Integrated Corridor Approach to Urban Transport. O.P. Agarwal World Bank Presentation at CODATU XV Addis Ababa, 25 th October 2012
|
|
- Sophia Hilary Cole
- 5 years ago
- Views:
Transcription
1 Integrated Corridor Approach to Urban Transport O.P. Agarwal World Bank Presentation at CODATU XV Addis Ababa, 25 th October 2012
2 What is the Integrated Corridor Approach for Urban Transport Public? Why is it important? How should it be planned and executed? 2
3 Integrated Corridor Approach for Urban Transport? Combines PT, NMT and roadway infrastructure design elements to increase over-all travel speed, reliability, safety, security Comprehensive, integrated program of complimentary improvements, covering entire corridor or sub-area Focus on making public and non-motorized transport more attractive without compromising the performance of the transport system for others 3
4 Why is it Important In developing cities, a clear majority of people traveling on virtually every arterial street are in public and/or non-motorized, not private transport in cities large and small, rich and poor Large share of the travel demand is on a few corridors Roadway, bikeway and sidewalk space need to be efficiently used to move people not vehicles 4
5 Where are Most of the Travelers? Ring Road II, Beijing 5
6 Different from Traditional Traffic Management and Road Safety Objective is to make movement of people and goods, not vehicles, more efficient and safer Not limited to reducing vehicle congestion Targeted at more than individual problem roadway segments or black spots 6
7 Accident Black-spots are all over the city so where do we start? Kunming 7
8 The Process Evaluate Current And Near Term Transport Problems; Analyze To Determine Causes Identify Public, Non Motorized Transport Infrastructure, PT Facility/Operations/Equipment, Traffic Management, Safety Improvement Options Objective: Improve Performance of Multi-Modal Transport System in Moving People Evaluate Individual Options; Package; Evaluate Package(s) Decision Implement
9 Focus on where public transport is losing time 9
10 Focus on corridors that carry the most fatalities Find out which corridors are carrying majority of fatalities and injuries Fatality map Idea to focus on couple of high risk corridors rather than individual spots 10
11 Select your corridor(s) The data analysis will lead to few corridors in the city having PT, TM and RS problem at the same time. 11
12 Identify Alternative Improvements to Address the problems Public Transport Service, management, operating plan Condition, capacity of infrastructure, facilities Vehicle condition, design PT access infrastructure, facilities NMT coverage, condition Inefficient traffic, parking management Passenger, management information Safety 12
13 Safety Improvements Obvious relationship between pedestrian safety and public transport performance Safer pedestrian crossings = improved public transport access/egress No parked cars on side walks near bus stops = fewer people walking into the street to catch the bus Larger stop platforms = less crowded stops, fewer people waiting in street Reduced conflicts at intersections Reduced general traffic speeds in urban areas 13
14 Urumqi Enforcement of No Parking at Bus Stops, Bus Lanes Benxi Xian 3 rd Avenue Bus Lane New York 14
15 Shenyang Sidewalk Parking PT Passengers Wait in Street 15
16 Safe Way To Cross Street To/From Busy Bus Stops? Shenyang 16
17 3. Evaluate alternatives Evaluate singly, then package complimentary, feasible strategies into comprehensive corridor improvement project Criteria Effectiveness (PT travel times, mode shares usage, reliability, traffic fatality and injury rates ) Probability of successful implementation Costs (initial capital, ongoing operations) Impacts Important: Effectiveness criterion is total, all-mode person travel time 17
18 Case Study: New York Select Bus Fordham Rd., The Bronx Partnership of NYC DOT, NYC Transit First corridor in multi-corridor BRT program Already high ridership in heavily transit-dependent corridor Very constrained right of way Heavy pedestrian volumes in high density, mixed use corridor 98% customer satisfaction in tough, critical city >25% peak period speed increase >10% increase in ridership 18
19 Running Time Before/After Before 57 m 54 s After 46 m 44 s In Motion 49.2% 28 m 30 s Dwell Time 27.4% 15 m 51 s Signal Delay 20.8% 12 m 02 s In Motion 60.7 % 28 m 22 s Dwell Time 20.5% 9 m 34 s Signal Delay 16.0% 7 m 29 s 19
20 How Were Benefits Achieved? Comprehensive package Revised service plan Fewer stops, attractive shelters Off-board fare collection Dedicated, red colored bus lane over most of 11 Km corridor Improved traffic engineering for PT (e.g., some turns banned, leading green phase for buses before congested sections), improved enforcement New three-door, low floor buses 20
21 21
22 22
23 New Three-Door Low Floor Buses
24 Case Study : London Quality Bus Corridors* Seventy planned corridors Response to growing congestion & subsidies as well as declining bus speeds Grew out of need to affordably improve surface PT system with more than traditional measures Multi-agency partnership, PT, roads and traffic *Adapted from Presentation by Peter Yendall AECOM/Faber-Maunsell 24
25 London s Approach Combined whole corridor and whole journey concepts into one integrated approach Whole journey concept covers every aspect of all corridor travel, from trip origin (e.g., home) to destination (e.g., work place) Whole corridor covers entire geographic extent of corridor travel market *Adapted from Presentation by Peter Yendell AECOM/Faber-Maunsell 25
26 Whole Journey Concept Origin/Home Pre Trip Information Walk to Bus Stop Wait at Bus Stop Board the Bus Bus Journey Street Lighting CCTV in shelter + visibility, Panic Buttons, Pre Pay Ticket Machines, Smart Cards Low floor buses; Match vehicle floor, stop platform heights Better enforcement Priority lanes, signal priority, traffic engineering Alight from Bus Low floor buses, etc. Walk to Destination Street Lighting 26
27 London Results Between 1997 and 2007, annual bus passenger Km increased from 4.3 billion to 7.7 billion or by 80%! 27
28 Other Cities with Similar Approach Paris Berlin Hamburg Los Angeles New York Seoul. 28
29 Key Words for Corridor Improvement Integration (Public Transport Priority and Traffic Management/Safety) Comprehensive (Across entire route/corridor and journey) Complimentary (All elements produce more benefits together than sum of individual benefits) Cooperative effort of all stakeholders, e.g., traffic police, bus company, construction and planning bureaus 29
Traditional Public Transport Priority. Priority/Traffic Management? What is Integrated Public Transport Priority/Traffic management? Why? How?
Integrated Public Transport Priority & Traffic Management Sam Zimmerman What is Integrated Public Transport Priority/Traffic management? Why? How? Integrated Public Transport Priority/Traffic Management?
More informationRoadways. Roadways III.
Introduction 97 Roadway Design Principles 98 Safe Speeds 99 Optimizing of Street Space 00 Minimum Lane Widths in the City of Boston 02 Design Features that Reduce Operating Speeds 05 Travel Lanes Transit
More informationArterial Transitway Corridors Study. Sept. 26, 2011
Arterial Transitway Corridors Study Sept. 26, 2011 Purpose of Study Study 11 urban corridors in Minneapolis, St. Paul and surrounding communities Develop service and facilities plan to improve Transit
More informationScope of the Transit Priority Project
Transit Planning Committee #1 March 19, 2015 Scope of the Transit Priority Project Review of the 2010 plan Analysis of Transit Priority Measures Preliminary plans for rapid transit Recommendations for
More informationCommunity Task Force July 25, 2017
Community Task Force July 25, 2017 Welcome and Introductions Project Partners Regional Transportation District (RTD) Colorado Department of Transportation (CDOT) Denver Regional Council of Governments
More informationITS-NY ANNUAL MEETING Bus Rapid Transit in New York City: Bus Lane Operations on One-Way Arterial Streets
ITS-NY ANNUAL MEETING Bus Rapid Transit in New York City: Bus Lane Operations on One-Way Arterial Streets June 9, 2011 Ted Orosz AICP, Director Long Range Bus Planning MTA New York City Transit 1 Overview
More informationSpring Lake Park Mounds View North Oaks. Arden Hills. Shoreview. Roseville. Little Canada. Falcon Heights SNELLING. Lilydale. West Saint Paul 35E
Coon Rapids Blaine Spring Lake Park Mounds View rth Oaks In 2011, Metro Transit embarked on the Arterial 494 Minnetonka Maple Grove Plymouth Hopkins Brooklyn Park New Hope Golden Valley Louis Park Edina
More informationDavid Jickling, Public Transportation Director Regional Transportation Commission, Washoe County
David Jickling, Public Transportation Director Regional Transportation Commission, Washoe County Virginia Street Resort corridor connecting University of Nevada, Reno Downtown Truckee River Strip Casinos
More informationPurpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need
Chapter 2 Purpose and Need 2.1 Introduction The El Camino Real Bus Rapid Transit (BRT) Project (Project) would make transit and other transportation improvements along a 17.6-mile segment of the El Camino
More informationBus Rapid Transit Plans
Twin Cities Region Bus Rapid Transit Plans ULI Minnesota Workshop Connecting Bus Rapid Transit to the Community December 15, 2009 John Levin Director of Service Development Metro Transit Metropolitan Area
More informationCITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies
CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN Section VIII Mobility Element Goals, Objectives, and Policies Adopted August 6, 2015 by Ordinance No. 1591 VIII MOBILITY ELEMENT Table of Contents Page Number
More informationArterial Transitway Corridors Study. Ave
Arterial Transitway Corridors Study Ave January 2012 Arterial Transitway Corridors Study Overview Corridor Features and Demographics 11 study corridors, 95 route miles 86,000 daily rides and half of existing
More informationHow To Encourage More Efficient Transportation in Brazilian Cities
How To Encourage More Efficient Transportation in Brazilian Cities Todd Litman Victoria Transport Policy Institute Presented Seminar on Discouraging The Use Of Cars São Paulo, Brazil 3 September 2013 Creating
More informationAurora Corridor to E Line
Aurora Corridor to E Line Jack Whisner Transit Planner, Service Development King County Metro Transit Seattle, Washington jack.whisner@kingcounty.gov 206-477-5847 King County Metro Transit Part of general
More informationSouthwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.
Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW
More informationInsert the title of your presentation here
Insert the title of your presentation here Intermodality and Partnerships to make public transport more attractive Heather Presented Allen by Name Programme Here Director Sustainable Job Title - Date Transport
More informationNorth Shore Transportation Improvement Strategy
North Shore Transportation Improvement Strategy Preliminary, Near-term Recommendation 2016 April Transportation Improvement Strategy (TIS) Comprehensive and Analytical A multi-modal transportation strategy
More informationEliminate on-street parking where it will allow for a dedicated bus only lane %
Traffic Dashboard Priorities Survey Responses Introduction 1) Are you familiar with bus rapid transit (BRT)? a. No, BRT is new to me. 597 23.5% b. I ve heard of BRT, but I don t know much about it. 1,136
More informationBus Rapid Transit ALTERNATIVES ANALYSIS. Open House
Bus Rapid Transit ALTERNATIVES ANALYSIS Open House June 23, 2015 Open House Meeting Agenda Agenda Introductions What is BRT? Project Goals Study Tasks Next steps Discussion PVTA Bus Rapid Transit Study
More information5. RUNNINGWAY GUIDELINES
5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved
More informationIn station areas, new pedestrian links can increase network connectivity and provide direct access to stations.
The Last Mile Planning for Pedestrians Planning around stations will put pedestrians first. Making walking to stations safe and easy is important; walking will be a part of every rapid transit Accessible
More informationNY 5 BRT Conceptual Design Study: Study Advisory Committee Meeting 1. with Creighton Manning Engineering, LLP Logitrans Herb Levinson
NY 5 BRT Conceptual Design Study: Study Advisory Committee Meeting 1 with Creighton Manning Engineering, LLP Logitrans Herb Levinson September 22, 2003 Overview Introduction to the consultant team Goals
More informationDowntown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue. Bus Rapid and Conventional Transit Planning and Design Services
Downtown BRT Corridor Alternatives Review: 1 st, 2 nd, 3 rd and 4 th Avenue Bus Rapid and Conventional Transit Planning and Design Services City of Saskatoon February 2018 Project Team HDR Corporation
More informationKonstantin Glukhenkiy Economic Affairs Officer
Konstantin Glukhenkiy Economic Affairs Officer Rapid growth of urban areas Very rapid increase in motorisation Substantial increases in traffic congestion Relative decline of public transport usage and
More informationChapter 3 BUS IMPROVEMENT CONCEPTS
Chapter 3 BUS IMPROVEMENT CONCEPTS The purpose of this chapter is to describe potential bus improvement strategies and potential impacts or implications associated with BRT implementation within the existing
More information12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)
12 RECOMMENDATIONS Recommendations are based on the technical analysis of existing and future road and active transportation conditions, the results of the review of existing City policies and public feedback.
More informationM14A/D Select Bus Service
M14A/D Select Bus Service Manhattan Community Board 6: April 1, 2019 New York City Transit 2 Background M14 Select Bus Service M14 was identified as a critical future SBS corridor in past BRT studies as
More informationGerald Ollivier Lead Transport Specialist World Bank, New Delhi. Transforming Cities through Integrated Planning Corridor Scale
Gerald Ollivier Lead Transport Specialist World Bank, New Delhi Transforming Cities through Integrated Planning Corridor Scale JOB ACCESSIBILITY: ZHENGZHOU A: LINE 1, 2, AND 3 AND WALKING: 12% B. SCENARIO
More information6 Screen 3 Analysis and Results
6 Screen 3 Analysis and Results Introduction This chapter documents the results of the Screen 3 (final) evaluation and screening process. This chapter contains the following elements: Description of the
More informationHennepin County Bicycle and Pedestrian Planning
Hennepin County Bicycle and Pedestrian Planning 1 Value of bicycle and sidewalk systems Safety Livability Mobility Health Personal Finances Economic Sustainability Clean Air Recreation Parking and congestion
More informationMost Important Part of any Plan
Most Important Part of any Plan Objectives must be evaluated to determine if they have been achieved Achievement of Objectives: 10 of 13 Objectives Achieved 1 not achieved 2 not due yet Transportation
More informationPURPOSE AND NEED SUMMARY 54% Corridor Need 1. Corridor Need 2. Corridor Need 3. Corridor Need 4. Corridor Need 5
SUMMARY PURPOSE AND NEED Chapel Hill Transit ridership has increased Buses operate every 4 minutes and have standing room only Exceeding seated capacity by 12% Corridor Need 1 by more than 20 percent between
More informationProvidence Downtown Transit Connector STAKEHOLDER MEETING #2. Stakeholder Meeting #1 October 24, 2016
Providence Downtown Transit Connector STAKEHOLDER MEETING #2 Stakeholder Meeting #1 October 24, 2016 February 2017 1 AGENDA 1 DTC Goals and Expectations 2 Street Design Concepts 3 Potential Benefits and
More informationPreliminary Transportation Analysis
Preliminary Transportation Analysis Goals of a Robust, Multimodal Transportation Network Safe Accessible/Connected Efficient Comfortable Context-Sensitive Motor Vehicle: Continue to analyze the data to
More informationWALKNBIKE DRAFT PLAN NASHVILLE, TENNESSEE EXECUTIVE SUMMARY NASHVILLE, TENNESSEE
NASHVILLE, TENNESSEE EXECUTIVE SUMMARY Executive Summary A world-class multi-modal transportation system is essential to a vibrant city and better quality of life. -Mayor Barry The WalknBike plan aims
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: January 28, 2014 SUBJECT: IMPROVING PEDESTRIAN SAFETY AND CUSTOMER JOURNEY TIMES: TRANSIT STOPS ACTION ITEM RECOMMENDATIONS It is recommended
More informationClackamas County Comprehensive Plan
ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They
More informationArterial Transitway Corridors Study
Arterial Transitway Corridors Study February 2012 Arterial Transitway Corridors Study Overview Corridor Features and Demographics 11 study corridors, 95 route miles Routes: 86,000 daily rides and half
More informationNM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.
Transportation PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN NON-MOTORIZED PLAN CONTENTS Goals, Policies, and Action Strategies Table 4 (Bike Facility Classifications and Descriptions) Table 5 (Bike Facility
More informationCanada s Capital Region Delegation to the Velo-City Global 2010 Conference
Canada s Capital Region Delegation to the Velo-City Global 2010 Conference Report of Findings from Visits, Meetings & Presentations In Amsterdam-Den Haag, Utrecht, Berlin & Copenhagen The Itinerary Copenhagen
More informationPerformance Criteria for 2035 Long Range Transportation Plan
Minimizing Impacts on Natural, Historic, Cultural or Archeological Resources 2035 LRTP Weighting Factor: 7% Objective 1.1: Use appropriate planning and design criteria to protect and enhance the built
More informationOperational Comparison of Transit Signal Priority Strategies
Operational Comparison of Transit Signal Priority Strategies Revision Submitted on: November, 0 Author: Adriana Rodriguez, E.I Assistant Engineer Parsons Brinckerhoff 0 South Orange Avenue, Suite 00 Orlando,
More information2. Context. Existing framework. The context. The challenge. Transport Strategy
Transport Strategy Providing quality connections Contents 1. Introduction 2. Context 3. Long-term direction 4. Three-year priorities 5. Strategy tree Wellington City Council July 2006 1. Introduction Wellington
More informationDRAFT. Memo. Range of the Alternatives Considered in the EIS
Memo Date: Friday, December 09, 2016 Project: To: From: Subject: State Route 30 EIS UDOT Vince Izzo This memorandum summarizes the draft State Route (S.R.) 30 Level 1 screening results. A more detailed
More informationBURGAS INTEGRATED PUBLIC TRANSPORT PROJECT. Information day, 5 th July 2011, Burgas
BURGAS INTEGRATED PUBLIC TRANSPORT PROJECT Information day, 5 th July 2011, Burgas BRT TECHNICAL DESIGN TENDER Preliminary tender specifications and requirements Overview 1 Burgas BRT concept 2 Main outputs
More informationMOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014
MOBILITY WORKSHOP Joint City Council and Transportation Commission May 5, 2014 Review of General Plan M-1 Develop world-class transit system M-3 Maintain/enhance pedestrian-oriented City M-4 Create comprehensive
More informationSANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008
SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008 To assist VTA and Member Agencies in the planning, development and programming of bicycle improvements in Santa Clara County. Vision Statement To establish,
More informationALTERNATIVES SCREENING REPORT
VAN NESS AVENUE BUS RAPID TRANSIT (BRT) ALTERNATIVES SCREENING REPORT Revised Draft, 3/28/08 San Francisco County Transportation Authority 1 Introduction The San Francisco County Transportation Authority
More informationExecutive Summary BEYOND THE B-LINE: RAPID TRANSIT LINE PHASE II - COMMERCIAL DRIVE WEST. Final Draft December 13, Appendix B BROADWAY/LOUGHEED
BEYOND THE B-LINE: BROADWAY/LOUGHEED RAPID TRANSIT LINE PHASE II - COMMERCIAL DRIVE WEST Appendix B Executive Summary Final Draft December 13, 1999 UMA Lloyd Lindley Davidson Yuen Simpson Architects BROADWAY/LOUGHEED
More informationREYKJAVÍK - NEW MOBILITY OPTIONS
25. OKTÓBER 2017 REYKJAVÍK - NEW MOBILITY OPTIONS ÞORSTEINN R. HERMANNSSON City of Reykjavik Director of Transportation REYKJAVIK CAPITAL AREA EXPECTED GROWTH 2015-2040 70.000 How will we travel? How should
More informationMarket Factors and Demand Analysis. World Bank
Market Factors and Demand Analysis Bank Workshop and Training on Urban Transport Planning and Reform. Baku, April 14-16, 2009 Market Factors The market for Public Transport is affected by a variety of
More informationADOT Statewide Bicycle and Pedestrian Program Summary of Phase IV Activities APPENDIX B PEDESTRIAN DEMAND INDEX
ADOT Statewide Bicycle and Pedestrian Program Summary of Activities APPENDIX B PEDESTRIAN DEMAND INDEX May 24, 2009 Pedestrian Demand Index for State Highway Facilities Revised: May 29, 2007 Introduction
More informationTypical Rush Hour Commute. PennyforTransportation.com
Typical Rush Hour Commute In the News Overview of the Plan Collaborative plan with projects in every community Prioritizing connectivity and congestion relief Dedicated transportation-specific funding;
More informationCentral Freeway and Octavia Circulation Study
Central Freeway and Octavia Circulation Study Final Report Plans and Programs Committee San Francisco County Transportation Authority September 18, 2012 Presentation Outline Background and Study Purpose
More informationData Analysis February to March 2018 Identified safety needs from reported collisions and existing travel patterns. SFMTA Board of
Welcome! Thank you for participating in today s Valencia Data Analysis February to March 2018 Identified safety needs from reported collisions and existing travel patterns. First Community Event(s) July
More information95 th Street Corridor Transportation Plan. Steering Committee Meeting #2
95 th Street Corridor Transportation Plan Steering Committee Meeting #2 February 18, 2015 PURPOSE OF THE MEETING Update Steering Committee Present Community/Stakeholder Survey Results Present Transportation
More informationCPC Parking Lot Riverside Drive. Transportation Rationale
CPC Parking Lot Transportation Rationale Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 September 2015 Novatech File: 114093 Ref: R-2015-153 Table of Contents 1.0 INTRODUCTION...
More informationMultimodal Approach to Planning & Implementation of Transit Signal Priority within Montgomery County Maryland
Multimodal Approach to Planning & Implementation of Transit Signal Priority within Montgomery County Maryland A Path to Successful Implementation James Allday Bunch - Sabra, Wang & Associates, Inc. ITS
More informationWilshire Boulevard Bus Rapid Transit Project
Los Angeles County Metropolitan Transportation Authority Wilshire Boulevard Bus Rapid Transit Project COMMUNITY MEETINGS November 2008 Agenda Introduction Proposed Project Overview Participating Agencies
More informationCycle Track Design Best Practices Cycle Track Sections
Design Best Practices Sections It is along street segments where the separation and protection methods of cycle tracks offer more comfort than conventional bicycle lanes, and are more attractive to a wide
More informationContents. Champaign-Urbana Mass Transit District Stop Placement Guidelines
Contents Champaign-Urbana Mass Transit District Introduction... 1 Stop Spacing... 2 Rural... 2 Low Density Suburban... 2 General Urban... 2 Urban Core... 2 Operational Safety... 3 Stop Placement... 4 Nearside
More informationProposed. City of Grand Junction Complete Streets Policy. Exhibit 10
Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel
More information2.2 TRANSIT VISION 2040 FROM VISION TO ACTION. Emphasize transit priority solutions STRATEGIC DIRECTION
TRANSIT VISION 2040 FROM VISION TO ACTION TRANSIT VISION 2040 defines a future in which public transit maximizes its contribution to quality of life with benefits that support a vibrant and equitable society,
More informationMCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx
MCTC 8 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV.xlsx Madera County Transportation Commission Regional Transportation Plan / Sustainable Communities Strategy Multi-Modal Project
More informationWELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary
WELCOME! Thank you for attending our open house. There will be no formal presentation today so please take the time to read the boards. If you have any questions, please do not hesitate to approach one
More informationChapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails
Chapter 7 Transportation Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails 7.1 TRANSPORTATION BACKGROUND The District of Maple Ridge faces a number of unique
More informationALTERNATIVES ANALYSIS EXECUTIVE SUMMARY
West Valley Connector Corridor ALTERNATIVES ANALYSIS EXECUTIVE SUMMARY FINAL September 2014 Ontario International Airport Ontario Mills Rancho Cucamonga Metrolink Station Kaiser Permanente PARSONS EXECUTIVE
More informationSixth Line Development - Transit Facilities Plan
Memorandum Date: November 13, 2012 To: From: c.c. Subject: Rob Freeman (Freeman Planning) Kevin Phillips Sixth Line Development - Transit Facilities Plan 33016631 This memo was prepared to review the transit
More informationVI. Market Factors and Deamnd Analysis
VI. Market Factors and Deamnd Analysis Introduction to Public Transport Planning and Reform VI-1 Market Factors The market for Public Transport is affected by a variety of factors No two cities or even
More informationGoodlettsville Bicycle and Pedestrian Plan Executive Summary
Goodlettsville Bicycle and Pedestrian Plan July 2010 In Cooperation with the Nashville Area Metropolitan Planning Executive Organization Summary Introduction Progressive and forward thinking communities
More informationCommunity Task Force October 5, 2017
Community Task Force October 5, 2017 Welcome and Introductions Project Partners Regional Transportation District (RTD) Colorado Department of Transportation (CDOT) Denver Regional Council of Governments
More informationCONNECTING PEOPLE TO PLACES
CONNECTING PEOPLE TO PLACES 82 EAST BENCH MASTER PLAN 07 Introduction The East Bench transportation system is a collection of slow moving, treelined residential streets and major arteries that are the
More informationCity of Ottawa s Complete Streets Approach to Transportation Projects
City of Ottawa s Complete Streets Approach to Transportation Projects Presentation to Stakeholders Date: May 5, 2015 Presentation Overview Purpose of the study Proposed definition of Complete Streets for
More informationONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT
One Size Doesn t Fit All S Corbett, C Chenery Page 1 ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT Authors/Presenters: Sam Corbett, Principal Transport
More informationMOBILITY RESULTS AREA. Budgeting For Outcomes Council Presentation January 12, 2007
MOBILITY RESULTS AREA Budgeting For Outcomes Council Presentation January 12, 2007 Mobility Results Team Members 2 Hammond Perot, OED, Co-Team Leader Bonnie Meeder, DEV (returning), Co-Team Leader Peer
More informationEXECUTIVE SUMMARY. Vision
Vision Walking and bicycling in Salt Lake City will be safe, convenient, comfortable, and viable transportation options that connect people to places, foster recreational and economic development opportunities,
More informationMulti Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY
Multi Modal Transit Access Plan KIPDA ID # 239 Project Type: STUDY Description: In conjunction with the results from Project Gobility and the Transit LOS Analysis, TARC seeks to examine the possibilities
More informationQueensboro Bridge Bus Priority Study: Summary of Recommendations. Presentation to Manhattan Community Board 8 May 4, 2011
: Summary of Recommendations Presentation to Manhattan Community Board 8 May 4, 2011 1 Overview Study Goal: Identify cost-effective ways to improve bus speed and reliability for local and express buses
More informationWelcome. If you have any questions or comments on the project, please contact:
Welcome This drop-in public open house is intended to provide information about the Bay Street bike lanes project. This project proposes a dedicated cycling facility along Bay Street between Aberdeen Avenue
More informationCHAPTER 7.0 IMPLEMENTATION
CHAPTER 7.0 IMPLEMENTATION Achieving the vision of the Better Streets Plan will rely on the ability to effectively fund, build and maintain improvements, and to sustain improvements over time. CHAPTER
More informationHighway Transitway Corridor Study
Highway Transitway Corridor Study CTS Research Conference May 21, 2014 1 2030 Transportation Policy Plan Transitway modes on highways: Highway bus rapid transit (BRT), plan identified 6 total Highway BRT
More informationWashington Metropolitan Area Transit Authority Board Action/Information Summary. MEAD Number:
Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 100962 Resolution: Yes No TITLE: Bicycle and Pedestrian Access Improvements Study PURPOSE:
More informationSolana Beach Comprehensive Active Transportation Strategy (CATS)
Solana Beach Comprehensive Active Transportation Strategy (CATS) 3.0 Goals & Policies The Solana Beach CATS goals and objectives outlined below were largely drawn from the Solana Beach Circulation Element
More informationCity of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015
City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015 McPhail Transportation Planning Services Ltd. AGENDA 6:00 7:00 pm Viewing Boards / Q & A with the Team 7:00 7:50
More informationADDIS ABABA ROAD SAFETY STRATEGY
ADDIS ABABA ROAD SAFETY STRATEGY (2017-2030) Feb 22, 2017 Presentation: Daniel Molla Overview Addis Ababa Capital City of Ethiopia, Seat of AU Area: 540 km 2 Population 3.4 million Road safety crises 400
More informationPlanning Guidance in the 2012 AASHTO Bike Guide
Planning Guidance in the 2012 AASHTO Bike Guide Presentation by: RJ Eldridge Peter Lagerwey August 22, 2012 WEBINAR 2: PLANNING GUIDANCE IN THE 2012 AASHTO BIKE GUIDE Today s Webinar Significant Updates
More informationItem B1 November 19, 2009
November 19, 2009 Planning and Development Department Land Use Planning Division DATE: November 19, 2009 STAFF REPORT TO: FROM: SUBJECT: Members of the Transportation Commission Elizabeth Greene Senior
More informationMain-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation
Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation APRIL 2016 A collaborative study between: For Additional Information or to Comment If you would like additional
More informationFrequently Asked Questions (FAQ)
Frequently Asked s (FAQ) Study Process... 2 Rapid Transit Service and Operations... 5 Public Consultation... 8 Business Impacts... 8 Design and Property Impacts... 9 Construction Impacts...12 Traffic,
More informationSwift Bus Rapid Transit. June DeVoll, Community Transit & Tom Hingson, Everett Transit
Swift Bus Rapid Transit June DeVoll, Community Transit & Tom Hingson, Everett Transit October 22, 2013 Swift Washington State s First BRT is almost 4 years old Everett Transit Everett Transit College Station
More informationSpeed Limits Study and Proposal. Public Input Session: 8/14/13
Speed Limits Study and Proposal Public Input Session: 8/14/13 Why is Decatur a unique place for this project? First Community Transportation Plan in the nation with a Health Impact Assessment. Strong sense
More informationCirculation in Elk Grove includes: Motor vehicles, including cars and trucks
Circulation, as it is used in this General Plan, refers to the many ways people and goods move from place to place in Elk Grove and the region. Circulation in Elk Grove includes: Motor vehicles, including
More informationStation Plan: Penn & 43rd Avenue
Station Plan: Penn & 43rd Avenue This station will serve the northern portion of the Penn Avenue corridor, including the commercial node at 44th Avenue. Ridership and roadway geometry support station siting
More informationPresentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN
Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN Public Outreach Fall 2011: Two community meetings/open houses Fall 2012: Three community meetings/open houses
More informationA COMPREHENSIVE APPROACH TO TRANSPORTATION AT SUNTRUST PARK AND THE BATTERY ATLANTA
A COMPREHENSIVE APPROACH TO TRANSPORTATION AT SUNTRUST PARK AND THE BATTERY ATLANTA Overview The Atlanta Braves strategically selected the location for SunTrust Park to provide an environment rich in transportation
More informationUNIT V 1. What are the traffic management measures? [N/D-13] 2. What is Transportation System Management (TSM)? [N/D-14]
UNIT V 1. What are the traffic management measures? [N/D-13] Some of the well-known traffic management measures are: a) Restrictions on turning movements b) One - way streets c) Tidal - flow operations
More informationExperience from India Future Perspectives
Experience from India Future Perspectives The 2 nd Asia BRTS Conference September 29 and 30, 2014 Amdavad Prof. Shivanand Swamy Executive Director Centre of Excellence in Urban Transport, CEPT University
More informationTRANSPORTATION NEEDS ASSESSMENT
TRANSPORTATION NEEDS ASSESSMENT A travel demand analysis was carried out to determine the operational issues and the potential benefit that adding traffic capacity would have on the road network. All the
More informationFMATS Transportation Improvement Program Project Nomination Form
FMATS 2015 2018 Transportation Improvement Program Project Nomination Form Project nominations are accepted from the public and are scored based on the adopted Project Scoring Criteria. These criteria
More informationNorth Coast Corridor:
North Coast Corridor: Connecting People, Transportation & Environment Legislative Hearing: 11.8.10 1 North Coast Corridor Region s Lifeline A Regional Strategy Mobility, Economy & Environment North Coast
More information