1 Frascati Road and Temple Hill Route Improvements Outline Design Report to Accompany Public consultation September 2013
2 Background: Dún Laoghaire-Rathdown is committed to providing high quality pedestrian and cycle facilities throughout the County. In 2012 the County Wide Cycle Network was finalised. This ranked routes based on their potential demand and current level of service for cyclists. Frascati Road between Mount Merrion Avenue and Temple Hill was ranked 19 out of 89 sections assessed for improvement. The improvement of this route for cyclists will provide a key missing link in the Cycle Network. The existing layout of Frascati Road (dual carriageway with median) is very car orientated and acts as a barrier for pedestrians and cyclists. This discourages users from walking and cycling into Blackrock and improving facilities for both modes will encourage more people to choose a sustainable travel mode. The Draft Blackrock LAP is currently being progressed and includes a number of pedestrian and cycle objectives. These have been incorporated into the scheme where possible. Scheme Objectives: The main objective of the proposed scheme can be summarized as follows: The provision of high quality cycle facilities along and across the route The improvement of pedestrian facilities along and across the route Incorporate the objectives of the Blackrock LAP where possible e.g. pedestrian crossing locations, and to prepare a design that will facilitate the LAP objectives this scheme cannot deliver e.g. public realm upgrades / new entrance to Blackrock park Review bus stop locations and propose new bus stop locations Proposed Scheme: Improvements are proposed for the various modes along the route including: Cycling: It is proposed to provide dedicated cycle facilities along the length of the proposed scheme. These will be of a high quality (minimum level of service B) and segregated from vehicular traffic where possible. The facilities will be in accordance with the recommendations in the National Cycle Manual.
3 Crossing points will be upgraded to Toucan crossings to assist cyclists to cross the route It is proposed to install traffic signal by-passes where possible and particularly at T junctions to improve journey times and priority for cyclists. A signal by-pass will allow cyclists to continue along the main route while traffic from the side roads is exiting. Specific issues outbound: Outbound in advance of Rock Hill The approach to Rock Hill junction leaves straight ahead cyclists in a vulnerable position where there is potential for cars turning left into the Main Street to come into conflict with them. It is proposed to install cycle lanes and provide a build out in advance of the junction to restrict the area where cars can enter but maintain access for the bus.
4 Approach to Temple Road The approach to the Temple Road junction is a similar issue to the above and results in cyclists being in a vulnerable position for a long time between the two traffic lanes. It is proposed to install cycle lanes and reduce the length of the turning pocket to reduce conflict and vehicles speeds. Exit from Temple Road onto Frascati Road The current exit from Temple Road onto Frascati results in vehicles exiting at speed with poor visibility of vehicles approaching from behind. It is proposed to make this exit a bus and cycle gate with all other vehicles restricted from exiting.
5 Monkstown Road The current layout of the Monkstown Road exit makes it very difficult for cyclists to continue straight ahead at this junction. It is proposed to reduce the entry angle and kerb radii to reduce the speeds of vehicles exiting and the distance cyclists have to cross. Temple Hill / Newtownpark Avenue The current layout on approach to the Temple Hill / Newtownpark Avenue junction is very difficult for cyclists due to the narrow lanes and tight geometry. It is proposed to merge the outbound straight ahead and right turn lanes. This will allow the footways on both sides to be extended and cyclists will be permitted to share with pedestrians. This will remove them from conflict points and improve their safety.
6 Inbound: Approaching Carysfort Avenue The approach to the Carysfort Avenue junction is a similar issue to the above and results in cyclists being in a vulnerable position between two traffic lanes. It is proposed to install cycle lanes and remove the acceleration lane to reduce conflict. Area adjacent to shopping centers The current layout of this area results in a number of people merging into the traffic lanes and exiting into the shopping center. It is proposed to install
7 build outs to separate turning movements and to provide protection to cyclists travelling straight ahead. Mount Merrion Avenue The exit onto Mount Merrion Avenue results in vehicles exiting a high speed in an area where cyclists are vulnerable. It is proposed to reduce the flare of the exit to slow speeds and reduce conflict. Pedestrian Facilities: It is proposed to improve pedestrian facilities at: Rock Hill by removing the slip lane and reducing crossing distance Georges Avenue by improving the tactile paving and signalising the side road Carysfort Avenue by adding crossing points parallel to Frascati Road Barclay Court by signalising the side road Newtownpark Avenue by shortening crossing distances and widening footpaths It is proposed to install new pedestrian facilities at: Sweetmans Avenue
8 Bus stops: There are a number of bus stop relocations and proposed new locations for bus stops proposed in the Blackrock LAP. These have been included in this scheme. Vehicles: To facilitate the installation of cycle facilities along the route it is proposed to reduce the width of the traffic lanes to 3m in line with the recommendations of the Design Manual for Urban Roads and Streets. It is also proposed to reduce kerb radii and turning pockets to reduce speeds and conflict. These changes will have no significant impact on capacity along the route and will encourage slower speeds and improve safety. Specific Issues: To facilitate the installation of facilities for pedestrians and cyclists at the Newtownpark Avenue junction it is proposed to merge the outbound straight ahead and right turn lane. The phasing of the signals will have to be altered to facilitate this change, and following traffic modelling analyse it is predicted that this will increase vehicle queuing at this junction. A number of options were investigated at this junction including banning the right turn onto Newtownpark Avenue. The proposed solution provides the best balance between improved facilities for vulnerable road users and maintaining efficient movement of vehicles. Newtownpark Avenue junction
9 As the outbound lanes are being merged at the Temple Hill / Newtownpark Avenue junction it is proposed to amend the current layout outbound between the Newtown Avenue / Temple Hill and the Monkstown Road / Temple Hill junctions from both lanes being permitted to travel straight ahead to only the right lane being permitted to travel straight head. This will remove the need for cars to merge in / after the junction. The majority of cars in the left lane already exit onto Monkstown Road. Meeting with the NRA: As a section of this scheme (Mount Merrion Avenue to Newtown Avenue) is on the National Primary N31, the proposals have been discussed with the National Roads Authority. In general they are in favour of the changes and further consultation will take place during the detailed design phase of the project. Public Consultation: It is proposed to initiate a period of non statutory public consultation on the proposed scheme. Displays will be put up in County Hall, Blackrock Library and on the Councils website for a period of 4 weeks. Following this, a report will be brought back to the Dún Laoghaire Area Committee as early as possible (October / November). Funding: Funding to complete design and options development has been provided by the National Transport Authority. Funding is also available in 2013 to commence construction of the section of the scheme from Newtown Avenue to Temple Hill. Following the period of public consultation it is proposed to separate the scheme into 2 sections for the purpose of construction with the Newtown Avenue Temple Hill section being constructed towards the end of 2013 and the Frascati Road Section in Summer 2014 when traffic volumes will be lighter. Conclusion and Recommendation: Further to the presentation of the scheme to the Area Committee it is recommended that Public Consultation be initiated. Conor Geraghty Cycling Officer John Broderick Senior Executive Engineer
Dún Laoghaire Rathdown County Council. Luas to Dart via UCD Cycle and Pedestrian Route
Dún Laoghaire Rathdown County Council Luas to Dart via UCD Cycle and Pedestrian Route October 2012 Luas to Dart via UCD Cycle and Pedestrian Route DOCUMENT CONTROL SHEET Client: Project Title: Document
More informationSandyford Cycle Route (Kilgobbin / Drummartin Link Road)
Sandyford Cycle Route (Kilgobbin / Drummartin Link Road) Public Consultation Report on Submissions Client: Dun Laoghaire-Rathdown County Council Date: May 2018 Job Number: 15_116B Clifton Scannell Emerson
More informationHISTON ROAD Have your say on better public transport, cycling and walking journeys
HISTON ROAD Have your say on better public transport, cycling and walking journeys Have your say: Please complete the survey inside this leaflet or online at www.greatercambridge.org.uk/histonconsultation
More informationRhebogue Neighbourhood Greenway. Road Safety Audit Stage 2
Rhebogue Neighbourhood Greenway Road Safety Audit Stage 2 Report Number: 12/007/00/00057 July 2014 Mid West National Road Design Office Lissanalta House, Dooradoyle County Limerick Tel: 061 496 800 Fax:
More informationAgenda Item 34. N11 - Brewery Road Improvement Scheme
Agenda Item 34 N11 - Brewery Road Improvement Scheme Public Consultation Report on Submissions Client: Dún Laoghaire-Rathdown County Council Date: November 2017 Job Number: 13_066A Document Pack Page 11
More informationTS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1
TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL Page 1 Table of Contents 1.0 Introduction... 3 2.0 Project Overview... 3 3.0 Project Proposals... 4 3.1 Enfield Road / Durham Road Junction... 3 5 3.2 Summerfield
More informationIAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm
IAN WHITE ASSOCIATES Crawley Station Gateway Public Realm contents 1. objectives & client brief 2. site appraisal 3. best practice guidance 4. design concept 1. objectives & client brief Crawley Train
More informationHow do we design for pedestrians? Case study: transforming the Walworth Road
How do we design for pedestrians? Case study: transforming the Walworth Road David Moores, Director of Public Realm Institution of Highways and Transportation, November 2009 Presentation overview Design
More informationDerby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN. Date: 20 th November, 2018.
Your Ref: Derby City Council Air Quality - Preferred Option Nov 2018 Derby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN Date: 20 th November, 2018. 1. Introduction: 1.1. Derby Cycling
More informationPerne Rd / Radegund Rd Roundabout Cambridge
Perne Rd / Radegund Rd Roundabout Cambridge The conversion of an conventional urban roundabout to continental geometry A little bit of history The first traffic roundabout was built in Sollershott, Letchworth
More informationDESIGN CODE. Enterprise West Harlow London Road North Design Code 21
DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.
More informationJunction Design with Traffic Signals
Junction Design with Traffic Signals Wednesday March 2 nd 2016 Overview Introduction Context Conventional Approach Sustainable Approach Analysis Design Summary Introduction What are Traffic Signals? Purpose
More informationCycle Superhighway 4 from Tower Bridge to Greenwich
Cycle Superhighway 4 from Tower Bridge to Greenwich About Sustrans Sustrans is the charity making it easier for people to walk and cycle. We are engineers and educators, experts and advocates. We connect
More informationDesign and Installation of Low Level Cycle Signals
Transport for London Surface Transport Management System Document Guidance Note Design and Installation of Low Level Cycle Signals Document reference: SQA-0651 - Issue: Draft out of date information. 1
More informationCURRENT ORIGINAL REFERENCE SECTIONS. (Typical Section) (Typical Section) The Parade Island Bay : Concept Option Summary Sheets.
ORIGINAL (Typical Section) CURRENT (Typical Section) 3,900 3,000 2,000 1,500 3,100 1,600 3,100 1,500 2,000 2,500 3,900 3,000 1,800 600 2,000 3,000 3,000 2,000 600 1,800 2,500 Existing Planting Traffic
More informationThe Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport
LONDON BOROUGH OF RICHMOND UPON THAMES Cabinet Member Decision DATE: January 2012 REPORT OF: LEAD OFFICER: SUBJECT: WARDS: The Cabinet Member for Highways & Streetscene Aurang Zeb - Head of Highways &
More informationMILTON ROAD LLF PROJECT UPDATE
Greater Cambridge City Deal MILTON ROAD LLF PROJECT UPDATE 9 th May 2017 Project objectives Comprehensive priority for buses in both directions wherever practicable; Additional capacity for sustainable
More informationCabinet Member for Highways & Streetscene. Highway Infrastructure Manager
LONDON BOROUGH OF RICHMOND UPON THAMES DATE: AUGUST 2015 DECISION MAKER: LEAD OFFICER: SUBJECT: WARDS: Cabinet Member for Highways & Streetscene Highway Infrastructure Manager PROPOSED CYCLING IMPROVEMENTS
More informationChelmsford City Growth Package
Chelmsford City Growth Package Public Consultation Document Volume 2 West Chelmsford July - August 2017 Chelmsford City Growth Package Public Consultation Document - Volume 2 - West Chelmsford Contents
More informationE4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign
E4 Cycle Route Exeter University to Redhayes Bridge - Recommendations from Exeter Cycling Campaign 1.0 Introduction Exeter Cycling Campaign has prepared this report to provide recommendations for Devon
More informationHave your say on the transformation of Oxford Street West
Have your say on the transformation of Oxford Street West About Living Streets We are Living Streets, the UK charity for everyday walking. We want to create a walking nation, free from congested roads
More informationCHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT
CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT 2.1 General topics 2.1.1 Changes since previous audit Do the conditions for which the scheme was originally designed still apply? (for example, no changes to
More informationMarcus Jones, TRL. Presented by Name Here Job Title - Date
Segregation Insert the title and of priority your at presentation junctions: a here discussion Marcus Jones, TRL Presented by Name Here Job Title - Date Background: TfL cycle facility trials Infrastructure
More informationAuckland Transport s responses to feedback on proposed upgrades to the intersection of Mercari way and Don Mckinnon Drive
s to feedback on proposed upgrades to the intersection of way and Don Mckinnon Drive Points raised through feedback process 1 Congestion The proposal will improve traffic flow through the intersection
More informationSLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane
SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane Exception Report Client Officer Rudo Beremauro Date 20 January 2015 RSA /Project Sponsor s Contents Section 3 Project Sponsor's
More informationMarch Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016
Context. Author: Parish Clerk 2 The Draft Integrated Transport Policy (DITS) sets out a vision and objectives, and identifies a detailed programme of interventions to support the Maidstone Borough Local
More informationSCHEME DESIGN AND ENGINEERING
THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL LINK CLASSIFIED ROAD) SIDE ROADS ORDER 2013 THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL LINK) COMPULSORY PURCHASE ORDER 2013 THE NORTH SOMERSET COUNCIL (SOUTH BRISTOL
More informationTRANSPORT AND MOVEMENT
TRANSPORT AND MOVEMENT Movement Strategy Public Transport Cycling and Walking Road Network Parking Standards Transport Impact Assessments Traffic Management Policies DRAFT POOLBEG PLANNING SCHEME Movement
More informationDMURS - Practical Implications
Comhairle Contae Fhine Gall DMURS - Practical Implications Sean McGrath. 13 November 2013 Planning and Strategic Infrastructure Department DMURS Practical Implications What DMURS means for: Street Layouts
More informationMilton Road Project Update. Paul van de Bulk 30 January 2018
Milton Road Project Update Paul van de Bulk 30 January 2018 Milton Road Project Objectives Comprehensive priority for buses in both directions wherever practicable; Safer and more convenient routes for
More informationPublic Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY
Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR SAY Consultation open from 24 September to 5 November 2018 Contents Introduction 3 Background 4 Springwood Drive Roundabout
More informationDodder Greenway Emerging Preferred Route Consultation - October 2018
Dodder Greenway Emerging Preferred Route Consultation - October 2018 1.0 Introduction Dublin Cycling Campaign is the advocacy group for cycling in Dublin. Dublin Cycling Campaign is the leading member
More informationMaynooth Cycling Submission on North South Corridor
Maynooth Cycling Submission on North South Corridor Maynooth Cycling welcomes the intention to improve facilities and quality of service for pedestrians and cyclists in Maynooth. In particular, we strongly
More informationA127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017
A127/A130 Fairglen Interchange Improvement Schemes Information Leaflet February 2017 1 2 Foreword By Councillor Kevin Bentley Essex is continuing to grow as a vibrant economic hub and as a fantastic place
More informationsessions. The opinions of local people will help decide which of these two options is taken forward to be built.
A4018 FAQs Why are no bus lanes proposed north of Crow Lane? Inbound and outbound bus lanes were considered north of the Crow Lane junction, but they took away capacity from other traffic on the approach
More informationBroom Hill/Blackberry Hill Walking and Cycling Improvements
Broom Hill/Blackberry Hill Walking and Cycling Improvements Introduction Bristol has been awarded additional funding from the UK government to upgrade and extend walking and cycling routes across the city.
More informationIntroduction. Prince Street Cycling Ambition Fund Public Realm Project
Introduction The (CAF) project will create a high quality, 8-80 s cycle route up the west side of Prince Street from Cumberland Road, over Prince Street bridge to the Centre. This is part of the City Centre
More informationIMPLEMENTATION. PEDESTRIAN USERS (Continued /) A: Class 2 Pedestrian / Cycle Ways. Pedestrian and Cycle Ways:
A: Class 2 Pedestrian / Cycle Ways PLAN VIEW Pedestrian and Cycle Ways: Layout and Geometry (Refer to A): Walkways and cycle to be provided adjacent to all Class 2 Roads (these facilities should always
More informationThe Rower Traffic Management Scheme
KILKENNY COUNTY COUNCIL Comhairle Chontae Chill Chainnigh Section 38 of the Road Traffic Act, 1994 as amended by the Public Transport Regulation Act, 2009 (Section 46) The Rower Traffic Management Scheme
More informationAppendix F CAPITA Technical Audit
Appendix F CAPITA Technical Audit West Hendon - Major Review of Technical Audit Responses 14 June 2016 Quality Management Quality Management Job No Project Location Title CS/086106 West Hendon - Major
More informationPART 5 TD 51/03 SEGREGATED LEFT TURN LANES AND SUBSIDIARY DEFLECTION ISLANDS AT ROUNDABOUTS SUMMARY
DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 6 SECTION 3 ROAD GEOMETRY HIGHWAY FEATURES PART 5 TD 51/03 SEGREGATED LEFT TURN LANES AND SUBSIDIARY DEFLECTION ISLANDS AT ROUNDABOUTS SUMMARY This document sets
More informationBYRES ROAD: PUBLIC REALM Public Consultation
Public Consultation Introduction As a vibrant commercial, shopping and residential location within the heart of the West End Byres Road is an important destination. Its proximity to the University of Glasgow
More informationFrome Street Bicycle Route
The Adelaide City Council invites engagement from the community about Frome Street Bicycle Route Project Summary Adelaide City Council is seeking feedback on design options to construct bicycle facilities
More informationCork City Council Morrison s Island Public Realm and Flood Defence Project Transport Assessment
Morrison s Island Public Realm and Flood Defence Project REP/1 Issue 12 February 2018 This report takes into account the particular instructions and requirements of our client. It is not intended for and
More informationGlanmire Road Improvements and Sustainable Transport Works
Glanmire Road Improvements and Sustainable Transport Works Cork County Council Project number: 60559532 Quality information Prepared by Checked by Approved by Conor Luttrell Engineer Michael Condon Principal
More informationMilton Road Bus Stop and Crossings Workshop WSP. 19th September 2017
Bus Stop and Crossings Workshop WSP 19th September 2017 Workshop Aims Task 1: Identify preferences for bus stop designs relative to: (a) Ranking preference between 4 possible bus stop designs on the narrower
More informationParking. Signing. Appendix C Typical detail drawings. London Cycling Design Standards
Appendix C Typical detail drawings London Cycling Design Standards All drawings are prefixed CCE/ General A1 Cycle Symbol Diagram 1057 165 A3 Raised entry treatment on side roads 166 A4 Raised table at
More information10 SHERFORD Town Code
Key Fixes (Ref: Masterplan Book, section 4a. Land Use Budget and Key Fixes ) The Town Plan designs and allocates buildings, streets and spaces as accurately as possible in the understandable absence of
More information14. PROPOSED PEDESTRIAN CROSSING IMPROVEMENTS IN MOORHOUSE AVENUE
165 14. PROPOSED PEDESTRIAN CROSSING IMPROVEMENTS IN MOORHOUSE AVENUE General Manager responsible: General Manager City Environment, DDI 941-8528 Officer responsible: Transport and Greenspace Unit Manager
More informationPART 5 TD 51/17 SUMMARY
DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 6 SECTION 3 ROAD GEOMETRY HIGHWAY FEATURES PART 5 TD 51/17 SEGREGATED LEFT TURN LANES AND SUBSIDIARY DEFLECTION ISLANDS AT ROUNDABOUTS SUMMARY This document sets
More informationDRAFT. Jesmond Vale Lane. Meldon Terrace. Heaton Road. King John Street. Newcastle City Council
Remove footway build-out and reposition crossing equipment & tactile paving uild-out kerb to reduce turning speeds Jesmond Vale Lane Provide gap in parking for right turning cycles Light segregation set-back
More information1. TRANSFORM CITY ROAD WEST INTO A GREAT CENTRAL city street
1. TRANSFORM CITY ROAD WEST INTO A GREAT CENTRAL city street Understanding City Road West City Road West (between Clarendon Street and ower Street) is a local street, and can be significantly enhanced
More information1 This technical note considers the issues associated with the use of tidal flow bus lanes on key public transport corridors in Cambridge.
TECHNICAL NOTE: TIDAL FLOW BUS LANE OPTION ASSESSMENT Purpose 1 This technical note considers the issues associated with the use of tidal flow bus lanes on key public transport corridors in Cambridge.
More informationREF. PE01595: MORATORIUM ON SHARED SPACE SCHEMES
PE1595/RRR Sustrans submission of 17 March 2017 Following the Public Petitions Committee meeting on 9 th February 2017 you wrote to Sustrans Scotland requesting a clarification on our position on the use
More informationSevenways Roundabout, and the need for a Road Safety Scheme:
Sevenways Roundabout, and the need for a Road Safety Scheme: The way the current roundabout has evolved has obviously created an environment that is dangerous for all road users, motorists, cyclists and
More informationCycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design
Cycle traffic and the Strategic Road Network Sandra Brown, Team Leader, Safer Roads- Design Highways England A Government owned Strategic Highways Company Department for Transport Road Investment Strategy
More informationProposed: Temporary Traffic Management Design Guidance
Current Temporary Traffic Management Guidance Structure: Chapter 8 Traffic Signs Manual First published in 1996, updated 2007 Addendum in 2010 Guidance for the Control and Management of Traffic at Road
More informationAttachment A: Traffic Mitigation Measures
Attachment A: Traffic Mitigation Measures Central Interceptor Main Project Works Watercare Services Limited This appendix outlines examples of detailed mitigation measures that could be implemented for
More informationLEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document
LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document TELL US Bakers Arms to Leyton Green Road (Section D, E, F) Leyton Green Road to Whipps Cross Roundabout (Section G) YOUR VIEWS www.enjoywalthamforest.co.uk
More informationTGSI Tactile Ground Surface Indicators
TGSI Tactile Ground Surface Indicators Introduction: This Design Note, No 11, provides guidelines and requirements for the use and installation of Tactile Ground Surface Indicators (TGSI s). References
More informationChapter 4 - Links Within the Highway. Suitability of Routes
Chapter 4 - Links Within the Highway Suitability of Routes Most cycling takes place on existing urban roads; this will also be the case with the National Cycle Network. As well as following lightly trafficked
More informationWhy do we need checklists?
Support for Implementing Measures for the South East Core Regional Transport Network Multi Annual Plan (EuropeAid/125783/C/SER/MULTI) The RSA Checklists core part of the Manual (RSA part 2) by L. Pfeiffer
More informationIssues at T junctions:
TheSlade_PublicConsulationPlans_March2017.pdf These comments relate to junction designs in this phase of the project on The Slade. Comments begin with the northernmost junction: Girdlestone Rd and continue
More informationAT403.1 Ancient monument Note 3 amended P500 Basic triangle New size 1800mm added
AT403.1 P666 P874 P1028.4 P2509.1 P5001.2 P500 P672 P875 P1032 P2511.1 P5010 P530A P673 P876 P1033 P2512.1 P5011 P530.1 P784.1 P877 P1050 P2601.1 P7005 P543 P786 P878 P2010.1 P2601.1A P7009.1 P563.1 P787
More informationPrinciples. 4biii. Good Urban Design
Principles Good Urban Design The Sherford approach to the hierarchy of travel modes is fostered and encouraged by a combination of influences. These are as follows, described in further detail below: Town
More informationEntry Treatments. Traffic Advisory Leaflet 2/94 August Introduction. Design. Vertical Deflections. Locations
Traffic Advisory Leaflet 2/94 August 1994 Entry Treatments Introduction Entry treatments have been developed for use at side roads so that drivers leaving a major road are in no doubt that they are entering
More informationD L R C C T R A F F I C N E W S
D L R C C T R A F F I C N E W S Saturday 23 rd July 2016 to Friday 29 th July 2016 A public service provided by the Transportation & Water Services Department of Dún Laoghaire-Rathdown County Council.
More informationMAGNA PARK Lutterworth. DHL SUPPLY CHAIN: Design and Access Statement. June
DHL SUPPLY CHAIN: Design and Access Statement June 2015 CONTENTS SECTION - The Access Proposals 9.1. Site Access 140 9.2. Mere Lane 140 9.3. A5 140 9.4. Footpaths, cycle ways and bridleways 142 SECTION
More informationIMPROVEMENT OPTIONS REPORT - WONERSH VILLAGE. for WONERSH PARISH COUNCIL. March V3.0 stilwell-ltd.co.uk
IMPROVEMENT OPTIONS REPORT - WONERSH VILLAGE for WONERSH PARISH COUNCIL March 2016 V3.0 stilwell-ltd.co.uk Improvement Options Report Wonersh Village, Wonersh Date of Prepared Checked Revision Comments
More informationLET US KNOW WHAT YOU THINK
A164 and Jock s Lodge Junction Improvement Scheme Funding Bid PUBLIC CONSULTATION November 2017 Public Exhibition to be held at Beverley Racecourse on Wednesday 8 th November 2017 between 9.30 am and 6.45
More informationFootpath design. A guide to creating footpaths that are safe, comfortable, and easy to use
Footpath design A guide to creating footpaths that are safe, comfortable, and easy to use November 2013 Contents Introduction / 1 Zoning system / 2 Width / 4 Height / 5 Surface / 5 Footpath elements /
More informationRe: N71 Muckross Road Traffic Calming Scheme Part 8 and Section 38
Administrative Officer, Kerry County Council, Roads, Transportation & Safety Department, Room 115, Áras an Chontae, Rathass, Tralee, Co. Kerry. The Tailor's Hall, Back Lane, Dublin 8. The Tailor's Hall,
More informationComments on the Hailsham to Eastbourne Sustainable Transport Corridor
Comments on the Hailsham to Eastbourne Sustainable Transport Corridor Version 1.1 25/01/2015 Paul Humphreys 1 Table of Contents Version Control... 2 Summary... 2 Rationale provided by ESCC... 3 The ESCC
More informationProgress update on the Sustainable Movement Corridor scheme Guildford Borough Council, June 2016
Progress update on the Sustainable Movement Corridor scheme Guildford Borough Council, June 2016 1. Introduction The concept of the Sustainable Movement Corridor (hereafter the SMC ) was first developed
More informationA105 Green Lanes junction with Bourne Hill / Hedge Lane
Cycle Enfield - Section 5 A105 Green Lanes junction with Bourne Hill / Hedge Lane Stage 2 Road Safety Audit Ref: 2759.03.05/032/A105/BOR/2016 Prepared for: London Borough of Enfield By: Road Safety Audit,
More informationBackground. Caversham a vision for the future. Joint public meeting arranged by:
Joint public meeting arranged by: Sharing our Streets Caversham a vision for the future and Caversham Traders Association This presentation followed a presentation by Simon Beasley, Network Manager for
More informationSide Roads and Other Non-Signalised Junctions
Green Surfacing Sections of the Cycle Superhighway are marked with green paint these highlight sections where people cycling the Superhighway are likely to come into contact with walkers, drivers, or other
More informationNRA New Divided Road Types: Type 2 and Type 3 Dual - Carriageways
NRA New Divided Road Types: Type 2 and Type 3 Dual - Carriageways DN-GEO-03059 December 2007 DN Design Technical TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland
More informationThe existing site constraints which may be encountered for the A428 scheme proposals are divided into sections as follows.
Project: A428 Study To: Cambridgeshire County Council Subject: Tidal Bus lane Review From: Atkins Date: 24 May 2016 cc: Introduction As part of the A428 Corridor Study to improve the bus journey time between
More informationIMPLEMENTATION. PEDESTRIAN USERS (Continued /) Building Frontages: A: Stair Applications. Geometry (Accessed from the Sidewalk) Refer to A:
A: Stair Applications Building Frontages: Geometry (Accessed from the Sidewalk) Refer to A: Ramps should be provided for disabled users at 1:12 (8.3%) gradient. Ramp rises should be stepped at 400mm intervals.
More informationKings Road, Herne Bay: Proposed Crash Remedial Measure
Kings Road, Herne Bay: Proposed Crash Remedial Measure To: Canterbury Joint Transportation Board 17 February 2015 By: Classification: Ward: Tim Read - Head of Transportation Unrestricted Herne Bay Summary:
More information2. NORTEL CARLING CAMPUS EXPANSION - PROPOSED MODIFICATIONS TO MOODIE DRIVE (REGIONAL ROAD 59) AND HIGHWAY 417 INTERCHANGE
2. NORTEL CARLING CAMPUS EXPANSION - PROPOSED MODIFICATIONS TO MOODIE DRIVE (REGIONAL ROAD 59) AND HIGHWAY 417 INTERCHANGE COMMITTEE RECOMMENDATIONS AS AMENDED That Council approve: 1. The endorsement
More informationNRA New Divided Road Types: Type 2 and Type 3 Dual-carriageways
NRA New Divided Road Types: Type 2 and Type 3 Dual-carriageways BENEFITS of the TYPE 2 and TYPE 3 DUAL CARRIAGEWAY ROAD TYPE There are significant safety and economic benefits associated with the Type
More informationGreen Streets and Urban Greenways
127 11 Green Streets and Urban Greenways 11. Green Streets and Urban Greenways 128 11 Green Streets and Urban Greenways Once the traffic-free section of a route has come to an end, then comes the remaining
More informationPart B Design Guidance / Principles _
Part B Design Guidance / Principles www. landlab.co.nz Queenstown Town Centre Public Realm Design Guidelines Version 7 14 June 2018 Page 006 B1 Design Guidance & Best Practice The Queenstown Town Centre
More informationMARKHOUSE ROAD IMPROVEMENTS
MARKHOUSE ROAD IMPROVEMENTS www.enjoywalthamforest.co.uk Waltham Forest is changing and we want you to be part of it. Thanks to a funding pot of 27million from Transport for London, we re delivering the
More informationDouglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013
Douglas Land Use and Transportation Strategy (DLUTS) Summary August 2013 Background Douglas is a large and popular residential suburb of approximately 30,000 persons on the periphery of Cork City along
More informationUlster Canal Greenway Phase 1 Stage 2 Road Safety Audit
Monaghan County Council July 2013 Ulster Canal Greenway Phase 1 Stage 2 Road Safety Audit Prepared by:... Checked by:... Johanne Browne Brian McMahan Senior Consultant Senior Engineer Approved by:... Joe
More informationSubmission on Clontarf to City Centre Cycle Route with signatures of 1,493 people
Submission on Clontarf to City Centre Cycle Route with signatures of 1,493 people Route should use a fully segregated two-way cycle path Contact details Cian Ginty - editor, IrishCycle.com - cian.ginty@gmail.com
More informationGovernance and Priorities Committee Report For the July 2, 2015 Meeting
CITY OF VICTORIA For the July 2, 2015 Meeting To: Governance and Priorities Committee Date: From: Subject: Brad Dellebuur, A/Assistant Director, Transportation and Parking Services Executive Summary The
More informationguide to a phased approach TRIPP
complete street development guide to a phased approach TRIPP development phases Existing 00 months 00 crores/km Phase 0 months 0 crores/km Phase 09 months 0 to 08 crores/km Phase months 07 to crores/km
More information6.4 RECOMMENDED IMPROVEMENTS
6.4 RECOMMENDED IMPROVEMENTS 6.4.1 Williston Road Recommendations While all alternatives would be an improvement over existing conditions, Alternative 3B is recommended over the others because it provides
More informationAudit No. RSA Stage 1 Road Safety Audit Bermuda Park, Nuneaton Getting West Nuneaton Moving: Bermuda Connection
Audit No. RSA 2199 Stage 1 Road Safety Audit Bermuda Park, Nuneaton Getting West Nuneaton Moving: Bermuda Connection 1 1.0 INTRODUCTION 1.1 This report results from a Stage 1 Road Safety Audit for a highways
More informationComplete Streets. Designing Streets for Everyone. Sarnia
Complete Streets Designing Streets for Everyone Sarnia Complete Streets ~ Sarnia ~ 2018 Introduction Our City is made up of a network of streets that we use to go for a walk, cycle to work, drive to the
More informationCHURCH ROAD. Public consultation document TELL US YOUR VIEWS.
CHURCH ROAD Public consultation document YOUR TELL US VIEWS www.enjoywalthamforest.co.uk CHURCH ROAD Introduction Waltham Forest Council was one of three boroughs to be awarded 27million of funding from
More informationCITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY
RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study
More informationA27 Worthing and Lancing: facilities for walking, cycling, and horse riding [nonmotorised
A27 Worthing and Lancing: facilities for walking, cycling, and horse riding [nonmotorised users (NMUs)] Introduction This note describes our understanding of the needs of Non-Motorised Users (NMUs) as
More informationReport from Embassy Visit to Copenhagen May David Arditti
Report from Embassy Visit to Copenhagen May 2013 David Arditti Standard CPH cycle track, one-way 1.5 2m wide, 5cm above carriageway, 5cm below footway Basic one-way cycle track protected by car parking
More information1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02
1 VicRoads Access Management Policies May 2006 Ver 1.02 VicRoads Access Management Policies May 2006 Version 1.02 2 VicRoads Access Management Policies May 2006 Ver 1.02 FOREWORD FOR ACCESS MANAGEMENT
More informationD L R C C T R A F F I C N E W S
D L R C C T R A F F I C N E W S Saturday, 22 nd September 2018 to Friday 28 th September 2018 A public service provided by Municipal Services Department of Dún Laoghaire-Rathdown County Council. Listed
More information