne Arundel County BICYCLE, PEDESTRIAN, TRANSIT ASSESSMENT GUIDELINES December 2018 TABLE OF CONTENTS I. Executive Summary 3 II. When Is A Bicycle Pedestrian Transit Assessment (BPTA) Required? 4 III.
More informationAppendix 3 Roadway and Bike/Ped Design Standards
Appendix 3 Roadway and Bike/Ped Design Standards OTO Transportation Plan 2040 4/20/2017 Page A3-1 Adopted Standards The adopted OTO Design Standards and Major Thoroughfare Plan are contained herein.
More informationcomplete streets design and construction standards public primer City of Edmonton
complete streets design and construction standards public primer City of Edmonton introduction Complete Streets are streets for everyone: people who walk, wheel, bike, take transit, or drive. They are
More informationRAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings
RAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings Location: Crossing No. Date of On-Site Inspection: (Day) / / (Night) / / Weather: CHECKLIST 5. - GENERAL TOPICS Level of control
More informationFootpath design. A guide to creating footpaths that are safe, comfortable, and easy to use
Footpath design A guide to creating footpaths that are safe, comfortable, and easy to use November 2013 Contents Introduction / 1 Zoning system / 2 Width / 4 Height / 5 Surface / 5 Footpath elements /
More information10 SHERFORD Town Code
Key Fixes (Ref: Masterplan Book, section 4a. Land Use Budget and Key Fixes ) The Town Plan designs and allocates buildings, streets and spaces as accurately as possible in the understandable absence of
More informationguide to a phased approach TRIPP
complete street development guide to a phased approach TRIPP development phases Existing 00 months 00 crores/km Phase 0 months 0 crores/km Phase 09 months 0 to 08 crores/km Phase months 07 to crores/km
More informationAPPENDIX A BICYCLE, PEDESTRIAN, AND TRANSIT ASSESSMENT WORKSHEET. B. Subdivision/Site Development Plan/Grading Permit Name and Number:
APPENDIX A BICYCLE, PEDESTRIAN, AND TRANSIT ASSESSMENT WORKSHEET I. GENERAL INFORMATION A. Project name: B. Subdivision/Site Development Plan/Grading Permit Name and Number: C. Project address: D. Project
More informationAurora Urban Street Standards For Transit Oriented Developments and Urban Centers
Aurora Urban Street Standards For Transit Oriented Developments and Urban Centers I. Purpose These standards will be applied to create a safe, comfortable, pleasant and pedestrian-friendly multi-modal
More informationThis Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans.
4.1 GENERAL This Chapter sets forth the minimum design, technical criteria and specifications to be used in the preparation of all roadway plans. These Roadway Standards are for new construction and modification
More informationGuidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions
ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions This treatment provides a transition from two-way separated bike lanes to one-way
More informationCHAPTER 5: GENERAL SITE AND BUILDING ELEMENTS
CHAPTER 5: GENERAL SITE AND BUILDING ELEMENTS 501 General 501.1 Scope. The provisions of Chapter 5 shall apply where required by Chapter 2 or where referenced by a requirement in this document. 502 Parking
More informationCity of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY
4.10 ALBERT LEA CROSSWALK POLICY PURPOSE: Pedestrian crosswalks are an integral part of our transportation infrastructure. To be effective and promote safety, marked crosswalks must be installed after
More informationAccommodating Pedestrians in the Work Zone
Accommodating Pedestrians in the Work Zone Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However,
More informationStandards vs. Guidelines. Public Right-of Way Accessibility Guidelines (PROWAG)
www.access-board.gov Public Right-of Way Accessibility Guidelines (PROWAG) Juliet Shoultz, P.E Transportation Systems Engineer US Access Board Standards vs. Guidelines Guidelines are developed by the Access
More information(HIGHWAY GEOMETRIC DESIGN -1)
LECTURE HOUR-19 TE-1(10CV56) UNIT-3 (HIGHWAY GEOMETRIC DESIGN -1) Width of carriage way: Width of the carriage way or the width of the pavement depends on the width of the traffic lane and number of lanes.
More informationIntersection Design. Leah Ness, Craig Hardy and Eric Sorensen
Intersection Design Leah Ness, Craig Hardy and Eric Sorensen OVERVIEW TYPES OF INTERSECTIONS SCOPING COORDINATION INTERSECTION EVALUATION HORIZONTAL AND VERTICAL LAYOUTS DESIGN COORDINATION CONSTRUCTION
More informationADA Design Overview. Section 2. ADA Design Overview. Pedestrian Access Routes. Pedestrian Access Routes. Overview
ADA Design Overview Section 2 ADA Design Overview Overview Accessible Pedestrian Signals Alternate Fall, 2017 Ann Johnson, PE Services Brady Rutman, SRF Consulting Group 2 Pedestrian Access Route (PAR)
More informationBACCHER CERTIFICATES / CONTENTS CERTIFICATES / STATUS CONTENTS. l TRAFFIC ACCOMMODATION. ROAD SERVICES (PTY) LTD Your Vision Our Reality!
CERTIFICATES / CONTENTS CERTIFICATES / STATUS CONTENTS CONTENTS / CERTIFICATION BACKGROUND 2 3 ROAD SIGNS 4 REGULATORY SIGNS WARNING SIGNS 6 9 INFORMATION SIGNS GUIDANCE SIGNS TOURISM SIGNS ROUTE MARKERS
More informationADA on Construction. Guidance for Section C Plan Preparers
ADA on Construction Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However, good planning can minimize
More informationActive Transportation Facility Glossary
Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike
More informationField guide for Accessible Public Rights-of-Way Edition
Field guide for Accessible Public Rights-of-Way 2015 Edition BRIEFING MEMO SUBJECT: Department of Justice/Department of Transportation Joint Technical Assistance on Title II of the Americans with Disabilities
More informationCITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY
RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study
More informationPRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN
PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations
More informationBroad Street Bicycle Boulevard Design Guidelines
Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified
More informationIAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm
IAN WHITE ASSOCIATES Crawley Station Gateway Public Realm contents 1. objectives & client brief 2. site appraisal 3. best practice guidance 4. design concept 1. objectives & client brief Crawley Train
More informationOLDER PEOPLE INDEPENDENT MOBILITY FOR LIVEABLE COMMUNITIES. Christopher G B (Kit) Mitchell
OLDER PEOPLE INDEPENDENT MOBILITY FOR LIVEABLE COMMUNITIES by Christopher G B (Kit) Mitchell Independent mobility is necessary for a high quality of adult life In developed countries, the automobile has
More informationRE: 100 VARLEY LANE TRANSPORTATION OVERVIEW
IBI Group 400 333 Preston Stret Ottawa ON K1S 5N4 Canada tel 613 225 1311 fax 613 225 9868 April 28, 2014 Mr. Ed Blaszynski Project Manager Infrastructure Approvals Development Review Urban Services Branch
More informationDEFINING THE STREETSCAPE DRAFT
3 DEFINING THE STREETSCAPE Context Sensitive Design Context Sensitive Design The structuring elements of streetscapes for the City of Vaughan are road classifi cation, streetscape type and level of service.
More informationFigure 3B-1. Examples of Two-Lane, Two-Way Marking Applications
Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications A - Typical two-lane, two-way marking with passing permitted in both directions B - Typical two-lane, two-way marking with no-passing zones
More informationIntroduction Methodology Study area and data collection Results and recommendation Conclusion References
Introduction Methodology Study area and data collection Results and recommendation Conclusion References It is formal procedure for assessing accident potential and safety performance in the provision
More information2.0 LANE WIDTHS GUIDELINE
2.0 LANE WIDTHS GUIDELINE Road Engineering Design Guidelines Version 2.0.1 May 2018 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services initiated
More informationADA & Public Rights of Way
ADA & Public Rights of Way Overview of Current and Up-coming Requirements FDOT Design Training Expo 2012 Orlando, FL Dean Perkins, RA - ADA Coordinator Florida Department of Transportation Office of Design,
More informationAccess Management in the Vicinity of Intersections
Access Management in the Vicinity of Intersections FHWA-SA-10-002 Technical Summary Photo: Ralph Bentley (used with permission) 0 Access Management is: The design, implementation and management of entry
More informationCycle Track Design Best Practices Cycle Track Sections
Design Best Practices Sections It is along street segments where the separation and protection methods of cycle tracks offer more comfort than conventional bicycle lanes, and are more attractive to a wide
More informationIntersection Safety 6/7/2015 INTERSECTIONS. Five basic elements should be considered in intersection design. Intersection Safety (continued)
Intersection Safety S. M. SOHEL MAHMUD Assistant Professor Accident Research Institute (ARI), Bangladesh University of Engineering and Technology (BUET) Dhaka-1000, Bangladesh 1 Outline of the Presentation
More informationCopenhagen Cycling Map. Red Lines Cycling facilities
Copenhagen Cycling Map Red Lines Cycling facilities Copenhagen Cycling Facilities Design Approaches Transportation without Pollution Copenhagen s Strategy Where Cycling is one of the top key activities
More informationDr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS
Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS Overview Highway Functions and Classifications Highway Design Components Design Control
More informationChapter 3 DESIGN SPECIFICATIONS
Brampton PathWays Planning and Design Guidelines 27 Chapter 3 DESIGN SPECIFICATIONS 3.1 CLASS 1 MULTI-USE PATH Off-road multi-use trails are the backbone of the Brampton PathWays Network. They are typically
More informationBallston Station Multimodal Study WMATA and Arlington County. Meeting Minutes
Date of Meeting: June 10, 2010 Location: Ballston Metrorail Station and NRECA Building 4301 Wilson Blvd, Arlington, VA Subject: Ballston Station Multimodal Study Stakeholder Meeting #1 Summary: This first
More informationCHECKLIST 5: ROADWORK TRAFFIC SCHEME AUDIT
CHECKLIST 5: ROADWORK TRAFFIC SCHEME AUDIT 5.1 General items 5.1.1 Alignment Are the roadworks located safely with respect to horizontal and vertical alignment? If not, does works signing cater for this?
More informationCAR PARKING [15] General provision
CAR PARKING [15] 1 1. General provision Provision should be made for car parking spaces for disabled motorists (Blue (formerly Orange) Badge holders) wherever conventional parking spaces are provided.
More informationMultimodal Through Corridors and Placemaking Corridors
68 Multimodal Through Corridors and Placemaking Corridors Corridors have different functions in a region. Some corridors are used to get smoothly and rapidly through a region or to get quickly to major
More informationCURBSIDE ACTIVITY DESIGN
5 CURBSIDE ACTIVITY DESIGN This chapter provides design guidance for separated bike lanes adjacent to curbside activities including parking, loading and bus stops. Typical configurations are presented
More informationCity of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A
A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table
More informationItem to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines
Passaic County Complete Streets Checklist - Concept Development Project Name Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Existing Plans Have
More informationState Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway
State Road 54/56 Tampa Bay s Northern Loop The Managed Lane Solution Linking I-75 to the Suncoast Parkway SUNCOAST PARKWAY Both I 75 and the Suncoast Parkway are planning, or in the process of constructing,
More informationTRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION
TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION CITY OF TORONTO TRANSPORTATION SERVICES DIVISION 2016 TRAFFIC CALMING GUIDE FOR TORONTO TABLE OF CONTENTS Introduction
More information5. RUNNINGWAY GUIDELINES
5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved
More informationNJDOT Complete Streets Checklist
Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip
More informationField guide for Accessible Public Rights-of-Way Edition
Field guide for Accessible Public Rights-of-Way 2017 Edition CONTENTS PEDESTRIAN FACILITIES IN THE PUBLIC RIGHT-OF-WAY Pedestrian access routes 3 Components 3 Continuous width 3 Median and pedestrian refuge
More informationPERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4
PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 1 WORK DESCRIPTION 2 WORK DESCRIPTION 3 WORK DESCRIPTION 4 Repair Install Remove Clean 306 DRAINAGE PIPE ACTIVITY DESCRIPTION Install, repair, clean,
More informationGeometric Design Tables
Design Manual Chapter 5 - Roadway Design 5C - Geometric Design Criteria 5C-1 Geometric Design Tables A. General The following sections present two sets of design criteria tables - Preferred Roadway Elements
More informationCHECKLIST 6: EXISTING ROADS: ROAD SAFETY AUDIT
CHECKLIST 6: EXISTING ROADS: ROAD SAFETY AUDIT 6.1 Road alignment and cross-section 6.1.1 Visibility; sight distance Is sight distance adequate for the speed of traffic using the route? Is adequate sight
More informationDesigning Pedestrian Facilities for Accessibility. Module 3 Curb Ramps & Blended Transitions
Module 3 & Other Purpose: Allow pedestrians to transition between the street and sidewalks, islands, etc. Typically installed at: Intersections (1 ramp at each end of each crosswalk) Mid-block crossings
More informationPedestrian crossings: design guideline for TGSI application in South Africa
Pedestrian crossings: design guideline for TGSI application in South Africa Frano Combrinck Technician GIBB Engineering & Science fcombrinck@gibb.co.za BACKGROUND The correct implementation, application
More informationRoad Markings. Lecture Notes in Transportation Systems Engineering. Prof. Tom V. Mathew. 1 Overview 1. 2 Classification 2
Road Markings Lecture Notes in Transportation Systems Engineering Prof. Tom V. Mathew Contents 1 Overview 1 2 Classification 2 3 Longitudinal markings 2 3.1 Center line.....................................
More informationComplete Streets Design Considerations. Second Street Corridor Complete Streets Workshop and Assessment Manchester, NH April 26, 2013
Complete Streets Design Considerations Second Street Corridor Complete Streets Workshop and Assessment Manchester, NH April 26, 2013 2 nd Street Existing Information Average Annual Daily Traffic Volumes
More information4. Guided Bus Explained
4. Guided Bus Explained Contents 1 INTRODUCTION... 2 Structure of this report... 2 2 KERB GUIDED BUS... 3 Overview... 3 Kerb guidance... 3 Figures Figure 2.1 Figure 2.2 Figure 2.3 Figure 2.4 Figure 2.5
More informationCOMPLETE STREETS CHECKLIST City of Philadelphia The City of Philadelphia's Complete Streets policies are designed ensure that city streets are safe, comfortable and convenient for people of all ages and
More informationCity of Vestavia Hills Traffic Calming Policy for Residential Streets
City of Vestavia Hills Traffic Calming Policy for Residential Streets PURPOSE: The purpose of the Traffic Calming Policy for Residential Streets is to address safety concerns related to vehicular traffic
More informationGeometric designs for Safe Highways. Dr. Manoj M. Asst. Professor Department of Civil Engineering IIT Delhi
Geometric designs for Safe Highways Dr. Manoj M. Asst. Professor Department of Civil Engineering IIT Delhi WORKSHOP-CUM-TRAINING PROGRAMME ON ROAD SAFETY 17th 21st September 2018 Outline Introduction Cross
More informationTown of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy
Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy Adopted January 6, 2014 Town of Mooresville Development Services Department TOWN OF MOORESVILLE NEIGHBORHOOD TRAFFIC
More informationSECTION V - CIRCULATION PLAN
- CIRCULATION PLAN 1 2 - CIRCULATION PLAN ELEMENT INTRODUCTION As a community that is essentially fully-developed, Livingston s transportation improvement opportunities are limited. The primary mode of
More informationOmaha s Complete Streets Policy
Omaha s Complete Streets Policy (Adopted August 2015) VISION To create great places and enhance our quality of life, the City of Omaha will provide safe, accessible streets for all users. Complete Streets
More informationSection 4: Inventory Methodology and Findings
Section 4: Inventory Methodology and Findings Section 4.1: Purpose and Summary of the Inventory Effort The purpose of the inventory is to show a baseline of existing pedestrian facilities in the City of
More informationParking. Parking 11/27/2012. On street parking. Off-street parking is space provided for vehicular parking outside the dedicated street right-of-way.
Parking On street parking Off-street parking is space provided for vehicular parking outside the dedicated street right-of-way. At-grade parking lot Parking garages SITE Parking 90 degree (20 x 9 stalls)
More informationCITY OF SARATOGA SPRINGS PEDESTRIAN CROSSING TOOLBOX
CITY OF SARATOGA SPRINGS PEDESTRIAN CROSSING TOOLBOX This toolbox is to be used to guide pedestrian crossing improvements within the City of Saratoga Springs. Details for each crossing type are provided.
More informationRIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community
Riverside Station A green, transit-oriented community October 6, 2011 TONIGHT S AGENDA: 1. Project Update (5 min.) 2. Master Plan Update (10 min.) 3.Traffic Plan Update (10 min.) Questions & Answers MASTER
More informationPEDESTRIAN ACCOMMODATIONS DPS 201 AT ROUNDABOUTS
PEDESTRIAN ACCOMMODATIONS DPS 201 AT ROUNDABOUTS WHY THEY WORK FOR PEDESTRIANS IF DESIGNED CORRECTLY Separated sidewalks direct peds to crosswalks Splitter island Slow speed exit Truck apron Crosswalk
More informationDriveway Design Criteria
Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved
More informationINTERSECTIONS AT GRADE INTERSECTIONS
INTERSECTIONS 1 AT GRADE INTERSECTIONS INTERSECTIONS INTERSECTIONS = INTERRUPTED FACILITIES Definitions and key elements An intersection is defined as an area where two or more roadways join or cross.
More informationIntroduction. Using the Checklist. TDM-Supportive Development Design and Infrastructure Checklist Version 1.0 (30 June 2017) City of Ottawa
Introduction The s Transportation Impact Assessment (TIA) Guidelines (specifically Module 4.1 Development Design) requires proponents of qualifying developments to use the City s TDM-Supportive Development
More informationRevisions to Larimer County Urban Area Street Standards (2016 Update)
1.9.2 B 1-18 Street Construction Policy 1.14 (new) 1-29 Complete Streets in Fort Collins 4.1.1 04-01 General 4.1.3 04-01 Capacity and Safety Issues 4.1.3 B 04-02 Pedestrian Traffic Considerations 4.1.4
More information7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811
7/23/2017 VIA EMAIL Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: 65 th Street Apartments (DR17-220) Dear Mr. Hanebutt:
More informationCity of Vallejo Traffic Calming Toolbox
City of Vallejo Traffic Calming Toolbox June 1, 2013 Final Table of Contents Introduction... 1 Non-Physical Devices... 3 High-Visibility Crosswalk... 3 In Pavement Lighted Crosswalk... 4 Rapid Flashing
More informationPublic Information Centre
WELCOME Public Information Centre Father Tobin Road Lougheed Middle School - Library Wednesday November 7, 2012 7:00 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background The City
More informationAppendix A: Crosswalk Policy
Appendix A: Crosswalk Policy Appendix A: Crosswalk Policy Introduction This citywide Crosswalk Policy is aimed at improving pedestrian safety and enhancing pedestrian mobility by providing a framework
More informationCity of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS
SECTION 13 BIKEWAYS 13-1 GENERAL The City of Roseville bikeway standards are designed to insure that transportation and recreational bikeways are constructed in a manner that would provide a safe and comfortable
More informationCONTEXT SENSITIVE STREETS STANDARDS COMMITTEE
CONTEXT SENSITIVE STREETS STANDARDS COMMITTEE February 23, 2015 Prepared by: Denise Chaplick, AICP City Jacksonville Bicycle and Pedestrian Coordinator Source: NCDOT Complete Streets Planning and Design
More informationPolicy Statement. Objective. Context. References and Supporting Documentation
Policy Statement Subject Placement of Distribution Poles Along Roads With Speed Limits Not Exceeding 70km/h Approved by Robert Rogerson Signature & Date Distribution Standards and Policy Manager Authorised
More informationFrascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation
Frascati Road and Temple Hill Route Improvements Outline Design Report to Accompany Public consultation September 2013 Background: Dún Laoghaire-Rathdown is committed to providing high quality pedestrian
More informationDESIGN CODE. Enterprise West Harlow London Road North Design Code 21
DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.
More informationRoad Markings. Lecture Notes in Transportation Systems Engineering. Prof. Tom V. Mathew
Road Markings Lecture Notes in Transportation Systems Engineering Prof. Tom V. Mathew 1 Overview The essential purpose of road markings is to guide and control traffic on a highway. They supplement the
More informationChapter 2: Standards for Access, Non-Motorized, and Transit
Standards for Access, Non-Motorized, and Transit Chapter 2: Standards for Access, Non-Motorized, and Transit The Washtenaw County Access Management Plan was developed based on the analysis of existing
More informationCOMPLETE STREETS DURING CONSTRUCTION
COMPLETE STREETS DURING CONSTRUCTION MAINTAINING ACCESSIBILITY FOR ALL Presented by Robbie Burgess, P.E., PTOE Associate Principal Construction Services Manager Howard Stein Hudson rburgess@hshassoc.com
More information