texas department of transportation Commission Approved Stimulus Maintenance Projects

Size: px
Start display at page:

Download "texas department of transportation Commission Approved Stimulus Maintenance Projects"

Transcription

1 West Region TxDOT Districts: Abilene, Amarillo, Childress, El Paso, Lubbock, Odessa, San Angelo ABL HOWARD $5,052,463 Repair Roadway IH 20 MARTIN COUNTY LINE TO BIG SPRING Let ABL TAYLOR $222,634 Replace Bridge CR ON CR 173 (PSN 1) TO AT BULGER CREEK Let ABL TAYLOR $196,673 Replace Bridge CR ON CR 345 (PSN 1) TO AT DRAW Let ABL TAYLOR $329,127 Replace Bridge CR ON CR 344 TO AT MULBERRY CREEK TRIBUTARY (PSN 3) Let ABL TAYLOR $174,441 Replace Bridge CR ON CR 344 TO AT MULBERRY CREEK TRIBUTARY (PSN 2) Let ABL TAYLOR $983,383 Replace Bridge FM 126 ON FM 126 (PSN 13) TO AT MULBERRY CREEK Let ABL CALLAHAN $6,757,845 Resurface Roadway SH 36 US 283 to Eastland County line Let AMA OCHILTREE $1,505,681 Repair Roadway US 83 Perryton to Wolf Creek Bridge Let AMA ARMSTRONG $11,714,257 Repair Roadway US 287 CARSON COUNTY LINE TO 8.6 MILES EAST OF CARSON C/L Let AMA RANDALL $1,716,426 Resurface Roadway IH 27 POTTER COUNTY LINE TO 45TH AVENUE Let AMA HARTLEY $5,513,521 Repair Roadway US 87 DALHART SOUTH CITY LIMITS TO 0.07 MI EAST OF JCT US 385 Let CHS HARDEMAN $1,654,412 Resurface Roadway US 287 Childress C/L, SE to Loop 285 (SBL) Let CHS CHILDRESS $134,256 Replace Bridge CR CR Let CHS HALL $223,315 Replace Bridge CR CR 7 at Turkey Creek Let CHS HALL $284,803 Replace Bridge CR CR C Tributary Dry Salt Creek Let CHS HALL $218,989 Replace Bridge CR CR I at Draw Creek Let CHS HALL $232,921 Replace Bridge CR CR CC at Kent Creek Let CHS HALL $255,170 Replace Bridge CR CR P at Draw Let CHS HALL $3,277,826 Widen Roadway FM MI N OF COTTLE C/L, NE TO CHILDRESS C/L Let CHS CHILDRESS $366,542 Widen Roadway FM 94 Hall C/L to FM 2042 Let ELP BREWSTER $4,750,000 Resurface Roadway US 67 MOSLEY LANE TO MI W OF MOSLEY_LANE Let ELP EL PASO $857,009 Resurface Roadway FM 2529 FM 3255 TO FM 2637 Let ELP EL PASO $315,226 Resurface Roadway FM 1110 INT OF FM 76 AND FM 1110 TO IH 10 GATEWAY WEST ON FM Let 1110 ELP EL PASO $2,916,000 Resurface Roadway LP 375 US 54/LP 375 TO 1.74 MI W OF US 54/LP 375 INTERCH Let LBB CASTRO $3,952,396 Repair Roadway FM 1055 SH 86 TO FM 2397 Let LBB CASTRO $3,447,604 Repair Roadway FM 1055 FM 2397 to Deaf Smith County Line Let LBB CASTRO $281,000 Repair Roadway FM 2943 Deaf Smith County Line to US 385 Let LBB HALE $2,429,984 Resurface Roadway FM 2286 FM 400 TO FLOYD COUNTY LINE Let LBB FLOYD $503,422 Resurface Roadway FM 2286 Hale County Line to FM 2301 Let LBB LUBBOCK $3,524,400 Repair Roadway VA IH 27, CITY OF LUBBOCK TO HALE COUNTY LINE Let LBB HALE $2,309,038 Repair Roadway VA IH 27, Lubbock County Line to Swisher County Line Let LBB SWISHER $2,695,900 Repair Roadway VA IH 27, Hale County Line to Randall County Line Let ODA MARTIN $2,307,629 Repair Roadway SH MI SOUTH OF DAWSON CO.LINE TO DAWSON CO. LINE Let ODA PECOS $2,417,418 Repair Roadway US 385 SPUR 194 TO 17.9 MILES SOUTH Let ODA ANDREWS $1,912,752 Repair Roadway SH 115 US 385 (IN ANDREWS) S TO MUSTANG DRIVE (WEST) Let ODA ANDREWS $2,744,713 Repair Roadway SH 115 US 385 (IN ANDREWS) TO MUSTANG DRIVE (WEST) Let SJT IRION $2,000,000 Repair Roadway US MI. S. OF THE TOM GREEN C/L TO RM 915 Let SJT IRION $1,553,629 Repair Roadway US 67 TOM GREEN CO LINE TO MILES SOUTH Let SJT EDWARDS $1,600,449 Construct Bridge SH 55 At Little Hackberry Creek Let SJT MENARD $1,399,550 Construct Bridge RM 864 At San Saba River Let AMA POTTER $4,536,875 Relocate Rail VA SE 3RD FROM MANHATTAN TO BIG TEXAN RD CHS DICKENS $291,295 Resurface Roadway FM 836 FROM FM 2565, SE TO FM 2794 Let ELP PRESIDIO $898,593 Resurface Roadway US 67 APPROX 7 MI W OF MOSLEY LANE TO MI E OF BREWSTER/ Let PRESIDIO C/L ELP BREWSTER $601,034 Resurface Roadway US MI E BREWSTER/PRESIDIO C/L TO BREWSTER/PRESIDIO Let C/L ELP EL PASO $998,476 Upgrade Roadway Signs VA VARIOUS LOCATIONS DISTRICTWIDE Let Updates: You can keep current with TxDOT s stimulus work at Enter keyword stimulus in the search box. Funding: Total ARRA funding for Texas highway programs is $2.25 billion. Available for the Commission s direct use is $1.7 billion. Staff has recommended approximately $500 million of these funds be spent on maintenance projects and the remaining $1.2 billion be obligated to significant projects. An additional $500 million in funding is available to the state s metropolitan planning organizations for use at their discretion. 1

2 West Region continued ELP EL PASO $1,200,000 Relocate Rail CS US/MX BORDER TO APPROX 1.5 MILES NORTH LBB CROSBY $337,825 Resurface Roadway SH 207 US 62 TO FM 40 EAST Let LBB CROSBY $227,219 Resurface Roadway FM 1471 US 62 TO FM 651 Let LBB FLOYD $307,960 Resurface Roadway FM 651 US 62 TO CROSBY CO. LINE Let LBB FLOYD $330,015 Resurface Roadway FM 1958 FM 651 EAST TO FM 28 Let ODA WINKLER $2,175,346 Construct New Roadway SH MILES EAST OF SH 18 IN KERMIT TO ECTOR COUNTY LINE Let Lanes SJT COKE $414,208 Repair Roadway US MI NORTH OF SH 158 (MAIN ST.) TO SH 158 (MAIN ST) IN BRONTE ABL CALLAHAN $2,380,019 Repair Roadway IH 20 East of Mexia Creek to Eastland County Line CHS DONLEY $2,100,000 Resurface Roadway US 287 Clarendon est city limits to Clarendon east city limits Subtotal $101,531,669 2

3 South Region TxDOT Districts: Austin, Corpus, Laredo, Pharr, San Antonio, Yoakum AUS TRAVIS $5,159,969 Resurface Roadway RM 1431 TRAILS END RD to LAGO VISTA CITY LIMITS Let AUS TRAVIS $3,760,429 Resurface Roadway LP 1 DUVAL RD to LADY BIRD LAKE Let AUS WILLIAMSON $2,015,100 Resurface Roadway US 79 IH 35 NBFR to W OF FM 1460 Let AUS TRAVIS $2,715,128 Resurface Roadway LP 1 COLORADO RIVER to BARTON CREEK Let AUS HAYS $531,934 Resurface Roadway FM 2439 CENTERPOINT RD to COMAL C/L Let AUS LIANO $667,879 Repair Roadway SH 71 SH 16 to CR 304 Let AUS TRAVIS $1,971,024 Resurface Roadway LP 1 GAINES CREEK to CONVICT HILL ROAD Let AUS HAYS $494,000 Repair Roadway SH 123 IH 35 to FM 3407 Let AUS BLANCO $1,200,000 Resurface Roadway US 281 S OF US 290 to MCCALL CREEK RD Let AUS CALDWELL $6,000,012 Resurface Roadway SH MILES W OF HAYS CL to FM 20 Let AUS LEE $652,489 Resurface Roadway FM 180 US 290 to BURLESON C/L Let AUS MASON $810,000 Resurface Roadway US 377 US 87 to MENARD C/L Let AUS BURNET $2,740,000 Resurface Roadway RM 2341 SH 29 to 11.7 Mi North of SH 29 Let AUS MASON $832,100 Resurface Roadway SH 29 MENARD C/L to W OF US 377 Let CRP JIM WELLS $650,000 Resurface Roadway BU 281R FM 1352 TO FM 1930 Let CRP JIM WELLS $1,577,000 Repair Roadway SH 141 KLEBERG CO. LINE TO US 281 Let CRP KLEBERG $6,723,000 Repair Roadway SH 141 JIM WELLS CO. LINE TO SANTA GERTRUDIS ST. (FM 2045) Let CRP SAN PATRICIO $1,000,000 Resurface Roadway BU 77-T US 181 TO US 77 N. RELIEF ROUTE Let CRP SAN PATRICIO $1,200,000 Resurface Roadway BU 77-T US 181 TO US 77 S. RELIEF ROUTE Let CRP SAN PATRICIO $2,400,000 Repair Roadway SH 234 IH 37 TO US 77 ODEM Let CRP REFUGIO $600,000 Resurface Roadway US 77 N. OF REFUGIO N. CITY LIMITS TO REFUGIO N. CITY LIMITS Let CRP REFUGIO $1,900,000 Resurface Roadway US 77 6 MI N. OF REFUGIO TO N. OF REFUGIO N CITY LIMITS Let CRP SAN PATRICIO $2,300,000 Widen Roadway FM 2046 COUNTY ROAD 82D TO FM 1944 Let CRP SAN PATRICIO $2,663,780 Resurface Roadway US 77 Odem North City Limits to US 77 S. Relief Route Let CRP BEE $2,492,100 Resurface Roadway US 181 KARNES COUNTY LINE TO 0.76 MI. S. OF FM 1465 Let CRP BEE $702,900 Resurface Roadway US 181 O.76 MI. S. OF FM 1465 to BEE STREET IN NORMANA Let LRD DUVAL $986,102 Repair Roadway SH 359 SOUTH END OF SAN DIEGO CREEK BRIDGE TO INTERSECTION Let WITH 1329 LRD VAL VERDE $3,171,512 Repair Roadway US MI SOUTH OF SH 163 TO 4.01 MI SOUTH Let LRD MAVERICK $5,200,000 Repair Roadway US MI NORTH OF FM 1908 TO MI N OF FM 1664 NORTH Let INT LRD MAVERICK $4,678,857 Repair Roadway FM 2644 DIMMIT COUNTY LINE TO FM 1021 Let PHR HIDALGO $3,770,821 Rebuild Roadway SH 107 FM 2128 TO US 281 Let PHR STARR $1,746,315 Resurface Roadway US 83 FM 1430 TO FM 2360 Let PHR WILLACY $184,846 Resurface Roadway SH 186 KING ST TO BUSINESS 77 Let PHR WILLACY $219,700 Resurface Roadway SH 186 BUSINESS 77 TO US 77 Let PHR ZAPATA $1,438,673 Resurface Roadway SH 16 ZAP/JIM HOGG COUNTY LINE TO MI W OF ZAP/JH Let COUNTY LINE PHR HIDALGO $856,657 Resurface Roadway SH 336 FM 1016 TO US 83 Let PHR HIDALGO $890,367 Resurface Roadway SH 336 PRODUCE ROAD, N TO FM 1016 Let PHR HIDALGO $519,636 Resurface Roadway FM 1015 US 281, SOUTH TO 1.6 MI (END STATE MAINT) Let PHR CAMERON $655,554 Resurface Roadway FM 509 US 77 TO FM 800 Let PHR HIDALGO $1,129,720 Resurface Roadway SH 107 FM 2128 TO FM 493 Let PHR CAMERON $619,641 Resurface Roadway FM 509 FM 106 to BUSINESS 77 Let PHR HIDALGO $797,174 Resurface Roadway US 83 FM 2221 TO FM 1427 Let PHR STARR $2,803,636 Rebuild Roadway FM 755 US 83 NORTH to MI N OF FM 755/AVASOLO INTERSECTION Let PHR STARR $1,406,735 Rebuild Roadway CS US 83 N ON AVASOLO ST. to FM 755 Let PHR CAMERON $1,715,485 Resurface Roadway SP 206 US 77 to SL 499 Let SAT KERR $1,872,184 Replace Bridge SH 39 AT LYNX HAVEN CROSSING Let SAT KERR $1,068,607 Replace Bridge FM 1340 AT MAYHUGH CROSSING Let Updates: You can keep current with TxDOT s stimulus work at Enter keyword stimulus in the search box. Funding: Total ARRA funding for Texas highway programs is $2.25 billion. Available for the Commission s direct use is $1.7 billion. Staff has recommended approximately $500 million of these funds be spent on maintenance projects and the remaining $1.2 billion be obligated to significant projects. An additional $500 million in funding is available to the state s metropolitan planning organizations for use at their discretion. 3

4 South Region continued SAT KERR $1,323,035 Replace Bridge FM MILE W. OF GUADALUPE RIVER TO 0.2 MILE E. OF GUADAL- UPE RIVER SAT UVALDE $5,391,180 Widen Roadway RM MI SOUTH OF US 90 IN SABINAL TO 0.8 MI SOUTH OF Let SABINAL RIVER SAT MEDINA $2,641,359 Widen Roadway FM 462 FM 1250 TO 0.4 MI SOUTH OF CR 540 Let SAT MEDINA $688,111 Construct Freeway IH MI S OF CR 770 to 0.1 MI N OF CR 770 Let Ramps SAT MEDINA $1,899,750 Construct Freeway IH 35 ON NBFR FROM SH 173, N to 0.3 MI N OF CR 777 Let Ramps SAT MEDINA $966,755 Construct New Road IH 35 SH 173 to 0.1 MI N OF ROSSVILLE RD. Let SAT GUADALUPE $3,200,000 Rebuild Roadway IH MI W. OF SH 46 TO SH 46 Let SAT COMAL $7,952,470 Construct New Roadway FM 306 US 281 TO 0.4 MI W. OF MYSTIC PARKWAY Let Lanes SAT COMAL $1,183,246 Construct New Roadway FM 306 FM 484 TO HANCOCK RD. Let Lanes SAT FRIO $1,086,500 Construct Curb and FM 140 TREVINO ST. TO 0.1 MILES EAST OF FM 1581 Let Gutter SAT ATASCOSA $5,000,000 Rehabilitate Roadway SH 16 FM 1332 TO 1 MILE NORTH OF MCMULLEN COUNTY LINE Let SAT WILSON $4,370,873 Widen Roadway FM 1681 CR 448 TO GONZALES COUNTY LINE Let YKM WHARTON $1,300,000 Restore Roadway FM 2765 SOUTH END OF SCHOOL PROJECT TO BU 59 Let YKM MATAGORDA $1,100,000 Restore Roadway SH 35 SOUTH OF FM 457 TO NANCY ST. IN BAY CITY Let YKM WHARTON $5,800,000 Repair Roadway US 90A 3.3 MI E OF LISSIE TO FORT BEND C/L Let YKM AUSTIN $3,600,000 Rebuild Roadway FM 1093 SH 36 TO BRAZOS RIVER Let YKM VICTORIA $2,170,000 Repair Roadway BU 59-T GUADALUPE RIVER BRIDGE IN VICTORIA TO BU 77S (GOLDMAN Let HILL) YKM MATAGORDA $2,800,000 Rebuild Roadway FM 521 FM 457 TO BRAZORIA C/L Let YKM FAYETTE $850,000 Resurface Roadway US 77 BS 71-E TO CAMP LONESTAR ROAD IN LAGRANGE Let YKM FAYETTE $650,000 Resurface Roadway US 77 ROITSCH STREET TO BS 71-E IN LAGRANGE Let YKM COLORADO $930,000 Resurface Roadway US 90A 2.49 MI. WEST OF SH 71 TO MI. WEST OF SH 71 Let YKM DEWITT $505,000 Resurface Roadway SH 72 SH 119 TO FM 237 Let YKM DEWITT $306,000 Resurface Roadway SH 72 FM 2980 to SH 119 Let YKM GONZALES $850,000 Widen Roadway FM 1681 WILSON COUNTY LINE TO SH 80 Let AUS HAYS $700,000 Resurface Roadway IH 35 FM 2001 TO 2000 FT N OF FM 2001 Let AUS LEE $2,310,000 Replace Bridge FM MILES NE OF FM 619 TO MILES NE OF FM 619 Let AUS LEE $1,815,000 Replace Bridge FM 696 AT PIN OAK BR, 7.2 MI W OF FM 112 TO STR Let CRP JIM WELLS $5,512,948 Repair Roadway SH 44 VENTURA ST IN SAN DIEGO TO 0.15 MI E OF FM 1554 Let CRP ARANSAS $216,000 Resurface Roadway BS 35-L STAPP STREET TO ARANSAS/SAN PATRICIO COUNTY LINE Let CRP SAN PATRICIO $684,000 Resurface Roadway BS 35-L ARANSAS/SAN PATRICIO COUNTY LINE TO AVE A IN INGLESIDE Let CRP SAN PATRICIO $2,950,000 Resurface Roadway US 77 ARANSAS RIVER BRIDGE TO BU 77-T Let LRD LASALLE $2,471,844 Repair Roadway IH 35 LASALLE/FRIO COUNTY LINE TO 8.5 MI SOUTH Let LRD LASALLE $296,108 Resurface Roadway BI 35-C IH 35/BI-35C NORTH INTERSECTION TO MI SOUTH Let LRD VAL VERDE $234,960 Resurface Roadway US 90 STRICKLEN DRIVE TO 17TH STREET Let LRD VAL VERDE $178,176 Resurface Roadway US 90 AVENUE F TO EAST CORTINAS STREET Let LRD ZAVALA $148,877 Resurface Roadway US MI S. OF FM 1025 TO 0.1 MI S OF AVE F Let LRD DIMMITT $477,591 Resurface Roadway US 83 ZAVALA/DIMMIT CO. LINE TO SH 85 Let LRD WEBB $324,329 Resurface Roadway SH MI. W. OF RETEMA CREEK TO MI. E. OF RETAMA Let LRD MAVERICK $473,885 Resurface Roadway US MI E. OF US 57 TO MI E. OF LAMPASITAS CR Let LRD KINNEY $248,138 Resurface Roadway RM 693 US 277 TO MI W. OF RR TRACKS Let LRD ZAVALA $250,790 Resurface Roadway FM MI W. TORTUGA CR TO FM 117 Let LRD ZAVALA $222,073 Resurface Roadway FM 2691 FM 393 TO END OF PAVEMENT Let LRD WEBB $683,747 Resurface Roadway US MI N. OF ESPEJO-MOLINA RD TO ZAPATA/WEBB CO. LINE Let PHR HIDALGO $981,570 Resurface Roadway SH 107 EAST OF FM 493 TO EAST OF FM 88 Let PHR HIDALGO $998,920 Resurface Roadway FM 907 SH 107 TO US 83 Let PHR HIDALGO $540,908 Rebuild Roadway FM 2061 TRENTON RD TO NOLANA (FM 3461) Let PHR CAMERON $1,288,906 Rebuild Roadway FM MI. N OF US 83TO 3.88 MI. N OF US 83 Let SAT FRIO $5,248,294 Widen Roadway FM MI E OF PEARSALL TO FM 472 Let SAT UVALDE $1,853,770 Widen Roadway RM MI S. OF SABINAL RIVER TO ZAVALA COUNTY LINE Let YKM WHARTON $2,144,006 Resurface Roadway US 59 CANEY CREEK TO BU 59 SOUTH OF WHARTON Let Let 4

5 South Region continued YKM WHARTON $2,869,904 Resurface Roadway US 59 NORTH OF SH 60 TO CANEY CREEK Let YKM CALHOUN $1,996,666 Resurface Roadway SH 35 MILDRED DR IN PORT LAVACA TO BARGE CANAL Let AUS CALDWELL $1,900,000 Resurface Roadway SH 142 BORCHERT LOOP IN LOCKHART TO US 183 Nov/09 AUS HAYS $638,000 Repair Roadway FM 621 SH 123 TO GUADALUPE COUNTY LINE Nov/09 AUS HAYS $265,000 Resurface Roadway SH 123 EBONY STREET TO IH 35 Nov/09 AUS LLANO $1,396,491 Repair Roadway RM 2900 RM 1431 TO LLANO RIVER Nov/09 AUS TRAVIS $889,500 Resurface Roadway US 183 S LOOP 1 TO BURNET ROAD Nov/09 AUS WILLIAMSON $342,000 Resurface Roadway SH 29 RAILROAD STREET TO AUSTIN AVENUE Nov/09 AUS WILLIAMSON $515,000 Resurface Roadway SH 29 AUSTIN AVEUE TO HUTTO ROAD Nov/09 YKM WHARTON $1,324,375 Repair Roadway BU 59-S US 59 in El Campo to US 59 AUS BASTROP $4,220,296 Construct Center Turn FM mi S OF SH 71 to SH 71 Lanes LRD DUVAL $809,316 Repair Roadway US 59 SH 16 to mi East LRD DUVAL $394,803 Repair Roadway US Mil west of SH 16 to SH 16 YKM FAYETTE $1,137,462 Resurface Roadway IH 10 US 77 to Colorado County Line (WB lanes only) YKM COLORADO $2,318,517 Resurface Roadway IH 10 Fayette County Line to Hattermann Lane (WB lanes only) SAT ATASCOSA $4,727,549 Resurface Roadway IH 37 US 281 to Bexar County Line AUS TRAVIS $3,400,000 Resurface Roadway Loop 1 RM 2222 to Ladybird Lake Subtotal $208,455,064 5

6 East Region TxDOT Districts: Beaumount, Bryan, Houston, Lufkin BMT HARDIN $700,000 Resurface Roadway FM 420 US 69, EAST TO END OF MAINT Let BMT JASPER $3,500,000 Widen Roadway FM 1131 FM 105, SOUTH TO ORANGE CO/L Let BMT TYLER $2,400,000 Resurface Roadway US MI W OF US 69 TO US 69 Let BMT JEFFERSON $7,500,000 Resurface Roadway SH 73 CHAMBERS COUNTY LINE TO TAYLORS BAYOU BRIDGE Let BMT CHAMBERS $212,045 Resurface Roadway IH MI W OF FM 1406, EAST TO SH 73 (N FRONTAGE RD) Let BMT CHAMBERS $187,955 Resurface Roadway IH 10 SH 73, EAST TO FM 1663 (N FRONTAGE RD) Let BMT CHAMBERS $2,000,000 Resurface Roadway SH 61 LIBERTY CL TO FM 2041 Let BMT HARDIN $700,000 Resurface Roadway FM 418 FM 92 IN SILSBEE, EAST TO BU 96F Let BMT NEWTON $72,611 Repair Bridge FM 1012 At Lewis Gully & Big Cow Creek Let BMT NEWTON $192,955 Repair Bridge FM 1415 AT LITTLE COW CREEK TO (STR ) Let BMT NEWTON $34,054 Repair Bridge LP 505 AT TWO MILE BRANCH TO (STR ) Let BMT NEWTON $132,332 Repair Bridge FM 363 AT LITTLE COW CREEK, DRAW & WHITMAN TO BRANCH Let BMT NEWTON $89,892 Repair Bridge FM 363 AT THICKETY CREEK & BIG COW CREEK TO (STR & Let ) BMT NEWTON $151,530 Repair Bridge FM 1416 AT DONAHUE, DEMPSEY & BIG COW CREEK TO (STR Let , , ) BMT NEWTON $141,900 Repair Bridge FM 253 AT DRAW, DRAW & NICHOLS CREEK TO (STR Let , , ) BMT NEWTON $124,213 Repair Bridge FM 1414 AT UNDERWOOD CREEK, YELLOW BAYOU & TO LITTLE COW Let CREEK BMT NEWTON $49,523 Repair Bridge FM 82 AT DRAW TO (STR ) Let BMT NEWTON $93,905 Repair Bridge FM 2460 AT BIG COW CRK RELIEF & BIG COW CRK TO (STR & Let ) BMT NEWTON $124,771 Repair Bridge FM 2626 AT CANEY CREEK, QUICKSAND CREEK TO (2 STRS) & LITTLE Let QUICKSAND CREEK BMT TYLER $800,000 Resurface Roadway US 69 US 190 IN WOODVILLE, SOUTH TO 1.1 MI Let BMT LIBERTY $500,000 Resurface Roadway FM 1409 US 90, SOUTH TO 2.0 MI Let BMT ORANGE $600,000 Resurface Roadway FM 1132 SH 12, EAST TO IH 10 Let BMT JASPER $320,974 Rebuild Roadway CR FM MILES N. OF RR 255, S. TO RR 255 BRY BRAZOS $1,059,977 Resurface Roadway SH 21 FM 2818 TO FM 158 Let BRY BRAZOS $157,235 Resurface Roadway SH MILE EAST OF FM 974 TO BLUEBONNET STREET Let BRY BRAZOS $408,170 Resurface Roadway FM 60 FM 2818 TO DISCOVERY DRIVE Let BRY BRAZOS $234,864 Resurface Roadway FM 60 BS 6-R (TEXAS AVENUE) TO TARROW STREET Let BRY BRAZOS $664,293 Resurface Roadway FM 2347 FM 2154 TO BS 6-R (TEXAS AVENUE) Let BRY LEON $747,234 Repair Roadway FM MILES NORTH OF SH 7 TO SH 7 Let BRY BRAZOS $420,000 Resurface Roadway FM MILE EAST OF FM 158 TO THE SH 6 NORTHBOUND FRONT- Let AGE ROAD BRY LEON $8,691,661 Resurface Roadway IH 45 KEECHI CREEK to BLISS CREEK Let BRY BURLESON $2,801,100 Resurface Roadway SH 36 Brushy Creek to N. of FM 60 in Lyons Let BRY FREESTONE $243,759 Repair Roadway FM 80 FM 1449 to FM 27 Let BRY FREESTONE $2,002,589 Repair Roadway FM 80 FM 27 to US 84 Let BRY FREESTONE $2,547,521 Repair Roadway FM 80 SH 75 to FM 1449 Let HOU BRAZORIA $4,456,938 Resurface Roadway SH 35 SOUTH OF SH 35 BYPASS to FM 523 Let HOU HARRIS $1,080,001 Repair Roadway SH 225 SHELL OVERPASS to MILLER CUTOFF ROAD Let HOU GALVESTON $327,738 Replace Bridge CR MCKAY ROAD AT DRAINAGE DITCH Let HOU FORT BEND $300,000 Resurface Roadway FM 3155 US 90A to RICHMOND STATE SCHOOL Let HOU MONTGOMERY $500,000 Repair Roadway VA VARIOUS LOCATIONS Let HOU FORT BEND $2,110,000 Repair Roadway SH 36 US 90A to AVENUE M Let HOU GALVESTON $1,220,000 Resurface Roadway LP 197 FM 1765 to FM 519 Let HOU BRAZORIA $1,092,489 Resurface Roadway FM 1459 SH 35 to FM 524 Let HOU FORT BEND $1,494,074 Resurface Roadway US 90A WHARTON COUNTY LINE to SPUR 10 Let Updates: You can keep current with TxDOT s stimulus work at Enter keyword stimulus in the search box. Funding: Total ARRA funding for Texas highway programs is $2.25 billion. Available for the Commission s direct use is $1.7 billion. Staff has recommended approximately $500 million of these funds be spent on maintenance projects and the remaining $1.2 billion be obligated to significant projects. An additional $500 million in funding is available to the state s metropolitan planning organizations for use at their discretion. 6

7 East Region continued HOU BRAZORIA $980,016 Resurface Roadway FM 524 SH 35 to FM 1301 Let HOU MONTGOMERY $5,299,527 Resurface Roadway LP 494 US 59 to KINGWOOD DRIVE Let HOU FORT BEND $1,500,000 Resurface Roadway FM 1093 FM 1489 to FM 359 Let HOU WALLER $1,560,717 Widen Roadway FM 362 BU US 290 to MI S OF BU 290H Let HOU HARRIS $638,000 Resurface Roadway FM MI S. OF HUFFSMITH KUYKENDAHL to 0.14 MI N. OF Let HUFFSMITH KUYKENDAHL HOU HARRIS $216,310 Repair Roadway US 290 SH 6 to FM 529 Let HOU HARRIS $8,700,000 Resurface Roadway FM 1093 DAIRY ASHFORD to POST OAK Let HOU WALLER $3,040,000 Resurface Roadway FM 1458 FM 359 to BRAZOS RIVER Let HOU GALVESTON $5,169,743 Resurface Roadway SH 87 CRYSTAL BEACH to GILCHRIST Let HOU GALVESTON $3,000,000 Resurface Roadway SH 87 ON SH 87 IN GILCHRIST to ON SH 124 AT INTRACOASTAL CANAL Let HOU GALVESTON $4,192,725 Resurface Roadway SH 87 BOLIVAR FERRY LANDING Let HOU HARRIS $1,814,000 Repair Roadway US 90 W OF KRENEK to E OF RUNNEBURG Let HOU FORT BEND $1,260,000 Resurface Roadway FM 521 SH 6 to BRAZORIA COUNTY LINE Let HOU WALLER $1,440,000 Resurface Roadway FM MI N. OF CLAPP RD TO FM 529 Let LFK NACOGDOCHES $3,300,000 Resurface Roadway US 259 Rusk C/L to SH 204 Let LFK SAN AUGUSTINE $88,000 Resurface Roadway LP 547 SH 21 to E. of SH 21 Let LFK SHELBY $214,000 Resurface Roadway LP 500 US 96 to SH 7 Let LFK HOUSTON $622,000 Resurface Roadway BU 287-V US 287 N to US 287 S Let LFK SHELBY $300,000 Resurface Roadway SH 87 Jackson St to LP 500 Let LFK POLK $446,000 Resurface Roadway BU 59-J S of US 190 to S of Garner St Let LFK SHELBY $1,681,283 Widen Roadway FM 138 NACOGDOCHES CO LINE TO FM 1645 Let LFK SHELBY $7,000,000 Repair Roadway US 84 TENAHA TO MORRIS CREEK Let LFK HOUSTON $3,553,947 Widen Roadway FM 227 SH 21 TO SH 7 Let BMT JEFFERSON $542,605 Rebuild Roadway SH MI W OF RAINBOW BRIDGE TO 0.32 MI EAST (WESTBOUND) Let BMT LIBERTY $1,200,000 Repair Roadway FM 834 SH 146, EAST TO FM 770 Let BRY GRIMES $1,961,804 Resurface Roadway SH 30 FM 244 TO SH 90 Let BRY FREESTONE $2,019,898 Repair Roadway FM 489 FM 1848 TO US 84 Let BRY MILAM $1,069,635 Resurface Roadway US MILE WEST OF FM 2095 TO CEDAR PARK Let HOU HARRIS $7,883,843 Construct Overpass/ FM 2978 AT UP RR Let Underpass HOU GALVESTON $3,227,313 Rebuild Roadway FM MILES EAST OF SALT CEDAR DRIVE TO WEST END OF Let SEAWALL HOU WALLER $1,657,626 Resurface Roadway FM 359 BU 290 TO FORT BEND COUNTY LINE Let HOU WALLER $777,940 Resurface Roadway FM 1489 IH 10 EASTBOUND FRONTAGE ROAD TO WALLER/FORT BEND C/L Let HOU HARRIS $1,390,380 Bridge Repair VA VARIOUS LOCATIONS Let HOU FORT BEND $1,411,254 Replace Bridge FM 762 AT SMITHERS LAKE Let HOU FORT BEND $536,678 Replace Bridge CR MULLINS REYNOLDS AT BESSIES CREEK Let HOU VARIOUS $1,186,731 Upgrade Traffic VA VARIOUS LOCATIONS Let Signals HOU MONTGOMERY $374,100 Upgrade/Install Drainage FM MILES NW OF MILLS ROAD TO MILES NE OF MILLS Let Structures ROAD HOU VARIOUS $1,105,202 Upgrade Traffic VA VARIOUS LOCATIONS DISTRICTWIDE Let Signals HOU HARRIS $240,981 Install Pavement IH 45 NORTH OF BW 8 TO CYPRESSWOOD DRIVE Let Markings HOU HARRIS $103,972 Install Pavement IH 45 SOUTH OF BW 8 TO NORTH OF BW 8 Let Markings HOU GALVESTON $464,420 Repair Roadway VA VARIOUS LOCATIONS Let HOU HARRIS $126,732 Upgrade/Install Drainage BW 8 AT WHITE OAK BAYOU Let Structures LFK SAN JACINTO $282,803 Resurface Roadway US MI S OF RR OVERPASS TO LIBERTY COUNTY LINE Let LFK SAN JACINTO $134,710 Resurface Roadway US 59 TRINITY RIVER BRIDGE TO 0.13 MI N OF FM 1127 Let LFK SAN AUGUSTINE $215,481 Resurface Roadway SH 103 FM 1751 TO SABINE COUNTY LINE Let LFK SABINE $686,462 Resurface Roadway SH 103 SAN AUGUSTINE COUNTY LINE TO MI W OF SH 21 Let LFK SAN AUGUSTINE $160,122 Resurface Roadway US 96 SHELBY COUNTY LINE TO 2.95 MI S Let BMT JASPER $6,196,270 Rebuild Roadway US mi N of RE 255, south to 2.7 mi N of US190 Subtotal $144,161,533 7

8 North Region TxDOT Districts: Atlanta, Brownwood, Dallas, Fort Worth, Paris, Tyler, Waco, Wichita Falls ATL TITUS $6,185,488 Resurface Roadway SH MI W OF FM 2348 TO MORRIS COUNTY LINE Let ATL MORRIS $895,113 Resurface Roadway SH 49 TITUS COUNTY LINE TO 0.2 MI. EAST OF FM 144 (S) Let ATL PANOLA $2,810,529 Widen Roadway US MI. S. OF MILL CREEK TO FM 31 AT DEBERRY Let ATL MORRIS $1,339,652 Widen Roadway SH MI. E. OF US 259 TO 0.2 MI. W. OF L&A RAILROAD Let ATL CASS $1,170,000 Widen Roadway SH 43 SOUTH OF FM 2328 TO FM 248 IN BIVINS Let ATL CASS $1,615,904 Widen Roadway SH 77 SH 8 IN DOUGLASSVILLE TO FM 96 Let ATL CASS $1,166,035 Widen Roadway SH 77 FM 96 TO FM 995 IN ATLANTA Let BWD BROWN $1,816,133 Repair Roadway US MI. W OF FM 3254 TO CR 152 Let BWD MILLS $475,408 Repair Roadway US 84 US 183, EAST TO LP 15 Let BWD MILLS $5,784,704 Repair Roadway US 84 LOOP 15, EAST TO CENTER CITY Let DAL NAVARRO $4,305,089 Resurface Roadway FM 639 FM 744 TO SH 22 Let DAL NAVARRO $5,900,000 Resurface Roadway FM 1126 SH 22 to FM 3383 Let DAL ELLIS $525,000 Replace Bridge CR FRANKS ROAD AT RICHLAND CREEK Let DAL ELLIS $181,000 Repair Bridge CR PLUTO RD. AT MILL CREEK Let DAL ELLIS $262,000 Replace Bridge CR MORGAN RD AT HOG CREEK TRIB Let DAL ELLIS $262,000 Replace Bridge CR SCHIELD ROAD AT ELM BRANCH Let DAL ELLIS $265,000 Replace Bridge CR PECAN TREE ROAD AT BIG ONION CREEK Let DAL KAUFMAN $1,726,839 Replace Bridge FM 740 BUFFALO CREEK Let DAL KAUFMAN $1,335,218 Replace Bridge FM 740 BUFFALO CREEK RELIEF Let DAL ELLIS $255,000 Replace Bridge CR NORTH WARD ST AT HOUSTON CREEK in ITALY Let DAL DENTON $203,297 Replace Bridge CR ON FREEMAN RD TO AT N HICKORY CREEK TRIBUTARY Let DAL COLLIN $2,500,000 Intersection Safety SH 289 ON SH 289/PRESTON RD AT LEGACY DR. Let Improvements DAL KAUFMAN $1,141,499 Replace Bridge FM 1836 AT BIG COTTONWOOD CREEK Let DAL KAUFMAN $1,013,330 Replace Bridge FM 1836 AT LITTLE COTTONWOOD CREEK Let DAL DENTON $605,601 Replace Bridge CR ON GREGORY ROAD AT DUCK CREEK Let DAL ELLIS $320,650 Replace Bridge FM 660 AT TRIBUTARY OF BEAR CREEK Dec-09 DAL ELLIS $2,100,000 Repair Roadway BI 45-J DALLAS COUNTY LINE TO IH 45 SOUTH OF FERRIS Let DAL ELLIS $3,268,824 Repair Roadway BI-45G South of SH 34 to I-45 North in Ennis Let DAL KAUFMAN $3,998,397 Rebuild Roadway FM 598 FM 1392, 1.0 MI SW OF SH 205, SE TO SH 205 IN TERRELL Let DAL DALLAS $1,194,979 Install Traffic Signal FM 1382 AT STRAUS RD TO IN THE CITY OF CEDAR HILL Let DAL DALLAS $663,542 Intersection Safety FM 1382 WEST OF STRAUS TO AT STRAUS Let Improvements FTW PARKER $6,182,460 Resurface Roadway US 180 SPUR 312 TO IH 20 Let FTW TARRANT $1,050,000 Resurface Roadway FM 157 COPELAND TO DIVISION Let FTW TARRANT $5,696,100 Resurface Roadway IH 820 MARINE CREEK PARKWAY TO IH 35W Let FTW WISE $231,700 Resurface Roadway US S OF CR 4840 TO TARRANT C/L Let FTW WISE $121,550 Resurface Roadway US 81 NBL 1300 S OF CR 4421 TO MI S OF CR 4421 Let FTW JOHNSON $569,600 Resurface Roadway US 377 PARKER CO LINE TO DIVIDED SECTION (CRESSON) Let FTW WISE $2,883,600 Resurface Roadway US SOUTH OF FM 407 TO CR 4840 Let FTW JOHNSON $653,120 Rebuild Roadway SH 174 WILLINGHAM STREET TO POINDEXTER STREET; IN CLEBURNE Let FTW JOHNSON $411,050 Resurface Roadway SH 171 AT&SF RAILROAD TO 1 MILE SOUTH Let FTW JOHNSON $462,028 Resurface Roadway US 67 FM 2331 TO PARK ROAD 21 Let FTW JOHNSON $398,700 Resurface Roadway US 67 PARK ROAD 21 TO 975 FEET WEST OF FM 1434 Let FTW WISE $840,300 Resurface Roadway SH MILE SOUTH OF US 380 INTERSECT TO SL 373 (13TH ST) Let IN BRIDGEPORT FTW TARRANT $904,300 Resurface Roadway SH 26 NEAR FM 1938 TO CHEEKSPARGER/MIDCITIES BLVD Let FTW PARKER $927,300 Resurface Roadway SH 171 US 180 TO FM 1884 Let FTW HOOD $1,354,060 Resurface Roadway US 377 BRAZOS RIVER BRIDGE TO HOLMES DRIVE Let FTW TARRANT $1,462,000 Repair Bridge VA VARIOUS LOCATIONS TO IN NORTH TARRANT COUNTY Let Updates: You can keep current with TxDOT s stimulus work at Enter keyword stimulus in the search box. Funding: Total ARRA funding for Texas highway programs is $2.25 billion. Available for the Commission s direct use is $1.7 billion. Staff has recommended approximately $500 million of these funds be spent on maintenance projects and the remaining $1.2 billion be obligated to significant projects. An additional $500 million in funding is available to the state s metropolitan planning organizations for use at their discretion. 8

9 North Region continued FTW JOHNSON $1,840,200 Resurface Roadway SH 174 NORTH OF RIO VISTA TO WILLINGHAM STREET Let FTW HOOD $1,020,700 Resurface Roadway SH 171 PARKER CO LINE TO 0.14 MILES WEST OF US 377 Let FTW ERATH $411,000 Resurface Roadway SH 108 BU377J TO US 281 IN STEPHENVILLE Let FTW WISE $2,329,850 Resurface Roadway US FT S OF US 380 TO1890 FT S OF FM 407 Let FTW WISE $1,390,500 Resurface Roadway US FT N OF PIONEER ROAD TO 2000 FT S OF SH 114 EAST Let PAR HOPKINS $7,000,000 Repair Roadway SH MI E OF FM 2653 TO 4.0 MI EAST Let PAR GRAYSON $3,132,178 Repair Roadway FM 902 SH 289 TO US 75 WEST FRONTAGE ROAD Let PAR GRAYSON $4,730,000 Repair Roadway FM 121 US 377 TO SH 289 Let PAR LAMAR $1,382,322 Repair Roadway FM MILES N OF FM 1497 TO 1.38 MILES N OF FM 1497 Let PAR LAMAR $4,442,880 Repair Roadway FM 1498 FM 1497 TO 3.8 MILES WEST OF FM 1497 Let TYL VAN ZANDT $250,000 Repair Bridge SH 243 AT CANEY CRK Let TYL GREGG $3,100,000 Repair Roadway US 259 IH 20 N FRONTAGE RD, N TO US 80, IN LONGVIEW Let TYL ANDERSON $4,800,000 Widen Roadway US 84 3 MI E OF FM 3266, E OF P STINE, E TO 2.5 MI W OF FM 747 Let (CHEROKEE C/L) TYL GREGG $2,500,000 Resurface Roadway US 80 SP 63/SH 31, E TO US 259 IN LONGVIEW Let TYL RUSK $4,500,000 Repair Roadway US 259 US/BU 259 SPLIT, S OF KILGORE, S TO FM 850 AT JACOBS Let TYL WOOD $1,000,000 Resurface Roadway SH 37 FM 564(N) IN MINEOLA, S TO US 69/SH 37 SPLIT Let TYL WOOD $1,600,000 Resurface Roadway US 69 US 69/SH 37 SPLIT IN MINEOLA, S TO 0.65 MI S OF US 80 Let TYL SMITH $4,000,000 Resurface Roadway US 69 IH 20, S TO LP 323 IN TYLER Let TYL HENDERSON $2,750,000 Repair Roadway SH 31 1 MI E OF SH 198 (MALAKOFF), E TO 1.6 MI W OF SL 7 NEAR Let ATHENS WAC CORYELL $12,000,000 Construct New Roadway US 84 FM 932 TO HAMILTON C/L Let Lanes WAC BELL $1,032,000 Resurface Roadway SH 317 FM 93 (6TH AVE) IN BELTON, SOUTH TO IH 35 Let WAC BELL $300,000 Resurface Roadway SH TH ST IN BELTON, SOUTH TO FM 93 (6TH AVE) Let WAC BELL $1,587,496 Intersection Safety SH 201 AT MOHAWK DRIVE IN KILLEEN Let Improvements WAC CORYELL $3,300,000 Construct Overpass/ US 190 AT RAILHEAD RD Let Underpass WFS WILBARGER $3,386,000 Resurface Roadway US 287 US 70 to SH 240 in Harrold (NBL) Let WFS COOKE $3,000,000 Resurface Roadway IH 35 NEAR RED RIVER TO NEAR US 82 Let WFS ARCHER $3,000,001 Widen Roadway SH 25 FM 368 TO 0.79 MILES WEST OF SH 79 Let WFS COOKE $2,377,539 Widen Roadway FM 2071 FM 372 TO FM 922 Let ATL MARION $332,580 Repair Roadway FM 134 FM 2208 TO HARRISON C/L Let ATL CASS $475,698 Upgrade Traffic VA VARIOUS LOCATIONS IN ATL DISTRICT Let Signals ATL BOWIE $150,000 Install Traffic Signals SH 93 AT 40TH ST & KENNEDY LN IN TEXARKANA Let ATL UPSHUR $715,360 Repair Roadway US 259 FM 557 TO SH 155 Let BWD STEPHENS $1,649,943 Rebuild Roadway US 183 FM 2231 TO FM 1032 Let DAL COLLIN $6,104,390 Repair Roadway FM 982 US 380 TO 0.1 MI SOUTH OF CR 400 Let DAL NAVARRO $332,637 Replace Bridge FM 709 AT TREADWELL BRANCH Let DAL NAVARRO $556,889 Replace Bridge SH 31 WB AT CEDAR CREEK Let DAL DALLAS $3,264,757 Resurface Roadway SH 78 IH 635 TO AVENUE B Let FTW HOOD $431,983 Resurface Roadway FM 167 US 377 TO FM 4 IN ACTON Let FTW TARRANT $357,775 Resurface Roadway BU 287P OAK STREET IN MANSFIELD TO HUNT STREET (OLD FM 917) Let FTW TARRANT $616,868 Resurface Roadway FM FT. SOUTH OF DEBBIE LANE TO NORTH OF BU 287P Let FTW TARRANT $246,152 Resurface Roadway IH FT. BEFORE COLLINS TO 1550 FT. AFTER COLLINS Let FTW TARRANT $491,792 Resurface Roadway IH 20 WEST OF MATLOCK RD TO WEST OF SOUTH COLLINS STREET Let FTW PARKER $769,121 Widen Roadway FM 3325 FM 1886 TO WHITE SETTLEMENT ROAD Let FTW WISE $995,739 Resurface Roadway US 81 NB LANE 475 FT. SOUTH OF US 380 TO 1937 FT. SOUTH OF FM Let 2264 FTW PALO PINTO $1,892,018 Repair Roadway SH 16 PALO PINTO CREEK TO US 180 Let FTW JOHNSON $1,435,523 Rebuild Roadway FM 2415 FM 4 TO END OF ROADWAY Let FTW JOHNSON $1,092,647 Resurface Roadway SH 171 CLEBURNE CITY LIMITS TO 1.36 MI. SOUTH OF FM 2135 Let FTW SOMERVELL $770,212 Resurface Roadway US 67 ERATH COUNTY LINE TO PALUXY RIVER BRIDGE Let FTW JOHNSON $2,242,511 Resurface Roadway SH 174 NORTH OF POINDEXTER ST IN CLEBURNE TO NORTH OF Let VAUGHAN ST FTW ERATH $387,655 Resurface Roadway SH 6 FM 847 TO 5.9 MI. EAST OF FM 847 Let FTW ERATH $165,158 Resurface Roadway SH MI. EAST OF FM 847 TO FM 914 Let 9

10 North Region continued PAR GRAYSON $4,330,212 Resurface Roadway US 82 BETHANY ROAD TO US 69 Let TYL SMITH $830,000 Resurface Roadway FM MI S OF LP 323 IN TYLER, S TO 0.10 MI N OF SH 57(GRANDE) Let TYL ANDERSON $1,291,571 Resurface Roadway US MI SE OF FM 2394 IN PALESTINE NE, TO 0.5 MI W OF SH 155 Let TYL ANDERSON $908,430 Resurface Roadway US MI W OF SH 155 NE, TO 0.1 MI N OF SL 256 IN PALESTINE Let WAC McLENNAN, etc. $2,420,000 Resurface Roadway US 84 SH 31 IN MCLENNAN COUNTY TO SH 14 IN LIMESTONE COUNTY Let WFS WILBARGER $803,658 Resurface Roadway US 183 US 287 TO CATO ROAD Let ATL HARRISON $5,184,561 Repair Roadway LP 281 Gregg County Line to US 80 WFS YOUNG $2,000,000 Resurface Roadway SH 16 4TH Street to South Salem Loop WFS YOUNG $200,000 Resurface Roadway SH 16 US 380 to 4TH Street Graham TYL ANDERSON $1,541,000 Repair Roadway US 287 FM 2419 S of Palestine S to 1.3 mi N of FM 1817 in Elkhart TYL VAN ZANDT $3,200,000 Repair Roadway IH 20 Kaufman C/L, E to 2.5 mi E of FM 47 TYL SMITH $700,000 Resurface Roadway FM 2493 US 69 in Tyler to LP 323 Subtotal $210,483,605 Total $664,631,871 10

Commission Approved Stimulus Maintenance Projects

Commission Approved Stimulus Maintenance Projects West Region TxDOT Districts: Abilene, Amarillo, Childress, El Paso, Lubbock, Odessa, San Angelo ABL HOWARD $5,052,463 Repair Roadway IH 20 MARTIN COUNTY LINE TO BIG SPRING Apr-09 ABL TAYLOR $222,634 Replace

More information

OPPORTUNITY ZONE TRACT LISTING

OPPORTUNITY ZONE TRACT LISTING TRACT NUMBER COUNTY 48001950401 Anderson County 48001950901 Anderson County 48005000200 Angelina County 48005000500 Angelina County 48005000600 Angelina County 48005000700 Angelina County 48005001001 Angelina

More information

texas department of transportation Commission Approved Stimulus Projects

texas department of transportation Commission Approved Stimulus Projects North Region TxDOT Districts: Atlanta, Brownwood, Dallas, Fort Worth, Paris, Tyler, Waco, Wichita Falls Project Types: PRS (Preservation/Maintenance); ENH (Enhancement); AC (Added Capacity/Mobility) DISTRICT

More information

Texas Department of State Health Services Vital Statistics Unit

Texas Department of State Health Services Vital Statistics Unit 142 ANDERSON COUNTY 74 53 71.62% 200 ANDREWS COUNTY 16 9 56.25% 090 ANGELINA COUNTY 107 64 59.81% 017 ATASCOSA COUNTY -- CLERKS OFFICE 222 94 42.34% 074 AUSTIN COUNTY -- COUNTY CLERK 57 38 66.67% 220 BAILEY

More information

Texas Department of State Health Services Vital Statistics Unit

Texas Department of State Health Services Vital Statistics Unit 142 ANDERSON COUNTY 57 54 94.74% 200 ANDREWS COUNTY 38 25 65.79% 090 ANGELINA COUNTY 147 107 72.79% 017 ATASCOSA COUNTY -- CLERKS OFFICE 311 142 45.66% 074 AUSTIN COUNTY -- COUNTY CLERK 103 71 68.93% 220

More information

Perforated Appendix Admission Risk-Adjusted-Rate, 2013

Perforated Appendix Admission Risk-Adjusted-Rate, 2013 Perforated Appendix Admission -, 2013 The inside of the appendix forms a cul-de-sac that usually opens into the large intestine. When the inside of the appendix is blocked by a piece of stool, a foreign

More information

AGENDA. TEXAS TRANSPORTATION COMMISSION 125 East 11 th Street Austin, Texas THURSDAY June 30, 2005 * * *

AGENDA. TEXAS TRANSPORTATION COMMISSION 125 East 11 th Street Austin, Texas THURSDAY June 30, 2005 * * * INTERNET ADDRESS: http://www.dot.state.tx.us AGENDA TEXAS TRANSPORTATION COMMISSION 125 East 11 th Street Austin, Texas 78701-2483 THURSDAY June 30, 2005 * * * 9:00 A.M. CONVENE MEETING Approved 1. Approval

More information

EXHIBIT A. Revised List of Projects Originally Approved by the Commission in Minute Order Dated November 19, 2009.

EXHIBIT A. Revised List of Projects Originally Approved by the Commission in Minute Order Dated November 19, 2009. Value from &! M East HOU M East HOU M East HOU &! M East HOU &! M East HOU IH 45 0271-14-217 0271-14-218 0271-14-213 0271-14-228 0500-03-462 0500-03-550 0500-03-565 Reconstruct US /IH 610 IC. Construct

More information

Texas. Demographic Characteristics and Trends. Senate Select Committee on Redistricting. September 1, 2010 Austin, TX

Texas. Demographic Characteristics and Trends. Senate Select Committee on Redistricting. September 1, 2010 Austin, TX Texas Demographic Characteristics and Trends Senate Select Committee on Redistricting September 1, 2010 Austin, TX 1 25 Million Reasons to be Proud of Texas (among a few more) TEXAS is: Demographic Highlights

More information

TxAlerts (Flyer Program)

TxAlerts (Flyer Program) TxAlerts (Flyer Program) Presented by Ben Patterson Alert Program Administrator Missing Person Alerts TDEM oversees issuing AMBER, Silver, Blue and Endangered Missing alerts requested by local law enforcement

More information

SAFE-D Members *updated 1/18/2019

SAFE-D Members *updated 1/18/2019 SAFE-D Members *updated 1/18/2019 ESD/Organization Renewal month Austin County ESD 1 Sep 2019 Austin County ESD 3 Feb 2019 Bastrop County ESD 1 Aug 2019 Bastrop County ESD 2 Nov 2019 Bastrop/Travis Counties

More information

March 27, All Nursing Facility Administrators

March 27, All Nursing Facility Administrators COMMISSIONER Jon Weizenbaum To: All Nursing Facility Administrators Subject: Information Letter (IL) No. 13-17 (Replaces IL 11-37) Provider Letter (PL) 13-12 (Replaces PL 11-08) Re: Minimum Data Set 3.0

More information

SAFE-D Members *updated 11/1/2017

SAFE-D Members *updated 11/1/2017 SAFE-D Members *updated 11/1/2017 ESD/Organiza,on Aus$n County ESD 3 Feb 2018 Bastrop County ESD 1 Aug 2018 Bastrop County ESD 2 Nov 2017 Bastrop/Travis Coun$es ESD 1 May 2018 Bexar County ESD 12 Dec 2017

More information

2014 Annual Report Epidemiology and Supplemental Projects Group Prepared July 22, 2015

2014 Annual Report Epidemiology and Supplemental Projects Group Prepared July 22, 2015 2014 Annual Report Epidemiology and Supplemental Projects Group Prepared July 22, 2015 The Texas HIV Surveillance Report is an annual report generated by: Texas Department of State Health Services TB/HIV/STD

More information

APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13,

APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER :19 Thursday, June 13, APPROVED PROJECTS RESCHEDULED FROM AUGUST TO SEPTEMBER 2013 14:19 Thursday, June 13, 2013 1 ABILENE DISTRICT FUNC AUTHORIZED TOTAL EST OVER- TAYLOR 0034-01-124 US 83 C 34-1-124 5 3.2 P14BM $2,112,500 $3,721,952

More information

AGENDA TEXAS TRANSPORTATION COMMISSION. 125 East 11 th Street Austin, Texas THURSDAY April 30, 2009

AGENDA TEXAS TRANSPORTATION COMMISSION. 125 East 11 th Street Austin, Texas THURSDAY April 30, 2009 INTERNET ADDRESS: http://www.txdot.gov AGENDA TEXAS TRANSPORTATION COMMISSION 125 East 11 th Street Austin, Texas 78701-2483 THURSDAY April 30, 2009 9:00 A.M. CONVENE MEETING 1. Approval of Minutes of

More information

Texas County & District Retirement System Pension Trust Fund Schedule of Changes in Financial Net Position by Employer

Texas County & District Retirement System Pension Trust Fund Schedule of Changes in Financial Net Position by Employer Pension Trust Fund Schedule of Changes in Financial Net Position by Employer Year ended Dec. 31, 2015 2 3 4 638 Acton MUD $2,247,386 $60,155 $86,382 $(40,983) $105,554 $(37,998) $(1,647) $2,156 $(37,490)

More information

Dr. James P. Gaines Chief Economist. recenter.tamu.edu

Dr. James P. Gaines Chief Economist. recenter.tamu.edu Dr. James P. Gaines Chief Economist recenter.tamu.edu REC s Economic Crystal Ball 2 Newton s Law #1: Inertia and Motion An object at rest stays at rest. An object in motion stays in motion, with the same

More information

Texas Rural Transportaion Plan - Preliminary Project Rankings by District

Texas Rural Transportaion Plan - Preliminary Project Rankings by District Texas Rural Transportaion Plan - Preliminary Rankings by District RTP ID Score Rank District County Highway Description Limit From Limit To 271 564.7 171 Abilene Howard US 87 CONSTRUCT NEW RELIEF ROUTE

More information

2002 PLAGUE SURVEILLANCE REPORT (REVISED )

2002 PLAGUE SURVEILLANCE REPORT (REVISED ) Zoonosis Control Division 1100 W 49 th Street Austin, Texas 78756 2002 PLAGUE SURVEILLANCE REPORT (REVISED 10-10-14) Each year Texas Department of Health (TDH) Zoonosis Control personnel, in cooperation

More information

Dr. James P. Gaines Chief Economist. recenter.tamu.edu

Dr. James P. Gaines Chief Economist. recenter.tamu.edu Dr. James P. Gaines Chief Economist recenter.tamu.edu U.S. Outlook Uncertain impact of Tax Cut and Jobs Act Slow GDP growth new norm 8 years avg. 2.2%; 2017 ~2.3%; 2018 ~3% Interest rates likely to rise

More information

TEXAS DEPARTMENT OF TRANSPORTATION. Condition of Texas Pavements

TEXAS DEPARTMENT OF TRANSPORTATION. Condition of Texas Pavements TEXAS DEPARTMENT OF TRANSPORTATION Condition of Texas Pavements PMIS Annual Report FY 2007-2010 Condition of Texas Pavements Pavement Management Information System (PMIS) Annual Report FY 2007-2010 Prepared

More information

Safety. Rural. District. Strategic Projects $4,150, to Maple Streett $6,117,000. west of Conway BNSF railroad. Georgia Street $549,080

Safety. Rural. District. Strategic Projects $4,150, to Maple Streett $6,117,000. west of Conway BNSF railroad. Georgia Street $549,080 Selected for $2 Billion Allocation Safety SLRTP Rural priority IH 35 Corridor Border and Port Trade 100 most congested Ports to Plains Corridor IH 69 Corridor Rural System Preservation Other High Corridors

More information

TEXAS DEPARTMENT OF TRANSPORTATION. Condition of Texas Pavements

TEXAS DEPARTMENT OF TRANSPORTATION. Condition of Texas Pavements TEXAS DEPARTMENT OF TRANSPORTATION Condition of Texas Pavements PMIS Annual Report FY 2008-2011 Condition of Texas Pavements Pavement Management Information System (PMIS) Annual Report FY 2008-2011 Prepared

More information

Intensive management of native ungulates: Conservation success inside a Pandora s box. Randy W. DeYoung

Intensive management of native ungulates: Conservation success inside a Pandora s box. Randy W. DeYoung Intensive management of native ungulates: Conservation success inside a Pandora s box Randy W. DeYoung Arms of Hertfordshire, England Arms of Raon aux Bois, France Arms of Dotternhausen, Germany Arms

More information

TEXAS LAND MARKET DEVELOPMENTS 2007

TEXAS LAND MARKET DEVELOPMENTS 2007 TEXAS LAND MARKET DEVELOPMENTS 2007 Charles E. Gilliland Research Economist Nirad Pachchigar Research Assistant Siddhartha Singh Research Assistant TECHNICAL REPORT 1 8 6 1 JUNE 2008 TR Texas Land Market

More information

Texas Rural Transportaion Plan - Preliminary Project Rankings by District

Texas Rural Transportaion Plan - Preliminary Project Rankings by District RTP ID Score Rank District County Highway Description Limit From Limit To 271 565.3 162 Abilene Howard US 87 CONSTRUCT NEW RELIEF ROUTE IH 20, 4 miles West of Big Spring FM 700, 3 miles North 7.5 1000

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 1 VARIOUS Districts Pursuant to Transportation Code, Chapter 223, Subchapter A, and Title 43, Texas Administrative Code, Chapter

More information

DISTRICT AUSTIN 3226 BASTROP US NH 2011(720) $ 578, NO AWARD

DISTRICT AUSTIN 3226 BASTROP US NH 2011(720) $ 578, NO AWARD HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 1 3226 BASTROP US 290 0114-04-063 NH 2011(720) 1.364 $ 578,444.15 4-16.15 NO AWARD CONTRACTOR: J.D. RAMMING PAVING CO., LTD.

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARlOUS Counties MINUTE ORDER Page 1 of 1 VARlOUS Districts Pursuant to Transportation Code, Chapter 223, Subchapter A, and Title 43, Texas Administrative Code, Chapter

More information

July 2007 NO UPDATE FOR TEX-207-F, EFFECTIVE MAY 2007

July 2007 NO UPDATE FOR TEX-207-F, EFFECTIVE MAY 2007 July 2007 NO. 0707 UPDATE FOR TEX-207-F, EFFECTIVE MAY 2007 Tex-207-F, Determining Density of Compacted Bituminous Mixtures. is now on-line at the TxDOT website. This test procedure was implemented effective

More information

I-69 Program Segment Committee

I-69 Program Segment Committee I-69 Program Segment Committee MEMORANDUM OF CONFERENCE CALL SUBJECT: I-69 Segment Four and Five Committees Conference Call DATE: February 16, 2011 PARTICIPANTS: Participants List (Attachment 1) Purpose:

More information

Appendix C Status of Major Projects from the TIP

Appendix C Status of Major Projects from the TIP Appendix C of Major Projects from the 2017-2020 TIP This page left blank intentionally of Major Projects Appendix C C 3 Appendix C of Major Projects from the 2017 2020 TIP Appendix C of the 2019-2022 Transportation

More information

OFFICIAL MINUTES. MINUTES OF THE DIRECTORS BOARD OF THE TEXAS MASTER GARDENERS ASSOCIATION FEBRUARY 3/2018 Texas A&M University College Station, Texas

OFFICIAL MINUTES. MINUTES OF THE DIRECTORS BOARD OF THE TEXAS MASTER GARDENERS ASSOCIATION FEBRUARY 3/2018 Texas A&M University College Station, Texas OFFICIAL MINUTES MINUTES OF THE DIRECTORS BOARD OF THE TEXAS MASTER GARDENERS ASSOCIATION FEBRUARY 3/2018 Texas A&M University College Station, Texas Officers Present: President Nicky Maddams; 1 st Vice

More information

Case 2:13-cv Document Filed in TXSD on 11/19/14 Page 1 of 5 OF PUBLIC SAFETY AUSTIN. wwwdpstexasgov. the Department of Public

Case 2:13-cv Document Filed in TXSD on 11/19/14 Page 1 of 5 OF PUBLIC SAFETY AUSTIN. wwwdpstexasgov. the Department of Public Case 2:13-cv-00193 Document 773-23 Filed TXSD on 11/19/14 Page 1 of 5 TEXAS DEPARTMENT 5805 N LAMAR BLVD OF PUBLIC SAFETY BOX 4087 AUSTIN TEXAS 787701 5124242000 wwwdpstexasgov STEVEN C McCRAW COMMISSION

More information

ENERGY SECTOR ROADWAY REPAIR PROJECT. August 15, 2013 Industry Workshop

ENERGY SECTOR ROADWAY REPAIR PROJECT. August 15, 2013 Industry Workshop ENERGY SECTOR ROADWAY REPAIR PROJECT August 15, 2013 Industry Workshop Safety Moment Sign-in Sheet Exit Locations Gathering Point Directions from Emergency Responders Signal to re-enter the Building or

More information

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,

More information

Transportation Code, establishes prima facie reasonable and prudent speed limits for various categories of public roads, streets and highways.

Transportation Code, establishes prima facie reasonable and prudent speed limits for various categories of public roads, streets and highways. TEXAS TRANSPORTATION COMMISSION V ARlO US Counties MINUTE ORDER Page 1 of 1 VARIOUS Districts Transportation Code, 545.352 establishes prima facie reasonable and prudent speed limits for various categories

More information

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects -2022 Transportation Improvement Program - DRAFT Project Number Alamo Area Commute Solutions Pgm - FY 2017 5101.0 0915-12-547 AACOG Alamo Area Commute Solutions Pgm - FY 2018 5102.0 0915-12-543 AACOG Alamo

More information

10 Year Plan Cost/Revenue Matrix for the Dallas Fort Worth Region FY 2017 FY 2028

10 Year Plan Cost/Revenue Matrix for the Dallas Fort Worth Region FY 2017 FY 2028 Collin 54005 2351 01 017 FM 2478 FM 1461 to US 380 Collin 54005.1 2351 02 014 FM 2478 Collin 55038 2679 03 015 FM 2514 FM 1461 to North of FM 1461 East of Lavon Parkway to North of Drain Drive Widen two

More information

Pedestrian Improvements Kemp Blvd Wichita Falls (Midwestern Pkwy to Southwest Pkwy)

Pedestrian Improvements Kemp Blvd Wichita Falls (Midwestern Pkwy to Southwest Pkwy) EXHIBIT A TRANSPORTATION ALTERNATIVES PROGRAM (TAP) PROJECTS SELECTED FOR FUNDING SMALL URBAN AREAS (POPULATION 5,001 200,000) Nominating Entity TAP Project Name Federal Funds Bryan South College Phase

More information

Short Term 12 Expanded Freeway TxDOT IH-35 Slaughter Creek Overpass Reconstruct bridge and add lane to frontage road.

Short Term 12 Expanded Freeway TxDOT IH-35 Slaughter Creek Overpass Reconstruct bridge and add lane to frontage road. CAMPO Plan Priority Project List: Regionally Funded Projects (Projects may be funded by Federal, State or Local funding) AS AMENDED: 1/10/2011, 3/11/2011, 10/10/2011, 4/9/2012, and 10/8/2012 I. Roadway

More information

STATEWIDE OBSERVATIONAL SURVEY OF SAFElY BELT AND MOTORCYCLE HELMET USE IN TEXAS Prepared By KN. Womack VJ. Pezoldt

STATEWIDE OBSERVATIONAL SURVEY OF SAFElY BELT AND MOTORCYCLE HELMET USE IN TEXAS Prepared By KN. Womack VJ. Pezoldt STATEWIDE OBSERVATIONAL SURVEY OF SAFElY BELT AND MOTORCYCLE HELMET USE IN TEXAS--1993 Prepared By KN. Womack VJ. Pezoldt Prepared For Traffic Operations Division Texas Department of Transportation Jeanne

More information

Training Schedule. Revised 11/29/2017 Page 1 of 9

Training Schedule. Revised 11/29/2017 Page 1 of 9 Schedule Please choose a training site that is most convenient to attend. You are required to contact the facility prior to the training to verify no schedule changes have occurred and to ensure you are

More information

Training Schedule. Training Date Training Start Time Training End Time Contact Number Training Location Street Address City Zip

Training Schedule. Training Date Training Start Time Training End Time Contact Number Training Location Street Address City Zip Training Schedule Please choose a training site that is most convenient to attend. You are required to contact the facility prior to the training to verify no schedule changes have occurred and to ensure

More information

Demographic Characteristics and Trends of Bexar County and San Antonio, TX

Demographic Characteristics and Trends of Bexar County and San Antonio, TX Demographic Characteristics and Trends of Bexar County and San Antonio, TX Leadership San Antonio Understand Infrastructure. Prepare for Growth. May 2, 2012 San Antonio, TX Select Growing States, 2000-2010

More information

"Mobility 2045" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

Mobility 2045 Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects Number Alamo Area Commute Alamo Area MPO: Bexar, Comal Guadalupe & partial Kendall County AACOG Solutions Program Alamo Area Commute Solutions Pgm - FY 2017 $100,000 5101.0 0915-12-547 7/2018 Bexar Alamo

More information

Short and Long Term Needs

Short and Long Term Needs Short and Long Term Needs The short- and long-term programs of proposed projects listed below have been designed to address the mobility issues in South Montgomery County. These improvements to the transportation

More information

ZONE V SEPTEMBER 7-9, 2018

ZONE V SEPTEMBER 7-9, 2018 2019 ZONE V SEPTEMBER 7-9, 2018 NATIONAL SHOOTING COMPLEX 5931 Roft Road, San Antonio, TX 78253 210-688-3371 www.nationalshootingcomplex.com GENERAL INFORMATION NATIONAL SHOOTING COMPLEX 5931 ROFT ROAD

More information

plyr Modelling large data Hadley Wickham

plyr Modelling large data Hadley Wickham plyr Modelling large data Hadley Wickham 1. Strategy for analysing large data. 2. Introduction to the Texas housing data. 3. What s happening in Houston? 4. Using a models as a tool 5. Using models in

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

Texas Strategic Highway Safety Plan Update. 2 nd Emphasis Area Team Meeting Older Road Users 3/7/2017 Austin, TX

Texas Strategic Highway Safety Plan Update. 2 nd Emphasis Area Team Meeting Older Road Users 3/7/2017 Austin, TX Texas Strategic Highway Safety Plan Update 2 nd Emphasis Area Team Meeting Older Road Users 3/7/2017 Austin, TX Agenda Welcome and introductions (roll call) Review revised strategies Review new data runs

More information

J.R. Small Engines 9450 E. Bankhead Hwy Aledo TX, Morrison Outdoor Power Equipment 8300 County Road 508 Alvarado TX, 76009

J.R. Small Engines 9450 E. Bankhead Hwy Aledo TX, Morrison Outdoor Power Equipment 8300 County Road 508 Alvarado TX, 76009 J.R. Small Engines 9450 E. Bankhead Hwy Aledo TX, 76008 Morrison Outdoor Power Equipment 8300 County Road 508 Alvarado TX, 76009 Nationwide General Rental Center 4218 SW 34th Ave. Amarillo TX, 79109 Expert

More information

BEST PRACTICES FOR PAVEMENT EDGE MAINTENANCE

BEST PRACTICES FOR PAVEMENT EDGE MAINTENANCE BEST PRACTICES FOR PAVEMENT EDGE MAINTENANCE William D. Lawson and M. Shabbir Hossain Multidisciplinary Research in Transportation Texas Tech University Lubbock, TX 79409 Submitted to: Texas Department

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

FY Transportation Improvement Program Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

FY Transportation Improvement Program Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects -2022 Transportation Improvement Program Project Number Alamo Area Commute Solutions Pgm - 5301.0 0915-00-195 AAMPO Alamo Area Commute Solutions Pgm - 5302.0 0915-00-196 AAMPO Alamo Area Commute Solutions

More information

Action Plan and Summary for Roads to Gravel

Action Plan and Summary for Roads to Gravel Impact of Energy Sector and Heavy Commercial Development Action Plan and Summary for Roads to Gravel Research Report RR-13-01 Prepared for Texas Department of Transportation Maintenance Division Prepared

More information

Copyrighted STANDARD PRINTING & LITHOGRAPHING Co Capitol Ave. Houston, Texas

Copyrighted STANDARD PRINTING & LITHOGRAPHING Co Capitol Ave. Houston, Texas b Copyrighted 1930 STANDARD PRINTING & LITHOGRAPHING Co. 1207-11 Capitol Ave. Houston, Texas This book is lovingly dedicated to those who today share the lives of "The Medicine Man in Texas" THE WoMAN's

More information

Proposed Project I 35 from Denton to Cooke County Line

Proposed Project I 35 from Denton to Cooke County Line Proposed Project I 35 from Denton to Cooke County Line The existing I 35 facility is four lanes from I 35E/I 35W to Farm to Market Road (FM) 3002. The purpose of the proposed project is to increase capacity

More information

State of Texas Operations and Maintenance

State of Texas Operations and Maintenance State of Texas Operations and Maintenance Barbour Terminal Ship Channel The Barbour Terminal Channel and Turning Basin is a 1.7-mile-long deep draft waterway that extends from the Houston Ship Channel

More information

Training Schedule. Revised 5/4/18 Page 1 of 8

Training Schedule. Revised 5/4/18 Page 1 of 8 Training Schedule Please choose a training site that is most convenient to attend. You are required to contact the facility prior to the training to verify no schedule changes have occurred and to ensure

More information

CAMPO 2040 Regional Transportation Plan

CAMPO 2040 Regional Transportation Plan 11-00001-00 TxDOT Bastrop US 290 1 Mile East of FM 696 8.864 Miles East of FM 696 Widen to a 4-lane divided. 2018 $50,303,707.00 11-00002-00 TxDOT Bastrop FM 2571 SH 304 SH 95 Full Depth, Level-up and

More information

DRAFT INVESTMENT CORRIDORS

DRAFT INVESTMENT CORRIDORS DRAFT INVESTMENT CORRIDORS Mode Studied ID CORRIDOR / ROADWAY FROM TO EXISTING CMTA ROUTES CORRIDOR TYPE PRIORITY STREET COMMUTER ELECTRIC EXPRESS LIGHT METRO RAPID RIGHT-OF-WAY PRESERVATION SHUTTLE STREETCAR

More information

CAMPO 2040 Regional Transportation Plan

CAMPO 2040 Regional Transportation Plan 11-00001-00 TxDOT Bastrop US 290 1 Mile East of FM 696 8.864 Miles East of FM 696 Widen to a 4-lane divided. 2018 $50,303,707.00 11-00002-00 TxDOT Bastrop FM 2571 SH 304 SH 95 Full Depth, Level-up and

More information

Sponsored By: Support From:

Sponsored By: Support From: Sponsored By: Support From: A voluntary association of local governments, H-GAC provides a regional forum for cooperative action. Created by Texas, role defined by State and local governments: Area Agency

More information

13,351. Overall Statewide Results. How was the survey taken? Do you own or lease a personal vehicle? What is your primary means of transportation?

13,351. Overall Statewide Results. How was the survey taken? Do you own or lease a personal vehicle? What is your primary means of transportation? Overall Statewide Results 3 1 Houston 2 Dallas 3 Fort Worth 4 San Antonio 2 11 12 Austin 6 Laredo / Pharr 7 Corpus Christi / Yoakum 8 Bryan / Waco 9 Atlanta / Beaumont / Lufkin / Paris / Tyler Amarillo

More information

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 008-0 Austin District NOVEMBER 007 Quarterly Revisions CAMPO Capital Area Metropolitan Planning Organization October 5, 007 Mr. Robert Daigh, P.E. District

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

Houston. Arturo Garcilazo. Darell Hoffer. Chase Karl PEOPLE'S CHOICE BEST OF SHOW OPEN RANGE

Houston. Arturo Garcilazo. Darell Hoffer. Chase Karl PEOPLE'S CHOICE BEST OF SHOW OPEN RANGE Houston Arturo Garcilazo Darell Hoffer PEOPLE'S CHOICE BEST OF SHOW OPEN RANGE Chase Karl Cindy Hawk Doug Petrich Ella Hawk www.ttha.com THE JOURNAL OF THE TEXAS TROPHY HUNTERS - The Voice of Texas Hunting

More information

GENERAL DESCRIPTION. Page 1 of 5

GENERAL DESCRIPTION. Page 1 of 5 38. SH 114/SH 121 Corridor The DFW Connector : FT1345, FT 1347, FT1424, FR1424, FT1425, FR1425, FT1440, FT1500, FR1500, FT1505, FR1505, FT1507, FR1507, FT1510, FR1510, FT1715, FR1715, FT2720, FR2720, HM8190

More information

North Texas Real Estate Information System MLS Current Month Summary for: July 2010

North Texas Real Estate Information System MLS Current Month Summary for: July 2010 North Texas Real Estate Information System MLS Current Month Summary for: July 2010 Property Type Single Family 5,143-29% $215,743 11% 77-1% Condos and Townhomes 262-37% $182,880 16% 102 20% Farms and

More information

THSADA NEWSLETTER. Letter From the Executive Director Rusty Dowling, Executive Director, THSADA

THSADA NEWSLETTER. Letter From the Executive Director Rusty Dowling, Executive Director, THSADA THSADA NEWSLETTER Presented by Home Team Marketing May 2012 Letter From the Executive Director Rusty Dowling, Executive Director, THSADA I would like to take this opportunity to thank the Texas High School

More information

OPEN GIRLS Winners are (left to right) Champion Meagan Harrington from Nueces County 4-H, Runner-Up Rachel Barringer from Victoria County 4-H, Third P

OPEN GIRLS Winners are (left to right) Champion Meagan Harrington from Nueces County 4-H, Runner-Up Rachel Barringer from Victoria County 4-H, Third P OPEN GIRLS Winners are (left to right) Champion Meagan Harrington from Nueces County 4-H, Runner-Up Rachel Barringer from Victoria County 4-H, Third Place Tara Creighton from Madison County 4-H, Fourth

More information

Training Schedule. Contact Number Training Location Street Address City Zip

Training Schedule. Contact Number Training Location Street Address City Zip Schedule Please choose a training site that is most convenient to attend. You are required to contact the facility prior to the training to verify no schedule changes have occurred and to ensure you are

More information

Duval Classic Prospect Show 11 th Annual Duval Classic Prospect Show Nov 10, 2012-Steers and Heifers Nov 11, 2012-Lambs and Goats Benavides Ag Farm

Duval Classic Prospect Show 11 th Annual Duval Classic Prospect Show Nov 10, 2012-Steers and Heifers Nov 11, 2012-Lambs and Goats Benavides Ag Farm Medina County Fair Association, INC. Promoting pride in Medina County Swine Prospect Show November 24, 2012 Medina County Fairgrounds-Hondo, TX This is not a sanctioned show Exhibitor Eligibility-Grades

More information

HUD's 2012 Continuum of Care Homeless Assistance Programs Housing Inventory Count Report

HUD's 2012 Continuum of Care Homeless Assistance Programs Housing Inventory Count Report CoC Number: TX-607 CoC Name: Texas Balance of State CoC Summary of all beds reported by Continuum of Care: ¹ Total Yr-Round Seasonal Overflow / Voucher Emergency, Safe Haven and Transitional Housing 646

More information

NCTCOG 16-County Crash and Fatality Data

NCTCOG 16-County Crash and Fatality Data North Central Texas Council of Governments - Traffic Safety Crash and Fatality Statistics NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS (NCTCOG) 2012 Safety Program Performance Measures NCTCOG 16-County Crash

More information

CAMPO 2040 Regional Transportation Plan

CAMPO 2040 Regional Transportation Plan 11-00001-00 TxDOT Bastrop US 290 1 Mile East of FM 696 8.864 Miles East of FM 696 Widen to a 4-lane divided. 2018 $50,303,707.00 11-00002-00 TxDOT Bastrop FM 2571 SH 304 SH 95 Full Depth, Level-up and

More information

"Mobility 2040" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

Mobility 2040 Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects Number Alamo Area Commute Alamo Area MPO: Bexar, Comal Guadalupe & partial Kendall County AACOG Solutions Program Alamo Area Commute Solutions Pgm - FY 2017 $100,000 5101.0 0915-12-547 7/2018 Alamo Area

More information

I-35 Corridor Segment Committee NW Loop 410 San Antonio, Texas. February 11, :00 AM to Noon

I-35 Corridor Segment Committee NW Loop 410 San Antonio, Texas. February 11, :00 AM to Noon I-35 Corridor Segment Committee 4 3500 NW Loop 410 San Antonio, Texas February 11, 2010 9:00 AM to Noon Welcome Nancy Parker Facilitator Committee Work Session Nancy Parker Facilitator Discussion of Proposed

More information

2018 Challenger, CMZ, SCMZ, and Challenger 1-Day Events

2018 Challenger, CMZ, SCMZ, and Challenger 1-Day Events 2018 Challenger, CMZ, SCMZ, and Challenger 1-Day Events JANUARY 1st Weekend (6-7) Frisco Tennis School (City of Frisco) Challenger Willow Fork County Club Challenger Brazos Valley Tennis Association CMZ

More information

ENERGY SECTOR COORDINATION

ENERGY SECTOR COORDINATION ENERGY SECTOR COORDINATION Darin Kosmak, Deputy Director TxDOT Rail Division November 4, 2013 Energy Sector Considerations Existing FM roads not built to handle truck traffic resulting from: Oil & natural

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE November 9 November 15, 2017 Update: 11/9/17 3:45 p.m. New Pass, Bridge

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance

More information

Ave C to Ave J Repair and installation of sidewalks along eastern side of Main St

Ave C to Ave J Repair and installation of sidewalks along eastern side of Main St 2040 Metropolitan Transportation Plan Project Listing Short Range Funded (2014-2023) Projects with Allocated as of June 2017 and Listed in the Transportation Improvement Program (TIP) CATEGORY 7 PROJECTS

More information

Proposed Action, Purpose and Need Technical Memorandum

Proposed Action, Purpose and Need Technical Memorandum Proposed Action, Purpose and Need Technical Memorandum MoPac (State Loop 1) Intersections, Austin District From North of Slaughter Lane to South of La Crosse Avenue CSJ: 3136-01-015 Travis County, Texas

More information

USBR 21 KNOXVILLE TO CHATTANOOGA ROUTE MILE TURNS ROADS

USBR 21 KNOXVILLE TO CHATTANOOGA ROUTE MILE TURNS ROADS USBR 21 KNOXVILLE TO CHATTANOOGA ROUTE MILE TURNS ROADS 0.0 L SS Hill Rd 0.3 L SL S Gay Street 0.6 R SL E Blount Ave - stay S at SL 2.2 L SL Maryville Pike 2.3 R SS Martin Mill Pike 4.0 L Neubert Springs

More information

Kenedy County Deer Hunting Market Research

Kenedy County Deer Hunting Market Research Deer Hunting Market Research Kenedy County, TX Miles Philips, Extension Specialist Texas A&M Agrilife Extension College Station, TX T: 979-845-1023 E: mdphillips@ag.tamu.edu http://hunting.tamu.edu Deer

More information

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,

More information

I-35 COMAL COUNTY OPERATIONAL IMPROVEMENTS

I-35 COMAL COUNTY OPERATIONAL IMPROVEMENTS I- COMAL COUNTY OPERATIONAL IMPROVEMENTS OPEN HOUSE The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been,

More information

Kentucky Highway District 7

Kentucky Highway District 7 Kentucky Highway District 7 ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

Lake Travis Boy's Golf Results

Lake Travis Boy's Golf Results 2017-18 Lake Travis Boy's Golf Results Fall (Varsity) R1 R2 R3 Total September 22-23 Bart Granger 297 295 298 890 11th out of 52 October 6-7 LT Shootout at the Lake Team 1 287 278 278 843 2nd out of 20

More information

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related

More information

Dangerous by Design 2014 Texas

Dangerous by Design 2014 Texas Dangerous by Design 2014 Texas May 2014 The National Complete Streets Coalition, a program of Smart Growth America, seeks to fundamentally transform the look, feel and function of the roads and streets

More information

Atascosa County Deer Hunting Market Research

Atascosa County Deer Hunting Market Research Deer Hunting Market Research Atascosa County, TX Miles Philips, Extension Specialist Texas A&M Agrilife Extension College Station, TX T: 979-845-1023 E: mdphillips@ag.tamu.edu http://hunting.tamu.edu Deer

More information

NCTCOG DALLAS-FORT WORTH-ARLINGTON CATEGORY 7 RECAP FY 2013

NCTCOG DALLAS-FORT WORTH-ARLINGTON CATEGORY 7 RECAP FY 2013 NCTCOG DALLAS-FORT WORTH-ARLINGTON CATEGORY 7 RECAP FY 2013 Total Uncommitted Funds FY 2013 A + B = C C + D = E E - F = G A B C D E F G Balance Carryover from FY 12 FY (includes all adjustments) Total

More information

RECEIVED. Be it Enacted by the People of the State of Colorado: SECTION 1. In Colorado Revised Statutes, add part 11 to article 4 of title 43 as

RECEIVED. Be it Enacted by the People of the State of Colorado: SECTION 1. In Colorado Revised Statutes, add part 11 to article 4 of title 43 as Initiative 2017-2018 #167 FINAL TEXT INITIATED STATUTE TO AUTHORIZE BONDING FOR TRANSPORTATION FuNDs WITHOUT RAISING TAXESTOFIXOURDAIVINROADS RECEIVED PROPOSED INITIATIVE 2017-20 18 #167 MAR 162018 Be

More information

Brooks County Deer Hunting Market Research

Brooks County Deer Hunting Market Research Deer Hunting Market Research Brooks County, TX Miles Philips, Extension Specialist Texas A&M Agrilife Extension College Station, TX T: 979-845-1023 E: mdphillips@ag.tamu.edu http://hunting.tamu.edu Deer

More information

Transportation Improvement Program. Appendix H. Non-regionally Significant Arterials in Mobility Update

Transportation Improvement Program. Appendix H. Non-regionally Significant Arterials in Mobility Update 2015-2018 Transportation Improvement Program Appendix H Non-regionally Significant Arterials in Mobility 2035 2014 Update North Central Texas Council of Governments DFW Metropolitan Planning Organization

More information

PARKING LOT VENDING TENANT INFORMATION:

PARKING LOT VENDING TENANT INFORMATION: PARKING LOT VENDING TENANT INFORMATION: If you are interested in being a Parking Lot vendor, there are a few minimum requirements including (but not limited to): Tenant must sign a minimum of a six month

More information