1 Report by the Comptroller and Auditor General Department for Transport and Highways England Progress with the Road Investment Strategy HC 1056 SESSION MARCH 2017

2 4 Key facts Progress with the Road Investment Strategy Key facts 841m (7%) the amount by which forecast costs exceed available capital funding for road period 1, as at September road enhancement projects (out of 112) scheduled to open for traffic in road period 2 ( to ) or later, including 54 scheduled to start construction in the final year of road period 1 16 projects that Highways England had identified as at risk of not delivering value for money as at February billion capital funding initially provided over fi ve years for items such as road enhancement and renewals in the fi rst Road Investment Strategy, subsequently increased to 11.9 billion to support new projects or earlier delivery of existing projects 1.2 billion effi ciency savings target set for Highways England over the fi ve years of road period 1 ( to ) 112 major road enhancement projects in the fi rst Road Investment Strategy, such as smart motorway upgrades and upgrading single-carriageway A-roads to dual carriageway 6 major road enhancements which opened for traffi c by September billion effectively committed to road enhancement projects in road period 2 ( to )

3 Progress with the Road Investment Strategy Summary 5 Summary 1 Investment in England s strategic road network (motorways and major A-roads) fell sharply from the mid-1990s. In 2013, the government announced a series of Roads Reform measures, designed to improve the management and performance of the network. The main aspects of Roads Reform were to: establish Road Investment Strategies, with approved funding covering five-year periods, known as road periods. The first strategy covers road period 1, which runs from April 2015 to March 2020; and transform the Highways Agency into Highways England, a government-owned company, to deliver the Road Investment Strategies. 2 In 2014, the government announced details of the first Road Investment Strategy, a programme of work for road period 1. The main objectives of the first Road Investment Strategy are to: support economic growth; establish a safe and serviceable network; create a more free-flowing network; improve the environment; and improve accessibility and integration of the network. 3 The government committed 11.4 billion of capital funding to the strategic road network for the five years of road period 1. Of this, 7.7 billion was allocated to road enhancement works and ring-fenced funding for projects designed to, for example, promote cycling, improve air quality and encourage economic growth. 3.7 billion was allocated to renewing the network.

4 6 Summary Progress with the Road Investment Strategy 4 The roles and responsibilities of the main organisations involved are as follows: The Department for Transport (the Department) sets the strategic goals for the road network and oversees Highways England s delivery of road investment. Highways England is responsible for the enhancement, renewal, maintenance and operation of England s strategic road network. Highways Monitor, part of the Office of Rail and Road, monitors and reports to the Secretary of State for Transport on Highways England s performance. Scope of the report 5 The main focus of this report is the 112 major enhancement projects, which account for 57% of planned capital expenditure, and represent a material step-change in what is required from Highways England. This report looks at: the background to the Road Investment Strategy; the development of the Road Investment Strategy, Highways England s progress so far in delivering the enhancement projects, and risks to delivery, affordability and costs relative to benefits; and the steps that Highways England and the Department are taking to mitigate those risks, and their plans for future Road Investment Strategies. Key findings Development and delivery of the first Road Investment Strategy 6 The first Road Investment Strategy represents a significant improvement in the efficient management of the strategic road network. By developing a five-year programme of work with guaranteed funding, Highways England has the opportunity to work more effectively and efficiently. A long-term strategy and improved certainty of funding is intended to enable contractors to plan better and help Highways England to secure lower-cost, long-term contracts with suppliers. The Department expects it to achieve 1.2 billion of efficiencies over road period 1. Following the announcement of additional funding in the 2013 Spending Round, the Department announced a programme of 112 road enhancement projects in December 2014 and passed the Infrastructure Act in February 2015, which established Highways England (paragraphs 1.3, 1.5 and 1.6).

5 Progress with the Road Investment Strategy Summary 7 7 The speed with which the Department designed the first Road Investment Strategy created risks to value for money and deliverability. The Department put together both the Road Investment Strategy and the legislation to create Highways England as a new government-owned company in 17 months, driven by the government s desire to publish the strategy before the May 2015 general election (the equivalent planning process in Network Rail takes around 30 months). As a result: the Department selected the enhancement projects without knowing enough about whether the portfolio represented best value. It did not integrate plans for enhancement, renewal and maintenance work, which could have saved money and reduced disruption for road users. The Department selected projects which address longstanding issues on the road network. It carried out a broad, high level assessment of costs and benefits of the whole portfolio, which estimated that the portfolio could produce benefits of up to 7 for every 1 spent. However, it only conducted limited analysis for many of the potential projects to support this (paragraphs 2.9, 2.10 and 2.13); and of the 112 enhancement projects, 54 are scheduled to start in , which would cause significant disruption to the road network, increase prices and put pressure on resources at Highways England. When the strategy was announced, 69 of the 112 enhancement projects were at an early stage of planning, and road projects typically take around five years from inception to the start of construction. The Road Investment Strategy states that Highways England planned to begin construction on all of these before the end of March 2020 (paragraphs 2.11 and 2.12). 8 The Department did not make it sufficiently clear when it announced the Road Investment Strategy that the 112 enhancement projects could be subject to change or cancellation. Because the majority of projects were at a very early stage of development, there was significant uncertainty about their affordability, deliverability and potential benefits relative to costs, with the potential to bring these commitments into doubt. While it noted that these commitments were subject to, for example, value for money tests, this risk was not communicated explicitly in public announcements. By giving the impression that it had made a firm commitment to deliver the 112 projects, the Department may find it more difficult to cancel, delay or modify them (paragraph 2.2).

6 8 Summary Progress with the Road Investment Strategy 9 The Department chose to set a capital programme which was forecast to exceed funding by 652 million and this has since increased to 841 million. Over-programming had been standard practice in the Highways Agency when capital funding was provided on an annual basis, as it was expected that some projects would be delayed or drop out of the portfolio as it was refined. The Highways Agency would typically over-programme by about 10%, and the portfolio of 112 enhancement projects was broadly in line with this. The original investment plan did not include some capital costs such as post-project evaluations, capital investment in IT, costs associated with transforming the organisation, and works running over from Highways England now estimates that these will cost 409 million. The cost pressure initially built into the programme was therefore higher than the Department understood it to be, and it had increased further to 1.2 billion in March Highways England has made some progress in reducing the cost of the 112 projects but, because of the additional costs, and the original over-programming, by September 2016 forecast expenditure for the enhancements was 12,727 million, which still exceeded available funding of 11,886 million by 841 million (paragraphs 2.15 to 2.17). 10 Highways England is now reviewing the enhancement programme to improve value for money and deliverability, and make sure the programme is affordable. As at February 2017, Highways England had identified up to 16 projects which present a risk to value for money. Highways England and the Department are exploring a number of ways to manage this risk, including revising project design, merging projects on the same stretch of road, cancelling projects and delaying projects to enable further assessment of benefits. Highways England has also started work to address the risks caused by the high number of project starts that it scheduled for The Department has not yet decided how it will change the delivery schedule. So far, Highways England has also developed options to bring forward the start dates of up to 10 projects and to push back the start dates of up to 19 projects into the first years of road period 2. The Department and Highways England currently expect that this will not significantly delay delivery of the expected benefits to road users. The decisions the Department takes in response to these reviews could help reduce the current cost pressure, but it is not yet clear by how much. It is likely Highways England and the Department will need to continue to carry out further work in order to bring the portfolio within the available funding by the end of the road period (paragraphs 3.2 to 3.8).

7 Progress with the Road Investment Strategy Summary 9 11 To date, Highways England has completed and opened six projects to traffic on or ahead of schedule. However, these projects were completed slightly over budget. Highways England has started construction on a further 19 projects on schedule, and currently forecasts that it will complete 16 of these 19 projects on or ahead of schedule. Highways England forecasts that these projects will be delivered around 5% over budget (paragraphs 2.4 to 2.6). 12 Highways England met its efficiency savings target of 33 million in , but meeting its overall target of 1.2 billion over five years may still prove challenging. Highways England expects to exceed its target of 139 million for However, Highways England s plans show that it has to achieve 70% of its savings target in the final two years of the road period. Highways England has taken steps to incentivise and promote its project teams to implement savings and has developed plans for how to identify, evidence and measure efficiencies (paragraphs 2.19 to 2.21). 13 Highways England faces challenges in recruiting the specialist resources it needs to contract for and manage enhancement projects. Highways England plans to procure contracts for 57 major enhancement projects during 2017, compared with six in 2016, but is currently 19% below its target headcount for procurement and commercial specialists. Demand for these skills is high, so there is a risk that Highways England will struggle to recruit sufficient skilled staff. Highways England has been filling gaps with consultants and interim staff, but these cost on average three times more than permanent employees. The impact of a shortage of skills will be more significant if decisions are not taken to reduce the number of projects due to start in (paragraph 3.15). Preparing for future Road Investment Strategies 14 Limited time and analytical capability could restrict Highways England s ability to develop the second Road Investment Strategy effectively. The Department and Highways England are currently putting together the second Road Investment Strategy and are doing so in a more robust and systematic way than the first. However, developing a robust delivery plan is a major undertaking and Highways England has only nine months before it needs to publish its initial report on the priorities for improving the strategic road network during road period 2. Highways England is working on developing the analytical capability it requires. The Department and Highways England are also reviewing the enhancement projects in road period 1. Although these two pieces of work have significant interdependencies, the Department and Highways England are currently carrying them out largely as separate exercises (paragraphs 3.9 to 3.15).

8 10 Summary Progress with the Road Investment Strategy 15 The 66 projects carried over from road period 1 will reduce Highways England s opportunity to take a fully strategic approach to the second Road Investment Strategy, due to be announced in early Highways England currently forecasts that the construction work begun in road period 1 will cost 8.3 billion to complete in road period 2, an increase of 0.5 billion from the original forecast. Ensuring a smooth profile of work was identified as vital in improving efficiency in the highways sector. Highways England is working on this, but there is a risk that the uneven profile of work in the first Road Investment Strategy will be repeated in road period 2 (paragraph 3.10 and 3.11). 16 Highways England is at an early stage in implementing the systems and processes it needs to manage the enhancement portfolio effectively. Highways England has established a change programme to improve its understanding and management of the overall portfolio of road investments, and has recruited experienced staff to lead and support that work. However, on current plans, it will not have the full capability it needs until the start of the second road period, starting in April 2020 (paragraph 3.16). 17 The Department and Highways England will need to ensure that risks are being managed effectively as the enhancements portfolio increases in scale and complexity. The scale of the challenge for Highways England is now increasing. Procurement for 57 projects is beginning later in 2017, including some large, complex projects such as the Stonehenge tunnel, with further large, complex transformational projects being planned. In rail, the Department and Network Rail monitor performance across the Network Rail portfolio of investment through a joint portfolio board. In addition, both our work and Dame Colette Bowe s review of Network Rail s investment programme suggest that individual large, complex projects can benefit from being managed and governed separately (paragraphs 3.18 to 3.20). Conclusion on value for money 18 The Road Investment Strategy announced by the Department in December 2014 is an important step towards better long-term planning. However, the speed with which it was put together created risks to deliverability, affordability and value for money. Highways England is beginning to address these risks, but we are now nearly two years into road period 1. If the Department and Highways England do not take decisive action before Highways England publishes the next iteration of its delivery plan in summer 2017, there is a risk that the first Road Investment Strategy will not deliver optimal value, and that current challenges are carried forward into future road investment periods. 19 In order to meet the current challenges the Department and Highways England will need to consider delaying or cancelling some of the 112 projects. While this may mean that some stakeholder expectations are not met, value for money depends on the Department and Highways England proceeding, in this and in future road periods, with a realistic and affordable plan, and focusing resources on those projects which offer the best value to taxpayers and road users.

9 Progress with the Road Investment Strategy Summary 11 Recommendations a The Department and Highways England should agree an updated delivery plan for the remainder of road period 1, including an updated programme of road enhancement projects that is deliverable, affordable and represents value for money. The plan should include: the latest cost estimates compared with available funding, and plans for how cost pressures will be managed; and a clear statement setting out the impact of the updated delivery plan on the work that is to be undertaken in road period 2. b When announcing the second Road Investment Strategy, the Department and Highways England should be clear about: which projects they are committed to, and which they intend to deliver subject to further development and analysis; the level of certainty about the estimated costs, scope and delivery schedule of the projects; and the likely impact on future road periods. c d Highways England and the Department should ensure that the second Road Investment Strategy marks a step towards establishing a stable, rolling programme of investment. It might not be possible for this to be fully achieved with the second strategy, but the Department and Highways England should have a clear long-term plan for achieving a smooth profile of capital investment in the road network. The Department should re-evaluate its approach to the oversight of Highways England as the scale and complexity of Highways England s investment portfolio increases. In particular, the Department should consider: how it gains assurance about the affordability, deliverability and overall value for money of the enhancement portfolio, including, for example, considering establishing a joint portfolio board like that which the Department now uses to monitor Network Rail s portfolio; and whether it and Highways England should monitor and govern large-scale, complex and transformational projects outside its main portfolio.

Cycling and Walking Investment Strategy & Local Cycling and Walking Infrastructure Plans

Cycling and Walking Investment Strategy & Local Cycling and Walking Infrastructure Plans Cycling and Walking Investment Strategy & Local Cycling and Walking Infrastructure Plans 1 Investing in cycling and walking contributes to a broad range of cross-cutting policy objectives Cycling and walking

More information

Report to Cabinet. 18 May 2016

Report to Cabinet. 18 May 2016 Agenda Item 8 Report to Cabinet 18 May 2016 Subject: Presenting Cabinet Member: Proposed CCTV Enforcement of Traffic Contraventions in a Bus Lane (Key Decision Ref. No. HE030) Highways and Environment

More information

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS Page 1 of 9 EXECUTIVE SUMMARY Alberta Transportation ( AT ) is preparing to construct the final sections of the Calgary Ring Road. This includes the South West Ring Road ( SWRR ) (from Lott Creek Blvd

More information

// RoWSaF Making roads safer for road workers rowsaf.org.uk. RoWSaF Strategy 2015

// RoWSaF Making roads safer for road workers rowsaf.org.uk. RoWSaF Strategy 2015 // RoWSaF Making roads safer for road workers rowsaf.org.uk Working in partnership with clients, industry and key stakeholders to improve worker safety Often working close to live traffic, activities conducted

More information

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016 Context. Author: Parish Clerk 2 The Draft Integrated Transport Policy (DITS) sets out a vision and objectives, and identifies a detailed programme of interventions to support the Maidstone Borough Local

More information

ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology decision. That the Mayors Council on Regional Transportation receive this report.

ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology decision. That the Mayors Council on Regional Transportation receive this report. TO: FROM: Mayors Council on Regional Transportation Geoff Cross, Vice President of Planning and Policy DATE: September 27, 2017 SUBJECT: ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology

More information

Outcome-based payment schemes: government s use of payment by results

Outcome-based payment schemes: government s use of payment by results Report by the Comptroller and Auditor General Cross-government Outcome-based payment schemes: government s use of payment by results HC 86 SESSION 2015-16 19 JUNE 2015 Outcome-based payment schemes: government

More information

Delivering the next generation of road mapping for England and Wales

Delivering the next generation of road mapping for England and Wales Delivering the next generation of road mapping for England and Wales OS MM Highways Network Paul Baden Network Condition and Geography Statistics Branch 3 million mapping project to transform road improvements

More information

Report to COUNCIL for decision

Report to COUNCIL for decision 17 152 Title: Section: Prepared by: Olympic Pool Business Case Community & Recreation Andrew White (Community & Recreation Manager) Meeting Date: 18 May 2017 Legal Financial Significance = Medium Report

More information

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025

ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025 ANNEX1 The investment required to achieve the Government s ambition to double cycling activity by 2025 May 2016 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable.

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: December 12,2011 To: Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Bill Rosendahl, Chair, Transportation Committee

More information

The RCM Analyst - Beyond RCM

The RCM Analyst - Beyond RCM The RCM Analyst - Beyond RCM darylm@strategic-advantages.com About the Author: Daryl Mather was originally trained in RCM in 1991, after which he was involved in the application of the method through a

More information

Report by the Comptroller and. SesSIon february 2010

Report by the Comptroller and. SesSIon february 2010 Report by the Comptroller and Auditor General HC 298 SesSIon 2009 2010 26 february 2010 Preparations for the London 2012 Olympic and Paralympic Games: Progress report February 2010 Our vision is to help

More information

Caltrain Bicycle Parking Management Plan

Caltrain Bicycle Parking Management Plan Caltrain Bicycle Parking Management Plan Board of Directors October 5, 2017 Agenda Item 11 Context for Plan Capacity and Access Issues Modernization program with Electrification Complimenting limited on-board

More information

Planning for tennis in your Local Government Area. A resource from Tennis Australia

Planning for tennis in your Local Government Area. A resource from Tennis Australia Planning for tennis in your Local Government Area A resource from Tennis Australia Part 1 July 2016 ABOUT THIS RESOURCE This resource forms part of Tennis Australia's Local Government Engagement Program.

More information

Highways England Road Safety Ambition. David Stones PACTS Autumn 2015 Conference 3 nd November 2015

Highways England Road Safety Ambition. David Stones PACTS Autumn 2015 Conference 3 nd November 2015 Highways England Road Safety Ambition David Stones PACTS Autumn 2015 Conference 3 nd November 2015 Highways England Strategic Road Network 4,300 miles (40% Motorway & 60% All Purpose Trunk Road). 34% of

More information

GD 0043/18 ACTIVE TRAVEL STRATEGY

GD 0043/18 ACTIVE TRAVEL STRATEGY GD 0043/18 ACTIVE TRAVEL STRATEGY 2018-2021 May 2018 Minister s Introduction There is strong evidence that regular physical activity reduces the risk of a range of health conditions. The best way to increase

More information

DRAFT INTERIM ADVICE NOTE 150/17

DRAFT INTERIM ADVICE NOTE 150/17 DRAFT INTERIM ADVICE NOTE 150/17 Guidance on Alternative Temporary Traffic Management Techniques for Relaxation Works on Dual Carriageways Summary Guidance for temporary traffic management (TTM), on the

More information

Forewarned is Forearmed Highways Agency approach to quantifying network safety risk

Forewarned is Forearmed Highways Agency approach to quantifying network safety risk Forewarned is Forearmed Highways Agency approach to quantifying network safety risk The Highways Agency Safety Risk Model 17 th May 2012 Elizabeth Mathie, Safety Risk Modelling Manager The Highways Agency

More information

London Cycle Network Annual Report 2000

London Cycle Network Annual Report 2000 London Cycle Network Annual Report 2000 A cycle network for London by 2005 A cycle network for London by 2005 The London Cycle Network will: provide local links between residential neighbourhoods, railway

More information

Safer Verges and the Strategic Road Network

Safer Verges and the Strategic Road Network Safer Verges and the Strategic Road Network Gavin Williams Senior Technical Advisor Vehicle Restraints Outline The Journey from Highways Agency to Highway England Overview of the Highways England Health

More information

MOTION NO. M Contract Amendment for Systems Construction Management Consultant Services

MOTION NO. M Contract Amendment for Systems Construction Management Consultant Services MOTION NO. M2017-74 Contract Amendment for Systems Construction Management Consultant Services MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee PROPOSED ACTION 5/11/2017 5/25/2017 Recommend

More information

THE PLANNING AND. Transport and the law Integrated transport planning Strategies Responsibilities of local government and road controlling authorities

THE PLANNING AND. Transport and the law Integrated transport planning Strategies Responsibilities of local government and road controlling authorities The planning and policy context Transport and the law Integrated transport planning Strategies Responsibilities of local government and road controlling authorities THE PLANNING AND POLICY CONTEXT Providing

More information

INTERIM ADVICE NOTE 150/14 Revision 02. Guidance on Alternative Temporary Traffic Management Techniques for Relaxation Works on Dual Carriageways

INTERIM ADVICE NOTE 150/14 Revision 02. Guidance on Alternative Temporary Traffic Management Techniques for Relaxation Works on Dual Carriageways INTERIM ADVICE NOTE 150/14 Revision 02 Guidance on Alternative Temporary Traffic Management Techniques for Relaxation Works on Dual Carriageways Summary Guidance for temporary traffic management (TTM),

More information

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design Cycle traffic and the Strategic Road Network Sandra Brown, Team Leader, Safer Roads- Design Highways England A Government owned Strategic Highways Company Department for Transport Road Investment Strategy

More information

The Highways Agency is working to improve the M1 between junction 28 (near Alfreton) and junction 35a (the A616 Stocksbridge bypass).

The Highways Agency is working to improve the M1 between junction 28 (near Alfreton) and junction 35a (the A616 Stocksbridge bypass). Welcome The Highways Agency is working to improve the M1 between junction 28 (near Alfreton) and junction 35a (the A616 Stocksbridge bypass). The M1 is a vital part of the strategic road network, connecting

More information

Racecourse Operations Manager. Position Description

Racecourse Operations Manager. Position Description Racecourse Operations Manager Position Description Position Discription Racecourse Operations Manager Position Title: Reports To: Business Unit: Department: Racecourse Operations Manager CEO Pakenham Racing

More information

Greater Cambridge City Deal Executive Board & Joint Assembly

Greater Cambridge City Deal Executive Board & Joint Assembly Greater Cambridge City Deal Executive Board & Joint Assembly Welcome to the Call for Evidence on tackling congestion in Cambridge Launch Event 11 th November 2015 Bob Menzies Service Director: Strategy

More information

Role Profile. Project Director (North or South dependent on candidate location)

Role Profile. Project Director (North or South dependent on candidate location) Role Profile Post: Relationship Development Manager Salary: 50,000-60,000 Location Reporting to: Contract: London or Bolton with national travel Project Director (North or South dependent on candidate

More information

APPENDIX 2 PROPOSAL FOR REPLACEMENT FOR POOLE (DOLPHIN) LEISURE CENTRE FINAL SPECIFICATION

APPENDIX 2 PROPOSAL FOR REPLACEMENT FOR POOLE (DOLPHIN) LEISURE CENTRE FINAL SPECIFICATION APPENDIX 2 PROPOSAL FOR REPLACEMENT FOR POOLE (DOLPHIN) LEISURE CENTRE FINAL SPECIFICATION 1 PURPOSE 1.1 To provide the following information and supporting evidence for the Member decision (reference

More information

Regional Bus Priority

Regional Bus Priority Regional Bus Priority Recommendation(s) That the Board: i) Notes the systematic review for bus priority measures on the proposed Frequent Transit Network (FTN). Executive summary The New Network public

More information

WANAKA SWIMMING FACILITIES STATEMENT OF PROPOSAL

WANAKA SWIMMING FACILITIES STATEMENT OF PROPOSAL WANAKA SWIMMING FACILITIES STATEMENT OF PROPOSAL 17 October 2014 Contents Executive Summary Background National Guidelines The Status Quo Issue One Timing Issue Two Location Issue Three Size Issue Four

More information

1. What are FIFA s general objectives in the area of football development? How does development relate to FIFA s daily business?...

1. What are FIFA s general objectives in the area of football development? How does development relate to FIFA s daily business?... 1. What are FIFA s general objectives in the area of football development?... 3 2. How does development relate to FIFA s daily business?... 3 3. What are FIFA s main development programmes?... 4 4. What

More information

Annual Meeting of Shareholders May 8, Oyu Tolgoi: world-class asset, development optionality, significant cash flow potential

Annual Meeting of Shareholders May 8, Oyu Tolgoi: world-class asset, development optionality, significant cash flow potential Annual Meeting of Shareholders May 8, 2018 Oyu Tolgoi: world-class asset, development optionality, significant cash flow potential Forward-looking statements 2 This presentation includes certain forward-looking

More information

Appendix 1 Transit Network Analysis

Appendix 1 Transit Network Analysis Appendix 1 Transit Network Analysis APPENDIX 1 TRANSIT NETWORK ANALYSIS The purpose of this appendix is to provide an update on the transit network analysis as it pertains to: i. SmartTrack ii. Scarborough

More information

MARINE SAFETY PLAN

MARINE SAFETY PLAN PORT MARINE SAFETY CODE MARINE SAFETY PLAN 2015-2017 Introduction As required at article 3.20 of the Port Marine Safety Code (PMSC), the Port of London Authority (PLA) publishes its Marine Safety Plan

More information

Our journey a 20 year Transport Manifesto for the North East

Our journey a 20 year Transport Manifesto for the North East Our journey a 20 year Transport Manifesto for the North East Sustrans submission to North East Combined Authority (NECA). March 2016 Summary Sustrans is a leading UK charity enabling people to travel by

More information

INTERIM ADVICE NOTE 188/16

INTERIM ADVICE NOTE 188/16 INTERIM ADVICE NOTE 188/16 Guidance on Omission of Warning Lights (Road Danger Lamps) for Relaxation Works on Dual Carriageways Summary Guidance for omission of warning lights (road danger lamps) in temporary

More information

Integrated Regional Traffic Management. Michael Aherne Technical Director POLIS Conference 2009

Integrated Regional Traffic Management. Michael Aherne Technical Director POLIS Conference 2009 Integrated Regional Traffic Management Michael Aherne Technical Director POLIS Conference 2009 M50 finish Public Transport and Pedestrians College Green The Spatial Perspective What Could has

More information

This report is PUBLIC [NOT PROTECTIVELY MARKED] WMCA Board. (1) To approve the adoption of the West Midlands Cycle Design Guidance.

This report is PUBLIC [NOT PROTECTIVELY MARKED] WMCA Board. (1) To approve the adoption of the West Midlands Cycle Design Guidance. This report is PUBLIC [NOT PROTECTIVELY MARKED] WMCA Board Date 8 December 2017 Report title Portfolio Lead Accountable Chief Executive Accountable Employee Report has been considered by West Midlands

More information

Irish Hockey Four Year Strategic Plan

Irish Hockey Four Year Strategic Plan FOUR YEAR STRATEGIC PLAN 2014-2018 Irish Hockey Four Year Strategic Plan 2014-2018 Acknowledgements An extensive consultation process was carried out by Irish Hockey to ensure that this plan met the needs

More information

Big Bike Revival Scotland - Cycling Development Officer. Job Description and Responsibilities.

Big Bike Revival Scotland - Cycling Development Officer. Job Description and Responsibilities. Big Bike Revival Scotland - Cycling Development Officer Job Description and Responsibilities. Reports to: Direct Reports: Location of Role: Salary: Contract: Big Bike Revival Scotland Project Manager None

More information

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT Update June 2018 Hi, Let s Get Wellington Moving (LGWM) is developing a Recommended Programme of Investment (RPI) that meets our programme objectives and supports the city s and region s growth. As part

More information

Nottingham Cycle City Frequently Asked Questions

Nottingham Cycle City Frequently Asked Questions Nottingham Cycle City Frequently Asked Questions About the scheme How much money is to be spent on cycling? And where is the money from? We have 6.1 million in Growth Fund which we will be investing directly

More information

GOVERNMENT OF SASKATCHEWAN SUBMISSION TO THE RAILWAY SAFETY ACT REVIEW PANEL

GOVERNMENT OF SASKATCHEWAN SUBMISSION TO THE RAILWAY SAFETY ACT REVIEW PANEL GOVERNMENT OF SASKATCHEWAN SUBMISSION TO THE RAILWAY SAFETY ACT REVIEW PANEL Saskatchewan Highways & Transportation May 29, 2007 I Introduction Government of Saskatchewan Submission To the Railway Safety

More information

INTERIM ADVICE NOTE 150/12. Guidance for Alternative Temporary Traffic Management Techniques for Relaxation Schemes on Dual Carriageways.

INTERIM ADVICE NOTE 150/12. Guidance for Alternative Temporary Traffic Management Techniques for Relaxation Schemes on Dual Carriageways. INTERIM ADVICE NOTE 150/12 Guidance for Alternative Temporary Traffic Management Techniques for Relaxation Schemes on Dual Carriageways Summary Guidance for temporary traffic management (TTM), on the approach

More information

Birmingham Connected. Edmund Salt. Transportation Policy Birmingham City Council

Birmingham Connected. Edmund Salt.   Transportation Policy Birmingham City Council Birmingham Connected Edmund Salt Transportation Policy Birmingham City Council www.birmingham.gov.uk/connected Birmingham Connected the story so far Broadly following EU Guidance We ve done all of this

More information

A1307 Haverhill to Cambridge: Approval to consult on transport improvement concepts

A1307 Haverhill to Cambridge: Approval to consult on transport improvement concepts Report To: Greater Cambridge City Deal Executive Board 3 March 2016 Lead Officer: Graham Hughes, Executive Director of Economy, Transport and Environment, Cambridgeshire County Council A1307 Haverhill

More information

2013 Special Reliability Assessment: Accommodating an Increased Dependence on Natural Gas for Electric Power

2013 Special Reliability Assessment: Accommodating an Increased Dependence on Natural Gas for Electric Power 2013 Special Reliability Assessment: Accommodating an Increased Dependence on Natural Gas for Electric Power Special Reliability Assessments Deeper focus on issues identified in Long-Term Reliability Assessment

More information

BC Games Society 2016/ /19 SERVICE PLAN

BC Games Society 2016/ /19 SERVICE PLAN 2016/17 2018/19 SERVICE PLAN For more information on the BC Games Society contact: 200-990 Fort Street Victoria BC V8V 3K2 Kelly Mann, President and CEO kellym@bcgames.org or visit our website at www.bcgames.org

More information

Transport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age.

Transport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age. Transport Workshop Dearbhla Lawson Head of Transport & Infrastructure Policy & Funding University of the Third Age 30 th March 2015 1 Presentation Overview Roles and responsibilities Snapshot of Key Challenges

More information

ENFIELD TOWN THE REVISED DESIGN

ENFIELD TOWN THE REVISED DESIGN TOWN THE REVISED DESIGN We re turning Enfield into a borough that encourages walking and cycling, a place that s easy for all of us to get around however we choose to travel. A greener place, with safer

More information

Active Transportation Infrastructure Investment A Business Case

Active Transportation Infrastructure Investment A Business Case Active Transportation Infrastructure Investment A Business Case In 2016, the Real Estate Foundation awarded the Capital Regional District a $50,000 grant for Shifting Gears: Land Use Change through Active

More information

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return

May 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return Summary: Local return is an important revenue source for cities to maintain their local transportation infrastructure. Most cities use their local return to operate small bus systems and repave streets,

More information

Strategic Plan. Approved: September 2016

Strategic Plan. Approved: September 2016 Strategic Plan 2016 2020 Approved: September 2016 VISION To be the leading university hockey club in Australia for high performance and development, and recognised as one of the most participation-friendly,

More information

Tackling congestion by making better use of England s motorways and trunk roads

Tackling congestion by making better use of England s motorways and trunk roads Tackling congestion by making better use of England s motorways and trunk roads REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 15 Session 2004-2005 26 November 2004 The National Audit Office scrutinises

More information

CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION

CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION Title: Prepared by: A9 Dualling Project: Dalraddy to Slochd Murray Ferguson, Director of Planning and Rural Development and Gavin Miles, Head of Planning

More information

York Scarborough Bridge Economic Appraisal Update Technical Note

York Scarborough Bridge Economic Appraisal Update Technical Note York Scarborough Bridge Economic Appraisal Update Technical Note Specification No. 1 Client name West Yorkshire Combined Authority Client reference M088 Discipline Transportation Project name CCAG2 Economics

More information

Standing Committee on Policy and Strategic Priorities

Standing Committee on Policy and Strategic Priorities POLICY REPORT Report Date: January 15, 2019 Contact: Steve Brown Contact No.: 604.873.9733 RTS No.: 12955 VanRIMS No.: 08-2000-20 Meeting Date: January 30, 2019 TO: FROM: SUBJECT: Standing Committee on

More information

Living Streets response to the Draft London Plan

Living Streets response to the Draft London Plan Living Streets response to the Draft London Plan Contents Living Streets response to the Draft London Plan... 1 About Living Streets... 2 Summary... 2 Consultation response... 3 Chapter 1: Planning London

More information

WINNER S CASE STUDY. BNFL Award 2012 Olympic Delivery Authority

WINNER S CASE STUDY. BNFL Award 2012 Olympic Delivery Authority Category Winner BNFL Award 2012 Olympic Delivery Authority Sponsor Overview London s successful bid for the 2012 Olympic and Paralympic Games created the need for a major regeneration and construction

More information

Tackling congestion by making better use of England s motorways and trunk roads

Tackling congestion by making better use of England s motorways and trunk roads Tackling congestion by making better use of England s motorways and trunk roads LONDON: The Stationery Office 10.75 Ordered by the House of Commons to be printed on 24 November 2004 REPORT BY THE COMPTROLLER

More information

CYCLING CHARTER ACTION PLAN EXECUTIVE SUMMARY

CYCLING CHARTER ACTION PLAN EXECUTIVE SUMMARY CYCLING CHARTER ACTION PLAN EXECUTIVE SUMMARY THE VISION OF THE CYCLING CHARTER To realise the full potential of cycling s contribution to the health and wealth of the West Midlands creating more sustainable

More information

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April MINE SAFETY TARGETED ASSESSMENT PROGRAM Ground or strata failure NSW metalliferous mines April 2017 www.resourcesandenergy.nsw.gov.au Document control Publication title: Ground or strata failure NSW metalliferous

More information

CONTENTS PREFACE 1.0 INTRODUCTION AND SCOPE 2.0 POLICY AND GOVERNANCE 3.0 SUMMARY OF PROGRESS 4.0 NATURE OF DEMAND 5.0 TRAVEL AND PARKING INITIATIVES

CONTENTS PREFACE 1.0 INTRODUCTION AND SCOPE 2.0 POLICY AND GOVERNANCE 3.0 SUMMARY OF PROGRESS 4.0 NATURE OF DEMAND 5.0 TRAVEL AND PARKING INITIATIVES CONTENTS PREFACE 1.0 INTRODUCTION AND SCOPE 2.0 POLICY AND GOVERNANCE 3.0 SUMMARY OF PROGRESS 4.0 NATURE OF DEMAND 5.0 TRAVEL AND PARKING INITIATIVES 6.0. TARGETS PREFACE The University of St Andrews has

More information

CONTROL AND COMMUNICATIONS PROVISION PART 1 TD 46/05 MOTORWAY SIGNALLING SUMMARY

CONTROL AND COMMUNICATIONS PROVISION PART 1 TD 46/05 MOTORWAY SIGNALLING SUMMARY DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 9 SECTION 1 NETWORK - TRAFFIC CONTROL AND COMMUNICATIONS STANDARDS OF PROVISION PART 1 TD 46/05 MOTORWAY SIGNALLING SUMMARY This issue of TD 46 incorporates Interim

More information

Global Certifying Authority for Scrum and Agile Professionals

Global Certifying Authority for Scrum and Agile Professionals Global Certifying Authority for Scrum and Agile Professionals SCRUM is an iterative and incremental agile framework for managing complex projects. A scrum (short for scrummage) is a method of restarting

More information

London 2012 Olympics The Green Build. Rachel Krzeminski Aggregate Industries UK Ltd

London 2012 Olympics The Green Build. Rachel Krzeminski Aggregate Industries UK Ltd London 2012 Olympics The Green Build Rachel Krzeminski Aggregate Industries UK Ltd Aggregate Industries UK Ltd Aggregate Industries is an international aggregates, construction and building materials group

More information

Global Certifying Authority for Scrum and Agile Professionals. Authorized Training Partner

Global Certifying Authority for Scrum and Agile Professionals. Authorized Training Partner Global Certifying Authority for Scrum and Agile Professionals Authorized Training Partner SCRUM is an iterative and incremental agile framework for managing complex projects. A scrum (short for scrummage)

More information

THE GOVERNING BOARD OF THE EUROPEAN INSTITUTE OF INNOVATION AND TECHNOLOGY,

THE GOVERNING BOARD OF THE EUROPEAN INSTITUTE OF INNOVATION AND TECHNOLOGY, 02730.EIT.2015.I.GB38 DECISION 35/2015 OF THE GOVERNING BOARD OF THE EUROPEAN INSTITUTE OF INNOVATION AND TECHNOLOGY (EIT) ON PRINCIPLES FOR FINANCING, MONITORING AND EVALUATING KIC ACTIVITIES THE GOVERNING

More information

Lane Rental - A Utility Perspective. Paul Gerrard Street Works Manager, National Grid

Lane Rental - A Utility Perspective. Paul Gerrard Street Works Manager, National Grid Lane Rental - A Utility Perspective Paul Gerrard Street Works Manager, National Grid Introduction Energy Networks Association (ENA) represents the wires and pipes transmission and distribution network

More information

Preparations for the London 2012 Olympic and Paralympic Games Risk assessment and management

Preparations for the London 2012 Olympic and Paralympic Games Risk assessment and management Preparations for the London 2012 Olympic and Paralympic Games Risk assessment and management REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 252 Session 2006-2007 2 February 2007 The National Audit Office

More information

UBS Annual Nordic Financial Services Conference Lars Aa. Løddesøl Group CFO - Storebrand

UBS Annual Nordic Financial Services Conference Lars Aa. Løddesøl Group CFO - Storebrand UBS Annual Nordic Financial Services Conference 2013 Lars Aa. Løddesøl Group CFO - Storebrand 1 The Storebrand Group 100% of investments assessed by sustainability criteria 2.200 employees 40.000 corporate

More information

Strategic Plan for Sevens Rugby. September 2006

Strategic Plan for Sevens Rugby. September 2006 Strategic Plan for Sevens Rugby September 2006 Introduction The promotion of Sevens has been instrumental in taking Rugby to new territories and regions. The continued growth of Sevens would help achieve

More information

PRESENTATION TO THE BRITISH COLUMBIA LEGISALTIVE STANDING COMMITTEE ON FINANCE September 26, 2013

PRESENTATION TO THE BRITISH COLUMBIA LEGISALTIVE STANDING COMMITTEE ON FINANCE September 26, 2013 PRESENTATION TO THE BRITISH COLUMBIA LEGISALTIVE STANDING COMMITTEE ON FINANCE September 26, 2013 On behalf of its 40,000 plus members, The BC Wildlife Federation welcomes the opportunity to address the

More information

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other: Memorandum Date: November 20, 2017 To: Transportation Authority Board From: Eric Cordoba Deputy Director Capital Projects Subject: 12/5/17 Board Meeting: San Francisco Freeway Corridor Management Study

More information

Government transport policy

Government transport policy Government transport policy and the implications for planning RTPI TPS Transport Planning Network James Harris P o l i c y a n d N e t w o r k s M a n a g e r R o y a l To w n P l a n n i n g I n s t i

More information

Motorway-to-motorway: a potential technological solution to motorway congestion

Motorway-to-motorway: a potential technological solution to motorway congestion 108 Roger Higginson Principal Engineer Intelligent Transport Systems Atkins Jill Hayden Principal Engineer Intelligent Transport Systems Atkins Sukhvinder Ubhi Project Sponsor Highways Agency Motorway-to-motorway:

More information

WELCOME TO OPEN HOUSE # 1 June 14, 2017

WELCOME TO OPEN HOUSE # 1 June 14, 2017 Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE # 1 June 14, 2017 Please sign in and join our mailing list Purpose of Open House #1 & Study Area York

More information

University of Leeds Travel Plan

University of Leeds Travel Plan University of Leeds Travel Plan 2015-2018 Contents 1: Introduction 1.1 What is a Travel Plan? 1.2 Why do we need one? 1.3 Sustainability Strategy 2: Overview 2.1 The bigger picture 2.2 The City scale 2.3

More information

Program Update. Relationship: RP, RTIP, Budget, POF. Board of Directors Item 16 February 22, Board of Directors Item 16 Feb 22,

Program Update. Relationship: RP, RTIP, Budget, POF. Board of Directors Item 16 February 22, Board of Directors Item 16 Feb 22, Program Update Board of Directors Item 16 February 22, 2019 Relationship: RP, RTIP, Budget, POF 2019 2020 2025 2030 2035 2040 2045 2050 Contains ten-year capital program budget 2 Board of Directors Item

More information

A national cycling strategy for more and safer cycling

A national cycling strategy for more and safer cycling A national cycling strategy for more and safer cycling contributing to a sustainable society and a high quality of life throughout the country Ministry of Enterprise and Innovation 1 Background The Government

More information

Seal Extension Guidelines. Asset Management and Systems

Seal Extension Guidelines. Asset Management and Systems Seal Extension Guidelines 1. Guideline Definitions AADT - Annual Average Daily Traffic is measured at regular annual (or greater) intervals and adjusted for seasonal effects, using an approved traffic

More information

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)

12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years) 12 RECOMMENDATIONS Recommendations are based on the technical analysis of existing and future road and active transportation conditions, the results of the review of existing City policies and public feedback.

More information

Bristol City Council has produced a draft Bristol Transport Strategy document.

Bristol City Council has produced a draft Bristol Transport Strategy document. Bristol Transport Strategy Summary Document Introduction Bristol City Council has produced a draft Bristol Transport Strategy document. The Strategy fills a gap in transport policy for Bristol. We have

More information

Ocean Beaches Strategy Version 1.0 August 2013

Ocean Beaches Strategy Version 1.0 August 2013 Ocean Beaches Strategy 2013 2023 Version 1.0 August 2013 Contents Foreword 3 Introduction 5 Executive Summary 7 Strategy Background 9 Gold Coast City 9 Background 9 Current Services to the community 10

More information

Aiming for Zero Road Worker Safety. Mark Pooley Highways Agency Road Worker Safety Programme Manager Monday 11 June 2012

Aiming for Zero Road Worker Safety. Mark Pooley Highways Agency Road Worker Safety Programme Manager Monday 11 June 2012 Aiming for Zero Road Worker Safety Mark Pooley Highways Agency Road Worker Safety Programme Manager Monday 11 June 2012 1. Road Worker Safety Strategy. RWS Strategic Target No. 1: achieve a substantial

More information

Welsh Government Trunk Road Maintenance Manual

Welsh Government Trunk Road Maintenance Manual Welsh Government Trunk Road Maintenance Manual into Value for Money of Motorway and Trunk Road Investment. the Welsh Government's specification 'Trunk Road Maintenance Manual' (TRMM). This. 11 Materials,

More information

QLDC Council 24 July Report for Agenda Item: Fergburger Proposed Shotover Street Footpath Upgrade

QLDC Council 24 July Report for Agenda Item: Fergburger Proposed Shotover Street Footpath Upgrade 127 COU 14/07/05 QLDC Council 24 July 2014 Department: Infrastructure and Assets Report for Agenda Item: 5 5. Fergburger Proposed Shotover Street Footpath Upgrade Purpose 1 To consider a request for Council

More information

QLDC Council 29 October Report for Agenda Item: 3

QLDC Council 29 October Report for Agenda Item: 3 QLDC Council 29 October 2015 Department: Infrastructure Beach Street Pedestrianisation Purpose Report for Agenda Item: 3 1 The purpose of this report is to obtain Council approval to consult over options

More information

OHRIA Ontario Horse Racing Industry Association

OHRIA Ontario Horse Racing Industry Association OHRIA Ontario Horse Racing Industry Association P.O. Box 456, Stn. B, Toronto, ON M9W 5L4 Tel: 416-679-0741 Fax: 416-679-9114 Email: ohria@ohria.com Submission to the Standing Committee of Finance and

More information

Annual results Accell Group 2016

Annual results Accell Group 2016 Annual results Accell Group 2016 Amsterdam, 10 March 2017 René J. Takens, CEO Hielke H. Sybesma, CFO Agenda 1. Key results 2016 2. Strategy 3. Outlook 10 March 2017 Accell Group N.V. presentation annual

More information

Role Profile. Chief Executive of Blackburn Youth Zone. Chair and Board of Blackburn Youth Zone

Role Profile. Chief Executive of Blackburn Youth Zone. Chair and Board of Blackburn Youth Zone Role Profile Job Role: Accountable to: Key Relationships: Chief Executive of Blackburn Youth Zone Chair and Board of Blackburn Youth Zone Youth Zone Chair and Board, Youth Zone Senior Management Team,

More information

CRICKET HONG KONG 2019 AGM CHAIRMAN S REPORT

CRICKET HONG KONG 2019 AGM CHAIRMAN S REPORT CRICKET HONG KONG 2019 AGM CHAIRMAN S REPORT INTRODUCTION The 2019 AGM is a major milestone in the history of cricket in Hong Kong. The board elected at this AGM will be the first under the new constitution

More information

County of Simcoe Transportation Master Plan

County of Simcoe Transportation Master Plan FINAL REPORT County of Simcoe July 2008 PREPARED FOR: County of Simcoe County Administration Centre 1110 Highway #26 Midhurst, ON L0L 1X0 PREPARED BY: Earth Tech Canada Inc. 105 Commerce Valley Drive West

More information

Active travel and economic performance: A What Works review of evidence from cycling and walking schemes

Active travel and economic performance: A What Works review of evidence from cycling and walking schemes 1 Making the economic case for active travel Active travel and economic performance: A What Works review of evidence from cycling and walking schemes Active Travel Toolkit Slide Pack July 2017 Active travel

More information

9. Parking Supporting Statement

9. Parking Supporting Statement 9. Parking Supporting Statement Content 1. Setting the Scene 2. Vision 3. Parking and the Shared Priorities 4. Issues 5. Delivery Programme in the first Plan Period 2001/02 2005/06 6. Good Practice 7.

More information

STRATEGIC PLAN

STRATEGIC PLAN STRATEGIC PLAN 2015-2019 www.golfqueensland.org.au FROM THE BOARD This Golf Queensland Strategic Plan builds on the achievement of the previous four year plan and recognises the opportunities as well the

More information

Managing Leakage and Preparing for the 2012 Olympics

Managing Leakage and Preparing for the 2012 Olympics Water UK Leakage Conference 2012 Managing Leakage and Preparing for the 2012 Olympics Andrew Oakes Thames Water - Leakage Planning Manager Steven Harvey Thames Water - Asset Modelling and Design Specialist

More information

DOE Climate Change Proposals

DOE Climate Change Proposals DOE Climate Change Proposals Sustrans response to Proposals for Taking Forward NI Climate Change Legislation January 2016 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable.

More information