1 19 April 2018 Louise Wood Senior Resource Consents Planner Taupō District Council Private Bag 2005 Taupō 3352 Gray Matter Ltd 2 Alfred Street PO Box Hamilton, 3252 Tel: _02 Dear Louise RC25777 PROPOSED SERVICE CENTRE, 25 TE ARAHORI STREET, TURANGI REVIEW OF TRAFFIC ASSESSMENT FINAL 1. Introduction and Summary The application by WD Holmes 2000 Trust is to establish and operate a service centre comprising a BP and fast food operation on land zoned for residential purposes at 25 Te Arahori Street, Turangi. The site is currently operating as a motor lodge which is to remain (the Proposal). Taupo District Council (TDC) engaged Gray Matter Ltd to review the Proposal and the supporting Integrated Transportation Assessment (ITA) from a transportation perspective. The Proposal comprises: The existing motor lodge to remain (24 trips) Service station (8 pump islands, Wild Bean shop/café, 290m 2 GFA, 2 lane truck stop, 22 parking spaces, 3 coach/truck parking spaces, 3-5 campervan/trailer spaces, loading space) Fast food restaurant (300m 2 GFA, drive, 41 parking spaces, loading space) All movement access to and from Te Arahori Street and left slip access only from SH1. We consider that the ITA (TDG, 14/12/2017) and Assessment of Environmental Effects (CKL, 24/1/2018) adequately cover the information requirements of the Taupo District Plan (the Plan). The Proposal appears to comply with the relevant Transportation rules and requirements of the Plan other than the proposed left slip lane which, at this time does not have NZ Transport Agency consent, is wider than the District Plan Requirement and does not meet separation standards. The Proposal will result in around 250 vehicle trips to and from the site in the peak hour likely to be around 1,700 vehicle trips daily 1. It includes around 70 parking spaces including accessible spaces and two loading spaces, sufficient to meet Taupo District Plan requirements and likely demand. A key assumption in the ITA is that the Proposal will generate little additional traffic, and rely on attracting new pass-by traffic southbound and some of the existing traffic from SH1 that currently uses the existing service station and fast food outlet in the commercial centre opposite. Trip attraction in the ITA is estimated based on a survey of the service centre opposite which showed a significantly higher proportion of passing traffic attracted than typical service stations. The likely adverse effects of the Proposal relating to traffic include: An increased risk of crashes as a result of increased traffic and potential for conflict at: - the SH1/Te Arahori Street intersection; - the proposed left slip lane from SH1 into the site; and, - the entrance to the site; Increases in travel time resulting from delays at intersections during peak periods; 1 Estimated based on peak period traffic being 15% of daily traffic. Alasdair Gray alasdair.gray@graymatter.co.nz Karen Hills karen.hills@graymatter.co.nz

2 Increased noise from on site manoeuvring and parking activities (not assessed as part of this review); Changes to on street parking; An unresolved position with the NZ Transport Agency, the road controlling authority for SH1, in relation to: - The need for slip lane; - Performance of the SH1/Te Arahori Street intersection if slip lane is not constructed or preferred by drivers; - Design standards for the proposed alteration to the SH1/Te Arahori Street intersection; - Design standards for slip lane. The ITA concludes that the proposed service station and fast food development, with the site layout and access provisions proposed, can be safely and efficiently accommodated within the local transport environment with no more than minor effects on the adjacent road network. We have reviewed the Proposal and consider the trip generation, traffic assignment and parking assessment for the Proposal to be reasonable. There remains a risk of higher or lower than forecast trip attraction and different turning movements, depending on how attractive the services offered on each site are to drivers. The altered local trip distributions are expected to result in a small increase in movements crossing SH1. We understand that NZTA as road controlling authority do not currently support the Proposal or slip lane. In our opinion, the ITA conclusions understate the potential adverse effects of the proposal on safety but the conclusions relating to the adverse effects of the proposal on traffic efficiency appear reasonable. We conclude that: There will be adverse effects on efficiency but these are unlikely to exceed a few seconds extra delay for turning vehicles except during short periods of peak demand and for traffic following vehicles turning left into Te Arahori Road. There would be adverse construction effects on the state highway from alteration to the intersection and entranceway. The Proposal increases the predicted crash rate to one DSI every 5.6 years compared to a predicted crash rate for the current environment of one DSI every 6.6 years. Current actual performance is 1 every 8.5 years. That increase would compromise NZTA and Government objectives to reduce road deaths and serious injuries, but is unlikely to increase the crash rate at the intersection to a level that would be a funding priority. Subsequent interventions to reduce the crash risk such as a roundabout or reduced speed restrictions would have additional adverse effects on efficiency. The separate adverse traffic effects from the Proposal are not very large, but still result in adverse cumulative effects on the safety and efficiency of the state highway that, while minimal, are assessed as undesirable and unlikely to fully be mitigated by the Proposal. 2. ITA Review 2.1. Adequacy The transportation assessment information requirements in the Taupo District Plan are brief, and include: Relevant aspects of standard Resource Management Act Section 88 and Schedule 4 information requirements; Parking, access, loading and manoeuvring space required for vehicles; Written comments of Transit New Zealand (now NZ Transport Agency) for activities seeking to establish adjacent to the State Highway Network; Performance standard information on vehicle movement; and, PAGE 2

3 Plans including vehicle parking, access, manoeuvring and loading areas. The ITA had some areas where additional information may have been useful such as: Assessment of intersection performance without slip lane (not part of the Proposal) or with increased use of Te Arahori Street in preference to the slip lane; Consideration of traffic growth (likely to be lower risk than sensitivity to higher trip attraction); and Construction effects (low risk and easily covered by a construction management plan including temporary traffic management). The information in the ITA is consistent with typical industry expectations such as those set out in NZTA Road Research Report 422: Integrated Transport Assessment Guidelines. We generally consider the ITA to be sufficient to inform an assessment of effects. Where additional information may have been useful, the ITA tests sensitivity to assumptions such as percentage of traffic using their own side of the road and additional local traffic. These are sufficient to guide evaluation of the impacts Existing site data The existing site includes 31 motel units and 10 motorhome sites, with an ancillary conference facility that seats people and a restaurant that opens for dinner from 6pm to 9pm. The ITA (6.1) suggests that the existing peak traffic would be up to 53 trips per hour during its periods of peak operation and that a typical day s peak hour will generate approximately 24 trips. There is no information on mode share, but the number of pedestrians, cyclists and bus users for the existing site will be very low Existing Transport Data The ITA presents a comprehensive description of the existing traffic environment. There is no specific consideration and modelling taking into account traffic growth but this is covered to some extent in the peak volumes and sensitivity testing Development Details The development is described in sufficient detail with hourly flows. Daily flows are not assessed, but the peak hourly flows are the most relevant basis for capacity assessments, although it meant that our crash prediction based on daily flows has relied on inferred turning flows. The existing motor lodge to remain (31 motel units and 10 motorhome sites, with an ancillary conference facility that seats people and a restaurant that opens for dinner from 6pm to 9pm (not clear whether this is restricted or an operational decision). Service station (8 pump islands, Wild Bean shop/café, 290m 2 GFA, 2 lane truck stop, 22 parking spaces, 3 coach/truck parking spaces, 3-5 campervan/trailer spaces, loading space) Fast food restaurant (300m 2 GFA, drive, 41 parking spaces, loading space) All movement access to and from Te Arahori Street and left slip access only from SH1. An intersection upgrade is relied upon in the ITA, as is slip lane. PAGE 3

4 Figure 1: Proposed Service Centre There is no information on the volumes or nature of construction traffic. This is a low risk and could be dealt with a requirement for a construction traffic management plan and temporary traffic management approvals Trip generation and assignment The assessment includes existing trip generation for the motel at 24vph typically and up to 53vph in peaks. This appears reasonable. ITA Section 6.2 estimates trip generation based on surveys of the site opposite, and assumptions on the proportion of traffic likely to be attracted (e.g. more southbound traffic will use the proposed site to avoid right turns). We would normally use the RR453 rates for comparison but the ITA survey data suggests that the existing service centre opposite already attracts a surprisingly high proportion of traffic, so exceeds typical rates. The supermarket and proximity to other town centre activities may influence this and attract a higher proportion of traffic to the service station on the other side. We agree with the ITA assessment that most trips are likely to be pass-by trips which will not affect the wider network. We agree that there may be additional crossing trips, as has been assessed and provided for in the assessment, with people using this site and then crossing to the supermarket or town centre as a secondary trip, for example. The ITA considers scenarios in the SIDRA modelling including typical peak hour conditions, 70% and 80% proportions turning into the service centre on the same side of the road as they are driving and 30 th design hour with an increase in new local traffic. It does not give specific consideration of entranceway performance, but since the traffic on Te Arahori Street is so low, entranceway traffic is unlikely to have to give way to opposing turns and therefore any delay effects are expected to be negligible. PAGE 4

5 Figure 2: Peak Hour Trips (Extracts from ITA) The ITA presumes all southbound state highway traffic entering the site will use the slip lane (79vph). This means that the intersection assessment is conservative for all movements except to Te Arahori Street. We consider that there is a risk of traffic turning left onto Te Arahori Street for access instead of using the slip lane since the fast food outlet is at that end of the site and the distance to travel appears less, without having to cross the service station forecourt. Additional left turns into Te Arahori Street would add to the 34vph northbound traffic turning right in to Te Arahori Street, and turn right across Te Arahori Street to access the site. 3. Discussion/Observations In general, the ITA trip generation and assignment appears reasonable. The trip generation may be low, but there would be no significant changes in my conclusions or the management responses if higher rates eventuated. In principle, it is poor practice to have a commercial area straddling an arterial road, because of the increase in conflict from crossing movements and side friction from access manoeuvres. At the site, pedestrian crossing is provided for with an underpass beneath SH1. Cyclists using the road and vehicular traffic would still be affected. There are whole of journey benefits derived from motorist service centres including contributing to safety objectives by providing road users with the opportunity to break their journey, reduce fatigue and service vehicles. The ITA estimates an increase in southbound drivers stopping (30% of SH1 traffic compared to surveyed 21% currently using site on opposite side of road). Since the dominant demand is from passing traffic, with a high proportion of southbound traffic currently turning right to access the existing town centre, we expected an improvement in safety at the intersection because fewer people would need to turn right. However, as discussed below, our assessment of predicted crashes based on conflict suggests a marginally less safe outcome. We consider that the main issues relate to: The extent to which traffic growth on SH1 should be included. We consider that 10 years should be included since there are no significant state highway improvements anticipated within that period. This makes little difference to our review and conclusions. The left slip lane having direct access off SH1, which is contrary to good practice for road hierarchies, access management and road safety principles. However, if the Proposal is consented, PAGE 5

6 I consider that slip lane would be more appropriate than the single crossing on Te Arahori Street. An unresolved position with the NZ Transport Agency, the road controlling authority for SH1 access and intersection changes. The potential for more traffic to turn left into Te Arahori Street and how to deal with it, noting a corresponding reduction elsewhere. Increased potential for crashes at SH1/Te Arahori Street, including deaths and serious injuries. Whether the intersection modifications proposed satisfactorily mitigate the change in safety for turning traffic Basis for Assessment Our assessment is based on the Proposal in comparison to an environment with the existing motor lodge. We consider that there should be consideration of higher SH1 traffic flows than current typical (e.g. allowing for 10 years growth) but that is covered to some extent by the 30 th peak hour modelling for intersection performance, but does affect aspects such as the thresholds for auxiliary lanes. Growth on SH1 is not an effect of the Proposal, but network changes to mitigate traffic effects should take growth into account Left Slip Lane The design of vehicle accesses should avoid confusion between vehicle manoeuvres at other driveways or intersections 2. The slip lane is a high volume access and would typically be considered as an intersection. Austroads suggests spacing of 5 seconds travel time (125m at 90km/h) is desirable to reduce the potential for confusion and allow drivers to process information relating to traffic, signs and road layouts. The proposal has provided for a 4 second separation of the entry point to the slip lane for the speed environment of 90km/h so there is little practical difference. District Plan Rule 6.5.4: Distance Road Intersection to Vehicle Crossing, states that where access is to be obtained from a State Highway the consent of New Zealand Transport Agency is required and the standards of the District Plan do not apply where they conflict with the standards of the road controlling authority. SH1 carries around 5,060vpd in the vicinity with growth currently at around 3.5% annually. Presuming a 10 year assessment period to allow for growth, SH1 traffic could be 6,830vpd. That does not result in a change in NZTA accessway standards (Figure 3 below). However, NZTA Planning Policy Manual App5B.3 Accessway spacing guidelines states that medium to high volume entranceways should be considered as intersections for the purposes of access safety. NZTA Planning Policy Manual indicates that NZTA determine intersection spacing on state highways on a case-by-case basis following an assessment of criteria including: key transport outcomes from growth strategies and strategic studies we are not aware of growth or integrated land use strategies that would support additional access, although the draft Government Policy Statement on Transport includes provides increased access to economic and social opportunities, enables transport choice and is resilient as a strategic direction. the state highway category national (second highest). Hierarchy and access management principles would more strongly indicate and access preference from the side road. anticipated safety issues on the state highway and connecting local road(s) since it is mainly left turns and equivalent turns are mostly taking place already at the existing site opposite, I do not consider this likely to be a problem. anticipated project costs, available funding options and affordability not applicable. 2 Section 3.1, Guidelines for visibility at driveways, RTS 6 PAGE 6

7 Figure 3: NZTA Standards (Planning Policy Manual) Depending on interpretation of where the crossing is, the separation between slip lane and the intersection may not meet desirable standards (100m required, proposed = 90m to taper and 160m to crossing at boundary). We consider the start of the diverge taper to be the most relevant point since that is where the manoeuvring commences. There is the potential for slowing beforehand and early indicating for turning left taking place before Te Arahori Street. However, slip lane layout has fewer potential conflicts than a typical crossing and the bases for the separation requirements are not strictly relevant. 90m provides 3.6 seconds travel time at 90km/h so is sufficient for the minimum 3 seconds indicating but less than Austroads desirable spacing of 5 seconds travel time (125m). It appears that the layout could be adjusted to achieve greater separation but that could result in more people using Te Arahori Street. Clear advanced signing would contribute to an enhanced driver appreciation and use of the proposed access arrangements and potentially an overall safer outcome with respect to these movements. The reduced separation could lead to confusion about the intentions of indicating vehicles, increasing the risk to turning and crossing traffic at Te Arahori Street, but we do not consider that the deficiency would be likely to have a noticeable impact on safety. The Proposal is reliant in part on access from SH1 to operate as presented. No new access to SH1 from the site is proposed. It would be desirable for NZ Transport Agency authorisation for this to be confirmed in advance of the hearing. Otherwise, the consent, if approved, could be made subject to a condition precedent or equivalent requiring that slip be subject to engineering design approval, including an independent stage 4 safety audit appropriately responded to in consultation with NZTA, and the final design plans authorised by NZ Transport Agency prior to construction commencing and in place prior to operations commencing Left turns into Te Arahori Street We expect that some southbound traffic will use Te Arahori Street to access the site. Based on Austroads guidance for auxiliary lanes, including an allowance for a nominal 10 years growth for traffic, it would only take an additional 6 vph turning left to warrant a short auxiliary left turn lane, equivalent to less than 10% of the expected southbound site traffic. PAGE 7

8 The background to the warrants for left turns 3 state that they are set to match driver expectations rather than achieving a benefit cost ratio of one, as is the case for right turn warrants. The warrants are not intended for direct application to accesses and driveways but can be used as a reference for decisions. Future for slip lane demand at 79vph Existing around 300vph southbound 10 years growth around 400vph southbound Te Arahori Street Left Turn Current warrant around 20vph 10 year growth means only 10vph Existing left turn is 4vph not warranted Figure 4: Left turn lane warrants (Austroads) We consider that additional traffic to be likely, and a short auxiliary left turn lane to be desirable to mitigate efficiency effects and the risk of rear end crashes from vehicles slowing to turn. Clear signage promoting use of the slip lane could reduce the number of left turns. However, a left turn lane would probably reduce visibility for Te Arahori Street drivers joining or crossing SH1, and increase the risk of crashes if a following vehicle is concealed by a vehicle slowing in a left turn lane to to Te Arahori Street. That risk can be mitigated by detailed design to protect visibility, but would result in a wider intersection that further reduces space for queuing on Te Arahori Street for right turns into the site. Although there is a low risk of queuing affecting the state highway, the consequences could be severe and it would be desirable for vehicles to be able to pass traffic turning into the site even if the queues are long. On balance, we consider that the risks of high severity crashes from potential shadowing associated with a left turn lane outweigh the adverse safety and efficiency effects of not installing one, as the current form of the proposal intends Te Arahori Street Parking Restrictions The Proposal appears likely to require restricting parking on Te Arahori Street near the entranceway to allow for an island and a median and operate as presented. We suggest that parking restrictions should be dealt with in advance of the hearing or the consent, if approved, be made subject to a condition precedent or equivalent requiring that these are approved prior to construction commencing and in place prior to operations. 3 Austroads Guide to Traffic Management Part 6, Commentary C5.2 and 5.3 PAGE 8

9 3.5. Positive Effects from Intersection Changes The ITA indicates that there will be convenience, safety and efficiency benefits to existing users from reducing the need to turn right to the existing service centre and the intersection upgrade. The ITA states that although the proposed development is expected to reduce the demand for the right to Pihanga Street the intersection upgrade will still increase the queue space. This appears to be a reasonable assertion Other Adverse Effects from Intersection and Access Changes The Proposal includes two widened areas for left turns. These result in extended potential conflict zones for cyclists, exposing vulnerable users to potential crashes likely to lead to serious injuries. The increased movements at the Te Arahori Street entrance exposes pedestrians, cyclists and local traffic. There appear to be few pedestrians and cyclists potentially affected, so the likelihood of a crash appears very low. These risks could be mitigated with appropriate design, as noted in the ITA Crash Prediction We predicted the potential for crashes using the NZ Transport Agency s Crash Estimation Compendium general and conflict models (Attachment A). These should be considered comparative, since the current intersection performance is better than predicted (0.117 DSIs compared to predicted 0.15 DSIs). Since one crash in a five year period could add one or more casualties and increase the DSI rate by 0.2 DSIs per year or more, the difference in performance is unlikely to be statistically significant. We considered four scenarios, each with and without the Proposal: 1. Existing traffic flows. Daily flows inferred based on daily to hourly ratios - SH ( ) and side road for Te Arahori Street ( ). 2. Sensitivity: High SH traffic growth. 3.5% per annum on SH, 1% pa on side roads. Modelled at year Sensitivity: Conservative traffic growth all legs at 1% pa. Modelled at year Sensitivity: High growth. Turangi town centre and SH1. 3.5% pa all legs. Modelled at year 10. The results are presented in Table 2. Scenario Te Arahori Street crashes Pihanga Road crashes Total for scenario (injury crashes/yr) A T Equivalent DSIs DSIs per year Existing without Proposal (Year 0) Existing with Proposal (Year 0) 2 High SH traffic growth without Proposal (Year 10) 2 High SH traffic growth with Proposal (Year 10) (consistent with ITA which predicts 0.32) 0.15 DSIs per year. One DSI every 6.6 years injury crashes/yr 0.18 DSIs per year. One DSI every 5.6 years injury crashes/yr 0.18 DSIs per year. One DSI every 5.5 years injury crashes/yr 0.21 DSIs per year. One DSI every 4.7 years 4 Ratio based on 5060vpd:826vph on SH1 also applied to Pihanga Rd 5 Ratio based on 956vpd:65vph on Te Arahori Road, PAGE 9

10 Scenario Te Arahori Street crashes Pihanga Road crashes Total for scenario (injury crashes/yr) A T Equivalent DSIs DSIs per year 3 Conservative traffic growth without Proposal (Year 10) 3 Conservative traffic growth with Proposal (Year 10) 4High SH traffic growth and Turangi growth without Proposal (Year 10) PAGE injury crashes/yr 0.17 DSIs per year. One DSI every 6.1 years injury crashes/yr 0.19 DSIs per year. One DSI every 5.2 years injury crashes/yr 0.20 DSIs per year. One DSI every 5.1 years. 4 High SH traffic injury crashes/yr 0.23 DSIs per year. One growth and DSI every 4.3 years Turangi growth with Proposal (Year 10) Table 2: Predicted Injury Crash Rates (Injury crashes/year) The general crash prediction models do not take account of sight distance. The conflicting flow models in the Crash Estimation Compendium include a model for right turns in high speed areas that takes account of visibility deficiency but we do not consider that to be relevant here because the restriction is only when vehicles obstruct visibility and the Proposal is to reconfigure the intersection to achieve compliant sight distance for traffic turning right into Te Arahori Street, currently often obstructed by turning vehicles in the right turn bay for Pihanga Road. Based on conflict model predictions, the Proposal results in an increase in injury crash rates of around 15-20%. The high speed and conflict angles increase the risk of severe crashes. Since the corridor is already at a medium crash risk rating the potential increase could change the crash performance of the network. If significant, this could mean that NZ Transport Agency may have to consider additional intervention. Intervention by NZ Transport Agency as road controlling authority could be to reduce speeds or introduce an alternative intersection layout to reduce crash severity. Since these are not currently planned, they could reduce the effort or funding available to deal with existing safety priorities Left slip lane Direct access to the site from a national arterial via slip lane proposed would be contrary to the road hierarchy principles and method set out in Taupo District Plan. However, the layouts proposed indicate that a fully Austroads compliant slip lane can be established and I consider that if the Proposal is consented, then slip lane is likely to result in a better traffic outcome than restricting access to and from Te Arahori Road. Objective 3f.2.1 is The safe and efficient operation of the roading network, and movement of traffic, including cyclists and pedestrians within the District. The policies relevant to access are: Ensure activities avoid, remedy or mitigate any adverse effects on the operation and function of the roading network, including the movement of traffic cyclists and pedestrians, as accordance with the Roading Hierarchy. Encourage activities, including the design and location of new vehicle crossings, to provide for the safe and efficient movement of traffic, including cyclists and pedestrians. The explanation states: The roading network, including the movement of traffic cyclists and pedestrians, is an essential part of the District s infrastructure. The Roading Hierarchy, included within this Plan, identifies the different functions of

11 roads. As activities and vehicle access points have the potential to conflict with the existing roading network, the hierarchy will be used to manage the appropriate location of activities, and associated vehicle crossings, within the District. This will result in the efficient and effective operation of the roading network with the adverse effects on other users of the road and other land use activities avoided, remedied or mitigated the appropriate location of activities within the Environments and areas of the District. The design and location of vehicle crossings is also an important consideration as poorly located and designed property access points can inhibit the flow of traffic and increase the likelihood of accidents. Accordingly, activities shall consider access, as well as suitability with the type, formation, topography and design speed of adjoining roads. Pedestrians need to have the ability to utilise safe areas of the roading network. The safety, capacity and roading around a site and the affect an activity may have on these aspects of the existing roading network are a necessary consideration for all development. Not having a left turn slip lane would increase left turn demands at the intersection which might result in a minor increase in delays. We have assessed this above and have concluded that if consent were granted, the layout as proposed, is preferred. It would also increase demand for right turns from the local road into the site which, if they led to queues affecting state highway traffic could be significant adverse safety and efficiency impacts. The assessments in the ITA demonstrate there will be adequate and safe storage capacity within the right turn bays, appropriately mitigating this potential effect. There is little conflicting traffic on Te Arahori Street so I consider problems from Te Arahori Street queues affecting the entranceway highly unlikely Likely Adverse Effects on the Environment Relating to Traffic The likely adverse effects on the environment relating to traffic associated with the proposal include: Safety potential for an increased risk of predicted crashes, mainly at the intersection and entranceways resulting from the Proposal. - The relatively low speed environment on Te Arahori Street means that crashes are more likely to be non-injury or minor injury crashes. An increase in potential conflict on Te Arahori Street is likely to be substantially offset by a reduction in potential conflict for access to the other service centre from Pihanga Road opposite. - The speed environment on SH1 means that crashes have the potential to lead to serious injuries or fatalities. Crash predictions suggest an increase in the potential for deaths or serious injuries of around 20%. The current intersection operates slightly more safely than typical intersections but this may be because the good visibility for right turners into Pihanga Street and very poor visibility for right turns into Te Arahori Street results in safer decisions from drivers. - The crash predictions are reliant on the intersection alteration achieving suitable visibility for right turn movements into Te Arahori Street, which the application indicates it achieves. - Adversely affecting safety would be contrary to the Taupo District Plan Objective 3f.2.1 The safe and efficient operation of the roading network, and movement of traffic, including cyclists and pedestrians within the District. The key safety issue, in my opinion, would be from commercial development straddling the state highway leading to an increase in conflict. This is reduced to some extent by the Proposal since most of the trips are pass by trips, but we expect that there will be an increase in demand that counter-balance this. - There would be an increased risk of crashes if delays for traffic entering from Te Arahori Street lead to queues reaching traffic lanes. The ITA analysis indicates this is not expected to be likely and there will be ample queuing storage, in particular reduced demand for turning right to Pihanga Road. Efficiency delays to traffic - Efficiency impacts should only be delays of a few extra seconds at peak times, with the network still operating at acceptable levels of service, as long as the access arrangements operate effectively. PAGE 11

12 - In my opinion, a left turn lane is warranted at Te Arahori Street to reduce safety and efficiency effects on southbound traffic. This would result in worse safety effects and should not be installed, meaning that those delays, albeit nominal in in overall effect, from slowing/turning vehicles are not mitigated. Most of the effect expected to arise from vehicles slowing to turn left is currently occurring by way of their slowing to turn right. I do not consider the delays from turning traffic significant. - There is a risk of obstruction associated with peak period queuing for right turns or cross movements at SH1/Te Arahori Street obstructing entering vehicles leading to left turn traffic affecting movements. That could result in a risk of crashes and delays or disruption but should be managed by appropriate design. Parking On-street parking and controls - There is currently no restriction to on-street parking on Te Arahori Street near the site entrance. There is unlikely to be any need for on street parking because there is little development between the state highway and the proposed site access. - Parking regulation would require a Council resolution to change the bylaw and may therefore be uncertain impact enforcement demands on TDC staff. It would be desirable for this to be resolved prior to the hearing or have a condition precedent imposed to cover it. Overall, the change should be achievable and is expected to be self-enforcing given the undeveloped adjacent land use demands and expected street utilisation. Amenity noise, emissions, manoeuvring for car park not assessed as part of this review. Construction effects including dust, noise, vibration, parking, etc. These can generally be managed a construction management plan including appropriate temporary traffic management. For this site it should require permanent entrance formation as part of preliminary/enabling works and parking and loading management plans for construction staff and materials to avoid on-street parking and loading effects. 4. Conclusion 4.1. Conclusion In my opinion, the ITA conclusions understate the potential adverse effects of the proposal on safety. We have used NZ Transport Agency crash prediction methods to estimate the change in the likelihood of crashes (injury crashes and DSIs (deaths and serious injury equivalents). The change in turning movements is likely to lead to an increase in injury crashes of around 15-20% equivalent to an injury crash every 2.6 years instead of every 2.9 years from modelling the existing environment. Although a relatively low probability, the consequence of a potential crash at high speeds and conflict angles is likely to be severe, and result in deaths or serious injuries. Our crash predictions suggest that the Proposal increases the predicted crash rate to one DSI every 5.6 years compared to a predicted crash rate for the current environment of one DSI every 6.6 years. Current actual performance is 1 injury crash every 8.5 years. A serious crash would lead to adverse effects on the local communities and state highway traffic, as well as compromising NZ Transport Agency s objective to reduce deaths and serious injuries, and adverse economic impacts. If traffic growth on SH1 is taken into account or the development results in greater attraction to the Proposal than expected for southbound left turn traffic, or traffic crossing SH1, the potential for conflict would be slightly higher but the relative increase is similar. The likely consequence of the Proposal would either be for the community to accept an increase in crashes potentially including deaths and serious injuries, or intervention by NZ Transport Agency as road controlling authority to reduce speeds or introduce an alternative intersection layout to reduce crash severity. Based on my review and conditions during my site visit, the conclusions relating to the adverse effects of the proposal on traffic efficiency appear reasonable, and although there will be adverse effects, these are likely to be infrequent and unlikely to exceed a few seconds extra delay for turning vehicles except during short periods of peak demand. During those periods there will be an increased likelihood of longer queues and frustrated drivers making poor decisions. This increases the potential for crashes, but as long as queuing does not exceed the capacity of vehicle storage space such as right turn bays that is likely to be at PAGE 12

13

14 Attachment A: Crash Predictions To: Alasdair Gray Copy: File From: Naomi McMinn Date: 26 March 2018 updated 18 April 2018 Job Number: 170_02 SUBJECT: Turangi BP -updated 1. Crash History NZTA Crash Analysis System (CAS) reported crashes ( inclusive) are shown on the collision diagram below: In the recent five year period, , within 50m of the SH1/Pihanga Road/ Te Arahori Road intersection there were eight reported crashes. We have also included two crashes in 2017 and one in PAGE 14

15 Date Movement Description Injury 9/12/12 MC U-turn NI 30/7/17 FB SBD on SH1 hit rear end of vehicle slowing/stopping for cross traffic 9/3/17 HA Crossing (no turns) NI 12/6/15 DA Loss of control NI 30/12/14 HA Crossing (no turns) NI 21/3/14 LB Right turn against (right turn across failed to give way and hit oncoming ) 12/1/14 KB Merging (right ) NI 10/2/14 JA NI 11/8/14 LB NI 17/1/18 FB NI 5/1/12 HA NI NI 2 Minor Based on 5 year history 2 minor injuries, one LB injury crash. 0.2 injury crashes/year equivalent to DSIs/year. One DSI every 12.8 years. Based on the 10 year injury crashes: 1 LB crash resulting in 1 serious injury 1 LB crash resulting in 2 minor injuries 1 KB crash resulting in 1 minor injury 0.3 injury crashes/year equivalent to DSIs/year, one DSI every 8.5 years. Traffic Volumes Hourly traffic volumes are from figure 7 and figure 13 of the TIA for existing and post development traffic. For Pihanga I have used the SH ratio daily to hourly since using the Te Arahori St ratio means the daily count on Pihanga is significantly exceeded. PAGE 15

16 Daily traffic volumes are available from mobileroad.org: 1,288 vpd Pihanga Road (estimated 28/12/2016) 956 vpd Te Arahori Street (estimated 28/12/2016) 5,061vpd SH1 (estimated 28/12/2016) PAGE 16

17 2. Crash Model Table 27 High Speed Priority Crossroads (>80 km/hr) Existing: Based on the SH1 traffic volumes (daily to hourly ratio) (5061 vpd/826 vph). The ratio (6.13) applied to movements q5, q11, q4, Qe maj. The Te Arahori volumes (daily to hourly ratio) (956 vpd/65 vph). The ratio (14.7) applied to movements q2 and Qemin for the Te Arahori side leg model. For Pihanga Road, the SH ratio (6.13) applies. Scenario 1: Base (existing) Hourly volumes Side road Te Arahori St Pihanga Rd road out Daily volumes Existing All SH1 from road out Te Arahori St Pihanga Rd Scenarios: Existing with Proposal. SH ratio daily to hourly (6.13) and ratio for Te Arahori Street (14.7) 2. Sensitivity: SH traffic growth, 3.5% per annum on SH, 1% pa on side roads. Modelled at year Sensitivity: conservative traffic growth all legs at 1%. Modelled at year Sensitivity: What if Turangi town centre grows faster? So 3.5% on all side road legs. Year 10. PAGE 17

18 Crash Estimations for SH1 Turangi Proposed BP Crash Compendium Actual crash history DSIs DSIS crash per yrs Scenario 1 Without Proposal at Year 0 Existing Traffic Flows: Hourly volumes Te Arahori St Pihanga Rd Scenario 1 Existing Traffic Volumes Scenario 1 Without Proposal at Year 0 Existing Traffic Flows: Daily volumes Te Arahori St Pihanga Rd Crash Type Scenario 1 Without Proposal at Year 0 Existing Traffic Flows: Crash Model HA HA GC, GD, GE crossing hit Crossing hit minor road Right turning and following vehicles Other major Other minor Total for leg AT AT AT AT AT AT Te Arahori St Pihanga Rd PAGE 18

19 Total AT for scenario HA DSIs Existing GC GD GE DSIs other TOTAL DSIs one DSI per 6.55 yrs Scenario 1 With Proposal at Year 0 Existing Traffic Flows: Hourly volumes Te Arahori St Pihanga Rd Scenario 1 With Proposal at Year 0 Existing Traffic Flows: Daily volumes Te Arahori St Pihanga Rd Scenario 1 With Proposal at Year 0 Existing Traffic Flows: Crash Model HA HA GC, GD, GE Crash Type crossing hit Crossing hit minor road Right turning and following vehicles Other major Other minor Total for leg AT AT AT AT AT AT Te Arahori St Pihanga Rd Total AT for HA DSIs PAGE 19

20 scenario GC GD GE DSIs other DSIs TOTAL Total DSIs one DSI per 5.58 yrs PAGE 20

21 Sensitivity: SH traffic growth, 3.5% per annum on SH, 1% pa on side roads. Modelled at year 10 Existing without proposal Scenario 2 Without Proposal at Year 10 High SH traffic growth: Hourly volumes (Year 0) Scenario 2 Sensitivity: SH traffic growth, 3.5% per annum on SH, 1% pa on side roads. Modelled at year 10 Te Arahori St Pihanga Rd Scenario 2 Without Proposal at Year 10 High SH traffic growth: Hourly volumes (Year 10) Te Arahori St Pihanga Rd Scenario 2 Without Proposal at Year 10 High SH traffic growth: Daily volumes (Year 10) Te Arahori St Pihanga Rd Crash Type Te Arahori St Pihanga Rd Scenario 2 Without Proposal at Year 10 High SH traffic growth: Crash Model HA HA GC, GD, GE crossing hit Crossing hit minor road Right turning and following vehicles Other major Other minor Total for leg AT AT AT AT AT AT PAGE 21

22 Total AT for scenario HA DSIs Existing GC GD GE DSIs other TOTAL DSIs one DSI per 5.50 yrs Scenario 2 With Proposal at Year 10 High SH traffic growth: Hourly volumes (year 0) Te Arahori St Pihanga Rd Scenario 2 With Proposal at Year 10 High SH traffic growth: Hourly volumes - (Yr 10) Te Arahori St Pihanga Rd Scenario 2 With Proposal at Year 10 High SH traffic growth: Daily volumes (Yr10) Te Arahori St Pihanga Rd Scenario 2 With Proposal at Year 10 High SH traffic growth: Crash Model HA HA GC, GD, GE Crash Type crossing hit Crossing hit minor road Right turning and following vehicles Other major Other minor Total for leg AT AT AT AT AT AT PAGE 22

23 Te Arahori St Pihanga Rd Total AT for scenario HA DSIs Existing GC GD GE DSIs other TOTAL DSIs one DSI per 4.69 yrs PAGE 23

24 Sensitivity: conservative traffic growth all legs at 1%. Modelled at year 10 Scenario 3 Without Proposal at Year 10 conservative traffic growth: hourly volumes (Yr0) Te Arahori St Scenario 3 Conservative traffic growth all legs 1% pa. Modelled at Year 10 Pihanga Rd Scenario 3 Without Proposal at Year 10 conservative traffic growth: Hourly volumes (Yr 10) Te Arahori St Pihanga Rd Scenario 3 Without Proposal at Year 10 conservative traffic growth: Daily volumes (Yr10) Te Arahori St Pihanga Rd Scenario 3 Without Proposal at Year 10 conservative traffic growth: Crash Model Crash Type HA HA GC, GD, GE crossing hit Crossing hit minor road Right turning and following vehicles Other major Other minor Total for leg AT AT AT AT AT AT Te Arahori St Pihanga Rd PAGE 24

25 Total AT for scenario HA DSIs Existing GC GD GE DSIs other TOTAL DSIs one DSI per 6.05 yrs Scenario 3 With Proposal at Year 10 conservative traffic growth: Hourly volumes (Year 0) Te Arahori St Pihanga Rd Scenario 3 with Proposal at Year 10 conservative traffic growth: Hourly volumes (Year 10) Te Arahori St Pihanga Rd Scenario 3 With Proposal at Year 10 conservative traffic growth: Daily volumes (Year 10) Te Arahori St Pihanga Rd Scenario 3 With Proposal at Year 10 conservative traffic growth: Crash Model HA HA GC, GD, GE Crash Type crossing hit Crossing hit minor road Right turning and following vehicles Other major Other minor Total for leg AT AT AT AT AT AT PAGE 25

26 Te Arahori St Pihanga Rd Total AT for scenario HA DSIs Existing GC GD GE DSIs other TOTAL DSIs one DSI per 5.15 yrs PAGE 26

27 Sensitivity: What if Turangi town centre grows faster? 3.5% annual traffic growth. Year 10 Scenario 4 Sensitivity: What if Turangi town centre grows faster? 3.5% annual traffic growth. Year 10 Scenario 4 Without Proposal at Year 10 high traffic growth SH and Turangi: Hourly volumes (Yr0) Te Arahori St Pihanga Rd Scenario 4 Without Proposal at Year 10 high traffic growth SH and Turangi: Hourly volumes - Yr 10 Te Arahori St Pihanga Rd Scenario 4 Without Proposal at Year 10 high traffic growth SH and Turangi: Daily volumes (Yr10) Te Arahori St Pihanga Rd Scenario 4 Without Proposal at Year 10 high traffic growth SH and Turangi: Crash Model Crash Type HA HA GC, GD, GE crossing hit Crossing hit minor road Right turning and following vehicles Other major Other minor Total for leg AT AT AT AT AT AT Te Arahori St PAGE 27

28 Pihanga Rd Total AT for scenario HA DSIs Existing GC GD GE DSIs other TOTAL DSIs one DSI per 5.09 yrs Scenario 4 With Proposal at Year 10 high traffic growth SH and Turangi: Hourly volumes (Yr0) Te Arahori St Pihanga Rd Scenario 4 With Proposal at Year 10 high traffic growth SH and Turangi: Hourly volumes - Yr 10 Te Arahori St Pihanga Rd Scenario 4 With Proposal at Year 10 high traffic growth SH and Turangi: Daily volumes - Yr 10 Te Arahori St Pihanga Rd Scenario 4 With Proposal at Year 10 high traffic growth SH and Turangi: Crash Model PAGE 28

29 HA HA GC, GD, GE Crash Type crossing hit Crossing hit minor road Right turning and following vehicles Other major Other minor Total for leg AT AT AT AT AT AT Te Arahori St Pihanga Rd Total AT for scenario HA DSIs Existing GC GD GE DSIs other TOTAL DSIs one DSI per 4.33 yrs Summary Scenario Te Arahori Street crashes Pihanga Road crashes Total for scenario (injury crashes/yr) A T Equivalent DSIs DSIs per year Existing without Proposal (Year 0) Existing with Proposal (Year 0) 2 High SH traffic growth without Proposal (Year 10) (consistent with ITA which predicts 0.32) 0.15 DSIs per year. One DSI every 6.6 years injury crashes/yr 0.18 DSIs per year. One DSI every 5.6 years injury crashes/yr 0.18 DSIs per year. One DSI every 5.5 years PAGE 29

30 Scenario Te Arahori Street crashes Pihanga Road crashes Total for scenario (injury crashes/yr) A T Equivalent DSIs DSIs per year 2 High SH traffic growth with Proposal (Year 10) 3 Conservative traffic growth without Proposal (Year 10) 3 Conservative traffic growth with Proposal (Year 10) 4High SH traffic growth and Turangi growth without Proposal (Year 10) 4 High SH traffic growth and Turangi growth with Proposal (Year 10) injury crashes/yr 0.21 DSIs per year. One DSI every 4.7 years injury crashes/yr 0.17 DSIs per year. One DSI every 6.1 years injury crashes/yr 0.19 DSIs per year. One DSI every 5.2 years injury crashes/yr 0.20 DSIs per year. One DSI every 5.1 years injury crashes/yr 0.23 DSIs per year. One DSI every 4.3 years Conversion to DSIs is based on the High Risk Intersections Appendix Table A3-8 Rural priority controlled crossroads based on movement specific (0.5 for H movements and 0.25 for G movements and 0.39 for all/other movements). entranceways RT into site, Te Arahori St left turn out Low volume side road, entranceway, low risk. Proposal includes solid median to enforce LT out only. 3. Conclusion Intersection is performing better than the model prediction (0.117 DSIs compared to predicted 0.15 DSIs). Proposal increases likelihood of a crash, to one DSI every 5.6 years. Current modelled crash likelihood is 1 every 6.6 years. Current actual performance is one DSI every 8.5 years. Proposal likely to mean an increase in injury crashes at the intersection If state highway traffic growth is faster, then increase in right turning and following vehicles is much higher and there is potential for an increase in crashes relating to side roads. PAGE 30

31 Attachment B: Safety Background B1. Crashes ( ) B2. Collective Risk PAGE 31

32 B3. Corridors with High Risk Curves B4. Safe and Appropriate Speed (TomTom data suggests average of around 70km/h so 85%ile of 80-90km/h is reasonable) PAGE 32

Appendix 5B Accessway standards and guidelines Appendix 5B Accessway standards and guidelines

Appendix 5B Accessway standards and guidelines Appendix 5B Accessway standards and guidelines Appendix 5B standards and guidelines Appendix 5B standards and guidelines 204 Appendix 5B standards and guidelines Introduction This Appendix sets out Transit s safety standards for accessways onto state

More information

Harriet Fraser Traffic Engineering & Transportation Planning

Harriet Fraser Traffic Engineering & Transportation Planning Appendix 5: Traffic Assessment 71 26 February 2015 Mr James Beban Senior Resource Consents Planner Cuttriss Consultants Ltd PO Box 30429 Lower Hutt PO Box 40170 Upper Hutt 5140 P 04 526 2979 M 027 668

More information

Transport Assessment. Curtis Street Plan Change

Transport Assessment. Curtis Street Plan Change Transport Assessment Curtis Street Plan Change Transport Assessment for Curtis Street Plan Change i Contents 1. Introduction... 1 2. Existing Conditions... 2 2.1 Location... 2 2.2 Study Area... 3 2.3

More information

At each type of conflict location, the risk is affected by certain parameters:

At each type of conflict location, the risk is affected by certain parameters: TN001 April 2016 The separated cycleway options tool (SCOT) was developed to partially address some of the gaps identified in Stage 1 of the Cycling Network Guidance project relating to separated cycleways.

More information

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02 1 VicRoads Access Management Policies May 2006 Ver 1.02 VicRoads Access Management Policies May 2006 Version 1.02 2 VicRoads Access Management Policies May 2006 Ver 1.02 FOREWORD FOR ACCESS MANAGEMENT

More information

PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION PROGRESS REPORT

PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION PROGRESS REPORT Chairperson and Committee Members ENVIRONMENT AND COMMUNITY DEVELOPMENT COMMITTEE 6 DECEMBER 2011 Meeting Status: Public Purpose of Report: For Decision PAEKĀKĀRIKI HILL ROAD / BEACH ROAD / SH1 INTERSECTION

More information

Statement of Rebuttal Evidence of Anthony Thomas Penny on Behalf of Danne Mora Holdings (#1134)

Statement of Rebuttal Evidence of Anthony Thomas Penny on Behalf of Danne Mora Holdings (#1134) In the Matter of: The Resource Management Act 1991 and In the Matter of: and The Christchurch Proposed Replacement District Plan under the Canterbury Earthquake (Christchurch Replacement District Plan)

More information

Hewson Planning 35 Corbett Road RD2 Whangarei 082. Attachment 5. Traffic Assessment

Hewson Planning 35 Corbett Road RD2 Whangarei 082. Attachment 5. Traffic Assessment Hewson Planning 35 Corbett Road RD2 Whangarei 082 Attachment 5. Traffic Assessment 1 Engineering Outcomes, Limited 132 Beach Road PO Box 3048, Onerahi Whangarei New Zealand Telephone 09 436 5534 Mobile

More information

Statement of Evidence of Judith Makinson

Statement of Evidence of Judith Makinson In the Matter of: The Resource Management Act 1991 and In the Matter of: Podium Sports Lodge, 18 20 Peake Road Application By: Brian Perry Charitable Trust Statement of Evidence of Judith Makinson TDG

More information

Access Management Regulations and Standards

Access Management Regulations and Standards Access Management Regulations and Standards January 2014 Efficient highway operation Reasonable property access Concept of Access Management The way to manage access to land development while preserving

More information

Response to further information request Ministry of Education Notice of Requirement (200 & 252 Park Estate Road)

Response to further information request Ministry of Education Notice of Requirement (200 & 252 Park Estate Road) 21 Pitt Street PO Box 6345, Auckland 1141, New Zealand T: +64 9 300 9000 // F: +64 9 300 9300 E: info@beca.com // www.beca.com Auckland Council Private Bag 92300 Victoria Street West Auckland 1142 15 August

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

Appendix B Transportation Report

Appendix B Transportation Report Project File Report Appendix B Transportation Report Town of Whitby HMM Project No. 327878 Final Report October 2014 Revision and Version Tracking CP Rail Crossing at New Coronation Road Class EA Study

More information

Ministry of Education Flat Bush School Notice of Requirement. Integrated Transportation Assessment Report. February 2016

Ministry of Education Flat Bush School Notice of Requirement. Integrated Transportation Assessment Report. February 2016 Ministry of Education Flat Bush School Notice of Requirement Integrated Transportation Assessment Report February 2016 TDG Ref: 12988-2 151105 ita flat bush.docx Ministry of Education Flat Bush School

More information

Shotover Country. Proposed Private Plan Change. Transportation Assessment Report. February 2010

Shotover Country. Proposed Private Plan Change. Transportation Assessment Report. February 2010 Shotover Country Proposed Private Plan Change February 2010 PO Box 13 835, Armagh Christchurch 8141 P: +64 3 379 2404 www.tdg.co.nz New Zealand Shotover Country Proposed Private Plan Change Quality Assurance

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998 R1500 : Traffic Safety at 25 Avenue and 128 Street Intersection Corporate NO: R1500 Report COUNCIL DATE: May 25, 1998 REGULAR COUNCIL TO: Mayor & Council DATE: April 27, 1998 FROM: General Manager, Engineering

More information

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017 A127/A130 Fairglen Interchange Improvement Schemes Information Leaflet February 2017 1 2 Foreword By Councillor Kevin Bentley Essex is continuing to grow as a vibrant economic hub and as a fantastic place

More information

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT Update June 2018 Hi, Let s Get Wellington Moving (LGWM) is developing a Recommended Programme of Investment (RPI) that meets our programme objectives and supports the city s and region s growth. As part

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016 M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has

More information

Ministry of Education Notice of Requirement, North City High School. Transportation Assessment Report. July 2010

Ministry of Education Notice of Requirement, North City High School. Transportation Assessment Report. July 2010 Ministry of Education Notice of Requirement, North City High School Transportation Assessment July 2010 PO Box 1261, Level 1, 7 Hardley Street Hamilton 3240 P: +64 7 839 550 www.tdg.co.nz New Zealand 10574ta_v6.doc

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

Christchurch City Council Assets & Network Unit Transport Technical Services & Design

Christchurch City Council Assets & Network Unit Transport Technical Services & Design Date: 6 th May 2014 From: To: Bill Homewood Transportation Engineer TOC Subject: Main South Road / Carmen Road Optimisation Budget Category: Network Optimisation Appendices Appendix 1 - Turning Counts

More information

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL CITY OF WEST KELOWNA COUNCIL POLICY MANUAL Page 1 of 7 DEPARTMENT: Engineering Services SUBJECT: Traffic Calming Policy (Revised June 6, 2017) Policy Statement: The provision of traffic calming measures

More information

A5.1 Permitted activities

A5.1 Permitted activities Section A5 Transportation A5.1 Permitted activities A5.1.1 Activities within roads Note: Refer to Section D for the definition of road (a) Any activity associated with the movement of traffic and the functioning

More information

SH1, Karo Drive Wellington Crash Reduction Study

SH1, Karo Drive Wellington Crash Reduction Study SH1, Karo Drive Wellington Crash Reduction Study A REPORT PREPARED FOR New Zealand Transport Agency Reference: 12334 January 2013 Hawke s Bay office: PO Box 28 208, Havelock North 4157 Tel: (06) 877 8040

More information

Southside Road. Prepared for: City of St. John s Police & Traffic Committee. Prepared by: City of St. John s Traffic Division

Southside Road. Prepared for: City of St. John s Police & Traffic Committee. Prepared by: City of St. John s Traffic Division Southside Road Prepared for: City of St. John s Police & Traffic Committee Prepared by: City of St. John s Traffic Division January 2007 Southside Road - Traffic Report Page 1 of 9 BACKGROUND: th At the

More information

3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION

3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION Report No. 8 of the Transportation Services Committee Regional Council Meeting of October 20, 2011 3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION The Transportation Services Committee recommends:

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

CITY OF SAINT JOHN TRAFFIC CALMING POLICY CITY OF SAINT JOHN TRAFFIC CALMING POLICY VERSION: 1.0 April 10, 2012 Pedestrians, Cyclists and Motorists Sharing Street Spaces CONTENTS INTRODUCTION... 3 POLICY GOAL... 3 POLICY OBJECTIVES... 3 GUIDING

More information

Napier City road trauma for Napier City. Road casualties Estimated social cost of crashes* Major road safety issues.

Napier City road trauma for Napier City. Road casualties Estimated social cost of crashes* Major road safety issues. ISSN 1176-841X July 25 Land Transport New Zealand has prepared this road safety issues report. It is based on reported crash data and trends for the 2 24 period. The intent of the report is to highlight

More information

CITY OF SASKATOON COUNCIL POLICY

CITY OF SASKATOON COUNCIL POLICY ORIGIN/AUTHORITY Clause 1, Report No. 1-1980 and Clause 4, Report No. 22-1990 of the Works and Utilities Committee; Clause 6, Report No. 17-2004 of the Planning and Operations Committee; and Clause D5,

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

SH1 Western Belfast Bypass Transportation Assessment

SH1 Western Belfast Bypass Transportation Assessment SH1 Western Belfast Bypass Transportation Assessment WBB- Transportation Assessment i This report has been prepared on behalf of the NZ Transport Agency (NZTA). No liability is accepted by this company

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

Traffic Calming Policy

Traffic Calming Policy Article I. Purpose and Goal. The purpose of this policy is to establish criteria and procedures the City will use to evaluate requests for, and if appropriate, implement traffic calming measures. Neighborhood

More information

DRAFT. DRAFT Transport. Chapter 7 - Transport

DRAFT. DRAFT Transport. Chapter 7 - Transport Transport Contents 7.1 Objectives and policies 7.1.1 Objective 1 Integrated transport system 7.1.2 Objective 2 Adverse effects from the transport network 7.2 Rules All zones outside the Central City 7.2.1

More information

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study

More information

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.

The proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged. Stantec Consulting Ltd. 1331 Clyde Avenue, Suite 4 Ottawa ON K2C 3G4 Tel: (613) 722-442 Fax: (613) 722-2799 May 14, 213 File: 1638823 Robinson Park Development Corp. 5699 Power Road Ottawa, ON, K1G 3N4

More information

Borough of Danville, PA Traffic Calming Program Guidelines

Borough of Danville, PA Traffic Calming Program Guidelines Borough of Danville, PA Traffic Calming Program Guidelines Adopted by Borough Council on 1 INTRODUCTION Speeding Traffic is a major concern in the Borough of Danville because of its detrimental impacts

More information

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015 Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative

More information

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives Prepared for: The Town of Caledon August 9 Transportation Solutions Ltd. 43 Forest Road Cambridge, ON N1S 3B4

More information

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table

More information

Classification Criteria

Classification Criteria SCHEDULE D TO RECOMMENDED OFFICIAL PLAN AMENDMENT NO. 40 SCHEDULE C-4 Road Criteria Criteria Traffic Service Objective Land Service/Access Typical Daily Traffic Volume Flow characteristics Travel Speed

More information

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES (Adopted by the Town Council on June 30, 2004) (Revised December 6, 2010) (Revised February 8, 2016) POLICY AND PROCEDURES FOR TRAFFIC

More information

POLICY: TRAFFIC CALMING

POLICY: TRAFFIC CALMING 2006 MAY REFERENCE: COUNCIL APPROVED BY COUNCIL MAY 23, 2006 CITY OPERATIONS - NO. 608 POLICY: TRAFFIC CALMING A. All requests for traffic calming within the City shall be considered in accordance with

More information

Speed Limits in the Hoddle Grid

Speed Limits in the Hoddle Grid Speed Limits in the Hoddle Grid Recent History of speed limits March 2013 Docs # 7738485 1 Introduction Muncipalities have power to Erect speed limit signs BUT Municipalities DO NOT have the power to approve

More information

WHANGAREI IMPROVEMENTS

WHANGAREI IMPROVEMENTS WHANGAREI IMPROVEMENTS PROJECT OVERVIEW The NZ Transport Agency (NZTA) is working with Whangarei District Council (WDC) to improve the state highway through Whangarei. In addition to the recently completed

More information

A partnership of Christchurch City Council, New Zealand Transport Agency and Environment Canterbury Keeping Christchurch Moving

A partnership of Christchurch City Council, New Zealand Transport Agency and Environment Canterbury Keeping Christchurch Moving A partnership of Christchurch City Council, New Zealand Transport Agency and Environment Canterbury Keeping Christchurch Moving DRAFT: Transport Efficiency and Impact Guide April 2018 GUIDELINE DEVELOPMENT

More information

2. Context. Existing framework. The context. The challenge. Transport Strategy

2. Context. Existing framework. The context. The challenge. Transport Strategy Transport Strategy Providing quality connections Contents 1. Introduction 2. Context 3. Long-term direction 4. Three-year priorities 5. Strategy tree Wellington City Council July 2006 1. Introduction Wellington

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

TRAFFIC STUDY GUIDELINES Clarksville Street Department

TRAFFIC STUDY GUIDELINES Clarksville Street Department TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two

More information

Access Location, Spacing, Turn Lanes, and Medians

Access Location, Spacing, Turn Lanes, and Medians Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-3 Access Location, Spacing, Turn Lanes, and Medians This section addresses access location, spacing, turn lane and median needs, including

More information

Intersection Safety 6/7/2015 INTERSECTIONS. Five basic elements should be considered in intersection design. Intersection Safety (continued)

Intersection Safety 6/7/2015 INTERSECTIONS. Five basic elements should be considered in intersection design. Intersection Safety (continued) Intersection Safety S. M. SOHEL MAHMUD Assistant Professor Accident Research Institute (ARI), Bangladesh University of Engineering and Technology (BUET) Dhaka-1000, Bangladesh 1 Outline of the Presentation

More information

#!! "$% ##! &! # '#! % $ #!

#!! $% ##! &! # '#! % $ #! Executive Summary US Highway 16 (US 16) is the primary corridor connecting Rapid City to the Black Hills region. It serves a growing population of commercial and residential traffic, as well as seasonal

More information

6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT

6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT 6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT General Manager responsible: Officer responsible: Author: Jane Parfitt General Manager City Environment DDI 941 8656 Michael Aitken

More information

Findings on the Effectiveness of Intersection Treatments included in the Victorian Statewide Accident Black Spot Program

Findings on the Effectiveness of Intersection Treatments included in the Victorian Statewide Accident Black Spot Program Findings on the Effectiveness of Intersection Treatments included in the Victorian Statewide Accident Black Spot Program Nimmi Candappa, Jim Scully, Stuart Newstead and Bruce Corben, Monash University

More information

Section Outline Signalised Intersection Layout

Section Outline Signalised Intersection Layout Advanced Planning and Design for Cycling Module 4 Intersections SECTION 2 SIGNALISED INTERSECTION LAYOUT Section Outline Signalised Intersection Layout Refresher: 6 elements of intersection design Providing

More information

ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT

ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT One Size Doesn t Fit All S Corbett, C Chenery Page 1 ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT Authors/Presenters: Sam Corbett, Principal Transport

More information

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS Page 1 of 9 EXECUTIVE SUMMARY Alberta Transportation ( AT ) is preparing to construct the final sections of the Calgary Ring Road. This includes the South West Ring Road ( SWRR ) (from Lott Creek Blvd

More information

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY The Caledon Transportation Needs Study has been undertaken as a joint project by the Town of Caledon and the Region of Peel to determine the existing

More information

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 February 27, 2014 113-584 Overview_1.doc D. J. Halpenny

More information

MILTON ROAD LLF PROJECT UPDATE

MILTON ROAD LLF PROJECT UPDATE Greater Cambridge City Deal MILTON ROAD LLF PROJECT UPDATE 9 th May 2017 Project objectives Comprehensive priority for buses in both directions wherever practicable; Additional capacity for sustainable

More information

Understanding school road safety

Understanding school road safety Understanding school road safety 1. The purpose of these guidelines The safety of students travelling to and from school is one of the most important issues for school communities. Road environments around

More information

2.0 LANE WIDTHS GUIDELINE

2.0 LANE WIDTHS GUIDELINE 2.0 LANE WIDTHS GUIDELINE Road Engineering Design Guidelines Version 2.0.1 May 2018 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services initiated

More information

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015 HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE 1 MAY 14, 2015 ACCESSIBILITY Under the Accessibility Standards 2015 for Customer

More information

Route 7 Corridor Study

Route 7 Corridor Study Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi

More information

10.0 CURB EXTENSIONS GUIDELINE

10.0 CURB EXTENSIONS GUIDELINE 10.0 CURB EXTENSIONS GUIDELINE Road Engineering Design Guidelines Version 1.0 March 2017 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services

More information

M6 Junction 10 Public Consultation

M6 Junction 10 Public Consultation M6 Junction 10 Public Consultation December 2015 Introduction Walsall Council and Highways England are developing plans to provide a long term improvement to M6 junction 10. We are holding this non-statutory

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Welcome! San Jose Avenue Open House August 25, 2015

Welcome! San Jose Avenue Open House August 25, 2015 Welcome! San Jose Avenue Open House August 25, 2015 Vision Zero The City and County of San Francisco adopted Vision Zero San Francisco Vision Zero High Injury Network as a policy in 2014, committing an

More information

Tonight is an opportunity to learn about the Study and ask questions of the Study Team members.

Tonight is an opportunity to learn about the Study and ask questions of the Study Team members. Exhibit 1 Welcome Second Open House Tonight is an opportunity to learn about the Study and ask questions of the Study Team members. A first Public Open House was held on September 18th, 2013 which presented

More information

NMT SAFE STUDY APPROACH

NMT SAFE STUDY APPROACH 24 May 2017 ADVOCATING THE NON MOTORISED TRANSPORT AGENDA CONTENT Content NMT road safety study approach NMT road safety study process NMT SAFE STUDY APPROACH THE NEED FOR NMT SAFETY STUDIES Is there is

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN 8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN The Transportation Services Committee recommends the adoption of the recommendation contained in the following report

More information

PROVISION OF A LEFT SLIP LANE TO THE NORTHERN SECTION OF THE HAASENDAL DEVELPOMENT, KUILSRIVIER

PROVISION OF A LEFT SLIP LANE TO THE NORTHERN SECTION OF THE HAASENDAL DEVELPOMENT, KUILSRIVIER Date: 10 August 2016 Contact: Liezl du Plooy (tel 082 338 6466) Our ref: D122 Transport for Cape Town PO Box 19 Somerset West 7129 Attention: Mr. Bill Jones Sir PROVISION OF A LEFT SLIP LANE TO THE NORTHERN

More information

DYNAMIC LANES FOR AUCKLAND

DYNAMIC LANES FOR AUCKLAND Dynamic Lanes for Auckland MENEZES M. and INMAN R. Page 1 DYNAMIC LANES FOR AUCKLAND Authors: INMAN, Robert BA (Hons) Previously Auckland Transport Senior Traffic Engineer Now Aurecon Robert.Inman@aurecongroup.com

More information

Access Management Regulations and Standards for Minor Arterials, Collectors, Local Streets

Access Management Regulations and Standards for Minor Arterials, Collectors, Local Streets Access Management Regulations and Standards for Minor Arterials, Collectors, Local Streets September 2009 Paul Grasewicz Access Management Administrator Concept of Access Management The way to manage access

More information

SH3 Waitara to Bell Block

SH3 Waitara to Bell Block SH3 Waitara to Bell Block NZ Transport Agency August 2017 Community feedback report Copyright information This publication is copyright NZ Transport Agency. Material in it may be reproduced for personal

More information

QLDC Council 29 October Report for Agenda Item: 3

QLDC Council 29 October Report for Agenda Item: 3 QLDC Council 29 October 2015 Department: Infrastructure Beach Street Pedestrianisation Purpose Report for Agenda Item: 3 1 The purpose of this report is to obtain Council approval to consult over options

More information

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for: HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October

More information

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC

More information

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing

More information

Bay to Bay Boulevard Complete Streets Project

Bay to Bay Boulevard Complete Streets Project Bay to Bay Boulevard Complete Streets Project Dale Mabry Highway to Bayshore Boulevard February 08, 2018 Photo Source: Tampa Bay Times Alessandra Da Pra Meeting Format Introduction Resurfacing Information

More information

Why Zone In on Speed Reduction?

Why Zone In on Speed Reduction? Learn it. Do it. Live it! SPEED REDUCTION IN THE ZONE Why Zone In on Speed Reduction? Speeding is a serious issue that plays a major role in the risk of serious injury and pedestrian fatality in a crash.

More information

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis MEMORANDUM Transportation Bill Troe, AICP Jason Carbee, AICP 12120 Shamrock Plaza Suite 300 Omaha, NE 68154 (402) 334-8181 (402) 334-1984 (Fax) To: Project File Date: Subject: Solberg Avenue / I-229 Grade

More information

TECHNICAL NOTE THROUGH KERBSIDE LANE UTILISATION AT SIGNALISED INTERSECTIONS

TECHNICAL NOTE THROUGH KERBSIDE LANE UTILISATION AT SIGNALISED INTERSECTIONS TECHNICAL NOTE THROUGH KERBSIDE LANE UTILISATION AT SIGNALISED INTERSECTIONS Authors: Randhir Karma NDip: Eng (Civil) B. Tech Eng (Civil) M Eng (Hons) (Transportation) Auckland Traffic Service Group Manager

More information

City of Homewood Transportation Plan

City of Homewood Transportation Plan City of Homewood Transportation Plan Prepared for: City of Homewood, Alabama Prepared by: Skipper Consulting, Inc. May 2007 TABLE OF CONTENTS INTRODUCTION... 1 BACKGROUND INFORMATION... 1 EXISTING TRANSPORTATION

More information

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

Recommended Roadway Plan Section 2 - Land Development and Roadway Access Recommended Roadway Plan Section 2 - Land Development and Roadway Access SECTION 2 Land Development and Roadway Access 2.1 Land Use and Access Management The Federal Highway Administration (FHWA) defines

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,

More information

Overview. Existing Conditions. Corridor Description. Assessment

Overview. Existing Conditions. Corridor Description. Assessment Overview A study of the 23 rd Street corridor was undertaken to document the existing conditions, analyze traffic operations, and recommend remedies for deficient situations Although 23 rd Street is frequently

More information

Reduction of Speed Limit at Approaches to Railway Level Crossings in WA. Main Roads WA. Presenter - Brian Kidd

Reduction of Speed Limit at Approaches to Railway Level Crossings in WA. Main Roads WA. Presenter - Brian Kidd Australasian College of Road Safety Conference A Safe System: Making it Happen! Melbourne 1-2 September 2011 Reduction of Speed Limit at Approaches to Railway Level Crossings in WA Radalj T 1, Kidd B 1

More information

Memorandum INTRODUCTION METHODOLOGY. Smart Growth. Bruce Robinson, Transport Advisor, Infrastructure Planning

Memorandum INTRODUCTION METHODOLOGY. Smart Growth. Bruce Robinson, Transport Advisor, Infrastructure Planning Memorandum To: Smart Growth From: Bruce Robinson, Transport Advisor, Infrastructure Planning Subject: Te Tumu Transportation Assessment: Stage 1 Sensitivity Analysis Date: 1 June 2016 INTRODUCTION This

More information

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Date: April 16 th, 2015 To: From: Re: Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Darian Nagle-Gamm, Traffic Engineering Planner Highway 6 (2 nd Street) /