TRAFFIC IMPACT ANALYSIS For Bradfield Elementary School In Highland Park, Texas

Size: px
Start display at page:

Download "TRAFFIC IMPACT ANALYSIS For Bradfield Elementary School In Highland Park, Texas"

Transcription

1

2 TRFFIC IMPCT NLYSIS For Bradfield Elementary School In Highland Park, Texas EXECUTIVE SUMMRY The purpose of conducting this Traffic Impact nalysis (TI) was to evaluate the existing vehicular conditions and evaluate the renovation impact of the proposed Bradfield Elementary School underground parking garage. The existing school, which is located on the southwest quadrant of Mockingbird Lane at Douglas venue in Highland Park, Texas, will be demolished and replaced with a new building opening in the Fall of 219. The new building will be shifted to the west end of the property and an underground parking garage constructed with 89 spaces to serve school staff. ccess to the garage will be via a right-in right-out only access on Mockingbird Lane. The Full Build 219 analysis assumed an increase in student population by 7 students from 7 students to 77 students. The traffic operational analyses included existing traffic volumes forecasted with a 1% growth rate. Provided in the section below are recommendations for the proposed reconstruction of the Bradfield Elementary School. RECOMMENDTIONS It is recommended to keep the same standard carpool operations which exist today with the exception being the unloading/loading area being shifted west to the front door of the newly built elementary school. It is recommended to continue providing crossing guards at each of the four intersections which surround the school. There are two areas which should be closely monitored, those two areas are the westbound approach of Southern venue at rmstrong Parkway and the northbound approach of rmstrong Parkway at Mockingbird Lane. The analysis showed minimal queuing and delay on the westbound approach of Southern venue at rmstrong Parkway. Based on this information this should not impact the unloading/loading area of the carpool lane; however, should this approach spillback to the carpool unloading/loading area changes will need to be made to the traffic management plan as any queue which spills back into the loading/unloading area has the potential to breakdown the entire carpool lane. potential solution would be to provide a free flow westbound movement through the placement of cones to keep traffic moving up to the signalized intersection of rmstrong Parkway at Mockingbird Lane. The analysis of rmstrong Parkway and Mockingbird Lane showed acceptable levels of service for the northbound approach; however, if the queues become too long and spillback to rmstrong Parkway at Southern venue then this would could potentially impact the carpool loading/loading zones. Should this occur, then signal timing changes and/or lane assignment modifications made during the M carpool operations should be considered to mitigate this issue. Note, these issues are not currently anticipated but it is only recommended to be continually monitored. Traffic Impact nalysis Bradfield Elementary School TI Binkley & Barfield, Inc. i

3 TBLE OF CONTENTS Executive Summary... i Recommendations... i Introduction... 1 Existing Study rea... 1 rea Development... 1 Streets... 1 Intersections... 2 Parking... 2 Parents Drop-off/Pick-up program... 3 Proposed Development... 7 Trip Distribution... 8 Trip Generation... 8 Projected Traffic Volumes Site Traffic Volumes Background Traffic Volumes Traffic Volumes Intersection Capacity nalysis Existing Full Build Carpool Lane Queuing Calculations Traffic Management Plan Summary of Findings... 2 Recommendations... 2 Closing... 2 ppendix Traffic Impact nalysis Bradfield Elementary School TI Binkley & Barfield, Inc. ii

4 LIST OF FIGURES Figure 1. Site Location... 4 Figure 2. Peak Hour Volumes Existing (217)... 5 Figure 3. Peak Hour Pedestrian and Bicycle Volumes Existing (217)... 6 Figure 4. Trip Distribution Parking Garage... 9 Figure 5. Trip Distribution Students... 1 Figure 6. Peak Hour Volumes Site Generated Parking Garage Figure 7. Peak Hour Volumes Site Generated Students Figure 8. Peak Hour Volumes Background (219) Figure 9. Peak Hour Volumes Full Build (219) LIST OF TBLES Table 1. School Parking Capacity... 7 Table 2. Land use Data... 7 Table 3. Trip Generation Data Elementary School / Parking Garage... 8 Table 4. M Peak Hour Level of Service Table 5. PM Peak Hour Level of Service Table 6. School Queue nalysis Traffic Impact nalysis Bradfield Elementary School TI Binkley & Barfield, Inc. iii

5 INTRODUCTION The purpose of conducting this Traffic Impact nalysis (TI) was to evaluate the existing vehicular conditions and evaluate the future operations of the Bradfield Elementary School once it is reconstructed. The school is located on the southwest quadrant of Mockingbird Lane at Douglas venue in Highland Park, Texas. Once constructed an underground parking garage with 89 parking spots will be available to staff and the school population increased to 77 students. The reconstruction is proposed to be completed in 219. This report analyzed the site and its proposed access points under the following conditions: Existing 217 Full Build 219 EXISTING STUDY RE Provided below is a summary of the existing land uses near the school and descriptions of existing streets and intersections which encompass the study area. RE DEVELOPMENT The school is predominately surrounded by single-family homes, with commercial development east of the school along Douglas venue and Mockingbird Lane. There is an off-site parking area on the north side of Mockingbird Lane that serves the commercial area and that can be used by school staff and parents when needed. STREETS Mockingbird Lane is a two-lane undivided arterial between Douglas venue and rmstrong Parkway. The posted speed limit is 3 mph and has a school speed zone with flashing beacons signed at 2 mph between the hours of 7:15 9: M and 2:3 4:3 PM. Douglas venue is a two-lane undivided roadway with curb and gutters. It runs in a north-south direction. There is school speed zone with flashing beacons signed at 2 mph between the times of 7:15-9: M and 2:3 4:3 PM. Currently there is on street parking on the east side of Douglas venue designated by pavement markings. rmstrong Parkway is a two-lane undivided collector with curb and gutters. It runs in a northsouth direction. There is school speed zone with flashing beacons signed at 2 mph between the times of 7:15 9: M and 2:3 4:3 PM. Southern venue is a two-lane, one-way westbound roadway from Douglas venue to rmstrong Parkway. Southern venue has a posted speed limit of 2 mph all day long. There is school zone on Southern venue which is signed between the times of 7:15 9: M and 2:3 4:3 PM. Currently the south side of Southern venue serves as on street parking for the residents and on the north side of Southern venue there is a carpool loading/un-loading zone on the eastern half of the street and on street pavement markings for parking zones. Livingston venue is a two-lane, two-way local street that may serve traffic desiring to travel back to the Douglas after loading/unloading students on Southern venue. Traffic Impact nalysis Bradfield Elementary School TI Binkley & Barfield, Inc. 1

6 INTERSECTIONS Mockingbird Lane at rmstrong Parkway is signalized with left-turn only lanes on Mockingbird Lane that are unprotected (permissive left turns) with single lane approaches on rmstrong Parkway. Mockingbird Lane at Douglas venue is signalized with exclusive protected only left-turn lanes on the Mockingbird Lane approaches. There is an additional approach serving a retail area in the southeast quadrant of the intersection. The Douglas venue approaches have exclusive left-turn only lanes but no protected left turn phases. rmstrong Parkway at Southern venue. Is an all-way stop controlled intersection with a leftturn only lane and a shared through and right-turn lane on the westbound approach since Southern venue is a one-way street westbound. Douglas venue at Southern venue is un-signalized and Southern venue is one-way westbound. Northbound Douglas venue has a single lane while southbound Douglas venue has a right-turn only lane, which is associated with the carpool lane in front of Bradfield Elementary, and a shared through and right-turn lane. Douglas venue at Livingston venue is an all-way stop controlled intersection with single lane approaches and marked crosswalks. rmstrong Parkway at Livingston venue is a two-way stop controlled intersection with single lane approaches. rmstrong Parkway is the uncontrolled street and Livingston venue is the stop controlled street. The existing and proposed intersections included in this study are as follows: Mockingbird Lane at rmstrong Parkway (Existing, signalized) Mockingbird Lane at Douglas venue (Existing, signalized) rmstrong Parkway at Southern venue (Existing, stop controlled) Douglas venue at Southern venue (Existing, un-signalized) rmstrong Parkway at Livingston venue (Existing, stop controlled) Douglas venue at Livingston venue (Existing, stop controlled) Mockingbird Lane at Driveway #1 (Proposed, stop controlled) See Figure 1 for an aerial photograph of the area. Existing traffic volumes were collected on September 2, 217 and September 27, 217. The vehicular M and PM peak hour volumes are illustrated in Figure 2 and Figure 3 shows the pedestrian / bicycle M and PM peak hour volumes. The raw traffic count volume printouts have been provided in the ppendix. PRKING Currently the school has approximately 45 teacher parking spaces and three D parking spaces. dditional teacher and volunteer parking is along Southern venue and other side streets. Some parking is available in the common parking area serving the commercial developments. This parking is located at the northeast quadrant of the Mockingbird Lane and Douglas venue intersection that can be used for short term parking. Traffic Impact nalysis Bradfield Elementary School TI Binkley & Barfield, Inc. 2

7 n underground parking garage is proposed with 89 parking spaces which are to be utilized by school staff. ccess to the garage is proposed on Mockingbird Lane. PRENTS DROP-OFF/PICK-UP PROGRM There are existing drop-off and pick-up operations at the school. Those operations are described below. General Information Crossing guards are present at the following intersections list below. o Douglas venue at Mockingbird Lane o Douglas venue at Southern venue. o rmstrong Parkway at Mockingbird Lane o rmstrong Parkway and Southern venue Southern venue is one-way westbound. The carpool Drop-off/Pick-up lane is marked with traffic buttons along Southern venue and Douglas venue Morning Drop-off Operations Cones are put out before school to indicate where the carpool lane begins and ends. Carpoolers are asked not to enter the carpool queue lane from Mockingbird Lane during peak carpool times. Carpoolers are asked to alternately enter the carpool queue lane from north and south Douglas venue in the morning peak. Carpoolers are requested to stay inside the traffic bumps until they get to the end of the queue lane for the morning carpool. There are other written instructions address the proper method of using the carpool queue lanes and using marked crosswalks. School safety patrol (children) with supervision by teachers are placed along Southern venue to assist children leaving their vehicles. Doors open to the school at 7:3 M and front door is the only entry into the building in the mornings. fternoon Pick-up Operations Carpoolers are asked not to enter the carpool queue lane from Mockingbird Lane during peak carpool times. Carpoolers are asked to only enter the carpool queue lane from southbound Douglas venue. Carpoolers can cross the traffic bumps after they have loaded their passengers Kindergarten-parents physically park and walk up and get their children. Pick-ups are completed within 15 minutes. The school has written instructions which address the proper method of using the carpool queue lanes and using marked crosswalks. In the afternoon the students are released at the following times along Southern venue. 3: Kindergarten and 1 st Grade 3:15 2 nd Grade, 3 rd Grade, and 4 th Grade Traffic Impact nalysis Bradfield Elementary School TI Binkley & Barfield, Inc. 3

8 Imagery 217 Google, Map data 217 Google 5 ft BRDFIELD ELEMENTRY SITE LOCTION

9 BRDFIELD ELEMENTRY PEK HOUR VOLUMES - EXISTING (217)

10 BRDFIELD ELEMENTRY PEK HOUR PEDESTRIN & BICYCLE VOLUMES - EXISTING (217)

11 PROPOSED DEVELOPMENT This study not only analyzed existing conditions but also evaluated the impacts of a proposed parking garage to be located under the building which will be relocated to the west side of the campus. The underground parking garage will have a capacity for 89 vehicles compared to the 48 existing surface parking spots available today. Table 1 illustrates the parking capacities. Table 1. School Parking Capacity Year Location Quantity Existing 217 Surface 48 Full Build 219 Underground 89 The right-in/right-out driveway to the underground parking garage will be located on the north side of the development, it will access Mockingbird Lane. It will be located about 2 feet to the east of rmstrong Parkway along Mockingbird Lane. The reconstruction of Bradfield Elementary will increase the student capacity from 7 students to 77 students. The Full Build 219 conditions included the increase in students. Table 2 summarizes the land use data for proposed additional students for the elementary school. Table 2. Land use Data Land Use ITE Code Units Quantity Elementary School 52 Students 7 The school is proposing to keep the same start time and have only one end time for the different school grades which are summarized below. rrival and Dismissal Times o Start Time: 8: M o Release Time: 3:15 PM Traffic Impact nalysis Bradfield Elementary School TI Binkley & Barfield, Inc. 7

12 TRIP DISTRIBUTION The trip ends generated by the proposed parking garage used in this study were distributed to and from the study site based on its location with respect to area development, nearby major roadways, and existing traffic patterns. This distribution is shown in Figure 4 for the M Peak Hour and PM Peak Hour for the parking garage while Figure 5 represents the M Peak Hour and PM Peak Hour trip distributions for the additional 7 students. TRIP GENERTION Estimated vehicle trip ends to and from the study area are calculated utilizing trip generation rates and characteristics collected and compiled by the Institute of Transportation Engineers (ITE) in the ninth edition of their trip generation manual. Table 3 has been prepared to summarize the associated trip generation data and the calculated trips that are anticipated to be generated by the proposed site during a typical weekday for the 219 analysis year. Copies of the ITE data sheets used to develop Table 3 have been included in the ppendix. Note, these volumes represent the 7 new students while the 89 staff trips are likely existing today but are included as new trips to provide a more conservative analysis. Table 3. Trip Generation Data Elementary School / Parking Garage Land Use Number of M Peak PM Peak Units Enter Exit Enter Exit Elementary School 7 Students Parking Garage 89 Vehicles s: Traffic Impact nalysis Bradfield Elementary School TI Binkley & Barfield, Inc. 8

13 BRDFIELD ELEMENTRY TRIP DISTRIBUTION - PRKING GRGE

14 BRDFIELD ELEMENTRY TRIP DISTRIBUTION - STUDENTS

15 PROJECTED TRFFIC VOLUMES SITE TRFFIC VOLUMES For this study, site volumes represent the traffic expected to be generated by a staff member parking in the garage and the new trips created by the increase in student population. Figure 6 has been prepared to depict the site volumes that are anticipated to be distributed to and from the school during the M and PM peak hours for the proposed parking garage. Figure 7 has been prepared to depict the site volumes that are anticipated to be distributed to and from the school during the M and PM peak hours for the additional students. BCKGROUND TRFFIC VOLUMES For this study, background volumes represent the traffic expected to occur along the area streets and roadways as the result of increase in traffic volumes due to normal traffic growth in the area. Figure 8 has been prepared to depict the background volumes that are anticipated to occur along the streets and roadways in the study area in 219. The background volumes represent the current year 217 volumes extrapolated to the years 219 by applying an annual growth factor of 1.%. This reflects the reality that the cities of University Park and Highland Park are completely built out with little room for additional major traffic generators. There would be infill construction (basically removing and replacing residential or multi-family housing). Widening of streets serving the two cities is not expected to occur due to the expected cost of additional Right of Way so additional traffic volumes in the area would likely use other roadway facilities. TOTL TRFFIC VOLUMES Figure 9 has been prepared to depict the total volumes anticipated to occur along the streets and roadways within the study area for the year 219. The total volumes depicted include the parking garage generated volumes, the students generated volumes, and the background 219 volumes. Traffic Impact nalysis Bradfield Elementary School TI Binkley & Barfield, Inc. 11

16 BRDFIELD ELEMENTRY PEK HOUR VOLUMES - SITE GENERTED PRKING GRGE

17 BRDFIELD ELEMENTRY PEK HOUR VOLUMES - SITE GENERTED STUDENTS

18 BRDFIELD ELEMENTRY PEK HOUR VOLUMES - BCKGROUND (22)

19 BRDFIELD ELEMENTRY PEK HOUR VOLUMES - FULL BUILD (22)

20 INTERSECTION CPCITY NLYSIS Level of Service (LOS) analyses of the traffic operations were performed at the existing signalized and un-signalized intersections and the proposed access points. nalyses of the signalized and stop controlled intersections were conducted utilizing the SYNCHRO software which was developed by the Trafficware Corporation. The results of the capacity analyses for the intersections with the resulting delay and levels of service values are summarized by approach in following tables as follows: Table 4. M Peak Hour Level of Service Table 5. PM Peak Hour Level of Service Copies of the computer printouts as well as a description of the various levels of service have been included in the ppendix. Typically, the desirable levels of service are "" through "D" with "E" and "F" being undesirable. For each analysis, the signal timings for any existing or proposed signalized intersections were optimized. Traffic controls and network improvements for each of the study intersections are described in the following sections. Note: The Morning and fternoon Peak Hours use the traffic volumes during the actual time periods when school is opening and ending and not necessarily the actual peak hours on the adjacent streets. Furthermore, the existing peak hour factors of the existing intersections were utilized. These peak hour factors ranged from.63 to.93 depending on the intersection and the time of day. EXISTING 217 The analysis showed that the Existing 217 signalized intersections and stop controlled approaches are anticipated to operate at LOS D or better in the Morning and fternoon Peak Hours. FULL BUILD 22 The Full Build 22 analysis included estimated trips for 89 vehicles for the parking garage and the additional 7 students. The analysis showed that the Full Build 22 signalized intersections and stop controlled approaches are anticipated to operate at LOS D or better in the Morning and fternoon Peak Hours. Traffic Impact nalysis Bradfield Elementary School TI Binkley & Barfield, Inc. 16

21 Table 4. M Peak Hour Level of Service Scenario Eastbound Westbound Northbound Southbound Northwest INT Existing 217 Full Build 219 Scenario Existing 217 Full Build 219 Existing 217 Full Build 219 Existing 217 Full Build 219 Existing 217 Full Build 219 Existing 217 Full Build 219 Existing 217 Full Build 219 Full Build 219 Mockingbird Lane at Douglas venue B B D D C B B D D C Eastbound Westbound Northbound Southbound LT TH RT LT TH RT LT TH RT LT TH RT Mockingbird Lane at rmstrong Parkway B B D C C B C D C C Southern venue at rmstrong Parkway B B B B B - - B Southern venue at Douglas venue Livingston venue at rmstrong Parkway B C C B Livingston venue at Douglas venue B B Highland Park Village at Douglas venue - B - B B - B Mockingbird Lane at Driveway # Note: Letters are level of service; numbers are average seconds of delay per vehicle. INT Traffic Impact nalysis Bradfield Elementary School TI Binkley & Barfield, Inc. 17

22 Table 5. PM Peak Hour Level of Service Scenario Eastbound Westbound Northbound Southbound Northwest INT Existing 217 Full Build 219 Scenario Existing 217 Full Build 219 Existing 217 Full Build 219 Existing 217 Full Build 219 Existing 217 Full Build 219 Existing 217 Full Build 219 Existing 217 Full Build 219 Full Build 219 Mockingbird Lane at Douglas venue B B D D C B B D D C Eastbound Westbound Northbound Southbound LT TH RT LT TH RT LT TH RT LT TH RT Mockingbird Lane at rmstrong Parkway B D D C C D D C Southern venue at rmstrong Parkway B B B - - B Southern venue at Douglas venue Livingston venue at rmstrong Parkway B B B B Livingston venue at Douglas venue Highland Park Village at Douglas venue - B B Mockingbird Lane at Driveway # B Note: Letters are level of service; numbers are average seconds of delay per vehicle. INT Traffic Impact nalysis Bradfield Elementary School TI Binkley & Barfield, Inc. 18

23 CRPOOL LNE QUEUING CLCULTIONS The afternoon pick-up operations create the largest queues around the campus. Utilizing a queue estimator developed by the North Carolina Department of Transportation, estimates were made about the existing and future queues associated with the enrollment and pick-up times for Bradfield Elementary School. See Table 6 for a summary of those estimates. There are currently approximately 7 children attending Bradfield Elementary with up to 77 potentially attending after reconstruction. The 77 students are used to determine the approximate maximum queues for the afternoon period loading of vehicles in the carpool/queue lanes. Table 6. School Queue nalysis Grades & Release Times Number of Students Vehicles Calculated Minimum Queue Length * Calculated High Demand Queue Length * Current Dismissal (2 periods) Existing (217) (7 Students) Existing/Proposed Queue Length Kindergarten and 1 st grade at 3: ft 64 ft ~5 ft (Existing) 2nd, 3rd, and 4th at 3: ft 96 ft ~5 ft (Existing) Future Dismissal (1 period) Full Build (219) (77 Students) ll grades at 3: ,272 ft 1,654 ft ~1,9 ft (Proposed) Note: School Traffic Calculator form North Carolina Department of Transportation By relocating the school building to the west edge of the site approximately 42 feet of additional queue length is created for a total of 92 feet of queue on Southern venue. There is an additional 17 feet of queue length on Douglas venue providing a total of approximately 1,9 feet of queue for the unloading/loading zone for the parents. This is compared to existing conditions which allows for approximately 5 feet of queue along Southern venue and Douglas venue. If required, additional queue is available on the southbound approach of Douglas venue at Mockingbird Lane which is what occurs today. TRFFIC MNGEMENT PLN Traffic Management Plan has been developed to assist staff members at the school when managing student arrival and dismissals. dhering to the Traffic Management Plan will help to ensure that queues will be managed as expected in this study and will not negatively impact adjacent roadways. See site layout in the ppendix for the proposed Traffic Management Plan. Traffic Impact nalysis Bradfield Elementary School TI Binkley & Barfield, Inc. 19

24 SUMMRY OF FINDINGS The existing and future intersection operations were found to be acceptable, no intersection improvements are recommended. Furthermore, the proposed parking garage entrance on Mockingbird Lane was found to operate at LOS B or better and does not create any queues on Mockingbird Lane. The proposed parking garage provides improved off-street parking capacity for the school over existing conditions by increasing off-site parking from 48 to 89. The carpool queuing in the afternoon is likely to still exist on Douglas venue north of Mockingbird lane; however, by shifting the school to the west end of the site the available queue storage has been almost doubled and therefore the queuing on Douglas venue north of Mockingbird Lane should be minimized. RECOMMENDTIONS It is recommended to keep the same standard carpool operations which exist today with the exception being the unloading/loading area being shifted west to the front door of the newly built elementary school. It is recommended to continue providing crossing guards at each of the four intersections which surround the school. There are two areas which should be closely monitored, those two areas are the westbound approach of Southern venue at rmstrong Parkway and the northbound approach of rmstrong Parkway at Mockingbird Lane. The analysis showed minimal queuing and delay on the westbound approach of Southern venue at rmstrong Parkway. Based on this information this should not impact the unloading/loading area of the carpool lane; however, should this approach spillback to the carpool unloading/loading area changes will need to be made to the traffic management plan as any queue which spills back into the loading/unloading area has the potential to breakdown the entire carpool lane. potential solution would be to provide a free flow westbound movement through the placement of cones to keep traffic moving up to the signalized intersection of rmstrong Parkway at Mockingbird Lane. The analysis of rmstrong Parkway and Mockingbird Lane showed acceptable levels of service for the northbound approach; however, if the queues become too long and spillback to rmstrong Parkway at Southern venue then this would could potentially impact the carpool loading/loading zones. Should this occur, then signal timing changes and/or lane assignment modifications made during the M carpool operations should be considered to mitigate this issue. Note, these issues are not currently anticipated but it is only recommended to be continually monitored. CLOSING We have appreciated the opportunity to assist you in the preparation of a traffic impact analysis for the proposed development in Highland Park, Texas. Please do not hesitate to contact our office should you have any questions or comments concerning this report. Traffic Impact nalysis Bradfield Elementary School TI Binkley & Barfield, Inc. 2

25 PPENDIX PRELIMINRY SITE LYOUT... 1 PGE TRFFIC MNGEMENT PLN... 1 Page TRFFIC COUNT SUMMRY SHEETS... 3 PGES ITE TRIP GENERTION SHEETS... 3 PGES CPCITY NLYSIS Existing PGES Full Build PGES EXISTING BRDFIELD CRPOOL PROCEDURES... 2 Pages DESCRIPTION OF LEVELS OF SERVICE... 1 PGE Traffic Impact nalysis Bradfield Elementary School TI Binkley & Barfield, Inc. 21

26

27 ONLY # B B B B 22.75, , GLVNIZED GLVNIZED 5. OD. 18, 66,C, , 64.25, 67.75, B 9.375, 16.75, B 1.75, 22.75, GLVNIZED GLVNIZED 18, # 1' 1.75, 9.375, # 2' 2' 1' 2.75, , 2.75, B FINISH FLOOR EL ' FINISH FLOOR EL ' B B K B HEVY W L H 146.5,N 58.75, , B B HEVY 5. 9,16 OD. 332 W L HEVY WLL H B H 2'" 2'" 2'" 1'6" 2' 1'6" # # 2' 2' 2' 2'6" 3'" to 2'" 3'" 3'" 1'" GRDE 1'" 51,16 5. OD. 32 1' 15, 45 54,C, , ' 63,16 5. OD ,16 63, '" to 1'" 2' 1' 47,16 63,16 5. OD ,16 5. OD ,16 5. OD ,16 63, , ,1 71, , , 66,C, , , ,C, ,16 9, '" 5' 67.75, , , , ,16 OD. 32 9, , , , , ,N 6' # 5' 5' 99,16 5. OD , ,16 5. OD , , ,16 32 HEVY WLL 5. 9,16 OD ,16 63, , , 64.25, 67.75, , , 57,16 5. OD. O.D ,16 5. OD. O.D ,16 51,16 5. O.D ,16 51, , , -4,14 -.5, 39, O.D , 14,16 51, , 51, , , , 51, , , , , 45 3, -4, 15.75, 49.25, 15.75, 49.25, 59, , 54,C, ,C, , 63, , ,1 59, , 63, , , 2.75, 25.5, 63, 51, ,16 5. OD , 57, ,N -27.5,N 148.5,N -27.5,N 146.5,N 58.75, , 148.5,N -27.5,N 146.5,N 58.75, , 148.5,N -27.5,N 146.5,N 58.75, , 148.5,N -27.5,N 2.75, 146.5,N 148.5,N -27.5,N 148.5,N -27.5,N 146.5,N 148.5,N -27.5,N 2.75, 25.5,176 63, , 63, 25.5,176 63, , , , 63, , 63, ,16 51, # # # # # # # 32, , 28, 32, # # # # # # # # # # # # # # # # # # # # # # # # # # 1 # # # # # # # # # # # Q:\GTCD\2D\XSCPE_2-5\3623.DWG,., 34,N Q:\GTCD\2D\XSCPE_2-5\3615.DWG,., 56,N Q:\GTCD\2D\XSCPE_2-5\3621.DWG,., 57,N Q:\GTCD\2D\XSCPE_2-5\36 1.DWG,., 58,N Q:\GTCD\2D\XSCPE_2-5\3623.DWG,., 59,N Q:\GTCD\2D\PSPLUS\2-\ DWG,24., 26,N Q:\GTCD\2D\PSPLUS\1-\ DWG,12., 43,N Q:\GTCD\2D\PSPLUS\1-\363-1.DWG,12. Q:\GTCD\2D\PSPLUS\2-\ DWG,24., 54,N Q:\GTCD\2D\PSPLUS\1-\ DWG,12., 45,N Q:\GTCD\2D\PSPLUS\1-\ DWG,12., 46,N Q:\GTCD\2D\XSCPE_2-5\36 3.DWG,., 35,N Q:\GTCD\2D\XSCPE_2-5\3612.DWG,., 61,N Q:\GTCD\2D\XSCPE_2-5\36 2.DWG,.,36,N Q:\GTCD\2D\XSCPE_2-5\36 5.DWG,., 6,N Q:\GTCD\2D\XSCPE_2-5\36 2.DWG,., 62,N Q:\GTCD\2D\XSCPE_2-5\3613.DWG,., 33,N # # # # # Q:\GTCD\2D\PSPLUS\2-6\ DWG,3., 1,N Q:\GTCD\2D\PSPLUS\2-\167-2.DWG,24., 12,N Q:\GTCD\2D\PSPLUS\2-\167-2.DWG,24., 14,N Q:\GTCD\2D\PSPLUS\2-\ DWG,24. Q:\GTCD\2D\PSPLUS\2-\ DWG,24., 23,N 27,N Q:\GTCD\2D\PSPLUS\2-6\ DWG,3., 1,N Q:\GTCD\2D\PSPLUS\2-\167-2.DWG,24., 13,N Q:\GTCD\2D\PSPLUS\5-\ DWG,6., 2,N Q:\GTCD\2D\PSPLUS\2-\ DWG,24., 2,N Q:\GTCD\2D\PSPLUS\2-\ DWG,24. Q:\GTCD\2D\PSPLUS\1-6\ DWG,18., 25,N 29,N Q:\GTCD\2D\PSPLUS\1-6\ DWG,18., 32,N Q:\GTCD\2D\PSPLUS\1-\1683L1.DWG,12., 37,N Q:\GTCD\2D\PSPLUS\1-6\ DWG,18., 31,N Q:\GTCD\2D\PSPLUS\2-\ DWG,24., 28,N Q:\GTCD\2D\PSPLUS\5-\167-5.DWG,6.,,N # Q:\GTCD\2D\PSPLUS\5-\ DWG,6., 4,N Q:\GTCD\2D\PSPLUS\3-\ DWG,36., 6,N Q:\GTCD\2D\PSPLUS\3-\ DWG,36., 8,N Q:\GTCD\2D\PSPLUS\2-\167-2.DWG,24., 15,N Q:\GTCD\2D\PSPLUS\1-\167-1.DWG,12., 38,N 9 Q:\GTCD\2D\PSPLUS\2-\ DWG,24., 52,N Q:\GTCD\2D\PSPLUS\1-\167-1.DWG,12., 4,N Q:\GTCD\2D\PSPLUS\1-\ DWG,12., 47,N Q:\GTCD\2D\PSPLUS\1-\ DWG,12., 48,N Q:\GTCD\2D\PSPLUS\1-\167-1.DWG,12., 39,N Q:\GTCD\2D\PSPLUS\2-\ DWG,24.,51,N Q:\GTCD\2D\PSPLUS\2-\ DWG,24. Q:\GTCD\2D\PSPLUS\2-\ DWG,24., 24,N 2,N Q:\GTCD\2D\PSPLUS\2-\ DWG,24., 21,N Q:\GTCD\2D\PSPLUS\3-\ DWG,36., 7,N Q:\GTCD\2D\PSPLUS\3-\ DWG,36., 9,N Q:\GTCD\2D\PSPLUS\5-\8 Q:\GTCD\2D\PSPLUS\6-\ DWG, DWG,6., 1,N 5,N Q:\GTCD\2D\PSPLUS\1-6\ DWG,18., 3,N Q:\gtcad\2d\PSPLUS\-\ dwg,., 5,N Q:\GTCD\2D\PSPLUS\2-\ DWG,24., 53,N 6 66,C, , , ,C, ,C, ,C, ,C, ,C, ,C, ,C, ,C, ,C, ,C, , 1.75, ,C, ,C, , 22.75, ,C, ,C, , 1.75, 6,C, ,C, ,C, ,C, # H B 146.5,N Q:\GTCD\2D\PSPLUS\5-\81265R5.DWG,6., 3,N 9 9 6,C,1421 6,C, ,C, , 28.75, OD. 78,C, ,C, ,C,1421 9,C, ,T, ,C, ,C, ,C, ,C,1421 6,C, ,C, ,C, ,C,1421 6,C, ,C, OD , 5. OD. 42,C, O.D. 66,C, ,C, ,C, ,C, ,C, ,C,1421 6,C,1421 6,C, ,C, ,T, ,C, ,C, ,C, ,C,1421 6,C, ,C, ,C, ,C, ,C, ,C, ,C, ,C, ,C, ,C, O.D. 5. OD. 5. OD. 1.75, 9.375, 54,C, OD. 5. OD. 5. OD. 5. OD. 1.75, 9.375, 5. OD. 5. OD OD. 5. OD. 5. OD. 5. OD , 1.75, 1.75, 9.375, 66,C, ,C, OD. 66,C, OD. 5. OD OD O.D , 9.375, 1.75, 9.375, 1.75, 9.375, 9.375, 1.75, 2.75, 5. OD. 5. OD. 5. OD. 5. OD O.D , OD. 5. OD O.D. 5. OD , OD. 5. OD. 5. OD " O.D. 3.5" O.D. 5. OD. 5. OD. 5. OD. 5. OD. 5. OD. 5. OD. 15,T, ,C, ,T,8174 B OD OD " OD " OD. 5. OD , 28.75, , , 2.75, 2.75, 5. OD OD , 34.75, 3.375, OD OD OD , 2.75, , , 22.75, 22.75, , , 2.75, , 2.75, , 2.75, , 16.75, , 28.75, , , 34.75, , 2.75, , 2.75, 2.75, , 2.75, , 2.75, , 2.75, , 2.75, , , 2.75, 16.75, , 1.75, 9.375, 2.75, 1.75, 9.375, 1.75, 9.375, 1.75, 9.375, 1.75, 9.375, 1.75, 9.375, 1.75, 9.375, 1.75, 9.375, , 2.75, 16.75, , 1.75, 9.375, 1.75, 9.375, , 3.375, 34.75, 1.315" OD. 114,C, OD. 9 12,C, , 58.75, # ,C, OD. GLVNIZED , , , GLVNIZED GLVNIZED GLVNIZED ,1566 GLVNIZED GLVNIZED B B 114,C,1421 B B K B , 46.75, B B 146.5,N L , 7.75, L 6 B B 114,C, , 7.75, OD. L 6 114,C, , 7.75, OD. 6 L 111, , 5. OD. 5. OD. 114,C, OD. 5. OD. B B B B L L B B B B B B B B B B B B 51, , 9,C,1421 I I I I I I 3.5 OD. I I H I 4' # H Q:\GTCD\2D\PSPLUS\4-\ DWG,48.,35,N 4' 87, ,C, ,16 5, # # # # 4' 1,, '6" 6' 4'" 6'" 6'" 6'" 6' 6' 6'" BELOW 6'-" DECK 6'" 6'" 8' 6'" 4' 87,16 51, # 2' 111, , 5'" 2'" 2' 111, , 75, 1, , , 5'6" 1, , , , , ,1566 1, ,16 1, ,16 51, ,16 5, , , , 1,, ,N 75, , ,N 4.5,N ,N 64.5,N 74, , ,N 4.5,N 1, ,N 146.5,N 111, , ,T, , , 111, , 111, , 75, 1, , , 7.75, , OD , , 5. 1,57274 OD. 75, 1, ' 6' BELOW 6'-" DECK BELOW 6'-" DECK , , , 75, 1, ,N 146.5,N , 1, ,16 1, , ' , , 7.75, , , , , , , , , , O.D , , , , , , 7.75, , , ,N 4.5,N 74, , , , , , , , , OD. O.D , , ,16 1, ,N ,N 4.5,N 1, , ,N ,N 4.5,N -27.5,N 146.5,N ,N 4.5,N # 146.5,N ,N 4.5,N 146.5,N -27.5,N ,N 2,1 51, 721 2, , , 2, # # 146.5,N , 7.75, OD ,N 4.5,N 146.5,N ,N 4.5,N 69.75, # # 13.25, 69.75, 99, , ,, , # 9, ;9 ;2 ; ;9 ;2 ; ;9 ;2 ; ;9 ;2 ; ;9 ;2 ; ;9 ;2 ; ;9 ;2 ; ;9 ;2 ;421 63, ,C, , , ,C,1421 9,C, OD ,, , # 8 1 # # Q:\GTCD\2D\XSCPE_2\2649.DWG,., 58,N Q:\GTCD\2D\XSCPE_2\2675.DWG,., 67,N Q:\GTCD\2D\PSPLUS\4-\ DWG,48., 36,N Q:\GTCD\2D\XSCPE_2\2683.DWG,., 68,N Q:\GTCD\2D\XSCPE_2\2698.DWG,., 56,N # 81 1 # # 8Q:\GTCD\2D\PSPLUS\6-\8 1 1 # 1-6.DWG,72., 2,N # # # 81 1 # # 8Q:\GTCD\2D\PSPLUS\6-\8 1 1 # 1-6.DWG,72., 15,N 8Q:\GTCD\2D\PSPLUS\4-\8 1 1 # 1-4.DWG,48., 32,N # Q:\GTCD\2D\PSPLUS\6-\ DWG,72. 1 #, 3,N 81 1 # # # # 81 1 # # 2681 Q:\GTCD\2D\XSCPE_2\2681.DWG,. 1 #,57,N 26132L Q:\GTCD\2D\XSCPE_2\26132L.DWG,. 1 #, 64,N # Q:\GTCD\2D\XSCPE_2\2667.DWG,., 6,N Q:\GTCD\2D\PSPLUS\6-\ DWG,72., 31,N Q:\GTCD\2D\PSPLUS\4-\8 1-4.DWG,48., 3,N Q:\GTCD\2D\PSPLUS\4-\ DWG,48., 34,N Q:\GTCD\2D\PSPLUS\6-\8 16R6.DWG,72., 12,N # Q:\GTCD\2D\PSPLUS\6-\1683R6.DWG,72., 1,N # 8 1 # # # # # 81 1 # # # Q:\GTCD\2D\PSPLUS\6-\ DWG,72., 1,N Q:\GTCD\2D\PSPLUS\6-\8-6.DWG,72.,,N Q:\GTCD\2D\PSPLUS\6-\ DWG,72., 27,N 8634 Q:\GTCD\2D\PSPLUS\5-6\ DWG, 1 # 6.,4,N 2695 Q:\GTCD\2D\XSCPE_2\2695.DWG,. 1 #, 5,N Q:\GTCD\2D\XSCPE_2\2656.DWG,., 69,N Q:\GTCD\2D\XSCPE_2\2656.DWG,., 7,N # Q:\GTCD\2D\PSPLUS\6-\8 1-6.DWG,72., 16,N Q:\GTCD\2D\PSPLUS\4-\ DWG,48., 37,N ,C, OD. Q:\GTCD\2D\PSPLUS\5-6\ DWG, 6., 38,N Q:\GTCD\2D\PSPLUS\5-6\ DWG, 6., 39,N # Q:\GTCD\2D\PSPLUS\6-\8 1-6.DWG,72.,17,N Q:\GTCD\2D\PSPLUS\6-\8 1-6.DWG,72., 18,N Q:\GTCD\2D\PSPLUS\6-\8924B6.DWG,72., 23,N Q:\GTCD\2D\PSPLUS\6-\8 1-6.DWG,72., 19,N Q:\GTCD\2D\PSPLUS\6-\ DWG,72., 26,N Q:\GTCD\2D\PSPLUS\5-6\ DWG, 6., 41,N Q:\GTCD\2D\XSCPE_2\2658.DWG,., 51,N Q:\GTCD\2D\PSPLUS\2-\86 8R2.DWG,24., 45,N 9 114,C, ,C,1421 Q:\GTCD\2D\PSPLUS\5-\8 1-5.DWG,6., 42,N Q:\GTCD\2D\PSPLUS\5-\ DWG,6., 43,N Q:\GTCD\2D\PSPLUS\2-\ DWG,24., 46,N Q:\GTCD\2D\PSPLUS\2-\8-2.DWG,24., 44,N Q:\GTCD\2D\PSPLUS\2-\ DWG,24.,47,N Q:\GTCD\2D\XSCPE_2\2684.DWG,., 48,N Q:\GTCD\2D\XSCPE_2\2611.DWG,.,49,N Q:\GTCD\2D\XSCPE_2\2662.DWG,., 5,N Q:\GTCD\2D\XSCPE_2\2663.DWG,., 53,N , , 6 114,C, ,T,8194 Q:\GTCD\2D\XSCPE_2\2658.DWG,., 52,N Q:\GTCD\2D\PSPLUS\6-\8 1-6.DWG,72., 13,N Q:\GTCD\2D\PSPLUS\6-\ DWG,72., 28,N , 6 9,C, ,C, ,C, ,C, Q:\GTCD\2D\XSCPE_2\2678.DWG,., 54,N Q:\GTCD\2D\PSPLUS\6-\ DWG,72., 14,N Q:\GTCD\2D\PSPLUS\6-\ DWG,72., 29,N # # # Q:\GTCD\2D\PSPLUS\6-\8924B6.DWG,72., 2,N # Q:\GTCD\2D\PSPLUS\6-\8 1-6.DWG,72., 2,N # Q:\GTCD\2D\PSPLUS\6-\8924B6.DWG,72. Q:\GTCD\2D\PSPLUS\6-\ DWG,72., 25,N 24,N Q:\GTCD\2D\XSCPE_2\2672.DWG,., 71,N 6 114,C, Q:\GTCD\2D\XSCPE_2\ # 7.DWG,., 61,N 26132L 1 # Q:\GTCD\2D\PSPLUS\8-\ DWG,96., 3,N # Q:\GTCD\2D\XSCPE_2\26132L.DWG,., 63,N Q:\GTCD\2D\XSCPE_2\2669.DWG,., 65,N 6 114,C, ,C, ,C, ,C, ,C, ,T, ,T, ,T, ,C, ,C, , ,16 34 Q:\GTCD\2D\PSPLUS\6-\ DWG,72., 4,N ,C, , 14,C, ,C, ,C, ,T, ,C, , 7.75, OD. 14,C, OD OD. 5. OD. 114,C, , 7.75, OD. 14,C, OD. 3.5 OD. 3.5 OD O.D O.D. 5. O.D O.D. 3.5 OD. 5. O.D. 3.5 OD. 14,C, ,T, OD. 114,C, ,C,1421 9,C, , 46.75, 126,C, ,C, ,T, ,C,1421 9,C, ,C, ,C, ,C, ,C, ,C, , 64.75, OD. 12,C, ,T, ,T, ,C, , 7.75,OD. 114,C, ,C, OD. 5. OD OD OD. 5. OD. 5. OD. 5. OD. 5. OD. 5. OD OD , 7.75, OD O.D OD. 5. OD. 5. OD. 5. OD. 7.75, 5. OD. 5. OD. 5. OD. 5. OD. 5. OD. 5. OD. 5. OD , OD. 5. O.D. 5. OD " O.D " O.D. 5. OD. O.D " O.D. 3.5" O.D OD OD OD OD , 64.75, OD. 5. OD. 7.75, 46.75, , , 14.75, , 46.75, , 64.75, O.D. 5. OD. 5. OD. 5. OD. 5. OD. 5. OD. 5. OD , 7.75, , 7.75, , 7.75, , 5. OD. 3.5 OD , 7.75, 7.75, 3.5 OD. 7.75, , 5. OD. 5. OD , OD. 5. O.D. 5. O.D. 5. O.D. 1.9 OD. 1.9 OD. 5. OD O.D O.D OD. 5. OD. 3.5 OD. 7.75, 3.5 OD. 7.75, , 7.75, , 7.75, , 3.5 OD , 7.75, 7.75, , , 7.75, , 7.75, , 7.75, , , 7.75, , 7.75, 3.5 OD , 7.75, , , 7.75, , 7.75, 7.75, , 3.5 O.D. 3.5 O.D. 3.5 OD. 7.75, , , 7.75, 7.75, , , 7.75, , 7.75, , , , 46.75, 7.75, 7.75, 7.75, , OD OD. Q:\gtcad\2d\psplus\wildslide\ DWG,5'-", 5,N T ; ;12 EB ;41 92 ;5 92 ;5 92 ;5 EB ;41 78 ;12 GR ; ; T ; ;12 EB ;41 92 ;5 92 ;5 92 ;5 EB ;41 78 ;12 GR ; ;5 Q:\gtcad\2d\psplus\wildslide\ DWG,4'-", 8,N , , 7.75, 46.75, , 58.75, , 2.75, 2.75, , , 64.75, , 64.75, , 58.75, , 14.75, , , 14.75, 2.75, , 2.75, , Q:\gtcad\2d\psplus\wildslide\ DWG,3'-", 9,N T ; ;12 EB ;41 92 ;5 92 ;5 92 ;5 EB ;41 78 ;12 GR ; ;5 Q:\gtcad\2d\psplus\wildslide\ DWG,2'-", 1,N T ; ;12 EB ;41 92 ;5 92 ;5 92 ;5 EB ;41 78 ;12 GR ; ; O.D BRDFIELD ELEMENTRY TRFFIC MNGEMENT PLN ONLY ONLY ONLY Q:\GTCD\2D\PSPLUS\1-\167-1.DWG,12., 41,N Q:\GTCD\2D\PSPLUS\1-\ DWG,12., 42,N Q:\GTCD\2D\PSPLUS\2-\167-2.DWG,24., 16,N Q:\GTCD\2D\PSPLUS\2-\ DWG,24., 17,N 3.5 OD. 3.5 OD ;9 ;2 ; ;9 ;2 ; ;9 ;2 ; ;9 ;2 ; ;9 ;2 ; ;9 ;2 ; ;9 ;2 ; ;9 ;2 ;421 NORTH CRPOOL ENTRNCE T NORMNDY VENUE- MORNING & FTERNOON TECHER PRKING TURNS INTO CRPOOL LNE FROM MOCKINGBIRD LNE RE NOT PERMITTED NO PRKING OR PICK-UP/DROPOFFS ON MOCKINGBIRD LNE SECONDRY ENTRNCE SERVICE DRIVEWY MIN ENTRNCE CRPOOL EXIT DROP-OFF PICKUP RE CRPOOL QUEUE LNE SOUTHERN VENUE ONE-WY (NO STOPPING OR DROP-OFFS) LIMITED PRKING (DO NOT BLOCK RESIDENT DRIVEWYS) SOUTH CRPOOL ENTRNCE T BEVERLY DRIVE - MORNING ONLY NOTE: SIGNS SHOWN ON PLN RE FOR INFORMTIVE PURPOSES ONLY ND RE NOT MENT TO BE INSTLLED 2: PM - 3:3PM

28 Sycamore ve Pasadena, Texas, United States Count Name: Mockingbird Lane at rmstrong Parkway Site Code: 2 Start Date: 9/2/217 Page No: 1 Start Time Left Thru Right Turning Movement Data rmstrong Parkway Mockingbird Lane rmstrong Parkway Mockingbird Lane Southbound Westbound Northbound Eastbound U- Turn Peds pp. Left Thru Right U- Turn Peds pp. Left Thru Right U- Turn Peds pp. Left Thru Right U- Turn Peds pp. 7: M :15 M :3 M :45 M Hourly : M :15 M *** BREK *** Hourly :3 PM :45 PM Hourly : PM :15 PM :3 PM :45 PM Hourly Grand pproach % % ll Vehicles (no classification ) % ll Vehicles (no classification ) Bicycles on Crosswalk % Bicycles on Crosswalk Pedestrians % Pedestrians Int.

29 Sycamore ve Pasadena, Texas, United States Count Name: Mockingbird Lane at rmstrong Parkway Site Code: 2 Start Date: 9/2/217 Page No: 2 rmstrong Parkway [SB] Out In R T L U P U R Mockingbird Lane [EB] In Out L T R 9/2/217 7: M Ending t 9/2/217 4: PM ll Vehicles (no classification) Bicycles on Crosswalk Pedestrians T L U Out In Mockingbird Lane [WB] 4 4 P P U L T R P Out In rmstrong Parkway [NB] Turning Movement Data Plot

30 Sycamore ve Pasadena, Texas, United States Count Name: Mockingbird Lane at rmstrong Parkway Site Code: 2 Start Date: 9/2/217 Page No: 3 Start Time Left Thru Right Turning Movement Peak Hour Data (7:3 M) rmstrong Parkway Mockingbird Lane rmstrong Parkway Mockingbird Lane Southbound Westbound Northbound Eastbound U- Turn Peds pp. Left Thru Right U- Turn Peds pp. Left Thru Right U- Turn Peds pp. Left Thru Right U- Turn Peds pp. 7:3 M :45 M : M :15 M pproach % % PHF ll Vehicles (no classification ) % ll Vehicles (no classification ) Bicycles on Crosswalk % Bicycles on Crosswalk Pedestrians % Pedestrians Int.

31 Sycamore ve Pasadena, Texas, United States Count Name: Mockingbird Lane at rmstrong Parkway Site Code: 2 Start Date: 9/2/217 Page No: 4 rmstrong Parkway [SB] Out In R T L U P U R Mockingbird Lane [EB] In Out L 4 4 T R Peak Hour Data 9/2/217 7:3 M Ending t 9/2/217 8:3 M ll Vehicles (no classification) Bicycles on Crosswalk Pedestrians T L U Out In Mockingbird Lane [WB] 2 2 P P U L T R P Out In rmstrong Parkway [NB] Turning Movement Peak Hour Data Plot (7:3 M)

32 Sycamore ve Pasadena, Texas, United States Count Name: Mockingbird Lane at rmstrong Parkway Site Code: 2 Start Date: 9/2/217 Page No: 5 Start Time Left Thru Right Turning Movement Peak Hour Data (2:3 PM) rmstrong Parkway Mockingbird Lane rmstrong Parkway Mockingbird Lane Southbound Westbound Northbound Eastbound U- Turn Peds pp. Left Thru Right U- Turn Peds pp. Left Thru Right U- Turn Peds pp. Left Thru Right U- Turn Peds pp. 2:3 PM :45 PM : PM :15 PM pproach % % PHF ll Vehicles (no classification ) % ll Vehicles (no classification ) Bicycles on Crosswalk % Bicycles on Crosswalk Pedestrians % Pedestrians Int.

33 Sycamore ve Pasadena, Texas, United States Count Name: Mockingbird Lane at rmstrong Parkway Site Code: 2 Start Date: 9/2/217 Page No: 6 rmstrong Parkway [SB] Out In R T L U P U 1 1 R Mockingbird Lane [EB] In Out L T 3 3 R Peak Hour Data 9/2/217 2:3 PM Ending t 9/2/217 3:3 PM ll Vehicles (no classification) Bicycles on Crosswalk Pedestrians T L U Out In Mockingbird Lane [WB] P P U L T R P Out In rmstrong Parkway [NB] Turning Movement Peak Hour Data Plot (2:3 PM)

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams. Technical Memorandum TRFFIC IMPCT STUDY RIDLEY ROD CONVENIENCE STORE Southampton County, V Prepared for: Mr. David Williams By: Charles Smith, P.E., PTOE EPR Charlottesville, V July 2014 1 TBLE OF CONTENTS

More information

Hidden Oaks Elementary School

Hidden Oaks Elementary School Hidden Oaks Elementary School SCHOOL ROUTE PLAN For HIDDEN OAKS ELEMENTARY SCHOOL LOCATION 13 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Orange Center Elementary School

Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

TRAFFIC MANAGEMENT PLAN

TRAFFIC MANAGEMENT PLAN 292 84 140440 TRAFFIC MANAGEMENT PLAN The purpose of the Traffic Management Plan (TMP) is to have established procedures for traffic flow and circulation around the elementary school related to student

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

Lake Whitney Elementary School

Lake Whitney Elementary School Lake Whitney Elementary School SCHOOL ROUTE PLAN For LAKE WHITNEY ELEMENTARY SCHOOL LOCATION 18 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

Meadow Woods Elementary School

Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

TAKOMA METRO STATION

TAKOMA METRO STATION TKOM METRO STTION Traffic nalysis Technical Memorandum Station Planning in Support of Joint evelopment Job No. 13-FQ165-LN-2 November 213 WSHINGTON METROPOLITN RE TRNSIT UTHORITY (WMT) Takoma Metro Station

More information

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

THE LANDMARK AT TALBOT PARK

THE LANDMARK AT TALBOT PARK TRAFFIC IMPACT STUDY FOR THE LANDMARK AT TALBOT PARK IN NORFOLK, VA INTERMODAL ENGINEERING, P.C. OCTOBER, 200 The Landmark at Talbot Park is a proposed redevelopment of the existing apartments along the

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

Windy Ridge Elementary School

Windy Ridge Elementary School Windy Ridge Elementary School SCHOOL ROUTE PLAN For WINDY RIDGE ELEMENTARY SCHOOL LOCATION 54 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 151714A Table of Contents Table of Contents I. INTRODUCTION... 2 II. EXISTING CONDITIONS... 5 III. 215 EXISTING TRAFFIC CONDITIONS... 6

More information

TECHNICAL MEMORANDUM. Kevin Even, P.E. Village Engineer and Public Works Director Village of Waunakee. From: Kevin Wehner, P.E. KL Engineering, Inc.

TECHNICAL MEMORANDUM. Kevin Even, P.E. Village Engineer and Public Works Director Village of Waunakee. From: Kevin Wehner, P.E. KL Engineering, Inc. TEHIL MEMORUM To: Kevin Even, P.E. Village Engineer and Public Works irector Village of Waunakee 400 King James Way, uite 200 Madison, Wisconsin 3719 608-663-1218 www.klengineering.com From: Kevin Wehner,

More information

REDEVELOPMENT TRAFFIC IMPACT STUDY

REDEVELOPMENT TRAFFIC IMPACT STUDY REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

Gateway Transportation Study

Gateway Transportation Study Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213 Back of

More information

Prepared for Lutheran Services Carolinas. Project Number: /07/2017. Trinity Landing. New Hanover County, NC

Prepared for Lutheran Services Carolinas. Project Number: /07/2017. Trinity Landing. New Hanover County, NC Prepared for Lutheran Services Carolinas Project Number: 16273 4/7/217 Trinity Landing New Hanover County, NC Trinity Landing Transportation Impact nalysis Prepared for Lutheran Services Carolinas New

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

Marina Loft (DRC 51-R-12)

Marina Loft (DRC 51-R-12) Marina Loft (DRC 51-R-12) traffic study prepared for: Cymbal Development OCtober 2012 Traf Tech October 1, 2012 Mr. Asi Cymbal - President Cymbal Development 3470 North Miami Avenue Upper Suite Miami,

More information

Traffic Study North Shore School District 112

Traffic Study North Shore School District 112 Traffic Study North Shore School District 112 Proposed Expansion of Northwood Junior High School Prepared By: May 1, 2015 1. Introduction Kenig, Lindgren, O Hara, Aboona, Inc. (KLOA, Inc.) has been retained

More information

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY DECEMBER 2012 READ, VOORHEES & ASSOCIATES TORONTO, ONTARIO Read, Voorhees & Associates

More information

DRAFT Davidson Elementary School Expansion Transportation Impact Analysis

DRAFT Davidson Elementary School Expansion Transportation Impact Analysis DRAFT Davidson Elementary School Expansion Transportation Impact Analysis Prepared for: Town of Davidson 216 S. Main Street Davidson, NC 28036 Prepared by: Stantec Consulting Services Inc. 2127 Ayrsley

More information

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for: NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony

More information

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Momentum Planning & Communications 1165 Greenlawn Crescent Ottawa, ON K1L 6C2 June 29, 2015 115-618 Brief_1.doc

More information

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for: HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October

More information

SCHOOL ROUTE PLAN. For HUNTER S CREEK ELEMENTARY SCHOOL LOCATION 14 ORANGE COUNTY. Prepared for:

SCHOOL ROUTE PLAN. For HUNTER S CREEK ELEMENTARY SCHOOL LOCATION 14 ORANGE COUNTY. Prepared for: SCHOOL ROUTE PLAN For HUNTER S CREEK ELEMENTARY SCHOOL LOCATION 14 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering Division 42 South John

More information

Patuxent Green Golf Course

Patuxent Green Golf Course Patuxent Green Golf Course Laurel, Maryland February 23, 2018 Traffic Impact Analysis Prepared for: ADC Builders Alan Cohen 2701 Tower Oaks Boulevard, Suite 200 Rockville, Maryland 20852 TABLE OF CONTENTS

More information

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 February 27, 2014 113-584 Overview_1.doc D. J. Halpenny

More information

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for:

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for: TRAFFIC IMPACT STUDY For Creekside Thornton, Colorado August 215 November 215 Revised: August 216 Prepared for: Jansen Strawn Consulting Engineers 45 West 2 nd Avenue Denver, Colorado 8223 Prepared by:

More information

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff MEMORANDUM DATE March 1, 212 TO Town of Milton FROM RE Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff FFY 211 Safety and Operations Analyses at Selected Boston Region MPO Intersections:

More information

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina Prepared for Longbranch Development Prepared by January 13, 219 ii Table of Contents Subject Page Signature Page... i Table of Contents...

More information

Durrance Elementary School

Durrance Elementary School Durrance Elementary School SCHOOL ROUTE PLAN For DURRANCE ELEMENTARY SCHOOL LOCATION 9 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

Waterford Lakes Small Area Study

Waterford Lakes Small Area Study Waterford Lakes Small Area Study Existing Traffic Conditions PREPARED FOR: ORANGE COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION ORLANDO, FLORIDA PREPARED WITH: INWOOD CONSULTING ENGINEERS

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: 1649362 Ontario Inc. c/o Manor Park Management 231 Brittany Drive, Suite D Ottawa ON K1K 0R8 July

More information

Traffic Signal Redesign 50% Design Report

Traffic Signal Redesign 50% Design Report Traffic Signal Redesign 50% Design Report Joseph Davis, Jace Elkins, Jordan Weyrauch and Zach Crimmins CENE 486 Capstone J3Z Engineering March 10 th, 2016 Table of Contents 1.0 Project Description...1

More information

Troutbeck Farm Development

Troutbeck Farm Development Troutbeck Farm Development Willistown Township, Chester County PA For Submission To: Willistown Township Last Revised: October, 4 TPD# INLM.A. 5 E. High Street Suite 65 Pottstown, PA 9464 6.36.3 TPD@TrafficPD.com

More information

Donahue Drive Corridor Traffic Operational Evaluation

Donahue Drive Corridor Traffic Operational Evaluation Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY Prepared for: City of Thornton And Colorado Department of Transportation Prepared by: 11 Blake Street, Suite 2 Denver, Colorado 822 Contact: Brian Bern, PE, PTOE

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School

Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School SCHOOL ROUTE PLAN For MAXEY ELEMENTARY SCHOOL LOCATION 33 ORANGE COUNTY Prepared for:

More information

Gene Dillon Elementary School Traffic Study Division Street Site

Gene Dillon Elementary School Traffic Study Division Street Site To: From: Dr. James Hess, Superintendent Jordan Schwarze, PE, Senior Engineer Matt Pacyna, PE, Senior Associate Date: March 30, 2016 Subject: Gene Dillon Elementary School Traffic Study reet Site Memorandum

More information

EXECUTIVE SUMMARY. Page 1 of 6

EXECUTIVE SUMMARY. Page 1 of 6 EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY TRAFFIC IMPACT STUDY for the GLEN ELLEN COUNTRY CLUB SENIOR RESIDENTIAL REDEVELOPMENT 84 Millis, Massachusetts Prepared by: McMahon Associates, Inc. Prepared for: Toll Brothers, Inc. August 216 DRAFT

More information

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Quickie Convenience Stores Larny Holdings Ltd. c/o PBC Group April 15, 2015 115-615 Report_1.doc D. J. Halpenny

More information

Fleetwood Enclave Transportation Impact Assessment

Fleetwood Enclave Transportation Impact Assessment Fleetwood Enclave Transportation Impact ssessment Draft Report Prepared for City of Surrey Date October 31, 2012 Prepared by Bunt & ssociates Project No. 027.22 TBLE OF CONTENTS EXECUTIVE SUMMRY... I 1.

More information

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018 Public Information Meeting Orange Camp Road Dr. Martin Luther King Jr. Beltway to I-4 Presented by: Volusia County August 2, 2018 1 Project Goals To improve the operations and safety for Orange Camp Road

More information

Traffic Impact Statement

Traffic Impact Statement Traffic Impact Statement Mixed Use Development, US 41 and Old Trail Drive aka Tide-Starbucks 4900 9 th Street North General Development Site Plan (GDSP) Collier County, FL 10/6/2015 Prepared for: Prepared

More information

DRAFT Sage YMCA Facility Expansion Traffic Impact Study

DRAFT Sage YMCA Facility Expansion Traffic Impact Study DRAFT Sage YMCA Facility Expansion CITY OF CRYSTAL LAKE MCHENRY COUNTY, ILLINOIS February 8, 2013 Prepared For: City of Crystal Lake 100 W. Woodstock Street Crystal Lake, IL 60014 Prepared By: 1475 E.

More information

6060 North Central Expressway Mixed-Use Site Dallas, Texas

6060 North Central Expressway Mixed-Use Site Dallas, Texas Volume 1 Traffic Impact Analysis 6060 North Central Expressway Mixed-Use Site Dallas, Texas April 30, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #063238300 Registered Firm F-928 Traffic

More information

Traffic Impact Study Flathead County Rail Park Kalispell, Montana DRAFT. Prepared for Flathead County Economic Development Association

Traffic Impact Study Flathead County Rail Park Kalispell, Montana DRAFT. Prepared for Flathead County Economic Development Association Flathead County Rail Park Kalispell, Montana DRFT Prepared for Flathead County Economic Development ssociation Prepared by KLJ May 2013 KLJ Project # 15413003 CERTIFICTION I hereby certify that this traffic

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine Draft Study STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine SUBMITTED TO: BANGOR AREA COMPREHENSIVE TRANSPORTATION SYSTEM SUBMITTED BY: I MAY 23, 2017 DRAFT STILLWATER AVENUE STUDY FINAL REPORT Table

More information

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT November 2016 TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT & Aspinwall Borough, Sharpsburg Borough & O Hara Township, Allegheny County, Pennsylvania Prepared for: Riverfront

More information

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd. 9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

ENKA INTERMEDIATE SCHOOL

ENKA INTERMEDIATE SCHOOL TRANSPORTATION IMPACT ANALYSIS Prepared for Buncombe County Schools ENKA INTERMEDIATE SCHOOL Asheville, NC Project Number: 13-71 8/1/13 www.davenportworld.com DAVENlORT Transportation Impact Analysis Enka

More information

FINAL Albertville Business Park AUAR Update Traffic Study

FINAL Albertville Business Park AUAR Update Traffic Study FINAL Albertville Business Park AUAR Update Traffic Study Prepared for City of Albertville, MN July 20, 2017 SRF No. 10060.00 Table of Contents Introduction... 1 Existing Conditions... 1 Data Collection...

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

MDM. Key findings of the traffic assessment are as follows:

MDM. Key findings of the traffic assessment are as follows: Key findings of the traffic assessment are as follows: Baseline Traffic Volumes. Townhouse Road to the east of Route 25 carries approximately 3, vehicles per day (vpd) during the summer. The peak hour

More information

TRAFFIC IMPACT ANALYSIS OF PROPOSED CHESTNUT HILL COLLEGE MASTER PLAN DEVELOPMENT

TRAFFIC IMPACT ANALYSIS OF PROPOSED CHESTNUT HILL COLLEGE MASTER PLAN DEVELOPMENT TRAFFIC IMPACT ANALYSIS OF PROPOSED CHESTNUT HILL COLLEGE MASTER PLAN DEVELOPMENT Prepared by Orth-Rodgers & Associates, Inc. December 14, 2009 Updated November 9, 2010 230 South Broad Street Philadelphia

More information

1609 E. FRANKLIN STREET HOTEL

1609 E. FRANKLIN STREET HOTEL 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343 East Six Forks Road

More information

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study To: Ms. Susan C. Ryan Spaulding Youth Center 72 Spaulding Road Northfield, NH 03276 Date: September 7, 2017 Project #: 52455.00 From: Robin Bousa Director of Transportation Systems Re: Spaulding Youth

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

STONEBRIDGE GOLF COMMUNITY - PHASES 10 TO 12

STONEBRIDGE GOLF COMMUNITY - PHASES 10 TO 12 STONERIDGE GOLF COMMUNITY PHSES 10 TO 12 TRNSPORTTION IMPCT STUDY UGUST 2007 II GROUP TRNSPORTTION IMPCT STUDY TLE OF CONTENTS EXECUTIVE SUMMRY 1. INTRODUCTION...1 2. PROPOSED DEVELOPMENT...1 2.1 Site

More information

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc

More information

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: First Bay Properties Inc. 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 August 8, 2017 117-663 Brief_1.doc

More information

Student Housing Development

Student Housing Development Traffic Impact Study for the proposed Student Housing Development City of Oneonta Otsego County, New York Project No. 3259 December 212 Revised February 13, 212 Prepared For: Newman Development Group,

More information

SCHOOL TRAFFIC ASSESSMENT

SCHOOL TRAFFIC ASSESSMENT PK# 2415-17.387 Z178-150 TRAFFIC IMPACT ANLAYSIS: SCHOOL TRAFFIC ASSESSMENT Project: In Dallas, Texas Prepared for: City of Dallas On behalf of: Dallas Independent School District Prepared by: Hunter W.

More information

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for oad & Traffic Management Road & Traffic Management R Atlantic Traffic Engineering Specialists Draft Report Traffic Impact Study Superstore, Wal-Mart, and Kent Development Yarmouth, Nova Scotia Prepared

More information

Exhibit 964B Traffic Management Pianj. (no change) Daily Start/End Schedule Grades K-5th: Grades K-5th: >Start: 7:55 AM

Exhibit 964B Traffic Management Pianj. (no change) Daily Start/End Schedule Grades K-5th: Grades K-5th: >Start: 7:55 AM Exhibit 964B 30115 1 6 10 15 Traffic Management Pianj Traffic Management Plan A Traffic Management Plan (TMP) is important to safely achieve an optimum level of traffic flow and circulation during peak

More information

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

More information

Appendix B: Forecasting and Traffic Operations Analysis Framework Document

Appendix B: Forecasting and Traffic Operations Analysis Framework Document Existing Conditions Report - Appendix Appendix B: Forecasting and Traffic Operations Analysis Framework Document This document defines the methodology and assumptions that will be used in the traffic forecasting

More information

3.0 Future Conditions

3.0 Future Conditions 3.0 Future Conditions In order to be able to recommend appropriate improvements to the transportation system of the Town, it is important to first understand the nature and volume of traffic that is expected

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

TRAFFIC MANAGEMENT PLAN

TRAFFIC MANAGEMENT PLAN April 19, 018 PK# 415-17.387 TRAFFIC MANAGEMENT PLAN Project: In Dallas, Texas Prepared for: City of Dallas On behalf of: Dallas Independent School District Prepared by: Hunter W. Lemley, P.E. 7557 Rambler

More information

Capital Region Council of Governments

Capital Region Council of Governments March 23, 2018 Capital Region Council of Governments PROJECT CONCEPT REPORT Realignment of Swamp and Northfield Road s approaches to Route 44 (Boston Turnpike) Town of Coventry SUMMARY: The Town of Coventry

More information

Intersection Traffic Control Feasibility Study

Intersection Traffic Control Feasibility Study Intersection Traffic Control Feasibility Study CSAH 9 at CSAH 60 (185th Avenue) Prepared For: Dakota County Transportation Department Western Service Center 14955 Galaxie Avenue, 3rd Floor Apple Valley,

More information

NO BUILD TRAFFIC OPERATIONS

NO BUILD TRAFFIC OPERATIONS 3. 23 NO BUILD TRAFFIC OPERATIONS This section addresses the operations of the transportation system and details how it would be expected to function under year 23 No Build conditions with the projected

More information

CarMax Auto Superstore/ Reconditioning Center #6002 Murrieta, California

CarMax Auto Superstore/ Reconditioning Center #6002 Murrieta, California CarMax Auto Superstore/ Reconditioning Center #6002 Murrieta, California TUSTIN 17782 17th Street Suite 200 Tustin, CA 92780-1947 714.665.4500 Fax: 714.665.4501 LOS ANGELES 145 S. Spring Street Suite 120

More information

Wesbrook Place Traffic Analysis of Redistributed Dwelling Units

Wesbrook Place Traffic Analysis of Redistributed Dwelling Units Wesbrook Place Traffic Analysis of Redistributed Dwelling Units 1 Summary This report presents an analysis of the changes in traffic volumes in the Wesbrook Place neighbourhood associated with a redistribution

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. 1.0 EXECUTIVE SUMMARY King Soopers #116, a grocery marketplace anchored commercial development, is proposed

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information