OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

Size: px
Start display at page:

Download "OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:"

Transcription

1 OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, Report_1.doc D. J. Halpenny & Associates Ltd. Consulting Transportation Engineers P.O. Box 774, Manotick, ON K4M 1A7 Tel (613) Fax (613)

2 TABLE OF CONTENTS PAGE 1. BACKGROUND Purpose and Scope of Work ROADWAY NETWORK Existing Roadways and Intersections PROPOSED DEVELOPMENT Trip Generation Trip Generated Primary Trips and Pass-By Trips TRANSPORTATION IMPACT Background Traffic Volumes Total Traffic Volumes Traffic Analysis Site Circulation Pedestrian, Cycling, and Transit Facilities FINDINGS AND RECOMMENDATIONS APPENDIX LIST OF FIGURES 1.1 SITE LOCATION PLAN EXISTING WEEKDAY PM AND SATURDAY PEAK HOUR TRAFFIC COUNTS CONCEPTUAL SITE PLAN WEEKDAY PEAK PM AND SATURDAY PEAK HOUR PRIMARY TRIPS WEEKDAY PEAK PM AND SATURDAY PEAK HOUR PASS-BY TRIPS WEEKDAY PM AND SATURDAY PEAK HOUR BACKGROUND TRAFFIC WEEKDAY PM AND SATURDAY PEAK HOUR BACKGROUND TRAFFIC WEEKDAY PM AND SATURDAY PEAK HOUR TOTAL TRAFFIC WEEKDAY PM AND SATURDAY PEAK HOUR TOTAL TRAFFIC LIST OF TABLES 3.1 RETAIL SPACE TRIP GENERATION RATES SITE GENERATED TRIPS PRIMARY AND PASS-BY TRIPS SITE ACCESS/INDUSTRIAL LoS and Volume/Capacity (v/c) SITE ACCESS/BELFAST LoS and Volume/Capacity (v/c) SITE ACCESS/TRAINYARDS (RAILMARKET) LoS and Volume/Capacity (v/c) INDUSTRIAL/TRAINYARDS LoS and Volume/Capacity (v/c) TRAINYARDS/TERMINAL LoS and Volume/Capacity (v/c) BELFAST/TRAINYARDS LoS and Volume/Capacity (v/c) INDUSTRIAL/RUSSELL LoS and Volume/Capacity (v/c) ST. LAURENT/INDUSTRIAL (INNES) LoS and Volume/Capacity (v/c) ST. LAURENT/BELFAST LoS and Volume/Capacity (v/c)... 26

3 Trainyards Drive Ottawa OTTAWA TRAIN YARDS PHASE 3 TRAINYARDS DRIVE, OTTAWA TRANSPORTATION IMPACT STUDY 1. BACKGROUND The Ottawa Train Yards Inc. has proposed the development of lands for Phase 3 of the Ottawa Train Yards shopping centre. The lands are at the east portion of the site, east of Trainyards Drive and adjacent to the east and south limits of Phase 2 of the shopping centre development. The development will comprise of a Farm Boy store, an L.C.B.O. store, and various retail stores. The development will utilize a new access onto Belfast Road which has been constructed by the City of Ottawa for joint use between the shopping centre and the new bus garage facility at 735 Industrial Avenue. The development will also include a new full movement access onto Industrial Avenue. Figure 1.1 shows the location of Phase 3 of the Ottawa Train Yards shopping centre. The proposed shopping centre is expected to be completed and substantially occupied by the year The firm of D. J. Halpenny & Associates Ltd. has been retained by the Ottawa Train Yards Inc. to prepare a report which would examine the impact of Phase 3 of the shopping centre on the adjacent roadways. The study will account for all development already constructed and development approved under Site Plan Applications but not yet constructed. 1.1 Purpose and Scope of Work The purpose of the (TIS) report will be to examine the roads and intersections within the study area to determine the impact of the site generated trips from the proposed retail in Phase 3 of the development. The study is required as part of the Site Plan Application for the development. The development will consist of retail stores which will typically be closed during the weekday peak AM hours of the adjacent roads. For this reason the study will examine the impact of the development during the peak PM hour of the adjacent roads and the peak Saturday hour which is when the development is expected to generate the highest number of site generated trips. The analysis years will be at build out of Phase 3 in 2015, and five years beyond build out in The analysis will examine the operation of the proposed site access onto Industrial Avenue, accesses onto Trainyards Drive and Belfast Road, and adjacent intersections within the study area. The TIS report will follow the City of Ottawa guidelines as documented in the Transportation Impact Assessment Guidelines dated October The location of the development and intersections examined within the study area are shown in Figure 1.1.

4 2 FIGURE 1.1 SITE LOCATION PLAN

5 3 2. ROADWAY NETWORK 2.1 Existing Roadways and Intersections Phase 3 of the Ottawa Train Yards development will utilize the existing access point onto Trainyards Drive which was constructed under Phase 2 of the development, and will provide a new full movement access onto Industrial Avenue. The site will also share the new access onto Belfast Road which has been constructed for the City of Ottawa bus garage. The site is located on the north side of Industrial Avenue. Industrial Avenue is designated in the Ottawa 20/20 Transportation Master Plan as an undivided four lane arterial roadway. The posted speed limit along Industrial Avenue is 60 km./h. There is a pedestrian sidewalk along the north side of the road in the vicinity of the site. There are no designated cycling lanes along Industrial Avenue. Industrial Avenue in the vicinity of the site is not identified as an On-road Cycling Route. The proposed development is located on the east side of Trainyards Drive. Trainyards Drive is a two lane urban collector roadway which links Belfast Road to Industrial Avenue. The road has an unposted speed limit of 50 km./h., with sidewalks along both the east and west side of the roadway. Trainyards Drive is not identified as an On-road Cycling Route, but the road is sufficiently wide to accommodate cycling facilities with cycling pockets located at intersections. Belfast Road is designated as a collector road with a posted speed of 50 km./h. The road has a two lane rural cross-section east of the Belfast/Trainyards intersection, and a four lane urban cross-section west of Trainyards Drive. There are no sidewalks or cycling lanes along the road. Railmarket Private is a two lane private urban road which passes through the retail site linking Terminal Avenue to Trainyards Drive. Terminal Avenue is a two lane urban collector road extending west from Trainyards Drive. The road has an unposted speed limit of 50 km./h. There are sidewalks along the south side of the roadway adjacent to the site, which extends from Wal-Mart to Trainyards Drive. Russell Road is a two lane collector road which connects to Industrial Avenue and Smyth Road. The road has a sidewalk along the east side of the road, with sidewalks along both sides between Industrial Avenue and Coronation Avenue. The road has an posted speed limit of 50 km./h. with no cycling lanes. St. Laurent Boulevard is a four lane divided arterial road with a posted speed limit of 70 km./h. The road has sidewalks along both sides of the road, and no cycling facilities.

6 4 The Trainyards/Railmarket intersection will provide one of the access points for the proposed Phase 3 development. Trainyards Drive will form the northbound and southbound approaches, Railmarket Private the eastbound, and the access to Phases 2 and 3 the westbound approach. The intersection is controlled by traffic signals. The lane configuration of the intersection is as follows: Trainyards Approach - One left turn lane One shared through/right lane Trainyards Approach - One left turn lane One through lane One right turn lane Railmarket Approach - One left turn lane One shared through/right lane New Retail Entrance - One left turn lane One shared through/right lane The Trainyards/Terminal intersection is controlled by traffic signals. The intersection has Trainyards Drive forming the northbound and southbound approaches, and Terminal Avenue the eastbound approach. A private driveway forms the westbound approach. The following is the current lane configuration of the intersection: Trainyards Approach - One left turn lane One through lane One shared through/right lane Trainyards Approach - One shared left/through lane One right turn lane Terminal Approach - Two left turn lanes One shared through/right lane Private Driveway - One shared left/through/right lane The Trainyards/Belfast intersection is a T intersection with Belfast Road forming the eastbound and westbound approaches, and Trainyards Drive the northbound approach. The intersection is controlled by traffic signals. The intersection has the following lane configuration: Trainyards Approach - Two left turn lanes One right turn lane Belfast Approach - One through lane One right turn lane Belfast Approach - One left turn lane Two through lanes The Trainyards/Industrial intersection is a signalized intersection with Industrial Avenue forming the eastbound and westbound approaches, Trainyards Drive the southbound approach, and a private driveway to the Metro commercial site forms the northbound approach. The current configuration of the intersection is as follows:

7 5 Metro Driveway - One shared left/through/right lane Trainyards Approach - One shared left/through lane One right turn lane Industrial Approach - One left turn lane One through lane One shared through/right lane Industrial Approach - One left turn lane One through lane One shared through/right lane The Industrial/Russell intersection is controlled by traffic signals with Industrial Avenue forming the eastbound and westbound approaches. Russell Road forms the northbound approach and a private driveway into the City of Ottawa facility forms the southbound approach. The intersection has the following lane configuration: Russell Approach - One shared left/through lane One channelized right turn lane City Facility Approach - One shared left/through lane One channelized right turn lane Industrial Approach - One left turn lane Two through lanes One channelized right turn lane Industrial Approach - One left turn lane One through lane One shared through/right lane The St. Laurent/Belfast intersection is controlled by traffic signals with St. Laurent Boulevard forming the northbound and southbound approaches and Belfast Road the eastbound and westbound approaches. The intersection has the following lane configuration: St. Laurent Approach - One left turn lane Two through lanes One channelized right turn lane St. Laurent Approach - One left turn lane Two through lanes One channelized right turn lane Belfast Approach - One left turn lane One through lane One channelized right turn lane Belfast Approach - One left turn lane One through lane One channelized right turn lane The Industrial/St. Laurent intersection is controlled by traffic signals with Industrial Avenue forming the eastbound approach, Innes Road the westbound approach, and St. Laurent Boulevard the northbound and southbound approaches. The right turn movements at all approaches are controlled by traffic islands. The current configuration of the intersection is as follows:

8 6 St. Laurent Approach - One left turn lane Two through lanes One right turn lane (channelized) St. Laurent Approach - One left turn lane Two through lanes One right turn lane (channelized) Industrial Approach - One left turn lane Two through lanes One right turn lane (channelized) Industrial Approach - One left turn lane One shared left/through lane One through lane One right turn lane (channelized) Figure 2.1 shows the existing weekday peak PM hour and Saturday peak hour traffic counts. 3. PROPOSED DEVELOPMENT Phase 3 of the Ottawa Train Yards development is located on the north side of Industrial Avenue and east of Trainyards Drive. The development is adjacent to the Phase 2 development and will utilize the existing access onto Trainyards Drive at Railmarket Private which was constructed as part of Phase 2. The development will also use the new shared access onto Belfast Road which has been constructed by the City of Ottawa for the new articulated bus garage facility at 735 Industrial Avenue. The site also proposes a new full movement access onto Industrial Avenue. The site is expected to be completed and substantially occupied by the year The development will consist of various free standing retail stores, and a retail store strip along the Belfast Road access. Figure 3.1 provides a site plan showing the individual store foot prints which would contribute to the site trips which are addressed in this study. Table 3.1 shows the gross floor area of each retail space. TABLE 3.1 RETAIL SPACE RETAIL BUILDING GROSS AREA (m 2 ) GROSS AREA (ft 2 ) , , , , , , , , ,169 TOTAL AREA 8, ,951

9 7 FIGURE 2.1 EXISTING WEEKDAY PM AND SATURDAY PEAK HOUR TRAFFIC COUNTS

10 8 FIGURE 3.1 CONCEPTUAL SITE PLAN

11 9 3.1 Trip Generation The expected site generated trips from Phase 3 of the Ottawa Train Yards development were determined utilizing statistical data published by the Institute of Transportation Engineers (ITE) in the manual, Trip Generation, 8th Ed. The study has used the average trip rate for the Shopping Center land use, ITE Code 820. All land uses utilized the average trip rate for the weekday peak PM hour of the adjacent street traffic, and the peak Saturday hour. Table 3.2 presents the trip generation rates used in the analysis. TABLE 3.2 TRIP GENERATION RATES LAND USE Weekday Peak PM hr. TRIP RATES Saturday Peak hr. ITE Land Use Shopping Center 3.73 Trips/1000 ft Trips/1000 ft 2 The trips generation rates from Table 3.2 were applied to the total gross floor area of the retail space (Table 3.1), with the expected site generated trips shown in Table 3.3. TABLE 3.3 SITE GENERATED TRIPS LAND USE WEEKDAY PEAK PM HOUR SATURDAY PEAK HOUR Total Enter Exit Total Enter Exit Retail Centre (49%) 183 (51%) (52%) 225 (48%) 10 % Modal Share Total Trips Trip Generated Primary Trips and Pass-By Trips The site generated trips shown in Table 3.3 are divided into primary trips which are trips where the primary destination of trips are to/from the proposed retail development, and pass-by trips which can be defined as traffic already on the adjacent street, which stops off at the development while passing by on-route to its primary destination. Shopping centres are known to experience a high volume of pass-by trips. The Institute of Transportations Engineers (ITE) Trip Generation Handbook, March 2001, presents statistical data which shows that the pass-by trips from free-standing discount stores vary between 15 and 40 percent during a Saturday peak time period, with a higher pass-by trip experienced during a weekday peak PM

12 10 hour. Although this shopping centre development is located adjacent to two heavily travelled roadways, this study has assumed that 20 percent of the site trips for the proposed development are already on the road and passing by the site for both the weekday peak PM hour and Saturday peak hour. With the site adjacent to the major roads in the area, no diverted linked trips were considered. Table 3.3 shows the primary and pass-by site generated trips. TABLE 3.4 PRIMARY AND PASS-BY TRIPS UNIT TYPE WEEKDAY PEAK PM HR. SATURDAY PEAK HR. TOTAL ENTER EXIT TOTAL ENTER EXIT Primary Trips (80%) Pass-By Trips (20%) Total Trips The primary site generated trips were distributed onto the surrounding roads utilizing a combination of the existing commercial trip distribution from the site and background traffic volumes. Figure 3.2 shows the expected distribution of primary site trips for a weekday peak PM hour and peak Saturday hour. The pass-by trips are trips already passing by the site on their way to a primary destination other than the proposed Phase 3 development. The distribution of pass-by trips was determined from the volume of background traffic along the surrounding roads. Figure 3.3 shows the expected pass-by trips for the development for a weekday peak PM hour and peak Saturday hour. 4. TRANSPORTATION IMPACT The study will examine the operation of the site accesses and surrounding intersections using the Highway Capacity Software, which utilizes the intersection capacity analysis procedure as documented in the 2010 Highway Capacity Manual. For unsignalized intersections, the level of service of each lane movement is determined as a function of the delay of vehicles at the approach. The following relates the level of service of each lane movement with the expected delay at the approach. LEVEL OF SERVICE DELAY Level of Service A 0-10 sec./vehicle Little or No Delay Level of Service B >10-15 sec./vehicle Short Traffic Delays Level of Service C >15-25 sec./vehicle Average Traffic Delays Level of Service D >25-35 sec./vehicle Long Traffic Delays Level of Service E >35-50 sec./vehicle Very Long Traffic Delays Level of Service F >50 sec./vehicle Extreme Delays - Demand

13 11 FIGURE 3.2 WEEKDAY PEAK PM AND SATURDAY PEAK HOUR PRIMARY TRIPS

14 12 FIGURE 3.3 WEEKDAY PEAK PM AND SATURDAY PEAK HOUR PASS-BY TRIPS

15 13 The expected length of queue at the critical lane movements for an unsignalized intersection was determined by the calculation of the 95 th percentile queue at the lane approach. The 95 th percentile queue length is the calculated 95 th greatest queue length out of 100 occurrences at a movement during a 15-minute peak period. The 95 th percentile queue length is a function of the capacity of a movement and the total expected traffic, with the calculated value determining the magnitude of the queue by representing the queue length as fractions of vehicles. For a signalized intersection, the operation or level of service of an intersection is determined from the volume to capacity ratio (v/c) for each lane movement as documented by the City of Ottawa in the Assessment Guidelines, October The following relates the level of service with the volume to capacity ratio at each lane movement. LEVEL OF SERVICE VOLUME TO CAPACITY RATIO Level of Service A 0 to 0.60 Level of Service B 0.61 to 0.70 Level of Service C 0.71 to 0.80 Level of Service D 0.81 to 0.90 Level of Service E 0.91 to 1.00 Level of Service F > Background Traffic Volumes The background traffic volumes represent traffic along the surrounding roads which is not associated with the Phase 3 development of the Ottawa Train Yards. The background traffic volumes were determined for the expected build out at the year The 2015 background traffic includes the retail development of Phase 2 which is currently being constructed but is not accounted for in the existing traffic counts. A new Belfast Road entrance has been constructed by the City of Ottawa to access the proposed Ottawa articulated bus garage facility which is located at the east limit of the Ottawa Train Yards development. The Ottawa Train Yards east development (Phases 2 and 3) will share the Belfast Road access with the OC Transpo buses. The number of buses using the access was determined from the New Articulated Bus Garage Facility at 735 Industrial Avenue Ottawa, Traffic Assessment Report dated March 2011 and prepared by the IBI Group. A portion of the Phase 2 site trips were proportioned to the Belfast Road access, as well as to the proposed Industrial Avenue access which will be constructed under Phase 3. Historical traffic counts along the surrounding roads in the area determined that the background traffic volumes were increasing at a rate of approximately 0.7 percent per year. To determine the year 2015 and 2020 background traffic volumes, the existing traffic counts from Figure 2.1 were increased at 1.0 percent per year which was applied to the eastbound/westbound Belfast Road through movements at the Belfast/Trainyards intersection, and eastbound/westbound Industrial Avenue through movements at the Industrial/Trainyards intersection. All traffic movements at the St. Laurent/Belfast, St. Laurent/Industrial and Industrial/Russell intersections were increased at an annual rate of 1.0 percent. Since a large portion of the traffic along Trainyards Drive is related to the Ottawa Train Yards shopping centre and would not experience the same growth as

16 14 would the background commuter traffic, the 1.0 percent annual growth for all turning movements from Belfast Road and Industrial Avenue onto Trainyards Drive and traffic along Trainyards Drive were reduced to 50 percent for the weekday peak hour, and to 30 percent for the peak Saturday hour. This would represent the increase in the traffic which is not related to the Ottawa Train Yards shopping centre. Figure 4.1 shows the expected year 2015 background traffic volumes for the weekday peak PM hour and Saturday peak hour, and Figure 4.2 the year 2020 background traffic volumes. 4.2 Total Traffic Volumes The total future peak hour traffic volumes were determined by the sum of the background traffic volumes (Figure 4.1 for the 2015 volumes and Figure 4.2 for the 2020 volumes), the expected site generated trips (Figure 3.2), and the pass-by trips (Figure 3.3). The result would be the expected total 2015 weekday peak PM hour and Saturday peak hour traffic volumes shown in Figure 4.3, and the total 2020 traffic volumes shown in Figure Traffic Analysis The study has examined the operation of the intersections listed below which will be discussed in detail in the following sections: Proposed Site Access onto Industrial Avenue Belfast Road Access (OC Transpo access) Site Access (Railmarket Private) onto Trainyards Drive Industrial/Trainyards Intersection Trainyards/Terminal Intersection Belfast/Trainyards Intersection Industrial/Russell Intersection St. Laurent/Industrial Intersection St. Laurent/Belfast Intersection Proposed Site Access onto Industrial Avenue The Site Plan proposes a full movement access onto Industrial Avenue. The intersection will be a T intersection with the southbound site exit approach comprising of exclusive right turn and left turn lanes. The following is the configuration of the intersection which was used in the year 2015 and 2020 analysis: Access - One exclusive left turn lane One exclusive right turn lane (45 metre of vehicular storage) Industrial - One shared left/through lane One through lane Industrial - One through lane One shared through/right lane

17 15 FIGURE WEEKDAY PM AND SATURDAY PEAK HOUR BACKGROUND TRAFFIC

18 16 FIGURE WEEKDAY PM AND SATURDAY PEAK HOUR BACKGROUND TRAFFIC

19 17 FIGURE WEEKDAY PM AND SATURDAY PEAK HOUR TOTAL TRAFFIC

20 18 FIGURE WEEKDAY PM AND SATURDAY PEAK HOUR TOTAL TRAFFIC

21 19 A traffic signal warrant analysis was completed using the year 2020 total peak PM hour traffic volumes (Figure 4.4). The warrant analysis, which is provided as Exhibit 1 in the Appendix, determined that for the expected weekday traffic volumes, the access intersection met 67 percent of the warrants for the installation of traffic control signals. Since the traffic volumes at the intersection are relatively high and a two-way stop controlled intersection would result in long queues and delays for exiting vehicles from the site, traffic signals are recommended and the analysis has assumed a signal controlled intersection for both the year 2015 and 2020 traffic volumes. The operational analysis determined that with two phase traffic signals and a 95 second (PM hour) and 99 second (Saturday peak hour) signal cycle, the intersection would operate at a Level of Service (LoS) A during both the weekday peak PM hour and Saturday peak hour. The southbound left and right turn movements would require 35 metres of vehicular storage. The proposed southbound right turn lane provides approximately 45 metres of vehicular storage. Table 4.1 summarizes the operation of the intersection, with the analysis sheets provided in the appendix as Exhibits 2 and 3 for the expected 2015 traffic volumes, and Exhibits 4 and 5 for the expected 2020 traffic volumes. TABLE 4.1 SITE ACCESS/INDUSTRIAL LoS and Volume/Capacity (v/c) Intersection Approach WEEKDAY PEAK PM HOUR YEAR (2015) 2020 SATURDAY PEAK HOUR YEAR (2015) 2020 LoS v/c LoS v/c SB - Access (A) A (0.21) 0.21 (A) A (0.24) 0.24 SB - Access (A) A (0.04) 0.04 (A) A (0.06) 0.06 EB /Through - Industrial (C) C (0.75) 0.78 (A) A (0.38) 0.39 WB /Through - Industrial (A) A (0.53) 0.55 (A) A (0.40) 0.41 Total Intersection LoS (A) A (0.57) 0.59 (A) A (0.35) 0.39 Site Access (OC Transpo Access) onto Belfast Road The City of Ottawa has constructed an access point onto Belfast Road which will provide access to the new articulated bus garage facility at 735 Industrial Avenue. The access will also provide access to Phase 2 and 3 of the Ottawa Train Yards shopping centre. The Belfast Road access will be located approximately 560 metres west of St. Laurent Boulevard, and will be controlled by traffic signals. The following is the configuration of the intersection as documented in the IBI Group Traffic Assessment Report. The intersection configuration was used for both the year 2015 and 2020 analysis:

22 20 Access - Egress - Belfast - Belfast - One exclusive left turn lane One exclusive right turn lane One exclusive left turn lane (OC Transpo driveway exit only) One exclusive right turn lane One shared through/right lane One exclusive left turn lane One through lane The analysis has utilized the expected bus traffic as documented in the IBI Group Traffic Assessment Report, plus the expected site traffic from both Phase 2 and 3 of the Ottawa Train Yards. The operational analysis has assumed two phase traffic signals with a cycle length of 99 seconds for the weekday peak PM hour and 92 seconds for the peak Saturday hour (corresponds with the signal phasing at Belfast Road and Trainyards Drive). The analysis determined that the intersection would function at a LoS B during the peak PM hour and a LoS A during the expected traffic volumes at both the years 2015 and Table 4.2 summarizes the operation of the Belfast Road access, with the operational analysis provided as Exhibits 6 and 7 for the year 2015, and 8 and 9 for the year TABLE 4.2 SITE ACCESS/BELFAST LoS and Volume/Capacity (v/c) Intersection Approach WEEKDAY PEAK PM HOUR YEAR (2015) 2020 SATURDAY PEAK HOUR YEAR (2015) 2020 LoS v/c LoS v/c NB - Access (A) A (0.43) 0.43 (A) A (0.19) 0.19 NB - Access (A) A (0.14) 0.14 (A) A (0.13) 0.13 SB OC Transpo driveway (C) C (0.80) 0.80 (A) A (0.00) 0.00 SB - OC Transpo driveway (A) A (0.57) 0.57 (A) A (0.00) 0.00 EB Through/ - Belfast (B) B (0.68) 0.70 (A) A (0.43) 0.45 WB - Access (A) A (0.24) 0.24 (A) A (0.17) 0.17 WB Through - Through (A) A (0.29) 0.30 (A) A (0.14) 0.15 Total Intersection LoS (B) B (0.65) 0.66 (A) A (0.37) 0.38 Site Access (Railmarket Private) onto Trainyards Drive The proposed site will utilize the site access which was constructed under Phase 2 of the Ottawa Train Yards. The access forms the westbound approach to Trainyards Drive, with Railmarket Private forming the eastbound approach. The analysis has examined the intersection utilizing the existing 2011 peak hour Saturday traffic counts taken by the City of Ottawa (weekday PM hour

23 21 counts were taken prior to the completion of Phase 2). The analysis has utilized the existing intersection geometry and the traffic signal timing plan obtained from the City of Ottawa. The analysis determined that the intersection currently functions at a LoS C during the peak Saturday hour with a signal cycle length of 75 seconds. With some adjustments to the signal timing and maintaining the 75 second signal cycle, the intersection would function at a LoS B at the years 2015 and For the expected weekday peak PM hour traffic volumes, the intersection would function at a LoS A at the years 2015 and 2020 using the 80 second signal cycle as per the timing plan. The southbound Trainyards Drive left turn lane provides approximately 55 metres of vehicular storage which is sufficient to accommodate the expected 2020 traffic volumes. There would be no requirement for modifications to the intersection due to the proposed development. Table 4.3 summarizes the operation of the intersection, with the analysis sheets provided in the Appendix as Exhibits 10 to 14. TABLE 4.3 SITE ACCESS/TRAINYARDS (RAILMARKET) LoS and Volume/Capacity (v/c) Intersection Approach WEEKDAY PEAK PM HOUR YEAR 2011 (2015) 2020 SATURDAY PEAK HOUR YEAR 2011 (2015) 2020 LoS v/c LoS v/c NB - Trainyards (A) A (0.24) 0.25 A (A) A 0.01 (0.11) 0.11 NB Through/ - Trainyards (A) A (0.46) 0.47 A (B) B 0.59 (0.64) 0.65 SB Trainyards (A) A (0.17) 0.19 A (A) A 0.45 (0.35) 0.35 SB Through - Trainyards (A) A (0.41) 0.43 A (A) A 0.23 (0.27) 0.27 SB -Trainyards (A) A (0.06) 0.06 A (A) A 0.25 (0.29) 0.29 EB - Railmarket (A) A (0.22) 0.23 A (A) A 0.50 (0.47) 0.47 EB Through/ - Railmarket (B) B (0.61) 0.62 C (C) C 0.75 (0.71) 0.72 WB - Access (A) A (0.53) 0.54 E (C) C 0.96 (0.78) 0.79 WB Through/ - Access (A) A (0.44) 0.44 A (A) A 0.44 (0.45) 0.45 Total Intersection LoS (A) A (0.52) 0.53 C (B) B 0.76 (0.68) 0.69 Industrial Avenue and Trainyards Drive Intersection The Industrial/Trainyards intersection is controlled by traffic signals, with Industrial Avenue forming the eastbound and westbound approaches, Trainyards Drive the southbound approach, and the Metro driveway the northbound approach. The intersection currently (2010 counts) functions at a LoS C during the weekday peak PM hour and a LoS B during the peak Saturday hour (2011 counts). At the years 2015 and 2020 the intersection is expected to function at a LoS D during the peak PM hour and a LoS C during the peak Saturday hour. The

24 22 eastbound Industrial Avenue left turn lane would require approximately 70 metres of vehicular storage with 100 metres provided. There would be no requirement for modifications to the intersection except for minor adjustments to the signal timing. Table 4.4 summarizes the operation of the intersection, with the analysis sheets provided as Exhibits 15 to 20. TABLE 4.4 INDUSTRIAL/TRAINYARDS LoS and Volume/Capacity (v/c) Intersection Approach WEEKDAY PEAK PM HOUR YEAR 2010 (2015) 2020 SATURDAY PEAK HOUR YEAR 2011 (2015) 2020 LoS v/c LoS v/c NB /Through/ - Metro A (A) A 0.01 (0.01) 0.01 A (A) A 0.00 (0.00) 0.00 SB /Through Trainyards E (D) D 0.92 (0.84) 0.86 C (B) B 0.71 (0.64) 0.65 SB -Trainyards A (A) A 0.16 (0.17) 0.18 A (A) A 0.28 (0.31) 0.32 EB - Industrial A (A) B 0.44 (0.57) 0.61 C (B) C 0.71 (0.69) 0.72 EB Through/ - Industrial A (A) A 0.44 (0.46) 0.48 A (A) A 0.15 (0.18) 0.19 WB - Industrial A (A) A 0.05 (0.06) 0.07 A (A) A 0.00 (0.00) 0.00 WB Through/ - Industrial B (C) D 0.64 (0.77) 0.81 A (B) B 0.53 (0.61) 0.63 Total Intersection LoS C (D) D 0.78 (0.81) 0.83 B (B) B 0.65 (0.68) 0.69 Trainyards Drive and Terminal Avenue Intersection The intersection of Trainyards Drive and Terminal Avenue is controlled by three phase traffic signals which has an 80 second signal cycle during the peak PM hour and a peak Saturday hour cycle of 75 seconds. The operational analysis determined that the intersection currently functions at a LoS A during the peak PM and Saturday peak hours, and will continue to function at a LoS A at the years 2015 and There would be no requirement for modifications to the intersection due to the proposed development. Table 4.5 summarizes the operation of the intersection, with the analysis sheets provided as Exhibits 20 to 26. Belfast Road and Trainyards Drive Intersection The intersection of Belfast Road and Trainyards Drive is a T intersection with Belfast Road forming the eastbound and westbound approaches and Trainyards Drive the northbound approach. The intersection is controlled by traffic signals. Utilizing the peak PM hour and peak Saturday counts along with the traffic signal timing plan, the intersection currently functions at a LoS A. The intersection will continue to function at a LoS A at the years 2015 and There would be no requirement for modifications to the

25 23 intersection due to the development. Table 4.6 summarizes the operation of the intersection, with the analysis sheets provided as Exhibits 27 to 32. TABLE 4.5 TRAINYARDS/TERMINAL LoS and Volume/Capacity (v/c) Intersection Approach WEEKDAY PEAK PM HOUR YEAR 2010 (2015) 2020 SATURDAY PEAK HOUR YEAR 2011 (2015) 2020 LoS v/c LoS v/c NB - Trainyards A (A) A 0.18 (0.27) 0.28 A (A) A 0.22 (0.18) 0.18 NB Through/ - Trainyards A (A) A 0.19 (0.23) 0.24 A (A) A 0.19 (0.18) 0.18 SB /Through Trainyards A (A) A 0.35 (0.55) 0.56 A (A) A 0.65 (0.53) 0.54 SB -Trainyards A (A) A 0.14 (0.15) 0.16 A (A) A 0.04 (0.04) 0.05 EB - Terminal A (A) B 0.23 (0.24) 0.24 A (A) A 0.28 (0.28) 0.28 EB Through/ - Terminal A (A) A 0.13 (0.14) 0.14 A (A) A 0.24 (0.25) 0.25 WB /Through/ - Access A (A) A 0.05 (0.05) 0.05 A (A) A 0.02 (0.02) 0.02 Total Intersection LoS A (A) A 0.26 (0.36) 0.37 A (A) A 0.40 (0.35) 0.35 TABLE 4.6 BELFAST/TRAINYARDS LoS and Volume/Capacity (v/c) Intersection Approach WEEKDAY PEAK PM HOUR YEAR 2010 (2015) 2020 SATURDAY PEAK HOUR YEAR 2011 (2015) 2020 LoS v/c LoS v/c NB - Trainyards A (A) A 0.34 (0.40) 0.41 A (A) A 0.23 (0.25) 0.25 NB - Trainyards A (A) A 0.38 (0.41) 0.43 A (A) A 0.13 (0.08) 0.09 EB Through - Belfast A (A) A 0.33 (0.44) 0.46 A (A) A 0.19 (0.33) 0.35 EB - Belfast A (A) A 0.27 (0.38) 0.39 A (A) A 0.30 (0.21) 0.21 WB - Belfast A (A) A 0.38 (0.40) 0.41 A (A) A 0.23 (0.15) 0.15 WB Through - Belfast A (A) A 0.10 (0.12) 0.13 A (A) A 0.05 (0.07) 0.07 Total Intersection LoS A (A) A 0.46 (0.51) 0.53 A (A) A 0.34 (0.31) 0.32

26 24 Industrial Avenue and Russell Road Intersection The Industrial/Russell intersection is controlled by traffic signals with Industrial Avenue forming the eastbound and westbound approaches, Russell Road the northbound approach, and the City of Ottawa facility the southbound approach which will also be the access to the articulated bus garage at 735 Industrial Avenue. The operational analysis was conducted only for the peak PM hour since peak Saturday hour traffic counts are not available from the City of Ottawa. Counts at the Industrial/Trainyards intersection showed that Saturday counts were substantially lower than weekday peak PM hour counts. The operational analysis determined that the intersection currently functions at a LoS C using the peak PM hour 2011 traffic counts. Due to the increasing traffic volumes along Industrial Avenue, the intersection was determined to function at a LoS D during the peak PM hour at the years 2015 and No modifications are required at the intersection due to the development. Traffic signal timing adjustments are recommended to handle the expected traffic at the year 2015 and Table 4.7 summarizes the operation of the intersection, with the analysis sheets provided as Exhibits 33, 34 and 35. TABLE 4.7 INDUSTRIAL/RUSSELL LoS and Volume/Capacity (v/c) Intersection Approach WEEKDAY PEAK PM HOUR YEAR 2011 (2015) 2020 SATURDAY PEAK HOUR YEAR 2011 (2015) 2020 LoS v/c LoS v/c NB /Through - Russell B (C) C 0.66 (0.75) SB /Through City Yards A (A) A 0.05 (0.10) EB - Industrial A (A) A 0.03 (0.04) EB Through - Industrial C (C) D 0.76 (0.80) WB - Industrial D (D) D 0.81 (0.85) WB Through - Industrial A (A) A 0.33 (0.35) Total Intersection LoS C (D) D 0.76 (0.83) St. Laurent Boulevard and Industrial Avenue (Innes Road) Intersection The intersection of St. Laurent/Industrial is controlled by traffic signals with St. Laurent Boulevard forming the northbound and southbound approaches, Industrial Avenue the eastbound approach, and Innes Road the westbound approach. With only weekday peak PM hour traffic

27 25 counts available from the City of Ottawa and the weekday traffic greater than Saturday traffic, the analysis has completed only a weekday peak PM hour analysis of the intersection. The existing 2011 traffic counts determined that the St. Laurent/Industrial intersection currently functions at a LoS F with vehicular delays at all intersection approaches. As traffic volumes continue to increase along the arterial roads, the intersection will continue to operate at a LoS F for the expected 2015 and 2020 traffic volumes. Traffic from the proposed development would contribute little to the operation of the intersection, with no requirements for modifications due to the development of Phase 3 of the Ottawa Train Yards site. Table 4.8 summarizes the operation of the intersection, with the analysis sheets provided as Exhibits 36, 37 and 38. TABLE 4.8 ST. LAURENT/INDUSTRIAL (INNES) LoS and Volume/Capacity (v/c) Intersection Approach WEEKDAY PEAK PM HOUR YEAR 2011 (2015) 2020 SATURDAY PEAK HOUR YEAR 2011 (2015) 2020 LoS v/c LoS v/c NB St. Laurent F (F) F 1.40 (1.55) NB Through - St. Laurent F (F) F 1.53 (1.59) SB St. Laurent E (F) F 0.99 (1.03) SB Through - St. Laurent F (F) F 1.03 (1.07) EB - Industrial A (A) A 0.46 (0.48) EB Through - Industrial E (F) F 0.97 (1.04) WB - Industrial F (F) F 1.13 (1.17) WB /Through - Industrial F (F) F 1.17 (1.24) Total Intersection LoS F (F) F 1.80 (2.11) St. Laurent Boulevard and Belfast Road Intersection The intersection of St. Laurent Boulevard and Belfast Road is controlled by traffic signals, with St. Laurent Boulevard forming the northbound and southbound approaches and Belfast Road the eastbound and westbound approaches. All approaches have a channelized right turn lane. The 2010 and 2011 traffic counts from the City of Ottawa determined that the St. Laurent/Belfast intersection functioned at a LoS A for both the weekday peak PM hour and Saturday peak hour. Following the development of Phase 3, the intersection would function at a LoS B during the 2015 and 2020 peak PM hour and a LoS A during the 2015 and 2020 Saturday peak hour. There would be no requirement for modifications to the intersection due to the

28 26 development. Table 4.9 summarizes the operation of the intersection, with the analysis sheets provided as Exhibits 39 to 44. TABLE 4.9 ST. LAURENT/BELFAST LoS and Volume/Capacity (v/c) Intersection Approach WEEKDAY PEAK PM HOUR YEAR 2010 (2015) 2020 SATURDAY PEAK HOUR YEAR 2011 (2015) 2020 LoS v/c LoS v/c NB St. Laurent A (A) A 0.22 (0.23) 0.25 A (A) A 0.31 (0.34) 0.36 NB Through - St. Laurent A (B) B 0.60 (0.63) 0.66 A (B) B 0.59 (0.61) 0.64 SB St. Laurent A (A) A 0.13 (0.14) 0.15 A (A) A 0.14 (0.15) 0.16 SB Through - St. Laurent A (A) A 0.38 (0.40) 0.42 A (B) B 0.60 (0.62) 0.65 EB - Belfast A (A) A 0.28 (0.37) 0.39 A (A) A 0.41 (0.50) 0.53 EB Through - Belfast A (A) A 0.19 (0.20) 0.21 A (A) A 0.11 (0.12) 0.13 WB - Belfast B (C) C 0.67 (0.72) 0.76 A (A) A 0.15 (0.15) 0.16 WB Through - Belfast A (A) A 0.38 (0.40) 0.42 A (A) A 0.23 (0.24) 0.25 Total Intersection LoS A (B) B 0.60 (0.65) 0.69 A (A) A 0.54 (0.58) Site Circulation The site plan provides an efficient movement of vehicles through the site and at the three accesses from the parking lot to the municipal road system. Direct access to Trainyards Drive, Belfast Road and Industrial Avenue would be from full movement signalized intersections. Pedestrian movement throughout the site would be from an internal sidewalk system and cross walks which would provide the safe movement of pedestrians. 4.5 Pedestrian, Cycling, and Transit Facilities The proposed development has provided sidewalks linking the stores and the development to the existing sidewalk along the north side of Industrial Avenue and east side of Trainyards Drive. A sidewalk is also provided along the new Belfast Road access to Belfast Road. Cycling traffic will be accommodated along the internal road system with direct connection to the mixed use pathway located along the east side of Trainyards Drive between Belfast Road and Industrial Avenue.

29 27 The site is service by regular transit route 121 which travels along Belfast Road and through the site along the Belfast Road bus access to Industrial Avenue at Russell Road. The route provides access to additional service routes at Hurdman Station and additional routes along St. Laurent Boulevard. 5. FINDINGS AND RECOMMENDATIONS The Ottawa Train Yards Inc. has prepared a Site Plan showing additional retail on the lands east of Trainyards Drive. The development is Phase 3 of the shopping centre and would comprise of various retail pads which front onto Industrial Avenue. The development proposes a new full movement access onto Industrial Avenue, and would utilize the existing Trainyards Drive access and share the new Belfast Road access constructed by the City of Ottawa for access to the new articulated bus garage. The development is expected to be completed and substantially occupied by the year The report is being prepared in support of the Site Plan Application. The findings and recommendations of the study are summarized in the following: 1) The proposed development would generate 322 new weekday peak PM hour trips and 422 new trips during the Saturday peak hour. Some of these trips would be shared with other retail within the Ottawa Train Yards shopping centre. 2) The proposed Phase 3 development will include the construction of a new full movement access point onto Industrial Avenue, and a connection to the Belfast Road access which has been constructed by the City of Ottawa and will be shared with OC Transpo buses. The additional accesses onto Industrial Avenue and Belfast Road will reduce the traffic volumes onto Trainyards Drive from both Phase 2 and 3 of the shopping centre. 3) The traffic analysis for Phase 3 of the Ottawa Train Yards shopping centre examined the impact of the development on the surrounding roads at build out of the development at the year 2015, and at a period of five years beyond build out at the year The time period of the analysis was the weekday peak PM hour and the Saturday peak hour which was considered to generate the highest volume of site trips. 4) The analysis examined intersections and site access points within approximately one kilometre of the development, and assessed the impact of the expected site generated trips at the intersections. The study determined roadway improvements at the following intersections: Proposed Site Access onto Industrial Avenue Addition of traffic control signals. Site Access (Railmarket Private) onto Trainyards Drive Adjust signal timing plan.

30 28 Industrial Avenue and Trainyards Drive Intersection Adjust signal timing plan. Industrial Avenue and Russell Road Intersection Adjust signal timing plan. 5) A Check List is provided in the Appendix as Exhibit 45. Prepared by: David J. Halpenny, P. Eng.

31 29 APPENDIX TRAFFIC SIGNAL WARRANT ANALYSIS OPERATIONAL ANALYSIS WORK SHEETS TRANSPORTATION IMPACT STUDY CHECK LIST

32 30 EXHIBIT 1 YEAR 2020 TRAFFIC SIGNAL WARRANT ANALYSIS Site Access/Industrial

33 31 EXHIBIT 2 YEAR 2015 PEAK PM HOUR ANALYSIS Site Access/Industrial Inter.: Industrial/Site Access Period: Peak PM Hour Year: Year 2015 E/W St: Industrial Avenue N/S St: Site Access No. Lanes LGConfig LT TR L R Volume Lane Width RTOR Vol 0 15 EB P NB Thru P Thru Peds Peds X WB SB A Thru P Thru P A NB EB SB WB Green Yellow All Red Cycle Length: 95.0 secs Thru LT # Thru TR Thru L # Thru R Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.51 Total lost time per cycle, L = sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.57

34 32 EXHIBIT 3 YEAR 2015 PEAK SATURDAY HOUR ANALYSIS Site Access/Industrial Inter.: Industrial/Site Access Period: Peak Saturday Hour Year: Year 2015 E/W St: Industrial Avenue N/S St: Site Access No. Lanes LGConfig LT TR L R Volume Lane Width RTOR Vol 0 15 EB P NB Thru P Thru Peds Peds X WB SB A Thru P Thru P A NB EB SB WB Green Yellow All Red Cycle Length: 99.0 secs Thru LT Thru TR # Thru L # Thru R Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.31 Total lost time per cycle, L = sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.35

35 33 EXHIBIT 4 YEAR 2020 PEAK PM HOUR ANALYSIS Site Access/Industrial Inter.: Industrial/Site Access Period: Peak PM Hour Year: Year 2020 E/W St: Industrial Avenue N/S St: Site Access No. Lanes LGConfig LT TR L R Volume Lane Width RTOR Vol 0 15 EB P NB Thru P Thru Peds Peds X WB SB A Thru P Thru P A NB EB SB WB Green Yellow All Red Cycle Length: 95.0 secs Thru LT # Thru TR Thru L # Thru R Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.53 Total lost time per cycle, L = sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.59

36 34 EXHIBIT 5 YEAR 2020 PEAK SATURDAY HOUR ANALYSIS Site Access/Industrial Inter.: Industrial/Site Access Period: Peak Saturday Hour Year: Year 2020 E/W St: Industrial Avenue N/S St: Site Access No. Lanes LGConfig LT TR L R Volume Lane Width RTOR Vol 0 15 EB P NB Thru P Thru Peds Peds X WB SB A Thru P Thru P A NB EB SB WB Green Yellow All Red Cycle Length: 99.0 secs Thru LT Thru TR # Thru L # Thru R Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.32 Total lost time per cycle, L = sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.36

37 35 EXHIBIT 6 YEAR 2015 PEAK PM HOUR ANALYSIS Site Access/Belfast Inter.: Belfast/Site Access Period: Peak PM Hour Year: Year 2015 E/W St: Belfast Road N/S St: Site Access (OC Transpo Access) No. Lanes LGConfig TR L T L R L R Volume Lane Width RTOR Vol EB NB A Thru P Thru P A WB A P SB A Thru A P Thru A Peds X X Peds X NB EB SB WB Green Yellow All Red Cycle Length: 99.0 secs Thru TR # # L Thru T L Thru R L # Thru R Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.57 Total lost time per cycle, L = sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.65

38 36 EXHIBIT 7 YEAR 2015 PEAK SATURDAY HOUR ANALYSIS Site Access/Belfast Inter.: Belfast/Site Access Period: Peak Saturday Hour Year: Year 2015 E/W St: Belfast Road N/S St: Site Access (OC Transpo Access) No. Lanes LGConfig TR L T L R L R Volume Lane Width RTOR Vol EB NB A Thru P Thru P A WB A P SB A Thru A P Thru A Peds X X Peds X NB EB SB WB Green Yellow All Red Cycle Length: 92.0 secs Thru TR # # L Thru T L # Thru R L Thru R Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.33 Total lost time per cycle, L = sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.37

39 37 EXHIBIT 8 YEAR 2020 PEAK PM HOUR ANALYSIS Site Access/Belfast Inter.: Belfast/Site Access Period: Peak PM Hour Year: Year 2020 E/W St: Belfast Road N/S St: Site Access (OC Transpo Access) No. Lanes LGConfig TR L T L R L R Volume Lane Width RTOR Vol EB NB A Thru P Thru P A WB A P SB A Thru A P Thru A Peds X X Peds X NB EB SB WB Green Yellow All Red Cycle Length: 99.0 secs Thru TR # # L Thru T L Thru R L # Thru R Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.58 Total lost time per cycle, L = sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.66

40 38 EXHIBIT 9 YEAR 2020 PEAK SATURDAY HOUR ANALYSIS Site Access/Belfast Inter.: Belfast/Site Access Period: Peak Saturday Hour Year: Year 2020 E/W St: Belfast Road N/S St: Site Access (OC Transpo Access) No. Lanes LGConfig TR L T L R L R Volume Lane Width RTOR Vol EB NB A Thru P Thru P A WB A P SB A Thru A P Thru A Peds X X Peds X NB EB SB WB Green Yellow All Red Cycle Length: 92.0 secs Thru TR # # L Thru T L # Thru R L Thru R Sum of flow ratios for critical lane groups, Yc = Sum (v/s) = 0.34 Total lost time per cycle, L = sec Critical flow rate to capacity ratio, Xc = (Yc)(C)/(C-L) = 0.38

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Momentum Planning & Communications 1165 Greenlawn Crescent Ottawa, ON K1L 6C2 June 29, 2015 115-618 Brief_1.doc

More information

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: ORLEANS GARDENS SHOPPING CENTRE 1615 ORLEANS BOULEVARD CITY OF OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: Orleans Gardens Shopping Centre Inc. 2851 John Street, Suite 1 Markham, ON K3R 5R7

More information

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for: HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October

More information

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: 1649362 Ontario Inc. c/o Manor Park Management 231 Brittany Drive, Suite D Ottawa ON K1K 0R8 July

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for: NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony

More information

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates

More information

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Quickie Convenience Stores Larny Holdings Ltd. c/o PBC Group April 15, 2015 115-615 Report_1.doc D. J. Halpenny

More information

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 February 27, 2014 113-584 Overview_1.doc D. J. Halpenny

More information

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc

More information

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: First Bay Properties Inc. 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 August 8, 2017 117-663 Brief_1.doc

More information

BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: Ontario Limited.

BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: Ontario Limited. BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: 2534189 Ontario Limited April 6, 2018 117-668 TIA Report_2.doc D. J. Halpenny & Associates

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY DECEMBER 2012 READ, VOORHEES & ASSOCIATES TORONTO, ONTARIO Read, Voorhees & Associates

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for oad & Traffic Management Road & Traffic Management R Atlantic Traffic Engineering Specialists Draft Report Traffic Impact Study Superstore, Wal-Mart, and Kent Development Yarmouth, Nova Scotia Prepared

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited

2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief. Paradigm Transportation Solutions Limited 2136 And 2148 Trafalgar Road Townhouse Development Traffic Brief Paradigm Transportation Solutions Limited March 217 March 217 Project: 1627 Diana Vlasic, M.C.I.P., R.P.P Metropolitan Consulting 445 Paletta

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

List of Exhibits...ii

List of Exhibits...ii One Brickell Traffic Study TABLE OF CONTENTS List of Exhibits...ii EXECUTIVE SUMMARY...1 1. INTRODUCTION...2 1.1 Study Area...2 1.2 Study Objective...5 2. EXISTING TRAFFIC CONDITIONS...6 2.1 Data Collection...6

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged. Stantec Consulting Ltd. 1331 Clyde Avenue, Suite 4 Ottawa ON K2C 3G4 Tel: (613) 722-442 Fax: (613) 722-2799 May 14, 213 File: 1638823 Robinson Park Development Corp. 5699 Power Road Ottawa, ON, K1G 3N4

More information

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study

More information

Troutbeck Farm Development

Troutbeck Farm Development Troutbeck Farm Development Willistown Township, Chester County PA For Submission To: Willistown Township Last Revised: October, 4 TPD# INLM.A. 5 E. High Street Suite 65 Pottstown, PA 9464 6.36.3 TPD@TrafficPD.com

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY TRAFFIC IMPACT STUDY for the GLEN ELLEN COUNTRY CLUB SENIOR RESIDENTIAL REDEVELOPMENT 84 Millis, Massachusetts Prepared by: McMahon Associates, Inc. Prepared for: Toll Brothers, Inc. August 216 DRAFT

More information

CastleGlenn Consultants Inc.

CastleGlenn Consultants Inc. February 1 st, 2010 CastleGlenn Consultants Inc. Engineers, Project Managers & Planners Mr. Kevin Yemm Planning and Land Development Richraft Ltd. 2280 St. Laurent Boulevard Suite 201 Ottawa, Ontario (Tel:

More information

Having held a public hearing, that Council approve:

Having held a public hearing, that Council approve: 3. MODIFICATIONS TO MERIVALE ROAD FROM FALLOWFIELD ROAD TO OLD HIGHWAY 16 TO ACCOMMODATE THE GROWTH WITHIN THE SOUTH MERIVALE BUSINESS PARK - PUBLIC HEARING COMMITTEE RECOMMENDATIONS Having held a public

More information

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212

More information

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

COMMITTEE RECOMMENDATIONS. That Council approve:

COMMITTEE RECOMMENDATIONS. That Council approve: 4. MODIFICATIONS TO INNES ROAD (REGIONAL ROAD 30) AND TENTH LINE ROAD (REGIONAL ROAD 47) TO ACCOMMODATE THE DEVELOPMENT OF THE TRINITY COMMONS SHOPPING CENTRE COMMITTEE RECOMMENDATIONS That Council approve:

More information

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd. 9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major

More information

REDEVELOPMENT TRAFFIC IMPACT STUDY

REDEVELOPMENT TRAFFIC IMPACT STUDY REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport

More information

Parking Lot P6C Transportation Impact Assessment

Parking Lot P6C Transportation Impact Assessment Transportation Carleton University Parking Lot P6C Transportation Impact Assessment Prepared by: AECOM 302 1150 Morrison Drive 613 820 8282 tel Ottawa, ON, Canada K2H 8S9 613 820 8338 fax www.aecom.com

More information

EXECUTIVE SUMMARY. Page 1 of 6

EXECUTIVE SUMMARY. Page 1 of 6 EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,

More information

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677 Transportation Impact Analysis Sierra College Boulevard Commercial Project City of Rocklin Prepared for: David Mohlenbrok City of Rocklin 081 Alvis Court Rocklin, CA 95677 Prepared by: 1875 Olympic Boulevard,

More information

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina Prepared for Longbranch Development Prepared by January 13, 219 ii Table of Contents Subject Page Signature Page... i Table of Contents...

More information

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Date: April 16 th, 2015 To: From: Re: Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Darian Nagle-Gamm, Traffic Engineering Planner Highway 6 (2 nd Street) /

More information

Capital Region Council of Governments

Capital Region Council of Governments March 23, 2018 Capital Region Council of Governments PROJECT CONCEPT REPORT Realignment of Swamp and Northfield Road s approaches to Route 44 (Boston Turnpike) Town of Coventry SUMMARY: The Town of Coventry

More information

CPC Parking Lot Riverside Drive. Transportation Brief

CPC Parking Lot Riverside Drive. Transportation Brief CPC Parking Lot 2785 Riverside Drive Transportation Brief Prepared By: NOVATECH Suite 2, 24 Michael Cowpland Drive Ottawa, Ontario K2M P6 7 / 5 / 25 Novatech File: 49 Ref: R-25-22 July 5 th, 25 City of

More information

St. Stefan Serbian Orthodox Church 1989 and 1993 Prince of Wales Drive, Ottawa REVISED TRANSPORTATION BRIEF

St. Stefan Serbian Orthodox Church 1989 and 1993 Prince of Wales Drive, Ottawa REVISED TRANSPORTATION BRIEF St. Stefan Serbian Orthodox Church 1989 and 1993 Prince of Wales Drive, Ottawa REVISED TRANSPORTATION BRIEF Prepared By: NOVATECH ENGINEERING CONSULTANTS LTD. Suite 200, 240 Michael Cowpland Drive Ottawa,

More information

Traffic Study North Shore School District 112

Traffic Study North Shore School District 112 Traffic Study North Shore School District 112 Proposed Expansion of Northwood Junior High School Prepared By: May 1, 2015 1. Introduction Kenig, Lindgren, O Hara, Aboona, Inc. (KLOA, Inc.) has been retained

More information

Waterford Lakes Small Area Study

Waterford Lakes Small Area Study Waterford Lakes Small Area Study Existing Traffic Conditions PREPARED FOR: ORANGE COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION ORLANDO, FLORIDA PREPARED WITH: INWOOD CONSULTING ENGINEERS

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

Gateway Transportation Study

Gateway Transportation Study Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213 Back of

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc. Magnolia Place Traffic Impact Analysis Prepared for: City of San Mateo Prepared by: Hexagon Transportation Consultants, Inc. Updated January 4, 2010 Table of Contents 1. Introduction...1 2. Existing Conditions...6

More information

THE LANDMARK AT TALBOT PARK

THE LANDMARK AT TALBOT PARK TRAFFIC IMPACT STUDY FOR THE LANDMARK AT TALBOT PARK IN NORFOLK, VA INTERMODAL ENGINEERING, P.C. OCTOBER, 200 The Landmark at Talbot Park is a proposed redevelopment of the existing apartments along the

More information

Co-ordinator Transportation Committee. Director, Mobility Services and Corporate Fleet Services Environment and Transportation Department

Co-ordinator Transportation Committee. Director, Mobility Services and Corporate Fleet Services Environment and Transportation Department 28 REGIONAL MUNICIPALITY OF OTTAWA-CARLETON MUNICIPALITÉ RÉGIONALE D OTTAWA-CARLETON REPORT RAPPORT Our File/N/Réf. Your File/V/Réf. 25 23-97-R016 DATE 15 April 1997 TO/DEST. FROM/EXP. SUBJECT/OBJET Co-ordinator

More information

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 151714A Table of Contents Table of Contents I. INTRODUCTION... 2 II. EXISTING CONDITIONS... 5 III. 215 EXISTING TRAFFIC CONDITIONS... 6

More information

Traffic Impact Statement

Traffic Impact Statement Traffic Impact Statement Mixed Use Development, US 41 and Old Trail Drive aka Tide-Starbucks 4900 9 th Street North General Development Site Plan (GDSP) Collier County, FL 10/6/2015 Prepared for: Prepared

More information

Road Conversion Study Plumas Street

Road Conversion Study Plumas Street Plumas Street Phase I Submitted to The Regional Transportation Commission of Washoe County Submitted by Zong Tian, Ph.D., P.E. Saeedeh Farivar Haiyuan Li, Ph.D. Center for Advanced Transportation Education

More information

Donahue Drive Corridor Traffic Operational Evaluation

Donahue Drive Corridor Traffic Operational Evaluation Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

AMEC Earth and Environmental. Bovaird Drive Environmental Assessment. Traffic Study Final Report. August Excellence in Transportation Planning

AMEC Earth and Environmental. Bovaird Drive Environmental Assessment. Traffic Study Final Report. August Excellence in Transportation Planning AMEC Earth and Environmental Bovaird Drive Environmental Assessment Traffic Study Final Report August Excellence in Transportation Planning AMEC Earth and Environmental Bovaird Drive Class EA Traffic

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

485 Ancaster Avenue. Transportation Impact Assessment. Engineering. Planning. Landscape Architecture

485 Ancaster Avenue. Transportation Impact Assessment. Engineering. Planning. Landscape Architecture Engineering Land / Site Development Municipal Infrastructure Environmental / Water Resources Traffic / Transportation Structural Recreational 485 Ancaster Avenue Transportation Impact Assessment Planning

More information

3.2.2 Proposed Road Network within Phase 1B Lands

3.2.2 Proposed Road Network within Phase 1B Lands 3.2.2 Proposed Road Network within Phase 1B Lands Figure 3.1 also shows the proposed road network within the Premier Gateway Phase 1B Employment Area lands, which features two collector roads providing

More information

TRANSPORTATION IMPACT STUDY

TRANSPORTATION IMPACT STUDY Dundas MEP Developments Inc. City of Toronto 219 and 231 Dundas Street East, Proposed Mixed-Use Development TRANSPORTATION IMPACT STUDY 9782/2 April 216 LEA Consulting Ltd. Consulting Engineers & Planners

More information

Proposed Addition to Pickering Islamic Centre

Proposed Addition to Pickering Islamic Centre TRAFFIC IMPACT STUDY, PARKING STUDY, SITE CIRCULATION REVIEW & TDM PLAN Proposed Addition to Pickering Islamic Centre 265 Brock Road City of Pickering, Ontario Prepared for: Pickering Islamic Centre Masjid

More information

FORM A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION

FORM A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION FORM 901.3.A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION The following information is required from all applicants directly or indirectly accessing any collector or arterial road or as otherwise

More information

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS...

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... IX 1 INTRODUCTION... 1 1.1 Project Overview... 1 1.2 Analysis Scenarios...

More information

Fieldgate. Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton

Fieldgate. Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton Fieldgate Traffic Impact Study Proposed Retail Commercial and Residential Development Thompson Road and Louis St. Laurent Avenue Town of Milton September 214 September 23 214 Ms Debbie Pacchiarotti Our

More information

Grant Avenue Streetscape

Grant Avenue Streetscape REPORT TYPE GOES HERE Grant Avenue Streetscape PREPARED FOR City of Manassas 9027 Center Street Manassas, VA 20110 PREPARED BY 8300 Boone Boulevard Suite 700 Vienna, Virginia 22182 571.389.8121 July 31,

More information

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT November 2016 TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT & Aspinwall Borough, Sharpsburg Borough & O Hara Township, Allegheny County, Pennsylvania Prepared for: Riverfront

More information

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748 City of Barrie Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report Project Number: JDE 1748 Date Submitted: June 12 th, 2017 06/12/17 John Northcote, P.Eng. Professional License

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY 675 Millcreek Drive, Unit 1 Mississauga, Ontario L5N 5M4 T: 416.213.7121 F: 95.89.8499 www.transtech.co TRAFFIC IMPACT STUDY PROPOSED MOSQUE DEVELOPMENT 4269 REGIONAL ROAD 25 TOWN OF OAKVILLE PREPARED

More information

Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico

Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico INSTITUTE OF TRANSPORTATION ENGINEERS 2016 WESTERN DISTRICT MEETING JULY 11, 2016 7/11/2016 1 Project Vicinity Map 7/11/2016

More information

RÉGION D OTTAWA-CARLETON

RÉGION D OTTAWA-CARLETON 8 REGION OF OTTAWA-CARLETON RÉGION D OTTAWA-CARLETON REPORT RAPPORT Our File/N/Réf. Your File/V/Réf. 50 23-00-R030-H DATE 14 July 2000 TO/DEST. FROM/EXP. SUBJECT/OBJET Co-ordinator Transportation Committee

More information

HUMC/Mountainside Hospital Redevelopment Plan

HUMC/Mountainside Hospital Redevelopment Plan Traffic and Parking Analysis HUMC/Mountainside Hospital Redevelopment Plan in Glen Ridge Borough and Montclair Township PREPARED FOR H2M 119 Cherry Hill Road, Suite 11 Parsippany, NJ 754 862.27.59 PREPARED

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

2. executing a legal agreement with respect to the above.

2. executing a legal agreement with respect to the above. 2. MODIFICATIONS TO INNES ROAD AND BLAIR ROAD INTERSECTION TO ACCOMMODATE THE CONSTRUCTION OF THE INNES CENTRE - PUBLIC HEARING COMMITTEE RECOMMENDATION Having held a public hearing, that Council approve

More information

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study

James M. Moore, Director of Planning & Building Services, Town of Fairfax. Victory Village Senior Housing Development Traffic Study Traffic Study To: From: James M. Moore, Director of Planning & Building Services, Town of Fairfax David Parisi, PE, TE, Parisi Transportation Consulting Date: October 14, 216 Subject: Victory Village Senior

More information

Figure 1: Vicinity Map of the Study Area

Figure 1: Vicinity Map of the Study Area ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

Design Traffic Technical Memorandum

Design Traffic Technical Memorandum State Road 7 Extension PD&E Study Design Traffic Technical Memorandum Palm Beach County, FL October 2010 State Road 7 Extension PD&E Study Design Traffic Technical Memorandum Palm Beach County, FL Prepared

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff MEMORANDUM DATE March 1, 212 TO Town of Milton FROM RE Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff FFY 211 Safety and Operations Analyses at Selected Boston Region MPO Intersections:

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT

PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT PRELIMINARY DRAFT WADDLE ROAD / I-99 INTERCHANGE PROJECT ALTERNATIVE ANALYSIS FINAL TRAFFIC SUMMARY REPORT Prepared by: In Association with: November 2013 EXECUTIVE SUMMARY Patton Township, in partnership

More information

Chapter 16: Traffic and Parking A. INTRODUCTION

Chapter 16: Traffic and Parking A. INTRODUCTION Chapter 6: Traffic and Parking A. ITRODUCTIO This chapter examines the potential traffic and parking impacts of the proposed Fresh Kills Park roads. The analysis of transit and pedestrians is presented

More information

LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY

LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY LIBERTY TREE ACADEMY TRAFFIC IMPACT STUDY Prepared for: Liberty Tree Academy Prepared by: 161 Blake Street, Suite 2 Denver, Colorado 822 Contact: David Kline, PE, PTOE (33)-572-2 On Behalf of: Liberty

More information

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives Prepared for: The Town of Caledon August 9 Transportation Solutions Ltd. 43 Forest Road Cambridge, ON N1S 3B4

More information

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY Prepared for: City of Thornton And Colorado Department of Transportation Prepared by: 11 Blake Street, Suite 2 Denver, Colorado 822 Contact: Brian Bern, PE, PTOE

More information

Operational Comparison of Transit Signal Priority Strategies

Operational Comparison of Transit Signal Priority Strategies Operational Comparison of Transit Signal Priority Strategies Revision Submitted on: November, 0 Author: Adriana Rodriguez, E.I Assistant Engineer Parsons Brinckerhoff 0 South Orange Avenue, Suite 00 Orlando,

More information

2. Existing Conditions

2. Existing Conditions 2. Existing Conditions The existing traffic and parking conditions on the site and the surrounding area were reviewed based on the study methodology in Section 1.2. 2.1 Existing Land Use The portion of

More information