MEETING CHIPPING BARNET AREA ENVIRONMENT SUB-COMMITTEE DATE AND TIME WEDNESDAY 13 MARCH, 2013 AT 7.00 PM VENUE 1255 HIGH ROAD, WHETSTONE, N20 0EJ

Size: px
Start display at page:

Download "MEETING CHIPPING BARNET AREA ENVIRONMENT SUB-COMMITTEE DATE AND TIME WEDNESDAY 13 MARCH, 2013 AT 7.00 PM VENUE 1255 HIGH ROAD, WHETSTONE, N20 0EJ"

Transcription

1 MEETING CHIPPING BARNET AREA ENVIRONMENT SUB-COMMITTEE DATE AND TIME WEDNESDAY 13 MARCH, 2013 AT 7.00 PM VENUE 1255 HIGH ROAD, WHETSTONE, N20 0EJ Dear Councillors, Please find enclosed additional papers relating to the following items for the above mentioned meeting which were not available at the time of collation of the agenda. Item No Title of Report Pages 9. Feasibility Study of Traffic Management Measures and Safety Improvements on Totteridge Village N20 and Barnet Lane junction 1-10 Maria Lugangira

2 This page is intentionally left blank

3 AGENDA ITEM 9 Meeting Date 13 March 2013 Subject Report of Summary Chipping Barnet Area Environment Sub- Committee Feasibility Study of Traffic Management Measures and Safety Improvements on Totteridge Village N20 and Barnet Lane junction Director for Place The report reviews the necessity for traffic calming measures and safety improvements at the Totteridge Village / Barnet Lane Junction and outlines recommendations from the preliminary investigations. Officer Contributors Status (public or exempt) Wards Affected Key Decision Reason for urgency / exemption from call-in Function of Themba Nleya, Senior Engineer Public Totteridge Ward Not Applicable Not Applicable Executive Enclosures Drawing No C Contact for Further Information: Themba Nleya

4 1. RECOMMENDATIONS 1.1 That this committee note the outcome of the investigation into the feasibility of providing traffic management measures and safety improvements on Totteridge Village as presented in this report. 1.2 That this committee instructs the Director for Place, subject to availability of funding and a satisfactory consultation outcome, to implement the following; Installation of a vehicle activated sign (VAS) at the location shown on drawing C, Retention and re-aligning of the existing pedestrian island Kerb re-alignment, and Carriageway resurfacing renewal of road markings 1.3 That any objections from the formal consultation be addressed by the Director for Place in consultation with the Cabinet Member for Environment. 2. RELEVANT PREVIOUS DECISIONS 2.1 The Chipping Barnet Area Environment Sub-Committee sitting in 16 January 2013 considered the local ward member Councillor Alison Cornelius s representation and noted her concerns regarding concerns regarding the speed of cars and the increase of accidents on Totteridge Lane. There has been a steady stream of accidents - particularly with cars travelling from west to east - cars being upturned onto their roofs or going off the road into peoples' fences or gates and demolishing them. The Sub-Committee therefore instructed the feasibility study and cost analysis with regard to improving road safety in Totteridge Lane at the War Memorial Site. 3. CORPORATE PRIORITIES AND POLICY CONSIDERATIONS 3.1 Introducing traffic management measures in the borough will contribute to the Corporate Plan priority A Successful London Suburb by enhancing Barnet s reputation as a good place to work and live. 3.2 The London Mayor s Transport Strategy also addresses these areas through: Proposal 30: The Mayor, through TfL, and working with the London boroughs and other stakeholders, will introduce measures to smooth traffic flow to manage congestion (delay, reliability and network resilience) for all people and freight movements on the road network, and maximise the efficiency of the network. These measures will include c) keep traffic moving, e) Planning and implementing improvements to the existing road network, to improve traffic flow on the most congested sections of the network, and to improve conditions for all road users 4. RISK MANAGEMENT ISSUES 4.1 I consider the issues involved are likely to give rise to policy considerations as any proposed measures would then have to be considered for the rest of the 2

5 borough and may have a major impact on traffic flow especially from the consideration of Emergency Services. 4.2 There would be some minor disruption whilst the work is being completed but this would be minimised through traffic management in discussion with contractor undertaking the work. 5. EQUALITIES AND DIVERSITY ISSUES 5.1 The introduction of traffic management measures on Totteridge Village would minimise the risk of vehicle to vehicle and/or vehicle to pedestrian collisions on a relatively busy road and particularly benefiting vulnerable users such as the elderly, physical or visually impaired. 6. USE OF RESOURCES IMPLICATIONS (Finance, Procurement, Performance & Value for Money, Staffing, IT, Property, Sustainability) Finance Any measures that may be preferred will be accommodated within the 2013/14 or future Traffic Management and Road Safety allocations Procurement The highway works would be procured through the borough s highway term contracts There are no Staffing, IT or Property implications arising out of this report. 7. LEGAL ISSUES 7.1 The Traffic Management Act 2004 places an obligation on authorities to ensure the safe and expeditious movement of traffic on their road network. 7.2 The Council as Highway Authority has the necessary legal powers to introduce or amend Traffic Management Orders through the Road Traffic Regulation Act CONSTITUTIONAL POWERS (Relevant section from the Constitution, Key/Non-Key Decision) 8.1 Constitution Part 3 Responsibility for Functions Area Environment Subcommittees perform functions that are the responsibility of the Executive including highways use and regulation not the responsibility of the Council, within the boundaries of their areas in accordance with Council policy and within budget. 9.0 BACKGROUND The speeding investigations at this location have arisen due to concerns raised by a local ward member during a site meeting on 21 March 2012 following numerous reported traffic incidents. Subsequent meetings with stakeholders have since taken followed During discussions, various concerns and suggested remedial measures have been suggested by the ward member and are summarised in the table below; 3

6 Table 1 summarises the concerns as they were presented (column 1) and possible action (column 2). Concern / Request (as shown on sketch submitted by ward member and discussed during the site meeting at location) 1. VAS bend sign with SLOW Legend 2. Chevron Sign between tree and lamp-post Possible Action Following speed surveys at three agreed locations, a vehicle activated sign is among options being considered (Since been replaced) 3. SLOW text on c/way with chevron markings, 20mph roundels coming from Mill Hill SLOW carriageway markings and 30mph roundels marked on carriageway among options under consideration. A 20mph marking would require the Traffic Order to amend the speed limit and current Council approach does not favour the proposal barring a policy review. 4. Replace cat s eyes Replacement being considered as part of the next 5. Lower plinth of pedestrian refuge, ribbed lines either side of island 6. Refresh ribbed edge of resurfacing job at this location Re-aligning the position of the pedestrian island and reviewing the markings around it is among the options being considered Replacement being considered as part of the next resurfacing job at this location c/way markings 7. No right turn sign A destination sign (or legend type) in advance of the junction is being considered 8. Remove raised surface (No further action anticipated unless review shows otherwise) 9. SLOW text on c/way with chevron markings, 20mph roundels coming from Whetstone 10. Resurface with hard grip material (surface needs rehabilitation) 11. VAS bend sign with SLOW Legend 12. Totteridge Lane (from the bends to Burnhams ) + on every 3 rd /4 th lighting column a 30mph repeater sign 13. Move Give-way line back See (3) above Resurfacing options are being considered as part of proposals in this report See (1) above No further action Covered as part of the proposals in this report The last extensive pedestrian improvements at the location were done with the approval of Totteridge Manor Association during 2003/04 and sought to address particular difficulties for people wanting to use the westbound bus stop and the poor visibility of the westbound traffic that made the crossing location hazardous to use. As a result, the existing refuge, together with 4

7 some minor amendments to the existing footpaths and the island, were introduced whose aim was to channel the pedestrians to a single crossing point with enhanced visibility. The bus stop was relocated closer to the island by the existing bench to provide a more suitable waiting area for the users. Speed Surveys & Personal Injury Accidents Speed surveys have been conducted at agreed locations on both approaches to the island by the memorial. For the posted limit at 30mph that this section of road is subject to, the results as shown on the table below do not appear to suggest speeding. However, it is recognised that the road layout and kerb alignment at this location may not be helpful even for the low speeds that are being recorded Table 2: Highest recorded daily 85%ile* during the period 16 April to 23 April 2012 Table 2 NB SB Location (mph) (mph) LC41, north of Barnet Lane Junction LC30, south of Barnet Lane Junction *The eighty-fifth percentile (85%ile) speed is the speed at which 85% or the vehicles using that road travel at or below. It is nationally used benchmark by highway authorities and gives an indication of the extent of speed/trends at a given location The location appears on accident cluster sites previously presented to this Committee. The details of incidents presented then are shown on Appendix 1 and point to majority of incidents occurring in the dry and during daylight hours. Anecdotal evidence from recent incidents appears to suggest light dazzle could also be a contributory factor especially during those periods when the sun is hovering just above the horizon The latest available 3 year data is for the period October 2009 to September 2012 and is shown on Table 3 below. Therefore the data does not include any incidents after 30 September Like-wise the road traffic incident (Police Ref CAD 5665) of 4 February 2013 by Totteridge Village at the junction with Barnet Lane involving a school pupil (pedestrian) is not yet shown in the database and further details are awaited. Table to (12 months) Slight 6-1 involved vision affected by sun dazzle causing driver to lose control and hit island - 1 involved driver losing control on bend - 4 involved right turning movements and/or failure to give way Serious 0 Nil Fatal 0 None Totals 6 5

8 9.1.8 The recorded average 85%ile speed data, when taken in isolation, a conclusion is likely to be drawn not to introduce measures as the average 85%ile figures do not exceed the Association of Chief Highway Police Officers (ACPO) recommended thresholds for targeted enforcement. The ACPO threshold figure would be expected to be 35mph for this location. Road Layout, Carriageway Condition and Traffic Management Measures During investigations, poor skid resistance and worn-out surfacing was also suspected to contribute to incidents. However, condition surveys appear to suggest that the measured skid resistance (SCRIM) still meets the assigned investigatory level (IL). When the measured SCRIM value is below the IL that means the skid resistance has deteriorated but this does not appear to be the case here hence the location is not on the current list of sites that are due to be resurfaced The existing island introduced during previous improvements appears to be victim to the kink of the kerb alignment and frequently gets hit by vehicles. The proposals being tabled in this report suggest a minor re-alignment of the island However, the surfacing is developing potholes and there is need to consider resurfacing as part of the overall treatment of replacing the cat s eyes and renewal of the road markings on a like-for-like basis. The SLOW text markings on the carriageway will be introduced over the new surface and are therefore additional While there is a clear case for improving the kerb alignment, it would appear previous attempts have been constrained by the fact that the required land to achieve this is not public highway This report considers amongst other measures; i) a vehicle activated sign set at a low threshold to encourage drivers to reduce their speed if possible to below the posted limit, and ii) the kerb re-alignment to be necessary in mitigating related incidents and therefore proposes for land acquisition discussions with the TMA to be given consideration. The TMA would need to give approval for a VAS to be erected on land under their control on the existing lighting column. The proposed measures as highlighted on drawing C are being kept to a minimum and sympathetic in keeping with the amenity of the area The costs for the resurfacing job with, and without, the carriageway widening aspect are highlighted in Table 4 below but these do not include the cost of any anticipated land acquisition that could possibly be off-set by trading off an equal area of public highway land in-lieu. 6

9 Table 4 Costs 1no x VAS 4,000 Re-align island 7,000 (involves road closure) Kerb re-alignment 10,000 (includes grass verge being converted to full-depth carriageway construction, requires road closure) Re-surfacing 85,000 Totals without carriageway widening/kerb realignment with carriageway widening/kerb re-alignment When viewed in the context of the current approach to traffic management requests, the location does appear to meet the criteria for the below recommendations to be put forward as a candidate for funding The measures assume utilisation of a small amount of non-highway land. Discussions with the local ward member indicate that the landowners, the Totteridge Manor Association (TMA), are amenable to this and assuming the proposals are approved, appropriate steps will be taken to formalise this arrangement Therefore the anticipated aggregate cost for the vehicle activated sign, carriageway widening, re-surfacing and re-aligning the pedestrian island is at current prices including officer time. This figure does not take into account land negotiations or costs. 10 Officer Recommendations: 10.1 Therefore it is recommended the committee instruct the Director for Place to proceed to a detailed study and public consultation with a view to implementing the following subject to availability of resources; Installation of the vehicle activated sign (VAS) at the location shown on drawing C Retention and re-aligning the pedestrian island to continue to accord pedestrians the opportunity to cross the busy road in two stages Kerb re-alignment, and Carriageway resurfacing renewal of road markings 7

10 This page is intentionally left blank 8

11 9

12 This page is intentionally left blank 10

Strategic Director for Environment. Enclosures Appendix A - Option drawings. Jamie Blake- Strategic Director for Environment

Strategic Director for Environment. Enclosures Appendix A - Option drawings. Jamie Blake- Strategic Director for Environment Chipping Barnet Area Committee 9 July 2018 Title Report of Wards Status Urgent Key Cromer Road Request for 20mph Zone Strategic Director for Environment High Barnet Public No No Enclosures Appendix A -

More information

Appendix 12 Parking on footways and verges

Appendix 12 Parking on footways and verges Appendix 12 Parking on footways and verges Legal position Parking on footways and verges whether wholly or partly is banned throughout London, unless signs are placed to allow parking. The ban requires

More information

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager LONDON BOROUGH OF RICHMOND UPON THAMES DATE: AUGUST 2015 DECISION MAKER: LEAD OFFICER: SUBJECT: WARDS: Cabinet Member for Highways & Streetscene Highway Infrastructure Manager PROPOSED CYCLING IMPROVEMENTS

More information

Report to Cabinet. 18 May 2016

Report to Cabinet. 18 May 2016 Agenda Item 8 Report to Cabinet 18 May 2016 Subject: Presenting Cabinet Member: Proposed CCTV Enforcement of Traffic Contraventions in a Bus Lane (Key Decision Ref. No. HE030) Highways and Environment

More information

Process for managing parking on verges, footways and footpaths

Process for managing parking on verges, footways and footpaths Process for managing parking on verges, footways and footpaths Author: MG/NR Highways and Transport Environment Department Date: 28 July 2015 Version: 2.0 PARKING ON VERGES, FOOTWAYS AND FOOTPATHS Introduction

More information

CHIPPING BARNET RESIDENTS FORUM BARNET HOUSE, 1255 HIGH ROAD, WHETSTONE, N20 0EJ TUESDAY, 25 JUNE 2013, 6.00PM

CHIPPING BARNET RESIDENTS FORUM BARNET HOUSE, 1255 HIGH ROAD, WHETSTONE, N20 0EJ TUESDAY, 25 JUNE 2013, 6.00PM CHIPPING BARNET RESIDENTS FORUM BARNET HOUSE, 1255 HIGH ROAD, WHETSTONE, N20 0EJ TUESDAY, 25 JUNE 2013, 6.00PM Chairman: Councillor Kate Salinger Vice-Chairman: Councillor Barry Evangeli ISSUES TO BE CONSIDERED

More information

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport LONDON BOROUGH OF RICHMOND UPON THAMES Cabinet Member Decision DATE: January 2012 REPORT OF: LEAD OFFICER: SUBJECT: WARDS: The Cabinet Member for Highways & Streetscene Aurang Zeb - Head of Highways &

More information

IMPROVEMENT OPTIONS REPORT - WONERSH VILLAGE. for WONERSH PARISH COUNCIL. March V3.0 stilwell-ltd.co.uk

IMPROVEMENT OPTIONS REPORT - WONERSH VILLAGE. for WONERSH PARISH COUNCIL. March V3.0 stilwell-ltd.co.uk IMPROVEMENT OPTIONS REPORT - WONERSH VILLAGE for WONERSH PARISH COUNCIL March 2016 V3.0 stilwell-ltd.co.uk Improvement Options Report Wonersh Village, Wonersh Date of Prepared Checked Revision Comments

More information

6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT

6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT 6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT General Manager responsible: Officer responsible: Author: Jane Parfitt General Manager City Environment DDI 941 8656 Michael Aitken

More information

Environment Committee 14 July 2016

Environment Committee 14 July 2016 Environment Committee 14 July 2016 Title Traffic Calming Measures Report of Wards Status Urgent Key Commissioning Director for Environment All Public No No Enclosures Appendix A Type of Traffic Calming

More information

Mill Hill Broadway Capacity Improvement

Mill Hill Broadway Capacity Improvement 1 16 MARCH 2016 Mill Hill Broadway Capacity Improvement Presentation to Barnet Members and Mill Hill Residents Association 2 Background A1 is one of 23 Transport for London Road Network (TLRN) Strategic

More information

Frequently asked questions (FAQ) about a borough-wide 20 mph speed limit

Frequently asked questions (FAQ) about a borough-wide 20 mph speed limit Frequently asked questions (FAQ) about a borough-wide 20 mph speed limit February 2013 1. Is it safer to drive at 20 mph? Yes. According the Royal Society for Prevention of Accidents (RoSPA) if a pedestrian

More information

Speed Limit Policy Isle of Wight Council

Speed Limit Policy Isle of Wight Council APPENDIX B Speed Limit Policy Isle of Wight Council 2009 Contents Section 1 Introduction 1.1 Links with the Local Transport Plan Section 2 Speed Limits on Urban Roads and Residential Areas 2.1 20mph Limits

More information

M9/A90/M90 Edinburgh to Fraserburgh Trunk Road. A90 Tealing. Moving Cursor Programme Junction Study

M9/A90/M90 Edinburgh to Fraserburgh Trunk Road. A90 Tealing. Moving Cursor Programme Junction Study A90 Tealing Moving Cursor Programme Junction Study This is an unpublished report prepared for the Transport Scotland, Trunk Road and Bus Operations Division (TRBO) and must not be referred to in any publication

More information

Cuddington Traffic Calming

Cuddington Traffic Calming Buckinghamshire County Council Cuddington Traffic Calming PRIV18003 / FEA / DOC / 01 June 2018 Ringway Jacobs Ltd Harling House 47-51 Great Suffolk Street London SE1 0BS Tel: 02079604040 Fax: 02079604051

More information

NMT SAFE STUDY APPROACH

NMT SAFE STUDY APPROACH 24 May 2017 ADVOCATING THE NON MOTORISED TRANSPORT AGENDA CONTENT Content NMT road safety study approach NMT road safety study process NMT SAFE STUDY APPROACH THE NEED FOR NMT SAFETY STUDIES Is there is

More information

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES

TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES (Adopted by the Town Council on June 30, 2004) (Revised December 6, 2010) (Revised February 8, 2016) POLICY AND PROCEDURES FOR TRAFFIC

More information

Skid Resistance Policy. July 2008

Skid Resistance Policy. July 2008 July 2008 JOB NUMBER: DOCUMENT REF: Rev 4 Rev 3 Rev 2 Rev 1 1 st Draft AT KH Revision Purpose Description Originate Checked Review Authorised Date Safer Roads, Better Journeys Page 1 of 13 1.0 Introduction

More information

Kings Road, Herne Bay: Proposed Crash Remedial Measure

Kings Road, Herne Bay: Proposed Crash Remedial Measure Kings Road, Herne Bay: Proposed Crash Remedial Measure To: Canterbury Joint Transportation Board 17 February 2015 By: Classification: Ward: Tim Read - Head of Transportation Unrestricted Herne Bay Summary:

More information

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document TELL US Bakers Arms to Leyton Green Road (Section D, E, F) Leyton Green Road to Whipps Cross Roundabout (Section G) YOUR VIEWS www.enjoywalthamforest.co.uk

More information

Bramshaw traffic calming proposal

Bramshaw traffic calming proposal - 1 - Bramshaw traffic calming proposal Initial options appraisal report July 2017 - 2-1. Project background Hampshire Country Council has commissioned Test Valley Borough Council to carry out an option

More information

Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths

Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths Road Asset Technical Accord - RATA The Centre of Excellence for Road Asset Planning in the Waikato Region Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths

More information

MILTON ROAD LLF PROJECT UPDATE

MILTON ROAD LLF PROJECT UPDATE Greater Cambridge City Deal MILTON ROAD LLF PROJECT UPDATE 9 th May 2017 Project objectives Comprehensive priority for buses in both directions wherever practicable; Additional capacity for sustainable

More information

Collision Site Investigation - Bodenham By-Pass Background

Collision Site Investigation - Bodenham By-Pass Background Collision Site Investigation - Bodenham By-Pass Background The junction of the C12 and A338 was the subject of a Local Safety Scheme (LSS) in 2011. Analysation of the collisions at the time revealed the

More information

Sevenways Roundabout, and the need for a Road Safety Scheme:

Sevenways Roundabout, and the need for a Road Safety Scheme: Sevenways Roundabout, and the need for a Road Safety Scheme: The way the current roundabout has evolved has obviously created an environment that is dangerous for all road users, motorists, cyclists and

More information

Hendon Area Committee 30 March 2016

Hendon Area Committee 30 March 2016 Hendon Area Committee 30 March 2016 Title, Traffic Management Scheme Report of Wards Status Commissioning Director for Environment Mill Hill Public Enclosures Appendix - Drawing No. GC2419-CAP-00-XX-DR-C-002

More information

INTERIM ADVICE NOTE 98/07 GUIDANCE FOR HA SERVICE PROVIDERS ON IMPLEMENTING THE SKID RESISTANCE POLICY (HD28/04)

INTERIM ADVICE NOTE 98/07 GUIDANCE FOR HA SERVICE PROVIDERS ON IMPLEMENTING THE SKID RESISTANCE POLICY (HD28/04) INTERIM ADVICE NOTE 98/07 GUIDANCE FOR HA SERVICE PROVIDERS ON IMPLEMENTING THE SKID RESISTANCE POLICY (HD28/04) Summary This interim advice note provides guidance to facilitate the effective application

More information

1 This technical note considers the issues associated with the use of tidal flow bus lanes on key public transport corridors in Cambridge.

1 This technical note considers the issues associated with the use of tidal flow bus lanes on key public transport corridors in Cambridge. TECHNICAL NOTE: TIDAL FLOW BUS LANE OPTION ASSESSMENT Purpose 1 This technical note considers the issues associated with the use of tidal flow bus lanes on key public transport corridors in Cambridge.

More information

TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1

TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1 TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL Page 1 Table of Contents 1.0 Introduction... 3 2.0 Project Overview... 3 3.0 Project Proposals... 4 3.1 Enfield Road / Durham Road Junction... 3 5 3.2 Summerfield

More information

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016 Context. Author: Parish Clerk 2 The Draft Integrated Transport Policy (DITS) sets out a vision and objectives, and identifies a detailed programme of interventions to support the Maidstone Borough Local

More information

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design Cycle traffic and the Strategic Road Network Sandra Brown, Team Leader, Safer Roads- Design Highways England A Government owned Strategic Highways Company Department for Transport Road Investment Strategy

More information

Local Highway Panels Members Guide. 5 Crossing Facilities

Local Highway Panels Members Guide. 5 Crossing Facilities Local Highway Panels Members Guide 5 2 Local Highway Panels (LHP) Members Guide 2016/17 1. Introduction On the Network where there are sufficient crossing opportunities most individuals are able to cross

More information

The Highways Agency is working to improve the M1 between junction 28 (near Alfreton) and junction 35a (the A616 Stocksbridge bypass).

The Highways Agency is working to improve the M1 between junction 28 (near Alfreton) and junction 35a (the A616 Stocksbridge bypass). Welcome The Highways Agency is working to improve the M1 between junction 28 (near Alfreton) and junction 35a (the A616 Stocksbridge bypass). The M1 is a vital part of the strategic road network, connecting

More information

Traffic Assets Section Proposed Removal of Street Lighting Road Safety Review Report No 48

Traffic Assets Section Proposed Removal of Street Lighting Road Safety Review Report No 48 Street Lighting Section Unique Reference: o. 48 Traffic Assets Section Report o 48 Reviewer: Ellie Briggs, BEng (Hons) CEng MICE Highway Classification / umber Road / Street ame: District / Settlement:

More information

Harriet Fraser Traffic Engineering & Transportation Planning

Harriet Fraser Traffic Engineering & Transportation Planning Appendix 5: Traffic Assessment 71 26 February 2015 Mr James Beban Senior Resource Consents Planner Cuttriss Consultants Ltd PO Box 30429 Lower Hutt PO Box 40170 Upper Hutt 5140 P 04 526 2979 M 027 668

More information

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail.

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail. TRANSPORT AND ACCESS EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail. Whilst there are some walking facilities within

More information

Bus and Transit Lane Review Update

Bus and Transit Lane Review Update Board Meeting / 25 February 2013 Agenda Item no.8(i) Bus and Transit Lane Review Update Glossary Auckland Transport New Zealand Transport Agency Transit Two Transit Three (AT) (NZTA) (T2) (T3) Executive

More information

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information

Appendix A Type of Traffic Calming Measures Engineering Solutions

Appendix A Type of Traffic Calming Measures Engineering Solutions Appendix A Type of Traffic Calming Measures Engineering Solutions PHYSICAL MEASURES Central Hatching The major consideration of this feature is that, these markings can only be laid down the centre of

More information

3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION

3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION Report No. 8 of the Transportation Services Committee Regional Council Meeting of October 20, 2011 3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION The Transportation Services Committee recommends:

More information

The Safe System Approach

The Safe System Approach There are very few areas of public discussion and sentiment which generate as much consensus as road safety. Everyone wants safer roads for all users, and road safety is a key priority for governments,

More information

Speed Limits in the Hoddle Grid

Speed Limits in the Hoddle Grid Speed Limits in the Hoddle Grid Recent History of speed limits March 2013 Docs # 7738485 1 Introduction Muncipalities have power to Erect speed limit signs BUT Municipalities DO NOT have the power to approve

More information

MARKHOUSE ROAD IMPROVEMENTS

MARKHOUSE ROAD IMPROVEMENTS MARKHOUSE ROAD IMPROVEMENTS www.enjoywalthamforest.co.uk Waltham Forest is changing and we want you to be part of it. Thanks to a funding pot of 27million from Transport for London, we re delivering the

More information

Seal Extension Guidelines. Asset Management and Systems

Seal Extension Guidelines. Asset Management and Systems Seal Extension Guidelines 1. Guideline Definitions AADT - Annual Average Daily Traffic is measured at regular annual (or greater) intervals and adjusted for seasonal effects, using an approved traffic

More information

Improving the A1 in Northumberland Public consultation. November December North of Ellingham

Improving the A1 in Northumberland Public consultation. November December North of Ellingham A1 Improving the A1 in Northumberland Public consultation November December 2016 North of Ellingham Improving the A1 in Northumberland In autumn 2014, the government announced the first Road Investment

More information

C.A.R.S. Project Design Report.

C.A.R.S. Project Design Report. C.A.R.S. Project Design Report. PRODUCED BY: Browne, A. Kennedy, M. Dolan, N. Selman, C. STUDENT NO: DATE DUE: COURSE: LECTURER: C09365788-C09686908-D11125480-C08868352 20-April-2012 Dt004/3 Civil Engineering

More information

Aiming for Zero Road Worker Safety. Mark Pooley Highways Agency Road Worker Safety Programme Manager Monday 11 June 2012

Aiming for Zero Road Worker Safety. Mark Pooley Highways Agency Road Worker Safety Programme Manager Monday 11 June 2012 Aiming for Zero Road Worker Safety Mark Pooley Highways Agency Road Worker Safety Programme Manager Monday 11 June 2012 1. Road Worker Safety Strategy. RWS Strategic Target No. 1: achieve a substantial

More information

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL CITY OF WEST KELOWNA COUNCIL POLICY MANUAL Page 1 of 7 DEPARTMENT: Engineering Services SUBJECT: Traffic Calming Policy (Revised June 6, 2017) Policy Statement: The provision of traffic calming measures

More information

APPENDIX F: TECHNICAL NOTE 22 (VICARAGE ROAD JUNCTION)

APPENDIX F: TECHNICAL NOTE 22 (VICARAGE ROAD JUNCTION) APPENDIX F: TECHNICAL NOTE 22 (VICARAGE ROAD JUNCTION) West Midlands Interchange Transport Assessment DCO Submission WEST MIDLANDS INTERCHANGE SUBJECT: Technical Note 22 Review of Vicarage Road Junction

More information

Welcome. Knutsford to Bowdon Improvement. Start of works exhibition November An executive agency of the Department for Transport

Welcome. Knutsford to Bowdon Improvement. Start of works exhibition November An executive agency of the Department for Transport Start of works exhibition November 2014 Welcome Scheme plan A56 Bowdon A56 M56 Booth Bank Junction 8 M56 Millington Lane Cherry Tree Lane Junction 7 Millington Hall Lane Rostherne Mere Rostherne Lane N140519

More information

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

Roads and public rights of way

Roads and public rights of way Roads and public rights of way This factsheet outlines how the effects of the Proposed Scheme on roads and public rights of way (PRoW) along the line of route would be managed. Version 1.0 Last updated:

More information

SHOTLEY BRIDGE VILLAGE TRUST

SHOTLEY BRIDGE VILLAGE TRUST SHOTLEY BRIDGE VILLAGE TRUST Traffic & Parking Study - 2009 The Parking Lot, a focus group of the Shotley Bridge Village Trust, has undertaken this study. Evidence was gathered, through surveys during

More information

Background. The scale of the problem. The scale of the problem. Road Safety in London, the statistics. 280 Fatalities from road crashes in 2002

Background. The scale of the problem. The scale of the problem. Road Safety in London, the statistics. 280 Fatalities from road crashes in 2002 Impacts: 8th Intercontinental Conference - Geneva Thursday, 13 November 23 European Road Safety Programme Implementation by Cities AN OVERVIEW OF THE LONDON PICTURE Lukman Agboola Senior Road Safety Engineer

More information

Guide to the Cycle Enfield Public Consultation on Enfield Town. Produced by the Save Our Enfield Town Campaign Group

Guide to the Cycle Enfield Public Consultation on Enfield Town. Produced by the Save Our Enfield Town Campaign Group Guide to the Cycle Enfield Public Consultation on Enfield Town Produced by the Save Our Enfield Town Campaign Group What s in this guide? Introduction Page 3 What Enfield Council says about Option 1 Page

More information

18.1 Introduction Maintaining pedestrian-related Problems arising in the long term. infrastructure

18.1 Introduction Maintaining pedestrian-related Problems arising in the long term. infrastructure 18 Maintaining the pedestrian network Maintaining the pedestrian network Maintenance in the short and long term Planning for pedestrians during maintenance works 18.1 Introduction Both pedestrian-related

More information

ASSOCIATION OF RUNNING CLUBS EVENT PLANNING AND RISK ASSESSMENT

ASSOCIATION OF RUNNING CLUBS EVENT PLANNING AND RISK ASSESSMENT ASSOCIATION OF RUNNING CLUBS EVENT PLANNING AND RISK ASSESSMENT The purpose of this document is to inform and promote best practice for organisers of ARC permitted races. Consideration of the following

More information

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District No Turn on Red Regulations STAFF REPORT ACTION REQUIRED Date: June 1, 2010 To: From: Toronto and East York Community Council Director, Transportation Services, Toronto and East York District Wards: Trinity

More information

Essential Standard No. 16. Streetworks - Short duration static works carried out from a vehicle

Essential Standard No. 16. Streetworks - Short duration static works carried out from a vehicle Key Messages Short duration static works must not exceed 60 mins, including setting up and dismantling traffic management. A vehicle or vehicles should be used whenever possible to protect the workforce.

More information

Version 7 October Utilisation Strategy for Speed Camera Enforcement

Version 7 October Utilisation Strategy for Speed Camera Enforcement Version 7 October 2009 Utilisation Strategy for Speed Camera Enforcement Introduction The main aim of the Staffordshire Safer Roads Partnership is to reduce road casualties. The range of measures available

More information

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017 A127/A130 Fairglen Interchange Improvement Schemes Information Leaflet February 2017 1 2 Foreword By Councillor Kevin Bentley Essex is continuing to grow as a vibrant economic hub and as a fantastic place

More information

FONTMELL MAGNA. Village Traffic Management Scheme (TMS) Presented to and adopted by Fontmell Magna PC September 2014

FONTMELL MAGNA. Village Traffic Management Scheme (TMS) Presented to and adopted by Fontmell Magna PC September 2014 FONTMELL MAGNA Village Traffic Management Scheme (TMS) Presented to and adopted by Fontmell Magna PC September 2014 Why do we need a Village Traffic Management Scheme? 1. Because of the impact the A350

More information

Appendix 11 Barton Greenway Review

Appendix 11 Barton Greenway Review Appendix 11 Barton Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

LONDON FIELDS AREA WIDE REVIEW OF PROPOSALS

LONDON FIELDS AREA WIDE REVIEW OF PROPOSALS LONDON FIELDS AREA WIDE REVIEW OF PROPOSALS Summary Report MARCH 2017 London Fields Area Wide Review of Proposals Summary Report CONTACTS CHARLES HUTCHINSON Associate Technical Director dd + 44 (0)20 03014

More information

High Street, Pulloxhill Consider Representations to Proposed Waiting Restrictions

High Street, Pulloxhill Consider Representations to Proposed Waiting Restrictions Meeting: Delegated Decisions by the Executive Member for Community Services on Traffic Regulation Orders Date: 4 February 2016 Subject: High Street, Pulloxhill Consider Representations to Proposed Waiting

More information

Traffic Calming Policy

Traffic Calming Policy Article I. Purpose and Goal. The purpose of this policy is to establish criteria and procedures the City will use to evaluate requests for, and if appropriate, implement traffic calming measures. Neighborhood

More information

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities 6G.01 Typical Applications Each temporary traffic control (TTC) zone is different. Many variables, such as location of work, highway type,

More information

Entry Treatments. Traffic Advisory Leaflet 2/94 August Introduction. Design. Vertical Deflections. Locations

Entry Treatments. Traffic Advisory Leaflet 2/94 August Introduction. Design. Vertical Deflections. Locations Traffic Advisory Leaflet 2/94 August 1994 Entry Treatments Introduction Entry treatments have been developed for use at side roads so that drivers leaving a major road are in no doubt that they are entering

More information

A52. Nottingham Junctions. Construction at Nottingham Road and Cropwell Road junctions commencing early January 2017

A52. Nottingham Junctions. Construction at Nottingham Road and Cropwell Road junctions commencing early January 2017 Nottingham Junctions Construction at Nottingham Road and Cropwell Road junctions commencing early January 2017 Introduction The is the key east-west link across the East Midlands. The route is subject

More information

The Consultation has now ended.

The Consultation has now ended. The Consultation has now ended. We have received Cabinet Member approval to undertake implementation of the Baker Street Two Way scheme. You are not viewing the most recent documentation. Please visit

More information

Smart motorways: all lane running on the M25. Guidance for EEAST crews

Smart motorways: all lane running on the M25. Guidance for EEAST crews Smart motorways: all lane running on the M25 Guidance for EEAST crews Published April 2014 Background This month (April 2014) the Highways Agency launched its smart motorways, which make use of new technology

More information

Rural Economy and Connectivity Committee. Restricted Roads (20mph Speed Limit) (Scotland) Bill: Key Themes Arising from the Online Survey

Rural Economy and Connectivity Committee. Restricted Roads (20mph Speed Limit) (Scotland) Bill: Key Themes Arising from the Online Survey Rural Economy and Connectivity Committee Restricted Roads (20mph Speed Limit) (Scotland) Bill: Key Themes Arising from the Online Survey Introduction On Friday 9 November 2018, the Rural Economy and Connectivity

More information

Traffic Management Act 2004 implications of enactment. Nancy Cox Regulatory and Interconnect Manager August 2004

Traffic Management Act 2004 implications of enactment. Nancy Cox Regulatory and Interconnect Manager August 2004 Traffic Management Act 2004 implications of enactment Nancy Cox Regulatory and Interconnect Manager August 2004 Traffic Management Act 2004 Traffic Officers Network management by local traffic authorities

More information

ON-STREET PARKING IN THE HIGHCLIFFE HIGH STREET. M Mawbey

ON-STREET PARKING IN THE HIGHCLIFFE HIGH STREET. M Mawbey ON-STREET PARKING IN THE HIGHCLIFFE HIGH STREET M Mawbey 1. INTRODUCTION 1.1 The rate of the flow of eastbound traffic into the High Street is controlled to a certain extent by a pedestrian crossing. Westbound

More information

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013 Douglas Land Use and Transportation Strategy (DLUTS) Summary August 2013 Background Douglas is a large and popular residential suburb of approximately 30,000 persons on the periphery of Cork City along

More information

REPORT. Engineering and Construction Department

REPORT. Engineering and Construction Department REPORT COMMUNITY SERVICES COMMITTEE MEETING DATE: JUNE 11, 2013 FROM: Engineering and Construction Department DATE: May 24, 2013 SUBJECT: Great Lakes Boulevard Mini Roundabout LOCATION: Great Lakes Boulevard

More information

14. PROPOSED PEDESTRIAN CROSSING IMPROVEMENTS IN MOORHOUSE AVENUE

14. PROPOSED PEDESTRIAN CROSSING IMPROVEMENTS IN MOORHOUSE AVENUE 165 14. PROPOSED PEDESTRIAN CROSSING IMPROVEMENTS IN MOORHOUSE AVENUE General Manager responsible: General Manager City Environment, DDI 941-8528 Officer responsible: Transport and Greenspace Unit Manager

More information

Civil Parking Enforcement of Bus Lane Contraventions. Yes. Yes

Civil Parking Enforcement of Bus Lane Contraventions. Yes. Yes Name of meeting: CABINET Date: 6 June 2014 Title of report: Civil Parking Enforcement of Bus Lane Contraventions Is it likely to result in spending or saving 250k or more, or to have a significant effect

More information

Living Streets response to the Draft London Plan

Living Streets response to the Draft London Plan Living Streets response to the Draft London Plan Contents Living Streets response to the Draft London Plan... 1 About Living Streets... 2 Summary... 2 Consultation response... 3 Chapter 1: Planning London

More information

Our Approach to Managing Level Crossing Safety Our Policy

Our Approach to Managing Level Crossing Safety Our Policy Our Approach to Managing Level Crossing Safety Our Policy Our policy towards managing level crossing risk is: that we are committed to reducing the risk at level crossings where reasonably practicable

More information

Pedestrian Crosswalk Audit

Pedestrian Crosswalk Audit 1200, Scotia Place, Tower 1 10060 Jasper Avenue Edmonton, Alberta T5J 3R8 edmonton.ca/auditor Pedestrian Crosswalk Audit June 19, 2017 The conducted this project in accordance with the International Standards

More information

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21 DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.

More information

Parking Partnership Enforcement. Showing the Partnership Enforcement Policy and links to Regional and National Policy,

Parking Partnership Enforcement. Showing the Partnership Enforcement Policy and links to Regional and National Policy, Parking Partnership Enforcement Policy (PEP) Showing the Partnership Enforcement Policy and links to Regional and National Policy, V1.0 April 2009 v2.0 March & v2.1 July 2011 Updated v3.0 July 2015 Introduction

More information

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division

CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Transportation Planning and Parking Division TO: Chair and Members Public Works Committee COMMITTEE DATE: June 18, 2018 SUBJECT/REPORT NO:

More information

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY Appendix 2 City of Mississauga Lakeshore Road FINAL REPORT Transportation Review Study December 2010 EXECUTIVE SUMMARY Study Purpose

More information

Background. Caversham a vision for the future. Joint public meeting arranged by:

Background. Caversham a vision for the future. Joint public meeting arranged by: Joint public meeting arranged by: Sharing our Streets Caversham a vision for the future and Caversham Traders Association This presentation followed a presentation by Simon Beasley, Network Manager for

More information

How do we design for pedestrians? Case study: transforming the Walworth Road

How do we design for pedestrians? Case study: transforming the Walworth Road How do we design for pedestrians? Case study: transforming the Walworth Road David Moores, Director of Public Realm Institution of Highways and Transportation, November 2009 Presentation overview Design

More information

Draft letter to Designers and Managing Agents INTERIM ADVICE NOTE 43/02: CANTILEVER AND PORTAL GANTRY VMS

Draft letter to Designers and Managing Agents INTERIM ADVICE NOTE 43/02: CANTILEVER AND PORTAL GANTRY VMS Draft letter to Designers and Managing Agents INTERIM ADVICE NOTE 43/02: CANTILEVER AND PORTAL GANTRY VMS This Interim Advice Note announces amendments to a series of guidelines related to cantilever and

More information

SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane

SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane Exception Report Client Officer Rudo Beremauro Date 20 January 2015 RSA /Project Sponsor s Contents Section 3 Project Sponsor's

More information

Rhebogue Neighbourhood Greenway. Road Safety Audit Stage 2

Rhebogue Neighbourhood Greenway. Road Safety Audit Stage 2 Rhebogue Neighbourhood Greenway Road Safety Audit Stage 2 Report Number: 12/007/00/00057 July 2014 Mid West National Road Design Office Lissanalta House, Dooradoyle County Limerick Tel: 061 496 800 Fax:

More information

Municipality of Sofia Traffic Master Plan. Intelligent Transport Systems Strategy Andrew Walsh

Municipality of Sofia Traffic Master Plan. Intelligent Transport Systems Strategy Andrew Walsh Municipality of Sofia Traffic Master Plan Intelligent Transport Systems Strategy Andrew Walsh Introduction Presentation to describe an ITS Strategy for Sofia developed as part of the Sofia Traffic Master

More information

Progress update on the Sustainable Movement Corridor scheme Guildford Borough Council, June 2016

Progress update on the Sustainable Movement Corridor scheme Guildford Borough Council, June 2016 Progress update on the Sustainable Movement Corridor scheme Guildford Borough Council, June 2016 1. Introduction The concept of the Sustainable Movement Corridor (hereafter the SMC ) was first developed

More information

Improve the livability of our streets by

Improve the livability of our streets by Pedestrian and Traffic Calming Policy March 2018 2 of 6 Neighborhood Traffic Calming Policy The City of Aspen continually strives to protect multimodal function while maintaining a high standard of safety.

More information

TRAFFIC ADVISORY LEAFLET

TRAFFIC ADVISORY LEAFLET TRAFFIC ADVISORY LEAFLET 2/04 Rural traffic calming: Bird Lane, Essex INTRODUCTION Many rural communities are concerned about traffic growth and high vehicle speeds. Local authorities have to balance the

More information

2. Context. Existing framework. The context. The challenge. Transport Strategy

2. Context. Existing framework. The context. The challenge. Transport Strategy Transport Strategy Providing quality connections Contents 1. Introduction 2. Context 3. Long-term direction 4. Three-year priorities 5. Strategy tree Wellington City Council July 2006 1. Introduction Wellington

More information

Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy

Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy Adopted January 6, 2014 Town of Mooresville Development Services Department TOWN OF MOORESVILLE NEIGHBORHOOD TRAFFIC

More information

20mph. We want to make Edinburgh a better and safer place to live, work and play.

20mph. We want to make Edinburgh a better and safer place to live, work and play. 20mph CREATING A BETTER SAFER EDINBURGH We want to make Edinburgh a better and safer place to live, work and play. That s why on 13 January 2015 Councillors approved a new speed limit network for Edinburgh

More information

Improving the Bus Network through Traffic Signalling. Henry Axon Transport for London

Improving the Bus Network through Traffic Signalling. Henry Axon Transport for London Improving the Bus Network through Traffic Signalling Henry Axon Transport for London Improving the Bus Network through Traffic Signalling Introduction Transport for London (TfL) operates the most frequent

More information

A guide to how local communities can change local speed limits

A guide to how local communities can change local speed limits A guide to how local communities can change local speed limits The Council s approach to speed management Speeding continues to be one of the key road safety concerns being raised by local communities.

More information

High 2010 Medium 2010/11. PCT NHS Darlington Primary Care Trust HPC DBC DBC. High HPC. Med to High

High 2010 Medium 2010/11. PCT NHS Darlington Primary Care Trust HPC DBC DBC. High HPC. Med to High Hurworth Parish Plan 2010 Actions In this action plan cost ranges are: Low up to 499 Med - 500 to 4,999 High 5,000+ Very - Over 20,000 Hurworth Parish Council Darlington Borough Council MSG Middleton St

More information