Marcus Jones, TRL. Presented by Name Here Job Title - Date

Size: px
Start display at page:

Download "Marcus Jones, TRL. Presented by Name Here Job Title - Date"

Transcription

1 Segregation Insert the title and of priority your at presentation junctions: a here discussion Marcus Jones, TRL Presented by Name Here Job Title - Date

2 Background: TfL cycle facility trials Infrastructure trialled: Segregation within the carriagewayside road crossings and separation methods Dutch style roundabout Traffic signals for cyclists- high and low level Bus stop bypasses More than 6000 participants, over 130 days of trials

3 Requirement for off-street trials TfL is considering proposed designs (or elements of them) not currently approved for use in UK Overseas experience not always directly transferable to UK context Need to understand how people respond under safe and controlled conditions Off-street trials establish suitability for progressing to on-street trials, and help identify issues requiring further investigation

4 What did we want to find out in the trials? How people use the space: their speed and position, where they stop etc- impacts on capacity Whether conflicts occur, what form they take and severity Their understanding of the facility, e.g. who has priority? Their attitudes towards it: willingness to use, willingness to cycle etc NB- changes in priority rules were not part of the trial design, so trial findings do not lead to recommendations in this area

5 First trial: Segregation within the carriageway How far should segregation end before side roads? LTN2/08: As a result of concerns over the safety of parallel cycle tracks crossing side roads, it is becoming common European practice to reintroduce cyclists to the main road in advance of a junction. Cyclists pass the junction on the carriageway and then re-join the cycle track. The merge onto the carriageway should be at least 30 metres from the junction to reduce the risk of conflict with left turning traffic.

6 Two distinct approaches to this situation Re-introduce to the traffic before the junction (LTN2/08); or Segregate to the junction and give cyclists priority over turning vehicles Geometry, including raised crossings, can be used to manage vehicle speeds and position, particularly in the latter case

7 Examples Reintroduction Segregation to the turning Page 7

8 Trial layouts Test track Driving simulator

9 Set-back Distance

10 Reintroduction (>20m) Two distinct conflict points Cyclists and drivers have space to adjust to each other Preferred by nearly half of participants More familiar situation to UK road users?

11 Segregate to junction (<5m) Single point of conflict Reduced vehicle speeds, perpendicular approach Greater passing distance Preferred by slightly fewer participants Who has priority at junction?

12 Mid-way (~>5m to <20m) Two adjacent conflict points No effect on vehicle speed or position Limited space to merge into traffic flow Worst of both worlds, don t do it!

13 Light separation methods Wands Low profile Zebras

14 Light segregation Compared solid kerbs, wands, zebra separators against white line baseline Measured and position and speed in lane Qualitative survey of safety and comfort All three were quite similar in performance, slight preferences for kerbs, then wands, then zebras. Not focus of trial, but some concerns raised by participants about who has priority at exits to separated sections

15 Dutch Style Roundabout Orbital cycle track with priority for cyclists at entries and exits As built on TRL test track (Dutch-style markings)

16 Common issue: who has priority? When turning across a cycle lane to turn left? At exit to separated lanes? When turning in or out of a roundabout? In The Netherlands and Denmark, cyclists using adjacent cycle tracks will often have priority over turning vehicles; everyone understands this to be the case and expects it However, in trials, most people were prepared to give way anyway. Encouraged by the infrastructure?

17 The Highway Code 206 Drive carefully and slowly when: needing to cross a pavement or cycle track; for example, to reach or leave a driveway. Give way to pedestrians and cyclists on the pavement reversing into a side road; look all around the vehicle and give way to any pedestrians who may be crossing the road turning at road junctions; give way to pedestrians who are already crossing the road into which you are turning Does standard (e.g. DMRB) highway design undermine the priority rules?

18 Discussion In principle, is giving cyclists priority over turning traffic the right approach when designing segregated facilities? Does this need to be supported by regulatory change? Do drivers respect priority rules if infrastructure sends a contradictory message? Is appropriate design of infrastructure sufficient to encourage the desired behaviour, without requiring any regulatory change?

19 Marcus Jones TRL Ltd

Perne Rd / Radegund Rd Roundabout Cambridge

Perne Rd / Radegund Rd Roundabout Cambridge Perne Rd / Radegund Rd Roundabout Cambridge The conversion of an conventional urban roundabout to continental geometry A little bit of history The first traffic roundabout was built in Sollershott, Letchworth

More information

Issues at T junctions:

Issues at T junctions: TheSlade_PublicConsulationPlans_March2017.pdf These comments relate to junction designs in this phase of the project on The Slade. Comments begin with the northernmost junction: Girdlestone Rd and continue

More information

Transport Research Laboratory Creating the future of transport

Transport Research Laboratory Creating the future of transport Transport Research Laboratory Creating the future of transport DRAFT PROJECT REPORT RPN751 Off street trials of a Dutch-style roundabout Cycle Facility Trials, Work Stream 2: Off-street trials of the safety

More information

Report from Embassy Visit to Copenhagen May David Arditti

Report from Embassy Visit to Copenhagen May David Arditti Report from Embassy Visit to Copenhagen May 2013 David Arditti Standard CPH cycle track, one-way 1.5 2m wide, 5cm above carriageway, 5cm below footway Basic one-way cycle track protected by car parking

More information

DMURS - Practical Implications

DMURS - Practical Implications Comhairle Contae Fhine Gall DMURS - Practical Implications Sean McGrath. 13 November 2013 Planning and Strategic Infrastructure Department DMURS Practical Implications What DMURS means for: Street Layouts

More information

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation Frascati Road and Temple Hill Route Improvements Outline Design Report to Accompany Public consultation September 2013 Background: Dún Laoghaire-Rathdown is committed to providing high quality pedestrian

More information

Low Level Cycle Signals used as repeaters of the main traffic signals Appendices

Low Level Cycle Signals used as repeaters of the main traffic signals Appendices Low Level Cycle Signals used as repeaters of the main traffic signals Appendices Track trial report This document contains the appendices to accompany the report from the first sub-trial of a larger track

More information

Design and Installation of Low Level Cycle Signals

Design and Installation of Low Level Cycle Signals Transport for London Surface Transport Management System Document Guidance Note Design and Installation of Low Level Cycle Signals Document reference: SQA-0651 - Issue: Draft out of date information. 1

More information

Union Street roundabout Turbo-style roundabouts the future? Patrick Lingwood Walking and Cycling Officer Bedford Borough Council

Union Street roundabout Turbo-style roundabouts the future? Patrick Lingwood Walking and Cycling Officer Bedford Borough Council Union Street roundabout Turbo-style roundabouts the future? Patrick Lingwood Walking and Cycling Officer Bedford Borough Council Presentation outline Local importance and problems we faced The evolution

More information

Transport Research Laboratory Creating the future of transport

Transport Research Laboratory Creating the future of transport Transport Research Laboratory Creating the future of transport PUBLISHED PROJECT REPORT PPR704 TfL Cycle Facility Trials: Alternative Separation Methods for Cycle Lanes G Beard Prepared for: Project Ref:

More information

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager LONDON BOROUGH OF RICHMOND UPON THAMES DATE: AUGUST 2015 DECISION MAKER: LEAD OFFICER: SUBJECT: WARDS: Cabinet Member for Highways & Streetscene Highway Infrastructure Manager PROPOSED CYCLING IMPROVEMENTS

More information

Parking. Signing. Appendix C Typical detail drawings. London Cycling Design Standards

Parking. Signing. Appendix C Typical detail drawings. London Cycling Design Standards Appendix C Typical detail drawings London Cycling Design Standards All drawings are prefixed CCE/ General A1 Cycle Symbol Diagram 1057 165 A3 Raised entry treatment on side roads 166 A4 Raised table at

More information

Chicane Schemes. Traffic Advisory Leaflet 12/97 December Introduction

Chicane Schemes. Traffic Advisory Leaflet 12/97 December Introduction Traffic Advisory Leaflet 12/97 December 1997 Chicane Schemes Introduction Traffic Advisory Leaflet 9/94 "Horizontal Deflections" reported on the results of track trials carried out by the Transport Research

More information

Mill Hill Broadway Capacity Improvement

Mill Hill Broadway Capacity Improvement 1 16 MARCH 2016 Mill Hill Broadway Capacity Improvement Presentation to Barnet Members and Mill Hill Residents Association 2 Background A1 is one of 23 Transport for London Road Network (TLRN) Strategic

More information

Transport Research Laboratory Creating the future of transport

Transport Research Laboratory Creating the future of transport Transport Research Laboratory Creating the future of transport PUBLISHED PROJECT REPORT PPR752 Dutch-style Roundabout Capacity Report Research into the Capacity of a Dutch-style Roundabout P Emmerson,

More information

How do we design for pedestrians? Case study: transforming the Walworth Road

How do we design for pedestrians? Case study: transforming the Walworth Road How do we design for pedestrians? Case study: transforming the Walworth Road David Moores, Director of Public Realm Institution of Highways and Transportation, November 2009 Presentation overview Design

More information

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document TELL US Bakers Arms to Leyton Green Road (Section D, E, F) Leyton Green Road to Whipps Cross Roundabout (Section G) YOUR VIEWS www.enjoywalthamforest.co.uk

More information

MILTON ROAD LLF PROJECT UPDATE

MILTON ROAD LLF PROJECT UPDATE Greater Cambridge City Deal MILTON ROAD LLF PROJECT UPDATE 9 th May 2017 Project objectives Comprehensive priority for buses in both directions wherever practicable; Additional capacity for sustainable

More information

Introduction Methodology Study area and data collection Results and recommendation Conclusion References

Introduction Methodology Study area and data collection Results and recommendation Conclusion References Introduction Methodology Study area and data collection Results and recommendation Conclusion References It is formal procedure for assessing accident potential and safety performance in the provision

More information

1. TSRGD 2015 rewrite clarification and details

1. TSRGD 2015 rewrite clarification and details Question 13: The following issues need to be considered in the rewrite of TSRGD. These issues 1. clarify points of detail within the TSRGD rewrite 2. or provide additional signage to measures already approved

More information

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm IAN WHITE ASSOCIATES Crawley Station Gateway Public Realm contents 1. objectives & client brief 2. site appraisal 3. best practice guidance 4. design concept 1. objectives & client brief Crawley Train

More information

DYNAMIC LANES FOR AUCKLAND

DYNAMIC LANES FOR AUCKLAND Dynamic Lanes for Auckland MENEZES M. and INMAN R. Page 1 DYNAMIC LANES FOR AUCKLAND Authors: INMAN, Robert BA (Hons) Previously Auckland Transport Senior Traffic Engineer Now Aurecon Robert.Inman@aurecongroup.com

More information

Cycle track crossings of minor roads

Cycle track crossings of minor roads Cycle track crossings of minor roads Prepared for Charging and Local Transport Division, Department of the Environment, Transport and the Regions A Pedler and D G Davies TRL Report TRL462 First Published

More information

Evolution of Cycling in London

Evolution of Cycling in London 1 OCT 2017 Evolution of Cycling in London Korak van Tuyl Design Manager TfL Outcomes Delivery 2 HISTORY AND EVOLUTION History Key Dates Off-Street Trials Cycle Superhighways On Street Monitoring 3 Cycling

More information

Appendix A Type of Traffic Calming Measures Engineering Solutions

Appendix A Type of Traffic Calming Measures Engineering Solutions Appendix A Type of Traffic Calming Measures Engineering Solutions PHYSICAL MEASURES Central Hatching The major consideration of this feature is that, these markings can only be laid down the centre of

More information

Derby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN. Date: 20 th November, 2018.

Derby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN. Date: 20 th November, 2018. Your Ref: Derby City Council Air Quality - Preferred Option Nov 2018 Derby Cycling Group, c/o 126, Station road, Mickleover, Derby, DE3 9FN Date: 20 th November, 2018. 1. Introduction: 1.1. Derby Cycling

More information

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign E4 Cycle Route Exeter University to Redhayes Bridge - Recommendations from Exeter Cycling Campaign 1.0 Introduction Exeter Cycling Campaign has prepared this report to provide recommendations for Devon

More information

TYPES OF CYCLING. Figure 1: Types of Cycling by Gender (Actual) Figure 2: Types of Cycling by Gender (%) 65% Chi-squared significance test results 65%

TYPES OF CYCLING. Figure 1: Types of Cycling by Gender (Actual) Figure 2: Types of Cycling by Gender (%) 65% Chi-squared significance test results 65% TYPES OF CYCLING 1,980 responses were received to this question (multiple answers were allowed), 727 female (41%) and 1,242 (71%) from male respondents. The most common responses for both genders were

More information

Simulation Analysis of Intersection Treatments for Cycle Tracks

Simulation Analysis of Intersection Treatments for Cycle Tracks Abstract Simulation Analysis of Intersection Treatments for Cycle Tracks The increased use of cycle tracks also known as protected bike lanes has led to investigations of how to accommodate them at intersections.

More information

A465 Heads of the Valleys Dualling Sections 5 and 6 Dowlais Top to Hirwaun SUMMARY PROOF OF EVIDENCE. Highways Engineering Document WG 1.3.

A465 Heads of the Valleys Dualling Sections 5 and 6 Dowlais Top to Hirwaun SUMMARY PROOF OF EVIDENCE. Highways Engineering Document WG 1.3. A465 Heads of the Valleys Dualling Sections 5 and 6 Dowlais Top to Hirwaun SUMMARY PROOF OF EVIDENCE Highways Engineering Document WG 1.3.2 by Jonathan Thirkettle MARCH 2018 1. Introduction 1.1 I am Jonathan

More information

Highway Code for Cyclists Operation Close-Pass

Highway Code for Cyclists Operation Close-Pass Highway Code for Cyclists Operation Close-Pass 1 2 Operation Close-Pass For the 2 million people who cycle every day, close passes are an almost daily occurrence. Close passes are really intimidating and

More information

CURRENT ORIGINAL REFERENCE SECTIONS. (Typical Section) (Typical Section) The Parade Island Bay : Concept Option Summary Sheets.

CURRENT ORIGINAL REFERENCE SECTIONS. (Typical Section) (Typical Section) The Parade Island Bay : Concept Option Summary Sheets. ORIGINAL (Typical Section) CURRENT (Typical Section) 3,900 3,000 2,000 1,500 3,100 1,600 3,100 1,500 2,000 2,500 3,900 3,000 1,800 600 2,000 3,000 3,000 2,000 600 1,800 2,500 Existing Planting Traffic

More information

NRA New Divided Road Types: Type 2 and Type 3 Dual - Carriageways

NRA New Divided Road Types: Type 2 and Type 3 Dual - Carriageways NRA New Divided Road Types: Type 2 and Type 3 Dual - Carriageways DN-GEO-03059 December 2007 DN Design Technical TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland

More information

Accommodating Cyclists at Signalised Intersections

Accommodating Cyclists at Signalised Intersections Accommodating Cyclists at Signalised Intersections Axel Wilke Senior Traffic Engineer, Christchurch City Council Axel.Wilke@ccc.govt.nz Glen Koorey Transportation Lecturer, University of Canterbury Glen.Koorey@canterbury.ac.nz

More information

Milton Road Bus Stop and Crossings Workshop WSP. 19th September 2017

Milton Road Bus Stop and Crossings Workshop WSP. 19th September 2017 Bus Stop and Crossings Workshop WSP 19th September 2017 Workshop Aims Task 1: Identify preferences for bus stop designs relative to: (a) Ranking preference between 4 possible bus stop designs on the narrower

More information

Local road mountable roundabouts are there safety benefits?

Local road mountable roundabouts are there safety benefits? Local road mountable roundabouts are there safety benefits? Nimmi Monash University Accident Research Centre Abstract Roundabouts are internationally accepted as being highly effective in improving safety

More information

West Midlands Cycle Design Guidance Cycling and the Midland Metro

West Midlands Cycle Design Guidance Cycling and the Midland Metro Transport for the West Midlands Cycling and the Midland Metro September 2017 Project Code: 02821 Phil Jones Associates Ltd Seven House High Street Longbridge Birmingham B31 2UQ philjonesassociates.co.uk

More information

MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING

MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING NOVEMBER 216 MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING Cambridgeshire County Council Type of document (version)

More information

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport LONDON BOROUGH OF RICHMOND UPON THAMES Cabinet Member Decision DATE: January 2012 REPORT OF: LEAD OFFICER: SUBJECT: WARDS: The Cabinet Member for Highways & Streetscene Aurang Zeb - Head of Highways &

More information

Cycle Traffic and The Strategic Road Network. John Parkin and Phil Jones Presenting on behalf of Highways England

Cycle Traffic and The Strategic Road Network. John Parkin and Phil Jones Presenting on behalf of Highways England Society of Road Safety Auditors Annual Conference Monday 20 th and Tuesday 21 st June 2016 Cycle Traffic and The Strategic Road Network John Parkin and Phil Jones Presenting on behalf of Highways England

More information

HISTON ROAD Have your say on better public transport, cycling and walking journeys

HISTON ROAD Have your say on better public transport, cycling and walking journeys HISTON ROAD Have your say on better public transport, cycling and walking journeys Have your say: Please complete the survey inside this leaflet or online at www.greatercambridge.org.uk/histonconsultation

More information

Transport Research Laboratory Creating the future of transport

Transport Research Laboratory Creating the future of transport Transport Research Laboratory Creating the future of transport PUBLISHED PROJECT REPORT PPR730 Off-street trials of a Bus Stop Bypass An assessment of user perceptions, safety, capacity and accessibility

More information

FEASIBILITY OF IMPLEMENTING INTERNATIONAL "PEDESTRIAN CROSSWALK" LAWS IN NEW ZEALAND

FEASIBILITY OF IMPLEMENTING INTERNATIONAL PEDESTRIAN CROSSWALK LAWS IN NEW ZEALAND FEASIBILITY OF IMPLEMENTING INTERNATIONAL "PEDESTRIAN CROSSWALK" LAWS IN NEW ZEALAND Glen Koorey, PhD(Trptn), ME(Civil), BE(Hons), BSc, MIPENZ Senior Lecturer, Dept. of Civil and Natural Resources Engineering

More information

Cyclists at road narrowings

Cyclists at road narrowings Traffic Advisory Leaflet 1/97 February 1997 Cyclists at road narrowings Introduction Traffic calmed streets can offer a more attractive environment for cycling, by reducing motor vehicles speeds to a level

More information

Sevenways Roundabout, and the need for a Road Safety Scheme:

Sevenways Roundabout, and the need for a Road Safety Scheme: Sevenways Roundabout, and the need for a Road Safety Scheme: The way the current roundabout has evolved has obviously created an environment that is dangerous for all road users, motorists, cyclists and

More information

4. Guided Bus Explained

4. Guided Bus Explained 4. Guided Bus Explained Contents 1 INTRODUCTION... 2 Structure of this report... 2 2 KERB GUIDED BUS... 3 Overview... 3 Kerb guidance... 3 Figures Figure 2.1 Figure 2.2 Figure 2.3 Figure 2.4 Figure 2.5

More information

Rhebogue Neighbourhood Greenway. Road Safety Audit Stage 2

Rhebogue Neighbourhood Greenway. Road Safety Audit Stage 2 Rhebogue Neighbourhood Greenway Road Safety Audit Stage 2 Report Number: 12/007/00/00057 July 2014 Mid West National Road Design Office Lissanalta House, Dooradoyle County Limerick Tel: 061 496 800 Fax:

More information

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21 DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.

More information

RIGHT-OF-WAY INTERSECTIONS

RIGHT-OF-WAY INTERSECTIONS Infrastructure Give Cycling a Push INFRASTRUCTURE/ INTERSECTSIONS AND CROSSINGS RIGHT-OF-WAY INTERSECTIONS Overview Right-of-way mixed traffic is the simplest, most agreeable approach for cyclists on quiet

More information

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design Cycle traffic and the Strategic Road Network Sandra Brown, Team Leader, Safer Roads- Design Highways England A Government owned Strategic Highways Company Department for Transport Road Investment Strategy

More information

HORN PROHIBITED NO PARKING NO STOPPING STRAIGHT PROHIBITED NO ENTRY

HORN PROHIBITED NO PARKING NO STOPPING STRAIGHT PROHIBITED NO ENTRY UNIT III 1. What are the various types of traffic signs? [N/D-13] Traffic signs give timely warning of hazardous situations when they are not self - evident. The various types of traffic signs are: a)

More information

Trial 3: Interactions Between Autonomous Vehicles and Pedestrians and Cyclists

Trial 3: Interactions Between Autonomous Vehicles and Pedestrians and Cyclists Trial 3: Interactions Between Autonomous Vehicles and Pedestrians and Cyclists What is VENTURER? VENTURER is a 5m research and development project funded by government and industry and delivered by Innovate

More information

MARKHOUSE ROAD IMPROVEMENTS

MARKHOUSE ROAD IMPROVEMENTS MARKHOUSE ROAD IMPROVEMENTS www.enjoywalthamforest.co.uk Waltham Forest is changing and we want you to be part of it. Thanks to a funding pot of 27million from Transport for London, we re delivering the

More information

Interactions involving autonomous vehicles in the urban street environment: a research agenda

Interactions involving autonomous vehicles in the urban street environment: a research agenda John Parkin Professor of Transport Engineering Interactions involving autonomous vehicles in the urban street environment: a research agenda 14 th December 2016 Outline 1. What are Autonomous vehicles

More information

At each type of conflict location, the risk is affected by certain parameters:

At each type of conflict location, the risk is affected by certain parameters: TN001 April 2016 The separated cycleway options tool (SCOT) was developed to partially address some of the gaps identified in Stage 1 of the Cycling Network Guidance project relating to separated cycleways.

More information

Side Roads and Other Non-Signalised Junctions

Side Roads and Other Non-Signalised Junctions Green Surfacing Sections of the Cycle Superhighway are marked with green paint these highlight sections where people cycling the Superhighway are likely to come into contact with walkers, drivers, or other

More information

PART 5 TD 51/03 SEGREGATED LEFT TURN LANES AND SUBSIDIARY DEFLECTION ISLANDS AT ROUNDABOUTS SUMMARY

PART 5 TD 51/03 SEGREGATED LEFT TURN LANES AND SUBSIDIARY DEFLECTION ISLANDS AT ROUNDABOUTS SUMMARY DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 6 SECTION 3 ROAD GEOMETRY HIGHWAY FEATURES PART 5 TD 51/03 SEGREGATED LEFT TURN LANES AND SUBSIDIARY DEFLECTION ISLANDS AT ROUNDABOUTS SUMMARY This document sets

More information

SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane

SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane Exception Report Client Officer Rudo Beremauro Date 20 January 2015 RSA /Project Sponsor s Contents Section 3 Project Sponsor's

More information

Feasibility of Implementing International "Pedestrian Crosswalk" Laws in New Zealand Dr Glen Koorey & Courtney McCrostie University of Canterbury

Feasibility of Implementing International Pedestrian Crosswalk Laws in New Zealand Dr Glen Koorey & Courtney McCrostie University of Canterbury IPENZ Transportation Conference 2015 Feasibility of Implementing International "Pedestrian Crosswalk" Laws in New Zealand Dr Glen Koorey & Courtney McCrostie University of Canterbury Presentation Outline

More information

The existing site constraints which may be encountered for the A428 scheme proposals are divided into sections as follows.

The existing site constraints which may be encountered for the A428 scheme proposals are divided into sections as follows. Project: A428 Study To: Cambridgeshire County Council Subject: Tidal Bus lane Review From: Atkins Date: 24 May 2016 cc: Introduction As part of the A428 Corridor Study to improve the bus journey time between

More information

1) No through traffic except for pedestrians, cyclists or pedestrian and cyclists.

1) No through traffic except for pedestrians, cyclists or pedestrian and cyclists. THE PEP Proposed changes for road signs and signals in the Vienna Convention to make it easier to increase walking and cycling Benoît Hiron Cerema, July the 2nd 2017-07-02 Considering that many countries

More information

Milton Road Project Update. Paul van de Bulk 30 January 2018

Milton Road Project Update. Paul van de Bulk 30 January 2018 Milton Road Project Update Paul van de Bulk 30 January 2018 Milton Road Project Objectives Comprehensive priority for buses in both directions wherever practicable; Safer and more convenient routes for

More information

Design Manual for Road and Bridges (DMRB) Design Standards TD 50/04. Competency 4. Apply DfT and other technical advice and guidance.

Design Manual for Road and Bridges (DMRB) Design Standards TD 50/04. Competency 4. Apply DfT and other technical advice and guidance. Design Standards TD 50/04 Gafoor Din IEng FIHE Principal Engineer Competency 4 Apply DfT and other technical advice and guidance Competency 23 Design a traffic signals scheme (including facilities for

More information

Chapter 6 Performing Basic Vehicle Maneuvers

Chapter 6 Performing Basic Vehicle Maneuvers Chapter 6 Performing Basic Vehicle Maneuvers Correct hand position To turn use Hand over hand steering Push and Pull steering Steering Turn Signals Use indicators/signals Indicators inform other drivers

More information

DRAFT. Jesmond Vale Lane. Meldon Terrace. Heaton Road. King John Street. Newcastle City Council

DRAFT. Jesmond Vale Lane. Meldon Terrace. Heaton Road. King John Street. Newcastle City Council Remove footway build-out and reposition crossing equipment & tactile paving uild-out kerb to reduce turning speeds Jesmond Vale Lane Provide gap in parking for right turning cycles Light segregation set-back

More information

C L M ccrostie. Final Year Projects, 2014 Dept. of Civil and Natural Resources Engineering University of Canterbury Project supervisor(s): G.

C L M ccrostie. Final Year Projects, 2014 Dept. of Civil and Natural Resources Engineering University of Canterbury Project supervisor(s): G. C L M ccrostie Final Year Projects, 2014 Dept. of Civil and Natural Resources Engineering University of Canterbury Project supervisor(s): G. Koorey Keywords:, pedestrian crosswalk, traffic laws ABSTRACT

More information

Consultation Report & Results August 2016

Consultation Report & Results August 2016 Queen Edith s Way Consultation Report & Results August 216 Summary The consultation on walking and cycling improvements along Queen Edith s Way took place from 2 June to 1 August 216. A total of 64 survey

More information

Cyclist Safety at Signalised Junctions

Cyclist Safety at Signalised Junctions Cyclist Safety at Signalised Junctions Søren Underlien Jensen, Project Manager, Danish Road Directorate Niels Juels Gade 13, 1020 Copenhagen K, Denmark suj@vd.dk Summary: The Danish Road Directorate has

More information

CYCLISTS and PEDESTRIANS

CYCLISTS and PEDESTRIANS Infrastructure Give Cycling a Push INFRASTRUCTURE/ NETWORK LINKS CYCLISTS and PEDESTRIANS Overview Cyclists and pedestrians mix easily. Their speeds are not so different and cyclists adapt their behavior.

More information

Unit Five : Driving In Neighborhoods

Unit Five : Driving In Neighborhoods Unit Five : Driving In Neighborhoods What Are We Going To Do Today? Students will be able to describe the skills necessary to How safely and do legally you make drive in a residential How do area. you

More information

ST BEDE S CATHOLIC COLLEGE TRAFFIC MANAGEMENT PLAN

ST BEDE S CATHOLIC COLLEGE TRAFFIC MANAGEMENT PLAN ST BEDE S CATHOLIC COLLEGE TRAFFIC MANAGEMENT PLAN APPLICABLE TO Staff, students and parents DOCUMENT OWNER Principal APPROVAL DATE 6 th July 2018 APPROVED BY Principal SCHOOL ACTIONS School Policy Staff

More information

Citizens Cycling Jury. Sharing the Roads Safely Final Recommendations. November RAA Response to Recommendations

Citizens Cycling Jury. Sharing the Roads Safely Final Recommendations. November RAA Response to Recommendations Citizens Cycling Jury Sharing the Roads Safely Final Recommendations November 2014 RAA Response to Recommendations Background The Citizen s Jury Report entitled Sharing the Road Safely was presented to

More information

Strategic Director for Environment. Enclosures Appendix A - Option drawings. Jamie Blake- Strategic Director for Environment

Strategic Director for Environment. Enclosures Appendix A - Option drawings. Jamie Blake- Strategic Director for Environment Chipping Barnet Area Committee 9 July 2018 Title Report of Wards Status Urgent Key Cromer Road Request for 20mph Zone Strategic Director for Environment High Barnet Public No No Enclosures Appendix A -

More information

OLDER PEOPLE INDEPENDENT MOBILITY FOR LIVEABLE COMMUNITIES. Christopher G B (Kit) Mitchell

OLDER PEOPLE INDEPENDENT MOBILITY FOR LIVEABLE COMMUNITIES. Christopher G B (Kit) Mitchell OLDER PEOPLE INDEPENDENT MOBILITY FOR LIVEABLE COMMUNITIES by Christopher G B (Kit) Mitchell Independent mobility is necessary for a high quality of adult life In developed countries, the automobile has

More information

Signs. signs, signals and road markings. in this chapter

Signs. signs, signals and road markings. in this chapter 3 signs, signals and road markings in this chapter Signs regulatory signs school, playground and crosswalk signs lane use signs turn control signs parking signs reserved lane signs warning signs object

More information

A105 South of Ecclesbourne Gardens to Oakthorpe Road

A105 South of Ecclesbourne Gardens to Oakthorpe Road Cycle Enfield - Section 1 A105 South of Ecclesbourne Gardens to Oakthorpe Road Stage 2 Road Safety Audit Ref: 2759.03.01/032/A105/BOR/2016 Prepared for: London Borough of Enfield By: Road Safety Audit,

More information

NRA New Divided Road Types: Type 2 and Type 3 Dual-carriageways

NRA New Divided Road Types: Type 2 and Type 3 Dual-carriageways NRA New Divided Road Types: Type 2 and Type 3 Dual-carriageways BENEFITS of the TYPE 2 and TYPE 3 DUAL CARRIAGEWAY ROAD TYPE There are significant safety and economic benefits associated with the Type

More information

Streets for All : 9 Use of white lines

Streets for All : 9 Use of white lines Streets for All : 9 Use of white lines On 1st April 2015 the Historic Buildings and Monuments Commission for England changed its common name from English Heritage to Historic England. We are now re-branding

More information

Birmingham City Council

Birmingham City Council Birmingham City Council A summary of the recommendations for the calculation of Saturation Flows at Traffic Signals. Index to Recommended Method of Calculating Saturation Flows 1 Introduction 2 Summary

More information

IMPROVEMENT OPTIONS REPORT - WONERSH VILLAGE. for WONERSH PARISH COUNCIL. March V3.0 stilwell-ltd.co.uk

IMPROVEMENT OPTIONS REPORT - WONERSH VILLAGE. for WONERSH PARISH COUNCIL. March V3.0 stilwell-ltd.co.uk IMPROVEMENT OPTIONS REPORT - WONERSH VILLAGE for WONERSH PARISH COUNCIL March 2016 V3.0 stilwell-ltd.co.uk Improvement Options Report Wonersh Village, Wonersh Date of Prepared Checked Revision Comments

More information

Junction Design with Traffic Signals

Junction Design with Traffic Signals Junction Design with Traffic Signals Wednesday March 2 nd 2016 Overview Introduction Context Conventional Approach Sustainable Approach Analysis Design Summary Introduction What are Traffic Signals? Purpose

More information

The key to achievement of a sustainable, safe traffic system lies in the systematic and consistent application of safety principles.

The key to achievement of a sustainable, safe traffic system lies in the systematic and consistent application of safety principles. 3 SUSTAINABLE SAFE ROAD DESIGN: THEORY In the early 1990's, in the Netherlands Sustainable Safety was developed as a vision towards a safer road traffic system. The aim of Sustainable Safety is to avoid

More information

Economic and Social Council

Economic and Social Council UNITED NATIONS E Economic and Social Council Distr. GENERAL 20 December 2006 ENGLISH Original: ENGLISH and FRENCH ECONOMIC COMMISSION FOR EUROPE INLAND TRANSPORT COMMITTEE Working Party on Road Traffic

More information

Raised Rib Markings. Traffic Advisory Leaflet 2/95 March Introduction

Raised Rib Markings. Traffic Advisory Leaflet 2/95 March Introduction Traffic Advisory Leaflet 2/95 March 1995 Raised Rib Markings Introduction Raised rib markings consist of a continuous line marking with ribs across the line at regular intervals. They were first specially

More information

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session Intersection Improvement: 1 Welcome WHY IS AN INTERSECTION IMPROVEMENT NEEDED? 2 Traffic volumes for Sturgeon Road, Silver Avenue and Murray Park Road exceed the capacity of the existing 4-way stop controlled

More information

Reducing Speed: The C-Roundabout

Reducing Speed: The C-Roundabout Reducing Speed: The C-Roundabout Ivan Jurisich (PRESENTER) NZCE (Civil) BSc(Maths) MPhil (Civil Eng) Member of ITE Traffic Engineering Solutions Ltd Phone: +649 366 7532 Email: ivan.jurisich@tes.net.nz

More information

15/06/2015. The new TSRGD: Signals and cycling. Sally Gibbons Senior Engineer Traffic Division 18 May The story so far

15/06/2015. The new TSRGD: Signals and cycling. Sally Gibbons Senior Engineer Traffic Division 18 May The story so far IHE Traffic Signal Design Course The story so far The new TSRGD: Signals and cycling Sally Gibbons Senior Engineer Traffic Division 18 May 2015 Traffic Signs Policy Review: 2008-11 Signing the Way : October

More information

CITY OF SASKATOON COUNCIL POLICY

CITY OF SASKATOON COUNCIL POLICY ORIGIN/AUTHORITY Clause 1, Report No. 1-1980 and Clause 4, Report No. 22-1990 of the Works and Utilities Committee; Clause 6, Report No. 17-2004 of the Planning and Operations Committee; and Clause D5,

More information

National Cycle Network Route 81 Wolverhampton Cross City Route August 2005

National Cycle Network Route 81 Wolverhampton Cross City Route August 2005 Page 12 Buses often stop in Lichfield Street and there is no space to pass. Should an NCN route be following a road which is heavily congested with buses and diesel fumes? 14. Railway Drive The dropped

More information

APPENDIX H. Simulation Network Coding Guidance Note

APPENDIX H. Simulation Network Coding Guidance Note APPENDIX H Simulation Network Coding Guidance Note 5048375 / LD / 090202 H-1 5048375 / LD / 090202 H-2 H. Simulation Network Coding Guidance Note INTRODUCTION H.1 The G-BATS3 (2006) network is an updated

More information

guide to a phased approach TRIPP

guide to a phased approach TRIPP complete street development guide to a phased approach TRIPP development phases Existing 00 months 00 crores/km Phase 0 months 0 crores/km Phase 09 months 0 to 08 crores/km Phase months 07 to crores/km

More information

CHURCH ROAD. Public consultation document TELL US YOUR VIEWS.

CHURCH ROAD. Public consultation document TELL US YOUR VIEWS. CHURCH ROAD Public consultation document YOUR TELL US VIEWS www.enjoywalthamforest.co.uk CHURCH ROAD Introduction Waltham Forest Council was one of three boroughs to be awarded 27million of funding from

More information

Space for Cycling. A guide for decision makers

Space for Cycling. A guide for decision makers Space for Cycling A guide for decision makers Why create Space for Cycling? Imagine your area with considerably less traffic. Imagine safe streets and neighbourhoods, clean air, young and old alike able

More information

Improved Multi-lane Roundabout Designs for Cyclists

Improved Multi-lane Roundabout Designs for Cyclists Improved Multi-lane Roundabout Designs for Cyclists By Duncan Campbell, Senior Traffic Engineer, GHD Ltd; Ivan Jurisich, Principal Traffic Engineer, GHD Ltd; Roger Dunn, Associate Professor, Director of

More information

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN 8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN The Transportation Services Committee recommends the adoption of the recommendation contained in the following report

More information

IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING

IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING BBAG BRIEFING NOTE EMAIL: BERMUDABRIDGEAGP@BTINTERNET.COM WWW.FACEBOOK.COM/GROUPS/BERMUDABRIDGEAG TWITTER @BERMUDABRIDGEAG CYCLING BBAG BRIEFING NOTE

More information

Road Safety Factsheet

Road Safety Factsheet Road Safety Factsheet Overtaking July 2017 Overtaking is one of the highest risk manoeuvres for both drivers and riders because it can put the overtaking vehicle into the path of oncoming traffic, often

More information

Napier City road trauma for Napier City. Road casualties Estimated social cost of crashes* Major road safety issues.

Napier City road trauma for Napier City. Road casualties Estimated social cost of crashes* Major road safety issues. ISSN 1176-841X July 25 Land Transport New Zealand has prepared this road safety issues report. It is based on reported crash data and trends for the 2 24 period. The intent of the report is to highlight

More information

Cycle Superhighway 4 from Tower Bridge to Greenwich

Cycle Superhighway 4 from Tower Bridge to Greenwich Cycle Superhighway 4 from Tower Bridge to Greenwich About Sustrans Sustrans is the charity making it easier for people to walk and cycle. We are engineers and educators, experts and advocates. We connect

More information

ECONOMY PEOPLE ENVIRONMENT

ECONOMY PEOPLE ENVIRONMENT Report Back on Local Transit Improvements May 29, 2013 ECONOMY PEOPLE ENVIRONMENT Intro Council Requested Report Back Topics Progress on Planning for Broadway Subway False Creek Bridges Local Transit Improvements

More information